Items with Subject: contract formation
Ab Rani, N I; Ismail, S; Mohamed, Z; Hussain, A H and Ghafourian, K (2018) Local contractors' awareness on competitiveness towards liberalisation and globalisation in the Malaysian construction industry. Journal of Construction in Developing Countries, 23(1), pp. 21-42. ISSN 1823-6499
Abaza, M and Kisi, K (2024) Improper risk management outcomes and lessons learned from an EPC water transmission project. Journal of Construction Engineering and Management, 150(11): 05024012, ISSN 0733-9364
Abdel Aziz, A M (2021) The practice of roadway safety management in public-private partnerships. Journal of Construction Engineering and Management, 147(12): 04021173, ISSN 0733-9364
AbdelMagid, M H (2024) Navigating the anticipation-adaptation paradigms: Evaluating the decision-making pathways of critical infrastructure resilience planning. PhD thesis, Florida State University, USA.
Addy, M N; Adinyira, E; Dadzoe, F and Opoku, D (2022) The market for green buildings in Sub-Saharan Africa: Experts' perspective on the economic benefits in Ghana. Journal of Construction in Developing Countries, 27(1), pp. 173-188. ISSN 1823-6499
Adzivor, E K; Emuze, F and Das, D K (2023) Indicators for safety culture in SME construction firms: A Delphi study in Ghana. Journal of Financial Management of Property and Construction, 28(3), pp. 293-316. ISSN 1366-4387
Agapiou, A and Dainty, A R J (2003) Client-led approaches to increasing participation of women, ethnic minorities and disabled people in the construction workforce: A framework for change. Journal of Construction Procurement, 9(2), pp. 4-16. ISSN 1358-9180
Ahlstrand, R (2022) Structures of subcontracting: Work organisation, control, and labour in the Swedish building sector. PhD thesis, Lund University, Sweden.
Ahmed, M O; Abdul Nabi, M; El-Adaway, I H; Caranci, D; Eberle, J; Hawkins, Z and Sparrow, R (2021) Contractual guidelines for promoting integrated project delivery. Journal of Construction Engineering and Management, 147(11): 05021008, ISSN 0733-9364
Al-Mohammad, M S; Haron, A T; Esa, M; Aloko, M N; Alhammadi, Y; Anandh, K S and Rahman, R A (2023) Factors affecting BIM implementation: Evidence from countries with different income levels. Construction Innovation, 23(3), pp. 683-710. ISSN 1471-4175
Alfadhli, A (2013) Does the alternative dispute resolution have a role to play in the construction industry in the State of Kuwait?: look into the most appropriate methodology that may be taken in Kuwait in comparison with what are available in the English legal system. PhD thesis, University of Southampton, UK.
Almarri, K; Aljarman, M and Boussabaine, H (2019) Emerging contractual and legal risks from the application of building information modelling. Engineering, Construction and Architectural Management, 26(10), pp. 2307-2325. ISSN 0969-9988
Alshboul, O. and Shehadeh, A. (2026) Enhancing infrastructure project outcomes through optimized contractual structures and long-term warranties. Engineering, Construction and Architectural Management, 33(3), pp. 2220-2242. ISSN 0969-9988
Anastasopoulos, P C; Haddock, J E and Peeta, S (2014) Cost overrun in public-private partnerships: Toward sustainable highway maintenance and rehabilitation. Journal of Construction Engineering and Management, 140(6): 4014018, ISSN 0733-9364
Anund Vogel, J (2020) Incentivising Innovation in the Swedish Construction Industry. PhD thesis, KTH Royal Institute of Technology, Sweden.
Arditi, D and Alavipour, S M R (2019) Trends in expectations about duties and responsibilities of construction managers. Journal of Construction Engineering and Management, 145(7): 04019037, ISSN 0733-9364
Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(1), pp. 15-27. ISSN 01446193
Arkani, S (1999) Contractual interfaces: the implications of building production process management and interorganisational relations for productivity in building project coalitions. PhD thesis, University of Greenwich, UK.
Assaad, R; El-Adaway, I H; El Hakea, A H; Parker, M J; Henderson, T I; Salvo, C R and Ahmed, M O (2020) Contractual perspective for BIM utilization in US construction projects. Journal of Construction Engineering and Management, 146(12): 04020128, ISSN 0733-9364
Awad, A M (2005) The interaction between project finance of a large-scale construction project and macroeconomic indicators and policies. PhD thesis, University of Nottingham, UK.
Badger, W W and Mulligan, D E (1995) An implementation model of an alliance. Journal of Construction Procurement, 1(1), pp. 21-37. ISSN 1358-9180
Baggett, B L (1988) Analysis of the role of financial engineering in the marketing of major international construction projects. DBA thesis, George Washington University, USA.
Bhatt, N and Sarkar, D (2020) Evaluation of success and risk factors for highway project performance through integrated analytical hierarchy process and fuzzy interpretive structural modelling. International Journal of Construction Management, 20(6), pp. 653-665. ISSN 1562-3599
Binions, O (2019) A study of corruption using the Institutional Analysis and Development framework with an application to the bidding phase of infrastructure procurement. PhD thesis, University College London, UK.
Bond, S and Dermisi, S (2017) Using GIS to measure the impact of the Canterbury earthquakes on house prices in Christchurch, NZ. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 123-138. ISSN 1759-5916
Brooker, P (2011) Towards a code of professional conduct for construction mediators. International Journal of Law in the Built Environment, 3(1), pp. 24-47. ISSN 1756-1450
Brown, D C (2003) A methodology for selecting the construction team. PhD thesis, University of Southampton, UK.
Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.
Calvetti, D; Magalhães, P N M; Sujan, S F; Gonçalves, M C and Campos De Sousa, H J (2020) Challenges of upgrading craft workforce into Construction 4.0: Framework and agreements. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(4), pp. 158-165. ISSN 17514304
Candel, M; Gustavsson, T K and Eriksson, P E (2019) Beyond national building regulations: Exploring public-private negotiations over sustainability requirements. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Cariaga, I and El-Diraby, T E (2013) Assessing the market potential for housing construction products in Mexico. Journal of Construction Engineering and Management, 139(6), pp. 717-725. ISSN 0733-9364
Carmichael, D G; Nguyen, T A and Shen, X (2019) Single treatment of PPP road project options. Journal of Construction Engineering and Management, 145(2): 04018122, ISSN 0733-9364
Celoza, A; De Oliveira, D P and Leite, F (2023) Qualitative analysis of the impact of contracts on information management in AEC projects. Journal of Construction Engineering and Management, 149(3): 04022185, ISSN 0733-9364
Ceran, N (2002) Private participation in infrastructure: A risk analysis of long-term contracts in power sector. PhD thesis, George Mason University, USA.
Chakravarty, S (2002) Essays on contracting in the construction industry. PhD thesis, University of Southern California, USA.
Challender, J; Farrell, P and Sherratt, F (2015) Exploration of factors which affect trust within the context of construction partnering. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Chammout, B; El-Adaway, I H; Abdul Nabi, M and Assaad, R H (2024) Price escalation in construction projects: Examining national and international contracts. Journal of Construction Engineering and Management, 150(9): 04024109, ISSN 0733-9364
Champion, R (2005) Acceleration in construction and engineering contracts. PhD thesis, University of London, UK.
Chan, C H F (2010) To talk or to fight? Collective effects of strategic, cultural, and institutional factors on investors' renegotiation approach in public-private concessions. PhD thesis, Stanford University, USA.
Charlson, J; Baldwin, R and Harrison, J (2014) Early perceptions of allowing adjudication of oral contracts. International Journal of Law in the Built Environment, 6(3), pp. 233-249. ISSN 1756-1450
Chen, Q; Christy, A; Owens, M; Bortz, D; Greene, W and King, B (2012) Two-plus-two construction management programs and articulation agreements. International Journal of Construction Education and Research, 8(1), pp. 4-25. ISSN 1557-8771
Cheung, F K T; Wong, M W L and Skitmore, M (2008) A study of clients' and estimators' tolerance towards estimating errors. Construction Management and Economics, 26(4), pp. 349-362. ISSN 1466433X
Chiu, W Y B and Lai, J H K (2020) Building information modelling for building services engineering: Benefits, barriers and conducive measures. Engineering, Construction and Architectural Management, 27(9), pp. 2221-2252. ISSN 0969-9988
Chovichien, V and Suriyanon, N (2011) Attitudes of people in the Thai construction industry sector on issues related to delay in the approval of submittals. Journal of Construction in Developing Countries, 16(1), pp. 41-67. ISSN 1823-6499
Chowdhury, A N; Chen, P H and Tiong, R L K (2011) Analysing the structure of public-private partnership projects using network theory. Construction Management and Economics, 29(3), pp. 247-260. ISSN 1466433X
Collinge, W H (2025) Advancing social practice understandings of digital innovation delivery in construction project management. Engineering, Construction and Architectural Management, 32(7), pp. 4611-4630. ISSN 0969-9988
Cooke, John Richard (1973) Methods of documentation and administration of building contracts. PhD thesis, University of New South Wales, Australia.
Coolican, Alice Maeve (1989) A history of industrial relations in the Sydney building trades, 1870-1914. PhD thesis, University of New South Wales, Australia.
Dainty, A R J; Briscoe, G H and Millett, S J (2001) Subcontractor perspectives on supply chain alliances. Construction Management and Economics, 19(8), pp. 841-848. ISSN 01446193
Davis II, D C E (2023) Algorithmic design in recommender systems: Expanding DBE participation in the U.S. construction industry. DBA thesis, University of South Florida, USA.
Delaney, J W (2018) The effect of competition on bid quality and final results on state dot projects. PhD thesis, State University of New York at Buffalo, USA.
Dias, A and Ioannou, P G (1995) Debt capacity and optimal capital structure for privately financed infrastructure projects. Journal of Construction Engineering and Management, 121(4), pp. 404-414. ISSN 0733-9364
Diekmann, J E (2007) Past perfect: Historical antecedents of modern construction practices. Journal of Construction Engineering and Management, 133(9), pp. 652-660. ISSN 0733-9364
Dlakwa, M M (1990) Analysis of some problems in the management and cost control of public sector construction projects in Nigeria. PhD thesis, University of Stirling, UK.
Donohoe, S and Coggins, J K (2016) Framework agreements in a post-recession economy. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Druker, J and Croucher, R (2000) National collective bargaining and employment flexibility in the European building and civil engineering industries. Construction Management and Economics, 18(6), pp. 699-709. ISSN 01446193
Duffield, C (1998) Commercial viability of privately financed heating systems in Europe: A case study. Engineering, Construction and Architectural Management, 5(1), pp. 3-8. ISSN 0969-9988
Duffield, Colin F (2001) An evaluation framework for privately funded infrastructure projects in Australia. PhD thesis, University of Melbourne, Australia.
Evans, M (2022) Strategic frameworks for managing lean construction on megaprojects: towards global integrated delivery and corporate governance. PhD thesis, University of Bolton, UK.
Famakin, I O; Aje, I O and Ogunsemi, D R (2012) Assessment of success factors for joint venture construction projects in Nigeria. Journal of Financial Management of Property and Construction, 17(2), pp. 153-165. ISSN 1366-4387
Faris, H; Gaterell, M and Hutchinson, D (2022) Investigating underlying factors of collaboration for construction projects in emerging economies using exploratory factor analysis. International Journal of Construction Management, 22(3), pp. 514-526. ISSN 1562-3599
Faris, H M A (2020) Improving project collaboration to minimise the energy performance gap in residential construction: case study of Kurdistan. PhD thesis, University of Portsmouth, UK.
Fatima, Zahra (2024) Pakistan's international investment policy: Towards a new generation of fair and equitable treatment provisions. PhD thesis, Canterbury Christ Church University, UK.
Fauzi, F Z and Kusumasari, B (2020) Public-private partnership in Western and non-Western countries: A search for relevance. Journal of Financial Management of Property and Construction, 26(1), pp. 87-102. ISSN 1366-4387
Finnie, D; Ameer Ali, N and Park, K (2021) Early contractor involvement: a review of pre-construction service agreements. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(4), pp. 143-150. ISSN 17514304
Fitch, G J (2019) System dynamics models for the valuation of real options in infrastructure investments. PhD thesis, Columbia University, USA.
Fitch, G J; Odeh, I and William Ibbs, C (2015) Economic sustainability of dbo water based on wastewater projects in the U.S.: Three case studies. Journal of Construction Engineering and Management, 141(5): 05015001, ISSN 0733-9364
Fox, J V S (2014) Incentives and limits in letters of intent: Are they worth the paper they're written on? International Journal of Law in the Built Environment, 6(3), pp. 214-232. ISSN 1756-1450
Franco, L A (2005) Problem structuring methods for collaboration: A conceptual development, with an application to a construction partnership in the UK. PhD thesis, London School of Economics and Political Science, UK.
Frimpong, Y and Oluwoye, J (2003) Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana. Journal of Construction Research, 4(2), pp. 175-187. ISSN 1609-9451
Gad, G M (2012) Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts. PhD thesis, Iowa State University, USA.
Gannon M, M S A J (2013) Tied supply chains in construction projects: Lessons from London underground's public-private-partnership. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Gibbons, T (2013) Management agreements in multi-unit housing developments: Existing models and the New Zealand unit titles acts. International Journal of Law in the Built Environment, 5(1), pp. 40-52. ISSN 17561469
Gibbons, T N (2013) Management agreements in multi-unit housing developments: A case study in regulation and remedies. International Journal of Law in the Built Environment, 5(3), pp. 207-221. ISSN 17561469
Gidado, K and Smilas, M (2004) Development of a model for implementation of PFI/PPP in Cyprus. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Graafland, J and Nijhof, A (2007) Transparency, market operation and trust in the Dutch construction industry: An exploratory study. Construction Management and Economics, 25(2), pp. 195-205. ISSN 1466433X
Gransberg, D D; Dillon, W D; Reynolds, L and Boyd, J (1999) Quantitative analysis of partnered project performance. Journal of Construction Engineering and Management, 125(3), pp. 161-166. ISSN 0733-9364
Greenwood, D; Walker, P and Walker, A (2008) The world turned upside-down: Architects as subcontractors in design-and-build contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Greenwood, D J (2001) Power and proximity: A study of subcontract formation in the UK building industry. PhD thesis, University of Reading, UK.
Griffey, T (2011) Black power's labor politics: The united construction workers association and Title VII law in the 1970s. PhD thesis, University of Washington, USA.
Gruneberg, S (2013) Strategy framework for post-construction contractor services. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Gupta, M; Hasan, A; Jain, A K and Jha, K N (2018) Site amenities and workers' welfare factors affecting workforce productivity in Indian construction projects. Journal of Construction Engineering and Management, 144(11): 04018101, ISSN 0733-9364
Gurgun, A P and Koc, K (2023) The role of contract incompleteness factors in project disputes: A hybrid fuzzy multi-criteria decision approach. Engineering, Construction and Architectural Management, 30(9), pp. 3895-3926. ISSN 0969-9988
Hall, A T; Durdyev, S; Koc, K; Ekmekcioglu, O and Tupenaite, L (2023) Multi-criteria analysis of barriers to building information modeling (BIM) adoption for SMEs in new zealand construction industry. Engineering, Construction and Architectural Management, 30(9), pp. 3798-3816. ISSN 0969-9988
Haltenhoff, C E (1987) Construction management performance under dual services agreements. Journal of Construction Engineering and Management, 113(4), pp. 640-647. ISSN 0733-9364
Hampton, P (2016) Influencing the undergraduate built environment curricula through stakeholder understandings of built environment employability skills. DProf thesis, Middlesex University, UK.
Han, S H (1999) Risk-based go/no-go decision making model for international construction projects: The cross-impact analysis approach. PhD thesis, University of Colorado at Boulder, USA.
Han, S H and Diekmann, J E (2001) Approaches for making risk-based go/no-go decision for international projects. Journal of Construction Engineering and Management, 127(4), pp. 300-308. ISSN 0733-9364
Harper, C M (2014) Measuring project integration using relational contract theory. PhD thesis, University of Colorado at Boulder, USA.
Hasan, R (2025) Megaproject announcements' impact on firm value: Evidence from international project finance deals. PhD thesis, Southern New Hampshire University, USA.
Heidemann, A and Gehbauer, F (2011) The way towards cooperative project delivery. Journal of Financial Management of Property and Construction, 16(1), pp. 19-30. ISSN 1366-4387
Heredia-Rojas, B; Liu, L and Taborda, L (2015) Relational approach of value creation for construction project delivery: A conceptual framework. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Hernández, J M A (2024) Essays on public policy evaluation: The case of spain's supplier payment plan. PhD thesis, University of Exeter, UK.
Hinze, J; Hirakawa, J and Benjamin, N (1989) Comparison of labor agreements. Journal of Construction Engineering and Management, 115(1), pp. 90-107. ISSN 0733-9364
Hirano, S; Kayumba, E; Grafweg, A and Kelman, I (2011) Developing Rwanda's schools infrastructure standards and guidelines. International Journal of Disaster Resilience in the Built Environment, 2(1), pp. 30-46. ISSN 1759-5916
Hochstatter, Kirk (2025) Collaborative project delivery governance and shared leadership in AEC building virtual teams. PhD thesis, University of Washington, USA.
Hughes, W P (1997) Construction management contracts: Law and practice. Engineering, Construction and Architectural Management, 4(1), pp. 59-79. ISSN 0969-9988
Hunter, K and Kelly, J (2004) Value management workshops and partnering conundrums. Journal of Construction Procurement, 10(1),
Ivanoff, D J and Diekmann, J E (1989) Project-labor agreements in construction industry. Journal of Construction Engineering and Management, 115(4), pp. 567-584. ISSN 0733-9364
Jenkins, A W (1984) Social policy and construction wage formation: The Alberta experience. Construction Management and Economics, 2(1), pp. 25-36. ISSN 01446193
Jensen Jr, D A and Craig Jr, J W (1998) Testing the validity of liquidated damages clauses: Measuring the application preference and consistency of the intent test as applied by the United States court system. Construction Management and Economics, 16(3), pp. 269-281. ISSN 01446193
Jin, H; Liu, S; Li, J and Liu, C (2023) Determination of government guarantee and revenue cap in public-private partnership contracts. Engineering, Construction and Architectural Management, 30(2), pp. 393-414. ISSN 0969-9988
Jonker-Hoffrén, P (2023) Policy tensions in demolition: Dutch social housing and circularity. Buildings & Cities, 4(1), pp. 405-421. ISSN 2632-6655
Jun, J B (2008) Valuation of governmental guarantee in BOT project finance with real option analysis. PhD thesis, Texas A&M University, USA.
Karmakar, S (2025) Third-party quality control concept, methodology, and implementation in the building and housing construction industry in India. International Journal of Construction Management, 25(9), pp. 1021-1031. ISSN 1562-3599
Ke, Y; Davis, P and Jefferies, M (2016) A conceptual model of psychological contracts in construction projects. Construction Economics and Building, 16(3), pp. 20-37. ISSN 2204-9029
Kelly, J and Hunter, K (2002) Using value management techniques to set up partnering agreements. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Keyser, A (2012) Funding model for bulk raw water infrastructure in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 55-64. ISSN 17514312
Khalifa, M; Farrell, P and Emam, H (2015) The concept of partnering in public–private partnership projects in the United Arab Emirates. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 277-284. ISSN 17514304
Khamaksorn, A (2019) Knowledge transfer processes in international construction joint venture projects in Thailand. PhD thesis, Oxford Brookes University, UK.
Khoza, R B M (2021) Performance measurements on concession periods to forecast water infrastructure investment returns. PhD thesis, Walden University, USA.
Kim, K (2002) Distributed coordination of project schedule changes: An agent-based compensatory negotiation approach. PhD thesis, Stanford University, USA.
Korkmaz, S; Riley, D and Horman, M (2011) Assessing project delivery for sustainable, high-performance buildings through mixed methods. Architectural Engineering and Design Management, 7(4), pp. 266-274. ISSN 1745-2007
Ku, S; Jo, H; Sim, J and Moon, W S (2024) Competitive performance of public–private partnerships: unsolicited proposal projects and tendering rules in South Korea. Construction Management and Economics, 42(8), pp. 714-740. ISSN 01446193
Kulczak-Dawkins, R P (2021) Managing sustainability through architectural design decision processes: influences of values and frames. PhD thesis, University of Brighton, UK.
Kuru, K and Artan, D (2020) A canvas model for risk assessment and performance estimation in public-private partnerships. International Journal of Construction Management, 20(6), pp. 704-719. ISSN 1562-3599
Kwawu, W and Hughes, W P (2005) The impact of relational contracting on the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kwawu, W E K (2009) Relational contracting in the UK construction sector. PhD thesis, University of Reading, UK.
Lamb, D J and Merna, T (2004) Reappraisal of public private partnerships: An overview of refinancing, restructuring and termination. Journal of Financial Management of Property and Construction, 9(3), pp. 155-162. ISSN 1366-4387
Laryea, S (2016) Compensation events in NEC3 contracts: Case studies from South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(2), pp. 49-64. ISSN 17514304
Leicht, R and Harty, C (2017) Influence of multiparty IPD contracts on construction innovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Leshinsky, R (2012) Use of planning agreements to support sustainability and environmental preservation: A case study from Victoria, Australia. International Journal of Law in the Built Environment, 4(2), pp. 157-172. ISSN 1756-1450
Li, B; Akintoye, A; Edwards, P J and Hardcastle, C (2004) Value for money factors in the development of PPP/PFI Construction projects. Journal of Financial Management of Property and Construction, 9(1), pp. 43-52. ISSN 1366-4387
Lihua, R and Greenwood, D (2000) Technology transfer in international joint venture projects in China. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Liu, A M M and Fellows, R (2001) An eastern perspective on partnering. Engineering, Construction and Architectural Management, 8(1), pp. 1-19. ISSN 0969-9988
Lopez Del Puerto, C and Shane, J S (2014) Keys to success in megaproject management in Mexico and the United States: Case study. Journal of Construction Engineering and Management, 140(4): B5013001, ISSN 0733-9364
Luise Valencia Gluyas, J (2004) Public-private participation in water infrastructure in Mexico. PhD thesis, University of Leeds, UK.
Maci, M (2010) Bid rigging in the EU public procurement markets. PhD thesis, Queen Mary University of London, UK.
Madziva, T J (2018) The effect of partnering, infrastructure gaps and currency weakness on the cost of an infrastructure-building nonmarket strategy in emerging markets. PhD thesis, University of Pretoria, South Africa.
Maloney, W F and McFillen, J M (1986) Motivation in unionized construction. Journal of Construction Engineering and Management, 112(1), pp. 122-136. ISSN 0733-9364
Maloney, W F and McFillen, J M (1995) Job characteristics: Union-nonunion differences. Journal of Construction Engineering and Management, 121(1), pp. 43-54. ISSN 0733-9364
Mante, J (2014) Resolution of construction disputes arising from major infrastructure projects in developing countries: case study of Ghana. PhD thesis, University of Wolverhampton, UK.
Matthews, J and Rowlinson, S (1999) Partnering: Incorporating safety management. Engineering, Construction and Architectural Management, 6(4), pp. 347-357. ISSN 0969-9988
May, Margaret Gabrielle (2016) An unusual shade of green: Greenfield cases and greenfield agreements in Australia 2006-2012. PhD thesis, Griffith University, Australia.
McFillen, J M and Maloney, W F (1988) New answers and new questions in construction worker motivation. Construction Management and Economics, 6(1), pp. 35-48. ISSN 01446193
Miller, K S (1988) The causes of decentralization of the bargaining structure in the construction industry in the state of Ohio. PhD thesis, Ohio State University, USA.
Millett, S J; Dainty, A R J; Briscoe, G H and Neale, R H (2000) Towards an integrated construction supply network: Sub-contractors perspectives. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Mirzaee, A M; Pourrostam, T; Majrouhi Sardroud, J; Hosseini, M R; Rahnamayiezekavat, P and Edwards, D (2024) Dispute root causes and prevention in Iranian public-private partnership projects: A causal-predictive model. Engineering, Construction and Architectural Management, 31(1), pp. 405-431. ISSN 0969-9988
Mojela, T. W.; Laryea, S.; Zungu, Z. and Kwasafo, O. K. (2026) Client and contractor experiences in framework construction agreements in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 154-168. ISSN 1751-4304
Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.
Nguyen, V T; Do, S T; Tran, C N N and Vo, M D (2024) Assessing the impact of the traits of payment delay causes on subcontractor's business performance in construction projects: A case study in Vietnam. International Journal of Construction Management, 24(11), pp. 1259-1269. ISSN 1562-3599
Ojo, A E and Akinradewo, F O (2011) Essentials in arbitration clause for construction contract dispute resolution in Nigeria. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Ojode, L A (2000) A resource -based view of strategic alliances: Organizational capabilities, governance, and performance. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Okwilagwe, O (2017) Collaboration processes in partnership working: local regeneration in Nigeria. PhD thesis, Bournemouth University, UK.
Olayinka Agboola, A; Ayodele, T O and Olofa, A (2018) Tax increment financing in the UK and USA: Its prospects for urban regeneration in Nigeria. Smart and Sustainable Built Environment, 7(3-4), pp. 277-292. ISSN 2046-6099
Olubajo, O O and Daniel, E I (2024) Understanding a worker recruitment as a practice of informality in construction work packages. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Omer, M M; Moyo, T; Al-Otaibi, A; Alawag, A M; Rizal Alias, A and Rahman, R A (2025) Critical factors affecting workplace well-being at construction sites across countries with different income levels. Construction Innovation, 25(1), pp. 104-130. ISSN 1471-4175
Owusu-Manu, D G; Ghansah, F A; Darko, A; Asiedu, R O and Edwards, D J (2020) Insurable and non-insurable risks in complex project deals: Case of the Ghanaian construction industry. Journal of Engineering, Design and Technology, 18(6), pp. 1971-1995. ISSN 1726-0531
Palacios, J L; Gonzalez, V and Alarcón, L F (2014) Selection of third-party relationships in construction. Journal of Construction Engineering and Management, 140(4): B4013005, ISSN 0733-9364
Pietroforte, R (1992) Communication and information in the building delivery process. PhD thesis, Massachusetts Institute of Technology, USA.
Pinheiro, Gustavo Focesi (2022) The importance of municipal public policies for the design of sustainable buildings and cities: Focus on the city of Campinas – SP. PhD thesis, Universidade Estadual de Campinas, Brazil.
Pinheiro, Gustavo Focesi (2022) The importance of municipal public policies for the design of sustainable buildings and cities. Unpublished PhD thesis, Universidade Estadual de Campinas, Brazil.
Pishdad-Bozorgi, P (2017) Case studies on the role of integrated project delivery approach on the establishment and promotion of trust. International Journal of Construction Education and Research, 13(2), pp. 102-23. ISSN 1557-8771
Poulsom, M W (2017) S.62 LPA 1925: Restating the case for reform. International Journal of Law in the Built Environment, 9(1), pp. 79-91. ISSN 1756-1450
Primdahl, M B; Forman, M; Frandsen, A F; Pihl, D and Nielsen, A K B (2022) Does the enactment of information and communications technology agreements in a digital construction organisation impact the mental work environment? In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Ramachandra, T (2013) Exploring feasible solutions to payment problems in the construction industry in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.
Razak, D S A; Mills, G and Roberts, A (2018) How do infrastructure owners build capabilities to reduce operational failure? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Reaney, M; Griffith, A; Watson, P A and Ellis, C (2001) Construction cost control implications for the planning application process. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Retamal, F; Salazar, L A and Alarcón, L F (2022) Online monitoring and implementation of commitment management performance and its impact on project planning in four construction projects. Journal of Construction Engineering and Management, 148(10): 05022011, ISSN 0733-9364
Rich, Jeffrey R (1993) Victorian building workers and unions 1856-90. PhD thesis, Australian National University, Australia.
Rosander, L and Kadefors, A (2023) Implementing relational contracting in a public client organization: The influence of policy clashes, resources and project autonomy. Construction Management and Economics, 41(8), pp. 651-669. ISSN 01446193
Ross, A D (2005) A model of contingency factors affecting contractors' economic organisation of projects. PhD thesis, University of Salford, UK.
Rotimi, F E (2013) An evaluative framework for defects in new residential buildings: The New Zealand case. PhD thesis, Auckland University of Technology, New Zealand.
Roy, S; Majumder, S; Bhattacharya, S and Sardar, I H (2021) Simulation and analysis of the effects of room surface reflectance combinations on a proposed retrofit illumination system of an office. Journal of Engineering, Design and Technology, 19(6), pp. 1620-1647. ISSN 1726-0531
Rueda-Benavides, J; Gransberg, D; Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(1), pp. 1-15. ISSN 01446193
Ruiz, A; Vinke-De Kruijf, J; Santos, J; Keijzer, E; Volker, L and Dorée, A (2024) The slow implementation of sustainable innovations in the asphalt paving sector: the role of actors and their interactions. Construction Management and Economics, 42(10), pp. 902-925. ISSN 01446193
Sarie Eldin, H S (1995) Consortia agreements in the international construction industry: With special reference to Egypt. PhD thesis, Queen Mary University of London, UK.
Shahin, Y; Eid, M S; Ahmed, H and Elhakeem, A (2025) Towards a more stable Construction Joint Venture agreement: individual rationality vs. fairness. International Journal of Construction Management, 25(2), pp. 161-170. ISSN 1562-3599
Shi, L; Wang, Y and Onishi, M (2024) Tie-formation mechanisms in evolving networks of sponsors in highway public-private partnerships. Journal of Construction Engineering and Management, 150(10): 04024128, ISSN 0733-9364
Shields, R and West, K (2003) Innovation in clean-room construction: A case study of co-operation between firms. Construction Management and Economics, 21(4), pp. 337-344. ISSN 01446193
Shipton, C (2013) Making changes: an ethnography of client changes on a construction project. PhD thesis, University of Reading, UK.
Shipton, C; Hughes, W P and Tutt, D (2014) Change management in practice: An ethnographic study of changes to contract requirements on a hospital project. Construction Management and Economics, 32(7-8), pp. 787-803. ISSN 01446193
Shrestha, R B and Ogunlan, S (2006) Comparative study of power purchase agreements in the Nepalese environment. Journal of Financial Management of Property and Construction, 11(3), pp. 133-148. ISSN 1366-4387
Silva, P M; Domingo, N and Ameer Ali, N A N (2025) An interactive pre-contract dispute avoidance toolkit for New Zealand construction industry. Construction Innovation, 25(7), pp. 268-291. ISSN 1471-4175
Stanford, M S and Molenaar, K R (2018) Influence of simplified procurement methods on competition for public sector construction. Journal of Construction Engineering and Management, 144(2): 04017105, ISSN 0733-9364
Steel, A C (1985) The diffusion of working time innovations in manufacturing and construction industry. PhD thesis, Brunel University, UK.
Sunikka, M and Boon, C (2003) Environmental policies and efforts in social housing: The Netherlands. Building Research & Information, 31(1), pp. 1-12. ISSN 0961-3218
Sözen, Z and Kucediluk, M A (1999) Secondary subcontracting in the Turkish construction industry. Construction Management and Economics, 17(2), pp. 215-220. ISSN 01446193
Taiwo, D O (2022) Incremental development of a legal framework for arbitration in emerging markets: A case study of construction arbitration in Nigeria. PhD thesis, University of Essex, UK.
Thilakarathne, N; Rathnasinghe, A P; Kulatunga, U; Thurairajah, N and Weerasinghe, L (2023) An investigation of the conflict management strategies in international construction joint ventures of Sri Lanka. Journal of Financial Management of Property and Construction, 28(3), pp. 273-292. ISSN 1366-4387
Thomas, H R; Heuer, D W and Filippelli, R L (1984) Settlement of construction jurisdictional disputes. Journal of Construction Engineering and Management, 110(2), pp. 165-177. ISSN 0733-9364
Tsao, C C Y; Tommelein, I D; Swanlund, E S and Howell, G A (2004) Work structuring to achieve integrated product-process design. Journal of Construction Engineering and Management, 130(6), pp. 780-789. ISSN 0733-9364
Tutesigensi, A and Oak, D P (2007) Feasibility of collaborative working at the second tier subcontractor level in a prime contract. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Ugwu, O O and Haupt, T C (2005) Key performance indicators for infrastructure sustainability: a comparative study between Hong Kong and South Africa. Journal of Engineering, Design and Technology, 3(1), pp. 30-43. ISSN 1726-0531
Vacanas, Y and Danezis, C (2021) An overview of the risk of delay in Cyprus construction industry. International Journal of Construction Management, 21(4), pp. 369-381. ISSN 1562-3599
Velho Júnior, V E; Costa Melo, I; Alves Junior, P N and Rebelatto, D A N (2019) Analysis of real estate management of lease service agreements by the public sector of a latin American metropolis: São Paulo. Journal of Financial Management of Property and Construction, 24(1), pp. 97-122. ISSN 1366-4387
Vogel, J A; Lind, H and Holm, C (2019) Incentivising innovation in the construction sector: The role of consulting contracts. Construction Economics and Building, 19(2), pp. 181-196. ISSN 2204-9029
Volker, L; Eriksson, P E; Kadefors, A and Larsson, J (2018) A case-based comparison of the efficiency and innovation potential of integrative and collaborative procurement strategies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Wahab, A; Wang, J; Shojaei, A and Ma, J (2023) A model-based smart contracts system via blockchain technology to reduce delays and conflicts in construction management processes. Engineering, Construction and Architectural Management, 30(10), pp. 5052-5072. ISSN 0969-9988
Walker, D H T; Peters, R J; Hampson, K D and Thompson, M J (2001) Achieving a responsive industrial relations environment for construction industry workers: A project alliancing case study. Construction Innovation, 1(4), pp. 211-225. ISSN 1471-4175
Wang, S Q; Tiong, R L K; Ting, S K and Ashley, D (2000) Evaluation and management of foreign exchange and revenue risks in China's BOT projects. Construction Management and Economics, 18(2), pp. 197-207. ISSN 01446193
Watts, G (2019) Measuring and managing the social value created by a diverse construction business. PhD thesis, Loughborough University, UK.
Watts, G; Dainty, A and Fernie, S (2019) Measuring social value in UK construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Whang, S-W (2017) The influence of design-production management at the pre-production stage for major international projects in Korea. PhD thesis, University of Reading, UK.
Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Xiong, W and Zhang, X (2014) Concession renegotiation models for projects developed through public-private partnerships. Journal of Construction Engineering and Management, 140(5): 04014008, ISSN 0733-9364
Yates, I and Povall, J (2011) Managing uk highways act section 278 projects: a collaborative approach. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 117-128. ISSN 17514312
Yu, K W (2014) The economics of construction price inflation: measurement, output and productivity. PhD thesis, University College London, UK.
Zarkada, A (1998) Tendering ethics: A study of collusive tendering from a marketing perspective. PhD thesis, Queensland University of Technology, Australia.
Zuppa, D (2009) Model for developing trust in construction management. PhD thesis, University of Florida, USA.
Up a level