Items with Subject: construction planning

Number of items: 344.

Aalami, F B (1998) Using construction method models to generate four-dimensional production models. PhD thesis, Stanford University, USA.

Abdel-Fattah, A (2013) Dynamic site layout planning model. PhD thesis, University of Calgary, Canada.

Abdelmohsen, A Z (2016) Optimizing the construction planning of highway work zones. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Abdullah, A H; Yaman, S K; Mohammad, H and Hassan, P F (2018) Construction manager's technical competencies in Malaysian construction projects. Engineering, Construction and Architectural Management, 25(2), pp. 153-177. ISSN 0969-9988

Adedokun, O; Egbelakin, T and Omotayo, T (2024) Random forest and path diagram taxonomies of risks influencing higher education construction projects. International Journal of Construction Management, 24(1), pp. 66-74. ISSN 1562-3599

Aiyin, J and Yimin, Z (2010) A multi-stage approach to time-cost trade-off analysis using mathematical programming. International Journal of Construction Management, 10(3), pp. 13-27. ISSN 1562-3599

Akinnola, P (2021) Improving project performance on construction projects through stakeholder management-an action research inquiry. PhD thesis, University of Liverpool, UK.

Akintoye, A and Fitzgerald, E (2000) A survey of current cost estimating practices in the UK. Construction Management and Economics, 18(2), pp. 161-172. ISSN 01446193

Aksözen, M; Hassler, U; Rivallain, M and Kohler, N (2017) Mortality analysis of an urban building stock. Building Research & Information, 45(3), pp. 259-277. ISSN 0961-3218

Al-Tawal, D R; Arafah, M and Sweis, G J (2021) A model utilizing the artificial neural network in cost estimation of construction projects in Jordan. Engineering, Construction and Architectural Management, 28(9), pp. 2466-2488. ISSN 0969-9988

AlSaggaf, A and Jrade, A (2023) Arcspat: An integrated building information modeling (BIM) and geographic information system (GIS) model for site layout planning. International Journal of Construction Management, 23(3), pp. 505-527. ISSN 1562-3599

AlSehaimi, A (2011) Improving construction planning practice in Saudi Arabia by means of lean construction principles and techniques. PhD thesis, University of Salford, UK.

Ali, K S (2006) Construction project planning: Improving effectiveness of resources allocation. PhD thesis, University College London, UK.

Alkass, S; Mazerolle, M and Harris, F (1996) Construction delay analysis techniques. Construction Management and Economics, 14(5), pp. 375-394. ISSN 01446193

Alkoc, E and Erbatur, F (1998) Simulation in concreting operations: A comparison of models and resource combinations. Engineering, Construction and Architectural Management, 5(2), pp. 159-173. ISSN 0969-9988

Alleman, D and Lee, E B (2020) Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects. Engineering, Construction and Architectural Management, 27(10), pp. 2859-2891. ISSN 0969-9988

Allen, C and Smallwood, J (2008) Improving construction planning through 4D planning. Journal of Engineering, Design and Technology, 6(1), pp. 7-20. ISSN 1726-0531

Almarri, K; Alzahrani, S and Boussabaine, H (2019) An evaluation of the impact of risk cost on risk allocation in public private partnership projects. Engineering, Construction and Architectural Management, 26(8), pp. 1696-1711. ISSN 0969-9988

Alsehaimi, A O; Fazenda, P T and Koskela, L (2014) Improving construction management practice with the last planner system: A case study. Engineering, Construction and Architectural Management, 21(1), pp. 51-64. ISSN 0969-9988

Alshawi, M and Hassan, Z (1999) Integrated models for construction planning: Object flow and relationship. Engineering, Construction and Architectural Management, 6(2), pp. 197-212. ISSN 0969-9988

Alshboul, O; Shehadeh, A; Al-Kasasbeh, M; Al Mamlook, R E; Halalsheh, N and Alkasasbeh, M (2022) Deep and machine learning approaches for forecasting the residual value of heavy construction equipment: A management decision support model. Engineering, Construction and Architectural Management, 29(10), pp. 4153-4176. ISSN 0969-9988

Amany, A; Taghizade, K and Noorzai, E (2020) Investigating conflicts of expert contractors using the last planner system in building information modeling process. Journal of Engineering, Design and Technology, 18(6), pp. 1381-1402. ISSN 1726-0531

Amarkhil, Q.; Alroomi, A. S. and Narimani, M. R. (2026) Leveraging BIM, EPS and constraint programming for automated scheduling: A methodology for structured scheduling data and combinatorial optimization. Engineering, Construction and Architectural Management, 33(3), pp. 1980-2006. ISSN 0969-9988

Amer, F; Koh, H Y and Golparvar-Fard, M (2021) Automated methods and systems for construction planning and scheduling: Critical review of three decades of research. Journal of Construction Engineering and Management, 147(7): 0002093, ISSN 0733-9364

Anderson, S; Shane, J S and Schexnayder, C (2011) Strategies for planned project acceleration. Journal of Construction Engineering and Management, 137(5), pp. 372-381. ISSN 0733-9364

Anson, M; Ying, K C T and Siu, M F F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(8), pp. 1672-1695. ISSN 0969-9988

Aouad, G F; Kawooya, A A O and Price, A D F (1996) Construction planning models: A review of history, capabilities and limitations. Journal of Construction Procurement, 2(2), pp. 19-37. ISSN 1358-9180

Aranda-Mena, G; Sher, W; Gameson, R and Ward, P (2005) Evolving trends in nD modelling: The 'construction planning workbench'. Architectural Engineering and Design Management, 1(2), pp. 111-126. ISSN 1745-2007

Arditi, D and Koseoglu, H (1983) Factors affecting success in network applications in a developing country. Construction Management and Economics, 1(1), pp. 3-16. ISSN 01446193

Artpairin, A and Pinmanee, S (2023) Critical success factors in the management of petrochemical construction projects for contractors and subcontractors during the COVID-19 pandemic. International Journal of Construction Management, 23(11), pp. 1956-1968. ISSN 1562-3599

Atkin, B L (1988) Time-cost planning of construction. PhD thesis, University of Reading, UK.

Bae, J (2025) Supervised learning to covering cost risk through post-construction evaluation of transportation projects by project delivery methods. Engineering, Construction and Architectural Management, 32(9), pp. 5863-5884. ISSN 0969-9988

Baldwin, A; Li, H; Huang, T; Kong, C W; Guo, H L; Chan, N and Wong, J (2009) Supporting pre-tender construction planning with virtual prototyping. Engineering, Construction and Architectural Management, 16(2), pp. 150-161. ISSN 0969-9988

Ballesteros-Pérez, P; Sanz-Ablanedo, E; Soetanto, R; González-Cruz, M C; Larsen, G D and Cerezo-Narváez, A (2020) Duration and cost variability of construction activities: An empirical study. Journal of Construction Engineering and Management, 146(1): 04019093, ISSN 0733-9364

Bangwal, D and Tiwari, P (2019) Environmental design and awareness impact on organization image. Engineering, Construction and Architectural Management, 26(1), pp. 29-45. ISSN 0969-9988

Baniassadi, F; Alvanchi, A and Mostafavi, A (2018) A simulation-based framework for concurrent safety and productivity improvement in construction projects. Engineering, Construction and Architectural Management, 25(11), pp. 1501-1515. ISSN 0969-9988

Bansal, V K (2012) Application areas of GIS in construction projects and future research directions. International Journal of Construction Management, 12(4), pp. 17-36. ISSN 1562-3599

Bansal, V K (2020) Use of GIS to consider spatial aspects in construction planning process. International Journal of Construction Management, 20(3), pp. 207-222. ISSN 1562-3599

Barcia, R M (1985) Construction production planning and optimal control. PhD thesis, University of Waterloo, Canada.

Bhargava, A; Anastasopoulos, P C; Labi, S; Sinha, K C and Mannering, F L (2010) Three-stage least-squares analysis of time and cost overruns in construction contracts. Journal of Construction Engineering and Management, 136(11), pp. 1207-1218. ISSN 0733-9364

Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364

Blyth, K A (2002) A computer model that forecasts the cash flow of building projects at the tender stage using stage payments. PhD thesis, University of Liverpool, UK.

Boateng, P (2014) A dynamic systems approach to risk assessment in megaprojects. PhD thesis, Heriot-Watt University, UK.

Bokor, O; Szenik, G and Kocsis, T (2011) Application of evaluation lines in the analysis of time-type data of project plans. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Borges, Maria Luiza Abath Escorel (2025) Decision-making optimization method for construction site layout planning based on slp and BIM. PhD thesis, Universidade Estadual de Campinas, Brazil.

Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.

Boussabaine, A H and Duff, A R (1996) An expert-simulation system for construction productivity forecasting. Building Research & Information, 24(5), pp. 279-286. ISSN 0961-3218

Bowen, P A (1993) A communication-based approach to price modelling and price forecasting in the design phase of the traditional building procurement process in South Africa. Unpublished PhD thesis, University of Port Elizabeth, South Africa.

Brady, D A; Tzortzopoulos, P; Rooke, J; Formoso, C T and Tezel, A (2018) Improving transparency in construction management: A visual planning and control model. Engineering, Construction and Architectural Management, 25(10), pp. 1277-1297. ISSN 0969-9988

Burns, S A; Liu, L and Feng, C W (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14(3), pp. 265-276. ISSN 01446193

Cajzek, R and Klanšek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), pp. 2474-2508. ISSN 0969-9988

Caldas, C and Gupta, A (2017) Critical factors impacting the performance of mega-projects. Engineering, Construction and Architectural Management, 24(6), pp. 920-934. ISSN 0969-9988

Campbell, K; Clegg, D R; Perera, T; Stephenson, P and Stevens, A (1997) Simulation in the construction industry: A case-study review. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Cao, S; Duan, H; Guo, S; Wu, J; Ai, T and Jiang, H (2024) BIM-based task planning method for wheeled-legged rebar binding robot. Architectural Engineering and Design Management, 20(3), pp. 656-672. ISSN 1745-2007

Carmo, Cristiano Saad Travassos do (2023) A hybrid solution using stochastic and neural networks modeling for the consideration of safety uncertainties in construction planning methods. PhD thesis, Pontifícia Universidade Católica do Rio de Janeiro, Brazil.

Carr, R I J (1971) Synthesis of uncertainty in construction planning. PhD thesis, Stanford University, USA.

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, W H and Lu, M (2008) Materials handling system simulation in precast viaduct construction: Modeling, analysis, and implementation. Journal of Construction Engineering and Management, 134(4), pp. 300-310. ISSN 0733-9364

Charlesraj, V P C; Maheswari, J U; Kalidindi, S N and Varghese, K (2004) Knowledge management for planning construction projects using dependency structure matrix. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Chau, K W; Anson, M and Zhang, J P (2004) Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), pp. 598-606. ISSN 0733-9364

Chen, C (2016) Crane planning optimization for construction. PhD thesis, National University of Singapore, Singapore.

Chen, T; Hu, H and Zhu, F (2020) Developing a hierarchical road layout method for large-scale construction site. Journal of Construction Engineering and Management, 146(9): 04020115, ISSN 0733-9364

Chen, Z (2003) An integrated analytical approach to environmental management in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chen, Z; Li, H and Wong, C T C (2005) Environalplanning: Analytic network process model for environmentally conscious construction planning. Journal of Construction Engineering and Management, 131(1), pp. 92-101. ISSN 0733-9364

Cheng, M Y and O'Connor, J T (1996) Arcsite: Enhanced GIS for construction site layout. Journal of Construction Engineering and Management, 122(4), pp. 329-336. ISSN 0733-9364

Cheng, M Y and Yang, S C (2001) GIS-based cost estimates integrating with material layout planning. Journal of Construction Engineering and Management, 127(4), pp. 291-299. ISSN 0733-9364

Choi, B; Lee, H S; Park, M; Cho, Y K and Kim, H (2014) Framework for work-space planning using four-dimensional BIM in construction projects. Journal of Construction Engineering and Management, 140(9): 04014041, ISSN 0733-9364

Choo, H J (2003) Distributed planning and coordination to support lean construction. PhD thesis, University of California, Berkeley, USA.

Chua, D K H and Yeoh, K W (2011) PDM++: Planning framework from a construction requirements perspective. Journal of Construction Engineering and Management, 137(4), pp. 266-274. ISSN 0733-9364

Cieraad, F D; Schraven, D F J and de Bruijne, M L C (2018) Investments under pressure: A real options approach to prepare for emergency asylum shelter in a multi actor setting. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Cohenca, D; Laufer, A and Ledbetter, W B (1989) Factors affecting construction planning efforts. Journal of Construction Engineering and Management, 115(1), pp. 70-89. ISSN 0733-9364

Cottrell, D S (1995) Enhancing construction productivity through continuous process improvements. PhD thesis, Texas A&M University, USA.

Couto, J P and Teixeira, J C (2005) Using linear model for learning curve effect on highrise floor construction. Construction Management and Economics, 23(4), pp. 355-364. ISSN 01446193

Daniel, E I; Pasquire, C; Dickens, G and Ballard, H G (2017) The relationship between the last planner® system and collaborative planning practice in UK construction. Engineering, Construction and Architectural Management, 24(3), pp. 407-425. ISSN 0969-9988

Darlow, M J (1968) Investigations into line of balance scheduling house building. PhD thesis, Loughborough University, UK.

Davis, S; Davis, T; Howell, D and Leitzke, D (2020) Building engineers and construction managers: The impact of international service projects on the development of undergraduate students. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Dawood, N and Sikka, S (2009) Development of 4D based performance indicators in construction industry. Engineering, Construction and Architectural Management, 16(5), pp. 438-458. ISSN 0969-9988

Del Caño, A and De La Cruz, M P (2002) Integrated methodology for project risk management. Journal of Construction Engineering and Management, 128(6), pp. 473-485. ISSN 0733-9364

Deshpande, S D (1988) Some facility planning techniques for construction site layouts. PhD thesis, Indian Institute of Technology Delhi, India.

Do, Q; Moriyani, M A; Le, T; Le, C and Piratla, K (2025) Enhanced highway project clustering framework to support project cost estimation. Journal of Construction Engineering and Management, 151(1): 04024191, ISSN 0733-9364

Doloi, H; Sawhney, A and Iyer, K C (2012) Structural equation model for investigating factors affecting delay in Indian construction projects. Construction Management and Economics, 30(10), pp. 869-884. ISSN 1466433X

Du, J; Wang, Q and Shi, Q (2019) Description-experience gap under imperfect information: Information continuum and aggressive cost estimating in capital projects. Engineering, Construction and Architectural Management, 26(6), pp. 1151-1170. ISSN 0969-9988

Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.

Durdyev, S (2021) Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management, 28(4), pp. 1241-1260. ISSN 0969-9988

Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.

Echeverry, D (1991) Factors for generating initial construction schedules. PhD thesis, University of Illinois at Urbana-Champaign, USA.

El-Anwar, O and Aziz, T A (2014) Integrated urban-construction planning framework for slum upgrading projects. Journal of Construction Engineering and Management, 140(4): B4014003, ISSN 0733-9364

El-Rayes, K and Khalafallah, A (2005) Trade-off between safety and cost in planning construction site layouts. Journal of Construction Engineering and Management, 131(11), pp. 1186-1195. ISSN 0733-9364

El-Sabek, L M and McCabe, B Y (2018) Coordination challenges of production planning in the construction of international mega-projects in the middle East. International Journal of Construction Education and Research, 14(2), pp. 118-40. ISSN 1557-8771

El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. PhD thesis, Texas A&M University, USA.

El-Sersy, A H E (1992) An intelligent data model for schedule updating. PhD thesis, University of California, Berkeley, USA.

Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193

Elgendi, E M O (2016) An automated dynamic site layout planning system: a case study of Egypt. PhD thesis, University of Salford, UK.

Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3), pp. 401-420. ISSN 1471-4175

Elliott, J W; Thevenin, M K and Bigelow, B F (2017) Promoting CM student success: Establishing an academic performance benchmark given construction-education self-efficacy, motivation and planned behavior. International Journal of Construction Education and Research, 13(4), pp. 284-98. ISSN 1557-8771

Ezzeddine, A; Shehab, L; Lucko, G and Hamzeh, F (2022) Forecasting construction project performance with momentum using singularity functions in LPS. Journal of Construction Engineering and Management, 148(8): 04022063, ISSN 0733-9364

Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.

Faniran, O O; Love, P E D and Li, H (1999) Optimal allocation of construction planning resources. Journal of Construction Engineering and Management, 125(5), pp. 311-319. ISSN 0733-9364

Faniran, O O; Oluwoye, J O and Lenard, D (1994) Effective construction planning. Construction Management and Economics, 12(6), pp. 485-499. ISSN 01446193

Faniran, O O; Oluwoye, J O and Lenard, D J (1998) Interactions between construction planning and influence factors. Journal of Construction Engineering and Management, 124(4), pp. 245-256. ISSN 0733-9364

Farajmandi, M; Ali, M; Hermann, R and AbouRizk, S (2020) A decision support tool for planning module installation in industrial construction. Engineering, Construction and Architectural Management, 27(9), pp. 2615-2641. ISSN 0969-9988

Feng, K (2020) Environmentally friendly construction processes under uncertainty assessment, optimisation and robust decision-making. PhD thesis, Luleå University of Technology, Sweden.

Feng, K; Chen, S; Lu, W; Wang, S; Yang, B; Sun, C and Wang, Y (2023) Embedding ensemble learning into simulation-based optimisation: A learning-based optimisation approach for construction planning. Engineering, Construction and Architectural Management, 30(1), pp. 259-295. ISSN 0969-9988

Feng, K; Wang, S; Lu, W; Liu, C and Wang, Y (2022) Planning construction projects in deep uncertainty: A data-driven uncertainty analysis approach. Journal of Construction Engineering and Management, 148(8): 04022060, ISSN 0733-9364

Fernández, A I; Jarufe, J; Segarra, P and Cavieres, P (2025) Management of construction planning process in massive underground mining by integrating LPS and cit through action research. Journal of Construction Engineering and Management, 151(5): 04025024, ISSN 0733-9364

Ford, D N; Lander, D M and Voyer, J J (2002) A real options approach to valuing strategic flexibility in uncertain construction projects. Construction Management and Economics, 20(4), pp. 343-351. ISSN 01446193

Forman, M (2010) Lean construction and health and safety on site: Analysed in a planning and empowerment perspective. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Formoso, C T (1991) A knowledge based framework for planning house building projects. PhD thesis, University of Salford, UK.

Fulford, R G (2019) The implications of the construction industry to national wealth. Engineering, Construction and Architectural Management, 26(5), pp. 779-793. ISSN 0969-9988

Furusaka, S (1984) A model for the selection of the optimum crane for construction sites. Construction Management and Economics, 2(2), pp. 157-176. ISSN 01446193

Gadisa, B and Zhou, H (2021) Exploring influential factors leading to the poor performance of public construction project in Ethiopia using structural equation modelling. Engineering, Construction and Architectural Management, 28(6), pp. 1683-1712. ISSN 0969-9988

Gao, T; Ergan, S; Akinci, B and Garrett, J H (2014) Proactive productivity management at job sites: Understanding characteristics of assumptions made for construction processes during planning based on case studies and interviews. Journal of Construction Engineering and Management, 140(3): 4013054, ISSN 0733-9364

Gibson, G E; El Asmar, M; Yussef, A and Ramsey, D (2024) A novel approach for measuring the accuracy of front end engineering design. Engineering, Construction and Architectural Management, 31(7), pp. 2669-2696. ISSN 0969-9988

Gidado, K (2004) Enhancing the prime contractor's pre-construction planning. Journal of Construction Research, 5(1), pp. 87-106. ISSN 1609-9451

Gledson, B (2015) Investigating the diffusion of 4D BIM innovation. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Gledson, B (2022) Enhanced model of the innovation-decision process, for modular-technological-process innovations in construction. Construction Innovation, 22(4), pp. 1085-1103. ISSN 1471-4175

Gledson, B; Williams, D and Littlemore, M (2018) Construction planning efficiency and delivery time performance: Analysing failure in task-level 'hit rates'. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Gledson, B J (2017) Innovation diffusion within the UK construction sector: a study of the adoption of 4D BIM. PhD thesis, Northumbria University, UK.

Gledson, B J and Greenwood, D (2014) The implementation and use of 4D BIM and virtual construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Gledson, B J and Greenwood, D (2017) The adoption of 4D BIM in the UK construction industry: An innovation diffusion approach. Engineering, Construction and Architectural Management, 24(6), pp. 950-967. ISSN 0969-9988

Goodier, C; Austin, S and Guthrie, W (2009) Future scenarios for the European construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Gordon, C (2006) A formalism and a framework for planning of sensor-based construction inspections. PhD thesis, Carnegie Mellon University, USA.

Graham, D; Smith, S D and Crapper, M (2006) Refining the case-based reasoning model of construction processes. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Guan, Z; Millard, S and Yang, Z (2008) CDIO and the Liverpool Constructionarium. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 77-83. ISSN 17514312

Guo, J; Xiang, P; Liu, Q and Luo, Y (2024) Transportation infrastructure network optimisation based on computer simulation using Sichuan province, China as an example. Engineering, Construction and Architectural Management, 31(7), pp. 2740-2769. ISSN 0969-9988

Haji Karimian, S; Mbachu, J; Egbelakin, T and Shahzad, W (2019) Improving efficiency in roading projects: A New Zealand study. Engineering, Construction and Architectural Management, 26(5), pp. 827-849. ISSN 0969-9988

Hallowell, M; Esmaeili, B and Chinowsky, P (2011) Safety risk interactions among highway construction work tasks. Construction Management and Economics, 29(4), pp. 417-429. ISSN 1466433X

Hammad, A W A (2020) A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models. Construction Management and Economics, 38(8), pp. 756-772. ISSN 01446193

Hammad, A W A; Akbarnezhad, A; Rey, D and Waller, S T (2016) A computational method for estimating travel frequencies in site layout planning. Journal of Construction Engineering and Management, 142(5): 04015102, ISSN 0733-9364

Hamzeh, F R; El Samad, G and Emdanat, S (2019) Advanced metrics for construction planning. Journal of Construction Engineering and Management, 145(11): 04019063, ISSN 0733-9364

Hamzeh, F R; Faek, F and AlHussein, H (2019) Understanding improvisation in construction through antecedents, behaviours and consequences. Construction Management and Economics, 37(2), pp. 61-71. ISSN 01446193

Hamzeh, F R; Zankoul, E and Rouhana, C (2015) How can 'tasks made ready' during lookahead planning impact reliable workflow and project duration? Construction Management and Economics, 33(4), pp. 243-258. ISSN 01446193

Handa, V K and Barcia, R M (1986) Linear scheduling using optimal control theory. Journal of Construction Engineering and Management, 112(3), pp. 387-393. ISSN 0733-9364

Hanna, A S and Skiffington, M A (2010) Effect of preconstruction planning effort on sheet metal project performance. Journal of Construction Engineering and Management, 136(2), pp. 235-241. ISSN 0733-9364

Hare, B and Cameron, I (2012) Health and safety gateways for construction project planning. Engineering, Construction and Architectural Management, 19(2), pp. 192-204. ISSN 0969-9988

Hare, W J (2006) Integration of health and safety planning in construction project management through the development of a best practice gateway model. PhD thesis, Glasgow Caledonian University, UK.

Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects: An empirical study from India. Engineering, Construction and Architectural Management, 26(3), pp. 386-407. ISSN 0969-9988

Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364

Hassan, Z (1997) CONPLAN: Construction planning and buildability evaluation in an integrated and intelligent construction environment. PhD thesis, University of Salford, UK.

Hassanein, A and Moselhi, O (2004) Planning and scheduling highway construction. Journal of Construction Engineering and Management, 130(5), pp. 638-646. ISSN 0733-9364

Hassim, S; Muniandy, R; Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia: Modeling using fuzzy neural network. Engineering, Construction and Architectural Management, 25(3), pp. 443-457. ISSN 0969-9988

Hatamleh, M T; Alzarrad, A; Alghossoon, A; Alhusban, M and Ogunrinde, O (2025) Strategies for improving project risk management via communication and integration: The case of Jordan. Engineering, Construction and Architectural Management, 32(10), pp. 7006-7031. ISSN 0969-9988

Hatamleh, M T; Hiyassat, M; Sweis, G J and Sweis, R J (2018) Factors affecting the accuracy of cost estimate: Case of Jordan. Engineering, Construction and Architectural Management, 25(1), pp. 113-131. ISSN 0969-9988

He, C.; Liu, M.; He, W.; Wang, Z. and Hsiang, S. (2026) Addressing the information silo of construction planning constraints: A graph retrieval augmented generation approach. Engineering, Construction and Architectural Management, 33(7), pp. 5565-5591. ISSN 0969-9988

Heesom, D (2004) An analytical system for space planning on construction sites. PhD thesis, University of Wolverhampton, UK.

Heesom, D and Mahdjoubi, L (2004) Trends of 4D CAD applications for construction planning. Construction Management and Economics, 22(2), pp. 171-182. ISSN 01446193

Hegazy, T and Kassab, M (2003) Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129(6), pp. 698-705. ISSN 0733-9364

Heineck, L F (1983) On the analyses of activity durations on three house building sites. PhD thesis, University of Leeds, UK.

Heravi, G; Kebria, M F and Rostami, M (2021) Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Engineering, Construction and Architectural Management, 28(1), pp. 174-195. ISSN 0969-9988

Hildreth, J C and Vorster, M C (2010) Learning construction performance improvement through planning. International Journal of Construction Education and Research, 6(2), pp. 139-151. ISSN 1557-8771

Hong, Y; Hammad, A W A; Sepasgozar, S and Akbarnezhad, A (2019) BIM adoption model for small and medium construction organisations in Australia. Engineering, Construction and Architectural Management, 26(2), pp. 154-183. ISSN 0969-9988

Hosny, O A (1991) An intelligent decision support system for construction planning and scheduling. PhD thesis, University of Missouri - Rolla, USA.

Hu, Songbo (2023) Identification and prevention of crane operational hazards by integrating BIM and pathfinding algorithm in construction planning. PhD thesis, Monash University, Australia.

Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Huang, T; li, H; Guo, H; Chan, N; Kong, S; Chan, G and Skitmore, M (2009) Construction virtual prototyping: A survey of use. Construction Innovation, 9(4), pp. 420-433. ISSN 1471-4175

Idan, C K (2003) Quality function deployment (QFD) in the UK construction industry. PhD thesis, Nottingham Trent University, UK.

Igwe, C; Nasiri, F and Hammad, A (2022) Construction workspace management: Critical review and roadmap. International Journal of Construction Management, 22(10), pp. 1960-1973. ISSN 1562-3599

Ireland, V (1985) The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects. Construction Management and Economics, 3(1), pp. 59-87. ISSN 01446193

Jaafari, A (1984) Criticism of CPM for project planning analysis. Journal of Construction Engineering and Management, 110(2), pp. 222-233. ISSN 0733-9364

Jaafari, A; Manivong, K K and Chaaya, M (2001) Vircon: Interactive system for teaching construction management. Journal of Construction Engineering and Management, 127(1), pp. 66-75. ISSN 0733-9364

Jacob, J and Varghese, K (2018) A framework for ad hoc information management for the building design process. Engineering, Construction and Architectural Management, 25(8), pp. 1034-1052. ISSN 0969-9988

Javanmardi, A; Abbasian-Hosseini, S A; Liu, M and Hsiang, S M (2020) Improving effectiveness of constraints removal in construction planning meetings: Information-theoretic approach. Journal of Construction Engineering and Management, 146(4): 04020015, ISSN 0733-9364

Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988

Jin, Z; Gambatese, J; Liu, D and Dharmapalan, V (2019) Using 4D BIM to assess construction risks during the design phase. Engineering, Construction and Architectural Management, 26(11), pp. 2637-2654. ISSN 0969-9988

Johansen, E and Wilson, B (2006) Investigating first planning in construction. Construction Management and Economics, 24(12), pp. 1305-1314. ISSN 1466433X

Jägbeck, A (1998) It support for construction planning: A system design based on integrated information. PhD thesis, KTH Royal Institute of Technology, Sweden.

Kandil, A; El-Rayes, K and El-Anwar, O (2010) Optimization research: Enhancing the robustness of large-scale multiobjective optimization in construction. Journal of Construction Engineering and Management, 136(1), pp. 17-25. ISSN 0733-9364

Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kang, J H; Anderson, S D and Clayton, M J (2007) Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling. Journal of Construction Engineering and Management, 133(6), pp. 447-461. ISSN 0733-9364

Kangari, R and Yoshida, T (1989) Prototype robotics in construction industry. Journal of Construction Engineering and Management, 115(2), pp. 284-301. ISSN 0733-9364

Kannimuthu, M; Raphael, B; Ekambaram, P and Kuppuswamy, A (2020) Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem. Engineering, Construction and Architectural Management, 27(4), pp. 893-916. ISSN 0969-9988

Karatas, I and Budak, A (2024) Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Engineering, Construction and Architectural Management, 31(3), pp. 1123-1144. ISSN 0969-9988

Karpen, S (2013) The role of task openness in forming completion time estimates. PhD thesis, Indiana University, USA.

Kartman, S A (1995) Reengineering construction planning systems. PhD thesis, University of California, Berkeley, USA.

Khalafallah, A M (2006) Optimal construction site layout planning for airport expansion projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Khatib, J M; Chileshe, N and Sloan, S (2007) Antecedents and benefits of 3D and 4D modelling for construction planners. Journal of Engineering, Design and Technology, 5(2), pp. 159-172. ISSN 1726-0531

Kim, D Y (2011) Construction planning and execution strategies for enhancing project success on electrical construction subcontracts. PhD thesis, University of Texas at Austin, USA.

Kim, J L and Ellis Jr, R D (2008) Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling. Journal of Construction Engineering and Management, 134(11), pp. 904-913. ISSN 0733-9364

Kim, J-J (1993) A work package-based process model for petrochemical construction planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kodikara, G W; Thorpe, A and McCaffer, R (1993) The use of bills of quantities in building contractor organizations. Construction Management and Economics, 11(4), pp. 261-269. ISSN 01446193

Koekemoer, V and Smallwood, J (2007) Information technology (it) in the construction process. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Korb, S and Sacks, R (2021) Agent-based simulation of general contractor-subcontractor interactions in a multiproject environment. Journal of Construction Engineering and Management, 147(1): 1944, ISSN 0733-9364

Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.

Kuttantharappel Soman, R (2020) Automated look-ahead schedule generation using linked-data based constraint checking for construction projects. PhD thesis, Imperial College London, UK.

Kyrö, R; Peltokorpi, A and Luoma-Halkola, L (2019) Connecting adaptability strategies to building system lifecycles in hospital retrofits. Engineering, Construction and Architectural Management, 26(4), pp. 633-647. ISSN 0969-9988

Lam, K C; Tang, C M and Lee, W C (2005) Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects. Construction Management and Economics, 23(2), pp. 127-145. ISSN 01446193

Larbi, J A; Tang, L C M; Ababio, B K and Antwi-Afari, P (2025) Developing an integrated digital delivery framework for designing and planning construction projects: a review of interoperable digital technologies. International Journal of Construction Management, 25(3), pp. 347-362. ISSN 1562-3599

Lasni, A and Boton, C (2022) Implementing construction planning and control software: A specialized contractor perspective. Journal of Construction Engineering and Management, 148(9): 05022003, ISSN 0733-9364

Lau, C H; Mesthrige, J W; Lam, P T I and Javed, A A (2019) The challenges of adopting new engineering contract: A Hong Kong study. Engineering, Construction and Architectural Management, 26(10), pp. 2389-2409. ISSN 0969-9988

Laufer, A; Shapira, A; Cohenca-Zall, D and Howell, G A (1993) Prebid and preconstruction planning process. Journal of Construction Engineering and Management, 119(3), pp. 426-444. ISSN 0733-9364

Laufer, A and Tucker, R L (1987) Is construction project planning really doing its job? A critical examination of focus, role and process. Construction Management and Economics, 5(3), pp. 243-266. ISSN 01446193

Laufer, A and Tucker, R L (1988) Competence and timing dilemma in construction planning. Construction Management and Economics, 6(4), pp. 339-355. ISSN 01446193

Laufer, A; Tucker, R L; Shapira, A and Shenhar, A J (1994) The multiplicity concept in construction project planning. Construction Management and Economics, 12(1), pp. 53-65. ISSN 01446193

Le, P L; Dao, T M and Chaabane, A (2019) BIM-based framework for temporary facility layout planning in construction site: A hybrid approach. Construction Innovation, 19(3), pp. 424-464. ISSN 1471-4175

Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364

Lee, J G; Lee, H S; Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(7), pp. 2599-2614. ISSN 0969-9988

Lee, S (2006) Dynamic planning and control methodology: Understanding and managing iterative error and change cycles in large-scale concurrent design and construction projects. PhD thesis, Massachusetts Institute of Technology, USA.

Lee, S; Peña-Mora, F and Park, M (2005) Quality and change management model for large scale concurrent design and construction projects. Journal of Construction Engineering and Management, 131(8), pp. 890-902. ISSN 0733-9364

Lensgraf, S E (2024) Towards scalable autonomous underwater construction with free-floating robots. PhD thesis, Dartmouth College, USA.

Leu, S-S (1992) Object-oriented representation model of construction technology information. PhD thesis, University of Michigan, USA.

Levitt, R E; Kartam, N A and Kunz, J C (1988) Artificial intelligence techniques for generating construction project plans. Journal of Construction Engineering and Management, 114(3), pp. 329-343. ISSN 0733-9364

Li, B (2008) Managing a collaborative preconstruction planning process. PhD thesis, Loughborough University, UK.

Li, H; Chan, G; Skitmore, M and Huang, T (2015) A 4D automatic simulation tool for construction resource planning: A case study. Engineering, Construction and Architectural Management, 22(5), pp. 536-550. ISSN 0969-9988

Li, H; Chan, N K Y and Skitmore, M (2012) The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes. Construction Innovation, 12(4), pp. 429-446. ISSN 1471-4175

Li, Q; Sun, Q; Tao, S and Gao, X (2020) Multi-skill project scheduling with skill evolution and cooperation effectiveness. Engineering, Construction and Architectural Management, 27(8), pp. 2023-2045. ISSN 0969-9988

Lin, K-L (1995) Planning for critical construction operations involving large semi-stationary equipment. PhD thesis, University of Texas at Austin, USA.

Lingard, H; Pirzadeh, P; Blismas, N; Wakefield, R and Kleiner, B (2014) Exploring the link between early constructor involvement in project decision-making and the efficacy of health and safety risk control. Construction Management and Economics, 32(9), pp. 918-931. ISSN 01446193

Louzolo-Kimbembé, P and Pettang, C (2006) A new approach for construction planning in the developing countries: the sub-structure chaining diagram (SSCD). Journal of Construction Research, 7(1), pp. 159-176. ISSN 1609-9451

Lu, M (2003) Simplified discrete-event simulation approach for construction simulation. Journal of Construction Engineering and Management, 129(5), pp. 537-546. ISSN 0733-9364

Lu, M; Anson, M; Tang, S L and Ying, Y C (2003) Hkconsim: A practical simulation solution to planning concrete plant operations in Hong Kong. Journal of Construction Engineering and Management, 129(5), pp. 547-554. ISSN 0733-9364

Lu, M and Li, H (2003) Resource-activity critical-path method for construction planning. Journal of Construction Engineering and Management, 129(4), pp. 412-420. ISSN 0733-9364

Läufer, A; Howell, G A and Rosenfeld, Y (1992) Three modes of short-term construction planning. Construction Management and Economics, 10(3), pp. 249-262. ISSN 01446193

Marinelli, M (2022) A dfx-based approach for incorporating sustainability in infrastructure project planning. Built Environment Project and Asset Management, 12(1), pp. 20-37. ISSN 2044-124X

Marinelli, M; Dolan, M; Spillane, J and Konanahalli, A (2014) Material waste in the Northern Ireland construction industry: On-site management causes and methods of prevention. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Martins, S S; Evangelista, A C J; Hammad, A W A; Tam, V W Y and Haddad, A (2022) Evaluation of 4D BIM tools applicability in construction planning efficiency. International Journal of Construction Management, 22(15), pp. 2987-3000. ISSN 1562-3599

Masera, M (1999) An innovative planning technique in quality management. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Masih, S and Kar, S (2025) Assessing social sustainability for multimodal activities in construction: An FAHP-TOPSIS approach. Journal of Construction Engineering and Management, 151(12): 04025210, ISSN 0733-9364

Mattila, K G and Abraham, D M (1998) Linear scheduling: Past research efforts and future directions. Engineering, Construction and Architectural Management, 5(3), pp. 294-303. ISSN 0969-9988

Maurya, T; Kalita, J D and Kar, S (2026) Assessing safety scores of multimodal activities to integrate safety into construction planning. Journal of Construction Engineering and Management, 152(5): 04026039, ISSN 0733-9364

McCann, M (1986) An application of convex programming to construction scheduling. PhD thesis, Iowa State University, USA.

McKay, L J; Gibb, A G F; Haslam, R and Pendlebury, M (2002) Implications for the effect of standardization and pre-assembly on health, safety and accident causality: Preliminary results. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Mecca, S (1999) A model of construction planning procedure according to contingency theory. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Menches, C L; Hanna, A S; Nordheim, E V and Russell, J S (2008) Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry. Construction Management and Economics, 26(8), pp. 855-869. ISSN 01446193

Meng, J; Yan, J; Xue, B; Fu, J and He, N (2018) Reducing construction material cost by optimizing buy-in decision that accounts the flexibility of non-critical activities. Engineering, Construction and Architectural Management, 25(8), pp. 1092-1108. ISSN 0969-9988

Messi, Leonardo (2022) Development of a BIM-based simulator for workspace management in construction. PhD thesis, Università Politecnica delle Marche, Italy.

Mohammadi, S; Tavakolan, M and Zahraie, B (2022) An intelligent simulation-based framework for automated planning of concrete construction works. Engineering, Construction and Architectural Management, 29(2), pp. 916-939. ISSN 0969-9988

Moharrami, S; Taghaddos, M; RazaviAlavi, S R and AbouRizk, S (2021) A hybrid simulation approach for microtunneling construction planning. Construction Innovation, 21(3), pp. 363-378. ISSN 1471-4175

Moore, N (2013) A model based system for contextual on-site construction planning in augmented reality. PhD thesis, University of Wolverhampton, UK.

Moore, N J (2013) A contextual AR model based system on-site construction planning. PhD thesis, University of Wolverhampton, UK.

Morgan, D C (1986) Site layout and construction planning. PhD thesis, University of Nottingham, UK.

Morley, D; Lu, M and Abourizk, S (2014) Identification of invariant average weighted haul distance to simplify earthmoving simulation modeling in planning site grading operations. Journal of Construction Engineering and Management, 140(12): 04014057, ISSN 0733-9364

Moselhi, O and Nicholas, M J (1990) Hybrid expert system for construction planning and scheduling. Journal of Construction Engineering and Management, 116(2), pp. 221-238. ISSN 0733-9364

Moussavi Nadoushani, Z S; Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(7), pp. 938-957. ISSN 0969-9988

Musselwhite, D; Gledson, B and Greenwood, D (2021) Matters affecting construction project-level planning effectiveness: A literature review. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Musselwhite D, G B (2024) An analysis of activity-level predictability from UK construction projects. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Naumets, S; Lu, M and Ali, M (2022) Project schedule development under environment-induced time-window constraints: Case of constructing river-crossing bridge in remote Northern region. Journal of Construction Engineering and Management, 148(12): 04022129, ISSN 0733-9364

Nepal, M P (2011) Automated extraction and querying of construction-specific design features from a building information model. PhD thesis, University of British Columbia, Canada.

Netto, Joaquim Teixeira (2018) Integrated construction management model. PhD thesis, Universidade Federal Fluminense, Brazil.

Nguyen, T-H (1999) Automated deduction of topological information in a computer-based building design system. PhD thesis, Pennsylvania State University, USA.

Nie, P; Dahanayake, K C and Sumanarathna, N (2024) Exploring uae's transition towards circular economy through construction and demolition waste management in the pre-construction stage–a case study approach. Smart and Sustainable Built Environment, 13(2), pp. 246-266. ISSN 2046-6099

Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.

Obi, L I; Arif, M; Awuzie, B; Islam, R; Gupta, A D and Walton, R (2021) Critical success factors for cost management in public-housing projects. Construction Innovation, 21(4), pp. 625-647. ISSN 1471-4175

Odeh, A M (1992) CIPROS: Knowledge-based construction integrated project and process planning simulation system. PhD thesis, University of Michigan, USA.

Ok, S C and Sinha, S K (2006) Construction equipment productivity estimation using artificial neural network model. Construction Management and Economics, 24(10), pp. 1029-1044. ISSN 1466433X

Oloufa, A A; Eltahan, A A and Papacostas, C S (1994) Integrated GIS for construction site investigation. Journal of Construction Engineering and Management, 120(1), pp. 211-222. ISSN 0733-9364

Omar, B (2012) Context-aware services delivery in the construction supply chain. PhD thesis, University of Reading, UK.

Otto, H T (1985) The economics of the construction sector of the ussr. PhD thesis, University of Houston, USA.

Oyediran, H (2025) Robot-integrated 4D building information modeling (4D BIM): Framework for planning safe autonomous construction operations in dynamic environments. PhD thesis, University of Nebraska - Lincoln, USA.

Oyegoke, A S and Al Kiyumi, N (2017) The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman. Journal of Financial Management of Property and Construction, 22(3), pp. 286-302. ISSN 1366-4387

Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Patterson, D E (1997) Earthworks planning for linear construction projects. PhD thesis, University of Nottingham, UK.

Pearl, R G; Bowen, P A and Hall, K A (1998) The compilation of a tender submission: The role of method statements and construction planning charts. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Pearl, R G; Bowen, P A and Nkado, R N (1997) A communication-based examination of construction planning and tendering. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Pellegrino, R and Costantino, N (2018) An empirical investigation of the learning effect in concrete operations. Engineering, Construction and Architectural Management, 25(3), pp. 342-357. ISSN 0969-9988

Perez, A M and Ghosh, S (2018) Barriers faced by new-adopter of last planner system®: A case study. Engineering, Construction and Architectural Management, 25(9), pp. 1110-1126. ISSN 0969-9988

Perng, Y-H (1988) An intelligent system approach for construction risk identification. PhD thesis, University of Texas at Austin, USA.

Price, T (2010) Site waste management plans, the designer and the CDM principal contractor. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), pp. 577-587. ISSN 01446193

Radosavljevic, M (2003) Chaos in construction: labour productivity and its impact on planning and organisation of firms. PhD thesis, University of Dundee, UK.

Rankin, J H (2000) Computer-assisted construction planning. PhD thesis, University of British Columbia, Canada.

Rashidi, A; Yong, W Y; Maxwell, D and Fang, Y (2023) Construction planning through 4D BIM-based virtual reality for light steel framing building projects. Smart and Sustainable Built Environment, 12(5), pp. 1153-1173. ISSN 2046-6099

RazaviAlavi, S and AbouRizk, S (2022) A simulation-based decision support tool for integrating site layout and construction planning of tunneling projects. Journal of Engineering, Design and Technology, 20(4), pp. 866-886. ISSN 1726-0531

Razavialavi, S and Abourizk, S (2017) Genetic algorithm-simulation framework for decision making in construction site layout planning. Journal of Construction Engineering and Management, 143(1): 04016084, ISSN 0733-9364

Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.

Rwamamara, R A (2007) Planning the healthy construction workplace through risk assessment and design methods. PhD thesis, Luleå University of Technology, Sweden.

Rönnberg, N; Ringdahl, R and Fredriksson, A (2023) Measurement and sonification of construction site noise and particle pollution data. Smart and Sustainable Built Environment, 12(4), pp. 742-764. ISSN 2046-6099

Sacks, R and Goldin, M (2007) Lean management model for construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(5), pp. 374-384. ISSN 0733-9364

Sadeghpour, F (2004) A CAD-based model for site layout. PhD thesis, Concordia University, Canada.

Sadeghpour, F; Moselhi, O and Alkass, S T (2006) Computer-aided site layout planning. Journal of Construction Engineering and Management, 132(2), pp. 143-151. ISSN 0733-9364

Safikhani, S.; Shafaat, A. and Sartipipour, M. (2026) Automated project rescheduling with preemptive activity splitting for baseline restoration. Journal of Construction Engineering and Management, 152(6): 04026065, ISSN 0733-9364

Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Salah, M; Elbeltagi, E and Elsheikh, A (2024) Optimization of construction site layout using BIM generative design. International Journal of Construction Management, 24(3), pp. 314-322. ISSN 1562-3599

Sanad, H M; Ammar, M A and Ibrahim, M E (2008) Optimal construction site layout considering safety and environmental aspects. Journal of Construction Engineering and Management, 134(7), pp. 536-544. ISSN 0733-9364

Santos, P A S; Cortez, B and Carvalho, M T M (2025) Integrating GIS and BIM with MCDM for infrastructure planning: A comprehensive framework. Engineering, Construction and Architectural Management, 32(6), pp. 4197-4226. ISSN 0969-9988

Sarkar, D and Singh, M (2022) Risk analysis by integrated fuzzy expected value method and fuzzy failure mode and effect analysis for an elevated metro rail project of ahmedabad, India. International Journal of Construction Management, 22(10), pp. 1818-1829. ISSN 1562-3599

Schexnayder, C; Celaya, M; Recavarren, G C; Fiori, C and Jaselskis, E J (2011) Engineering with the elements. Journal of Construction Engineering and Management, 137, pp. 755-761. ISSN 0733-9364

Schroeder, H P (1991) Dycam 1.0: Dynamic construction activity model, a decision support tool for construction planning. PhD thesis, University of Colorado at Boulder, USA.

Schuldt, S and El-Rayes, K (2018) Optimizing the planning of remote construction sites to minimize facility destruction from explosive attacks. Journal of Construction Engineering and Management, 144(5): 04018020, ISSN 0733-9364

Sena, T C and Fabricio, M M (2023) Framework proposal for BIM implementation in Brazilian construction and development companies. Engineering, Construction and Architectural Management, 30(5), pp. 2101-2123. ISSN 0969-9988

Senior-Brown, B A (1993) A study of the planning and integrated cyclic analysis of serial system operations. PhD thesis, Purdue University, USA.

Seresht, N G and RazaviAlavi, S (2021) A framework to model the spread of infectious diseases on construction sites using hybrid agent-based modelling and Monte Carlo simulation. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Shafaat, A (2016) Designing project systems in presence of variations. PhD thesis, Purdue University, USA.

Shaked, O and Warszawski, A (1995) Knowledge-based system for construction planning of high-rise buildings. Journal of Construction Engineering and Management, 121(2), pp. 172-182. ISSN 0733-9364

Sharma, V; Zaki, M; Jha, K N and Krishnan, N M A (2022) Machine learning-aided cost prediction and optimization in construction operations. Engineering, Construction and Architectural Management, 29(3), pp. 1241-1257. ISSN 0969-9988

Shayboun, M; Kifokeris, D and Koch, C (2019) Construction planning with machine learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Sheikhkhoshkar, M; Bril El-Haouzi, H; Aubry, A and Hamzeh, F (2023) Functionality as a key concept for integrated project planning and scheduling methods. Journal of Construction Engineering and Management, 149(7): 04023053, ISSN 0733-9364

Shi, J J (2002) Three methods for verifying and validating the simulation of a construction operation. Construction Management and Economics, 20(6), pp. 483-491. ISSN 01446193

Shooshtarian, S; Lingard, H and Wong, P S P (2020) Using the cost of construction work to trigger legislative duties for WHS: The Australian experience. Built Environment Project and Asset Management, 10(3), pp. 369-387. ISSN 2044-124X

Shrestha, P and Behzadan, A H (2018) Chaos theory-inspired evolutionary method to refine imperfect sensor data for data-driven construction simulation. Journal of Construction Engineering and Management, 144(3): 04018001, ISSN 0733-9364

Sing, M C P; Fung, I W H; Edwards, D J and Liu, H (2022) Dynamic construction site layout planning: An application of branch and bond algorithm. International Journal of Building Pathology and Adaptation, 40(4), pp. 523-538. ISSN 23984708

Sinoh, S S; Othman, F and Ibrahim, Z (2020) Critical success factors for BIM implementation: A Malaysian case study. Engineering, Construction and Architectural Management, 27(9), pp. 2737-2765. ISSN 0969-9988

Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.

Skibniewski, M and Molinski, J (1989) Modelling of building production activities for multifacility projects. Construction Management and Economics, 7(4), pp. 357-365. ISSN 01446193

Sohrabi, H and Noorzai, E (2024) Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning. Engineering, Construction and Architectural Management, 31(2), pp. 544-570. ISSN 0969-9988

Son, J and Rojas, E M (2011) Impact of optimism bias regarding organizational dynamics on project planning and control. Journal of Construction Engineering and Management, 137(2), pp. 147-157. ISSN 0733-9364

Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364

Srisethanil, C (1996) Pedagogical framework for an engineering intelligent tutoring system. PhD thesis, Georgia Institute of Technology, USA.

Stockings, W H (2002) The process of construction planning. PhD thesis, Eindhoven University of Technology, Netherlands.

Stoneman, G; Hill, C J; Howarth, T and McNamara, T (1999) Construction planning software selection for improving the planning process. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Su, X (2013) A spatial temporal information model for construction planning. PhD thesis, Purdue University, USA.

Su, X and Cai, H (2014) Life cycle approach to construction workspace modeling and planning. Journal of Construction Engineering and Management, 140(7): 04014019, ISSN 0733-9364

Su, Y (2017) Unified quantitative modeling for integrated multi-objective project management with singularity functions. PhD thesis, Catholic University of America, USA.

Subbiah, A (2012) An investigation of the factors influencing the success of construction planning for the 2012 olympic stadium: An ethnographic study. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Suhail, S A (1995) CPM/LOB: new methodology to integrate CPM and line of balance. PhD thesis, Loughborough University, UK.

Sulaiman, M J (1997) Intesite: Intelligent site layout planning within an object-oriented integrated construction environment. PhD thesis, University of Salford, UK.

Sundquist, V; Hulthén, K and Gadde, L E (2018) From project partnering towards strategic supplier partnering. Engineering, Construction and Architectural Management, 25(3), pp. 358-373. ISSN 0969-9988

Suraji, A; Duff, A R and Peckitt, S J (2001) Development of causal model of construction accident causation. Journal of Construction Engineering and Management, 127(4), pp. 337-344. ISSN 0733-9364

Taghaddos, H; Heydari, M H and Asgari, A H (2021) A hybrid simulation approach for site layout planning in construction projects. Construction Innovation, 21(3), pp. 417-440. ISSN 1471-4175

Tah, J H M; Carr, V and Howes, R (1998) An application of case-based reasoning to the planning of highway bridge construction. Engineering, Construction and Architectural Management, 5(4), pp. 327-338. ISSN 0969-9988

Tam, C M; Tong, T K L and Chan, W K W (2001) Genetic algorithm for optimizing supply locations around tower crane. Journal of Construction Engineering and Management, 127(4), pp. 315-320. ISSN 0733-9364

Tam, C M; Tong, T K L; Leung, A W T and Chiu, G W C (2002) Site layout planning using nonstructural fuzzy decision support system. Journal of Construction Engineering and Management, 128(3), pp. 220-231. ISSN 0733-9364

Thunberg, M; Fredriksson, A; Danielsson, J; Hyll, H; Sandberg, E and Westin, A (2017) Planning in construction: How are the different planning processes linked? In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Torres Formoso, C (1991) A knowledge-based framework for planning house building projects. PhD thesis, University of Salford, UK.

Touran, A (1986) Computer packages for construction data acquisition and processing. Construction Management and Economics, 4(3), pp. 233-243. ISSN 01446193

Tran, D H and Long, L D (2018) Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution. Engineering, Construction and Architectural Management, 25(5), pp. 623-638. ISSN 0969-9988

Umar, T (2021) Applications of drones for safety inspection in the gulf cooperation council construction. Engineering, Construction and Architectural Management, 28(9), pp. 2337-2360. ISSN 0969-9988

Valverde-Gascueña, N; Navarro-Astor, E; Fuentes-del-Burgo, J and Ruiz-Fernandez, J P (2011) Factors that affect the productivity of construction projects in small and medium companies: Analysis of its impact on planning. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Varghese, K (1992) Automated route planning for large vehicles on industrial construction sites. PhD thesis, University of Texas at Austin, USA.

Viklund Tallgren, M; Roupe, M and Johansson, M (2015) An empowered collaborative planning method in a Swedish construction company: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Viles, E; Rudeli, N C and Santilli, A (2020) Causes of delay in construction projects: A quantitative analysis. Engineering, Construction and Architectural Management, 27(4), pp. 917-935. ISSN 0969-9988

Vu, H A; Cu, V H; Min, L X and Wang, J Q (2017) Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model. Engineering, Construction and Architectural Management, 24(6), pp. 1018-1039. ISSN 0969-9988

Wahab, A (2024) Integrating building information modeling (BIM) and blockchain technology in the pre-construction planning processes. PhD thesis, Mississippi State University, USA.

Walker D.H.T, S Y J (2002) Project understanding, planning, flexibility of management action and construction time performance: Two Australian case studies. Construction Management and Economics, 20(1), pp. 31-44. ISSN 01446193

Wang, Q; Guo, Z; Mintah, K; Li, Q; Mei, T and Li, P (2019) Cell-based transport path obstruction detection approach for 4D BIM construction planning. Journal of Construction Engineering and Management, 145(3): 04018141, ISSN 0733-9364

Wang, T; Abdallah, M; Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(1), pp. 82-100. ISSN 0969-9988

Ward, P (2011) A UK and Australian perspective of the suitability of the scl protocols' provisions for dealing with float for adoption and use by the Australian construction industry. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Warszawski, A (1990) Expert systems for crane selection. Construction Management and Economics, 8(2), pp. 179-190. ISSN 01446193

Watson, A and McInnes, S (1997) Small/medium scale construction logistics: A study into the factors affecting planning accuracy. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Waugh, L M (1990) A construction planner. PhD thesis, Stanford University, USA.

Williams, T (1999) Allocation of contingency in activity duration networks. Construction Management and Economics, 17(4), pp. 441-447. ISSN 01446193

Yamazaki, Y (1995) An integrated construction planning system using object-oriented product and process modelling. Construction Management and Economics, 13(5), pp. 417-426. ISSN 01446193

Yang, S; Zhang, J; Xu, S; Deng, T; He, Q and Wang, P (2025) Work section planning for accompanying construction of extra-long tunnel and ballastless track of mountainous high-speed railways. Journal of Construction Engineering and Management, 151(9): 04025126, ISSN 0733-9364

Yousefi, E; Ahmadian Fard Fini, A and Loganathan, S (2025) Production-oriented approach for optimal mass-customisation of floor panel layouts in cross-laminated timber (CLT) buildings. Engineering, Construction and Architectural Management, 32(9), pp. 5965-5988. ISSN 0969-9988

Zhang, H and Yu, L (2020) Dynamic transportation planning for prefabricated component supply chain. Engineering, Construction and Architectural Management, 27(9), pp. 2553-2576. ISSN 0969-9988

Zhang, Z; Pan, W and Pan, M (2022) Critical considerations on tower crane layout planning for high-rise modular integrated construction. Engineering, Construction and Architectural Management, 29(7), pp. 2615-2634. ISSN 0969-9988

Zhao, Z Y; You, W Y and Zuo, J (2010) Application of innovative critical chain method for project planning and control under resource constraints and uncertainty. Journal of Construction Engineering and Management, 136(9), pp. 1056-1060. ISSN 0733-9364

Zhou, W (2009) An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation. PhD thesis, University of Wolverhampton, UK.

Zhou, W; Heesom, D; Georgakis, P and Tah, J H M (2014) User-centred design for collaborative 4D modelling. Construction Innovation, 14(4), pp. 493-517. ISSN 1471-4175

Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(6), pp. 1129-1150. ISSN 0969-9988

Zohrehvandi, S; Vanhoucke, M; Soltani, R and Javadi, M (2020) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(2), pp. 502-524. ISSN 0969-9988

Zolfagharian, S; Irizarry, J; Ressang, A; Nourbakhsh, M and Gheisari, M (2014) Automated safety planning approach for residential construction sites in Malaysia. International Journal of Construction Management, 14(3), pp. 134-147. ISSN 1562-3599

Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.

al-Attar, H; Sweis, G; Tarawneh, B; Abu-Khader, W; Haddad, L and Sweis, R (2025) Enhanced construction project duration estimation using artificial neural networks: Initial design and planning stages. Construction Economics and Building, 25(2), pp. 168-191. ISSN 2204-9029

Šelih, J (2005) Improvement of construction and demolition (C&D) waste management on construction sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.