Items with Subject: construction operations

Number of items: 1538.

Abbasi, Mostafa (2017) Enhance the construction industry performance through lean applications. PhD thesis, Politecnico di Milano, Italy.

Abbasian-Hosseini, S A; Hsiang, S M; Leming, M L and Liu, M (2014) From social network to data envelopment analysis: Identifying benchmarks at the site management level. Journal of Construction Engineering and Management, 140(8): 04014028, ISSN 0733-9364

Abbott, C and Allen, S (2004) Exploring how regional construction activity can be supported by community benefit initiatives. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Abd Al-Jalil, Y Q (1998) Analysis of performance of tunnel boring machine-based systems. PhD thesis, University of Texas at Austin, USA.

Abdeen, F N; Gunatilaka, R N; Sepasgozar, S M E and Edwards, D J (2024) The usability of a novel mobile augmented reality application for excavation process considering safety and productivity in construction. Construction Innovation, 24(4), pp. 892-911. ISSN 1471-4175

Abdel-Monem, M and Hegazy, T (2013) Enhancing construction as-built documentation using interactive voice response. Journal of Construction Engineering and Management, 139(7), pp. 895-898. ISSN 0733-9364

Abdelghani, Mohammad (2021) Towards a generalized value stream mapping and domain ontology to support the enabling of industry 4.0 in construction. PhD thesis, University of Alberta, Canada.

Abdelhamid, T S (1999) Measuring and evaluating physiological demands of construction work. PhD thesis, University of Michigan, USA.

Abdelhamid, T S and Everett, J G (2002) Physiological demands during construction work. Journal of Construction Engineering and Management, 128(5), pp. 427-437. ISSN 0733-9364

Abdelmassih, A; Faddoul, R and Geara, F (2023) Impact of autonomous solutions on earthmoving electrification using machine learning: Case study. Construction Innovation, 23(3), pp. 606-621. ISSN 1471-4175

Abdelshafy, A and Walther, G (2023) Using dynamic-locational material flow analysis to model the development of urban stock. Building Research & Information, 51(1), pp. 5-20. ISSN 0961-3218

Abduh, M (2000) Utility assessment of electronic networking technologies for design -build projects. PhD thesis, Purdue University, USA.

Abduh, M and Skibniewski, M J (2004) Electronic networking technologies in construction. Journal of Construction Research, 5(1), pp. 17-42. ISSN 1609-9451

Abdul Nabi, M and El-Adaway, I H (2021) Risk-based approach to predict the cost performance of modularization in construction projects. Journal of Construction Engineering and Management, 147(10): 04021133, ISSN 0733-9364

AbdulAzeez, A D; Etubi, U and Umar, B (2019) An assessment of multi-skilling in addressing skills shortage in Nigerian construction firms. African Journal of Built Environment Research, 3(1), pp. 1-13. ISSN 2414-0236

AbdulLateef, O; Sanmargaraja, S; Oni, O; Anavhe, P and Mewomo, C M (2024) An association rule mining model for the application of construction technologies during COVID-19. International Journal of Construction Management, 24(4), pp. 443-453. ISSN 1562-3599

Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.

Abdullah, F (1999) The Malaysian construction industry: an analysis on the impact of Vision 2020. PhD thesis, University of Reading, UK.

Abdullah, R Z (1988) Integrated systems for site management. PhD thesis, Loughborough University, UK.

Abdulsalam, R S; Chan, M; Masrom, M A N and Nawawi, A H (2024) Benefits and challenges of implementing green building development in Nigeria. Built Environment Project and Asset Management, 14(3), pp. 399-413. ISSN 2044-124X

Abediniangerabi, B; Shahandashti, S M; Ahmadi, N and Ashuri, B (2017) Empirical investigation of temporal association between architecture billings index and construction spending using time-series methods. Journal of Construction Engineering and Management, 143(10): 04017080, ISSN 0733-9364

Abeid, J and Arditi, D (2003) Photo-net: An integrated system for controlling construction progress. Engineering, Construction and Architectural Management, 10(3), pp. 162-171. ISSN 0969-9988

Abeid, J N (2000) Photo-net: An integrated system for controlling the progress of construction activities. PhD thesis, Illinois Institute of Technology, USA.

Aboagye-Nimo, E; Raidén, A B and King, A (2014) Understanding the role of local safety groups in managing safety practices between micro construction firms and principal contractors. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

AbouRizk, S and Mather, K (2000) Simplifying simulation modeling through integration with 3D CAD. Journal of Construction Engineering and Management, 126(6), pp. 475-483. ISSN 0733-9364

Abourizk, S and Shi, J (1994) Automated construction-simulation optimization. Journal of Construction Engineering and Management, 120(2), pp. 374-385. ISSN 0733-9364

Abourizk, S M and Halpin, D W (1990) Probabilistic simulation studies for repetitive construction processes. Journal of Construction Engineering and Management, 116(4), pp. 575-594. ISSN 0733-9364

Abourizk, S M and Halpin, D W (1992) Statistical properties of construction duration data. Journal of Construction Engineering and Management, 118(3), pp. 525-544. ISSN 0733-9364

Abourizk, S M; Halpin, D W and Wilson, J R (1994) Fitting beta distributions based on sample data. Journal of Construction Engineering and Management, 120(2), pp. 288-305. ISSN 0733-9364

Aboushiwa, M A A (2000) Promoter briefing on the procurement and selection of contract strategy offering the best value for money. PhD thesis, University of Manchester, UK.

Abu Bakar, A H B (2004) Factors affecting technology transfer to indigenous construction companies in developing countries: a Malaysian experience. PhD thesis, University College London, UK.

Abuhishmeh, K S K (2023) Risk assessment of reinforced concrete sewer pipes under external loading and adverse environmental conditions using an adaptive neuro-fuzzy system. PhD thesis, University of Texas at Arlington, USA.

Abusnina, H (2019) Combining engineering and data-driven approaches to model the risk of excavation damage to underground natural gas facilities. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.

Acharya, N K; Dai Lee, Y and Man im, H (2006) Conflicting factors in construction projects: Korean perspective. Engineering, Construction and Architectural Management, 13(6), pp. 543-566. ISSN 0969-9988

Adam, A; Josephson, P-E B and Lindahl, G (2017) Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications. Engineering, Construction and Architectural Management, 24(3), pp. 393-406. ISSN 0969-9988

Adebowale, O J (2018) A multi-stakeholder approach to productivity improvement in the South African construction industry. PhD thesis, Nelson Mandela University, South Africa.

Adebowale, O J and Agumba, J N (2024) A systematic review of challenges undermining the efficacy of construction health and safety regulations in major African countries. Construction Economics and Building, 24(4-5), pp. 1-24. ISSN 2204-9029

Adjei, K O (2020) A model for predicting cost control practice in the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.

Adjei, S; Ankrah, N; Ndekugri, I and Searle, D (2015) Investigating the extent to which waste management legislation affects waste management practices within the UK construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Adjei, S D (2016) Review of waste management in the UK construction industry. PhD thesis, University of Wolverhampton, UK.

Adjei, S D; Ankrah, N A; Ndekugri, I and Searle, D (2018) Sustainable construction and demolition waste management: Comparison of corporate and project level drivers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Adjei-Kumi, T (1997) The development of an intelligent system for visual simulation of construction projects. PhD thesis, University of Strathclyde, UK.

Adriaanse, A; Voordijk, H and Dewulf, G (2010) The use of interorganisational ICT in construction projects: A critical perspective. Construction Innovation, 10(2), pp. 223-237. ISSN 1471-4175

Adu Gyamfi, T; Aigbavboa, C O and Thwala, W D (2024) Risk resources management influence on public-private partnership risk management in construction industry: Confirmatory factor analysis approach. Journal of Engineering, Design and Technology, 22(5), pp. 1544-1569. ISSN 1726-0531

Afzali Borujeni, S H; Zare, M and Adelzade Saadabadi, L (2024) Comparison of factors affecting the acceptance of the trenchless technology and open-trench method using ANP and AHP: Case study in Iran. Journal of Construction Engineering and Management, 150(1): 04023145, ISSN 0733-9364

Agapiou, A; Price, A D F and McCaffer, R (1995) Planning future construction skill requirements: Understanding labour resource issues. Construction Management and Economics, 13(2), pp. 149-161. ISSN 01446193

Agbesi, K; Kissi, E and Adjei-Kumi, T (2020) Implementation of sustainable procurement practices in public sector construction organisation in Ghana. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Aghimien, D O; Aghimien, E I; Fadiyimu, A O and Adegbembo, T F (2018) Survival strategies of built environment organisations in a challenging economy. Engineering, Construction and Architectural Management, 25(7), pp. 861-876. ISSN 0969-9988

Aghimien, D O; Aigbavboa, C O and Thwala, W D (2019) Microscoping the challenges of sustainable construction in developing countries. Journal of Engineering, Design and Technology, 17(6), pp. 1110-1128. ISSN 1726-0531

Agyakwa-Baah, A and Chileshe, N (2010) Construction professionals perception of risk assesssment and management practices: Does length of service in construction industry matter. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ahmad, I U; Russell, J S and Abou-Zeid, A (1995) Information technology (IT) and integration in the construction industry. Construction Management and Economics, 13(2), pp. 163-171. ISSN 01446193

Ahmad, R K (2000) Developing a proactive safety performance measurement tool (SPMT) for construction sites. PhD thesis, Loughborough University, UK.

Ahmad, S B S; Mazhar, M U; Bruland, A; Andersen, B S; Langlo, J A and Torp, O (2020) Labour productivity statistics: A reality check for the Norwegian construction industry. International Journal of Construction Management, 20(1), pp. 39-52. ISSN 1562-3599

Ahmadi, Ehsan (2025) Memory-augmented llm agent for predicting locomotion modes in construction activities. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Ahmadian Fard Fini, Alireza (2017) Optimizing crew performance through integration of human resource strategies into planning of construction activities. PhD thesis, University of New South Wales, Australia.

Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387

Ahmed, A (2012) Pavement damage cost estimation using highway agency maintenance, rehabilitation, and reconstruction strategies. PhD thesis, Purdue University, USA.

Ahmed, I and Kabir, M H (2021) Building codes and regulations for disaster resilience in Bangladesh: The case of Dhaka. International Journal of Disaster Resilience in the Built Environment, 12(5), pp. 540-554. ISSN 1759-5916

Ahmed, S and Arocho, I (2022) Implementing a choosing-by-advantages decision-making method to evaluate the critical success factors of mass-timber building materials in the US. Journal of Construction Engineering and Management, 148(10): 05022010, ISSN 0733-9364

Ahmed, S; Haq, I and Anam, S M A (2024) Impacts of COVID-19 on the construction sector in the least developed countries. International Journal of Building Pathology and Adaptation, 42(6), pp. 1085-1105. ISSN 2398-4708

Ahmed, T; Hossain, S M and Hossain, M A (2021) Reducing completion time and optimizing resource use of resource-constrained construction operation by means of simulation modeling. International Journal of Construction Management, 21(4), pp. 404-415. ISSN 1562-3599

Ahmed Memon, Z; Zaimi, M A M and Mustaffar, M (2007) A systematic procedure for developing the 3D model to evaluate the construction project progress. Construction Innovation, 7(2), pp. 187-199. ISSN 1471-4175

Ahn, C (2012) An integrated framework for sustainable construction processes: Understanding and managing the environmental performance of construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ahn, C R and Lee, S (2013) Importance of operational efficiency to achieve energy efficiency and exhaust emission reduction of construction operations. Journal of Construction Engineering and Management, 139(4), pp. 404-413. ISSN 0733-9364

Ahn, S; Crouch, L; Wan Kim, T and Rameezdeen, R (2020) Comparison of worker safety risks between onsite and offsite construction methods: A site management perspective. Journal of Construction Engineering and Management, 146(9): 0001890, ISSN 0733-9364

Ahn, S; Lee, S and Steel, R P (2014) Construction workers' perceptions and attitudes toward social norms as predictors of their absence behavior. Journal of Construction Engineering and Management, 140(5): 04013069, ISSN 0733-9364

Ahn, Sang Jun (2019) Transportation framework in panelized construction for residential building. PhD thesis, University of Alberta, Canada.

Aibinu, A A and Odeyinka, H A (2006) Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), pp. 667-677. ISSN 0733-9364

Ailabouni, N (2010) Factors affecting employee productivity in the UAE construction industry. PhD thesis, University of Brighton, UK.

Ailabouni, N; Painting, N and Ashton, P (2009) Factors affecting employee productivity in the UAE construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Ajayi, S O (2017) Design, procurement and construction strategies for minimizing waste in construction projects. PhD thesis, University of the West of England, Bristol, UK.

Aje, I (2012) The impact of contractors' prequalification on construction project delivery in Nigeria. Engineering, Construction and Architectural Management, 19(2), pp. 159-172. ISSN 0969-9988

Aka, A; Iji, J; Isa, R B and Bamgbade, A A (2021) Assessing the relationships between underlying strategies for effective building information modeling (BIM) implementation in Nigeria construction industry. Architectural Engineering and Design Management, 17(5-6), pp. 434-446. ISSN 1745-2007

Akadiri, O P (2011) Development of a multi-criteria approach for the selection of sustainable materials for building projects. PhD thesis, University of Wolverhampton, UK.

Akbas, R (2003) Geometry-based modeling and simulation of construction processes. PhD thesis, Stanford University, USA.

Akhavian, R and Behzadan, A H (2013) Knowledge-based simulation modeling of construction fleet operations using multimodal-process data mining. Journal of Construction Engineering and Management, 139(11): 4013021, ISSN 0733-9364

Akhavian, Reza (2015) Data-driven simulation modeling of construction and infrastructure operations using process knowledge discovery. PhD thesis, University of Central Florida, USA.

Akinade, O O (2017) BIM-based software for construction waste analytics using artificial intelligence hybrid models. PhD thesis, University of the West of England, Bristol, UK.

Akinci, B; Fischer, M and Kunz, J (2002) Automated generation of work spaces required by construction activities. Journal of Construction Engineering and Management, 128(4), pp. 306-315. ISSN 0733-9364

Akinci, B; Fischer, M; Kunz, J and Levitt, R (2002) Representing work spaces generically in construction method models. Journal of Construction Engineering and Management, 128(4), pp. 296-305. ISSN 0733-9364

Akindeinde, A S; Akinola, J A; Ojo, L D and Kenechukwu, O A (2024) Impact of modular integrated construction indicators on sustainable performance metrics in Nigeria. Construction Economics and Building, 24(4-5), pp. 81-97. ISSN 2204-9029

Akindele, O; Ajayi, S; Oyegoke, A S; Alaka, H A and Omotayo, T (2025) Application of geographic information system (GIS) in construction: A systematic review. Smart and Sustainable Built Environment, 14(1), pp. 210-236. ISSN 2046-6099

Aksözen, M; Hassler, U and Kohler, N (2017) Reconstitution of the dynamics of an urban building stock. Building Research & Information, 45(3), pp. 239-258. ISSN 0961-3218

Aktas, E (2001) Structural design code calibration using reliability-based cost optimization. PhD thesis, University of Pittsburgh, USA.

Al Nageim, H and Pountney, D (2007) A non-linear optimisation technique based on the complex method: The optimal design of a concrete trough supporting a new lightweight rail track system, lr55. Construction Innovation, 7(4), pp. 320-339. ISSN 1471-4175

Al Omari, Mohammad K (2025) Application of the AI-enabled unmanned aerial systems in resolving highway construction claims. PhD thesis, University of Illinois at Chicago, USA.

Al-Bayati, A J and Panzer, L (2020) Reducing damages to underground utilities: Importance of stakeholders' behaviors. Journal of Construction Engineering and Management, 146(9): 04020107, ISSN 0733-9364

Al-Fahad, J Y (2012) Reform of building codes, regulations, administration and enforcement in Kuwait: within the legal, administrative, technical & social framework. PhD thesis, Loughborough University, UK.

Al-Ghzawi, M and El-Rayes, K (2023) Optimizing the planning of airport airside expansion projects to minimize air traffic disruptions and construction cost. Journal of Construction Engineering and Management, 149(4): 04023013, ISSN 0733-9364

Al-Hajj, A and Hamani, K (2011) Material waste in the UAE construction industry: Main causes and minimization practices. Architectural Engineering and Design Management, 7(4), pp. 221-235. ISSN 1745-2007

Al-Hussein, M; Kumar, J; Sharma, V and Mah, D (2006) A knowledge-based automated development permit approval process in the housing industry. Engineering, Construction and Architectural Management, 13(3), pp. 290-306. ISSN 0969-9988

Al-Jarallah, M I (1983) Construction industry in Saudi Arabia. Journal of Construction Engineering and Management, 109(4), pp. 355-368. ISSN 0733-9364

Al-Kaabi, N S (2006) A fuzzy-based construction safety advisor (CSA) for construction safety in the United Arab Emirates. PhD thesis, Ohio State University, USA.

Al-Kaisy, A and Nassar, K (2005) Nighttime construction issues revisited. Journal of Construction Research, 6(1), pp. 139-156. ISSN 1609-9451

Al-Nasser, A A (2001) Optimisation of construction implemented as a manufacturing process. PhD thesis, University of Sussex, UK.

Al-Rasheed, K A (1997) Construction schedule logic development: The impact of visualization. PhD thesis, University of Colorado at Boulder, USA.

Al-Remal, A M (2013) Risk-based design of structures for fire. PhD thesis, University of Edinburgh, UK.

Al-Suleiman, T I and Alatoom, Y I (2024) Development of pavement roughness regression models based on smartphone measurements. Journal of Engineering, Design and Technology, 22(4), pp. 1136-1157. ISSN 1726-0531

AlAbbadi, G (2020) Development of a framework towards enhancing workers productivity in the Jordanian construction industry. PhD thesis, Coventry University, UK.

Alaghbari, W; Al-Sakkaf, A A and Sultan, B (2019) Factors affecting construction labour productivity in Yemen. International Journal of Construction Management, 19(1), pp. 79-91. ISSN 1562-3599

Alamri, R (2019) Development of a model for health and safety management in Saudi Arabian oil and gas construction projects. PhD thesis, University of Wolverhampton, UK.

Alaqad, M (2021) Critical success factors for integration of value, financial risk, and environmental management systems in medium sized design and build projects. PhD thesis, University of Brighton, UK.

Albeaino, Gilles (2023) Exploring human-robot interaction proxemics in construction. PhD thesis, University of Florida, USA.

Alexander, D; Hallowell, M and Gambatese, J (2017) Precursors of construction fatalities. II: Predictive modeling and empirical validation. Journal of Construction Engineering and Management, 143(7): 04017024, ISSN 0733-9364

Alfar, E (2016) GIS-based pavement maintenance management model for local roads in the UK. PhD thesis, University of Salford, UK.

Alhajeri, M (2011) Health and safety in the construction industry: challenges and solutions in the UAE. PhD thesis, Coventry University, UK.

Alhalafi, M (2021) Develop a lean project management framework for the construction companies in order to improve the time and cost efficiencies of their construction operations. PhD thesis, De Montfort University, UK.

Ali, A (2018) Development of a framework for sustainable construction waste management: a case study of three major Libyan cities. PhD thesis, University of Wolverhampton, UK.

Ali, G M; Olearczyk, J; Bouferguene, A and Al-Hussein, M (2021) Implementation of combined loading to calculate ground bearing pressure under crawler crane tracks. Journal of Construction Engineering and Management, 147(7): 04021051, ISSN 0733-9364

Ali, S; Zayed, T and Hegab, M (2007) Modeling the effect of subjective factors on productivity of trenchless technology application to buried infrastructure systems. Journal of Construction Engineering and Management, 133(10), pp. 743-748. ISSN 0733-9364

Ali, S A A; Arun, C and Krishnamurthy, K (2021) Re-defining flow in construction process for facilitating the identification and quantification of generic overruns existing in construction industry today. International Journal of Construction Management, 21(2), pp. 113-130. ISSN 1562-3599

Ali, Tauha H (2006) Influence of national culture on construction safety climate in Pakistan. PhD thesis, Griffith University, Pakistan.

Alkass, S and Harris, F (1988) Expert system for earthmoving equipment selection in road construction. Journal of Construction Engineering and Management, 114(3), pp. 426-440. ISSN 0733-9364

Alkass, S and Harris, F (1991) Development of an integrated system for planning earthwork operations in road construction. Construction Management and Economics, 9(3), pp. 263-289. ISSN 01446193

Alkass, S T (1988) An expert system applied to earthmoving operations and equipment selection. PhD thesis, Loughborough University, UK.

Alkinani, H (2014) Models of training needs assessment for the Iraqi construction industry. PhD thesis, University of Salford, UK.

Alluqmani, A E (2014) Design and behaviour of R.C. Beams to ACI318-and-SBC304; and EC2 codes when subjected to asymmetric loading. Journal of Engineering, Design and Technology, 12(2), pp. 158-176. ISSN 1726-0531

Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.

Almazrouei, M; Khalid, K and Davidson, R (2021) Safety climate of UAE petroleum industry: a cross-validation using confirmatory factor analytic approach. Journal of Engineering, Design and Technology, 19(4), pp. 943-965. ISSN 1726-0531

Alnahari, Mohammed Saeed (2023) Exploring the potential of blockchain technology for improved management and safety of underground utilities. PhD thesis, Arizona State University, USA.

Alsdorf, M; Koch, C and Sander, D (2006) Coaching at the building site: A feasibility study. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Alsehaimi, A O; Fazenda, P T and Koskela, L (2014) Improving construction management practice with the last planner system: A case study. Engineering, Construction and Architectural Management, 21(1), pp. 51-64. ISSN 0969-9988

Alsharef, A F A (2022) Leveraging data analytics to improve construction operations and occupational safety. PhD thesis, North Carolina State University, USA.

Alshboul, O (2019) Multi-objective optimization for heavy earthmoving construction equipment management based on time, cost, and pollutant emissions. PhD thesis, University of Central Florida, USA.

Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.

Alshihre, F (2018) Development of a framework for client satisfaction in the Saudi construction industry. PhD thesis, University of Wolverhampton, UK.

Alsugair, A M (1992) An intelligent resource allocation system. PhD thesis, Texas A&M University, USA.

Altamimi, M (2024) BIM adoption in local-based architecture and engineering SMEs : Developing an application-based method to pinpoint objective BIM uses and align them with business standards to facilitate the execution of BIM projects in prospective architecture and engineering SMEs. PhD thesis, University of Pécs, Hungary.

Altawil, Shadi N A (2017) Multi-level knowledge extraction and modeling to support job hazard analysis process for oil and gas pipeline projects. PhD thesis, University of Alberta, Canada.

Alvanchi, A and JavadiAghdam, S (2019) Job site weather index: an indicator for open environment construction projects. Construction Innovation, 19(1), pp. 110-124. ISSN 1471-4175

Alzohbi, M G M (2015) A framework for evaluating material management performance in Jordanian concrete building projects. PhD thesis, Sheffield Hallam University, UK.

Alzubi, K. M.; Alaloul, W. S.; Al Salaheen, M.; Musarat, M. A.; Baarimah, A. O. and Mushtaha, A. W. (2025) Indoor construction productivity assessment using computer vision and mask region-based convolutional neural networks. Construction Innovation, 26(5), pp. 1523-1555. ISSN 1471-4175

Amavasai, A (2023) Beyond the deterministic approach: On the feasibility of data assimilation methods in geotechnics. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Amin, K F and Abanda, F H (2019) Building information modelling plan of work for managing construction projects in Egypt. Journal of Construction in Developing Countries, 24(2), pp. 23-61. ISSN 1823-6499

Amini, S; Rezvani, A; Tabassi, M and Malek Sadati, S S (2023) Causes of cost overruns in building construction projects in Asian countries; Iran as a case study. Engineering, Construction and Architectural Management, 30(7), pp. 2739-2766. ISSN 0969-9988

Amiri, R; Majrouhi Sardroud, J and Momenaei Kermani, V (2023) Decision support system for tower crane location and material supply point in construction sites using an integer linear programming model. Engineering, Construction and Architectural Management, 30(4), pp. 1444-1462. ISSN 0969-9988

Ammar, M. A. and Alattyih, W. (2026) Lingo optimization modelling of construction scheduling. International Journal of Construction Management, 26(9), pp. 1746-1760. ISSN 1562-3599

Ammar, M A and Samy, M (2015) Learning curve modelling of gas pipeline construction in Egypt. International Journal of Construction Management, 15(3), pp. 229-238. ISSN 1562-3599

Amoah, C (2017) Public procurement reforms in Ghana: impact on the growth of the local construction industry. PhD thesis, Nelson Mandela Metropolitan University, South Africa.

An, X; Li, H; Zuo, J; Ojuri, O; Wang, Z and Ding, J (2018) Identification and prevention of unbalanced bids using the unascertained model. Journal of Construction Engineering and Management, 144(11): 05018013, ISSN 0733-9364

An, X; Zheng, F; Wang, Z; Li, Z; Jiao, Y and An, H (2025) Dynamic risk assessment approach for deep foundation pit construction based on the integration of multisource data using D-S evidence theory. Journal of Construction Engineering and Management, 151(10): 04025155, ISSN 0733-9364

Andersen, Janthea (2010) An empirical study of design management practices in collaborative design and construction projects: The roles, activities and conceptions of design management across project stages and within the building, civil and process sectors of a construction company. PhD thesis, University of Queensland, Australia.

Andersen, L P; Karlsen, I L; Kines, P; Joensson, T and Nielsen, K J (2015) Social identity in the construction industry: Implications for safety perception and behaviour. Construction Management and Economics, 33(8), pp. 640-652. ISSN 01446193

Andersson, N (2003) A mesoeconomic analysis of the construction sector. PhD thesis, Lund University, Sweden.

Anikeeff, M A and Sriram, V (2008) Construction management strategy and developer performance. Engineering, Construction and Architectural Management, 15(6), pp. 504-513. ISSN 0969-9988

Ansah, S K (2018) An integrated total quality management model for the Ghanaian construction industry. DPhil thesis, University of Johannesburg, South Africa.

Antoniou, F; Konstantinidis, D; Aretoulis, G and Xenidis, Y (2018) Preliminary construction cost estimates for motorway underpass bridges. International Journal of Construction Management, 18(4), pp. 321-330. ISSN 1562-3599

Antwi-Afari, M F; Li, H; Edwards, D J; Pärn, E A; Owusu-Manu, D G; Seo, J and Wong, A Y L (2018) Identification of potential biomechanical risk factors for low back disorders during repetitive rebar lifting. Construction Innovation, 18(2), pp. 206-226. ISSN 1471-4175

Antwi-Afari, M F; Li, H; Umer, W; Yu, Y and Xing, X (2020) Construction activity recognition and ergonomic risk assessment using a wearable insole pressure system. Journal of Construction Engineering and Management, 146(7): 04020077, ISSN 0733-9364

Aouad, G F (1991) Integrated planning systems for the construction industry. PhD thesis, Loughborough University, UK.

Appleton, B J A; Niaz, M A; Abourizk, S M; Al-Hussein, M and Mohamed, Y (2006) Priority rating logic simulation model for tower crane operations management. Journal of Construction Research, 7(1), pp. 133-147. ISSN 1609-9451

Arantes, A and Ferreira, L M D F (2020) Underlying causes and mitigation measures of delays in construction projects: An empirical study. Journal of Financial Management of Property and Construction, 25(2), pp. 165-181. ISSN 1366-4387

Araujo, Adolpho Guido de (2021) Methodology for evaluation of environmental aspects in urban subdivision works in the pre-construction phase. PhD thesis, Universidade Federal de Pernambuco, Brazil.

Arditi, D; Kale, S and Tangkar, M (1997) Innovation in construction equipment and its flow into the construction industry. Journal of Construction Engineering and Management, 123(4), pp. 371-378. ISSN 0733-9364

Arefizadeh, H and Shahir, H (2020) Three-dimensional analysis of anchored wall with concrete bearing pads. Journal of Engineering, Design and Technology, 18(6), pp. 1469-1486. ISSN 1726-0531

Ariaratnam, S T; Lueke, J S and Allouche, E N (1999) Utilization of trenchless construction methods by Canadian municipalities. Journal of Construction Engineering and Management, 125(2), pp. 76-86. ISSN 0733-9364

Arif, M; Bendi, D; Toma-Sabbagh, T and Sutrisna, M (2012) Construction waste management in India: An exploratory study. Construction Innovation, 12(2), pp. 133-155. ISSN 1471-4175

Arif, M and Egbu, C (2010) Making a case for offsite construction in China. Engineering, Construction and Architectural Management, 17(6), pp. 536-548. ISSN 0969-9988

Arocho Rosa, I d M (2015) The impact of transportation construction projects and activities on emissions. PhD thesis, North Carolina State University, USA.

Arora, J; Kar, S and Jha, K N (2023) Assessment of the significance of identified attributes affecting the rebar-fixing productivity using multiple regression. Journal of Construction Engineering and Management, 149(6): 04023039, ISSN 0733-9364

Arowoiya, V.; Oke, A.; Chan, M. and Adelusi, A. (2026) Benefits of adopting digital twin technology (dtt) in the Nigerian construction industry. International Journal of Construction Management, 26(7), pp. 1134-1148. ISSN 1562-3599

Arroyo, P (2014) Exploring decision-making methods for sustainable design in commercial buildings. PhD thesis, University of California, Berkeley, USA.

Ashuri, B and Lu, J (2010) Time series analysis of ENR construction cost index. Journal of Construction Engineering and Management, 136(11), pp. 1227-1237. ISSN 0733-9364

Ashuri, B; Shahandashti, S M and Lu, J (2012) Empirical tests for identifying leading indicators of ENR construction cost index. Construction Management and Economics, 30(11), pp. 917-927. ISSN 1466433X

Aslani, P (2007) Dynamic resource -constrained scheduling. PhD thesis, Polytechnic University, USA.

Asli, R A; Wedawatta, G; Hedges, P and Park, K (2016) Building environmental assessment scheme for residential building in Brunei. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2022) The impact of offsite construction on the workforce: Required skillset and prioritization of training needs. Journal of Construction Engineering and Management, 148(7): 04022056, ISSN 0733-9364

Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2022) Quantification of the state of practice of offsite construction and related technologies: Current trends and future prospects. Journal of Construction Engineering and Management, 148(7): 04022055, ISSN 0733-9364

Assaad, R H; El-Adaway, I H; Hastak, M and Lascola Needy, K (2023) Key factors affecting labor productivity in offsite construction projects. Journal of Construction Engineering and Management, 149(1): 04022158, ISSN 0733-9364

Assaad, R H; Omran, A; Soliman, N and Assaf, G (2024) Prediction of the lateral pressure of self-consolidating concrete on construction formwork systems using machine-learning algorithms. Journal of Construction Engineering and Management, 150(9): 04024110, ISSN 0733-9364

Atalah, A (2008) Effect of rock trenching vibrations on nearby structures. Journal of Construction Engineering and Management, 134(4), pp. 234-241. ISSN 0733-9364

Atkinson, B (2000) Inca: A retrospective performance tool for project management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Attar, A; Boudjakdji, M A; Bhuiyan, N; Grine, K; Kenai, S and Aoubed, A (2009) Integrating numerical tools in underground construction process. Engineering, Construction and Architectural Management, 16(4), pp. 376-391. ISSN 0969-9988

Aviram Traubita, A (2009) Structural response and cost characterization of bridge construction using seismic performance enhancement strategies. PhD thesis, University of California, Berkeley, USA.

Ayed Eid, A (2021) Effect of the transversal-spacing of stirrup-legs on the behavior and strength of shallow concealed RC beams. Journal of Engineering, Design and Technology, 19(4), pp. 932-942. ISSN 1726-0531

Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.

Ayyub, B M and Haidar, A (1985) Decisions in construction operations. Journal of Construction Engineering and Management, 111(4), pp. 343-357. ISSN 0733-9364

Baatz, N (2012) The UK Construction Act process plant exclusion. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 205-206. ISSN 17514312

Babalola, I H; Aigbavboa, C O; Aliu, J and Oke, A E (2025) Influence of emotional intelligence attributes on human resource management practices implementation in the Nigerian construction industry. Journal of Engineering, Design and Technology, 23(3), pp. 935-952. ISSN 1726-0531

Babazadeh, N; Teizer, J; Bargstädt, H J and Melzner, J (2025) Predictive simulation of construction site noise emissions from heavy equipment. Smart and Sustainable Built Environment, 14(3), pp. 715-739. ISSN 2046-6099

Bai, L (2013) RFID sensor-driven structural condition monitoring in integrated building information modeling environment. PhD thesis, University of Maryland, College Park, USA.

Bai, S; Li, M; Lu, Q; Tian, H and Qin, L (2022) Global time optimization method for dredging construction cycles of trailing suction hopper dredger based on grey system model. Journal of Construction Engineering and Management, 148(2): 04021198, ISSN 0733-9364

Bailey, M; Booth, C A; Horry, R; Vidalakis, C; Mahamadu, A M and Awuah, K G B (2020) Opinions of small and medium UK construction companies on environmental management systems. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(1), pp. 23-34. ISSN 17514304

Bakhtiyari, S; Kalali, A; Taghi Akbari, L and Farahbod, F (2017) The experimental behavior of CFRP-strengthened reinforced concrete slabs with fire protection systems subjected to standard fire exposure. International Journal of Disaster Resilience in the Built Environment, 8(3), pp. 238-250. ISSN 1759-5916

Bakti, E S; Majid, M Z B A; Zin, R M and Trigunarsyah, B (2011) Constructability improvement in seawater intake structure. Engineering, Construction and Architectural Management, 18(6), pp. 595-608. ISSN 0969-9988

Balasubramanian, S (2017) Green supply chain management: an investigation on the construction sector. PhD thesis, Middlesex University, UK.

Balatbat, M C A; Lin, C Y and Carmichael, D G (2011) Management efficiency performance of construction businesses: Australian data. Engineering, Construction and Architectural Management, 18(2), pp. 140-158. ISSN 0969-9988

Baldry, D (1997) The image of construction and its influence upon clients, participants, and consumers. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Baldwin, A; Li, H; Huang, T; Kong, C W; Guo, H L; Chan, N and Wong, J (2009) Supporting pre-tender construction planning with virtual prototyping. Engineering, Construction and Architectural Management, 16(2), pp. 150-161. ISSN 0969-9988

Ballesteros-Pérez, P; Sanz-Ablanedo, E; Soetanto, R; González-Cruz, M C; Larsen, G D and Cerezo-Narváez, A (2020) Duration and cost variability of construction activities: An empirical study. Journal of Construction Engineering and Management, 146(1): 04019093, ISSN 0733-9364

Ballesteros-Pérez, P; Smith, S T; Lloyd-Papworth, J G and Cooke, P (2018) Incorporating the effect of weather in construction scheduling and management with sine wave curves: Application in the United Kingdom. Construction Management and Economics, 36(12), pp. 666-682. ISSN 01446193

Ballesteros-Pérez, P; del Campo-Hitschfeld, M L; González-Naranjo, M A and González-Cruz, M C (2015) Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(6), pp. 596-621. ISSN 0969-9988

Baloi, D (2003) Sustainable construction: Challenges and opportunities. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Banawi, A and Bilec, M M (2014) A framework to improve construction processes: Integrating lean, green and six sigma. International Journal of Construction Management, 14(1), pp. 45-55. ISSN 1562-3599

Bangaru, S S (2021) Fatigue monitoring through wearable sensors for construction workers. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Baniassadi, F; Alvanchi, A and Mostafavi, A (2018) A simulation-based framework for concurrent safety and productivity improvement in construction projects. Engineering, Construction and Architectural Management, 25(11), pp. 1501-1515. ISSN 0969-9988

Barati, K; Shen, X; Li, N and Carmichael, D G (2022) Automatic mass estimation of construction vehicles by modeling operational and engine data. Journal of Construction Engineering and Management, 148(3): 4021208, ISSN 0733-9364

Barbosa, Adriano Aurelio Ribeiro (2014) Implementing a sound power method for testing noise on masonry saw. PhD thesis, Universidade Estadual de Campinas, Brazil.

Barham, W; Al-Maabreh, A and Latayfeh, O (2023) Effect of using magnetic water on the mechanical properties of concrete exposed to elevated temperature. International Journal of Building Pathology and Adaptation, 41(5), pp. 1086-1098. ISSN 23984708

Barnes, W C (1993) Microcomputers in management of construction operations. Journal of Construction Engineering and Management, 119(2), pp. 403-412. ISSN 0733-9364

Baroudi, B and McAnulty, S (2013) Management of remote construction projects: The Australian experience. International Journal of Construction Management, 13(2), pp. 1-12. ISSN 1562-3599

Barour, S and Zergua, A (2021) Numerical analysis of reinforced concrete beams strengthened in shear using carbon fiber reinforced polymer materials. Journal of Engineering, Design and Technology, 19(2), pp. 339-357. ISSN 1726-0531

Barras, G C and Mayo, R E (1995) Minidirectional drilling for installation of underground electrical conduit. Journal of Construction Engineering and Management, 121(4), pp. 364-369. ISSN 0733-9364

Barrett, P and Barrett, L (2006) The 4Cs model of exemplary construction projects. Engineering, Construction and Architectural Management, 13(2), pp. 201-215. ISSN 0969-9988

Barroso-Aguilar, L F (1973) An integrated modeling methodology for project-site management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.

Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364

Bates, W and Dawood, N N (1998) Development of a risk allocation strategy for construction in the process industry: A knowledge approach. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Bates, William (1999) A strategy for the development of a knowledge based system for predicting out-turn costs of heavy engineering works within a multi-national cost consultancy. PhD thesis, Teesside University, UK.

Battikha, M G and Davidson, C H (1996) Cause and effect 3-D model for measuring performance in construction acceleration: A decision support system. Building Research & Information, 24(6), pp. 351-357. ISSN 0961-3218

Bau, Z (2022) Developing circularity of construction waste in emerging economies: an environmental Kuznets curve approach. PhD thesis, University of Hong Kong, Hong Kong.

Bayandor, S; Kalatehjari, R; Akherati, R and Kasebzadeh, J (2025) Causes, effects and solutions of delay and cost overruns in Iranian deep excavation projects. Built Environment Project and Asset Management, 15(2), pp. 309-336. ISSN 2044-124X

Bello, A O; Okanlawon, T T; Gbenga, P O; Abdulraheem, A A and Olagoke, O T (2026) Critical success factors (csfs) for the implementation of distributed ledger technology (dlt) in the Nigerian construction industry. Construction Innovation, 26(2), pp. 531-550. ISSN 1471-4175

Bello, W (2018) Project performance diagnostics: A model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Bello, W A (2017) Project performance diagnostics: a model for assessing construction project performance in Nigeria. PhD thesis, University of Salford, UK.

Benjaoran, V and Bhokha, S (2009) Enhancing visualization of 4D CAD model compared to conventional methods. Engineering, Construction and Architectural Management, 16(4), pp. 392-408. ISSN 0969-9988

Benjaoran, V and Peansupap, V (2020) Grid-based construction site layout planning with particle swarm optimisation and travel path distance. Construction Management and Economics, 38(8), pp. 673-688. ISSN 01446193

Bennett, J and Ormerod, R N (1984) Simulation applied to construction projects. Construction Management and Economics, 2(3), pp. 225-263. ISSN 01446193

Berg, R and Hinze, J (2005) Theft and vandalism on construction sites. Journal of Construction Engineering and Management, 131(7), pp. 826-833. ISSN 0733-9364

Bergsdal, H; Brattebø, H; Bohne, R A and Müller, D B (2007) Dynamic material flow analysis for norway's dwelling stock. Building Research & Information, 35(5), pp. 557-570. ISSN 0961-3218

Bernold, L E (1985) Productivity transients in construction processes. PhD thesis, Georgia Institute of Technology, USA.

Bernold, L E (1989) Simulation of nonsteady construction processes. Journal of Construction Engineering and Management, 115(2), pp. 163-178. ISSN 0733-9364

Bernold, L E; Lorenc, S J and Luces, E (1997) Intelligent technology for truck crane accident prevention. Journal of Construction Engineering and Management, 123(3), pp. 276-284. ISSN 0733-9364

Berrill, P and Hertwich, E G (2021) Material flows and GHG emissions from housing stock evolution in US counties, 2020–60. Buildings & Cities, 2(1), pp. 599-617. ISSN 2632-6655

Bhat, A; Gupta, V; Aulakh, S S and Elsen, R S (2023) Generative design and analysis of a double-wishbone suspension assembly: A methodology for developing constraint oriented solutions for optimum material distribution. Journal of Engineering, Design and Technology, 21(3), pp. 927-942. ISSN 1726-0531

Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.

Bhurisith, I and Touran, A (2002) Case study of obsolescence and equipment productivity. Journal of Construction Engineering and Management, 128(4), pp. 357-361. ISSN 0733-9364

Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364

Bilec, M M (2007) A hybrid life cycle assessment model for construction processes. PhD thesis, University of Pittsburgh, USA.

Bilec, Melissa M (2007) A hybrid life cycle assessment model for construction processess. PhD thesis, University of Pittsburgh, USA.

Bilhaif, A (1990) The influence of high temperatures on the productivity of construction workers. PhD thesis, University of Reading, UK.

Bin Sh Said, S A A (2020) The adoption of building information modelling in facilities management. PhD thesis, Oxford Brookes University, UK.

Binti Ismail, S H (2016) Musculoskeletal modelling for ergonomics: shoulder & low back loading in bricklaying. PhD thesis, Imperial College London, UK.

Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools. PhD thesis, University of Huddersfield, UK.

Birkes, A Y (1999) Multimedia data definition and requirements for construction applications. PhD thesis, Georgia Institute of Technology, USA.

Björnfot, A and Jongeling, R (2007) Application of line-of-balance and 4D CAD for lean planning. Construction Innovation, 7(2), pp. 200-211. ISSN 1471-4175

Blacud, N A; Bogus, S M; Diekmann, J E and Molenaar, K R (2009) Sensitivity of construction activities under design uncertainty. Journal of Construction Engineering and Management, 135(3), pp. 199-206. ISSN 0733-9364

Blismas, N and Wakefield, R (2009) Drivers, constraints and the future of offsite manufacture in Australia. Construction Innovation, 9(1), pp. 72-83. ISSN 1471-4175

Blismas, N G; Sher, W D; Thorpe, A and Baldwin, A N (2004) Factors influencing project delivery within construction clients' multi-project environments. Engineering, Construction and Architectural Management, 11(2), pp. 113-125. ISSN 0969-9988

Blong, R (2004) Residential building damage and natural perils: Australian examples and issues. Building Research & Information, 32(5), pp. 379-390. ISSN 0961-3218

Boateng, E B (2021) The role of human safety interventions on co-workers’ safety outcomes in construction projects. PhD thesis, University of Newcastle, Australia.

Bogenberger, C; Dell'Amico, M; Fuellerer, G; Hoefinger, G; Iori, M; Novellani, S and Panicucci, B (2015) Two-phase earthwork optimization model for highway construction. Journal of Construction Engineering and Management, 141(6): 05015003, ISSN 0733-9364

Bokor, O (2022) Improving labour productivity in construction. A hybrid machine learning approach. PhD thesis, University of Northumbria at Newcastle, UK.

Bon, R (1996) Whither global construction? Some results of the ECERU opinion survey, 1993-95. Building Research & Information, 24(2), pp. 81-85. ISSN 0961-3218

Bon, R and Crosthwaite, D (2001) The future of international construction: Some results of 1992-1999 surveys. Building Research & Information, 29(3), pp. 242-247. ISSN 0961-3218

Bon, R and Yashiro, T (1996) Some new evidence of old trends: Japanese construction, 1960-1990. Construction Management and Economics, 14(4), pp. 319-323. ISSN 01446193

Boroujeni, K A (2023) Visual data analytic and robotics for automated construction performance monitoring. PhD thesis, North Carolina State University, USA.

Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.

Boyd, David (2006) Developing a knowledge centric approach to construction education. Architectural Engineering and Design Management, 2(1-2), pp. 149-159. ISSN 1745-2007

Boyes, G (2021) Towards BIM/GIS interoperability: a theoretical framework and practical generation of spaces to support infrastructure Asset Management. PhD thesis, University College London, UK.

Bradley, R A; Gohnert, M and Bulovic, I (2018) Construction considerations for low-cost earth brick shells. Journal of Construction in Developing Countries, 23(1), pp. 43-60. ISSN 1823-6499

Bresnen, M J; Bryman, A E; Ford, J R; Keil, E T; Beardsworth, A D and Jepson, M A (1984) Effective construction site management: A review. Journal of Construction Engineering and Management, 110(4), pp. 420-436. ISSN 0733-9364

Bresnen, M J; Ford, J R; Bryman, A E; Keil, E T; Beardsworth, A D and Wray, K (1986) Labour recruitment strategies and selection practices on construction sites. Construction Management and Economics, 4(1), pp. 37-55. ISSN 01446193

Bridge, A J (2008) Market structures in air conditioning maintenance activity. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Briggs, B (2021) An improved earned value management method integrating quality and safety. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Bronke J, F N (2023) Perceptions and understandings of construction site productivity: Insights from the Danish construction industry. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Brown, D C (2003) Novel method of excavation. Journal of Construction Engineering and Management, 129(2), pp. 222-225. ISSN 0733-9364

Bråthen, K and Moum, A (2016) Bridging the gap: Bringing BIM to construction workers. Engineering, Construction and Architectural Management, 23(6), pp. 751-764. ISSN 0969-9988

Cabahug, R R; Golding, P; Edwards, D J and Nicholas, J (2002) Cognitive 'visual' processing and manual dexterity: The influence of eye-to-hand coordination on a plant operator’s aptitude. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Cable, J K; Jaselskis, E J; Walters, R C; Li, L and Bauer, C R (2009) Stringless Portland cement concrete paving. Journal of Construction Engineering and Management, 135(11), pp. 1253-1260. ISSN 0733-9364

Cai, J (2020) Data-driven approach to holistic situational awareness in construction site safety management. PhD thesis, Purdue University, USA.

Cakan, H (2012) Analysis and modeling of roofer and steel worker fall accidents. PhD thesis, Wayne State University, USA.

Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.

Cao, W (2019) Data interpretation for infrastructure system diagnosis and prognosis based on model falsification. PhD thesis, National University of Singapore, Singapore.

Capano, C D (2007) Construction operations analysis for development of historical cost databases. PhD thesis, Marquette University, USA.

Carmichael, D G (1986) Shovel-truck queues: A reconciliation of theory and practice. Construction Management and Economics, 4(2), pp. 161-177. ISSN 01446193

Carmichael, D G and Mustaffa, N K (2018) Emissions and production penalties/bonuses associated with non-standard earthmoving loading policies. Construction Innovation, 18(2), pp. 227-245. ISSN 1471-4175

Carollo, Federica Carla (2023) Circularity in the construction and demolition waste management chain. PhD thesis, Politecnico di Milano, Italy.

Carreira, P; Castelo, T; Gomes, C C; Ferreira, A; Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users perception. Engineering, Construction and Architectural Management, 25(1), pp. 90-112. ISSN 0969-9988

Carreira, P; Castelo, T; Gomes, C C; Ferreira, A; Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users' perceptions. Engineering, Construction and Architectural Management, 25(1), pp. 90-112. ISSN 0969-9988

Cattell, D W; Bowen, P A and Kaka, A P (2007) Review of unbalanced bidding models in construction. Journal of Construction Engineering and Management, 133(8), pp. 562-573. ISSN 0733-9364

Cattell, D W; Bowen, P A and Kaka, A R (2008) A simplified unbalanced bidding model. Construction Management and Economics, 26(12), pp. 1283-1290. ISSN 1466433X

Chan, C T W and Pasquire, C (2002) Estimation of project overheads: A contractor’s perspective. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, P (2002) Factors affecting labour productivity in the construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Chan, P and Kaka, A (2004) Construction productivity measurement: A comparison of two case studies. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Chan, T K and Gao, S (2019) Can we really measure construction productivity? In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Chan, W T P (2009) Construction industry development and government policy. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chang Recavarren, L G (2023) Establishing the effect of building design on construction work. PhD thesis, Arizona State University, USA.

Chao, L-C (1994) An adaptive approach to evaluation of implementation prospects of new construction technologies. PhD thesis, Purdue University, USA.

Charles, S H; Chang-Richards, A and Yiu, T W (2022) What do post-disaster reconstruction project success indicators look like? End-user's perspectives. International Journal of Disaster Resilience in the Built Environment, 13(1), pp. 31-50. ISSN 1759-5916

Charoenngam, C; Coquinco, S T and Hadikusumo, B H W (2003) Web-based application for managing change orders in construction projects. Construction Innovation, 3(4), pp. 197-215. ISSN 1471-4175

Charoenngam, C and Maqsood, T (2001) A qualitative approach in problem solving process tracing of construction site engineers. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Chau, K W; Anson, M and Zhang, J P (2004) Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), pp. 598-606. ISSN 0733-9364

Chen, H-L (2002) Development of a systematic integration approach for multi-level cost flow prediction and management. PhD thesis, University of Florida, USA.

Chen, J; Taylor, J E and Comu, S (2017) Assessing task mental workload in construction projects: A novel electroencephalography approach. Journal of Construction Engineering and Management, 143(8): 04017053, ISSN 0733-9364

Chen, Jui-Lin (2025) Essays on housing and credit markets. PhD thesis, Duke University, USA.

Chen, Le (2007) Linking knowledge management to organisational business performance in construction. PhD thesis, Griffith University, Australia.

Chen, Q and Jin, R (2013) Multilevel safety culture and climate survey for assessing new safety program. Journal of Construction Engineering and Management, 139(7), pp. 805-817. ISSN 0733-9364

Chen, Q; Jin, R and Soboyejo, A (2013) Understanding a contractor's regional variations in safety performance. Journal of Construction Engineering and Management, 139(6), pp. 641-653. ISSN 0733-9364

Chen, S and Jiang, Y (2008) Pavement reflective cracking control with coarse-aggregate asphalt mix interlayer. International Journal of Construction Education and Research, 4(3), pp. 200-209. ISSN 1557-8771

Chen, Xilin (2025) Sustainability of underground infrastructure: Digitalisation-based embodied carbon assessment and design optimisation. PhD thesis, Monash University, Australia.

Chen, Y and Kamara, J M (2005) The use of mobile computing in construction information management. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chen, Z; Li, T; Qin, L and Jiang, Y (2025) Vision-guided autonomous block loading in a dual-robot collaborative handling framework. Journal of Construction Engineering and Management, 151(5): 04025035, ISSN 0733-9364

Cheng, T-m (1996) Impact of front-end loading on construction project cash-flows: A mathematical approach for determination of unit prices in bidding. PhD thesis, Purdue University, USA.

Cherian, T M (2020) E-business adoption in supply chain management: An exploratory study on construction companies in Kerala, India. PhD thesis, B S Abdur Rahman Crescent Institute of Science and Technology, India.

Cheung, S O; Yiu, T W; Leung, A Y T and Chiu, O K (2008) Catastrophic transitions of construction contracting behavior. Journal of Construction Engineering and Management, 134(12), pp. 942-952. ISSN 0733-9364

Chi, S and Caldas, C H (2012) Image-based safety assessment: Automated spatial safety risk identification of earthmoving and surface mining activities. Journal of Construction Engineering and Management, 138(3), pp. 341-351. ISSN 0733-9364

Chia, F C (2012) Construction and economic development: The case of Malaysia. International Journal of Construction Management, 12(1), pp. 23-35. ISSN 1562-3599

Chia, F C; Skitmore, M; Runeson, G and Bridge, A (2014) Economic development and construction productivity in Malaysia. Construction Management and Economics, 32(9), pp. 874-887. ISSN 01446193

Chidiobi, C (2022) Development of frameworks for the management of materials procurement and construction waste for Nigerian contractors. PhD thesis, University of the West of England, Bristol, UK.

Cho, C; Kim, K; Park, J and Cho, Y K (2018) Data-driven monitoring system for preventing the collapse of scaffolding structures. Journal of Construction Engineering and Management, 144(8): 04018077, ISSN 0733-9364

Cho, M (1994) Productivity analysis in construction using an expert system approach. PhD thesis, University of Manchester, UK.

Cho, Y-K (2000) Human-assisted rapid workspace modeling for construction equipment operations. PhD thesis, University of Texas at Austin, USA.

Chowdhury, R (2009) Life cycle based analysis of various materials used in road construction. PhD thesis, University of Toledo, USA.

Choy, C F (2011) Revisiting the 'Bon Curve'. Construction Management and Economics, 29(7), pp. 695-712. ISSN 1466433X

Christian, J (2002) An overview of systems utilizing information and communication technologies: Five research case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Christian, J and Hachey, D (1995) Effects of delay times on production rates in construction. Journal of Construction Engineering and Management, 121(1), pp. 20-26. ISSN 0733-9364

Christodoulou, S E; Ellinas, G N and Aslani, P (2009) Disorder considerations in resource-constrained scheduling. Construction Management and Economics, 27(3), pp. 229-240. ISSN 1466433X

Chua, D K H and Li, G M (2002) RISim: Resource-interacted simulation modeling in construction. Journal of Construction Engineering and Management, 128(3), pp. 195-202. ISSN 0733-9364

Chung, K H Y (2022) Data fusion, hedonic pricing, and blockchains: Lowering investment barriers for sustainable infrastructure. PhD thesis, University of Michigan, USA.

Chung, T H (2007) Simulation-based productivity modeling for tunnel construction operations. PhD thesis, University of Alberta, Canada.

Chung, T H; Mohamed, Y and Abourizk, S (2006) Bayesian updating application into simulation in the North Edmonton sanitary trunk tunnel project. Journal of Construction Engineering and Management, 132(8), pp. 882-894. ISSN 0733-9364

Clegg, D R (1999) A construction-specific simulation-based framework for earthworks. PhD thesis, Sheffield Hallam University, UK.

Clement, D; Aliabadi, A A; MacKey, J; Thé, J and Gharabaghi, B (2021) Dust emissions management model for construction sites. Journal of Construction Engineering and Management, 147(8): 04021092, ISSN 0733-9364

Cleveland, T G and Fashokun, A (2006) Construction-associated solids loads with a temporary sediment control bmp. Journal of Construction Engineering and Management, 132(10), pp. 1122-1125. ISSN 0733-9364

Cockerill, J E (1993) The construction industry in belfast 1800-1914. PhD thesis, Queen's University Belfast, UK.

Cole, R J (2000) Building environmental assessment methods: Assessing construction practices. Construction Management and Economics, 18(8), pp. 949-957. ISSN 01446193

Colwell, D A F and Ariaratnam, S T (2003) Evaluation of high-density polyethylene pipe installed using horizontal directional drilling. Journal of Construction Engineering and Management, 129(1), pp. 47-55. ISSN 0733-9364

Cooke, T (2013) Can knowledge sharing mitigate the effect of construction project complexity? Construction Innovation, 13(1), pp. 5-9. ISSN 1471-4175

Corcoran, J (2011) Engaging the workforce to establish a safety-conscious culture. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(2), pp. 71-78. ISSN 17514312

Corley, J and Deasley, P (2003) Factors affecting teamworking in construction service delivery projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Corona Suarez, G A (2007) Simulation-aided framework for assessing the effect of project quality management on construction performance. PhD thesis, University of Alberta, Canada.

Couto, J P and Teixeira, J C (2005) Using linear model for learning curve effect on highrise floor construction. Construction Management and Economics, 23(4), pp. 355-364. ISSN 01446193

Cui, Q; Hastak, M and Halpin, D (2010) Systems analysis of project cash flow management strategies. Construction Management and Economics, 28(4), pp. 361-376. ISSN 1466433X

Curran, M and Spillane, J P (2020) External stakeholder management and engagement on urban construction projects in Ireland. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(2), pp. 59-68. ISSN 17514304

Dabirian, S; Ahmadi, M and Abbaspour, S (2023) Analyzing the impact of financial policies on construction projects performance using system dynamics. Engineering, Construction and Architectural Management, 30(3), pp. 1201-1221. ISSN 0969-9988

Dai, F (2010) Applied photogrammetry for 3D modeling, quantity surveying, and augmented reality in construction. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Dai, J; Goodrum, P M and Maloney, W F (2007) Analysis of craft workers' and foremen's perceptions of the factors affecting construction labour productivity. Construction Management and Economics, 25(11), pp. 1139-1152. ISSN 01446193

Dai, J; Goodrum, P M and Maloney, W F (2009) Construction craft workers' perceptions of the factors affecting their productivity. Journal of Construction Engineering and Management, 135(3), pp. 217-226. ISSN 0733-9364

Damnjanovic, I and Zhou, X (2009) Impact of crude oil market behaviour on unit bid prices: The evidence from the highway construction sector. Construction Management and Economics, 27(9), pp. 881-890. ISSN 1466433X

Damrianant, Jirawat (1999) Petri net-based systems for construction-process modelling and simulation. PhD thesis, University of New South Wales, Australia.

Dan, Y and Liu, G (2024) Integrated scheduling optimization of production and transportation for precast component with delivery time window. Engineering, Construction and Architectural Management, 31(8), pp. 3335-3355. ISSN 0969-9988

Daoud, A O; KhairEldin, M; Ibrahim, A H and Toma, H M (2026) Adaptive neuro-fuzzy inference system for Egyptian residential construction waste prediction. International Journal of Construction Management, 26(6), pp. 1059-1077. ISSN 1562-3599

Dardouri, S; BuHamdan, S; Al Balkhy, W; Dakhli, Z; Danel, T and Lafhaj, Z (2023) RFID platform for construction materials management. International Journal of Construction Management, 23(14), pp. 2509-2519. ISSN 1562-3599

Davey, C L; Powell, J A; Powell, J E and Cooper, I (2002) Action learning in a medium-sized construction company. Building Research & Information, 30(1), pp. 5-15. ISSN 0961-3218

Davies, P J; Emmitt, S and Firth, S K (2014) Challenges for capturing and assessing initial embodied energy: A contractor's perspective. Construction Management and Economics, 32(3), pp. 290-308. ISSN 01446193

Dawood, N and Sikka, S (2009) Development of 4D based performance indicators in construction industry. Engineering, Construction and Architectural Management, 16(5), pp. 438-458. ISSN 0969-9988

Dawood, N N and Bates, W (1998) Forecasting indices for construction activities in the heavy civil engineering industry: A joint approach methodology. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Dawood, N N and Marasini, R (1999) Optimization of stockyard layout for the pre-cast building products industry. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

De Lapp, J A; Ford, D N; Bryant, J A and Horlen, J (2004) Impacts of CAD on design realization. Engineering, Construction and Architectural Management, 11(4), pp. 284-291. ISSN 0969-9988

De Lima, R X; Júnior, E F N; Prata, B D A and Weissmann, J (2013) Distribution of materials in road earthmoving and paving: Mathematical programming approach. Journal of Construction Engineering and Management, 139(8), pp. 1046-1054. ISSN 0733-9364

De Venny, A S (1999) Recycling of demolished masonry rubble. PhD thesis, Edinburgh Napier University, UK.

Deep, S; Joshi, R and Patil, S (2023) Identifying the contractor's core competencies in post-COVID-19 scenario: Developing a survey instrument. Engineering, Construction and Architectural Management, 30(9), pp. 3781-3797. ISSN 0969-9988

Deep, S; Vishnoi, S; Malhotra, R; Mathur, S; Yawale, H; Kumar, A and Singla, A (2025) Influence of augmented reality and virtual reality on real estate investment decisions: Understand consumer perspective in Indian AEC industry. Engineering, Construction and Architectural Management, 32(2), pp. 1122-1140. ISSN 0969-9988

Delavar, M (2017) BIM assisted design process automation for pre-engineered buildings (PEB). PhD thesis, University of Western Ontario, Canada.

Deng, T; Sharafat, A; Lee, S and Seo, J (2024) Automatic vision-based dump truck productivity measurement based on deep-learning illumination enhancement for low-visibility harsh construction environment. Journal of Construction Engineering and Management, 150(11): 04024154, ISSN 0733-9364

Deng, Y; Gan, V J L; Das, M; Cheng, J C P and Anumba, C (2019) Integrating 4D BIM and GIS for construction supply chain management. Journal of Construction Engineering and Management, 145(4): 04019016, ISSN 0733-9364

Deng, Zhong Ming (1995) Extended state space modelling and influence diagrams for construction processes and aids. PhD thesis, University of New South Wales, Australia.

Dhal, M (2020) Labor stand: Face of precarious migrant construction workers in India. Journal of Construction Engineering and Management, 146(6): 04020048, ISSN 0733-9364

Dharmapalan, V; Gambatese, J A; Fradella, J and Moghaddam Vahed, A (2015) Quantification and assessment of safety risk in the design of multistory buildings. Journal of Construction Engineering and Management, 141(4): 04014090, ISSN 0733-9364

Ding, Grace K C (2004) The development of a multi-criteria approach for the measurement of sustainable performance for built projects and facilities. PhD thesis, University of Technology Sydney, Australia.

Djebarni, R (1996) The impact of stress in site management effectiveness. Construction Management and Economics, 14(4), pp. 281-293. ISSN 01446193

Dlamini, S (2014) The relationship of the construction sector to economic growth: analysis of South African and UK construction sectors. PhD thesis, University of Reading, UK.

Dobrucali, E; Demirkesen, S; Sadikoglu, E; Zhang, C and Damci, A (2024) Investigating the impact of emerging technologies on construction safety performance. Engineering, Construction and Architectural Management, 31(3), pp. 1322-1347. ISSN 0969-9988

Doloi, H (2008) Application of AHP in improving construction productivity from a management perspective. Construction Management and Economics, 26(8), pp. 841-854. ISSN 01446193

Doloi, H (2009) Analysis of pre-qualification criteria in contractor selection and their impacts on project success. Construction Management and Economics, 27(12), pp. 1245-1263. ISSN 1466433X

Doloi, H (2013) Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. Journal of Construction Engineering and Management, 139(3), pp. 267-279. ISSN 0733-9364

Domdouzis, K (2007) Applications of wireless sensor technologies in construction. PhD thesis, Loughborough University, UK.

Dong, Z.; Lu, W.; Wu, L.; Jiang, C. and Fu, Y. (2026) Efficiency-enhanced machine learning on blockchain (MLOB) framework for real-time construction activities recognition. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988

Dong, S (2012) A single element based modeling approach for simulating construction operations. PhD thesis, University of Nebraska - Lincoln, USA.

Dorji, K and Hadikusumo, B H W (2006) Safety management practices in the Bhutanese construction industry. Journal of Construction in Developing Countries, 11(2), pp. 53-75. ISSN 1823-6499

Drewer, S P (1978) Traditional industry in modern capitalist economies: A study of the construction sector in France and the United Kingdom. PhD thesis, University of Sussex, UK.

Druker, J and Croucher, R (1999) Human resource management in European construction companies. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Du, W; M.E. Sepasgozar, S; Khan, A; Shirowzhan, S and Garzon Romero, J (2025) Developing an interactive pile training module for construction risk management and gaging users' intentions. Construction Innovation, 25(3), pp. 893-911. ISSN 1471-4175

Duanshun, Li (2018) Towards fully integrated and automated construction planning on earthworks projects. PhD thesis, University of Alberta, Canada.

Duff, A R (1987) Interference in stochastic flow-line models. Journal of Construction Engineering and Management, 113(3), pp. 385-398. ISSN 0733-9364

Duff, A R; Robertson, I T; Phillips, R A and Cooper, M D (1994) Improving safety by the modification of behaviour. Construction Management and Economics, 12(1), pp. 67-78. ISSN 01446193

Dulaimi, M; Khalfan, M M A and McDermott, P (2006) Innovating for supply chain integration within construction. Construction Innovation, 6(3), pp. 143-157. ISSN 1471-4175

Dulaimi, M F (1991) Job behaviour of site managers: Its determinants and assessment. PhD thesis, University of Bath, UK.

Dunston, P S; Sinfield, J V and Lee, T Y (2007) Technology development decision economics for real-time rolling resistance monitoring of haul roads. Journal of Construction Engineering and Management, 133(5), pp. 393-402. ISSN 0733-9364

Dupin, P (2021) Using pull and flow systems to improve production stability in real estate development projects. PhD thesis, Nottingham Trent University, UK.

Durdyev, S and Mbachu, J (2018) Key constraints to labour productivity in residential building projects: Evidence from Cambodia. International Journal of Construction Management, 18(5), pp. 385-393. ISSN 1562-3599

Durdyev, S; Mohamed, S; Lay, M L and Ismail, S (2017) Key factors affecting construction safety performance in developing countries: Evidence from Cambodia. Construction Economics and Building, 17(4), pp. 48-65. ISSN 2204-9029

Easa, S M (1988) Earthwork allocations with linear unit costs. Journal of Construction Engineering and Management, 114(4), pp. 641-655. ISSN 0733-9364

Ebekozien, A; Aigbavboa, C; Ahmed, M A H; Samsurijan, M S and Aliu, J (2025) Appraising construction artisans health insurance enrolment to achieve sustainable development goal 3 in the informal sector: Issues and solutions. International Journal of Building Pathology and Adaptation, 43(8), pp. 26-40. ISSN 2398-4708

Ebekozien, A; Aigbavboa, C; Ahmed, M A H; Thwala, W D; Samsurijan, M S; Aliu, J; Adekunle, S A; Akinradewo, O and Adoye, J (2025) Investigating personal protective equipment awareness of artisans in the informal sector: Issues and measures to improve achieving SDG 3. International Journal of Building Pathology and Adaptation, 43(8), pp. 59-74. ISSN 2398-4708

Ebekozien, A; Aigbavboa, C O; Thwala, W D D; Aigbedion, M I and Ogbaini, I F (2023) An appraisal of generic skills for Nigerian built environment professionals in workplace: The unexplored approach. Journal of Engineering, Design and Technology, 21(6), pp. 1841-1856. ISSN 1726-0531

Ebrahiminejad, M; Shakeri, E and Ardeshir, A (2014) Establishing abatement alternatives in construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Echeverry, D (1991) Factors for generating initial construction schedules. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Echeverry, D; Ibbs, C W and Kim, S (1991) Sequencing knowledge for construction scheduling. Journal of Construction Engineering and Management, 117(1), pp. 118-130. ISSN 0733-9364

Edwards, D J and Holt, G D (2000) Estivate: A model for calculating excavator productivity and output costs. Engineering, Construction and Architectural Management, 7(1), pp. 52-62. ISSN 0969-9988

Edwards, D J and Holt, G D (2005) Exposure to hand-arm vibration: Implications of new statutory requirements. Building Research & Information, 33(3), pp. 257-266. ISSN 0961-3218

Edwards, D J and Holt, G D (2008) Health and safety issues relating to construction excavators and their attachments. Engineering, Construction and Architectural Management, 15(4), pp. 321-335. ISSN 0969-9988

Edwards, D J and Holt, G D (2010) The case for "3D triangulation" when applied to construction management research. Construction Innovation, 10(1), pp. 25-41. ISSN 1471-4175

Egbu, C O; Gaskell, C and Howes, J (2001) The role of organizational culture and motivation in the effective utilization of information technology for teamworking in construction. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Egwunatum, S I; Anumudu, A C; Eze, E C and Awodele, I A (2022) Total quality management (TQM) implementation in the Nigerian construction industry. Engineering, Construction and Architectural Management, 29(1), pp. 354-382. ISSN 0969-9988

El-Hasia, A M (2005) The effects of state's construction procurement policy implementation on the outcome of local construction projects: the Libyan case. PhD thesis, University of Salford, UK.

El-Kelesh, A M and Hassan, D A (2023) Impact of ground conditions and excavation depth on selection of excavation support system. International Journal of Construction Management, 23(15), pp. 2539-2550. ISSN 1562-3599

El-Omari, S (2008) Automated data acquisition for tracking and control of construction projects. PhD thesis, Concordia University, Canada.

El-Rayes, K and Khalafallah, A (2005) Trade-off between safety and cost in planning construction site layouts. Journal of Construction Engineering and Management, 131(11), pp. 1186-1195. ISSN 0733-9364

El-Rayes, K and Moselhi, O (2001) Impact of rainfall on the productivity of highway construction. Journal of Construction Engineering and Management, 127(2), pp. 125-131. ISSN 0733-9364

El-Razek, M E A (1999) New method for construction of diaphragm walls. Journal of Construction Engineering and Management, 125(4), pp. 233-241. ISSN 0733-9364

ElMenshawy, M and Marzouk, M (2021) Automated BIM schedule generation approach for solving time–cost trade-off problems. Engineering, Construction and Architectural Management, 28(10), pp. 3346-3367. ISSN 0969-9988

ElNimr, A A (2011) Enhancing space modeling and mobile resources planning in construction operations through a simulation driven visualization framework. PhD thesis, University of Alberta, Canada.

Elazouni, A M and Basha, I M (1996) Evaluating the performance of construction equipment operators in Egypt. Journal of Construction Engineering and Management, 122(2), pp. 109-114. ISSN 0733-9364

Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364

Elazouni, A M and Metwally, F G (2005) Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), pp. 400-412. ISSN 0733-9364

Eldin, N N and Egger, S (1990) Productivity improvement tool: Camcorders. Journal of Construction Engineering and Management, 116(1), pp. 100-111. ISSN 0733-9364

Eldin, N N and Mayfield, J (2005) Determination of most economical scrapers fleet. Journal of Construction Engineering and Management, 131(10), pp. 1109-1114. ISSN 0733-9364

Eldukair, Z A R (1988) Safety assessment and optimization of construction operations based on fuzzy sets. PhD thesis, University of Maryland, College Park, USA.

Elgendi, E M O (2016) An automated dynamic site layout planning system: a case study of Egypt. PhD thesis, University of Salford, UK.

Elghaish, F; Matarneh, S T and Alhusban, M (2022) The application of "deep learning" in construction site management: Scientometric, thematic and critical analysis. Construction Innovation, 22(3), pp. 580-603. ISSN 1471-4175

Ellis Jr, R D and Lee, S H (2006) Measuring project level productivity on transportation projects. Journal of Construction Engineering and Management, 132(3), pp. 314-320. ISSN 0733-9364

Elmasoudi, I; Ibrahim, M G; Tokimatsu, K and Elbeltagi, E (2022) Environmental impact assessment model for buildings' construction activities. International Journal of Construction Management, 22(5), pp. 849-860. ISSN 1562-3599

Elvin, G A (1998) A process model for integrated design and construction. PhD thesis, University of California, Berkeley, USA.

Emere, C E; Clinton, C; Thwala, W D and Akinradewo, O I (2025) A principal component analysis of sustainable building construction features for project delivery in South Africa. Journal of Engineering, Design and Technology, 23(5), pp. 1463-1482. ISSN 1726-0531

Emuze, F (2018) Foreseeing countermeasures for construction safety violations in South Africa. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Emuze, F (2020) Factors causing fatigue and safety-related errors on construction sites in bloemfontein. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Emuze, F; Linake, M and Seboka, L (2016) Construction work and the housekeeping challenge in Lesotho. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Enshassi, A; Al-Najjar, J and Kumaraswamy, M (2009) Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), pp. 126-151. ISSN 1366-4387

Enshassi, A; Kumaraswamy, M and Jomah, A N (2010) Significant factors causing time and cost overruns in construction projects in the Gaza Strip: Contractors' perspective. International Journal of Construction Management, 10(1), pp. 35-60. ISSN 1562-3599

Enshassi, A and Shaath, K (2007) Training assessment of palestinian contractors. Journal of Construction in Developing Countries, 12(1), pp. 39-58. ISSN 1823-6499

Epstein, W C (1995) Development of a systematic approach for knowledge acquisition and experience capture of veteran practitioners in the highway construction industry. PhD thesis, University of Florida, USA.

Ershadi, M.; Jefferies, M.; Davis, P. and Mojtahedi, M. (2021) Achieving sustainable procurement in construction projects: The pivotal role of a project management office. Construction Economics and Building, 21(1), pp. 45-64. ISSN 2204-9029

Ershadi, M; Jefferies, M; Davis, P and Mojtahedi, M (2021) Enhancing productivity in infrastructure development: The key role of project management offices. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Esa, Mohd Reza (2018) Moving towards sustainable construction in Malaysia: A holistic model for construction and demolition (c&d) waste management. PhD thesis, University of Queensland, Australia.

Esmaeeli, A N and Heravi, G (2019) Real options approach versus conventional approaches to valuing highway projects under uncertainty. Journal of Construction Engineering and Management, 145(11): 04019068, ISSN 0733-9364

Everett, J G (1999) Overexertion injuries in construction. Journal of Construction Engineering and Management, 125(2), pp. 109-114. ISSN 0733-9364

Everett, J G and Farghal, S H (1997) Data representation for predicting performance with learning curves. Journal of Construction Engineering and Management, 123(1), pp. 46-52. ISSN 0733-9364

Everett, J G; Halkali, H and Schlaff, T G (1998) Time-lapse video applications for construction project management. Journal of Construction Engineering and Management, 124(3), pp. 204-209. ISSN 0733-9364

Ezzeldine, O Y (1995) Design of tunnels constructed using pressurized shield methods. PhD thesis, University of Alberta, Canada.

Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.

Falorca, J F and Lanzinha, J C G (2021) Facade inspections with drones–theoretical analysis and exploratory tests. International Journal of Building Pathology and Adaptation, 39(2), pp. 235-258. ISSN 23984708

Fang, X; Yang, L; Zhang, C; Yang, J and Zhou, W (2025) Large diameter shafts in fractured strata: Equipment and construction procedures. Journal of Construction Engineering and Management, 151(9): 06025001, ISSN 0733-9364

Farmer, I W (1996) Performance of chain trenchers in mixed ground. Journal of Construction Engineering and Management, 122(2), pp. 115-124. ISSN 0733-9364

Farrell, P (1999) Construction site managers: an investigation into the career development and role of site managers on medium-sized construction projects. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Farrell, P and Gale, A (2003) Career progression path as a determinant of site manager skills. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Fazio, P; Théberge, P; revay, S and Moselhi, O (1988) Design impact of construction fast-track. Construction Management and Economics, 6(3), pp. 195-208. ISSN 01446193

Feng, Chen (2015) Camera marker networks for pose estimation and scene understanding in construction automation and robotics. PhD thesis, University of Michigan, USA.

Feng, Z; Lovreglio, R; Yiu, T W; Acosta, D M; Sun, B and Li, N (2024) Immersive virtual reality training for excavation safety and hazard identification. Smart and Sustainable Built Environment, 13(4), pp. 883-907. ISSN 2046-6099

Fernando, M H V; Costa, D D; Malsha Nadeetharu, B K and Kulatunga, U (2024) Application of lean principles for building refurbishment projects in Sri Lanka. Built Environment Project and Asset Management, 14(2), pp. 244-259. ISSN 2044-124X

Fetterhoff III, O G (2004) Comparative evaluation of strategic construction-market forecasting methodologies. PhD thesis, University of Florida, USA.

Fikri Mohamed, S and Anumba, C J (2006) Potential for improving site management practices through knowledge management. Construction Innovation, 6(4), pp. 232-249. ISSN 1471-4175

Fiorani, Viviane Miranda Araujo (2016) Building sites environmental compensations in urban areas: Focusing the anthropic environment. PhD thesis, Universidade de São Paulo, Brazil.

Fitriani, H and Ajayi, S (2023) Investigation of requisite measures for enhancing sustainable construction practices in Indonesia. Engineering, Construction and Architectural Management, 30(6), pp. 2602-2620. ISSN 0969-9988

Flory, J P (2025) The value of using prequalification scores for assessing contractor safety climate at chemical manufacturing sites. PhD thesis, Indiana University of Pennsylvania, USA.

Flynn, M A and Sampson, J M (2012) Trench safety-using a qualitative approach to understand barriers and develop strategies to improve trenching practices. International Journal of Construction Education and Research, 8(1), pp. 63-79. ISSN 1557-8771

Fondahl, J W (1991) The development of the construction engineer: Past progress and future problems. Journal of Construction Engineering and Management, 117(3), pp. 380-392. ISSN 0733-9364

Forcael, E (2010) Buffering strategies for managing transportation construction projects. PhD thesis, University of Florida, USA.

Forsythe, P (2015) Monitoring customer perceived service quality and satisfaction during the construction process. Construction Economics and Building, 15(1), pp. 19-42. ISSN 2204-9029

Forsythe, P and Ding, G (2014) Greenhouse gas emissions from excavation on residential construction sites. Construction Economics and Building, 14(4), pp. 1-10. ISSN 2204-9029

Foster-Smith, L; Walsh, S; Crapper, M and Sherratt, F (2014) Safety and volunteer construction workers. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Fox, D S J (1994) Knowledge-based systems for the demolition industry. PhD thesis, University of Portsmouth, UK.

Frame, S M (1969) A descriptive study of the relationship of an economic index and school construction bid economy in fourteen Southern California counties. EdD thesis, New Mexico State University, USA.

Francis, A (2013) The chronographical approach for construction project modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(4), pp. 188-204. ISSN 17514312

Francis, A (2016) A chronographic protocol for modelling construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 168-177. ISSN 17514304

Francis, A (2017) Simulating uncertainties in construction projects with chronographical scheduling logic. Journal of Construction Engineering and Management, 143(1): 04016085, ISSN 0733-9364

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Fraser, C (2000) The influence of personal characteristics on effectiveness of construction site managers. Construction Management and Economics, 18(1), pp. 29-36. ISSN 01446193

Fredriksson, A; Janné, M and Peltokorpi, A (2024) Making logistics a central core in complex construction projects: a power-dependency analysis. Construction Management and Economics, 42(11-12), pp. 963-976. ISSN 01446193

Freitas, Márcia Regina de (2008) Computacional tool for support planning and elaboration of construction site layout. PhD thesis, Universidade de São Paulo, Brazil.

Furber, A; Duncan, S; Smith, S D and Crapper, M (2012) The health and safety implications of socio-cultural context for community construction projects in developing countries. Construction Management and Economics, 30(10), pp. 857-867. ISSN 1466433X

Furber, A M (2013) Social and cultural context of rural water and sanitation projects: Case studies from Ghana. PhD thesis, University of Edinburgh, UK.

Fuyama, H (1993) Computer assisted conceptual structural design of steel buildings. PhD thesis, Stanford University, USA.

Gadisa, B and Zhou, H (2021) Exploring influential factors leading to the poor performance of public construction project in Ethiopia using structural equation modelling. Engineering, Construction and Architectural Management, 28(6), pp. 1683-1712. ISSN 0969-9988

Gall, G (2012) Industrial conflict in the engineering construction industry in Britain. Construction Management and Economics, 30(7), pp. 535-544. ISSN 1466433X

Gallardo, Amarilis Lucia Casteli Figueiredo (2004) Evaluation of the environmental management practices in the construction of the descending roadway of imigrantes highway. PhD thesis, Universidade de São Paulo, Brazil.

Gambatese, J A and James, D E (2001) Dust suppression using truck-mounted water spray system. Journal of Construction Engineering and Management, 127(1), pp. 53-59. ISSN 0733-9364

Gamil, Y; Al-Sarafi, A H and Najeh, T (2023) Post COVID-19 pandemic possible business continuity strategies for construction industry revival a preliminary study in the Malaysian construction industry. International Journal of Disaster Resilience in the Built Environment, 14(5), pp. 640-654. ISSN 1759-5916

Ganah, A A M; Anumba, C J and Bouchlaghem, N M (2000) The use of visualization to communicate design information to construction sites. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Gangrade, R (2021) Quantifying spatial geotechnical uncertainty to advance the practice of risk assessment and decision-making for tunnel projects. PhD thesis, Colorado School of Mines, USA.

Gann, D (1997) Should governments fund construction research? Building Research & Information, 25(5), pp. 257-267. ISSN 0961-3218

Gao, T; Ergan, S; Akinci, B and Garrett, J H (2014) Proactive productivity management at job sites: Understanding characteristics of assumptions made for construction processes during planning based on case studies and interviews. Journal of Construction Engineering and Management, 140(3): 4013054, ISSN 0733-9364

Garcera, F C (2008) The rationale behind a small school district's decision to hire a facilities manager. EdD thesis, University of Pacific, USA.

Garcia, C; Huebschman, R; Abraham, D M and Bullock, D M (2006) Using GPS to measure the impact of construction activities on rural interstates. Journal of Construction Engineering and Management, 132(5), pp. 508-515. ISSN 0733-9364

Garcia-Lopez, N P (2017) An activity and flow-based construction model for managing on-site work. PhD thesis, Stanford University, USA.

Garcia-Lopez, N P and Fischer, M (2024) Managing on-site production using an activity and flow-based construction model. Journal of Construction Engineering and Management, 150(1): 04023144, ISSN 0733-9364

Gardiner, P D (1993) Conflict analysis in construction project management. PhD thesis, Durham University, UK.

Gardiner, P D and Simmons, J E L (1992) Analysis of conflict and change in construction projects. Construction Management and Economics, 10(6), pp. 459-478. ISSN 01446193

Gatton, T M (1991) Designing for construction automation: Advanced automation technologies for computer integrated construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Gelisen, G (2010) Automated productivity based schedule animation (APBSA). PhD thesis, Polytechnic Institute of New York University, USA.

Gelisen, G and Griffis, F H (2014) Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis. Journal of Construction Engineering and Management, 140(4): B4013007, ISSN 0733-9364

George, M G (2003) The implementation of project management in the building construction field in the United Arab Emirates. PhD thesis, University of South Wales, UK.

Gerami Seresht, N and Fayek, A R (2018) Dynamic modeling of multifactor construction productivity for equipment-intensive activities. Journal of Construction Engineering and Management, 144(9): 04018091, ISSN 0733-9364

Gerber, B and Ekenel, M (2013) Building code requirements for inspection of adhesive anchors in concrete. Journal of Construction Engineering and Management, 139(10): 06013001, ISSN 0733-9364

Ghanem, A (2007) Real-time construction project progress tracking: A hybrid model for wireless technologies selection, assessment, and implementation. PhD thesis, Florida State University, USA.

Ghanem, A (2023) Integrated framework for multi-hazard resilience assessment of infrastructures. PhD thesis, University of Hawai'i at Manoa, USA.

Ghannoum, M; Assaad, J; Daaboul, M and El-Mir, A (2025) Deterministic and stochastic finite element modeling of reinforced concrete beams without stirrups containing plastic wastes. International Journal of Building Pathology and Adaptation, 43(4), pp. 614-632. ISSN 2398-4708

Ghazal, N M (1992) Design of excavation operations using expert systems. PhD thesis, University of Cincinnati, USA.

Ghorai, S (2017) Accelerated construction of roadways: Life cycle assessment and environmental impacts. PhD thesis, Syracuse University, USA.

Ghosh, S and Burghart, J (2021) Lean construction: Experience of us contractors. International Journal of Construction Education and Research, 17(2), pp. 133-153. ISSN 1557-8771

Gilkey, D P (2002) Occupational low back pain in residential carpenters: Ergonomic elements of posture and strain. PhD thesis, Colorado State University, USA.

Ginigaddara, B; Perera, S; Feng, Y; Rahnamayiezekavat, P and Kagioglou, M (2024) Industry 4.0 driven emerging skills of offsite construction: A multi-case study-based analysis. Construction Innovation, 24(3), pp. 747-769. ISSN 1471-4175

Ginigaddara, B; Perera, S; Feng, Y; Rahnamayiezekavat, P and Thomson, R (2023) Development of offsite construction skill profile prediction models using mixed-effect regression analysis. Construction Management and Economics, 41(10), pp. 820-839. ISSN 01446193

Gledson, B; Williams, D and Littlemore, M (2018) Construction planning efficiency and delivery time performance: Analysing failure in task-level 'hit rates'. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Goldwyn, B (2022) Drawing from local, multi-hazard safety perceptions and engineering assessments for safer housing. PhD thesis, University of Colorado at Boulder, USA.

Golizadeh, H; Hosseini, M R; Edwards, D J; Abrishami, S; Taghavi, N and Banihashemi, S (2019) Barriers to adoption of RPAs on construction projects: a task–technology fit perspective. Construction Innovation, 19(2), pp. 149-169. ISSN 1471-4175

Gong, J (2009) An object recognition, tracking, and contextual reasoning based video interpretation methodology for rapid productivity analysis of construction operations. PhD thesis, University of Texas at Austin, USA.

Gong, J; Borcherding, J D and Caldas, C H (2011) Effectiveness of craft time utilization in construction. Construction Management and Economics, 29(7), pp. 737-751. ISSN 1466433X

Gonzlez, V; Alarcn, L F; Maturana, S and Bustamante, J A (2011) Site management of work-in-process buffers to enhance project performance using the reliable commitment model: Case study. Journal of Construction Engineering and Management, 137(9), pp. 707-715. ISSN 0733-9364

Goodrum, P M and Haas, C T (2004) Long-term impact of equipment technology on labor productivity in the U.S. Construction industry at the activity level. Journal of Construction Engineering and Management, 130(1), pp. 124-133. ISSN 0733-9364

Goodrum, P M; Haas, C T and Glover, R W (2002) The divergence in aggregate and activity estimates of US construction productivity. Construction Management and Economics, 20(5), pp. 415-423. ISSN 01446193

Goodrum, P M; Zhai, D and Yasin, M F (2009) Relationship between changes in material technology and construction productivity. Journal of Construction Engineering and Management, 135(4), pp. 278-287. ISSN 0733-9364

Goto, Y (2012) Sustainable wooden building concept for central Japan. DSc thesis, ETH Zürich, Switzerland.

Gounder, S; Hasan, A; Shrestha, A and Elmualim, A (2023) Barriers to the use of sustainable materials in Australian building projects. Engineering, Construction and Architectural Management, 30(1), pp. 189-209. ISSN 0969-9988

Gowda, R K; Singh, A and Connolly, M (1998) Holistic enhancement of the production analysis of bituminous paving operations. Construction Management and Economics, 16(4), pp. 417-432. ISSN 01446193

Graham, D P (2005) Stochastic modelling and analysis of construction processes. PhD thesis, University of Edinburgh, UK.

Graham, L D and Smith, S D (2003) A hybrid model to improve the estimation of concreting operations. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Graham, L D and Smith, S D (2004) A method for effectively implementing construction process productivity estimation models. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Graham, L D; Smith, S D and Dunlop, P (2005) Lognormal distribution provides an optimum representation of the concrete delivery and placement process. Journal of Construction Engineering and Management, 131(2), pp. 230-238. ISSN 0733-9364

Gransberg, D D (1996) Optimizing haul unit size and number based on loading facility characteristics. Journal of Construction Engineering and Management, 122(3), pp. 248-253. ISSN 0733-9364

Gray, C and Little, J (1985) A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(2), pp. 121-144. ISSN 01446193

Greene, I; Lokuge, W and Karunasena, W (2020) Structural design of floodways under extreme flood loading. International Journal of Disaster Resilience in the Built Environment, 11(4), pp. 535-555. ISSN 1759-5916

Greenwood, D J (2001) Power and proximity: A study of subcontract formation in the UK building industry. PhD thesis, University of Reading, UK.

Grifa, M A (2006) The construction industry in Libya , with particular reference to operations in Tripoli. PhD thesis, University of Newcastle upon Tyne, UK.

Grimm, Alec G (2023) Modeling and monitoring construction site sediment control measures to improve design, performance, and longevity. PhD thesis, Ohio State University, USA.

Gruneberg, S (2010) Does the Bon curve apply to infrastructure markets? In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Gunawardena, K and Steemers, K (2023) Assessing the influence of neighbourhood-scale vertical greening application. Buildings & Cities, 4(1), pp. 103-123. ISSN 2632-6655

Gundes, S (2011) Exploring the dynamics of the Turkish construction industry using input-output analysis. Construction Management and Economics, 29(1), pp. 59-68. ISSN 1466433X

Gupta, R; Gregg, M and Liu, C (2025) Local area energy mapping approach for high-density heat pump deployment. Buildings & Cities, 6(1), pp. 561-579. ISSN 2632-6655

Gurmu, A T and Ongkowijoyo, C S (2020) Stochastic-based model for setting formwork-productivity baseline. Journal of Construction Engineering and Management, 146(9): 04020099, ISSN 0733-9364

Guven, G and Ergen, E (2021) Tracking major resources for automated progress monitoring of construction activities: Masonry work case. Construction Innovation, 21(4), pp. 648-667. ISSN 1471-4175

Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century. PhD thesis, University of Sheffield, UK.

Ha, S K; Jang, J G; Park, S H and Lee, H K (2015) Advanced spray multiple layup process for quality control of sprayed FRP composites used to retrofit concrete structures. Journal of Construction Engineering and Management, 141(1): 04014060, ISSN 0733-9364

Haas, C and Einstein, H H (2002) Updating the decision aids for tunneling. Journal of Construction Engineering and Management, 128(1), pp. 40-48. ISSN 0733-9364

Hadipriono, F C (1982) Institutional and procedural methods for preventing failures of long span structures. DEngr thesis, University of California, Berkeley, USA.

Hagerty, D J; Schmitt, N G and Vandevelde, G T (1988) Shot-rock fill construction: Case history. Journal of Construction Engineering and Management, 114(3), pp. 489-502. ISSN 0733-9364

Haghdadi, H (1989) The role of micro computers on the construction site. PhD thesis, Aston University, UK.

Haidar, A; Naoum, S; Howes, R and Tah, J (1999) Genetic algorithms application and testing for equipment selection. Journal of Construction Engineering and Management, 125(1), pp. 32-38. ISSN 0733-9364

Hailemariam, E K; Hailemariam, L M; Amede, E A and Nuramo, D A (2023) Identification of barriers, benefits and opportunities of using bamboo materials for structural purposes. Engineering, Construction and Architectural Management, 30(7), pp. 2716-2738. ISSN 0969-9988

Haj Seiyed Taghia, S A; Darvishvand, H R and Ebrahimi, M (2020) Economic analyses for low-strength concrete wrapped with CFRP to improve the mechanical properties and seismic parameters. Journal of Construction Engineering and Management, 146(3): 04019117, ISSN 0733-9364

Hajiashrafi, R (2025) Streamlined shapley value models for contribution-based compensation allocation in scheduling networks in construction project management. PhD thesis, Catholic University of America, USA.

Hajibabai, L; Aziz, Z and Peña-Mora, F (2011) Visualizing greenhouse gas emissions from construction activities. Construction Innovation, 11(3), pp. 356-370. ISSN 1471-4175

Hajifathalian, K; Howell, G; Wambeke, B W; Hsiang, S M and Liu, M (2016) Oops simulation: Cost-benefits trade-off analysis of reliable planning for construction activities. Journal of Construction Engineering and Management, 142(8): 4016030, ISSN 0733-9364

Hajifathalian, K; Wambeke, B W; Liu, M and Hsiang, S M (2012) Effects of production control strategy and duration variance on productivity and work in process: Simulation-based investigation. Journal of Construction Engineering and Management, 138(9), pp. 1035-1043. ISSN 0733-9364

Hajirasouli, A; Banihashemi, S; Drogemuller, R; Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: Thematic analysis and conceptual frameworks. Construction Innovation, 22(3), pp. 412-443. ISSN 1471-4175

Hajjar, D (1999) A unified modeling methodology for simulation-based planning of construction projects. PhD thesis, University of Alberta, Canada.

Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099

Hall, M A and Jaggar, D M (1998) The importance of cultural differences to British construction professionals working internationally. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Hallowell, M R (2008) A formal model for construction safety and health risk management. PhD thesis, Oregon State University, USA.

Hallowell, M R and Gambatese, J A (2009) Activity-based safety risk quantification for concrete formwork construction. Journal of Construction Engineering and Management, 135(10), pp. 990-998. ISSN 0733-9364

Halpin, D W (1973) An investigation of the use of simulation networks for modeling construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Halpin, D W (1993) Process-based research to meet the international challenge. Journal of Construction Engineering and Management, 119(3), pp. 417-425. ISSN 0733-9364

Hammad, A W A (2020) A multi-objective construction site layout planning problem solved through integration of location and traffic assignment models. Construction Management and Economics, 38(8), pp. 756-772. ISSN 01446193

Hammond, S; Bowen, P and Cattell, K (2016) The roadside work-seeker phenomenon in the South African informal construction sector. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Hamoda, M F (2008) Modeling of construction noise for environmental impact assessment. Journal of Construction in Developing Countries, 13(1), pp. 79-89. ISSN 1823-6499

Hamzeh, F R; Faek, F and AlHussein, H (2019) Understanding improvisation in construction through antecedents, behaviours and consequences. Construction Management and Economics, 37(2), pp. 61-71. ISSN 01446193

Han, S (2005) Application modeling of the conventional and the GPS-based earthmoving systems. PhD thesis, Purdue University, USA.

Han, S (2013) Automated monitoring and systemic analysis of workers' safety behavior in construction operations. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Handa, V K and Barcia, R M (1986) Construction production planning. Journal of Construction Engineering and Management, 112(2), pp. 163-177. ISSN 0733-9364

Handa, V K and Rivers, D (1983) Downgrading construction incidents. Journal of Construction Engineering and Management, 109(2), pp. 190-205. ISSN 0733-9364

Hanggara, D and Wijeyewickrema, A C (2020) Vulnerability assessment of reinforced concrete buildings in Indonesia subjected to tsunami inundation forces. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 204-218. ISSN 1759-5916

Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364

Hanna, A S; Peterson, P and Lee, M J (2002) Benchmarking productivity indicators for electrical/mechanical projects. Journal of Construction Engineering and Management, 128(4), pp. 331-337. ISSN 0733-9364

Haque, M O; Aman, J and Mohammad, F (2022) Construction sustainability of container-modular-housing in coastal regions towards resilient community. Built Environment Project and Asset Management, 12(3), pp. 467-485. ISSN 2044-124X

Hardie, M; Khan, S; O'Donnell, A and Miller, G (2007) The efficacy of waste management plans in Australian commercial construction refurbishment projects. Construction Economics and Building, 7(2), pp. 26-36. ISSN 2204-9029

Hare, B and Cameron, I (2012) Health and safety gateways for construction project planning. Engineering, Construction and Architectural Management, 19(2), pp. 192-204. ISSN 0969-9988

Hariga, M and El-Sayegh, S M (2011) Cost optimization model for the multiresource leveling problem with allowed activity splitting. Journal of Construction Engineering and Management, 137(1), pp. 56-64. ISSN 0733-9364

Hartley, R and Cheyne, A (2009) Safety culture in the construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Hasan, A and Kamardeen, I (2022) Occupational health and safety barriers for gender diversity in the Australian construction industry. Journal of Construction Engineering and Management, 148(9): 04022100, ISSN 0733-9364

Hasanzade, M P; van Oel, C J and Pazhouhanfar, M (2023) Passengers' preferences for architectural design characteristics in the design of airport terminals. Architectural Engineering and Design Management, 19(6), pp. 586-601. ISSN 1745-2007

Hasheminasab, S and Kashi, E (2021) Finite element analysis of ports pavement under container loading. Journal of Engineering, Design and Technology, 19(2), pp. 497-508. ISSN 1726-0531

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hassan, M M and Gruber, S (2008) Simulation of concrete paving operations on Interstate-74. Journal of Construction Engineering and Management, 134(1), pp. 2-9. ISSN 0733-9364

Hassan, M M and Gruber, S (2008) Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation, 8(1), pp. 7-22. ISSN 1471-4175

Hassan, N M; Al Maazmi, T; Al Hadhrami, A and Al Hosani, M (2016) Discrete event simulation: A vital tool for a concurrent life cycle design. Construction Innovation, 16(1), pp. 67-80. ISSN 1471-4175

Hassan, P F (2005) A best practice framework for training UK construction site managers. PhD thesis, Sheffield Hallam University, UK.

Hassane Assaad, R (2021) Innovative modeling and management of infrastructure systems, engineering and construction operations, and offsite construction technology using computational data analytics. PhD thesis, Missouri University of Science and Technology, USA.

Hassanein, A and Moselhi, O (2004) Planning and scheduling highway construction. Journal of Construction Engineering and Management, 130(5), pp. 638-646. ISSN 0733-9364

Hatamleh, M T (2020) Enhancing the management proficiencies in developing countries: The impact of project risk management within a project management maturity model on project performance. PhD thesis, University of Alabama, USA.

Haupt, T C and Pillay, K (2016) Investigating the true costs of construction accidents. Journal of Engineering, Design and Technology, 14(2), pp. 373-419.

Hawk, D (2006) Conditions of success: A platform for international construction development. Construction Management and Economics, 24(7), pp. 735-742. ISSN 1466433X

Haycraft, W R (2011) History of construction equipment. Journal of Construction Engineering and Management, 137, pp. 720-723. ISSN 0733-9364

Hayes, J; McDermott, V and Lingard, H (2015) What is risk? Construction activity near hazardous infrastructure. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

He, P; Qin, L; Yuan, Y and Yuan, J (2025) Action reliability assessment framework for automated construction labor measurements: Case study on plastering operations. Journal of Construction Engineering and Management, 151(8): 05025006, ISSN 0733-9364

He, W; Li, W; Xu, S; Wang, W and An, X (2021) Time, cost, and energy consumption analysis on construction optimization in high-rise buildings. Journal of Construction Engineering and Management, 147(10): 04021128, ISSN 0733-9364

Hegab, M; Smith, G R and Salem, O M (2006) Soil penetration modeling in microtunneling projects. Journal of Construction Engineering and Management, 132(6), pp. 598-605. ISSN 0733-9364

Hegazy, T and Kassab, M (2003) Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129(6), pp. 698-705. ISSN 0733-9364

Hejducki, Z (2004) Sequencing problems in methods of organising construction processes. Engineering, Construction and Architectural Management, 11(1), pp. 20-32. ISSN 0969-9988

Hemalattha, S and Vidjeapriya, R (2021) Developing an integrated framework for optimization of spatial requirements of construction equipment. Built Environment Project and Asset Management, 11(5), pp. 903-917. ISSN 2044-124X

Heravi, G; Taherkhani, A H; Sobhkhiz, S; Mashhadi, A H and Zahiri-Hashemi, R (2022) Integrating risk management's best practices to estimate deep excavation projects' time and cost. Built Environment Project and Asset Management, 12(2), pp. 180-204. ISSN 2044-124X

Hermann, U H; Hasan, S; Al-Hussein, M and Bouferguene, A (2011) Innovative system for off-the-ground rotation of long objects using mobile cranes. Journal of Construction Engineering and Management, 137(7), pp. 478-485. ISSN 0733-9364

Hermans, M; Veldhuis, H; Huizing, D and Rots, S (2019) The embedding of the construction client role in Dutch municipalities and its effects on professionalism and organisational learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Hernández, J M A (2024) Essays on public policy evaluation: The case of spain's supplier payment plan. PhD thesis, University of Exeter, UK.

Heron, E; Bowen, P and Lincoln, D (2005) Vandalism: A product of environmental design? Journal of Financial Management of Property and Construction, 10(3), pp. 181-191. ISSN 1366-4387

Hildreth, J; Vorster, M and Martinez, J (2005) Reduction of short-interval GPS data for construction operations analysis. Journal of Construction Engineering and Management, 131(8), pp. 920-927. ISSN 0733-9364

Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Hildreth, J C and Vorster, M C (2010) Learning construction performance improvement through planning. International Journal of Construction Education and Research, 6(2), pp. 139-151. ISSN 1557-8771

Hindman, D P; Bamberg, C R and Nussbaum, M A (2014) Bracing of wood composite I-joists to resist lateral buckling from walking loads. Journal of Construction Engineering and Management, 140(9): 04014037, ISSN 0733-9364

Hindman, D P; Timko, P D and Nussbaum, M A (2013) Mechanical response of unbraced wood composite I-joist to walking loads. Journal of Construction Engineering and Management, 139(11): 4013023, ISSN 0733-9364

Hinkel, M P (2022) Three essays on labor market regulation in the American construction industry. PhD thesis, Michigan State University, USA.

Hinze, J and Antal, T (1991) Construction contract provisions for preservation of artifacts. Journal of Construction Engineering and Management, 117(1), pp. 106-117. ISSN 0733-9364

Hiyassat, M A; Hiyari, M A and Sweis, G J (2016) Factors affecting construction labour productivity: A case study of Jordan. International Journal of Construction Management, 16(2), pp. 138-149. ISSN 1562-3599

Holt, G D and Edwards, D J (2012) Innovation or business survival? A preliminary, qualitative study of UK construction plant supply chains. Construction Innovation, 12(1), pp. 99-122. ISSN 1471-4175

Hong, J; Akotia, J and Egbu, C (2024) Virtual reality in construction activities: Barriers for adoption in China. Construction Economics and Building, 24(1-2), pp. 77-93. ISSN 2204-9029

Hong, T; Cho, K; Hyun, C and Han, S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management, 137(6), pp. 393-402. ISSN 0733-9364

Hong, Y; Xie, H; Bhumbra, G and Brilakis, I (2021) Comparing natural language processing methods to cluster construction schedules. Journal of Construction Engineering and Management, 147(10): 04021136, ISSN 0733-9364

Horman, M J and Kenley, R (2005) Quantifying levels of wasted time in construction with meta-analysis. Journal of Construction Engineering and Management, 131(1), pp. 52-61. ISSN 0733-9364

Horman, M J and Thomas, H R (2005) Role of inventory buffers in construction labor performance. Journal of Construction Engineering and Management, 131(7), pp. 834-843. ISSN 0733-9364

Hosny, F.; El-Damaty, M.; Mantha, B. R. K. and Abu Dabous, S. (2026) Analysis and modeling of delays during construction handover stage for building projects: A case study of United Arab Emirates. International Journal of Building Pathology and Adaptation, 44(3), pp. 658-684. ISSN 2398-4708

Hosseini, A (2019) Data-driven modeling of in-service performance of flexible pavements, using life-cycle information. PhD thesis, Temple University, USA.

Howarth, T and Griffith, A (1998) Promoting continuous improvement in construction education: Developing curricula through graduate- practitioner reflection. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Howell, G A (2011) New operating system for project management: Consequences and opportunities. Journal of Construction Engineering and Management, 137, pp. 882-886. ISSN 0733-9364

Howell, G A; Ballard, G and Tommelein, I (2011) Construction engineering-reinvigorating the discipline. Journal of Construction Engineering and Management, 137, pp. 740-744. ISSN 0733-9364

Hu, M; Bergsdal, H; Van Der Voet, E; Huppes, G and Muller, D B (2010) Dynamics of urban and rural housing stocks in China. Building Research & Information, 38(3), pp. 301-317. ISSN 0961-3218

Hu, Q; Bai, Y; He, L; Cai, Q; Tang, S; Ma, G; Tan, J and Liang, B (2020) Intelligent framework for worker-machine safety assessment. Journal of Construction Engineering and Management, 146(5): 04020045, ISSN 0733-9364

Hua, G B (2012) Modeling sectoral construction demand and its relationship with economic indicators. International Journal of Construction Education and Research, 8(3), pp. 223-240. ISSN 1557-8771

Huang, R Y and Halpin, D W (1995) Graphical-based method for transient evaluation of construction operations. Journal of Construction Engineering and Management, 121(2), pp. 222-229. ISSN 0733-9364

Huang, R-Y (1994) A graphical-based method for transient evaluation of construction operations. PhD thesis, Purdue University, USA.

Huang, T; li, H; Guo, H; Chan, N; Kong, S; Chan, G and Skitmore, M (2009) Construction virtual prototyping: A survey of use. Construction Innovation, 9(4), pp. 420-433. ISSN 1471-4175

Huang, X; Bernd, D and Bernold, L E (1996) Innovative technology development for safe excavation. Journal of Construction Engineering and Management, 122(1), pp. 91-96. ISSN 0733-9364

Huang, X and Bernold, L E (1997) CAD-integrated excavation and pipe laying. Journal of Construction Engineering and Management, 123(3), pp. 318-323. ISSN 0733-9364

Hubbard, B and Hubbard, S (2023) Utilization of uas data by transportation agencies: Building on the experience of construction contractors. International Journal of Construction Management, 23(4), pp. 679-685. ISSN 1562-3599

Hugill, D (2000) Management as an accomplishment of project team meetings in construction. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Hulshizer, A J and Desai, A J (1984) Shock vibration effects on freshly placed concrete. Journal of Construction Engineering and Management, 110(2), pp. 266-285. ISSN 0733-9364

Hummer, J E; Arocho, I and Rasdorf, W (2017) Approach to assessing tradeoffs between construction equipment fleet emissions and cost. Journal of Construction Engineering and Management, 143(5): 04016122, ISSN 0733-9364

Hunt, B J P (1980) Development of a research program for scaffolding standards. DEng thesis, University of Kansas, USA.

Huuhka, S and Lahdensivu, J (2016) Statistical and geographical study on demolished buildings. Building Research & Information, 44(1), pp. 73-96. ISSN 0961-3218

Hwang, B G and Yang, S (2014) Rework and schedule performance: A profile of incidence, impact, causes and solutions. Engineering, Construction and Architectural Management, 21(2), pp. 190-205. ISSN 0969-9988

Hwang, S (2010) Cross-validation of short-term productivity forecasting methodologies. Journal of Construction Engineering and Management, 136(9), pp. 1037-1046. ISSN 0733-9364

Hwang, S and Liu, L Y (2010) Contemporaneous time series and forecasting methodologies for predicting short-term productivity. Journal of Construction Engineering and Management, 136(9), pp. 1047-1055. ISSN 0733-9364

Hyari, K and El-Rayes, K (2006) Lighting requirements for nighttime highway construction. Journal of Construction Engineering and Management, 132(5), pp. 435-443. ISSN 0733-9364

Hyari, K H and Alamayreh, T (2023) Unbalanced bidding in construction projects: A contractors' perspective. International Journal of Construction Management, 23(12), pp. 2058-2066. ISSN 1562-3599

Hyari, K H; El-Mashaleh, M S and Rababeh, S M (2015) Framework for managing the traffic impacts of building construction projects. Journal of Construction in Developing Countries, 20(2), pp. 97-113. ISSN 1823-6499

Ibrahim, Y M (2008) Developing a model for vision-based progress measurement and visualisation of as-built construction operations. PhD thesis, Heriot-Watt University, UK.

Ibrahim, Y M; Kaka, A P; Aouad, G and Kagioglou, M (2008) As-built documentation of construction sequence by integrating virtual reality with time-lapse movies. Architectural Engineering and Design Management, 4(2), pp. 73-84. ISSN 1745-2007

Idoro, G I (2011) Effect of mechanisation on occupational health and safety performance in the Nigerian construction industry. Journal of Construction in Developing Countries, 16(2), pp. 27-45. ISSN 1823-6499

Igwe, U S; Mohamed, S F; Azwarie, M B M D; Nwofia, C M and Ihekweme, N M (2025) Assessment of post contract cost control issues in Nigeria: Quantity surveyors' perspective. International Journal of Construction Management, 25(14), pp. 1725-1735. ISSN 1562-3599

Igwe, U S; Mohamed, S F; Dzahir, M A M; Yusof, Z M and Khiyon, N A (2022) Towards a framework of automated resource model for post contract cost control of construction projects. International Journal of Construction Management, 22(16), pp. 3088-3097. ISSN 1562-3599

Ikediashi, D I; Ogunlana, S O and Odesola, I A (2015) Service quality and user satisfaction of outsourced facilities management services in Nigeria's public hospitals. Built Environment Project and Asset Management, 5(4), pp. 363-379. ISSN 2044-124X

Ikuabe, M; Aigbavboa, C and Kissi, E (2023) Potential applications and benefits of humanoids in the construction industry: A south African perspective. International Journal of Building Pathology and Adaptation, 41(6), pp. 254-268. ISSN 23984708

Imbert, I D C (1990) Human issues affecting construction in developing countries. Construction Management and Economics, 8(2), pp. 219-228. ISSN 01446193

Imran, S A; Commuri, S; Barman, M; Zaman, M and Beainy, F (2017) Modeling the dynamics of asphalt-roller interaction during compaction. Journal of Construction Engineering and Management, 143(7): 04017015, ISSN 0733-9364

Infante-Perea, M; Román-Onsalo, M and Navarro-Astor, E (2025) Occupational alternatives in Spanish building engineering: A gender perspective. Journal of Engineering, Design and Technology, 23(6), pp. 2005-2022. ISSN 1726-0531

Inyang, N I (2013) A framework for ergonomic assessment of residential construction tasks. PhD thesis, University of Alberta, Canada.

Ioannou, P G (1988) Geologic exploration and risk reduction in underground construction. Journal of Construction Engineering and Management, 114(4), pp. 532-547. ISSN 0733-9364

Ioannou, P G (1988) Pilot tunnels: Contractor's position. Journal of Construction Engineering and Management, 114(4), pp. 594-613. ISSN 0733-9364

Iromuanya, C (2013) A qualitative study on construction project success factors in dynamic project environments: A Delphi approach. PhD thesis, Capella University, USA.

Iseley, D T (1988) Automated methods for the trenchless placement of underground utility systems. PhD thesis, Purdue University, USA.

Iseley, D T (1991) Trenchless excavation construction methods: Classification and evaluation. Journal of Construction Engineering and Management, 117(3), pp. 521-536. ISSN 0733-9364

Isidore, L J; Back, W E and Fry, G T (2001) Integrated probabilistic schedules and estimates from project simulated data. Construction Management and Economics, 19(4), pp. 417-426. ISSN 01446193

Isik, Z; Arditi, D; Dilmen, I and Talat Birgonul, M (2010) The role of exogenous factors in the strategic performance of construction companies. Engineering, Construction and Architectural Management, 17(2), pp. 119-134. ISSN 0969-9988

Jackson, F (2006) Biodegradable hydraulic fluids: Reducing oil-related pollution in the construction industry. PhD thesis, Nottingham Trent University, UK.

Jaenglom, Kamonmarn (2014) Exploring construction supply chain management: A systematic perspective for creating sustainable performance. PhD thesis, Università degli Studi di Bergamo, Italy.

Jagtap, P R and Pore, S M (2019) Effectiveness of CFRP composites on compression flange of structural I-beam. Journal of Engineering, Design and Technology, 17(4), pp. 782-792. ISSN 1726-0531

Jaillon, L and Poon, C S (2008) Sustainable construction aspects of using prefabrication in dense urban environment: A Hong Kong case study. Construction Management and Economics, 26(9), pp. 953-966. ISSN 1466433X

Jaillon, L C (2009) The evolution of the use of prefabrication techniques in Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Jamir Singh, P S; Oke, A E; Aliu, J; Isaiah Kayode, T; Azura Ramli, R; Haizzan Yahaya, M and Idris, A (2026) A study on substance abuse awareness and usage trends within the construction sector. Construction Innovation, 26(3), pp. 674-692. ISSN 1471-4175

Jannadi, O A and Almishari, S (2003) Risk assessment in construction. Journal of Construction Engineering and Management, 129(5), pp. 492-500. ISSN 0733-9364

Jansma, G L (1987) A methodology for making construction productivity comparisons. PhD thesis, University of Texas at Austin, USA.

Jarkas, A M and Haupt, T C (2015) Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1), pp. 165-194.

Jaselskis, E; Ruwanpura, J; Becker, T; Silva, L; Jewell, P and Floyd, E (2011) Innovation in construction engineering education using two applications of internet-based information technology to provide real-time project observations. Journal of Construction Engineering and Management, 137, pp. 829-835. ISSN 0733-9364

Jassim, H S H (2019) Assessing energy use and carbon emissions to support planning of environmentally sustainable earthmoving operations. PhD thesis, Luleå University of Technology, Sweden.

Jaya, N M (2014) An activity-based cost controlling model for improving the management of construction project overheads. PhD thesis, University of Salford, UK.

Jayawardane, A K W (1989) Optimising earthmoving by linear programming and computer simulation. PhD thesis, Loughborough University, UK.

Jayawardane, A K W and Harris, F C (1990) Further development of integer programming in earthwork optimization. Journal of Construction Engineering and Management, 116(1), pp. 18-34. ISSN 0733-9364

Jelodar, M B; Wilkinson, S; Kalatehjari, R and Zou, Y (2022) Designing for construction procurement: An integrated decision support system for building information modelling. Built Environment Project and Asset Management, 12(1), pp. 111-127. ISSN 2044-124X

Jelodar, M B; Yiu, T W and Wilkinson, S (2016) Relationship-quality judgment model for construction project procurement: A conjoint measurement. Journal of Construction Engineering and Management, 142(7): 4016012, ISSN 0733-9364

Jen, H (2005) Web-based construction process simulation framework. PhD thesis, Purdue University, USA.

Jensen, E and Koch, C (2003) Making large infrastructure projects safe: The case of the Copenhagen Metro. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Jeon, J; Zhang, Y; Yang, L; Xu, X; Cai, H and Tran, D (2023) Risk breakdown matrix for risk-based inspection of transportation infrastructure projects. Journal of Construction Engineering and Management, 149(4): 04023007, ISSN 0733-9364

Jiang, S; Zhang, J; Shi, J and Wu, Y (2026) Adaptive information retrieval for enhanced building safety management leveraging BIM. Engineering, Construction and Architectural Management, 33(1), pp. 336-360. ISSN 0969-9988

Jiang, Y (2020) Determination of elevations for excavation operations using drone technologies. PhD thesis, Marquette University, USA.

Jin, R and Chen, Q (2019) Overview of concrete recycling legislation and practice in the United States. Journal of Construction Engineering and Management, 145(4): 05019004, ISSN 0733-9364

Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988

Jin, Y (2018) Supervised learning for back analysis of excavations in the observational method. PhD thesis, University of Cambridge, UK.

Jin, Z; Gambatese, J A and Nnaji, C (2024) Musculoskeletal disorder risk assessment in modern ready-made concrete formwork construction. Journal of Construction Engineering and Management, 150(6): 05024005, ISSN 0733-9364

Jonasson, S; Dunston, P S; Ahmed, K and Hamilton, J (2002) Factors in productivity and unit cost for advanced machine guidance. Journal of Construction Engineering and Management, 128(5), pp. 367-374. ISSN 0733-9364

Jones, K (2019) A framework for assessing interventions to promote the implementation of material innovations on construction projects. PhD thesis, University College London, UK.

Jones, W; Gibb, A G F and Chow, V (2022) Adapting to COVID-19 on construction sites: What are the lessons for long-term improvements in safety and worker effectiveness? Journal of Engineering, Design and Technology, 20(1), pp. 66-85. ISSN 1726-0531

Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.

Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.

Joseph, V R and Mustaffa, N K (2023) Carbon emissions management in construction operations: A systematic review. Engineering, Construction and Architectural Management, 30(3), pp. 1271-1299. ISSN 0969-9988

Joukar, A and Nahmens, I (2016) Volatility forecast of construction cost index using general autoregressive conditional heteroskedastic method. Journal of Construction Engineering and Management, 142(1): 04015051, ISSN 0733-9364

Ju, J.; Liu, X.; Xu, F.; Cao, B.; Chen, W.; Wang, X. and Tian, G. (2026) Operational phase recognition and power matching under shoveling conditions in an autonomous loading mobile concrete mixer. Journal of Construction Engineering and Management, 152(9): 04026131, ISSN 0733-9364

Jukic, D and Carmichael, D G (2016) Emission and cost effects of training for construction equipment operators: A field study. Smart and Sustainable Built Environment, 5(2), pp. 96-110. ISSN 2046-6099

Jung, C; Ismail, M A; Arar, M and AlQassimi, N (2026) Mitigating indoor air pollution in uae's high-rise apartment buildings: A study on eco-friendly materials and adsorbents. Smart and Sustainable Built Environment, 15(1), pp. 40-61. ISSN 2046-6099

Jung, S-K (1993) A study of single-family residential construction activity: Simultaneous transfer function (STF) analysis. PhD thesis, Georgia State University, USA.

Jungclaus, M A (2024) Embodied carbon emissions benchmarks of residential and commercial reference buildings in the United States. PhD thesis, University of Colorado at Boulder, USA.

Junjia, Y; Ales@Alias, A H; Haron, N A and Abu Bakar, N (2025) Developing a method for evaluating the value of hoisting risk response strategies: A multi-stakeholder perspective. Engineering, Construction and Architectural Management, 32(9), pp. 6115-6136. ISSN 0969-9988

J⊘rgensen, B and Emmitt, S (2009) Investigating the integration of design and construction from a "lean" perspective. Construction Innovation, 9(2), pp. 225-240. ISSN 1471-4175

Kaboli, A S and Carmichael, D G (2014) Truck dispatching and minimum emissions earthmoving. Smart and Sustainable Built Environment, 3(2), pp. 170-186. ISSN 2046-6099

Kaboli, A S and Carmichael, D G (2014) Optimum scraper load time and fleet size for minimum emissions. International Journal of Construction Management, 14(4), pp. 209-226. ISSN 1562-3599

Kaboli, A S and Carmichael, D G (2016) An examination of the dret model and the influence of payload, haul grade and truck type on earthmoving emissions. International Journal of Construction Management, 16(2), pp. 95-108. ISSN 1562-3599

Kaboli, Alireza (2014) Cost and emissions analysis of earthmoving operations. PhD thesis, University of New South Wales, Australia.

Kahoul, H; Belhour, S; Bellaouar, A and Dron, J P (2019) Fatigue life prediction of upper arm suspension using strain life approach. Journal of Engineering, Design and Technology, 17(1), pp. 25-40. ISSN 1726-0531

Kakoto, T and Skibniewski, M (1991) Engineering decision support of automated shield tunneling. Journal of Construction Engineering and Management, 117(4), pp. 674-690. ISSN 0733-9364

Kalainesan, S (2007) Best management practices for highway construction site sedimentation basins. PhD thesis, University of Pittsburgh, USA.

Kalamaras, G S (1996) A case method approach for interactive risk analysis of tunnel "design-for-constructability" concept. PhD thesis, Pennsylvania State University, USA.

Kalasapudi, V S (2017) Automatic change-based diagnosis of structures using spatiotemporal data and as-designed model. PhD thesis, Arizona State University, USA.

Kallow, M A; Bodla, A A; Ejaz, A and Ishaq, M R (2023) How do risk management practices lead to project success in the construction industry? The mediated moderation of risk coping capacity and risk transparency. International Journal of Construction Management, 23(16), pp. 2779-2787. ISSN 1562-3599

Kaluarachchi, M; Waidyasekara, K and Rameezdeen, R (2022) Antecedents of noise pollution control behaviour of employees of construction companies. Built Environment Project and Asset Management, 12(2), pp. 277-292. ISSN 2044-124X

Kamma, R C and Jha, K N (2022) Quantifying building construction and demolition waste using permit data. Journal of Construction Engineering and Management, 148(9): 04022091, ISSN 0733-9364

Kandil, A A (2005) Multi-objective optimization for large-scale highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kang, L S and Paulson, B C (1997) Adaptability of information classification systems for civil works. Journal of Construction Engineering and Management, 123(4), pp. 419-426. ISSN 0733-9364

Kang, L S and Paulson, B C (1998) Information management to integrate cost and schedule for civil engineering projects. Journal of Construction Engineering and Management, 124(5), pp. 381-389. ISSN 0733-9364

Kang, S and Seo, J (2013) GIS method for haul road layout planning in large earthmoving projects: Framework and analysis. Journal of Construction Engineering and Management, 139(2), pp. 236-246. ISSN 0733-9364

Kangari, R and Halpin, D W (1990) Identification of factors influencing implementation of construction robotics. Construction Management and Economics, 8(1), pp. 89-104. ISSN 01446193

Kannan, G (2011) Field studies in construction equipment economics and productivity. Journal of Construction Engineering and Management, 137, pp. 823-828. ISSN 0733-9364

Kannan, G and Vorster, M (2000) Development of an experience database for truck loading operations. Journal of Construction Engineering and Management, 126(3), pp. 201-209. ISSN 0733-9364

Karshenas, S (1981) Probabilistic evaluation of safety of buildings during construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Karshenas, S (1989) Truck capacity selection for earthmoving. Journal of Construction Engineering and Management, 115(2), pp. 212-227. ISSN 0733-9364

Karsten Winther, J; Nielsen, R; Schultz, C and Teizer, J (2021) Automated activity and progress analysis based on non-monotonic reasoning of construction operations. Smart and Sustainable Built Environment, 10(3), pp. 457-486. ISSN 2046-6099

Karunaratne, Banneka Mudiyanselage (1994) A new method of analysis for cyclic construction operations using systems engineering approach. PhD thesis, University of New South Wales, Australia.

Karunsena, G; Gajanayake, A and Udawatta, N (2024) Wastewater management in the construction sector: A systemic analysis of current practice in Victoria, Australia. International Journal of Construction Management, 24(11), pp. 1166-1175. ISSN 1562-3599

Kasbar, M; Staub-French, S; Pilon, A; Poirier, E; Teshnizi, Z and Froese, T (2021) Construction productivity assessment on brock commons tallwood house. Construction Innovation, 21(4), pp. 951-968. ISSN 1471-4175

Kashwani, G A (2017) Enhancing the implementation of safety engineering systems in oil and gas construction projects in the UAE. PhD thesis, Heriot-Watt University, UK.

Kasim, N B; Anumba, C J and Dainty, A R J (2005) Improving materials management practices on fast-track construction projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Katoch, V and Mohan, S (2019) Design and fabrication of a safety frame for workers carrying out head lifting at construction sites. Journal of Engineering, Design and Technology, 17(6), pp. 1250-1265. ISSN 1726-0531

Kazan, E E (2013) Analysis of fatal and nonfatal accidents involving earthmoving equipment operators and on-foot workers. PhD thesis, Wayne State University, USA.

Kazaz, A and Ulubeyli, S (2006) Organizational factors influencing construction manpower productivity in Turkey. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Ke, Y; Zhao, X; Wang, Y and Wang, S (2009) SWOT analysis of domestic private enterprises in developing infrastructure projects in China. Journal of Financial Management of Property and Construction, 14(2), pp. 152-170. ISSN 1366-4387

Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.

Kedir, F N (2022) The performance and potential of industrialized construction for resource-efficient housing construction: A multi-scalar approach across product, system, and context. DSc thesis, ETH Zürich, Switzerland.

Kein, A T T; Ofori, G and Briffett, C (1999) ISO 14000: Its relevance to the construction industry of Singapore and its potential as the next industry milestone. Construction Management and Economics, 17(4), pp. 449-461. ISSN 01446193

Keller, E C (1999) Prevailing wage rates: The effects on school construction, levels of taxation, and state reimbursements. DEd thesis, Pennsylvania State University, USA.

Key, J M (1987) Earthmoving and heavy equipment. Journal of Construction Engineering and Management, 113(4), pp. 611-622. ISSN 0733-9364

Khalafallah, A and El-Rayes, K (2006) Minimizing construction-related hazards in airport expansion projects. Journal of Construction Engineering and Management, 132(6), pp. 562-572. ISSN 0733-9364

Khalafallah, A M (2006) Optimal construction site layout planning for airport expansion projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Khalil, A (2018) Developing a strategy for the implementation of sustainable construction practices in Libya. PhD thesis, University of Salford, UK.

Khallaf, Z; Alshibani, A; Alsawafy, O; Mohammed, A and Bubshait, A (2024) Dynamic fleet configuration model for optimizing earthmoving operations using mixed integer linear programming. Journal of Construction Engineering and Management, 150(11): 04024152, ISSN 0733-9364

Khan, L R (2014) Reliability estimation and risk-cost optimisation of underground pipelines. PhD thesis, University of Greenwich, UK.

Khan, M R and Sonawane, A (2020) Prediction of impact response in construction safety helmet using FEA. Journal of Engineering, Design and Technology, 18(3), pp. 557-566. ISSN 1726-0531

Kheni, N A (2008) Impact of health and safety management on safety performance of small and medium-sized construction businesses in Ghana. PhD thesis, Loughborough University, UK.

Khoshgoftar, M; Bakar, A H A and Osman, O (2010) Causes of delays in Iranian construction projects. International Journal of Construction Management, 10(2), pp. 53-69. ISSN 1562-3599

Khosrowshahi, F (1997) Construction activity in the UK recent trends and projections. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Kiani, H (1998) A model for measuring effectiveness of building construction organisations: Owner's perspective. PhD thesis, University of Waterloo, USA.

Kibert, C J; Sendzimir, J and Guy, B (2000) Construction ecology and metabolism: Natural system analogues for a sustainable built environment. Construction Management and Economics, 18(8), pp. 903-916. ISSN 01446193

Kim, S; Makhmalbaf, A and Shahandashti, M (2025) Forecasting the architecture billings index (abi) using machine learning predictive models. Engineering, Construction and Architectural Management, 32(8), pp. 5371-5393. ISSN 0969-9988

Kim, B; Lee, H; Park, H and Kim, H (2012) Greenhouse gas emissions from onsite equipment usage in road construction. Journal of Construction Engineering and Management, 138(8), pp. 982-990. ISSN 0733-9364

Kim, J (2004) Delay forecasting using a vulnerability index. PhD thesis, Purdue University, USA.

Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.

Kim, S (2008) Development of a wireless real-time productivity measurement system for rapid construction operations. PhD thesis, University of Kansas, USA.

Kim, S; Hwang, S and Son, J (2022) Safety management guidelines for precast concrete production plants using importance-performance analysis. Journal of Construction Engineering and Management, 148(7): 04022038, ISSN 0733-9364

Kim, S-K (2001) Toward a framework for an intelligent earthwork system (ies). PhD thesis, University of Wisconsin - Madison, USA.

Kim, T W and Fischer, M (2014) Ontology for representing building users' activities in space-use analysis. Journal of Construction Engineering and Management, 140(8): 04014035, ISSN 0733-9364

Kimmance, A G (2002) An integrated product and process information modelling system for on-site construction. PhD thesis, Loughborough University, UK.

Kinawy, S N (2017) Customizing information delivery for citizens in transportation infrastructure projects: Towards active community participation in decision-making. PhD thesis, University of Toronto, Canada.

Kisi, K P (2015) Estimation of optimal productivity in labor-intensive construction operations. PhD thesis, University of Nebraska - Lincoln, USA.

Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2017) Optimal productivity in labor-intensive construction operations: Pilot study. Journal of Construction Engineering and Management, 143(3): 04016107, ISSN 0733-9364

Kisi, K P; Mani, N; Rojas, E M and Foster, E T (2018) Estimation of optimal productivity in labor-intensive construction operations: Advanced study. Journal of Construction Engineering and Management, 144(10): 04018097, ISSN 0733-9364

Kitamura, A and Takeuchi, Y (1983) Seikan tunnel. Journal of Construction Engineering and Management, 109(1), pp. 25-38. ISSN 0733-9364

Kittinaraporn, W; Tuprakay, S and Prasittisopin, L (2022) Effective modeling for construction activities of recycled aggregate concrete using artificial neural network. Journal of Construction Engineering and Management, 148(3): 04021206, ISSN 0733-9364

Kiwan, M S A A (1994) Integration of building design and construction information: A neutral object-oriented model. PhD thesis, University of Dundee, UK.

Kiziltas, S (2008) An automated approach for developing integrated model-based construction project histories to support estimation of activity production rates. PhD thesis, Carnegie Mellon University, USA.

Kjellmark, G; Hjelseth, E; Peñaloza, G A and Riemer-Sørensen, S (2026) Toward construction 5.0: Bridging AI and people through continuous learning. Journal of Construction Engineering and Management, 152(1): 04025227, ISSN 0733-9364

Kloukinas, D (2015) Neolithic building technology and the social context of construction practices: The case of Northern Greece. PhD thesis, Cardiff University, UK.

Koch, C (2004) Operations management on the construction site: Developing a human resource and knowledge oriented alternative to lean construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Koch, C and Marton, J (2002) Implementing multiskilled teams on the construction site: Developing a scandinavian model? In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Koehn, E and Brown, G (1985) Climatic effects on construction. Journal of Construction Engineering and Management, 111(2), pp. 129-137. ISSN 0733-9364

Koekemoer, V and Smallwood, J (2007) Information technology (it) in the construction process. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Koh, T Y (2010) The effects of social capital on construction project success: exploring the mediating role of projectlearning. PhD thesis, University of Hong Kong, Hong Kong.

Koh T Y, T M M R S (2013) A relational approach to high reliability organising for construction project safety: A conceptual framework. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Kolera, B T and Bernold, L E (2006) Intelligent utility locating tool for excavators. Journal of Construction Engineering and Management, 132(9), pp. 919-927. ISSN 0733-9364

Kong, T-M S (2011) Organizational culture of safety in the Hong Kong construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Kongela, S M (2023) Sustainability potential awareness among built environment stakeholders: Experience from Tanzania. International Journal of Building Pathology and Adaptation, 41(2), pp. 301-319. ISSN 23984708

Kourkoulis, S K; Pasiou, E D; Markides, C F; Loukidis, A; Stavrakas, I and Triantis, D (2024) The determination of mode-I fracture toughness (by means of the Brazilian disc configuration) in the light of data provided by the 3D digital image correlation technique. International Journal of Building Pathology and Adaptation, 42(1), pp. 175-192. ISSN 23984708

Krcmar, C A (2022) Indian women construction workers' social construction of human security. PhD thesis, University of Massachusetts Boston, USA.

Kretzschmar, D and Schiller, G (2023) Non-domestic building stock: Linking dynamics and spatial distributions. Buildings & Cities, 4(1), pp. 727-748. ISSN 2632-6655

Ku, K and Taiebat, M (2011) BIM experiences and expectations: The constructors' perspective. International Journal of Construction Education and Research, 7(3), pp. 175-197. ISSN 1557-8771

Kucukvar, M (2013) Life cycle sustainability assessment framework for the U.S. Built environment. PhD thesis, University of Central Florida, USA.

Kuennen, S T (2002) Construction management practice in the execution of military construction projects. DEng thesis, Texas A&M University, USA.

Kukoyi, P O; Simpeh, F; Adebowale, O J and Agumba, J N (2022) Managing the risk and challenges of COVID-19 on construction sites in Lagos, Nigeria. Journal of Engineering, Design and Technology, 20(1), pp. 99-144. ISSN 1726-0531

Kum, Y T; Yap, J B H; Lew, Y L and Lee, W P (2024) Transforming construction health and safety management during COVID-19 pandemic using innovative technologies: PLS-SEM approach. Engineering, Construction and Architectural Management, 31(7), pp. 2770-2808. ISSN 0969-9988

Kumar, V (2019) Developing COBie dataset management system (CDMS) to enhance usability of building information model-facilities management information exchange standard. PhD thesis, National University of Singapore, Singapore.

Kumar, V and Lin, E T A (2020) Conceptualizing "COBieEvaluator": A rule based system for tracking asset changes using COBie datasheets. Engineering, Construction and Architectural Management, 27(5), pp. 1093-1118. ISSN 0969-9988

Kumar, V S S (1993) Application of fuzzy set theory in construction management. PhD thesis, Indian Institute of Technology Delhi, India.

Kuntz, K A (1994) A construction crew evaluation model to improve craft productivity. PhD thesis, Pennsylvania State University, USA.

Kuprenas, J A (1988) Use of influence diagrams to assess the cost and schedule impact of construction changes. DEng thesis, University of California, Berkeley, USA.

Kurakaew, N and Hadikusumo, B (2025) Key drivers affecting safety intervention success: Evidence from Thai construction industry. Built Environment Project and Asset Management, 15(2), pp. 337-353. ISSN 2044-124X

Kwon, N; Park, M; Lee, H S; Ahn, J and Kim, S (2017) Construction noise prediction model based on case-based reasoning in the preconstruction phase. Journal of Construction Engineering and Management, 143(6): 04017008, ISSN 0733-9364

Lahouti, A (2017) Cue-based decision-making in construction work crews: An agent-based modeling approach. PhD thesis, Michigan State University, USA.

Lai, J H-k (2005) Economic, management and contractual considerations in outsourcing operation and maintenance work for commercial buildings. PhD thesis, Cardiff University, UK.

Laing, Xiaoyun (2025) Communicate, understand, and collaborate: An AI-integrated human-robot collaboration approach to improve safety and productivity in construction. PhD thesis, The University of Texas at San Antonio, USA.

Lam, T Y M and Gale, K S (2023) A performance-driving model for public-sector construction framework procurement in England. Built Environment Project and Asset Management, 13(6), pp. 781-798. ISSN 2044-124X

Lambropoulos, S; Manolopoulos, N and Pantouvakis, J P (1996) Semantic: Smart earthmoving analysis and estimation of cost. Construction Management and Economics, 14(2), pp. 79-92. ISSN 01446193

Lamptey, T; De-Graft, O-M; Acheampong, A; Adesi, M and Ghansah, F A (2021) A framework for the adoption of green business models in the Ghanaian construction industry. Smart and Sustainable Built Environment, 10(3), pp. 536-553. ISSN 2046-6099

Lantz, M; Löwstedt, M and Netz, J (2024) Leadership and digital transformation in the construction industry: A qualitative exploration of leadership practices. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Larsson, R and Rudberg, M (2019) Impact of weather conditions on in situ concrete wall operations using a simulation-based approach. Journal of Construction Engineering and Management, 145(7): 05019009, ISSN 0733-9364

Lasebikan, B A; Akisanya, A R and Deans, W F (2015) Autoclave design for high pressure-high temperature corrosion studies. Journal of Engineering, Design and Technology, 13(4), pp. 539-555.

Lau, J L; Hashim, A H; Samah, A A and Salim, A S S (2016) Understanding the environmental worldviews of Malaysian project managers. Smart and Sustainable Built Environment, 5(4), pp. 307-324. ISSN 2046-6099

Lau, S C; Lu, M and Poon, C S (2014) Formalized approach to discretize a continuous plant in construction simulations. Journal of Construction Engineering and Management, 140(8): 04014032, ISSN 0733-9364

Laughton, C (1998) Evaluation and prediction of tunnel boring machine performance in variable rock masses. PhD thesis, University of Texas at Austin, USA.

Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599

Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364

Le, C; Le, T; Jeong, H D and Lee, E B (2019) Geographic information system-based framework for estimating and visualizing unit prices of highway work items. Journal of Construction Engineering and Management, 145(8): 04019044, ISSN 0733-9364

Le, P L; Elmughrabi, W; Dao, T M and Chaabane, A (2020) Present focuses and future directions of decision-making in construction supply chain management: A systematic review. International Journal of Construction Management, 20(5), pp. 490-509. ISSN 1562-3599

Lee, B; Lee, H S; Park, M and Kim, H (2015) Influence factors of learning-curve effect in high-rise building constructions. Journal of Construction Engineering and Management, 141(8): 04015019, ISSN 0733-9364

Lee, E B; Lee, H and Harvey, J T (2006) Fast-track urban freeway rehabilitation with 55-h weekend closures: I-710 long beach case study. Journal of Construction Engineering and Management, 132(5), pp. 465-472. ISSN 0733-9364

Lee, G H; Kim, J I; Koo, C and Kim, T W (2022) Automated generation of precast concrete slab stacks for transportation in offsite construction projects. Journal of Construction Engineering and Management, 148(8): 04022072, ISSN 0733-9364

Lee, H S; Lee, J Y and Lee, J S (1999) Nonshored formwork system for top-down construction. Journal of Construction Engineering and Management, 125(6), pp. 392-399. ISSN 0733-9364

Lee, J; Lorenc, S J and Bernold, L E (2003) Comparative performance evaluation of tele-operated pipe laying. Journal of Construction Engineering and Management, 129(1), pp. 32-40. ISSN 0733-9364

Lee, J S (2016) Estimating cumulative damages due to disruptions in repetitive construction. Journal of Construction Engineering and Management, 142(11): 04016064, ISSN 0733-9364

Lee, K H (2004) Site-specific load models and hazards for probability-based design. PhD thesis, Oregon State University, USA.

Lee, S (2001) Simulation analysis of productivity variation affected by accident risk in underground construction operations. PhD thesis, Purdue University, USA.

Lee, S and Halpin, D W (2003) Predictive tool for estimating accident risk. Journal of Construction Engineering and Management, 129(4), pp. 431-436. ISSN 0733-9364

Lee, W and Migliaccio, G C (2018) Temporal effect of construction workforce physical strain on diminishing marginal productivity at the task level. Journal of Construction Engineering and Management, 144(9): 04018083, ISSN 0733-9364

Lekan, A; Aigbavboa, C; Babatunde, O; Olabosipo, F and Christiana, A (2022) Disruptive technological innovations in construction field and fourth industrial revolution intervention in the achievement of the sustainable development goal 9. International Journal of Construction Management, 22(14), pp. 2647-2658. ISSN 1562-3599

Lema, N M (1996) Construction labour productivity analysis and benchmarking: the case of Tanzania. PhD thesis, Loughborough University, UK.

Lema, N M and Price, A D F (1996) Construction process performance variability: Focus on labour productivity. Building Research & Information, 24(6), pp. 339-350. ISSN 0961-3218

Leontaris, G (2021) Decision making under uncertainty for construction management of offshore wind assets. PhD thesis, Delft University of Technology, Netherlands.

Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193

Leu, S S and Yang, C H (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17(6), pp. 767-776. ISSN 01446193

Leu, S S and Yang, C H (1999) GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125(6), pp. 420-427. ISSN 0733-9364

Leung, A W T and Tam, C M (1999) Models for assessing hoisting times of tower cranes. Journal of Construction Engineering and Management, 125(6), pp. 385-391. ISSN 0733-9364

Leung, A W T and Tam, C M (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(3), pp. 305-314. ISSN 01446193

Lewis, N S (2023) Development of an open-source methodology for simulation of civil engineering structures subject to multi-hazards. PhD thesis, University of Washington, USA.

Li, F.; Chi, H. L.; Li, R.; Zou, Z. and Wang, R. D. (2026) Two-stage optimization design framework for tower crane layout planning in modular integrated construction considering transportation efficiency, operator visibility, and lifting safety. Journal of Construction Engineering and Management, 152(6): 04026080, ISSN 0733-9364

Li, F; Xu, X; Zhou, J; Chen, J and Zhou, S (2026) Automatic generation of inspection knowledge for highway construction via the integration of computer vision and ontology reasoning. Engineering, Construction and Architectural Management, 33(1), pp. 73-97. ISSN 0969-9988

Li, J.; Ouyang, Y.; Dai, Q. and Luo, X. (2026) Impact of age on cognitive states influencing falling from heights in high-altitude construction: Evidence from a virtual reality and electroencephalogram study. Journal of Construction Engineering and Management, 152(7): 04026101, ISSN 0733-9364

Li, D and Lu, M (2017) Automated generation of work breakdown structure and project network model for earthworks project planning: A flow network-based optimization approach. Journal of Construction Engineering and Management, 143(1): 04016086, ISSN 0733-9364

Li, Guokai (2024) A research on construction and demolition waste management. PhD thesis, Università degli Studi di Padova, Italy.

Li, H; Chan, G and Skitmore, M (2013) Integrating real time positioning systems to improve blind lifting and loading crane operations. Construction Management and Economics, 31(6), pp. 596-605. ISSN 1466433X

Li, H; Chan, N K Y and Skitmore, M (2012) The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes. Construction Innovation, 12(4), pp. 429-446. ISSN 1471-4175

Li, H; Luo, X and Skitmore, M (2020) Intelligent hoisting with car-like mobile robots. Journal of Construction Engineering and Management, 146(12): 04020136, ISSN 0733-9364

Li, J (2004) Web-based integrated project control. PhD thesis, Concordia University, Canada.

Li, J; Chen, Y and Wang, H (2025) Human-machine system modeling and safety risk assessment in construction operations incorporating workers' performance variability. Journal of Construction Engineering and Management, 151(3): 04024209, ISSN 0733-9364

Li, J; Moselhi, O and Alkass, S (2006) Internet-based database management system for project control. Engineering, Construction and Architectural Management, 13(3), pp. 242-253. ISSN 0969-9988

Li, J; Zhou, G; Li, D; Zhang, M and Zhao, X (2023) Recognizing workers' construction activities on a reinforcement processing area through the position relationship of objects detected by faster r-CNN. Engineering, Construction and Architectural Management, 30(4), pp. 1657-1678. ISSN 0969-9988

Li, M G; Chen, J J; Xu, A J; Xia, X H and Wang, J H (2014) Case study of innovative top-down construction method with channel-type excavation. Journal of Construction Engineering and Management, 140(5): 05014003, ISSN 0733-9364

Li, Y; Zhang, L; Liu, X and Li, X (2025) A project scheduling optimization model for reducing construction dust emissions based on variability in meteorological conditions. Journal of Construction Engineering and Management, 151(11): 04025171, ISSN 0733-9364

Liang, Houhao (2024) Unmanned ground vehicle-driven indoor monitoring: Enhancing routine data acquisition and on-site deployment. PhD thesis, National University of Singapore, Singapore.

Lim, B T C (1987) Causal modelling construction project performance. PhD thesis, Heriot-Watt University, UK.

Lim, B T H; Oo, B L and Ling, F (2010) The survival strategies of Singapore contractors in prolonged recession. Engineering, Construction and Architectural Management, 17(4), pp. 387-403. ISSN 0969-9988

Lin, C L; Chiang, W H; Weng, Y S and Wu, H P (2023) Assessing the anthropogenic carbon emission of wooden construction: An LCA study. Building Research & Information, 51(2), pp. 138-157. ISSN 0961-3218

Lin, K L and Haas, C T (1996) An interactive planning environment for critical operations. Journal of Construction Engineering and Management, 122(3), pp. 212-230. ISSN 0733-9364

Lin, K-L (1995) Planning for critical construction operations involving large semi-stationary equipment. PhD thesis, University of Texas at Austin, USA.

Lin, S (2022) Risk analysis and management for excavation engineering via multi-criteria decision making modeling. PhD thesis, National University of Singapore, Singapore.

Lin, S C (2015) An analysis for construction engineering networks. Journal of Construction Engineering and Management, 141(5): 04014096, ISSN 0733-9364

Lin, S S and Zheng, X J (2025) A decision support approach for safety risk analysis and management in large-scale shield cutter head hoisting operations. Journal of Construction Engineering and Management, 151(11): 04025169, ISSN 0733-9364

Lindhard, S M; Hamzeh, F; Gonzalez, V A; Wandahl, S and Ussing, L F (2019) Impact of activity sequencing on reducing variability. Journal of Construction Engineering and Management, 145(3): 04019001, ISSN 0733-9364

Lingard, H.; Cooke, T. and Gharaie, E. (2013) A case study analysis of fatal incidents involving excavators in the Australian construction industry. Engineering, Construction and Architectural Management, 20(5), pp. 488-504. ISSN 0969-9988

Lingard, H; Francis, V and Turner, M (2010) Work-family conflict in construction: Case for a finer-grained analysis. Journal of Construction Engineering and Management, 136(11), pp. 1196-1206. ISSN 0733-9364

Liu, C and Lu, M (2015) Optimizing earthmoving job planning based on evaluation of temporary haul road networks design for mass earthworks projects. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Liu, K and Golparvar-Fard, M (2015) Crowdsourcing construction activity analysis from jobsite video streams. Journal of Construction Engineering and Management, 141(11): 04015035, ISSN 0733-9364

Liu, L-Y (1991) Coops: Construction object-oriented process simulation system. PhD thesis, University of Michigan, USA.

Liu, Y (2017) Human-tool-interaction-based action recognition framework for automatic construction operation monitoring. PhD thesis, Texas A&M University, USA.

Liu, Y (2023) Worker-centric human-robot co-adaptation in construction. PhD thesis, Pennsylvania State University, USA.

Liu, Y; Habibnezhad, M; Shayesteh, S; Jebelli, H and Lee, S (2021) Paving the way for future EEG studies in construction: Dependent component analysis for automatic ocular artifact removal from brainwave signals. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364

Liu, Y and Mohamed, Y (2012) Modelling industrial construction operations using a multi-agent resource allocation framework. Engineering, Construction and Architectural Management, 19(4), pp. 406-427. ISSN 0969-9988

Lizarralde, G (2004) Organisational system and performance of post-disaster reconstruction projects. PhD thesis, Universite de Montreal, Canada.

Lizarralde, G and Root, D (2008) The informal construction sector and the inefficiency of low cost housing markets. Construction Management and Economics, 26(2), pp. 103-113. ISSN 1466433X

Lluch, J F (1981) Analysis of construction operations using microcomputers. PhD thesis, Georgia Institute of Technology, USA.

Loganathan, Santhosh (2023) A framework for analysing the influence of teamwork processes of onsite construction trade crews on productivity. PhD thesis, University of Technology Sydney, Australia.

Loosemore, M and Reid, S (2019) The social procurement practices of tier-one construction contractors in Australia. Construction Management and Economics, 37(4), pp. 183-200. ISSN 01446193

Lorenz, D; Lützkendorf, T and Panek, A (2005) Sustainable construction in central/eastern Europe: Implications from SB04 in warsaw. Building Research & Information, 33(5), pp. 416-427. ISSN 0961-3218

Lorterapong, P and Moselhi, O (1996) Project-network analysis using fuzzy sets theory. Journal of Construction Engineering and Management, 122(4), pp. 308-317. ISSN 0733-9364

Louis, J (2016) Simulation analysis, monitoring, and control of operations. PhD thesis, Purdue University, USA.

Louis, J and Dunston, P S (2017) Methodology for real-time monitoring of construction operations using finite state machines and discrete-event operation models. Journal of Construction Engineering and Management, 143(3): 04016106, ISSN 0733-9364

Love, P E D; Edwards, D J; Irani, Z and Goh, Y M (2011) Dynamics of rework in complex offshore hydrocarbon projects. Journal of Construction Engineering and Management, 137(12), pp. 1060-1070. ISSN 0733-9364

Love, P E D; Zhou, J; Matthews, J; Sing, C-P and Carey, B (2015) A systems information model for managing electrical, control, and instrumentation assets. Built Environment Project and Asset Management, 5(3), pp. 278-289. ISSN 2044-124X

Lu, M and Lam, H C (2009) Transform schemes applied on non-finish-to-start logical relationships in project network diagrams. Journal of Construction Engineering and Management, 135(9), pp. 863-873. ISSN 0733-9364

Lu, M; Lau, S C and Poon, C S (2009) Simulation approach to evaluating cost efficiency of selective demolition practices: Case of Hong Kong's Kai Tak Airport demolition. Journal of Construction Engineering and Management, 135(6), pp. 448-457. ISSN 0733-9364

Lu, N and Liska, R W (2008) Designers' and general contractors' perceptions of offsite construction techniques in the united state construction industry. International Journal of Construction Education and Research, 4(3), pp. 177-188. ISSN 1557-8771

Lu, Na (2007) Investigation of designers' and general contractors' perceptions of offsite construction techniques in the United States construction industry. PhD thesis, Clemson University, USA.

Lu, W (2006) A system for assessing and communicating contractors' competitiveness. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Lu, Y and Zhu, Y (2021) Integrating hoisting efficiency into construction site layout plan model for prefabricated construction. Journal of Construction Engineering and Management, 147(10): 04021130, ISSN 0733-9364

Lucko, G (2008) Productivity scheduling method compared to linear and repetitive project scheduling methods. Journal of Construction Engineering and Management, 134(9), pp. 711-720. ISSN 0733-9364

Ludlow, J E (1976) Assessment and prediction of noise from construction sites. PhD thesis, University of Southampton, UK.

Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work. PhD thesis, University of Michigan, USA.

Luo, Q; Sun, C; Dan, Y; Zhao, T and Zhang, G (2026) Unraveling safety risk coupling in prefabricated steel construction via data mining. Journal of Construction Engineering and Management, 152(3): 04025281, ISSN 0733-9364

Luo, H (2021) Automated construction machine pose monitoring using computer vision and deep learning for construction site safety. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Luo, X; Li, H; Huang, T and Skitmore, M (2016) Quantifying hazard exposure using real-time location data of construction workforce and equipment. Journal of Construction Engineering and Management, 142(8): 4016031, ISSN 0733-9364

Luo, Y; Hu, D; Yao, Q; Wang, J; Chen, X; Li, H and Shi, M (2025) Blasting and sliding parameter optimization for efficient autonomous construction rock debris sliding transportation in an inclined shaft. Journal of Construction Engineering and Management, 151(11): 04025162, ISSN 0733-9364

Lutz, J D and Hijazi, A (1993) Planning repetitive construction: Current practice. Construction Management and Economics, 11(2), pp. 99-110. ISSN 01446193

Löfgren, A (2008) Making mobile meaning: Expectations and experiences of mobile computing usefulness in construction site management practice. PhD thesis, KTH Royal Institute of Technology, Sweden.

Ma, K; Wu, R; Xiao, Y and Wang, H (2024) Spherical dome: Design, digital twin manufacturing, and testing of a glubam structure. Architectural Engineering and Design Management, 20(6), pp. 1471-1488. ISSN 1745-2007

Ma, L; Liu, C and Mills, A (2016) Construction labor productivity convergence: A conditional frontier approach. Engineering, Construction and Architectural Management, 23(3), pp. 283-301. ISSN 0969-9988

Ma, Z; Gu, J; Zhao, Q; Yang, M; Qian, C; He, M and Hei, X (2025) Intelligent optimization of blasting parameters in railroad tunnels based on blasting quality control. Journal of Construction Engineering and Management, 151(8): 04025094, ISSN 0733-9364

MacArulla, M; Forcada, N; Casals, M; Gangolells, M; Fuertes, A and Roca, X (2013) Standardizing housing defects: Classification, validation, and benefits. Journal of Construction Engineering and Management, 139(8), pp. 968-976. ISSN 0733-9364

Macchiarulo, V (2022) Integration of satellite radar interferometry and civil engineering procedures to assess building and infrastructure conditions. PhD thesis, University of Bath, UK.

Mahdavian, S; Lu, M and Pereira, E (2023) Application framework for safety-centric construction acceleration planning. Engineering, Construction and Architectural Management, 30(4), pp. 1401-1422. ISSN 0969-9988

Mahdavinejad, M; Bemanian, M; Abolvardi, G and Elhamian, S M (2012) Analyzing the state of seismic consideration of architectural non-structural components (ANSCs) in design process (based on IBC). International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 133-147. ISSN 1759-5916

Mahoney, J J and Tatum, C B (1994) Construction site applications of CAD. Journal of Construction Engineering and Management, 120(3), pp. 617-631. ISSN 0733-9364

Maiocco Jr., F R (2004) Funding public school construction in the United States. PhD thesis, Washington State University, USA.

Majdalani, Z; Ajam, M and Mezher, T (2006) Sustainability in the construction industry: A Lebanese case study. Construction Innovation, 6(1), pp. 33-46. ISSN 1471-4175

Majrouhi Sardroud, J (2011) Assessment and development of radio frequency identification applications for effective management of construction activities. PhD thesis, Kingston University, UK.

Makrigeorgis, C N (1991) Development of an optimal durability-based highway cost allocation model. PhD thesis, Texas A&M University, USA.

Malekaee Ashtiyani, F.; Karimi Gavareshki, M. h and Gheidar-Kheljani, J. (2026) Real-time prediction of project duration deviation using CNN-LSTM-FIS. Built Environment Project and Asset Management, 16(2), pp. 304-320. ISSN 2044-124X

Malekzadeh, H; Edwards, D J and Harris, F C (2005) Simulating the ground freezing process: a decision support model. Journal of Construction Research, 6(1), pp. 107-121. ISSN 1609-9451

Manavazhi, M R (1998) A configuration-based modeling methodology for the automated generation of simulation models in construction. PhD thesis, University of Alberta, Canada.

Mani, N (2015) A framework for estimating labor productivity frontiers. PhD thesis, University of Nebraska - Lincoln, USA.

Mani, N; Kisi, K P; Rojas, E M and Foster, E T (2017) Estimating construction labor productivity frontier: Pilot study. Journal of Construction Engineering and Management, 143(10): 04017077, ISSN 0733-9364

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A competency-based training guide model for labourers in construction. International Journal of Construction Management, 23(8), pp. 1323-1333. ISSN 1562-3599

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) Evaluating the efficiency and productivity of general workers in structural work practices of building construction through work-based training applications. International Journal of Construction Management, 24(3), pp. 339-350. ISSN 1562-3599

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) A systematic evaluation on the competencies of construction supervisors in productivity and performance improvement practices: Sri Lankan perspective. Smart and Sustainable Built Environment, 13(4), pp. 960-988. ISSN 2046-6099

Manoharan, K; Dissanayake, P B G; Pathirana, C; Deegahawature, D and Silva, K D R R (2023) A labour performance score and grading system to the next normal practices in construction. Built Environment Project and Asset Management, 13(1), pp. 36-55. ISSN 2044-124X

Mante, J (2015) Resolving infrastructure-related construction disputes in developing countries: The Ghana experience. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Mao, W; Ran, K; Wang, T K; Yu, A; Lv, H and Chen, J H (2025) An optimization model for just-in-time (JIT) delivery of precast components considering 3D loading constraints, real-time road conditions and assembly time. Engineering, Construction and Architectural Management, 32(5), pp. 3259-3284. ISSN 0969-9988

Maradza, E; Whyte, J and Larsen, G D (2014) Interactive learning in UK construction practice: Examining the role of BIM process standards. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Maradza, E N (2015) Adaptation of industry BIM process standards in a large construction firm. PhD thesis, University of Reading, UK.

Marasini, R (2002) An integrated simulation approach for realising efficient stockyard layouts: An application in the precast concrete products industry. PhD thesis, University of Teesside, UK.

Marasini, R and Dawood, N (2000) A simulation model to manage and optimise stockyard layout: A case study in precast concrete products industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Marasini, R and Dawood, N (2002) Integration of genetic algorithms and simulation for stockyard layout planning. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Marinelli, M; Dolan, M; Spillane, J and Konanahalli, A (2014) Material waste in the Northern Ireland construction industry: On-site management causes and methods of prevention. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Marinelli, M and Lambropoulos, S (2013) Algorithmic method for scraper load-time optimization. Journal of Construction Engineering and Management, 139(5), pp. 459-465. ISSN 0733-9364

Mariz, Renato Nunes (2024) Method for applying the work design in construction based on lean thinking. PhD thesis, Universidade Estadual de Campinas, Brazil.

Martinez, J C and Ioannou, P G (1999) General-purpose systems for effective construction simulation. Journal of Construction Engineering and Management, 125(4), pp. 265-276. ISSN 0733-9364

Martino, Antonello (2017) The historical landscape of ports: From the definition of a methodology for the risk assessment to the identification of guidelines for port heritage preservation. PhD thesis, Politecnico di Bari, Italy.

Marzouk, M (2002) Optimizing earthmoving operations using computer simulation. PhD thesis, Concordia University, Canada.

Marzouk, M (2006) Utility theory model for equipment selection. Construction Innovation, 6(1), pp. 21-32. ISSN 1471-4175

Marzouk, M; Abdallah, M and El-Said, M (2010) Modeling microtunneling projects using computer simulation. Journal of Construction Engineering and Management, 136(6), pp. 670-682. ISSN 0733-9364

Marzouk, M and Moselhi, O (2002) Simulation optimization for earthmoving operations using genetic algorithms. Construction Management and Economics, 20(6), pp. 535-543. ISSN 01446193

Marzouk, M and Moselhi, O (2003) Object-oriented simulation model for earthmoving operations. Journal of Construction Engineering and Management, 129(2), pp. 173-181. ISSN 0733-9364

Marzouk, M and Moselhi, O (2004) Fuzzy clustering model for estimating haulers' travel time. Journal of Construction Engineering and Management, 130(6), pp. 878-886. ISSN 0733-9364

Marzouk, M and Moselhi, O (2004) Multiobjective optimization of earthmoving operations. Journal of Construction Engineering and Management, 130(1), pp. 105-113. ISSN 0733-9364

Masera, M (1999) An innovative planning technique in quality management. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Masih, S and Kar, S (2025) Assessing social sustainability for multimodal activities in construction: An FAHP-TOPSIS approach. Journal of Construction Engineering and Management, 151(12): 04025210, ISSN 0733-9364

Masih-Tehrani, M and Ebrahimi-Nejad, S (2018) Hybrid genetic algorithm and linear programming for bulldozer emissions and fuel-consumption management using continuously variable transmission. Journal of Construction Engineering and Management, 144(7): 04018053, ISSN 0733-9364

Matarneh, S; Danso-Amoako, M; Al-Bizri, S; Gaterell, M and Matarneh, R (2019) BIM-based facilities information: Streamlining the information exchange process. Journal of Engineering, Design and Technology, 17(6), pp. 1304-1322. ISSN 1726-0531

Matarneh, S T (2019) BIM-based information exchange framework to support facilities management systems. PhD thesis, University of Portsmouth, UK.

Matsumoto, I T; Thorpe, A; Baldwin, A and McWilliams, R (2002) Linking process mapping and technology: A case study of teamwork 2001. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Maund, K; Gajendran, T and Brewer, G (2014) Examining the barriers to successful onsite construction environmental management operations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Mawdesley, M J; Askew, W H and Al-Jibouri, S H (2004) Site layout for earthworks in road projects. Engineering, Construction and Architectural Management, 11(2), pp. 83-89. ISSN 0969-9988

Maxwell, D and Couper, R (2023) Construction tracking: Implications of logistics data. Construction Innovation, 23(2), pp. 322-339. ISSN 1471-4175

Mayorga Amaya, C F (2020) Moving forecasting error: A risk-based cost forecasting approach. PhD thesis, Auburn University, USA.

Mazari, M (2014) Studying the parameters involved with modulus-based construction quality control for compaction of unbound pavement layers. PhD thesis, University of Texas at El Paso, USA.

Mañelele, I and Muya, M (2008) Risk identification on community-based construction projects in Zambia. Journal of Engineering, Design and Technology, 6(2), pp. 145-161. ISSN 1726-0531

Mbiti, Titus (2008) System dynamics model of construction output in Kenya. PhD thesis, RMIT University, Australia.

McAnulty, S and Baroudi, B (2010) Construction challenges in remote Australian locations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

McCabe, B Y (1997) An automated modeling approach for construction performance improvement using simulation and belief networks. PhD thesis, University of Alberta, Canada.

McCord, J; McCord, M; Davis, P T; Haran, M and Rodgers, W J (2015) Understanding delays in housing construction: Evidence from Northern Ireland. Journal of Financial Management of Property and Construction, 20(3), pp. 286-319. ISSN 1366-4387

McDavid, H A (1996) Construction and economic development: A stimulus or constraint in developing countries. DSc thesis, George Washington University, USA.

McDougall, J A and Swaffield, J A (2007) Transport of deformable solids within building drainage networks. Building Research & Information, 35(2), pp. 220-232. ISSN 0961-3218

McGibbney, L J (2012) Better regulation of construction activity through data modelling. PhD thesis, Glasgow Caledonian University, UK.

McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.

McGuinness, K P (1983) A theory of mechanics' liens (and related remedies). SJD thesis, University of Toronto, Canada.

Mecca, S (1999) A model of construction planning procedure according to contingency theory. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Meng, Q and Zhu, S (2022) Construction activity classification based on vibration monitoring data: A supervised deep-learning approach with time series randaugment. Journal of Construction Engineering and Management, 148(9): 04022090, ISSN 0733-9364

Metham, M and Benjaoran, V (2015) The assessment of greenhouse gas emissions for evaluating actual road construction operations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Mewomo, M C (2022) Construction labour productivity in South Africa: Challenges and possible remedies. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Miao, K; Lou, W; Schonfeld, P and Xiao, Z (2024) Optimal earthmoving-equipment combination considering carbon emissions with an indicator-based multiobjective optimizer. Journal of Construction Engineering and Management, 150(1): 04023152, ISSN 0733-9364

Miles, D W J (1997) The development of intermediate construction enterprises. PhD thesis, Loughborough University, UK.

Miles, R S and Ballard, G (2002) Problems in the interface between mechanical design and construction: A research proposal. Journal of Construction Research, 3(1), pp. 83-95. ISSN 1609-9451

Minchin, R E; Thurn, S B; Ellis, R D and Lewis, D W (2013) Using contractor bid amounts to estimate the impact of night construction on cost for transportation construction. Journal of Construction Engineering and Management, 139(8), pp. 1055-1062. ISSN 0733-9364

Minelli, P (2020) Improved methods for managing megaprojects. PhD thesis, Massachusetts Institute of Technology, USA.

Ming, C S; Runeson, G and Skitmore, M (1996) Changes in profit as market conditions change: An historical study of a building firm. Construction Management and Economics, 14(3), pp. 253-264. ISSN 01446193

Mitchell Jr., Zane Windsor (1998) A statistical analysis of construction equipment repair costs using field data & the cumulative cost model. PhD thesis, Virginia Tech, USA.

Mitropoulos, P; Abdelhamid, T S and Howell, G A (2005) Systems model of construction accident causation. Journal of Construction Engineering and Management, 131(7), pp. 816-825. ISSN 0733-9364

Mitropoulos, P and Memarian, B (2012) Team processes and safety of workers: Cognitive, affective, and behavioral processes of construction crews. Journal of Construction Engineering and Management, 138(10), pp. 1181-1191. ISSN 0733-9364

Mitropoulos, P and Namboodiri, M (2011) New method for measuring the safety risk of construction activities: Task demand assessment. Journal of Construction Engineering and Management, 137(1), pp. 30-38. ISSN 0733-9364

Mitropoulos, P and Namboodiri, M (2011) The task demands assessment methodology. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(1), pp. 9-17. ISSN 17514312

Mo, Y; Dainty, A and Price, A (2006) The relevance of eq to construction project management education and practice: An investigative framework. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Moaveni, B (2007) System and damage identification of civil structures. PhD thesis, University of California, San Diego, USA.

Mohamed, M (2022) A risk-based model for construction inspection in highways. PhD thesis, University of Kansas, USA.

Mohamed, M and Tran, D Q (2023) Content analysis of e-inspection implementation for highway infrastructure construction projects. Engineering, Construction and Architectural Management, 30(7), pp. 2621-2644. ISSN 0969-9988

Mohamed, M and Tran, D Q (2023) Examining critical factors and their combination effects on quality of roadway construction operations. International Journal of Construction Management, 23(15), pp. 2637-2648. ISSN 1562-3599

Mohamed, S F (2006) Improving construction site management practices through knowledge management. PhD thesis, Loughborough University, UK.

Mohamed, S F and Anumba, C J (2004) Towards a framework for integrating knowledge management processes into site management practices. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Mohandes, S R; Durdyev, S; Sadeghi, H; Mahdiyar, A; Hosseini, M R; Banihashemi, S and Martek, I (2023) Towards enhancement in reliability and safety of construction projects: Developing a hybrid multi-dimensional fuzzy-based approach. Engineering, Construction and Architectural Management, 30(6), pp. 2255-2279. ISSN 0969-9988

Moharrami, S; Bayat, A and Abourizk, S (2022) Modeling microtunnel boring machine penetration rate using a mechanistic approach. Journal of Construction Engineering and Management, 148(11): 04022128, ISSN 0733-9364

Mohieldin, Y A (1989) Analysis of construction processes with nonstationary work task durations. PhD thesis, University of Maryland, College Park, USA.

Mohsen, O; Petre, C and Mohamed, Y (2023) Machine-learning approach to predict total fabrication duration of industrial pipe spools. Journal of Construction Engineering and Management, 149(2): 04022172, ISSN 0733-9364

Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.

Monteiro do Nascimento, F A; Neto, G D M P; Hazin Alencar, L and Valdes-Vasquez, R (2026) Multicriteria subcontractor selection model for construction activities in wind farm projects. International Journal of Construction Management, 26(5), pp. 772-788. ISSN 1562-3599

Moon, S; Choi, E and Hong, S (2016) Creation of robust design alternatives for temporary construction in value engineering. Journal of Construction Engineering and Management, 142(3): 04015086, ISSN 0733-9364

Moon, S; Xu, S; Hou, L; Wu, C; Wang, X and Tam, V W Y (2018) RFID-aided tracking system to improve work efficiency of scaffold supplier: Stock management in Australasian supply chain. Journal of Construction Engineering and Management, 144(2): 04017115, ISSN 0733-9364

Moon, S; Yang, B and Choi, E (2018) Safety guideline for safe concrete placement utilizing the information on the structural behavior of formwork. Journal of Construction Engineering and Management, 144(12): 04018108, ISSN 0733-9364

Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.

Moore, B C (1993) Modeling risk of lunar construction activities: A technology assessment approach. PhD thesis, Georgia Institute of Technology, USA.

Moradi, S; Nasirzadeh, F and Golkhoo, F (2015) A hybrid SD-DES simulation approach to model construction projects. Construction Innovation, 15(1), pp. 66-83. ISSN 1471-4175

Moradipour, P; Noorzaei, J; Jaafar, M S and Aziz, F N A A (2013) An improved computational method in structural dynamics. Journal of Engineering, Design and Technology, 11(3), pp. 288-315. ISSN 1726-0531

Morley, D; Lu, M and Abourizk, S (2014) Identification of invariant average weighted haul distance to simplify earthmoving simulation modeling in planning site grading operations. Journal of Construction Engineering and Management, 140(12): 04014057, ISSN 0733-9364

Morua Padilla, E (1986) Resource strategies for dynamic construction project management. PhD thesis, University of Michigan, USA.

Moselhi, O and Alshibani, A (2009) Optimization of earthmoving operations in heavy civil engineering projects. Journal of Construction Engineering and Management, 135(10), pp. 948-954. ISSN 0733-9364

Mostafavi, A; Abraham, D; Noureldin, S; Pankow, G; Novak, J; Walker, R; Hall, K and George, B (2013) Risk-based protocol for inspection of transportation construction projects undertaken by state departments of transportation. Journal of Construction Engineering and Management, 139(8), pp. 977-986. ISSN 0733-9364

Mostafavi, A; Valentin, V; Abraham, D M and Louis, J (2012) Assessment of the productivity of nighttime asphalt paving operations. Journal of Construction Engineering and Management, 138(12), pp. 1421-1432. ISSN 0733-9364

Moussavi Nadoushani, Z S; Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(7), pp. 938-957. ISSN 0969-9988

Moyo, T; Crafford, G and Emuze, F (2021) People-centred management for improving construction workers' productivity in Zimbabwe. Built Environment Project and Asset Management, 11(2), pp. 350-368. ISSN 2044-124X

Mrad, F; Asem Abdul-Malak, M; Sadek, S and Khudr, Z (2002) Automated excavation in construction using robotics trajectory and envelop generation. Engineering, Construction and Architectural Management, 9(4), pp. 325-335. ISSN 0969-9988

Mucheti, A S and Albuquerque, P J R D (2022) Influence of execution speed on displacements of soil-nailed structures with vertical face in urban areas. Journal of Construction Engineering and Management, 148(7): 04022048, ISSN 0733-9364

Mucheti, Alexsander Silva (2025) Experimental and numerical analysis of nailed soil structures in urban areas. PhD thesis, Universidade Estadual de Campinas, Brazil.

Muhammed-Yakubu, N (2023) A BIM-based information management schema for construction activities data-flow across the project life cycle. PhD thesis, University of the West of England, Bristol, UK.

Mukherjee, A (2005) A multi-agent framework for general purpose situational simulations in construction management. PhD thesis, University of Washington, USA.

Murguia, D; Vasquez, C; Demian, P and Soetanto, R (2023) BIM adoption among contractors: A longitudinal study in Peru. Journal of Construction Engineering and Management, 149(1): 04022140, ISSN 0733-9364

Murillo, K P; Rocha, E and Rodrigues, M F (2019) Construction sectors efficiency analysis on seven European countries. Engineering, Construction and Architectural Management, 26(8), pp. 1801-1819. ISSN 0969-9988

Murphy, M (2016) Exploration of the synergies between activity theory and the dmaic method in evaluating construction processes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Murphy, M and Eadie, R (2019) Socially responsible procurement: A service innovation for generating employment in construction. Built Environment Project and Asset Management, 9(1), pp. 138-152. ISSN 2044-124X

Mustaffa, N K (2022) Alternative configurations of earthmoving loading practices toward emissions reduction. Journal of Construction Engineering and Management, 148(1): 04021177, ISSN 0733-9364

Mustaffa, N K; Isa, C M M; Ekundayo, D and Joseph, V R A (2022) Barriers and strategies for improving carbon emissions management approaches in Malaysian construction. Construction Economics and Building, 22(3), pp. 99-123. ISSN 2204-9029

Mustaffa, Nur Kamaliah (2018) Emissions, production and cost in construction operations. PhD thesis, University of New South Wales, Australia.

Mwemezi, B. R.; Kikwasi, G. J. and Phoya, S. (2026) Development and validation of a framework for improving health and safety risk management at informal construction sites in Tanzania. Journal of Engineering, Design and Technology, 24(2), pp. 403-426. ISSN 1726-0531

Mwemezi, B R; Kikwasi, G J and Phoya, S (2024) Perception of masonry workers on health and safety risks in informal construction sites in Dar es Salaam, Tanzania. International Journal of Construction Management, 24(12), pp. 1305-1313. ISSN 1562-3599

Mäki T, K H (2013) Site managers' uses of building information modeling on construction sites. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Müller, C C and Elzomor, M (2025) Fostering a sustainable built environment by preparing a construction engineering workforce with sustainability key performance indicators. Journal of Construction Engineering and Management, 151(6): 04025056, ISSN 0733-9364

Nadim, W and Goulding, J S (2010) Offsite production in the UK: The way forward? A UK construction industry perspective. Construction Innovation, 10(2), pp. 181-202. ISSN 1471-4175

Naghshbandi, S N; Varga, L and Hu, Y (2022) Technology capabilities for an automated and connected earthwork roadmap. Construction Innovation, 22(4), pp. 768-788. ISSN 1471-4175

Naghshbandi, Seyedeh Neda (2022) Technology capabilities for safe and resilient coordination of automated earthwork systems: a decentralized multi-agent system approach. PhD thesis, University College London, UK.

Naji, K K (1997) The development of a virtual environment for simulating equipment-based construction operations in real-time object-oriented systems. PhD thesis, University of Florida, USA.

Naji, K K; Gunduz, M and Naser, A F (2022) The effect of change-order management factors on construction project success: A structural equation modeling approach. Journal of Construction Engineering and Management, 148(9): 04022085, ISSN 0733-9364

Namian, M; Taherpour, F; Ghiasvand, E and Turkan, Y (2021) Insidious safety threat of fatigue: Investigating construction workers' risk of accident due to fatigue. Journal of Construction Engineering and Management, 147(12): 2180, ISSN 0733-9364

Nandun Madhusanka Hewa, W; Pan, W and Kumaraswamy, M (2021) Social network analysis applications in sustainable construction and built environment management: A review. Built Environment Project and Asset Management, 11(4), pp. 511-528. ISSN 2044-124X

Naoum, S and Hackman, J O N (1996) Do site managers and the head office perceive productivity factors differently? Engineering, Construction and Architectural Management, 3(1-2), pp. 147-160. ISSN 0969-9988

Napolitan, C L (1995) Improvement to the forecast precision of the factor model for masonry productivity. PhD thesis, Pennsylvania State University, USA.

Nash, W R (1985) Raise boring in civil and mining applications. Journal of Construction Engineering and Management, 111(1), pp. 15-30. ISSN 0733-9364

Naumets, S; Lu, M and Ali, M (2022) Project schedule development under environment-induced time-window constraints: Case of constructing river-crossing bridge in remote Northern region. Journal of Construction Engineering and Management, 148(12): 04022129, ISSN 0733-9364

Navon, R and Shpatnitsky, Y (2005) A model for automated monitoring of road construction. Construction Management and Economics, 23(9), pp. 941-951. ISSN 01446193

Navon, R and Shpatnitsky, Y (2005) Field experiments in automated monitoring of road construction. Journal of Construction Engineering and Management, 131(4), pp. 487-493. ISSN 0733-9364

Nelson, T N T (2024) Using socio-technical water systems in construction engineering to address water insecurity after hurricanes maria and fiona. PhD thesis, Iowa State University, USA.

Nelumdeniya, A U; Perera, B A K S and Gimhani, K D M (2025) Usage of digital technology in improving the mental health of workers on construction sites. Construction Innovation, 25(3), pp. 931-971. ISSN 1471-4175

Nepal, M P; Park, M and Son, B (2006) Effects of schedule pressure on construction performance. Journal of Construction Engineering and Management, 132(2), pp. 182-188. ISSN 0733-9364

Ness, K (2009) Not just about bricks: The invisible building worker. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Newaz, M T (2019) The psychological contract to measure safety outcomes on construction sites. PhD thesis, University of Newcastle, Australia.

Newman, W H (1934) The building industry and business cycles. PhD thesis, University of Chicago, USA.

Ng, A K W and Price, A D F (2010) Optimizing the time performance of subcontractors in building projects. Construction Economics and Building, 10(1-2), pp. 90-102. ISSN 2204-9029

Ngacho, C (2013) An assessment of the performance of public sector construction projects: An empirical study of projects funded under constituency development fund (CDF) in Western Province Kenya. PhD thesis, University of Delhi, India.

Ngowi, A B (1997) Impact of culture on construction procurement. Journal of Construction Procurement, 3(1), pp. 3-15. ISSN 1358-9180

Nguyen, Q N; Bui, N D N and Bui, D N (2026) Assessing lean construction principles for reducing environmental impact and enhancing cost efficiency and productivity in earthwork operations in Vietnam. Construction Economics and Building, 26(1), ISSN 2204-9029

Nguyen, L D and Nguyen, H T (2013) Relationship between building floor and construction labor productivity a case of structural work. Engineering, Construction and Architectural Management, 20(6), pp. 563-575. ISSN 0969-9988

Nguyen, L D; Nguyen, T K N; Tran, D Q and Villiers, C (2014) Productivity in daytime and nighttime construction of urban sewer systems. Journal of Construction Engineering and Management, 140(7): 04014021, ISSN 0733-9364

Nguyen, L D; Tran, D Q and Chandrawinata, M P (2016) Predicting safety risk of working at heights using Bayesian networks. Journal of Construction Engineering and Management, 142(9): 04016041, ISSN 0733-9364

Nguyen, M V (2025) Assessment of corporate social responsibility performance for Vietnamese construction organizations. Journal of Engineering, Design and Technology, 23(2), pp. 477-500. ISSN 1726-0531

Nguyen, T T (2017) Modeling of CLT creep behavior and real-time hybrid simulation of a CLT-LiFS building. PhD thesis, University of Alabama, USA.

Nicholas, J; Holt, G D and Harris, P T (1999) Materials suppliers: The builders' banker? Journal of Financial Management of Property and Construction, 4(3), pp. 29-38. ISSN 1366-4387

Nielsen, Y; Bouchlaghem, D; Koseoglu, O O; Erdogan, B and Anumba, C J (2006) Integration of visualisation & mobile technologies in construction. Journal of Construction Research, 7(1), pp. 227-246. ISSN 1609-9451

Nimbarte, A D (2009) Modeling the risk factors associated with the neck disorders during manual material handling tasks. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Nkomo, M W (2020) Assessment of mentoring of construction workers in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Noorzai, E (2023) Evaluating lean techniques to improve success factors in the construction phase. Construction Innovation, 23(3), pp. 622-639. ISSN 1471-4175

Noruwa, B I (2020) Application and effects of emerging technologies on variation minimisation in the UK construction projects. PhD thesis, Coventry University, UK.

Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.

Nwadike, A and Aigwi, I E (2024) Impacts of the COVID-19 pandemic on building consents and construction sector activities in New Zealand. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

O'Connor, J T and El-Diraby, T E (2000) Urban freeway bridge reconstruction planning: Case of mockingbird bridge. Journal of Construction Engineering and Management, 126(1), pp. 61-67. ISSN 0733-9364

O'Connor, J T and Huh, Y (2005) Crew production rates for contract time estimation: Bent footing, column, and cap of highway bridges. Journal of Construction Engineering and Management, 131(9), pp. 1013-1020. ISSN 0733-9364

Obaidat, Y T; Barham, W and Abu libdeh, R (2024) Development of interaction diagrams of reinforced concrete short columns strengthened by nsm-CFRP strips using finite element method. International Journal of Building Pathology and Adaptation, 42(6), pp. 1304-1327. ISSN 2398-4708

Obiozo R, S R (2013) The role of 'greening' and an ecosystem approach to enhancing construction ergonomics. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Obunwo, C; Chinyio, E and Suresh, S (2015) Relative contributions of project quality to customer satisfaction in Nigerian road construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ochoa Paniagua, J J (2011) Production planning approach for implementing sustainable building projects. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Odeh, A M (1992) CIPROS: Knowledge-based construction integrated project and process planning simulation system. PhD thesis, University of Michigan, USA.

Odeh, I; El-Rayes, K and Liu, L (2009) Field experiments to evaluate and control light tower glare in nighttime work zones. Journal of Construction Engineering and Management, 135(9), pp. 911-919. ISSN 0733-9364

Odeh, I S M (2010) Evaluation of glare and lighting performance in nighttime highway construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Odimabo, O (2016) Risk management system to guide building construction projects in developing countries: a case study of Nigeria. PhD thesis, University of Wolverhampton, UK.

Oduori, M and Mbuya, T (2009) Wire rope selection for manual winch application. Journal of Engineering, Design and Technology, 7(2), pp. 207-222. ISSN 1726-0531

Ofori, G; Briffett, C; Gang, G and Ranasinghe, M (2000) Impact of ISO 14000 on construction enterprises in Singapore. Construction Management and Economics, 18(8), pp. 935-947. ISSN 01446193

Ofori, G and Kien, H L (2004) Translating Singapore architects' environmental awareness into decision making. Building Research & Information, 32(1), pp. 27-37. ISSN 0961-3218

Ogbu, C P and Asuquo, C F (2019) Taxonomy of indigenous construction firms in South-South Nigeria. Journal of Construction in Developing Countries, 24(2), pp. 189-206. ISSN 1823-6499

Ogunmakinde, O E (2019) Developing a circular-economy-based construction waste minimisation framework for Nigeria. PhD thesis, University of Newcastle, Australia.

Ogunrinde, O; Amirkhanian, A; Corley, M and Nnaji, C (2020) Effect of nighttime construction on quality of asphalt paving. Journal of Construction Engineering and Management, 146(9): 04020111, ISSN 0733-9364

Ok, S C and Sinha, S K (2006) Construction equipment productivity estimation using artificial neural network model. Construction Management and Economics, 24(10), pp. 1029-1044. ISSN 1466433X

Oke, A E; Aliu, J; Mwanaumo, E M; Odia, O A; Kahanji, C and Tengan, C (2024) From awareness to action: a study of the effectiveness of environmental economic practices for sustainable construction in Nigeria. Smart and Sustainable Built Environment, 13(5), pp. 1194-1212. ISSN 2046-6099

Oke, A E; Aliu, J; Onajite, S and Simeon, M (2024) Success factors of digital technologies (DT) tools adoption for sustainable construction in a developing economy. Construction Innovation, 24(4), pp. 950-964. ISSN 1471-4175

Okon, B B (2013) Sustainable building services systems management. PhD thesis, University College London, UK.

Okonkwo, C; Evans, U F and Ekung, S (2023) Unearthing direct and indirect material waste-related factors underpinning cost overruns in construction projects. International Journal of Construction Management, 23(13), pp. 2298-2304. ISSN 1562-3599

Okoye, P U (2018) Occupational health and safety risk levels of building construction trades in Nigeria. Construction Economics and Building, 18(2), pp. 92-109. ISSN 2204-9029

Okpala, I; Nnaji, C and Gambatese, J (2023) Assessment tool for human-robot interaction safety risks during construction operations. Journal of Construction Engineering and Management, 149(1): 04022145, ISSN 0733-9364

Okpala, I U (2022) Robotics and automation in construction: Developing foundational insight and tools to support safe implementation. PhD thesis, University of Alabama, USA.

Oladimeji, O (2022) Influence of COVID-19 pandemic on local construction firms' viability. Journal of Engineering, Design and Technology, 20(1), pp. 201-221. ISSN 1726-0531

Olatunbosun, S; Odediran, S; Ekundayo, D and Aigbavboa, C (2024) Factors inhibiting energy access in the delivery of construction projects in Lagos metropolis, Nigeria. International Journal of Construction Management, 24(11), pp. 1215-1224. ISSN 1562-3599

Olayiwola, J; Yusuf, A O; Akanmu, A A; Murzi, H; Gao, X and Afsari, K (2025) Construction practice knowledge for complementing classroom teaching during site visits. Smart and Sustainable Built Environment, 14(1), pp. 119-139. ISSN 2046-6099

Oloufa, A A (1988) A framework for the operational simulation of construction projects. PhD thesis, University of California, Berkeley, USA.

Olugboyega, O; Ilesanmi, K E; Oseghale, G E and Aigbavboa, C (2024) The link between construction apps’ acceptance and digital attributes of construction professionals: Perspectives from digital competence model. Construction Innovation, 24(4), pp. 912-932. ISSN 1471-4175

Omar, H (2020) Towards an automated photogrammetry-based approach for monitoring and controlling construction site activities. PhD thesis, University of the West of England, Bristol, UK.

Omer, M M; Rahman, R A; Fauzi, M A and Almutairi, S (2025) Key competencies for identifying construction activities that produce recyclable materials: A competency gap analysis. Built Environment Project and Asset Management, 15(3), pp. 699-716. ISSN 2044-124X

Omer, M M; Rahman, R A; Fauzi, M A and Almutairi, S (2025) Key competencies for identifying construction activities that produce recyclable materials: An exploratory study. International Journal of Building Pathology and Adaptation, 43(4), pp. 855-876. ISSN 2398-4708

Omotayo, T; Olanipekun, A; Obi, L and Boateng, P (2020) A systems thinking approach for incremental reduction of non-physical waste. Built Environment Project and Asset Management, 10(4), pp. 509-528. ISSN 2044-124X

Op den Bosch, A (1994) Design/construction processes simulation in real-time object-oriented environments. PhD thesis, Georgia Institute of Technology, USA.

Orabi, W (2010) Optimizing highway reconstruction and rehabilitation projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Orstavik, F and Harty, C (2017) The unexplored brutality of performance recipes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Osorio-Sandoval, C A (2021) BIM-based construction simulation modelling. PhD thesis, University of Nottingham, UK.

Otchere-Darko, E; Atuah, L; Opoku, R and Koranteng, C (2025) Redefining green roof systems with climbers: Simulation of a conceptual model for thermal-radiative performance and plant vitality. International Journal of Building Pathology and Adaptation, 43(3), pp. 528-547. ISSN 2398-4708

Oteng-Abayie, E F and Dramani, J B (2019) Time-frequency domain causality of prime building cost and macroeconomic indicators in Ghana: Implications for project selection. Construction Management and Economics, 37(5), pp. 243-256. ISSN 01446193

Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss. PhD thesis, University of Washington, USA.

Owusu-Manu, D G; Kukah, A S; Edwards, D J; Pärn, E A; El-Gohary, H and Aigbavboa, C (2018) Causal relationships of moral hazard and adverse selection of Ghanaian public-private-partnership (PPP) construction projects. Journal of Engineering, Design and Technology, 16(3), pp. 439-460. ISSN 1726-0531

Oyediran, A; Oke, A E; Ikuabe, M; Aliu, J; Adeosun, F E and Aigbavboa, C O (2025) Exploring application areas of cyber-physical systems in the construction industry: A case of Nigeria. International Journal of Construction Management, 25(15), pp. 1811-1823. ISSN 1562-3599

Oyediran, H (2025) Robot-integrated 4D building information modeling (4D BIM): Framework for planning safe autonomous construction operations in dynamic environments. PhD thesis, University of Nebraska - Lincoln, USA.

Oyegoke, A S and Al Kiyumi, N (2017) The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman. Journal of Financial Management of Property and Construction, 22(3), pp. 286-302. ISSN 1366-4387

Ozcan-Deniz, G (2011) An integrated multi-agent framework for optimizing time, cost and environmental impact of construction processes. PhD thesis, Florida International University, USA.

Ozdemir, B and Kumral, M (2017) Stochastic assessment of the material haulage efficiency in the earthmoving industry. Journal of Construction Engineering and Management, 143(8): 05017013, ISSN 0733-9364

Oztemir, A E (2003) Skill-driven optimization of construction operations. PhD thesis, Arizona State University, USA.

Ozumba, A O; Ojiako, U; Shakantu, W; Marshall, A and Chipulu, M (2019) Process need areas and technology adoption in construction site management. Journal of Construction in Developing Countries, 24(2), pp. 123-155. ISSN 1823-6499

Ozumba, A O U and Shakantu, W (2018) Exploring challenges to ICT utilisation in construction site management. Construction Innovation, 18(3), pp. 321-349. ISSN 1471-4175

O’Connor, J T (1985) Impacts of constructability improvement. Journal of Construction Engineering and Management, 111(4), pp. 404-410. ISSN 0733-9364

Pagdadis, S (1990) An advanced technologies assessment strategy for construction automation. PhD thesis, University of Texas at Austin, USA.

Palaniappan, S (2009) Environmental performance of on-site construction processes in post-tensioned slab foundation construction: A study of production home building in the Greater Phoenix area. PhD thesis, Arizona State University, USA.

Palliyaguru, R; Amaratunga, D and Haigh, R (2010) Integration of "disaster risk reduction" into infrastructure reconstruction sector: Policy vs practise gaps. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 277-296. ISSN 1759-5916

Pan, H; Huang, H; Luo, Z; Wu, C and Yang, S (2025) Research on safety risk factors of metro shield tunnel construction in China based on social network analysis. Engineering, Construction and Architectural Management, 32(12), pp. 8114-8144. ISSN 0969-9988

Panas, A and Pantouvakis, J P (2010) Comparative analysis of operational coefficients' impact on excavation operations. Engineering, Construction and Architectural Management, 17(5), pp. 461-475. ISSN 0969-9988

Panas, A and Pantouvakis, J P (2014) Simulation-based and statistical analysis of the learning effect in floating caisson construction operations. Journal of Construction Engineering and Management, 140(1): 04013033, ISSN 0733-9364

Pandimani, M R; Ponnada, M R and Geddada, Y (2024) Finite-element modeling of partially prestressed concrete beams with unbonded tendon under monotonic loadings. Journal of Engineering, Design and Technology, 22(1), pp. 235-256. ISSN 1726-0531

Panwar, A and Jha, K N (2017) Trade-off between life cycle cost and greenhouse gas emission in construction projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Papadonikolaki, E; Vrijhoef, R and Wamelink, H (2015) BIM adoption in integrated supply chains: A multiple case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Park, J; Cai, H; Dunston, P S and Ghasemkhani, H (2017) Database-supported and web-based visualization for daily 4D BIM. Journal of Construction Engineering and Management, 143(10): 04017078, ISSN 0733-9364

Park, Y I and Papadopoulou, T C (2012) Causes of cost overruns in transport infrastructure projects in Asia: Their significance and relationship with project size. Built Environment Project and Asset Management, 2(2), pp. 195-216. ISSN 2044-124X

Parvan, K (2012) Estimating the impact of building information modeling (BIM) utilization on building project performance. PhD thesis, University of Maryland, College Park, USA.

Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.

Patacas, J (2019) A framework and common data environment for the development and management of asset information models. PhD thesis, Teesside University, UK.

Paulson, B C; Chan, W T and Koo, C C (1987) Construction operations simulation by microcomputer. Journal of Construction Engineering and Management, 113(2), pp. 302-314. ISSN 0733-9364

Peng, L.; Yang, H.; Ju, A.; Li, X. and Jiang, Z. (2026) Data-driven real-time digital twin framework for tunnel boring machine monitoring. Journal of Construction Engineering and Management, 152(9): 04026134, ISSN 0733-9364

Peng, J L; Yen, T; Lin, Y; Wu, K L and Chen, W F (1997) Performance of scaffold frame shoring under pattern loads and load paths. Journal of Construction Engineering and Management, 123(2), pp. 138-145. ISSN 0733-9364

Peng, L; Man, S S; Chung, H T; Chan, A H S and Zhang, Z (2025) Prospective workers' perceptions of crane operation risks: Using a pairwise comparison. Journal of Construction Engineering and Management, 151(7): 05025001, ISSN 0733-9364

Perkinson, C L (2008) The use of computing technology in highway construction contractor companies as a total jobsite management tool (TJMT). PhD thesis, Florida International University, USA.

Petersen, S H; Frederiksen, N and Bronke, J (2024) Making meaning of the piecework system. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Peña-Mora, F; Han, S; Lee, S and Park, M (2008) Strategic-operational construction management: Hybrid system dynamics and discrete event approach. Journal of Construction Engineering and Management, 134(9), pp. 701-710. ISSN 0733-9364

Pham, V H S and Pham, D H (2025) A cutting-edge approach to prefabricated construction site layouts using multi-objective artificial hummingbird algorithm solution. International Journal of Construction Management, 25(16), pp. 2063-2081. ISSN 1562-3599

Pham, V H S and Pham, D H (2025) Dynamic multiobjective optimization model for construction site layout in prefabricated projects. Journal of Construction Engineering and Management, 151(10): 04025150, ISSN 0733-9364

Pham Van, B and Peansupap, V (2024) Confirmatory analysis on factors influencing the material management effectiveness in construction projects. Engineering, Construction and Architectural Management, 31(6), pp. 2536-2562. ISSN 0969-9988

Pheng, L S and Hui, M S (1999) The application of JIT philosophy to construction: A case study in site layout. Construction Management and Economics, 17(5), pp. 657-668. ISSN 01446193

Pheng, L S and Tan, S K L (1998) How 'just-in-time' wastages can be quantified: Case study of a private condominium project. Construction Management and Economics, 16(6), pp. 621-635. ISSN 01446193

Pillai, S (2022) Regulation of artificial intelligence technologies in the Indian construction industry. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Pillajo, E; Mourgues, C and González, V A (2024) Formalizing the information requirements for decision-making of field managers during indoor construction activities. Engineering, Construction and Architectural Management, 31(10), pp. 4125-4145. ISSN 0969-9988

Pim-Wusu, M; Aigbavboa, C and Thwala, W D (2023) Adaptability capacity framework for sustainable practices in the Ghanaian construction industry. Built Environment Project and Asset Management, 13(1), pp. 89-104. ISSN 2044-124X

Plemmons, J K (1995) Materials management process measures and benchmarking in the industrial construction industry. PhD thesis, Clemson University, USA.

Poh, Y P (2005) Knowledge-based integrated project duration-cost risk simulation model. PhD thesis, London South Bank University, UK.

Ponnada, M R and Geddada, Y (2023) Nonlinear modelling and finite element analysis on the load-bearing capacity of RC beams with considering the bond–slip effect. Journal of Engineering, Design and Technology, 21(4), pp. 945-972. ISSN 1726-0531

Poon, C S; Yu, A T W and Jaillon, L (2004) Reducing building waste at construction sites in Hong Kong. Construction Management and Economics, 22(5), pp. 461-470. ISSN 01446193

Poon, J; Potts, K and Cooper, P (1999) Development of a new best practice model for building projects. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Poon, J L K (2001) Development of a process model for the design stage of building projects. PhD thesis, University of Wolverhampton, UK.

Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. PhD thesis, Loughborough University, UK.

Pornthepkasemsant, P and Charoenpornpattana, S (2019) Identification of factors affecting productivity in Thailand’s construction industry and proposed maturity model for improvement of the productivity. Journal of Engineering, Design and Technology, 17(5), pp. 849-861. ISSN 1726-0531

Prabhakaran, A (2023) Development of interactive and distributed virtual environments for immersive communication in the furniture, fixture and equipment sector. PhD thesis, University of the West of England, Bristol, UK.

Pradhan, A R (2009) An approach for fusing data from multiple sources to support construction productivity analyses. PhD thesis, Carnegie Mellon University, USA.

Pregenzer, L J; Seppanen, P J; Kunz, J C and Paulson, B C (1999) Value-added assessment of construction plans. Journal of Construction Engineering and Management, 125(4), pp. 242-248. ISSN 0733-9364

Price, A D F (1986) An evaluation of production output for in situ concrete work. PhD thesis, Loughborough University, UK.

Pridmore, A B (2009) Development of composite renewal systems for rapid rehabilitation and construction of bridge decks. PhD thesis, University of California, San Diego, USA.

Pritchard, C R (1999) Access to construction work and resources in Zimbabwe: An institutional analysis of the development of the construction industry. PhD thesis, London South Bank University, UK.

Priyadarshini, Shalini (2025) Setu: Safety in excavation and trenching for you a training and decision-making support tool for worker safety in excavation and trenching operations in construction. PhD thesis, Carnegie Mellon University, USA.

Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(4), pp. 350-358. ISSN 0969-9988

Puri, V (2012) Incorporation of continuous activities into activity cycle diagram based discrete event simulation for construction operations. PhD thesis, Purdue University, USA.

Puri, V and Martinez, J C (2013) Modeling of simultaneously continuous and stochastic construction activities for simulation. Journal of Construction Engineering and Management, 139(8), pp. 1037-1045. ISSN 0733-9364

Puybaraud, M-C (2001) A model of the role of management in construction fire safety failure scenarios. PhD thesis, Heriot-Watt University, UK.

Qasem, A and Almohassen, A S (2025) A virtual reality-based constructability index for construction projects. Construction Innovation, 25(2), pp. 442-460. ISSN 1471-4175

Qasim, M (2018) Improving highways construction processes using computer-based simulation techniques. PhD thesis, University of Salford, UK.

Qatawna, A; Allouzi, R and Qaqish, S (2024) Experimental and analytical behavior of one-way fiber foamed concrete slabs reinforced with/without glass fiber grid under 4-point flexural test. International Journal of Building Pathology and Adaptation, 42(6), pp. 1169-1184. ISSN 2398-4708

Qin, B (2019) Change and continuity: making sense of marketization in the Chinese construction sector. PhD thesis, University of Reading, UK.

Qin, B and Green, S (2019) Change and continuity in the Chinese construction sector: Practitioner responses to bidding and tendering. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Quagraine, V K (2007) New strategies to improve the management capacity of contractors for labor-based methods in road rehabilitation in Ghana. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Rajak, S and Vimal, V (2024) LSTM-CNN architecture for construction activity recognition using optimal positioning of wearables. Journal of Construction Engineering and Management, 150(12): 04024179, ISSN 0733-9364

Rajeh, M (2014) Comparative analysis of construction procurement systems based on transaction costs. PhD thesis, Auckland University of Technology, New Zealand.

Rajeh, M; Tookey, J E; Olabode, J and Rotimi, B (2015) Estimating transaction costs in the New Zealand construction procurement a structural equation modelling methodology. Engineering, Construction and Architectural Management, 22(2), pp. 242-267. ISSN 0969-9988

Ramachandra, T (2013) Exploring feasible solutions to payment problems in the construction industry in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Ramachandra, T; Rotimi, J O B and Rameezdeen, R (2013) Direction of the causal relationship between construction and the national economy of Sri Lanka. Journal of Construction in Developing Countries, 18(2), pp. 49-63. ISSN 1823-6499

Rambaldi, A N (1992) A regional market model for construction aggregate materials. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Rankin, J (2023) Reinforcement learning for trench excavation. PhD thesis, Loughborough University, UK.

Raouf, A M and Al-Ghamdi, S G (2023) Framework to evaluate quality performance of green building delivery: Construction and operational stage. International Journal of Construction Management, 23(2), pp. 253-267. ISSN 1562-3599

Rashad, A; Hegazy, H; Zhang, J; Mahdi, I; Abdel-Rasheed, I and Ebid, A (2025) Developing preliminary cost estimates for foundation systems of high-rise buildings. International Journal of Construction Management, 25(6), pp. 682-698. ISSN 1562-3599

Razavi, S N; Montaser, A and Moselhi, O (2012) RFID deployment protocols for indoor construction. Construction Innovation, 12(2), pp. 239-258. ISSN 1471-4175

RazaviAlavi, S and AbouRizk, S (2022) A simulation-based decision support tool for integrating site layout and construction planning of tunneling projects. Journal of Engineering, Design and Technology, 20(4), pp. 866-886. ISSN 1726-0531

Razkenari, M A (2019) Framework for measuring industrialized construction maturity. PhD thesis, University of Florida, USA.

Recsei, Richard Anthony (1998) A generalised decision support system for contaminated site management. PhD thesis, University of New South Wales, Australia.

Reda, R and Carr, R I (1989) Time-cost trade-off among related activities. Journal of Construction Engineering and Management, 115(3), pp. 475-486. ISSN 0733-9364

Rekapalli, P V and Martinez, J C (2011) Discrete-event simulation-based virtual reality environments for construction operations: Technology introduction. Journal of Construction Engineering and Management, 137(3), pp. 214-224. ISSN 0733-9364

Ren, S (1997) GIS-based tools for earthquake risk assessment of point and spatially distributed lifeline systems. PhD thesis, State University of New York at Buffalo, USA.

Ren, Z; Chrysostomou, V and Price, T (2012) The measurement of carbon performance of construction activities: A case study of a hotel construction project in South Wales. Smart and Sustainable Built Environment, 1(2), pp. 153-171. ISSN 2046-6099

Rezazadeh Azar, E; Dickinson, S and McCabe, B (2013) Server-customer interaction tracker: Computer vision-based system to estimate dirt-loading cycles. Journal of Construction Engineering and Management, 139(7), pp. 785-794. ISSN 0733-9364

Richards, J L (1973) An integrated approach to construction management. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Riley, D R (1994) Modeling the space behavior of construction activities. PhD thesis, Pennsylvania State University, USA.

Riley, D R and Sanvido, V E (1995) Patterns of construction-space use in multistory buildings. Journal of Construction Engineering and Management, 121(4), pp. 464-473. ISSN 0733-9364

Ringwald, R C (1985) Formwork design. Journal of Construction Engineering and Management, 111(4), pp. 391-403. ISSN 0733-9364

Robinson, P and McIlwaine, S (2020) Losing ground: Adapting construction management approaches to permafrost retreat. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Rodrigues Aragao, R (2018) Using network theory to manage knowledge from unstructured data in construction projects: Application to a collaborative analysis of the energy consumption in the construction of oil and gas facilities. PhD thesis, University of Toronto, Canada.

Romanello, G (2018) Stability analysis of mobile cranes and determination of outriggers loading. Journal of Engineering, Design and Technology, 16(6), pp. 938-958. ISSN 1726-0531

Roofigari-Esfahan, N; Paez, A and N.razavi, S (2015) Location-aware scheduling and control of linear projects: Introducing space-time float prisms. Journal of Construction Engineering and Management, 141(1): 06014008, ISSN 0733-9364

Rooke, J and Clark, L (2005) Learning, knowledge and authority on site: A case study of safety practice. Building Research & Information, 33(6), pp. 561-570. ISSN 0961-3218

Rotimi, F E; Brauner, M; Burfoot, M; Naismith, N; Silva, C W C and Mohaghegh, M (2024) Work environment challenge and the wellbeing of women in construction industry in New Zealand – the mediating role of work morale. Engineering, Construction and Architectural Management, 31(11), pp. 4417-4438. ISSN 0969-9988

Rotimi, J O B; Ramanayaka, C D E; Olatunji, O A and Rotimi, F E (2023) Migrant construction workers' demography and job satisfaction: A new zealand study. Engineering, Construction and Architectural Management, 30(3), pp. 1122-1145. ISSN 0969-9988

Rozenfeld, O; Sacks, R and Rosenfeld, Y (2009) 'Chaste': Construction hazard assessment with spatial and temporal exposure. Construction Management and Economics, 27(7), pp. 625-638. ISSN 1466433X

Ruddock, L (2000) Information on the construction sector: A world-wide survey. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Ruddock, L (2002) Measuring the global construction industry: Improving the quality of data. Construction Management and Economics, 20(7), pp. 553-556. ISSN 01446193

Ruddock, L and Lopes, J (2006) The construction sector and economic development: The 'Bon curve'. Construction Management and Economics, 24(7), pp. 717-723. ISSN 1466433X

Ruddock, L and Wharton, A (2001) Analysing the construction sector: Progress towards a new framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Russo, J G (1981) Construction marketing in the USA: A viable system for success and control. Construction Papers, 1(2), pp. 29-35. ISSN 0144-8587

Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(2), pp. 167-186. ISSN 1471-4175

Rylander, D (2021) Productivity improvements in construction transport operation through lean thinking and systems of systems. PhD thesis, Malardalen University, Sweden.

Ryu, J; Seo, J; Jebelli, H and Lee, S (2019) Automated action recognition using an accelerometer-embedded wristband-type activity tracker. Journal of Construction Engineering and Management, 145(1): 04018114, ISSN 0733-9364

S. Shehata, A.; M. El-Kelesh, A. and El-Kasaby, E. S. (2026) Effects of ground conditions on utilization factor of slurry tbms in soft ground tunneling. Engineering, Construction and Architectural Management, 33(7), pp. 5275-5299. ISSN 0969-9988

Saad, A M; Badran, H D; Ajayi, S and Sarhan, S (2026) Have we reached a technological plateau? A situational awareness approach to overcome the barriers limiting the development of BIM-based plugins. Construction Innovation, 26(1), pp. 219-235. ISSN 1471-4175

Saad, A; Ajayi, S O and Alaka, H A (2023) Trends in BIM-based plugins development for construction activities: A systematic review. International Journal of Construction Management, 23(16), pp. 2756-2768. ISSN 1562-3599

Saad, N M (2016) The influence of safety culture on safety performance in Saudi Arabian construction industry. PhD thesis, University of Salford, UK.

Sacks, R; Rozenfeld, O and Rosenfeld, Y (2009) Spatial and temporal exposure to safety hazards in construction. Journal of Construction Engineering and Management, 135(8), pp. 726-736. ISSN 0733-9364

Sadeghi, J; Ahmadi, A and Phipps, R (2026) Internet of things in construction: Trends and adoption insights from a scientometric perspective. International Journal of Construction Management, 26(1), pp. 113-130. ISSN 1562-3599

Sadeghi, B (2024) Selecting Industry 4.0 technologies for construction activities using clustering analysis and text mining. PhD thesis, University of Wisconsin - Milwaukee, USA.

Sahu, A and Shanmugapriya, S (2025) A practical approach of partial striking technique in high-rise buildings. Engineering, Construction and Architectural Management, 32(2), pp. 987-1009. ISSN 0969-9988

Said, H (2015) Prefabrication best practices and improvement opportunities for electrical construction. Journal of Construction Engineering and Management, 141(12): 04015045, ISSN 0733-9364

Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Said, H M M and Lucko, G (2016) Float types in construction spatial scheduling. Journal of Construction Engineering and Management, 142(12): 04016077, ISSN 0733-9364

Saif, W and Alshibani, A (2024) A close-range photogrammetric model for tracking and performance-based forecasting earthmoving operations. Construction Innovation, 24(1), pp. 164-195. ISSN 1471-4175

Sakhakarmi, S (2022) Automated approach for the enhancement of scaffolding structure monitoring with strain sensor data. PhD thesis, University of Nevada, Las Vegas, USA.

Sakhakarmi, S; Park, J and Cho, C (2019) Enhanced machine learning classification accuracy for scaffolding safety using increased features. Journal of Construction Engineering and Management, 145(2): 04018133, ISSN 0733-9364

Saleem, M (2024) Internal damage detection in reinforced concrete member using ultrasonic pulse velocity nondestructive testing. Journal of Construction Engineering and Management, 150(8): 04024084, ISSN 0733-9364

Salguero-Caparrós, F; Pardo-Ferreira, M D C; Herrera-Pérez, V and Rubio-Romero, J C (2026) Monitoring and improving safety and health in construction activities for concrete structures. Journal of Construction Engineering and Management, 152(5): 05026004, ISSN 0733-9364

Salhab, D; Møller, D E; Lindhard, S M; Hamzeh, F; Randrup, M and Pilgaard, A (2022) Accounting for variability: Identifying critical activities as a supplement to the critical path. Journal of Construction Engineering and Management, 148(5): 04022019, ISSN 0733-9364

Sanders, S R (1989) An analysis of factors affecting labor productivity in masonry construction. PhD thesis, Pennsylvania State University, USA.

Sanga, S A (2020) Compliance with building material specifications among informal skilled construction workers in Dar es Salaam, Tanzania. Journal of Construction in Developing Countries, 25(2), pp. 63-91. ISSN 1823-6499

Santoso, D S (2009) The construction site as a multicultural workplace: A perspective of minority migrant workers in Brunei. Construction Management and Economics, 27(6), pp. 529-537. ISSN 1466433X

Sanvido, V E (1988) Conceptual construction process model. Journal of Construction Engineering and Management, 114(2), pp. 294-310. ISSN 0733-9364

Sarah Slaughter, E (1999) Assessment of construction processes and innovations through simulation. Construction Management and Economics, 17(3), pp. 341-350. ISSN 01446193

Sarden, Y and Stehn, L (2006) Industrialisation as a tool for reducing uncertainty in construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Sarigul, F. H. and Gunaydin, H. M. (2026) Integrated BIM, GIS and interoperable digital technologies in lifecycle management of building construction projects: Systematic literature review. Smart and Sustainable Built Environment, 15(5), pp. 1808-1845. ISSN 2046-6099

Sastry, M K S and Seekumar, L (2012) Automation of real time monitoring and controlling of a marine loading arm. Journal of Engineering, Design and Technology, 10(2), pp. 217-227. ISSN 1726-0531

Sathiya, P; Abdul Jaleel, M Y and Shanmugarajan, B (2012) Analysis of metallurgical and mechanical properties of laser welded super austenitic stainless steel. Journal of Engineering, Design and Technology, 10(1), pp. 110-127. ISSN 1726-0531

Saunders, L W (2013) Measuring safety attitude differences in the construction supply chain. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Sawhney, A and Mund, A (2001) Intellicranes: An integrated crane type and model selection system. Construction Management and Economics, 19(2), pp. 227-237. ISSN 01446193

Sawhney, A and Mund, A (2002) Adaptive probabilistic neural network-based crane type selection system. Journal of Construction Engineering and Management, 128(3), pp. 265-273. ISSN 0733-9364

Sayed Suleiman, R (2019) Understanding site offices challenges to communicate and exchange information using technology in UK: main contractor perspective. PhD thesis, University of Salford, UK.

Schafer, D W (2014) A conceptual framework for resilience engineering in construction safety. PhD thesis, Michigan State University, USA.

Scharpff, J; Schraven, D; Volker, L; Spaan, M T J and de Weerdt, M M (2021) Can multiple contractors self-regulate their joint service delivery? A serious gaming experiment on road maintenance planning. Construction Management and Economics, 39(2), pp. 99-116. ISSN 01446193

Schexnayder, C; Knutson, K and Fente, J (2005) Describing a beta probability distribution function for construction simulation. Journal of Construction Engineering and Management, 131(2), pp. 221-229. ISSN 0733-9364

Schexnayder, C J and David, S A (2002) Past and future of construction equipment: part iv. Journal of Construction Engineering and Management, 128(4), pp. 279-286. ISSN 0733-9364

Schiavi, B; Havard, V; Beddiar, K and Baudry, D (2023) A VR training scenario editor for operation in construction based on bim 4D and domain expert authoring. Smart and Sustainable Built Environment, 12(5), pp. 1074-1089. ISSN 2046-6099

Schnabel, J J and Martin, R E (1983) Parking garage supported on structural fill. Journal of Construction Engineering and Management, 109(3), pp. 286-296. ISSN 0733-9364

Schroeder, H P (1991) Dycam 1.0: Dynamic construction activity model, a decision support tool for construction planning. PhD thesis, University of Colorado at Boulder, USA.

Schroeder, W L; Rybel, V W and Cochran, L (1986) Dewatering for opal springs powerhouse excavation. Journal of Construction Engineering and Management, 112(3), pp. 440-451. ISSN 0733-9364

Schultmann, F and Rentz, O (2002) Scheduling of deconstruction projects under resource constraints. Construction Management and Economics, 20(5), pp. 391-401. ISSN 01446193

Selinger, S (1983) Economic service life of building construction equipment. Journal of Construction Engineering and Management, 109(4), pp. 398-405. ISSN 0733-9364

Selvam, G; Kamalanandhini, M; Velpandian, M and Shah, S (2025) Duration and resource constraint prediction models for construction projects using regression machine learning method. Engineering, Construction and Architectural Management, 32(9), pp. 5743-5763. ISSN 0969-9988

Selvam, G; Madhavi, T C; Naazeema Begum, T P and Sudheesh, M (2020) Impact of labour productivity in estimating the duration of construction projects. International Journal of Construction Management, 22(12), pp. 2398-2404. ISSN 1562-3599

Senaratne, S and Mayuran, J (2015) Documentation management based on ISO for construction industries in developing countries. Journal of Construction in Developing Countries, 20(2), pp. 81-95. ISSN 1823-6499

Seo, J; Lee, S and Seo, J (2016) Simulation-based assessment of workers' muscle fatigue and its impact on construction operations. Journal of Construction Engineering and Management, 142(11): 04016063, ISSN 0733-9364

Seppänen, O; Evinger, J and Mouflard, C (2014) Effects of the location-based management system on production rates and productivity. Construction Management and Economics, 32(6), pp. 608-624. ISSN 01446193

Seun Oke, O.; Aliu, J. O.; Chukwuma, N. K. and Oke, A. E. (2026) Uncovering the drivers of green wall system adoption in construction: Insights from a developing country. International Journal of Construction Management, 26(10), pp. 2101-2115. ISSN 1562-3599

Sexton, M G (2000) Sustainable built environments and construction activity through dynamic research agendas. PhD thesis, University of Salford, UK.

Shafabakhsh, G; Kashi, E and Tahani, M (2018) Analysis of runway pavement response under aircraft moving load by FEM. Journal of Engineering, Design and Technology, 16(2), pp. 233-243. ISSN 1726-0531

Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Shahin, A; Abourizk, S M and Mohamed, Y (2011) Modeling weather-sensitive construction activity using simulation. Journal of Construction Engineering and Management, 137(3), pp. 238-246. ISSN 0733-9364

Shahparvari, M (2023) Minimisation of rework in UK housing construction: contribution of subcontractors. PhD thesis, London South Bank University, UK.

Shakantu, W; Muya, M; Tookey, J and Bown, P (2008) Evaluating truck empty running in construction: A case study from Cape Town, South Africa. Construction Economics and Building, 8(2), pp. 41-49. ISSN 2204-9029

Shamsollahi, D; Moselhi, O and Khorasani, K (2024) Automated detection and segmentation of mechanical, electrical, and plumbing components in indoor environments by using the yolact++ architecture. Journal of Construction Engineering and Management, 150(8): 04024100, ISSN 0733-9364

Shanbari, H and Issa, R R A (2019) Use of video games to enhance construction management education. International Journal of Construction Management, 19(3), pp. 206-221. ISSN 1562-3599

Shang, T; Hu, X; Ye, K and Tam, V W Y (2023) Will contractors pursue unsustainable practices following environmental recovery? A highway case in China. Engineering, Construction and Architectural Management, 30(3), pp. 1165-1182. ISSN 0969-9988

Shapira, A (1999) Contemporary trends in formwork standards: a case study. Journal of Construction Engineering and Management, 125(2), pp. 69-75. ISSN 0733-9364

Shapira, A; Filin, S and Wicnudel, A (2014) Quantitative analysis of blind tower-crane lifts using laser-scanning information. Construction Innovation, 14(3), pp. 383-403. ISSN 1471-4175

Shapira, A; Rosenfeld, Y and Mizrahi, I (2008) Vision system for tower cranes. Journal of Construction Engineering and Management, 134(5), pp. 320-332. ISSN 0733-9364

Sharifi, Y and Aviz, H (2016) Effect of outrigger-belt truss location on the dynamic response of high-rise building subjected to blast loading. Journal of Engineering, Design and Technology, 14(1), pp. 54-77.

Sharma, A and Sharma, R K (2021) Uplift behaviour of axial granular pile anchor encased with geogrid in cohesionless soil. Journal of Engineering, Design and Technology, 19(2), pp. 588-602. ISSN 1726-0531

Sharma, H; McIntyre, C; Gao, Z and Nguyen, T H (2009) Developing a traffic closure integrated linear schedule for highway rehabilitation projects. Journal of Construction Engineering and Management, 135(3), pp. 146-155. ISSN 0733-9364

Sharma, V; Zaki, M; Jha, K N and Krishnan, N M A (2022) Machine learning-aided cost prediction and optimization in construction operations. Engineering, Construction and Architectural Management, 29(3), pp. 1241-1257. ISSN 0969-9988

Sharrard, A L (2007) Greening construction processes using an input-output-based hybrid life cycle assessment method. PhD thesis, Carnegie Mellon University, USA.

Sharrard, A L; Matthews, H S and Roth, M (2007) Environmental implications of construction site energy use and electricity generation. Journal of Construction Engineering and Management, 133(11), pp. 846-854. ISSN 0733-9364

Shearman, J; Hughes, W P; Gilchrist, R and Elwazani, S (2005) Strategies for reducing construction problems on archaeological sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Shebob, A; Dawood, N; Shah, R K and Xu, Q (2012) Comparative study of delay factors in Libyan and the UK construction industry. Engineering, Construction and Architectural Management, 19(6), pp. 688-712. ISSN 0969-9988

Shehab, T (2009) Automated measurement of earthwork volume in construction projects. Construction Innovation, 9(3), pp. 341-358. ISSN 1471-4175

Shehadeh, Ali (2019) Multi-objective optimization for construction equipment fleet selection and management in highway construction projects based on time, cost, and quality objectives. PhD thesis, University of Central Florida, USA.

Shelbourn, M; Bouchlaghem, N M; Anumba, C and Carrillo, P (2007) Planning and implementation of effective collaboration in construction projects. Construction Innovation, 7(4), pp. 357-377. ISSN 1471-4175

Shelton, J; Martek, I and Chen, C (2016) Implementation of innovative technologies in small-scale construction firms: Five Australian case studies. Engineering, Construction and Architectural Management, 23(2), pp. 177-191. ISSN 0969-9988

Shen, L and Cheung, S O (2018) How forming joint ventures may affect market concentration in construction industry? International Journal of Construction Management, 18(2), pp. 151-162. ISSN 1562-3599

Shen, L Y (1990) Application of risk management to the Chinese construction industry. PhD thesis, University of Reading, UK.

Shen, L Y; Wu, M and Wang, J Y (2002) A model for assessing the feasibility of construction project in contributing to the attainment of sustainable development. Journal of Construction Research, 3(2), pp. 255-269. ISSN 1609-9451

Shen, X; Marks, E; Pradhananga, N and Cheng, T (2016) Hazardous proximity zone design for heavy construction excavation equipment. Journal of Construction Engineering and Management, 142(6): 05016001, ISSN 0733-9364

Sher, W D (2012) Tertiary construction management education: the lived experience of academic staff in Australia. PhD thesis, University of Newcastle, Australia.

Sherman, R; Gibson, G E; Merrow, E and Parrish, K (2021) Examining the impact of rate-of-return regulation on capital project planning. Journal of Construction Engineering and Management, 147(8): 04021080, ISSN 0733-9364

Sherratt, F (2014) Exploring 'zero target' safety programmes in the UK construction industry. Construction Management and Economics, 32(7-8), pp. 737-748. ISSN 01446193

Sherratt, F and Dainty, A (2023) The power of a pandemic: How COVID-19 should transform UK construction worker health, safety and wellbeing. Construction Management and Economics, 41(5), pp. 379-386. ISSN 01446193

Shi, G; Lu, D; Liu, Z; Du, X; Zhang, Q; Zhao, L and Wang, Z (2024) Material distribution planning method and experimental verification under multinode and multivehicle scene. Journal of Construction Engineering and Management, 150(11): 04024161, ISSN 0733-9364

Shi, J and Abourizk, S (1998) Continuous and combined event-process models for simulating pipeline construction. Construction Management and Economics, 16(4), pp. 489-498. ISSN 01446193

Shi, J J (1999) A neural network based system for predicting earthmoving production. Construction Management and Economics, 17(4), pp. 463-471. ISSN 01446193

Shi, J J (2002) Three methods for verifying and validating the simulation of a construction operation. Construction Management and Economics, 20(6), pp. 483-491. ISSN 01446193

Shih, N J and Wang, P H (2004) Plumbing locator in an as-built building form. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Shim, E (2008) The decision-making modeling for concurrent planning of construction projects. PhD thesis, Texas A&M University, USA.

Shin, H J (1994) Fuzzy approach to construction activity estimation. PhD thesis, Loughborough University, UK.

Shin, K-C (2000) Identification of critical dispute characteristics (CDCs) during construction project operations. PhD thesis, Georgia Institute of Technology, USA.

Shooshtarian, S; Maqsood, T; Wong, P S P; Caldera, S; Ryley, T; Zaman, A and Cáceres Ruiz, A M (2024) Circular economy in action: The application of products with recycled content in construction projects: a multiple case study approach. Smart and Sustainable Built Environment, 13(2), pp. 370-394. ISSN 2046-6099

Shrestha, H D; Yatabe, R; Bhandary, N P and Subedi, J (2012) Vulnerability assessment and retrofitting of existing school buildings: A case study of Aceh. International Journal of Disaster Resilience in the Built Environment, 3(1), pp. 52-65. ISSN 1759-5916

Shrestha, P P (2007) Performance benchmarking of large highway projects. PhD thesis, University of Texas at Austin, USA.

Shrivas, A and Singla, H K (2022) Analysis of interaction among the factors affecting delay in construction projects using interpretive structural modelling approach. International Journal of Construction Management, 22(8), pp. 1455-1463. ISSN 1562-3599

Shurrab, J; Hussain, M and Khan, M (2019) Green and sustainable practices in the construction industry: A confirmatory factor analysis approach. Engineering, Construction and Architectural Management, 26(6), pp. 1063-1086. ISSN 0969-9988

Shuster, W D; Burkman, C E; Grosshans, J; Dadio, S and Losco, R (2015) Green residential demolitions: Case study of vacant land reuse in storm water management in cleveland. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364

Sihabuddin, S S and Ariaratnam, S T (2009) Methodology for estimating emissions in underground utility construction operations. Journal of Engineering, Design and Technology, 7(1), pp. 37-64. ISSN 1726-0531

Simukonda, W and Kamwela, N (2021) The management of theft and vandalism on construction jobsites in the southern region of Malawi. Journal of Construction Business and Management, 5(1), pp. 47-59. ISSN 2521-0165

Sinoeurn, D and Panuwatwanich, K (2023) Development and evaluation of cloud-based virtual reality for design evaluation: Multicriteria comparative analysis. Smart and Sustainable Built Environment, 12(5), pp. 1198-1225. ISSN 2046-6099

Sirca, G F (2019) Analysis of full-scale in-service civil engineering structures. PhD thesis, Ohio State University, USA.

Skibniewski, M and Molinski, J (1989) Modelling of building production activities for multifacility projects. Construction Management and Economics, 7(4), pp. 357-365. ISSN 01446193

Skibniewski, M J (1986) Engineering and economic analysis of robotics application potential in selected construction operations. PhD thesis, Carnegie Mellon University, USA.

Skinner, D (1998) Forecasting models of activity in industrial and commercial building. PhD thesis, University of Salford, UK.

Smallwood, J (2006) Scaffolding health and safety: A multi-stakeholder issue. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Smallwood, J J (2002) Best practice workers' compensation insurance performance: The related issues. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Smallwood, J J (2010) Excavation health and safety (H&S): A South African perspective. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Smallwood, J J and Haupt, T C (2009) Construction ergonomics: Perspectives of female and male production workers. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site. PhD thesis, University of Glasgow, UK.

Smith, S (1998) Stochastic analysis of cyclic construction processes. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Smith, S D (1994) Production estimation of earthmoving operations using a discrete-event simulation model. PhD thesis, University of Edinburgh, UK.

Smith, S D (1999) Earthmoving productivity estimation using linear regression techniques. Journal of Construction Engineering and Management, 125(3), pp. 133-141. ISSN 0733-9364

Smith, S D; Osborne, J R and Forde, M C (1995) Analysis of earth-moving systems using discrete-event simulation. Journal of Construction Engineering and Management, 121(4), pp. 388-396. ISSN 0733-9364

Smith, S D; Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(2), pp. 219-228. ISSN 01446193

Soltani, A R (2005) An intelligent transportation system in construction sites. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Soltanmohammadlou, N.; Hon, C. K. H.; Drogemuller, R.; Motamedisedeh, O. and Rahimian, F. (2026) Modelling risk factors in earthmoving equipment operations on Australian construction sites: A fuzzy DEMATEL approach. Engineering, Construction and Architectural Management, 33(3), pp. 2118-2153. ISSN 0969-9988

Soltanmohammadlou, N.; Hon, C. K. H.; Drogemuller, R.; Sheikhkhoshkar, M. and Rahimian, F. (2026) An advanced exploration of technological functionalities addressing risk factors in earthmoving equipment operation on construction sites: A systematic literature review. Smart and Sustainable Built Environment, 15(5), pp. 1846-1876. ISSN 2046-6099

Soltanmohammadlou, Nazi (2025) A sociotechnical system for earthmoving equipment safety in Australian construction sites. PhD thesis, Queensland University of Technology, Australia.

Son, J; Mattila, K G and Myers, D S (2005) Determination of haul distance and direction in mass excavation. Journal of Construction Engineering and Management, 131(3), pp. 302-309. ISSN 0733-9364

Song, Y (2007) Intermediate function analysis for improving constructability. PhD thesis, National University of Singapore, Singapore.

Song, Y and Chua, D K H (2007) Temporal logic representation schema for intermediate function. Journal of Construction Engineering and Management, 133(4), pp. 277-286. ISSN 0733-9364

Sospeter, N G (2025) A categorization of factors affecting quality of design documentation in Tanzanian construction projects. Journal of Engineering, Design and Technology, 23(1), pp. 228-248. ISSN 1726-0531

Spillane, J and Oyedele, L (2013) Strategies for effective management of health and safety in confined site construction. Construction Economics and Building, 13(4), pp. 50-64. ISSN 2204-9029

Spillane, J P; Flood, M; Lukumon, O O; von Meding, J K and Konanahalli, A (2013) Urban high-density construction sites and their surrounding community: Issues encountered and strategies adopted by contractors. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Spillane, J P; Oyedele, L O and von Meding, J K (2012) Confined site construction: An empirical analysis of factors impacting health and safety management. Journal of Engineering, Design and Technology, 10(3), pp. 397-420. ISSN 1726-0531

Squicciarini, M and Asikainen, A L (2011) A value chain statistical definition of construction and the performance of the sector. Construction Management and Economics, 29(7), pp. 671-693. ISSN 1466433X

Sreram, P K and Thomas, A (2026) A discrete event simulation-based value stream map implementation scheme for small and medium enterprises (SMEs). International Journal of Construction Management, 26(3), pp. 428-444. ISSN 1562-3599

Srisuwanrat, C (2009) The sequence step algorithm: A simulation-based scheduling algorithm for repetitive projects with probabilistic activity durations. PhD thesis, University of Michigan, USA.

Staub-French, S A (2002) Feature-driven activity-based cost estimating. PhD thesis, Stanford University, USA.

Stella, C; Ceppi, G and D’Appolonia, E (1990) Temporary tunnel support using jet-grouted cylinders. Journal of Construction Engineering and Management, 116(1), pp. 35-53. ISSN 0733-9364

Stemp, B A and Walewski, J (2011) Lampson transi-lift mobile crane: Concept, design, and use. Journal of Construction Engineering and Management, 137, pp. 785-792. ISSN 0733-9364

Stephens, P (1974) Builders' and plumbers' merchanting: an attribute study of organization, functions and performance. PhD thesis, University of Manchester, UK.

Stevens, J D and Murray, A L (1994) Modified roof erection system. Journal of Construction Engineering and Management, 120(4), pp. 828-837. ISSN 0733-9364

Stiles, S (2019) Investigation of safety leadership within infrastructure engineering construction projects. PhD thesis, University of Nottingham, UK.

Stoy, C; Dreier, F and Schalcher, H R (2007) Construction duration of residential building projects in Germany. Engineering, Construction and Architectural Management, 14(1), pp. 52-64. ISSN 0969-9988

Styhre, A (2011) The overworked site manager: Gendered ideologies in the construction industry. Construction Management and Economics, 29(9), pp. 943-955. ISSN 1466433X

Su, X (2013) A spatial temporal information model for construction planning. PhD thesis, Purdue University, USA.

Su, X and Cai, H (2014) Life cycle approach to construction workspace modeling and planning. Journal of Construction Engineering and Management, 140(7): 04014019, ISSN 0733-9364

Su, Y and Lucko, G (2015) Synthetic cash flow model with singularity functions for unbalanced bidding scenarios. Construction Management and Economics, 33(1), pp. 35-54. ISSN 01446193

Su, Y Y; Hashash, Y M A and Liu, L Y (2006) Integration of construction as-built data via laser scanning with geotechnical monitoring of urban excavation. Journal of Construction Engineering and Management, 132(12), pp. 1234-1241. ISSN 0733-9364

Su, Y-Y (2010) Construction crew productivity monitoring supported by location awareness technologies. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Sullivan, S (2007) Construction and behavior of precast bridge deck panel systems. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Sun, L (2001) Stochastic performance modeling considering maintenance effects for highway pavement management. PhD thesis, University of Texas at Austin, USA.

Suraji, A; Duff, A R and Peckitt, S J (2001) Development of causal model of construction accident causation. Journal of Construction Engineering and Management, 127(4), pp. 337-344. ISSN 0733-9364

Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.

Sutrisna, M; Potts, K and Proverbs, D (2004) Quotation mechanism for pre-pricing variations in civil engineering projects: A quest for best practice. Journal of Financial Management of Property and Construction, 9(1), pp. 13-26. ISSN 1366-4387

Sutrisna, M; Ramanayaka, C D D and Goulding, J S (2018) Developing work breakdown structure matrix for managing offsite construction projects. Architectural Engineering and Design Management, 14(5), pp. 381-397. ISSN 1745-2007

Sweis, R J (1999) A model to assess alternative policies to promote the construction industry in developing countries. PhD thesis, Northwestern University, USA.

Szamocki, N; Kim, M K; Ahn, C R and Brilakis, I (2019) Reducing greenhouse gas emission of construction equipment at construction sites: Field study approach. Journal of Construction Engineering and Management, 145(9): 05019012, ISSN 0733-9364

Tafese, E. M. and Mengistu, D. G. (2026) Labor productivity management practice in construction companies. International Journal of Construction Management, 26(8), pp. 1527-1542. ISSN 1562-3599

Taghaddos, H; Heydari, M H and Asgari, A H (2021) A hybrid simulation approach for site layout planning in construction projects. Construction Innovation, 21(3), pp. 417-440. ISSN 1471-4175

Taheri, Ali (2024) The framework of an infrastructure performance model based on the concepts of civil integrated management (CIM). PhD thesis, Florida State University, USA.

Taheri, H and Beitollahi, A (2010) Proposed enhanced spectra for near-fault regions using forward directivity records. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 334-343. ISSN 1759-5916

Tahmasebinia, F; M.E. Sepasgozar, S; Shirowzhan, S; Niemela, M; Tripp, A; Nagabhyrava, S; Mansuri, K Z and Alonso-Marroquin, F (2020) Criteria development for sustainable construction manufacturing in Construction Industry 4.0: Theoretical and laboratory investigations. Construction Innovation, 20(3), pp. 379-400. ISSN 1471-4175

Taku, A M (2021) Predicting modular efficiency in oil and gas capital projects using multi-criteria decision analysis. DEng thesis, George Washington University, USA.

Talhouni, B T K (1990) Measurement and analysis of construction labour productivity. PhD thesis, University of Dundee, UK.

Talvitie, I; Amiri, A and Junnila, S (2024) Spatiotemporal evaluation of embodied carbon in urban residential developmentSpatiotemporal evaluation of embodied carbon in urban residential development. Buildings & Cities, 5(1), pp. 704-722. ISSN 2632-6655

Tam, C M; Tong, T K L and Tse, S L (2002) Artificial neural networks model for predicting excavator productivity. Engineering, Construction and Architectural Management, 9(5-6), pp. 446-452. ISSN 0969-9988

Tam, C M; Tong, T K L and Tse, S L (2004) Modelling hook times of mobile cranes using artificial neural networks. Construction Management and Economics, 22(8), pp. 839-849. ISSN 01446193

Tam, C M; Tong, T K L and Wong, B W L (2007) An integrated system for earthmoving planning. Construction Management and Economics, 25(11), pp. 1127-1137. ISSN 01446193

Tam, V W Y and Shen, L Y (2010) On applications of an optimal price-time bidding model in Hong Kong foundation projects. Construction Innovation, 10(1), pp. 14-24. ISSN 1471-4175

Tam, V W Y; Shen, L Y; Fung, I W H and Wang, J Y (2007) Controlling construction waste by implementing governmental ordinances in Hong Kong. Construction Innovation, 7(2), pp. 149-166. ISSN 1471-4175

Tam, V W Y; Tam, C M and Ng, W C Y (2007) On prefabrication implementation for different project types and procurement methods in Hong Kong. Journal of Engineering, Design and Technology, 5(1), pp. 68-80. ISSN 1726-0531

Tam, V W Y; Tam, C M; Shen, L Y; Zeng, S X and Ho, C M (2006) Environmental performance assessment: Perceptions of project managers on the relationship between operational and environmental performance indicators. Construction Management and Economics, 24(3), pp. 287-299. ISSN 01446193

Tam, V W Y; Tam, C M; Yiu, K T W and Cheung, S O (2006) Critical factors for environmental performance assessment (EPA) in the Hong Kong construction industry. Construction Management and Economics, 24(11), pp. 1113-1123. ISSN 1466433X

Tamate, S; Suemasa, N and Katada, T (2005) Analyses of instability in mobile cranes due to ground penetration by outriggers. Journal of Construction Engineering and Management, 131(6), pp. 689-704. ISSN 0733-9364

Tamimi, M F (2022) Reliability and sensitivity analysis of civil and marine structures using machine-learning-assisted simulation. PhD thesis, Oklahoma State University, USA.

Tang, J C S; Karasudhi, P and Tachopiyagoon, P (1990) Thai construction industry: Demand and projection. Construction Management and Economics, 8(3), pp. 249-257. ISSN 01446193

Tang, L; Chen, C; Li, H and Mak, D Y Y (2022) Developing a BIM GIS-integrated method for urban underground piping management in China: A case study. Journal of Construction Engineering and Management, 148(9): 05022004, ISSN 0733-9364

Tang, Y; Lim, P G and Gan, S W (2012) Forecasting capability of a construction organization model: 10 years later. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Tangtinthai, N (2016) Extraction, use and disposal of construction materials in Great Britain and Thailand. PhD thesis, University of Newcastle upon Tyne, UK.

Tanko, B L; Abdullah, F; Mohamad Ramly, Z and Enegbuma, W I (2018) An implementation framework of value management in the Nigerian construction industry. Built Environment Project and Asset Management, 8(3), pp. 305-319. ISSN 2044-124X

Tariq, M (2012) Green supply chain assessment model for construction projects in the UAE. PhD thesis, University of Salford, UK.

Tatari, O and Kucukvar, M (2012) Sustainability assessment of U.S. Construction sectors: Ecosystems perspective. Journal of Construction Engineering and Management, 138(8), pp. 918-922. ISSN 0733-9364

Tatum, C B (1983) Innovations in nuclear concrete construction. Journal of Construction Engineering and Management, 109(2), pp. 131-145. ISSN 0733-9364

Tatum, C B (1988) Classification system for construction technology. Journal of Construction Engineering and Management, 114(3), pp. 344-363. ISSN 0733-9364

Tatum, C B (2005) Building better: Technical support for construction. Journal of Construction Engineering and Management, 131(1), pp. 23-32. ISSN 0733-9364

Tatum, C B (2011) Core elements of construction engineering knowledge for project and career success. Journal of Construction Engineering and Management, 137, pp. 745-750. ISSN 0733-9364

Tatum, C B and Funke, A T (1988) Partially automated grading: Construction process innovation. Journal of Construction Engineering and Management, 114(1), pp. 19-35. ISSN 0733-9364

Tatum, C B; Vorster, M and Klingler, M (2006) Innovations in earthmoving equipment: New forms and their evolution. Journal of Construction Engineering and Management, 132(9), pp. 987-997. ISSN 0733-9364

Tatum, C B; Vorster, M; Klingler, M G and Paulson Jr, B C (2006) Systems analysis of technical advancement in earthmoving equipment. Journal of Construction Engineering and Management, 132(9), pp. 976-986. ISSN 0733-9364

Tavakoli, A (1983) Productivity analysis of heavy construction operations. PhD thesis, Georgia Institute of Technology, USA.

Tavakoli, A (1985) Productivity analysis of construction operations. Journal of Construction Engineering and Management, 111(1), pp. 31-39. ISSN 0733-9364

Tawalare, A; Laishram, B and Thottathil, F (2020) Relational partnership in public construction organizations: Front-line employee perspective. Journal of Construction Engineering and Management, 146(1): 04019086, ISSN 0733-9364

Taylor, T (2014) Assessing the thermal performance of buildings at the construction stage using thermography: development and evaluation of a testing approach in the context of new housing in Wales. PhD thesis, Cardiff Metropolitan University, UK.

Teerajetgul, W and Charoenngam, C (2006) Factors inducing knowledge creation: Empirical evidence from Thai construction projects. Engineering, Construction and Architectural Management, 13(6), pp. 584-599. ISSN 0969-9988

Tehrani, B M; BuHamdan, S and Alwisy, A (2024) Robotics in industrialized construction: An activity-based ranking system for assembly manufacturing tasks. Engineering, Construction and Architectural Management, 31(6), pp. 2264-2285. ISSN 0969-9988

Teizer, J (2006) Real-time spatial modeling to detect and track resources on construction sites. PhD thesis, University of Texas at Austin, USA.

Tekin, H (2022) The impact of COVID-19 on construction labor productivity: The case of Turkey. Engineering, Construction and Architectural Management, 29(9), pp. 3775-3806. ISSN 0969-9988

Tennant, S (2007) Site management teams and project performance in the UK construction industry. PhD thesis, University of Strathclyde, UK.

Tennant, S and Fernie, S (2010) A contemporary examination of framework agreements. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Tennant, S and Langford, D (2005) Construction management teams & project performance: A diagnostic toolkit. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Tennant, S; McCarney, M and Tong, M K L (2012) Re-engineering the construction supply chain: Transferring on-site activity off-site. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Teo, M and Loosemore, M (2006) Community protest groups' perceptions of environmental risks using social contagion theory. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Teo, M M M and Loosemore, M (2001) A theory of waste behaviour in the construction industry. Construction Management and Economics, 19(7), pp. 741-751. ISSN 01446193

Teo, M M M; Loosemore, M; Marosszeky, M; Karim, K and Gardner, D (2000) Operatives' attitudes towards waste on construction project. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Teriö, O and Kähkönen, K (2011) Developing and implementing environmental management systems for small and medium-sized construction enterprises. Construction Management and Economics, 29(12), pp. 1183-1195. ISSN 1466433X

Teriö, O; Sorri, J; Kähkönen, K and Hämäläinen, J (2014) Environmental index for Finnish construction sites. Construction Innovation, 14(2), pp. 245-262. ISSN 1471-4175

Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364

Tew, A D (2003) An examination of the procurement of insurance-funded repairs to privately owned dwellings. PhD thesis, Loughborough University, UK.

Thaesler-Garibaldi, M P (2005) A methodology to develop an integrated engineering system to estimate quantities for bridge repairs at the pre-design stage. PhD thesis, Georgia Institute of Technology, USA.

Thannon, A Y (1989) The appraisal and management of multistorey dwelling blocks using large concrete panel systems. PhD thesis, Aston University, UK.

Thiengburanathum, P (2003) Design of construction production systems: Representation, taxonomy, and design framework. PhD thesis, University of Colorado at Boulder, USA.

Thim, L Y and Zonggui, C (2004) The development of the construction legal system in China. Construction Management and Economics, 22(4), pp. 347-356. ISSN 01446193

Thomas, A V and Sudhakumar, J (2013) Critical analysis of the key factors affecting construction labour productivity: An Indian perspective. International Journal of Construction Management, 13(4), pp. 103-125. ISSN 1562-3599

Thomas, H R and Horman, M J (2006) Fundamental principles of workforce management. Journal of Construction Engineering and Management, 132(1), pp. 97-104. ISSN 0733-9364

Thomas, H R and Yiakoumls, I (1987) Factor model of construction productivity. Journal of Construction Engineering and Management, 113(4), pp. 623-639. ISSN 0733-9364

Thomas, J C and Le Van, A (2021) Deflections of pneumatic masts and columns. Architectural Engineering and Design Management, 17(3-4), pp. 299-315. ISSN 1745-2007

Thomas, M U (2010) Models for managing contingency construction operations. Journal of Construction Engineering and Management, 136(3), pp. 391-398. ISSN 0733-9364

Thu, K and Akintoye, A (2007) Structure of the public private partnership/private finance initiative market in the UK construction industry. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Tipple, C (1993) An analysis of the development of the construction industry since the 18th century. PhD thesis, University of Manchester, UK.

Titus, K M; Blismas, N; Wakefield, R and Lombardo, R (2011) System archetypes underlying the problematic behaviourof construction activity in Kenya. Construction Management and Economics, 29(1), pp. 3-13. ISSN 1466433X

Tokdemir, O B (2003) ALISS: Advanced linear scheduling system. PhD thesis, Illinois Institute of Technology, USA.

Toladun, Olawale (2025) Sustainable procurement of infrastructure projects in the Australian construction industry: The perceptions of consultants. PhD thesis, University of New South Wales, Australia.

Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Touran, A (1981) Construction operations data acquisition and processing via time-lapse photography interfaced to a minicomputer. PhD thesis, Stanford University, USA.

Touran, A (1986) Computer packages for construction data acquisition and processing. Construction Management and Economics, 4(3), pp. 233-243. ISSN 01446193

Touran, A (1991) Modeling uncertainty in operations with nonstationary cycle times. Journal of Construction Engineering and Management, 117(4), pp. 728-735. ISSN 0733-9364

Toyin, J O and Mewomo, M C (2023) An investigation of barriers to the application of building information modelling in Nigeria. Journal of Engineering, Design and Technology, 21(2), pp. 442-468. ISSN 1726-0531

Trill, J E (2003) The application of occupational performance standards in the construction industry: 'Factors influencing their use'. PhD thesis, University of Sussex, UK.

Tripathi, P and Mittal, Y K (2025) Risk assessment and ranking methodology for occupational hazards in construction: A case of Indian high-rise projects. Smart and Sustainable Built Environment, 14(6), pp. 1927-1949. ISSN 2046-6099

Tsai, W-S (1995) Evaluation of geotextiles as separators in roadways. PhD thesis, University of Washington, USA.

Tse, R Y C and Ganesan, S (1997) Causal relationship between construction flows and GDP: Evidence from Hong Kong. Construction Management and Economics, 15(4), pp. 371-376. ISSN 01446193

Tse, R Y C and Raftery, J (2001) The effects of money supply on construction flows. Construction Management and Economics, 19(1), pp. 9-17. ISSN 01446193

Tse, R Y C and Webb, J R (2000) The relationship between GDP and construction flows: A re-examination. Journal of Construction Research, 1(1), pp. 61-68. ISSN 1609-9451

Tsimberdonis, A I and Murphree, E L (1994) Equipment management through operational failure costs. Journal of Construction Engineering and Management, 120(3), pp. 522-535. ISSN 0733-9364

Tunji-Olayeni, P F; Mosaku, T O; Fagbenle, O I and Amusan, L M (2016) Project management competencies of indigenous contractors in Nigeria. African Journal of Built Environment Research, 1(1), pp. 49-58. ISSN 2414-0236

Uddin, S M J (2023) Leveraging social media platforms and generative AI technologies for construction industry applications. PhD thesis, North Carolina State University, USA.

Uddin, S M J; Albert, A and Karakhan, A A (2024) Leveraging YouTube to aid Construction Hazard Prevention through Design (CHPtD). Construction Management and Economics, 42(9), pp. 847-865. ISSN 01446193

Uddin, S M J; Albert, A; Tamanna, M and Alsharef, A (2023) Youtube as a source of information: Early coverage of the COVID-19 pandemic in the context of the construction industry. Construction Management and Economics, 41(5), pp. 402-427. ISSN 01446193

Ugwu, M C (1982) Absenteeism in the construction industry: A diagnostic study. PhD thesis, University of Missouri - Columbia, USA.

Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.

Umar, M; Ofem, M I; Anwar, A S and Salisu, A G (2021) Modelling of mechanical properties of Pa6 based reinforced graphite and graphite nano platelets composites using different aspect ratio. Journal of Engineering, Design and Technology, 19(4), pp. 809-827. ISSN 1726-0531

Umer, W; Li, H; Szeto, G P Y and Wong, A Y L (2017) Identification of biomechanical risk factors for the development of lower-back disorders during manual rebar tying. Journal of Construction Engineering and Management, 143(1): 04016080, ISSN 0733-9364

Umer, W; Li, H; Szeto, G P Y and Wong, A Y L (2018) Proactive safety measures: Quantifying the upright standing stability after sustained rebar tying postures. Journal of Construction Engineering and Management, 144(4): 04018010, ISSN 0733-9364

Uttam, K (2014) Seeking sustainability in the construction sector: Opportunities within impact assessment and sustainable public procurement. PhD thesis, KTH Royal Institute of Technology, Sweden.

Vaidya, R (1981) The role of the construction industry in economic development: The case of Nepal. PhD thesis, Cornell University, USA.

Vargas, C A (1998) Investigating construction falls using fault tree analysis and developing a prototype tool to reduce falls using expert system and computer-assisted instruction methods. PhD thesis, Ohio State University, USA.

Vaziri, K (2006) Program planning under uncertainty. PhD thesis, Cornell University, USA.

Vegad, K; Madurwar, M and Ralegaonkar, R (2014) Application of AV-ERP system for on-site project monitoring. Construction Innovation, 14(4), pp. 518-531. ISSN 1471-4175

Vennström, A and Erik Eriksson, P (2010) Client perceived barriers to change of the construction process. Construction Innovation, 10(2), pp. 126-137. ISSN 1471-4175

Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.

Vereen, S C; Rasdorf, W and Hummer, J E (2016) Development and comparative analysis of construction industry labor productivity metrics. Journal of Construction Engineering and Management, 142(7): 4016020, ISSN 0733-9364

Vidalakis, C and Sommerville, J (2013) Transportation responsiveness and efficiency within the building supply chain. Building Research & Information, 41(4), pp. 469-481. ISSN 0961-3218

Vigneshwar, R V K and Shanmugapriya, S (2023) Investigating the factors affecting construction site productivity: a case of India. Engineering, Construction and Architectural Management, 30(2), pp. 963-985. ISSN 0969-9988

Waidyasekara, K G A S; De Silva, L and Rameezdeen, R (2017) Application of "R" principles to enhance the efficiency of water usage in construction sites. Built Environment Project and Asset Management, 7(4), pp. 400-412. ISSN 2044-124X

Wakefield, R R and Sears, G A (1997) Petri nets for simulation and modeling of construction systems. Journal of Construction Engineering and Management, 123(2), pp. 105-112. ISSN 0733-9364

Walljee, L and Smallwood, J (2023) A framework for improving the performance of health and safety officers in the construction industry. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Walsh, K D; Sawhney, A and Bashford, H H (2007) Production equations for unsteady-state construction processes. Journal of Construction Engineering and Management, 133(3), pp. 254-261. ISSN 0733-9364

Walshaw, D (1991) Statistical analysis of wind speeds. PhD thesis, University of Sheffield, UK.

Wang, L; Wang, J; Li, H; Han, S; Zhang, M; Yang, X and Guo, N (2026) Noncontact physiological evaluation of cognitive load among prolonged sitting workers using millimeter wave sensing. Journal of Construction Engineering and Management, 152(3): 04025280, ISSN 0733-9364

Wang, G; Liu, M; Cao, D and Tan, D (2022) Identifying high-frequency–low-severity construction safety risks: An empirical study based on official supervision reports in Shanghai. Engineering, Construction and Architectural Management, 29(2), pp. 940-960. ISSN 0969-9988

Wang, H; Guo, T and Sun, H (2020) Bond–slip constitutive relation of mortar anchor under different loading rates. Journal of Engineering, Design and Technology, 18(4), pp. 761-772. ISSN 1726-0531

Wang, J; Han, J; Chen, J; Ding, G; Feng, G; Liu, T and Guo, B (2022) Experimental and numerical study on the dynamic response of a superthick backfill subgrade under high-speed railway loading: A case study of qianjiang-zhangjiajie-changde railway. Journal of Construction Engineering and Management, 148(12): 05022014, ISSN 0733-9364

Wang, J; Wang, G; Li, H; Han, S and Zhang, J (2024) Intelligent construction activity identification for all-weather site monitoring using 4D millimeter-wave technology. Journal of Construction Engineering and Management, 150(11): 04024150, ISSN 0733-9364

Wang, J Y; Kang, X P and Tam, V W Y (2008) An investigation of construction wastes: An empirical study in Shenzhen. Journal of Engineering, Design and Technology, 6(3), pp. 227-236. ISSN 1726-0531

Wang, K; Guo, F; Zhou, R and Qian, L (2024) Implementation of augmented reality in BIM-enabled construction projects: A bibliometric literature review and a case study from China. Construction Innovation, 24(4), pp. 1085-1116. ISSN 1471-4175

Wang, N (2022) Spoken dialogue system for information extraction from building information models using artificial intelligence. PhD thesis, University of Florida, USA.

Wang, S (2019) An exact architectural practice: Strategies for post-digital architectural design in China’s construction context. PhD thesis, The Chinese University of Hong Kong, Hong Kong.

Wang, S; Zhu, S and Yuen, P L (2021) Assessment of ground-borne vibration impact on nearby underground facilities induced by ground surface excavation. Journal of Construction Engineering and Management, 147(7): 04021071, ISSN 0733-9364

Wang, W C and Demsetz, L A (2000) Model for evaluating networks under correlated uncertainty: netcor. Journal of Construction Engineering and Management, 126(6), pp. 458-466. ISSN 0733-9364

Wang, Ze (2025) Advancing circular construction in sydney: Integrating system dynamics, evolutionary game theory, and robust optimization for construction and demolition waste management. PhD thesis, University of Sydney, Australia.

Ward, S A (2015) Critical success factors for lean construction intervention. PhD thesis, University of Dundee, UK.

Waroonkun, T and Stewart, R A (2008) Pathways to enhanced value creation from the international technology transfer process in Thai construction projects. Construction Innovation, 8(4), pp. 299-317. ISSN 1471-4175

Warsame, A (2009) Organizational modes in the residential building sector in Sweden. Construction Management and Economics, 27(2), pp. 153-163. ISSN 1466433X

Watson, S (2004) Improving the implementation of environmental strategies in the design of buildings: Towards a life-cycle based, front loaded, framework for building environmental assessment during design. PhD thesis, University of Queensland, Australia.

Weerasinghe, A S; Rasheed, E O and Rotimi, J O B (2022) Evaluating how social psychological aspects affect the choices of occupant behaviours: A modified motivation, opportunity and ability framework approach. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Wells, J (2001) Construction and capital formation in less developed economies: Unravelling the informal sector in an African city. Construction Management and Economics, 19(3), pp. 267-274. ISSN 01446193

Wells, J (2007) Informality in the construction sector in developing countries. Construction Management and Economics, 25(1), pp. 87-93. ISSN 1466433X

West, T and Worthington, A C (2006) Macroeconomic risk factors in Australian commercial real estate, listed property trust and property sector stock returns. Journal of Financial Management of Property and Construction, 11(2), pp. 105-116. ISSN 1366-4387

Whiteman, W E and Irwig, H G (1988) Disturbance scheduling technique for managing renovation work. Journal of Construction Engineering and Management, 114(2), pp. 191-213. ISSN 0733-9364

Whitla, P; Walters, P and Davies, H (2006) The use of global strategies by British construction firms. Construction Management and Economics, 24(9), pp. 945-954. ISSN 1466433X

Widén, K (2006) Innovation diffusion in the construction sector. PhD thesis, Lund University, Sweden.

Wilde, W J (1998) Life cycle cost analysis of portland cement concrete pavements. PhD thesis, University of Texas at Austin, USA.

Williams, J; Fugar, F and Adinyira, E (2020) Assessment of health and safety culture maturity in the construction industry in developing economies: A case of Ghanaian construction industry. Journal of Engineering, Design and Technology, 18(4), pp. 865-881. ISSN 1726-0531

Williams, T P (1987) Knowledge-based productivity analysis of construction operations. PhD thesis, Georgia Institute of Technology, USA.

Williams, T P (1991) Hypertext data base applications in construction. Journal of Construction Engineering and Management, 117(3), pp. 460-467. ISSN 0733-9364

Williams, T P (2007) Application of treemaps to the analysis of competitively bid project cost overruns. Construction Innovation, 7(4), pp. 340-356. ISSN 1471-4175

Wimalasena, B A D S (2011) A planning tool for construction waste management. PhD thesis, University of Calgary, Canada.

Winch, G M and North, S (2006) Critical space analysis. Journal of Construction Engineering and Management, 132(5), pp. 473-481. ISSN 0733-9364

Woldesenbet, A; Jeong, D H S and Oberlender, G D (2012) Daily work reports-based production rate estimation for highway projects. Journal of Construction Engineering and Management, 138(4), pp. 481-490. ISSN 0733-9364

Wong, C K; Fung, I W H and Tam, C M (2010) Comparison of using mixed-integer programming and genetic algorithms for construction site facility layout planning. Journal of Construction Engineering and Management, 136(10), pp. 1116-1128. ISSN 0733-9364

Wong, J K W; Maghrebi, M; Ahmadian Fard Fini, A; Alizadeh Golestani, M A; Ahmadnia, M and Er, M (2024) Development of a refined illumination and reflectance approach for optimal construction site interior image enhancement. Construction Innovation, 24(2), pp. 470-491. ISSN 1471-4175

Wong, J M W; Chiang, Y H and Ng, T S (2008) Construction and economic development: The case of Hong Kong. Construction Management and Economics, 26(8), pp. 815-826. ISSN 01446193

Wong, K C (2021) Factors affecting behavior of roadside construction workers in using personal protective equipment against dust and noise. PhD thesis, University of Hong Kong, Hong Kong.

Wong, M O; Zhang, Z and Pan, W (2024) Multiuser virtual reality-enabled collaborative heavy lift planning in construction. Journal of Construction Engineering and Management, 150(4): 04024022, ISSN 0733-9364

Wong Chong, Oscar (2022) IFC-based system and methods to support analysis of robot-assisted offsite construction. PhD thesis, Purdue University, USA.

Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.

Wood, B and Kenley, R (2004) The effectiveness of the bills of quantities in Australia. Journal of Construction Research, 5(2), pp. 291-309. ISSN 1609-9451

Wu, D; Chan, E H W and Shen, L (2004) Scoring system for measuring contractor's environmental performance. Journal of Construction Research, 5(1), pp. 139-147. ISSN 1609-9451

Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364

Wu, S; Xie, H; Zeng, Z; Wang, M; Zhao, H and Liu, Y (2023) Influence of pea-gravel layer on segment ring support performance in shield TBM tunnels: A discrete-continuous coupling simulation and model test. Journal of Construction Engineering and Management, 149(10): 04023097, ISSN 0733-9364

Wu, Shaoze (2024) Enhancing construction workforce safety through formulating an augmented reality digital twin system. PhD thesis, RMIT University, Australia.

Wu, W; Sandoval, A; Gunji, V; Ayer, S K; London, J; Perry, L; Patil, K and Smith, K (2020) Comparing traditional and mixed reality-facilitated apprenticeship learning in a wood-frame construction lab. Journal of Construction Engineering and Management, 146(12): 04020139, ISSN 0733-9364

Wuni, I Y (2023) Drivers of circular economy adoption in the construction industry: A systematic review and conceptual model. Building Research & Information, 51(7), pp. 816-833. ISSN 0961-3218

Xiao, C (2015) Comparative analysis of entropy algorithms to determine the most effective technique for measuring complexity in building construction. PhD thesis, Texas A&M University, USA.

Xiao, J; Li, X; Zhang, Z and Zhang, J (2018) Ontology-based knowledge model to support construction noise control in China. Journal of Construction Engineering and Management, 144(2): 04017103, ISSN 0733-9364

Xiao, Y (2017) Three-dimensional reconstruction and modeling using low-precision vision sensors for automation and robotics applications in construction. PhD thesis, University of Michigan, USA.

Xie, W; Zhao, T; Tang, J and Zhang, Y (2017) Arch first and beam later: Arch-rib integral installation construction technology for large-span tied-arch bridge. Journal of Construction Engineering and Management, 143(8): 04017059, ISSN 0733-9364

Xin, Z.; Dong, J.; Zeng, H.; Xiong, Z.; Wang, B.; Yan, J. and Wang, Z. (2026) Key parameters and integrated techniques for mechanized tunnel construction via drilling and blasting method. Journal of Construction Engineering and Management, 152(9): 04026148, ISSN 0733-9364

Xu, J; Shi, Y and Zhao, S (2019) Reverse logistics network-based multiperiod optimization for construction and demolition waste disposal. Journal of Construction Engineering and Management, 145(2): 04018124, ISSN 0733-9364

Xu, X (2024) A multi-agent reinforcement learning task allocation framework for navigation sequences of construction robots. PhD thesis, New York University Tandon School of Engineering, USA.

Xu, Z; Guo, X; Zhao, Y and Liu, X (2023) Performance of CFRP-bolted timber joints with slotted-in corrugated steel plates. Journal of Construction Engineering and Management, 149(12): 04023134, ISSN 0733-9364

Xuereb, K (2015) Future-proofing buildings: a novel approach to measure the performance of building structures. PhD thesis, University College London, UK.

Xuereb, K (2015) Future-proofing buildings: A novel approach to measure the performance of building structures. PhD thesis, University College London, UK.

Yahya, K and Boussabaine, A H (2004) Developing a framework for assessing eco-costs of construction site activities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Yahya, K and Boussabaine, H (2010) Quantifying environmental impacts and eco-costs from brick waste. Architectural Engineering and Design Management, 6(3), pp. 189-206. ISSN 1745-2007

Yalcinkaya, M and Singh, V (2019) Exploring the use of gestalt's principles in improving the visualization, user experience and comprehension of cobie data extension. Engineering, Construction and Architectural Management, 26(6), pp. 1024-1046. ISSN 0969-9988

Yamaguchi, K; Matsufuji, Y and Koyama, T (2007) A new structural system: Friction-resistant dry-masonry. Building Research & Information, 35(6), pp. 616-628. ISSN 0961-3218

Yamazaki, Y (1995) An integrated construction planning system using object-oriented product and process modelling. Construction Management and Economics, 13(5), pp. 417-426. ISSN 01446193

Yamusa, M. A.; Lawal, H. S.; Abdulrahman, R. S.; Salisu, A. S.; Saka, A.; Abubakar, M. and Abdullahi, M. (2026) A machine-learning model for estimating construction renovation costs. International Journal of Building Pathology and Adaptation, 44(3), pp. 757-772. ISSN 2398-4708

Yan, H.; Liu, C.; Yang, X.; Li, X. and Li, J. (2026) Digital twin-enabled 3D near-misses prediction method based on trajectories and postures for proactive construction safety management. Engineering, Construction and Architectural Management, pp. 1-27. ISSN 0969-9988

Yang, C (2023) Reliability-based methodology for design and evaluation of concrete bridge decks. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.

Yang, H; Li, H; Wang, G and Cao, D (2025) Interregional migration of construction workers in China: Roles of employment opportunities and environment amenities. Engineering, Construction and Architectural Management, 32(1), pp. 87-108. ISSN 0969-9988

Yang, J (2001) A decision support system for material routing in construction sites. PhD thesis, University of Wolverhampton, UK.

Yang, M L; Chen, S J and Chen, S T (2006) Innovative central opening strut system for foundation excavation. Journal of Construction Engineering and Management, 132(1), pp. 58-66. ISSN 0733-9364

Yang, W and Kohler, N (2008) Simulation of the evolution of the Chinese building and infrastructure stock. Building Research & Information, 36(1), pp. 1-19. ISSN 0961-3218

Yang, W; Zhang, F; Wang, H; Wu, J; Nie, Z and Li, L (2023) Synchronous control theory and first test of time-varying upper operation and chassis attitude maintenance for truck cranes. Journal of Construction Engineering and Management, 149(1): 04022156, ISSN 0733-9364

Yang, X; Wang, S; Jiang, Y; Wang, L; Li, P and Wang, S (2025) Theoretical and experimental analysis of stress variations in precast concrete segment linings during double-shield TBM excavation of subway tunnels. Journal of Construction Engineering and Management, 151(6): 04025040, ISSN 0733-9364

Yang, Z (2004) Assessing cumulative damage in concrete and quantifying its influence on life cycle performance modeling. PhD thesis, Purdue University, USA.

Yao, F.; Tong, W.; Ji, Y.; Zhang, Y. and Li, H. X. (2026) Monitoring hoisting workers' negative emotions in prefabricated construction using galvanic skin response measurements. Journal of Construction Engineering and Management, 152(9): 04026150, ISSN 0733-9364

Yao, Z; Chen, Z and Lee, Y (2025) A construction site layout planning study for dust reduction. Journal of Construction Engineering and Management, 151(6): 04025066, ISSN 0733-9364

Yap, J B H; Lim, B L; Skitmore, M and Gray, J (2022) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 800-822. ISSN 1726-0531

Yap, J B H; Rou Chong, J; Skitmore, M and Lee, W P (2020) Rework causation that undermines safety performance during production in construction. Journal of Construction Engineering and Management, 146(9): 04020106, ISSN 0733-9364

Yasamis, F (1999) Contractor quality performance (CQP) evaluation model in pavement projects. PhD thesis, Illinois Institute of Technology, USA.

Yasamis, F; Arditi, D and Mohammadi, J (2002) Assessing contractor quality performance. Construction Management and Economics, 20(3), pp. 211-223. ISSN 01446193

Ye, M (2018) The impacts of institutional distance on corporate social responsibility "glocalisation" : evidence from international construction. PhD thesis, University of Hong Kong, Hong Kong.

Yeung, A T (2017) A mobile biometric authentication system for site management in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(4), pp. 172-180. ISSN 17514304

Yin, Z and Caldas, C (2022) Scaffolding in industrial construction projects: Current practices, issues, and potential solutions. International Journal of Construction Management, 22(13), pp. 2554-2563. ISSN 1562-3599

Ying, F J; O'Sullivan, M and Adan, I (2021) Simulation of vehicle movements for planning construction logistics centres. Construction Innovation, 21(4), pp. 608-624. ISSN 1471-4175

Yogeswaran, K (1998) Sources, causes and minimisation of contractual claims in civil engineering projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Yogeswaran, K; Kumaraswamy, M M and Miller, D R A (1997) Perceived sources and causes of construction claims. Journal of Construction Procurement, 3(3), pp. 3-26. ISSN 1358-9180

Yong, Y C and Mustaffa, N E (2013) Critical success factors for Malaysian construction projects: An empirical assessment. Construction Management and Economics, 31(9), pp. 959-978. ISSN 1466433X

Yousef, R A (2015) Toward effective construction safety: Application of morphological analysis to the Arabian Gulf region. PhD thesis, University of Texas at Dallas, USA.

Yu, H; Oloke, D; Proverbs, D and Buckley, K (2005) Improving health and safty in construction: A knowledge-based approach. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Yu, W D and Lo, S S (2005) Time-dependent construction social costs model. Construction Management and Economics, 23(3), pp. 327-337. ISSN 01446193

Yu, W-d (1996) A neuro-fuzzy knowledge-based multi-criterion decision model for constructability analysis and improvement of construction technologies. PhD thesis, Purdue University, USA.

Yu, Y (2021) Road network maintenance and repair considering day-to-day traffic dynamics and transient congestion. PhD thesis, Imperial College London, UK.

Yuan, C; McClure, T; Cai, H and Dunston, P S (2017) Life-cycle approach to collecting, managing, and sharing transportation infrastructure asset data. Journal of Construction Engineering and Management, 143(6): 04017001, ISSN 0733-9364

Yuan, H (2011) A dynamic model for assessing the effectiveness of construction and demolition waste management. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Yunus, N B (1988) Toward the development of a knowledge-based construction schedule planning system. PhD thesis, University of Missouri - Rolla, USA.

Yunus, R and Yang, J (2012) Critical sustainability factors in industrialised building systems. Construction Innovation, 12(4), pp. 447-463. ISSN 1471-4175

Yuventi, J; Levitt, R and Robertson, H (2013) Organizational barriers to productivity and innovation in large-scale, U.S.-based photovoltaic system construction projects. Journal of Construction Engineering and Management, 139(10): 06013003, ISSN 0733-9364

Zaayman, L (2017) Optimisation of mechanised maintenance management of railway track infrastructure. PhD thesis, University of Johannesburg, South Africa.

Zaeri, F (2017) Exploring the potential for the application of simulation methods in construction project delivery in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.

Zarghami, S A (2022) Prioritizing construction activities: Addressing the flaws of schedule-based indexes. Journal of Construction Engineering and Management, 148(8): 04022069, ISSN 0733-9364

Zayed, T and Mohamed, E (2014) A case productivity model for automatic climbing system. Engineering, Construction and Architectural Management, 21(1), pp. 33-50. ISSN 0969-9988

Zayed, T M and Halpin, D (2001) Simulation of concrete batch plant production. Journal of Construction Engineering and Management, 127(2), pp. 132-141. ISSN 0733-9364

Zayed, T M and Halpin, D W (2004) Quantitative assessment for piles productivity factors. Journal of Construction Engineering and Management, 130(3), pp. 405-414. ISSN 0733-9364

Zhang, J and Jiang, S (2026) Unsafe behaviors in workers at heights: A spacetime-based coupling analysis method and its safety implications. Journal of Construction Engineering and Management, 152(1): 04025233, ISSN 0733-9364

Zhang, C (2013) Automated progress control using laser scanning technology. PhD thesis, Illinois Institute of Technology, USA.

Zhang, C; Shen, W and Ye, Z (2022) Technical feasibility analysis on applying ultra-wide band technology in construction progress monitoring. International Journal of Construction Management, 22(15), pp. 2951-2965. ISSN 1562-3599

Zhang, H; Li, H and Lu, M (2008) Modeling time-constraints in construction operations through simulation. Journal of Construction Engineering and Management, 134(7), pp. 545-554. ISSN 0733-9364

Zhang, H; Shi, J J and Tam, C M (2002) Application of simulation related techniques to construction operations. Engineering, Construction and Architectural Management, 9(5-6), pp. 433-445. ISSN 0969-9988

Zhang, H and Tam, C M (2003) Fuzzy decision-making for dynamic resource allocation. Construction Management and Economics, 21(1), pp. 31-41. ISSN 01446193

Zhang, H; Tam, C M; Li, H and Shi, J J (2006) Particle swarm optimization-supported simulation for construction operations. Journal of Construction Engineering and Management, 132(12), pp. 1267-1274. ISSN 0733-9364

Zhang, L; Wu, X and Liu, H (2016) Strategies to reduce ground settlement from shallow tunnel excavation: A case study in China. Journal of Construction Engineering and Management, 142(5): 04016001, ISSN 0733-9364

Zhang, Q Q; Chen, Z G; Li, J L and Liu, S W (2021) Pressure-cast-in-situ pile with spray-expanded frustum: Construction equipment and process. Journal of Construction Engineering and Management, 147(6): 06021002, ISSN 0733-9364

Zhang, S; Du, C; Sa, W; Wang, C and Wang, G (2014) Bayesian-based hybrid simulation approach to project completion forecasting for underground construction. Journal of Construction Engineering and Management, 140(1): 04013031, ISSN 0733-9364

Zhang, X; Otto, F and Oeser, M (2021) Modeling pavement surface deflections under accelerated pavement testing using the PCA method. Journal of Construction Engineering and Management, 147(12): 04021169, ISSN 0733-9364

Zhang, X; Wang, M; Zhou, B and Wang, X (2018) Influence of factors on collapse risk of loess tunnel: A multi-index assessment model. Journal of Engineering, Design and Technology, 16(5), pp. 734-749. ISSN 1726-0531

Zhang, X; Zhang, Z; Sun, W; Hu, J; Zhang, L and Zhu, W (2025) The mechanical deformation characteristics of the internal structure of large diameter shield tunnel in different construction stages. Engineering, Construction and Architectural Management, 32(4), pp. 2190-2209. ISSN 0969-9988

Zhang, Xuan (2025) Coordination and optimization of prefabricated building supply chain for sustainability development. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Zhang, Y (2009) Research on hydraulic engineering construction management decision support system based on network analysis method (in Chinese). PhD thesis, Beijing University of Aeronautics and Astronautics, China.

Zhang, Y; Luo, H; Skitmore, M; Li, Q and Zhong, B (2018) Optimal camera placement for monitoring safety in metro station construction work. Journal of Construction Engineering and Management, 145(1): 04018118, ISSN 0733-9364

Zhang, Z J; Li, M G; Chen, J J; Wang, J H and Zeng, F Y (2017) Innovative construction method for oversized excavations with bipartition walls. Journal of Construction Engineering and Management, 143(8): 04017056, ISSN 0733-9364

Zhao, J (2020) Towards a proactive real-time data-driven musculoskeletal disorders prevention approach in construction. PhD thesis, Pennsylvania State University, USA.

Zhao, T; Liu, W; Zhang, L and Zhou, W (2018) Cluster analysis of risk factors from near-miss and accident reports in tunneling excavation. Journal of Construction Engineering and Management, 144(6): 04018040, ISSN 0733-9364

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2002) Applying genetic algorithm techniques for time-cost optimization. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Zhou, R.; Li, H.; Hu, W.; Meng, T.; Lu, H.; Wu, Y.; Chen, Y.; Cao, D. and Wang, F. Y. (2026) Integrated dual-crane positioning and lifting planning in extreme conditions: A critical states and spatial constraint optimization approach. Journal of Construction Engineering and Management, 152(6): 04026072, ISSN 0733-9364

Zhou, T (2023) Embodied robot teleoperation in construction. PhD thesis, University of Florida, USA.

Zhou, T; Xia, P; Ye, Y and Du, J (2023) Embodied robot teleoperation based on high-fidelity visual-haptic simulator: Pipe-fitting example. Journal of Construction Engineering and Management, 149(12): 04023129, ISSN 0733-9364

Zhou, T; Zhu, Q; Shi, Y and Du, J (2022) Construction robot teleoperation safeguard based on real-time human hand motion prediction. Journal of Construction Engineering and Management, 148(7): 04022040, ISSN 0733-9364

Zhu, L; Zhu, Q and Zhao, X (2024) Identifying determinants of student learning effects in intensive online environments: An empirical investigation in civil engineering education. International Journal of Construction Management, 24(11), pp. 1249-1258. ISSN 1562-3599

Zhu, Q (2022) Haptic interaction for human-robot shared perception in construction. PhD thesis, University of Florida, USA.

Zolfagharian, S; Irizarry, J; Ressang, A; Nourbakhsh, M and Gheisari, M (2014) Automated safety planning approach for residential construction sites in Malaysia. International Journal of Construction Management, 14(3), pp. 134-147. ISSN 1562-3599

Zou, P X W (2004) Knowledge management practice in two Australian architecture-engineering-construction (AEC) companies. Construction Economics and Building, 4(2), pp. 19-32. ISSN 2204-9029

Zou, P X W and Zhang, G (2009) Comparative study on the perception of construction safety risks in China and Australia. Journal of Construction Engineering and Management, 135(7), pp. 620-627. ISSN 0733-9364

Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.

Zuo, J; Jin, X H and Flynn, L (2012) Social sustainability in construction: an explorative study. International Journal of Construction Management, 12(2), pp. 51-63. ISSN 1562-3599

Zuofa, T; Ochieng, E and Burns, A (2015) Appraising knowledge management perceptions among construction practitioners. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(2), pp. 89-98. ISSN 17514304

de Solminihac Tampier, H E (1992) System analysis for expediting urban highway construction. PhD thesis, University of Texas at Austin, USA.

li, H; Chen, Z; Wong, C T C and Love, P E D (2002) A quantitative approach to construction pollution control based on resource levelling. Construction Innovation, 2(2), pp. 71-81. ISSN 1471-4175

ter Huurne, R (2021) The role of risk attitudes: Discrepancies between human and computer-based risk analysis in the utility sector. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

ter Huurne, R and Coenen, T (2024) Exploring the barriers of ground penetrating radar adoption: A technological innovation system analysis. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

van Tonder, P and Low, M S (2021) The effect of CO loading on the properties of normal concrete vs fly ash concrete. Journal of Engineering, Design and Technology, 19(6), pp. 1472-1487. ISSN 1726-0531

van den Berg, M; Voordijk, H and Adriaanse, A (2021) BIM uses for deconstruction: An activity-theoretical perspective on reorganising end-of-life practices. Construction Management and Economics, 39(4), pp. 323-339. ISSN 01446193

Ökmen, Ö and Öztaş, A (2008) Construction project network evaluation with correlated schedule risk analysis model. Journal of Construction Engineering and Management, 134(1), pp. 49-63. ISSN 0733-9364

Špačková, O (2012) Risk management of tunnel construction projects. PhD thesis, Czech Technical University, Czech Republic.

This list was generated on Sat Aug 22 02:31:10 2026 UTC.