Items with Subject: construction methods
Adebayo, A K; Price, A D F and Gibb, A G F (2006) Impact of modern methods of construction on healthcare infrastructure. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Aghimien, D O; Aigbavboa, C O; Oke, A E and Thwala, W D (2020) Mapping out research focus for robotics and automation research in construction-related studies: A bibliometric approach. Journal of Engineering, Design and Technology, 18(5), pp. 1063-1079. ISSN 1726-0531
Al-Fares, M A (1995) On the development of an integrated system for the automation of on-site reinforced concrete construction. PhD thesis, University of Wisconsin - Madison, USA.
Alkass, S and Harris, F (1991) Development of an integrated system for planning earthwork operations in road construction. Construction Management and Economics, 9(3), pp. 263-289. ISSN 01446193
Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.
André, J P C G (2014) Determination of the main parameters affecting the performance of bridge falsework systems. PhD thesis, Oxford Brookes University, UK.
Antoniou, F; Konstantinidis, D; Aretoulis, G and Xenidis, Y (2018) Preliminary construction cost estimates for motorway underpass bridges. International Journal of Construction Management, 18(4), pp. 321-330. ISSN 1562-3599
Arai, K and Morimoto, E (2020) Renovation of the Japanese construction industry: Evaluation of i-Construction from the perspective of construction management. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Araujo, Adolpho Guido de (2021) Methodology for evaluation of environmental aspects in urban subdivision works in the pre-construction phase. PhD thesis, Universidade Federal de Pernambuco, Brazil.
Atherinis, D; Bakowski, B; Velcek, M and Moon, S (2018) Developing and laboratory testing a smart system for automated falsework inspection in construction. Journal of Construction Engineering and Management, 144(3): 04017119, ISSN 0733-9364
Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.
Bernold, L E (2002) Spatial integration in construction. Journal of Construction Engineering and Management, 128(5), pp. 400-408. ISSN 0733-9364
Bogenberger, C; Dell'Amico, M; Fuellerer, G; Hoefinger, G; Iori, M; Novellani, S and Panicucci, B (2015) Two-phase earthwork optimization model for highway construction. Journal of Construction Engineering and Management, 141(6): 05015003, ISSN 0733-9364
Brown, D C (2003) Novel method of excavation. Journal of Construction Engineering and Management, 129(2), pp. 222-225. ISSN 0733-9364
Burrows, B G (1989) Organisation and quality of falsework construction: A socio-economic study of the organisational structure of the construction industry with respect to the falsework production process and the quality of workmanship attained. PhD thesis, University of Warwick, UK.
Chen, H; Hu, H; Tang, M; Yang, X and Zhu, J (2018) Hybrid bored prestressed concrete cased piles: Equipment and construction procedures. Journal of Construction Engineering and Management, 144(12): 06018006, ISSN 0733-9364
Chennarapu, H; Garala, T K; Chennareddy, R; Balunaini, U and Venkata Narasimha Reddy, G (2018) Compaction quality control of earth fills using dynamic cone penetrometer. Journal of Construction Engineering and Management, 144(9): 04018086, ISSN 0733-9364
Chou, J-S (2005) Item-level quantity-based preliminary cost estimating system for highway earthwork, landscape, subgrade treatments, base, surface courses, pavement and traffic control. PhD thesis, University of Texas at Austin, USA.
Christian, J and Mir, S U (1987) Use of integrated microcomputer package for formwork design. Journal of Construction Engineering and Management, 113(4), pp. 603-610. ISSN 0733-9364
Clegg, D R (1999) A construction-specific simulation-based framework for earthworks. PhD thesis, Sheffield Hallam University, UK.
Darwish, M; Elsayed, A Y and Nassar, K (2018) Design and constructability of a novel funicular arched steel truss falsework. Journal of Construction Engineering and Management, 144(3): 04018002, ISSN 0733-9364
De Lima, R X; Júnior, E F N; Prata, B D A and Weissmann, J (2013) Distribution of materials in road earthmoving and paving: Mathematical programming approach. Journal of Construction Engineering and Management, 139(8), pp. 1046-1054. ISSN 0733-9364
Deng, T; Sharafat, A; Lee, S and Seo, J (2024) Automatic vision-based dump truck productivity measurement based on deep-learning illumination enhancement for low-visibility harsh construction environment. Journal of Construction Engineering and Management, 150(11): 04024154, ISSN 0733-9364
Duanshun, Li (2018) Towards fully integrated and automated construction planning on earthworks projects. PhD thesis, University of Alberta, Canada.
Dutch, W G (1989) The capital cost aspects of the environmental impact of new highways in association with the new design technique: the commercial route methodology. PhD thesis, Loughborough University, UK.
Easa, S M (1987) Earthwork allocations with nonconstant unit costs. Journal of Construction Engineering and Management, 113(1), pp. 34-50. ISSN 0733-9364
Easa, S M (1988) Earthwork allocations with linear unit costs. Journal of Construction Engineering and Management, 114(4), pp. 641-655. ISSN 0733-9364
El Sayed, A Y; Darwish, M and Nassar, K (2021) Design and constructability of novel extendable arched steel truss falsework. Journal of Construction Engineering and Management, 147(3): 04020187, ISSN 0733-9364
Forcada, N; Macarulla, M and Love, P E D (2013) Assessment of residential defects at post-handover. Journal of Construction Engineering and Management, 139(4), pp. 372-378. ISSN 0733-9364
Hadipriono, F C and Wang, H K (1986) Analysis of causes of falsework failures in concrete structures. Journal of Construction Engineering and Management, 112(1), pp. 112-121. ISSN 0733-9364
Hajji, A M (2013) Development of a productivity-based economic, energy, environmental model for heavy duty diesel construction equipment. PhD thesis, Oklahoma State University, USA.
Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099
Hallowell, M R (2008) A formal model for construction safety and health risk management. PhD thesis, Oregon State University, USA.
Hallowell, M R and Gambatese, J A (2009) Activity-based safety risk quantification for concrete formwork construction. Journal of Construction Engineering and Management, 135(10), pp. 990-998. ISSN 0733-9364
Hampson, K and Fischer, M (1997) Structural designs and construction technologies for California highway bridges. Journal of Construction Engineering and Management, 123(3), pp. 269-275. ISSN 0733-9364
Han, S; Jiang, Y and Bai, Y (2022) Fast-pgmed: Fast and dense elevation determination for earthwork using drone and deep learning. Journal of Construction Engineering and Management, 148(4): 04022008, ISSN 0733-9364
Haronian, E and Sacks, R (2021) Production control in earthworks: Concepts and metrics. Journal of Construction Engineering and Management, 147(10): 04021127, ISSN 0733-9364
Hsu, P-Y (2019) Optimal logistics for modular construction. PhD thesis, Imperial College London, UK.
Ikaheimonen, J (1998) Construction loads on shores and stability of horizontal formwork. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.
Irizarry, J; Meadati, P; Barham, W S and Akhnoukh, A (2012) Exploring applications of building information modeling for enhancing visualization and information access in engineering and construction education environments. International Journal of Construction Education and Research, 8(2), pp. 119-145. ISSN 1557-8771
Jaafar, K and El-Halawani, L I (2022) Simulation-based multi-objective optimization model for machinery allocation in shallow foundation. International Journal of Construction Management, 22(15), pp. 2845-2854. ISSN 1562-3599
Jassim, H S H (2019) Assessing energy use and carbon emissions to support planning of environmentally sustainable earthmoving operations. PhD thesis, Luleå University of Technology, Sweden.
Jayawardane, A K W and Harris, F C (1990) Further development of integer programming in earthwork optimization. Journal of Construction Engineering and Management, 116(1), pp. 18-34. ISSN 0733-9364
Jiang, Z; Han, Y; Cheng, Y; Wang, Z and Meng, H (2025) An improved yolov8-dyhead-wiseiou model for positioning and counting detection of grouting sleeves in a prefabricated wall. Journal of Construction Engineering and Management, 151(4): 04025016, ISSN 0733-9364
Jin, Z and Gambatese, J (2020) Exploring the potential of technological innovations for temporary structures: A survey study. Journal of Construction Engineering and Management, 146(6): 04020049, ISSN 0733-9364
Jin, Z; Gambatese, J A and Nnaji, C (2024) Musculoskeletal disorder risk assessment in modern ready-made concrete formwork construction. Journal of Construction Engineering and Management, 150(6): 05024005, ISSN 0733-9364
Johansson, C (2001) A modularization approach to housing. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
John, S T; Mohan, A; Philip, M S; Sarkar, P and Davis, R (2022) An IoT device for striking of vertical concrete formwork. Engineering, Construction and Architectural Management, 29(5), pp. 1991-2010. ISSN 0969-9988
Jonasson, S; Dunston, P S; Ahmed, K and Hamilton, J (2002) Factors in productivity and unit cost for advanced machine guidance. Journal of Construction Engineering and Management, 128(5), pp. 367-374. ISSN 0733-9364
Kang, S and Seo, J (2013) GIS method for haul road layout planning in large earthmoving projects: Framework and analysis. Journal of Construction Engineering and Management, 139(2), pp. 236-246. ISSN 0733-9364
Kim, B; Lee, H; Park, H and Kim, H (2012) Framework for estimating greenhouse gas emissions due to asphalt pavement construction. Journal of Construction Engineering and Management, 138(11), pp. 1312-1321. ISSN 0733-9364
Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.
Kim, S-K (2001) Toward a framework for an intelligent earthwork system (ies). PhD thesis, University of Wisconsin - Madison, USA.
Kitamura, A and Takeuchi, Y (1983) Seikan tunnel. Journal of Construction Engineering and Management, 109(1), pp. 25-38. ISSN 0733-9364
Kuo, Y-c (2004) Highway earthwork and pavement production rates for construction time estimation. PhD thesis, University of Texas at Austin, USA.
Lambropoulos, S; Manolopoulos, N and Pantouvakis, J P (1996) Semantic: Smart earthmoving analysis and estimation of cost. Construction Management and Economics, 14(2), pp. 79-92. ISSN 01446193
Lang, R; Goodier, C and Glass, J (2016) Are housebuilders' production strategies a barrier to offsite construction uptake in the UK? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Li, D and Lu, M (2017) Automated generation of work breakdown structure and project network model for earthworks project planning: A flow network-based optimization approach. Journal of Construction Engineering and Management, 143(1): 04016086, ISSN 0733-9364
Li, X and Chen, X (2012) Using grouting of shield tunneling to reduce settlements of overlying tunnels: Case study in Shenzhen metro construction. Journal of Construction Engineering and Management, 138(4), pp. 574-584. ISSN 0733-9364
Liu, C and Lu, M (2015) Optimizing earthmoving job planning based on evaluation of temporary haul road networks design for mass earthworks projects. Journal of Construction Engineering and Management, 141(3), ISSN 0733-9364
Liu, Y; Yao, F; Ji, Y; Tong, W; Liu, G; Li, H X and Hu, X (2022) Quality control for offsite construction: Review and future directions. Journal of Construction Engineering and Management, 148(8): 03122003, ISSN 0733-9364
Mawdesley, M J; A-Jibouri, S H; Askew, W H and Patterson, D E (2002) A model for the automated generation of earthwork planning activities. Construction Innovation, 2(4), pp. 249-268. ISSN 1471-4175
Mawdesley, M J; Askew, W H and Al-Jibouri, S H (2004) Site layout for earthworks in road projects. Engineering, Construction and Architectural Management, 11(2), pp. 83-89. ISSN 0969-9988
Mazari, M (2014) Studying the parameters involved with modulus-based construction quality control for compaction of unbound pavement layers. PhD thesis, University of Texas at El Paso, USA.
McCahill, D F (1990) A practical model for simulation of earthwork construction, with applications for scheduling. PhD thesis, University of Maryland, College Park, USA.
McCahill, D F and Bernold, L E (1993) Resource-oriented modeling and simulation in construction. Journal of Construction Engineering and Management, 119(3), pp. 590-606. ISSN 0733-9364
McMahon, P; Dawood, N N and Hobbs, B (1998) The utilization of it for managing ground information and optimizing earthworks. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
McMahon, P; Dawood, N N and Hobbs, B (1999) Development of an integrated ground modelling system. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Mello Saraiva Caldeira, L M and Brito, A (2014) Use of soil-rock mixtures in dam construction. Journal of Construction Engineering and Management, 140(8): 04014030, ISSN 0733-9364
Mensah, I; Adjei-Kumi, T and Nani, G (2016) Duration determination for rural roads using the principal component analysis and artificial neural network. Engineering, Construction and Architectural Management, 23(5), pp. 638-656. ISSN 0969-9988
Miao, K; Lou, W; Schonfeld, P and Xiao, Z (2024) Optimal earthmoving-equipment combination considering carbon emissions with an indicator-based multiobjective optimizer. Journal of Construction Engineering and Management, 150(1): 04023152, ISSN 0733-9364
Mohamad, M and Tran, D Q (2021) Risk-based prioritization approach to construction inspections for transportation projects. Journal of Construction Engineering and Management, 147(1): 04020150, ISSN 0733-9364
Mohamad Karimi, S; Jamshid Mousavi, S; Kaveh, A and Afshar, A (2007) Fuzzy optimization model for earthwork allocations with imprecise parameters. Journal of Construction Engineering and Management, 133(2), pp. 181-190. ISSN 0733-9364
Mohamed, M and Tran, D Q (2023) Examining critical factors and their combination effects on quality of roadway construction operations. International Journal of Construction Management, 23(15), pp. 2637-2648. ISSN 1562-3599
Moon, S; Yang, B and Choi, E (2018) Safety guideline for safe concrete placement utilizing the information on the structural behavior of formwork. Journal of Construction Engineering and Management, 144(12): 04018108, ISSN 0733-9364
Moret, Y and Einstein, H H (2012) Experience in expert estimation of probabilities and correlations for rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1103-1106. ISSN 0733-9364
Morley, D; Lu, M and Abourizk, S (2014) Identification of invariant average weighted haul distance to simplify earthmoving simulation modeling in planning site grading operations. Journal of Construction Engineering and Management, 140(12): 04014057, ISSN 0733-9364
Mucheti, Alexsander Silva (2025) Experimental and numerical analysis of nailed soil structures in urban areas. PhD thesis, Universidade Estadual de Campinas, Brazil.
Murtaza, M B; Fisher, D J and Skibniewski, M J (1993) Knowledge-based approach to modular construction decision support. Journal of Construction Engineering and Management, 119(1), pp. 115-130. ISSN 0733-9364
Naghshbandi, S N; Varga, L and Hu, Y (2022) Technology capabilities for an automated and connected earthwork roadmap. Construction Innovation, 22(4), pp. 768-788. ISSN 1471-4175
Naghshbandi, Seyedeh Neda (2022) Technology capabilities for safe and resilient coordination of automated earthwork systems: a decentralized multi-agent system approach. PhD thesis, University College London, UK.
Naoum, S and Haidar, A L I (2000) A hybrid knowledge base system and genetic algorithms for equipment selection. Engineering, Construction and Architectural Management, 7(1), pp. 3-14. ISSN 0969-9988
Nassar, K and Hosny, O (2012) Solving the least-cost route cut and fill sequencing problem using particle swarm. Journal of Construction Engineering and Management, 138(8), pp. 931-942. ISSN 0733-9364
Nguyen, Q N; Bui, N D N and Bui, D N (2026) Assessing lean construction principles for reducing environmental impact and enhancing cost efficiency and productivity in earthwork operations in Vietnam. Construction Economics and Building, 26(1), ISSN 2204-9029
Ohura, T and Kato, M (1993) Erection and field test of concrete arch bridge applying composite tube. Journal of Construction Engineering and Management, 119(4), pp. 666-680. ISSN 0733-9364
Park, Y J; Gwak, H S and Lee, D E (2017) Dozer workability estimation method for economic dozing. Journal of Construction Engineering and Management, 143(2): 04016096, ISSN 0733-9364
Patterson, D E (1997) Earthworks planning for linear construction projects. PhD thesis, University of Nottingham, UK.
Peng, J L (2002) Stability analyses and design recommendations for practical shoring systems during construction. Journal of Construction Engineering and Management, 128(6), pp. 536-544. ISSN 0733-9364
Peng, J L (2004) Structural modeling and design considerations for double-layer shoring systems. Journal of Construction Engineering and Management, 130(3), pp. 368-377. ISSN 0733-9364
Pinheiro Santos Fernandes, P G; Elias Arantes, A and Ferreira Nobre Júnior, E (2024) Optimization model for earthwork allocations considering the construction of multiple haul roads: GIS-based integrated approach. Journal of Construction Engineering and Management, 150(4): 05024001, ISSN 0733-9364
Poon, S-W (2002) Analysing and predicting falsework failure in Hong Kong. PhD thesis, Loughborough University, UK.
Portas, J and AbouRizk, S (1997) Neural network model for estimating construction productivity. Journal of Construction Engineering and Management, 123(4), pp. 399-410. ISSN 0733-9364
Qasim, M (2018) Improving highways construction processes using computer-based simulation techniques. PhD thesis, University of Salford, UK.
Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.
Safa, M; Reinsma, S; Haas, C T; Goodrum, P M and Caldas, C H (2018) A decision-making method for choosing concrete forming systems. International Journal of Construction Management, 18(1), pp. 53-64. ISSN 1562-3599
Shah, R K (2011) Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects. PhD thesis, Teesside University, UK.
Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), pp. 435-448. ISSN 1466433X
Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Shao, L; Guo, S; Dong, Y; Niu, H and Zhang, P (2023) Cause analysis of construction collapse accidents using association rule mining. Engineering, Construction and Architectural Management, 30(9), pp. 4120-4142. ISSN 0969-9988
Shehab, T (2009) Automated measurement of earthwork volume in construction projects. Construction Innovation, 9(3), pp. 341-358. ISSN 1471-4175
Shi, M; Wang, J; Li, Q; Cui, B; Guan, S and Zeng, T (2022) Accelerated earth-rockfill dam compaction by collaborative operation of unmanned roller fleet. Journal of Construction Engineering and Management, 148(7): 04022046, ISSN 0733-9364
Shoaib Khan, M; Kim, J; Park, S; Lee, S and Seo, J (2021) Methodology for voxel-based earthwork modeling. Journal of Construction Engineering and Management, 147(10): 04021111, ISSN 0733-9364
Simons, A E; Redden, L and Collins, W (2023) Sitework knowledge for entry-level construction professionals: Academic and industry perceptions. International Journal of Construction Education and Research, 19(2), pp. 199-220. ISSN 1557-8771
Sing, M; Chan, J; Liu, H and Ngai, N N H (2023) Developing an analytic hierarchy process-based decision model for modular construction in urban areas. Journal of Engineering, Design and Technology, 21(4), pp. 1212-1229. ISSN 1726-0531
Slattery, K T and Slattery, D K (2013) Modeling earth surfaces for highway earthwork computation using terrestrial laser scanning. International Journal of Construction Education and Research, 9(2), pp. 132-146. ISSN 1557-8771
Smith, I G N (1995) Rainfall patterns and the acceptability of soils for earthworking. PhD thesis, Heriot-Watt University, UK.
Smith, S D; Wood, G S and Gould, M (2000) A new earthworks estimating methodology. Construction Management and Economics, 18(2), pp. 219-228. ISSN 01446193
Soltanmohammadlou, N.; Hon, C. K. H.; Drogemuller, R.; Sheikhkhoshkar, M. and Rahimian, F. (2026) An advanced exploration of technological functionalities addressing risk factors in earthmoving equipment operation on construction sites: A systematic literature review. Smart and Sustainable Built Environment, 15(5), pp. 1846-1876. ISSN 2046-6099
Sun, R; Yan, Q; Zhang, C; Qiao, M and Ren, J (2025) Comprehensive evaluation of grouting effectiveness combining qualitative on-site tests and improved fuzzy integration with entropy weight method: Case study of a mountain tunnel. Journal of Construction Engineering and Management, 151(4): 04025020, ISSN 0733-9364
Taher, A; Vahdatikhaki, F and Hammad, A (2022) Formalizing knowledge representation in earthwork operations through development of domain ontology. Engineering, Construction and Architectural Management, 29(6), pp. 2382-2414. ISSN 0969-9988
Tam, C M; Tong, T K L and Wong, B W L (2007) An integrated system for earthmoving planning. Construction Management and Economics, 25(11), pp. 1127-1137. ISSN 01446193
Tatum, C B and Funke, A T (1988) Partially automated grading: Construction process innovation. Journal of Construction Engineering and Management, 114(1), pp. 19-35. ISSN 0733-9364
Tatum, C B; Vorster, M and Klingler, M (2006) Innovations in earthmoving equipment: New forms and their evolution. Journal of Construction Engineering and Management, 132(9), pp. 987-997. ISSN 0733-9364
Tatum, C B; Vorster, M; Klingler, M G and Paulson Jr, B C (2006) Systems analysis of technical advancement in earthmoving equipment. Journal of Construction Engineering and Management, 132(9), pp. 976-986. ISSN 0733-9364
Thomas, H R; Horman, M J; De Souza, U E L and Zavřski, I (2002) Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(2), pp. 144-154. ISSN 0733-9364
Thomas, H R and Završki, I (1999) Construction baseline productivity: Theory and practice. Journal of Construction Engineering and Management, 125(5), pp. 295-303. ISSN 0733-9364
Thuse, D G (1988) Road transport investment model using dynamic programming. PhD thesis, Indian Institute of Technology, Bombay, India.
Tischer, T E and Kuprenas, J A (2003) Bridge falsework productivity: measurement and influences. Journal of Construction Engineering and Management, 129(3), pp. 243-250. ISSN 0733-9364
Turkan, Y; Bosché, F; Haas, C T and Haas, R (2014) Tracking of secondary and temporary objects in structural concrete work. Construction Innovation, 14(2), pp. 145-167. ISSN 1471-4175
Tyvand, J and Blachly, A T (1986) Foamed plastic absorbs staged post-tensioning deflections. Journal of Construction Engineering and Management, 112(4), pp. 582-587. ISSN 0733-9364
Ugwu, O O; Tah, J and Howes, R (1998) Optimizing construction method selection strategies in an integrated decision support environment: Results of application to earthworks operations. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.
Walsh, K D; Houston, W N and Houston, S L (1997) Field implications of current compaction specification design practices. Journal of Construction Engineering and Management, 123(4), pp. 363-370. ISSN 0733-9364
Wang, C; Zou, F; Yap, J B H; Wood, L C; Li, H and Ding, L (2023) System dynamics tool for entropy-based risk control on sleeve grouting in prefabricated buildings. Engineering, Construction and Architectural Management, 30(2), pp. 538-567. ISSN 0969-9988
Wang, J; Han, J; Chen, J; Ding, G; Feng, G; Liu, T and Guo, B (2022) Experimental and numerical study on the dynamic response of a superthick backfill subgrade under high-speed railway loading: A case study of qianjiang-zhangjiajie-changde railway. Journal of Construction Engineering and Management, 148(12): 05022014, ISSN 0733-9364
Wang, Xi (2018) Assessing the application of the unmanned aerial systems (uas) in earthwork volume measurement. PhD thesis, University of Kentucky, USA.
Whyte, A and Donaldson, J (2015) Digital model data distribution in civil engineering contracts. Built Environment Project and Asset Management, 5(3), pp. 248-260. ISSN 2044-124X
Wu, S; Xie, H; Zeng, Z; Wang, M; Zhao, H and Liu, Y (2023) Influence of pea-gravel layer on segment ring support performance in shield TBM tunnels: A discrete-continuous coupling simulation and model test. Journal of Construction Engineering and Management, 149(10): 04023097, ISSN 0733-9364
Yang, X; Wang, S; Jiang, Y; Wang, L; Li, P and Wang, S (2025) Theoretical and experimental analysis of stress variations in precast concrete segment linings during double-shield TBM excavation of subway tunnels. Journal of Construction Engineering and Management, 151(6): 04025040, ISSN 0733-9364
Yu, W-d (1996) A neuro-fuzzy knowledge-based multi-criterion decision model for constructability analysis and improvement of construction technologies. PhD thesis, Purdue University, USA.
Zetterlund, M; Norberg, T; Ericsson, L O and Rosn, L (2011) Framework for value of information analysis in rock mass characterization for grouting purposes. Journal of Construction Engineering and Management, 137(7), pp. 486-497. ISSN 0733-9364
Zhang, C; Chen, K; Yang, J; Fu, J; Wang, S and Xie, Y (2022) Reuse of discharged soil from slurry shield tunnel construction as synchronous grouting material. Journal of Construction Engineering and Management, 148(2): 04021193, ISSN 0733-9364
Zhang, K; Li, D; Shen, X; Hou, W; Li, Y and Xue, X (2023) Research on strengthening stone arch bridge with CFRP rebars. International Journal of Building Pathology and Adaptation, 41(5), pp. 1014-1028. ISSN 23984708
Zhang, L; Wu, X and Liu, H (2016) Strategies to reduce ground settlement from shallow tunnel excavation: A case study in China. Journal of Construction Engineering and Management, 142(5): 04016001, ISSN 0733-9364
Zhang, Y (2009) Research on hydraulic engineering construction management decision support system based on network analysis method (in Chinese). PhD thesis, Beijing University of Aeronautics and Astronautics, China.
Up a level