Ababio, B K and Lu, W (2023) Barriers and enablers of circular economy in construction: A multi-system perspective towards the development of a practical framework. Construction Management and Economics, 41(1), pp. 3-21. ISSN 01446193
Abaza, M and Kisi, K (2024) Improper risk management outcomes and lessons learned from an EPC water transmission project. Journal of Construction Engineering and Management, 150(11): 05024012, ISSN 0733-9364
Abd Jamil, A H and Fathi, M S (2020) Enhancing BIM-based information interoperability: Dispute resolution from legal and contractual perspectives. Journal of Construction Engineering and Management, 146(7): 05020007, ISSN 0733-9364
Abd-Elnaby, A-E H A and Reffat, R M (2024) Enhancing BIM-BEM integration: Solutions for efficient data exchange and energy performance assessment. Architectural Engineering and Design Management, 20(3), pp. 596-623. ISSN 1745-2007
Abdalall, S (2017) Concurrent delay analysis in public works construction disputes: a cross-jurisdictional study of Egypt, Scotland and England. PhD thesis, University of Strathclyde, UK.
Abdelalim, A M; Salem, M; Al-Sabah, R; Said, S O; ElShafei, H M and Galal Badawy, M (2025) Optimizing claim management process groups to enhance construction project success. International Journal of Construction Management, 25(13), pp. 1583-1595. ISSN 1562-3599
Abdelmohsen, S M A (2011) An ethnographically informed analysis of design intent communication in BIM-enabled architectural practice. PhD thesis, Georgia Institute of Technology, USA.
Abdul-Aziz, A R and Chwee Ngoh Tan, A M Y (1998) GATT, GATS and the global construction industry. Engineering, Construction and Architectural Management, 5(1), pp. 31-37. ISSN 0969-9988
Abdul-Aziz, A R; Suresh, S and Renukappa, S (2020) The conundrum of professionalising building surveying in Malaysia. International Journal of Building Pathology and Adaptation, 38(5), pp. 621-634. ISSN 23984708
Abdullah, A-N M (2019) Assessing economic, social, political and environmental issues related to mega-projects : A case study of Merowe Dam in Sudan. PhD thesis, University of Plymouth, UK.
Abdullah Habib, S N H (2017) Critical success factors and contractual risks for Private Finance 2 projects implementing building information modelling. PhD thesis, University of Salford, UK.
Abdullahi Ahmed, U; Noor Amila Wan Abdullah, Z and Abdul-Rashid, A-A (2021) Malaysian regulators' ranking of PPP contract governance skills. Built Environment Project and Asset Management, 11(1), pp. 88-102. ISSN 2044-124X
Aboagye-Nimo, E; Raidén, A B and King, A (2014) Understanding the role of local safety groups in managing safety practices between micro construction firms and principal contractors. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Abu Hanipah, A F F and Tahar, K N (2018) Development of the 3D dome model based on a terrestrial laser scanner. International Journal of Building Pathology and Adaptation, 36(2), pp. 122-136. ISSN 23984708
Abubakar, M E; Hasan, A and Jha, K N (2022) Delays and financial implications of COVID-19 for contractors in irrigation projects. Journal of Construction Engineering and Management, 148(9): 05022006, ISSN 0733-9364
Acharya, N K; Dai Lee, Y and Man im, H (2006) Conflicting factors in construction projects: Korean perspective. Engineering, Construction and Architectural Management, 13(6), pp. 543-566. ISSN 0969-9988
Adedokun, O; Egbelakin, T and Omotayo, T (2024) Random forest and path diagram taxonomies of risks influencing higher education construction projects. International Journal of Construction Management, 24(1), pp. 66-74. ISSN 1562-3599
Agapiou, A (2011) Scottish construction lawyers' awareness and experiences of alternative dispute resolution. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(4), pp. 181-192. ISSN 17514304
Agapiou, A (2015) The factors influencing mediation referral practices and barriers to its adoption: A survey of construction lawyers in England and Wales. International Journal of Law in the Built Environment, 7(3), pp. 231-247. ISSN 1756-1450
Agapiou, A (2022) Briefing: The role of the technology and construction court in alternative dispute resolution. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 61-64. ISSN 1751-4304
Agapiou, A and Clark, B (2011) Scottish construction lawyers and mediation: An investigation into attitudes and experiences. International Journal of Law in the Built Environment, 3(2), pp. 159-181. ISSN 1756-1450
Aggeli, A; Christensen, T H and Larsen, S P A K (2022) The gendering of energy household labour. Buildings & Cities, 3(1), pp. 709-724. ISSN 2632-6655
Aghimien, D O; Aigbavboa, C O and Oke, A E (2020) Critical success factors for digital partnering of construction organisations: a Delphi study. Engineering, Construction and Architectural Management, 27(10), pp. 3171-3188. ISSN 0969-9988
Ahadzi, M and Bowles, G (2001) The private finance initiative: The procurement process in perspective. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Ahadzi, M and Bowles, G (2004) Public-private partnerships and contract negotiations: An empirical study. Construction Management and Economics, 22(9), pp. 967-978. ISSN 01446193
Ahadzi, M K (2004) Public private partnerships in infrastructure procurement: A generic multi-attribute hierarchical model for minimising pre-contract time and cost overruns (GMAHM). PhD thesis, Heriot-Watt University, UK.
Ahmed, M O; Abdul Nabi, M; El-Adaway, I H; Caranci, D; Eberle, J; Hawkins, Z and Sparrow, R (2021) Contractual guidelines for promoting integrated project delivery. Journal of Construction Engineering and Management, 147(11): 05021008, ISSN 0733-9364
Ahmed, M U (2000) ‘Champions of collaboration’ in collaborative technological innovation. PhD thesis, Simon Fraser University, Canada.
Aibinu, A A (2006) The relationship between distribution of control, fairness and potential for dispute in the claims handling process. Construction Management and Economics, 24(1), pp. 45-54. ISSN 01446193
Ajslev, J Z N and Møller, J L (2023) The art of role-switching: Positioning practices and the relational roles of OSH coordinators in the Danish construction industry. Construction Management and Economics, 41(9), pp. 703-723. ISSN 01446193
Akbiyikli, R and Eaton, D (2004) Risk management in PFI procurement: A holistic approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Akinci, B H (2000) Automatic generation of work spaces and analysis of time-space conflicts at construction sites. PhD thesis, Stanford University, USA.
Akindele, M A (2024) Development and evaluation of portable reduced-complexity air quality models for policy assessment in Africa. PhD thesis, Carnegie Mellon University, USA.
Akinsola, A O (1997) An intelligent model of variations' contingency on constructions projects. PhD thesis, University of Wolverhampton, UK.
Akintola, A; Venkatachalam, S and Root, D (2020) Understanding BIM's impact on professional work practices using activity theory. Construction Management and Economics, 38(5), pp. 447-467. ISSN 01446193
Akintoye, A and Chinyio, E (2005) Private finance initiative in the healthcare sector: Trends and risk assessment. Engineering, Construction and Architectural Management, 12(6), pp. 601-616. ISSN 0969-9988
Akintoye, A; Hardcastle, C; Beck, M; Chinyio, E and Asenova, D (2003) Achieving best value in private finance initiative project procurement. Construction Management and Economics, 21(5), pp. 461-470. ISSN 01446193
Akintoye, A; Renukappa, S and Lal, H (2012) The abolition of the contracts in writing rule in the 2009 Construction Act: Potential implications for UK adjudication. International Journal of Law in the Built Environment, 4(2), pp. 140-156. ISSN 1756-1450
Akpan, E O P and Igwe, O (2001) Methodology for determining price variation in project execution. Journal of Construction Engineering and Management, 127(5), pp. 367-373. ISSN 0733-9364
Al Rashdi, A (2012) A strategic framework for the further enhancement of the standard forms of construction contract in the Sultanate of Oman. PhD thesis, University of Salford, UK.
Al-Azemi, K (2012) Risk management for build, operate and transfer projects within Kuwait. PhD thesis, Loughborough University, UK.
Al-Derham, H R (1999) The establishment of performance criteria for the evaluation of procurement of senior staff and private housing projects in the State of Qatar. PhD thesis, University of Glamorgan, UK.
Al-Meshekeh, H S (2001) The effect of conflict management upon project effectiveness. Journal of Construction Procurement, 7(2), pp. 15-30. ISSN 1358-9180
Al-Meshekeh, H S and Langford, D A (1999) Conflict management and construction project effectiveness: a review of the literature and development of a theoretical framework. Journal of Construction Procurement, 5(1), pp. 58-75. ISSN 1358-9180
Al-Meshekeh, H S S (1991) The relationship between conflict management style and construction project effectiveness. PhD thesis, University of Strathclyde, UK.
Al-Obaidi, T S A (2018) A transformational organisational framework for improving Iraqi quasi-governmental construction companies' performance. PhD thesis, University of Salford, UK.
Al-Tabtabai, H M and Thomas, V P (2004) Negotiation and resolution of conflict using AHP: An application to project management. Engineering, Construction and Architectural Management, 11(2), pp. 90-100. ISSN 0969-9988
Alam, A; Bhat, M S; Farooq, H; Ahmad, B; Ahmad, S and Sheikh, A H (2018) Flood risk assessment of srinagar city in Jammu and Kashmir, India. International Journal of Disaster Resilience in the Built Environment, 9(2), pp. 114-129. ISSN 1759-5916
Alarcón, L F; Ashley, D B; De Hanily, A S; Molenaar, K R and Ungo, R (2011) Risk planning and management for the Panama Canal expansion program. Journal of Construction Engineering and Management, 137(10), pp. 762-771. ISSN 0733-9364
Alarcón-Ramirez, D; Oliveros-Romero, J and Mahn, D (2026) Performance comparison of public–private partnerships and traditionally procured hospitals. Construction Management and Economics, 44(2), pp. 79-97. ISSN 0144-6193
Alfadhli, A (2013) Does the alternative dispute resolution have a role to play in the construction industry in the State of Kuwait?: look into the most appropriate methodology that may be taken in Kuwait in comparison with what are available in the English legal system. PhD thesis, University of Southampton, UK.
Ali, B; Aibinu, A and Paton-Cole, V (2023) Facilitating agreement in disruption claims through disruption analysis methods. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Ali, B; Aibinu, A A and Paton-Cole, V (2024) Closing the information gaps: A systematic review of research on delay and disruption claims. Construction Innovation, 24(3), pp. 790-810. ISSN 1471-4175
Ali, F M M and Jones, K (2013) Negotiating community resilience in the city in a time of political change and deficit reduction. International Journal of Disaster Resilience in the Built Environment, 4(1), pp. 9-22. ISSN 1759-5916
Ali, K N (2004) Towards an online knowledge management system for reactive maintenance projects. PhD thesis, University of Salford, UK.
Almarri, K (2023) The value for money factors and their interrelationships for smart city public-private partnerships projects. Construction Innovation, 23(4), pp. 815-832. ISSN 1471-4175
Almutairi, M (2019) The influence of national culture on health and safety performance in Kuwait oil and gas sector construction projects. PhD thesis, University of Salford, UK.
Alqahtani, D (2022) A sustainability assessment framework for public-private partnerships (PPPs) in highway projects. PhD thesis, Syracuse University, USA.
Alshahrani, S (2017) Development the a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.
Alshahrani, S A A D (2017) Development of a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.
Alshawi, M A and Hope, A E (1989) Expert systems and contractual disputes: Extension of time under JCT 80. Construction Management and Economics, 7(1), pp. 65-74. ISSN 01446193
Alshboul, O. and Shehadeh, A. (2026) Conflict resolution and negotiation in construction projects using game theory: Achieving win-win outcomes. International Journal of Construction Management, 26(7), pp. 1341-1364. ISSN 1562-3599
Alsofyani, S (2021) An analysis of how culture influences the arbitration process used to resolve disputes on construction projects in Saudi Arabia. PhD thesis, University of Plymouth, UK.
Alutaibi, A (2018) The impact of facility management practices on tenant satisfaction forresidential complexes in the Kingdom of Saudi Arabiaresidential complexes in the Kingdom of Saudi Arabia. PhD thesis, Loughborough University, UK.
Aminian, E; Kirkham, R and Fenn, P (2011) Contracting strategies in construction industries. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Aminuddin, F A B (2019) The compatibility of dispute resolution mechanisms with national culture in the construction industry: a case study of the Malaysian statutory adjudication regime. PhD thesis, University of Salford, UK.
Amoo, O; Lukman, Y and Musa, N (2022) Dispute resolution methods adopted by contractors during COVID-19 in eastern cape South Africa: A case study. Journal of Construction Business and Management, 5(2), pp. 54-67. ISSN 2521-0165
An, J; Li, S and Wu, X P (2025) Multi-objective planning for time-cost trade-offs in multi-project parallel environment. Engineering, Construction and Architectural Management, 32(6), pp. 4051-4073. ISSN 0969-9988
Ancell, D J (2007) Performance-based contracting in construction: innovation for the brave? PhD thesis, University of Reading, UK.
Andrew, A; Murning, I; Pitt, M and Tucker, M (2008) Investment in the Scottish further education estate 19992006. Journal of Financial Management of Property and Construction, 13(3), pp. 209-216. ISSN 1366-4387
Antaki, N; Petrescu, D; Schalk, M; Brandao, E; Calciu, D and Marin, V (2026) Mediation roles and ecologies within resilience-focused urban living labs. Buildings & Cities, 7(1), pp. 20-38. ISSN 2632-6655
Aouad, G F; Ozorhon, B and Abbott, C (2010) Facilitating innovation in construction: Directions and implications for research and policy. Construction Innovation, 10(4), pp. 374-394. ISSN 1471-4175
Aoude, H S (1996) Computerized construction delay management system. PhD thesis, Polytechnic University (New York), USA.
Arar, A J; Papineau, C and Poirier, E (2024) An empirical evaluation of the causes leading to binding dispute resolution mechanisms in the quebec construction industry. International Journal of Construction Management, 24(7), pp. 761-770. ISSN 1562-3599
Arditi, D and Alavipour, S M R (2019) Trends in expectations about duties and responsibilities of construction managers. Journal of Construction Engineering and Management, 145(7): 04019037, ISSN 0733-9364
Arditi, D and Pattanakitchamroon, T (2008) Analysis methods in time-based claims. Journal of Construction Engineering and Management, 134(4), pp. 242-252. ISSN 0733-9364
Arkani, S (1999) Contractual interfaces: the implications of building production process management and interorganisational relations for productivity in building project coalitions. PhD thesis, University of Greenwich, UK.
Arnold, Stuart (2008) Transforming systems engineering principles into integrated project team practice. PhD thesis, Cranfield University, UK.
Ashraf, H and Rowlinson, S (2015) The importance of context in conflict management: Explicating the notion of conflict management climate and agenda setting for future research. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Ashraf, Hassan (2018) Psychological conflict management climate in general contractor's project organization and its influence on project performance: exploring multiple psychosocial and behavioral pathways. PhD thesis, University of Hong Kong, Hong Kong.
Atanasov, V; Greenwood, D and Robson, S (2020) The management of disputes as an element of construction transaction costs: An empirical study. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Atanasov, V; Greenwood, D; Thurairajah, N and Hatcher, C (2021) Forensic delay analysis: An investigation of the reasons for disagreements in time-related disputes. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Atapattu, A M D S; Hadiwattage, C; Perera, B A K S and Rajaratnam, D (2024) Employing criteria scoring matrix in appraising the economic return of transcending to a circular built environment. Smart and Sustainable Built Environment, 13(2), pp. 267-290. ISSN 2046-6099
Athanasakis, D (2007) Has multiparty arbitration failed in construction disputes? Legal and practical issues in drafting joinder provisions. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Attarzadeh, M (2014) Negotiation-based risk management for PPP-BOT infrastructure projects. PhD thesis, National University of Singapore, Singapore.
Attarzadeh, M; Chua, D K H; Beer, M and Abbott, E L S (2017) Options-based negotiation management of PPP-BOT infrastructure projects. Construction Management and Economics, 35(11-12), pp. 676-692. ISSN 0144-6193
Awuzie, B; McDermott, P and Farag, F (2018) Achieving social value through construction frameworks: the effect of client attributes. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(1), pp. 25-31. ISSN 17514304
Ayhan, M (2019) Development of dispute prediction and resolution method selection models for construction disputes. PhD thesis, Middle East Technical University, Turkey.
Baatz, N (2008) Problem management/dispute resolution in partnering contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(3), pp. 115-120. ISSN 17514312
Babaeian Jelodar, M; Yiu, T W and Wilkinson, S (2022) Empirical modeling for conflict causes and contractual relationships in construction projects. Journal of Construction Engineering and Management, 148(5): 04022017, ISSN 0733-9364
Babazadeh, N; Teizer, J; Bargstädt, H J and Melzner, J (2025) Predictive simulation of construction site noise emissions from heavy equipment. Smart and Sustainable Built Environment, 14(3), pp. 715-739. ISSN 2046-6099
Baborska-Narozny, M; Szulgowska-Zgrzywa, M; Mokrzecka, M; Chmielewska, A; Fidorow-Kaprawy, N; Stefanowicz, E; Piechurski, K and Laska, M (2020) Climate justice: Air quality and transitions from solid fuel heating. Buildings & Cities, 1(1), pp. 120-140. ISSN 2632-6655
Badenfelt, U (2008) The selection of sharing ratios in target cost contracts. Engineering, Construction and Architectural Management, 15(1), pp. 54-65. ISSN 0969-9988
Badger, W; Sullivan, K; Wiezel, A and Bopp, P H (2009) Profiling the leadership of project managers. International Journal of Construction Education and Research, 5(2), pp. 121-146. ISSN 1557-8771
Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.
Barlow, C (2012) The Code for Sustainable Homes: what are the innovation implications for the social housing development sector? PhD thesis, University of Salford, UK.
Batarseh, Sana (2025) An approach to adjusting design build for the modern construction industry. PhD thesis, Arizona State University, USA.
Bayat, M; Khanzadi, M and Nasirzadeh, F (2020) Bargaining game model to determine concessionary items in build-operate-transfer contracts. Journal of Construction Engineering and Management, 146(2): 04019109, ISSN 0733-9364
Bayat, M; Khanzadi, M; Nasirzadeh, F and Chavoshian, A (2020) Financial conflict resolution model in BOT contracts using bargaining game theory. Construction Innovation, 20(1), pp. 18-42. ISSN 1471-4175
Bazzan, J; Echeveste, M; Formoso, C T and Kowalski, J D S (2024) A data-driven customer complaint management model for residential building companies. Architectural Engineering and Design Management, 20(6), pp. 1381-1402. ISSN 1745-2007
Bendixen, M and Koch, C (2007) Negotiating visualizations in briefing and design. Building Research & Information, 35(1), pp. 42-53. ISSN 0961-3218
Berg, J B; Thuesen, C and Jensen, P A (2023) Procurement innovation as a vehicle for sustainable change: a case study of the Danish model of strategic partnerships. Construction Innovation, 23(3), pp. 665-682. ISSN 1471-4175
Besaiso, H and Fenn, P (2022) How international construction arbitrators make their decisions: Status of commercial norms and international construction law. Journal of Construction Engineering and Management, 148(9): 04022077, ISSN 0733-9364
Besaiso, H; Fenn, P and Emsley, M (2016) Alternative dispute resolution in Palestine: The myth and dilemma of construction mediation. International Journal of Law in the Built Environment, 8(3), pp. 269-286. ISSN 1756-1450
Beynon, K S (2005) Dispute resolution and access to justice, with particular reference to the construction industry in the United Kingdom. PhD thesis, Swansea University, UK.
Bhasha, A V and Reddy, B D V (2022) A multi-objective opposition-based barnacles mating optimization for image super resolution using hyper-spectral images. Journal of Engineering, Design and Technology, 20(6), pp. 1538-1564. ISSN 1726-0531
Birgonul, M T and Ozdogan, I D (2001) Risks borne by foreign contractors doing business in Turkey. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Bishop, D (1994) The professionals' view of the Health and Safety Commission's draft Construction (Design and Management) Regulations. Construction Management and Economics, 12(4), pp. 365-372. ISSN 01446193
Bittner, Ksenia (2020) Building information extraction and refinement from vhr satellite imagery using deep learning techniques. PhD thesis, Osnabrück University, Germany.
Blay, K B (2017) Resilience in projects: definition, dimensions, antecedents and consequences. PhD thesis, Loughborough University, UK.
Boamah, F A; Zhang, J and Miah, M H (2023) The impact of tacit knowledge sharing on the success of construction companies operations. Journal of Engineering, Design and Technology, 21(6), pp. 1767-1784. ISSN 1726-0531
Bohn, J S and Teizer, J (2010) Benefits and barriers of construction project monitoring using high-resolution automated cameras. Journal of Construction Engineering and Management, 136(6), pp. 632-640. ISSN 0733-9364
Boice, J R (1970) A history and evaluation of the school construction systems development project, 1961-1967. EdD thesis, Stanford University, USA.
Bortolini, R and Forcada, N (2020) A probabilistic performance evaluation for buildings and constructed assets. Building Research & Information, 48(8), pp. 838-855. ISSN 0961-3218
Bos-de Vos, M; Volker, L and Wamelink, H (2015) Prioritizing quality over profit: Value trade-offs within architect-client relations. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Bourgeois, I.; Ferreira, V. and Rodrigues, H. (2026) From monitoring to forecasting: Predictive modelling of thermal-induced displacements in heritage masonry: The batalha monastery case study. International Journal of Building Pathology and Adaptation, 44(9), pp. 16-34. ISSN 2398-4708
Bourgeois, I.; Ferreira, V. and Rodrigues, H. (2026) From monitoring to forecasting: Predictive modelling of thermal-induced displacements in heritage masonry: The Batalha Monastery case study. International Journal of Building Pathology and Adaptation, 44(9), pp. 16-34. ISSN 2398-4708
Bower, D A (1995) The creation of a proactive link between time and money. PhD thesis, University of Manchester, UK.
Bowes, D (2007) Practitioners' perception of adjudication in UK construction. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Bowes, D (2008) Identifying barriers to the establishment of dispute boards in UK construction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Boyd, P; Larsen, G D and Schweber, L (2015) The co-development of technology and new buildings: Incorporating building integrated photovoltaics. Construction Management and Economics, 33(5-6), pp. 349-360. ISSN 01446193
Braimah, N (2008) An investigation into the use of construction delay and disruption analysis methodologies. PhD thesis, University of Wolverhampton, UK.
Braimah, N and Ndekugri, I (2009) Consultants' perceptions on construction delay analysis methodologies. Journal of Construction Engineering and Management, 135(12), pp. 1279-1288. ISSN 0733-9364
Braimah, N; Ndekugri, I and Gameson, R (2007) A systematic methodology for analysing disruption claims. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Brand, M C and Uher, T (2010) Follow-up empirical study of the performance of the New South Wales construction industry security of payment legislation. International Journal of Law in the Built Environment, 2(1), pp. 7-25. ISSN 1756-1450
Brandli, L L; Jüngles, A E and Heineck, L F (1999) Sub-contracting policies: The case of the construction firms in brazil. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Brett-Jones, A T (1983) Barchester low rise: A case study of a management contract for remedial work to a large housing scheme. Construction Management and Economics, 1(2), pp. 91-117. ISSN 01446193
Bridges, D; Wulff, E; Bamberry, L; Krivokapic-Skoko, B and Jenkins, S (2020) Negotiating gender in the male-dominated skilled trades: A systematic literature review. Construction Management and Economics, 38(10), pp. 894-916. ISSN 01446193
Briscoe, G (2006) How useful and reliable are construction statistics? Building Research & Information, 34(3), pp. 220-229. ISSN 0961-3218
Britton, P and Bailey, J (2011) New homes and consumer rights: England and Australia compared. International Journal of Law in the Built Environment, 3(3), pp. 269-295. ISSN 1756-1450
Brockman, J L (2014) Interpersonal conflict in construction: Cost, cause, and consequence. Journal of Construction Engineering and Management, 140(2): 04013050, ISSN 0733-9364
Brooker, P (1997) Factors which impact on the choice of alternative dispute resolution in the construction industry. PhD thesis, Oxford Brookes University, UK.
Brooker, P and Lavers, A (1997) Perceptions of alternative dispute resolution as constraints upon its use in the UK construction industry. Construction Management and Economics, 15(6), pp. 519-526. ISSN 01446193
Brooks, T; Spillane, J; Tansey, P and Hendron, C (2016) The impact of the recent economic recession on the operation of the NEC contract in Northern Ireland. Construction Management and Economics, 34(6), pp. 393-417. ISSN 01446193
Brunes, F (2015) Essays on behavioural economics and cost overuns. PhD thesis, KTH Royal Institute of Technology, Sweden.
Bröchner, J; Josephson, P E and Kadefors, A (2002) Swedish construction culture, quality management and collaborative practice. Building Research & Information, 30(6), pp. 392-400. ISSN 0961-3218
Bubshait, A A and Cunningham, M J (1998) Comparison of delay analysis methodologies. Journal of Construction Engineering and Management, 124(4), pp. 315-322. ISSN 0733-9364
Bull, R and Janda, K B (2018) Beyond feedback: Introducing the 'engagement gap' in organizational energy management. Building Research & Information, 46(3), pp. 300-315. ISSN 0961-3218
Burtonshaw-Gunn, S A (2001) Strategic supply chain management: Critical success factors for partnering relationships within the UK construction industry. PhD thesis, Manchester Metropolitan University, UK.
Buser, M; Carlsson, V and Koch, C (2019) Interactive shaping of expertise: The play between house-owner and SME contractors negotiating renovation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Cai, J; Li, S and Cai, H (2019) Empirical analysis of capital structure determinants in infrastructure projects under public-private partnerships. Journal of Construction Engineering and Management, 145(5): 04019032, ISSN 0733-9364
Cai, J; Yang, L; Zhang, Y; Li, S and Cai, H (2021) Multitask learning method for detecting the visual focus of attention of construction workers. Journal of Construction Engineering and Management, 147(7): 04021063, ISSN 0733-9364
Cairns, G (2008) Advocating an ambivalent approach to theorizing the built environment. Building Research & Information, 36(3), pp. 280-289. ISSN 0961-3218
Caldas, C H; Chou, C C and O'Connor, J (2008) Negotiation-based decision support model for utility relocations in transportation infrastructure projects. Construction Management and Economics, 26(10), pp. 1079-1090. ISSN 1466433X
Campbell, A J (2012) The politics of canal construction: the Ashby Canal, 1781-1804. PhD thesis, University of Leicester, UK.
Campbell, J L (1999) A baseline study of practices and perceptions of marketing and aftermarketing activities among commercial general contractors. PhD thesis, University of Idaho, USA.
Candel, M; Gustavsson, T K and Eriksson, P E (2019) Beyond national building regulations: Exploring public-private negotiations over sustainability requirements. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Candel, M; Karrbom Gustavsson, T and Eriksson, P E (2021) Front-end value co-creation in housing development projects. Construction Management and Economics, 39(3), pp. 245-260. ISSN 01446193
Cao, T.; Zhang, L. and Qian, Q. (2026) For a rainy day: Preventing the escalation of threats into interorganizational relationship conflict through emotional regulation and boundary-spanning roles. Journal of Construction Engineering and Management, 152(7): 04026096, ISSN 0733-9364
Cao, N and Cheung, S O (2024) Voluntary mediation as a tenable resolution mechanism for construction disputes. Journal of Construction Engineering and Management, 150(6): 04024046, ISSN 0733-9364
Cao, N and Cheung, S O (2025) The value of voluntary participation in construction dispute mediation. Engineering, Construction and Architectural Management, 32(2), pp. 1229-1253. ISSN 0969-9988
Capper, P N (1995) The adjudicator under NEC 2nd edition: A new approach to disputes. Engineering, Construction and Architectural Management, 2(4), pp. 317-326. ISSN 0969-9988
Carbonara, N and Pellegrino, R (2018) Revenue guarantee in public-private partnerships: A win–win model. Construction Management and Economics, 36(10), pp. 584-598. ISSN 01446193
Carlsson, V and Koch, C (2014) Shall we dance? Encounters for energy renovation of single family houses. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Carmichael, D G and Balatbat, M C A (2010) A contractor's analysis of the likelihood of payment of claims. Journal of Financial Management of Property and Construction, 15(2), pp. 102-117. ISSN 1366-4387
Carrillo, P M; Robinson, H S; Anumba, C J and Bouchlaghem, N M (2006) A knowledge transfer framework: The PFI context. Construction Management and Economics, 24(10), pp. 1045-1056. ISSN 1466433X
Carroll, Steven Paige (2005) Risk-based approach to on-site wastewater treatment system siting design and management. PhD thesis, Queensland University of Technology, Australia.
Carty, G J (1995) Construction. Journal of Construction Engineering and Management, 121(3), pp. 319-328. ISSN 0733-9364
Castro-Lacouture, D (2003) B2b e-work intranet solution design for rebar supply interactions. PhD thesis, Purdue University, USA.
Cebrat, K; Narożny, J; Baborska-Narozny, M and Smektała, M (2025) Modelling site-specific outdoor temperature for buildings in urban environments. Buildings & Cities, 6(1), pp. 490-510. ISSN 2632-6655
Cevikbas, M; Okudan, O and Işık, Z (2024) Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. Engineering, Construction and Architectural Management, 31(1), pp. 1-27. ISSN 0969-9988
Chahrour, R; Hafeez, M A; Ahmad, A M; Sulieman, H I; Dawood, H; Rodriguez-Trejo, S; Kassem, M; Naji, K K and Dawood, N (2021) Cost-benefit analysis of BIM-enabled design clash detection and resolution. Construction Management and Economics, 39(1), pp. 55-72. ISSN 01446193
Chan, A P C; Chan, D W M; Chiang, Y H; Tang, B S; Chan, E H W and Ho, K S K (2004) Exploring critical success factors for partnering in construction projects. Journal of Construction Engineering and Management, 130(2), pp. 188-198. ISSN 0733-9364
Chan, C H F (2010) To talk or to fight? Collective effects of strategic, cultural, and institutional factors on investors' renegotiation approach in public-private concessions. PhD thesis, Stanford University, USA.
Chan, E H W (1997) Amicable dispute resolution in the people's republic of China and its implications for foreign-related construction disputes. Construction Management and Economics, 15(6), pp. 539-548. ISSN 01446193
Chan, E H W; Suen, H C H and Chan, C K L (2006) Maut-based dispute resolution selection model prototype for international construction projects. Journal of Construction Engineering and Management, 132(5), pp. 444-451. ISSN 0733-9364
Chan, E H W and Tse, R Y C (2003) Cultural considerations in international construction contracts. Journal of Construction Engineering and Management, 129(4), pp. 375-381. ISSN 0733-9364
Chan, H-W E (2003) A study of factors relevant to disputes arising in international construction projects involving both European and Asian cultural factors. PhD thesis, King's College London, UK.
Chan, Hon-Wan Edwin (2003) A study of contractual provisions relevant to disputes arising in international construction projects involving both European and East Asian cultural factors. PhD thesis, King's College London (University of London), UK.
Chang, C Y and Ive, G (2007) Reversal of bargaining power in construction projects: Meaning, existence and implications. Construction Management and Economics, 25(8), pp. 845-855. ISSN 1466433X
Chang, C Y and Qian, Y (2015) An econometric analysis of holdup problems in construction projects. Journal of Construction Engineering and Management, 141(6): 04015004, ISSN 0733-9364
Chang, H-P (2010) Relationships among supply chain management, strategic alliances, and organizational performance with implications for the construction industry. PhD thesis, Lynn University, USA.
Chang, S H (2013) Evaluating essential liabilities on design professionals under earthquake's impact: Taiwan experience. Engineering, Construction and Architectural Management, 20(2), pp. 181-194. ISSN 0969-9988
Chang, T; Chi, S and Im, S B (2022) Understanding user experience and satisfaction with urban infrastructure through text mining of civil complaint data. Journal of Construction Engineering and Management, 148(8): 04022061, ISSN 0733-9364
Chaphalkar, N and Iyer, K C (2014) Factors influencing decisions on delay claims in construction contracts for Indian scenario. Construction Economics and Building, 14(1), pp. 32-44. ISSN 2204-9029
Chaphalkar, N B (2007) Expert system for resolution of delay claims in construction contracts. PhD thesis, Indian Institute of Technology Delhi, India.
Chapman, P H J (2009) Dispute boards on major infrastructure projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(1), pp. 7-16. ISSN 17514312
Charkhakan, M H and Heravi, G (2019) Evaluating the preventability of conflicts arising from change occurrence in construction projects. Engineering, Construction and Architectural Management, 26(8), pp. 1777-1800. ISSN 0969-9988
Charkhakan, M H and Heravi, G (2023) Quantifying the predictability and preventability of conflicts between construction project parties. Engineering, Construction and Architectural Management, 30(5), pp. 1932-1950. ISSN 0969-9988
Charlson, J (2014) Law for engineering undergraduates on accredited courses 1. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(4), pp. 201-206. ISSN 17514304
Charlson, J (2021) Emerging trends in construction law at the confluence of academia and industry. PhD thesis, University of Wolverhampton, UK.
Charlson, J; Baldwin, R and Harrison, J (2014) Early perceptions of allowing adjudication of oral contracts. International Journal of Law in the Built Environment, 6(3), pp. 233-249. ISSN 1756-1450
Charlson, J and Oduoza, C (2014) Legal risk identification for SMEs in the construction industry. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Charlson J, C E (2013) A case study of joint procurement and provision of legal services to a group of a universities in the midlands. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Cheah, C Y J and Liu, J (2006) Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics, 24(5), pp. 545-554. ISSN 1466433X
Chen, B; Mao, C K and Hu, J L (2015) The optimal debt ratio of public-private partnership projects. International Journal of Construction Management, 15(3), pp. 239-253. ISSN 1562-3599
Chen, C; Lv, L; Wang, Z and Qiao, R (2023) Bargaining optimization model for risk renegotiation with fairness concerns in infrastructure PPP projects. Engineering, Construction and Architectural Management, 30(9), pp. 3876-3894. ISSN 0969-9988
Chen, C and Messner, J I (2005) An investigation of Chinese BOT projects in water supply: A comparative perspective. Construction Management and Economics, 23(9), pp. 913-925. ISSN 01446193
Chen, H; Feng, Z; Liu, Y; Chen, B; Deng, T; Qin, Y and Xu, W (2023) Multiobjective optimization of a 3D laser scanning scheme for engineering structures based on rf-NSGA-II. Journal of Construction Engineering and Management, 149(2): 4022169, ISSN 0733-9364
Chen, J-H (2003) Litigation prediction model for construction disputes caused by change orders. PhD thesis, University of Wisconsin - Madison, USA.
Chen, P (2005) An interpretive comparison of Chinese and western conceptions of project management work. PhD thesis, Cranfield University, UK.
Chen, Y; Chen, S; Hu, C; Jin, L and Zheng, X (2020) Novel probabilistic cost estimation model integrating risk allocation and claim in hydropower project. Journal of Construction Engineering and Management, 146(8): 04020092, ISSN 0733-9364
Cheng, Y H and Hong, W T (2025) An analytical research tool for monitoring stakeholder conflicts in public-private partnership project delivery. Construction Management and Economics, 43(12), pp. 1060-1079. ISSN 0144-6193
Cheung, S O and Chow, P T (2011) Withdrawal in construction project dispute negotiation. Journal of Construction Engineering and Management, 137(12), pp. 1071-1079. ISSN 0733-9364
Cheung, S O; Chow, P T and Yiu, T W (2009) Contingent use of negotiators' tactics in construction dispute negotiation. Journal of Construction Engineering and Management, 135(6), pp. 466-476. ISSN 0733-9364
Cheung, S O and Li, K (2019) Biases in construction project dispute resolution. Engineering, Construction and Architectural Management, 26(2), pp. 321-348. ISSN 0969-9988
Cheung, S O; Lyeung, D K; Cheung, F K T and Suen, H C H (2002) A planning framework for conditions of contract for use in partnering projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Cheung, S O and Suen, H C H (2002) A multi-attribute utility model for dispute resolution strategy selection. Construction Management and Economics, 20(7), pp. 557-568. ISSN 01446193
Cheung, S O; Suen, H C H and Lam, T I (2002) Fundamentals of alternative dispute resolution processes in construction. Journal of Construction Engineering and Management, 128(5), pp. 409-417. ISSN 0733-9364
Cheung, S O; Tam, C M; Ndekugri, I and Harris, F C (2000) Factors affecting clients' project dispute resolution satisfaction in Hong Kong. Construction Management and Economics, 18(3), pp. 281-294. ISSN 01446193
Cheung, S O; Yiu, K T W and Suen, H (2004) Construction negotiation online. Journal of Construction Engineering and Management, 130(6), pp. 844-852. ISSN 0733-9364
Cheung, S O; Yiu, T W and Chan, H W (2010) Exploring the potential for predicting project dispute resolution satisfaction using logistic regression. Journal of Construction Engineering and Management, 136(5), pp. 508-517. ISSN 0733-9364
Cheung, S O; Yiu, T W Y and Yeung, S F (2006) A study of styles and outcomes in construction dispute negotiation. Journal of Construction Engineering and Management, 132(8), pp. 805-814. ISSN 0733-9364
Cheung, S O; Zhu, L and Yu, K I (2022) The value of apology in construction dispute negotiation. International Journal of Construction Management, 22(10), pp. 1910-1923. ISSN 1562-3599
Cheung, S-O (1997) Risk allocation: an essential tool for construction project management. Journal of Construction Procurement, 3(1), pp. 16-27. ISSN 1358-9180
Cheung, S-O (1998) Project dispute resolution satisfaction of construction clients in Hong Kong. PhD thesis, University of Wolverhampton, UK.
Chi, C S-F (2010) How host country and transnational institutions interact on international infrastructure projects in less developed countries: Case studies of high-speed rail projects in China and Taiwan. PhD thesis, Stanford University, USA.
Chinazzo, G (2021) Investigating the indoor environmental quality of different workplaces through web-scraping and text-mining of glassdoor reviews. Building Research & Information, 49(6), pp. 695-713. ISSN 0961-3218
Chinyio, E A and Akintoye, A (2008) Practical approaches for engaging stakeholders: Findings from the UK. Construction Management and Economics, 26(6), pp. 591-599. ISSN 1466433X
Choi, B; Lee, H S; Park, M; Cho, Y K and Kim, H (2014) Framework for work-space planning using four-dimensional BIM in construction projects. Journal of Construction Engineering and Management, 140(9): 04014041, ISSN 0733-9364
Choi, Y; Kim, D C; Kim, S S; Nam, M S and Kim, T H (2013) Implementation of noise-free and vibration-free PHC screw piles on the basis of full-scale tests. Journal of Construction Engineering and Management, 139(8), pp. 960-967. ISSN 0733-9364
Chong, H Y and Zin, R M (2012) Selection of dispute resolution methods: Factor analysis approach. Engineering, Construction and Architectural Management, 19(4), pp. 428-443. ISSN 0969-9988
Chong, H Y; Zin, R M and Chong, S C (2013) Employing data warehousing for contract administration: E-dispute resolution prototype. Journal of Construction Engineering and Management, 139(6), pp. 611-619. ISSN 0733-9364
Chong, H-Y and Oon, C K (2016) A practical approach in clarifying legal drafting: Delphi and case study in Malaysia. Engineering, Construction and Architectural Management, 23(5), pp. 610-621. ISSN 0969-9988
Choudhury, T (2014) Masculinities, feminities and gender relations in contemporary Bangladesh: an analysis of the construction sector in Sylhet. PhD thesis, University of Hull, UK.
Chow, P T; Kong, F and Cheung, S O (2012) Mediating and moderating effect of tension on withdrawal-commitment relationship in construction dispute negotiation. Journal of Construction Engineering and Management, 138(10), pp. 1230-1238. ISSN 0733-9364
Chow, V W and Leiringer, R (2014) The translation of power: A study of boundary objects in public engagement processes. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Coggins, J; Elliott, R F and Bell, M (2010) Towards harmonisation of construction industry payment legislation: A consideration of the success afforded by the East and West coast models in Australia. Construction Economics and Building, 10(3), pp. 14-35. ISSN 2204-9029
Coggins, J and O’Leary, T (2008) The validity of adjudicators' determinations containing errors of law: The NSW judicial approach. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Coggins, J K and Donohoe, S (2012) The validity of adjudicators' determinations containing errors of law: A comparison of the judicial approach in England and New South Wales. International Journal of Law in the Built Environment, 4(2), pp. 116-125. ISSN 1756-1450
Coggins, Jeremy Keith (2012) A proposal for harmonisation of security of payment legislation in the Australian building and construction industry. PhD thesis, University of Adelaide, Australia.
Comerio, M C (2004) Public policy for reducing earthquake risks: A US perspective. Building Research & Information, 32(5), pp. 403-413. ISSN 0961-3218
Cordoba, Rodrigo Eduardo (2014) Study of the influence of leachates from civil construction waste landfills on water resource quality. PhD thesis, Universidade de São Paulo, Brazil.
Costanzo, V; Fabbri, K; Schito, E; Pretelli, M and Marletta, L (2021) Microclimate monitoring and conservation issues of a baroque church in Italy: A risk assessment analysis. Building Research & Information, 49(7), pp. 729-747. ISSN 0961-3218
Craig, R (2000) Re-engineering the tender code for construction works. Construction Management and Economics, 18(1), pp. 91-100. ISSN 01446193
Crawley, J; McKenna, E; Gori, V and Oreszczyn, T (2020) Creating domestic building thermal performance ratings using smart meter data. Buildings & Cities, 1(1), pp. 1-13. ISSN 2632-6655
Crossley, B J (2015) Inter-organisational relationship trust repair: A ranked Delphi study with UK professionals. International Journal of Law in the Built Environment, 7(3), pp. 195-213. ISSN 1756-1450
Cruz-Roveda, S (2022) A qualitative open-ended interview study using a comparative multiple case study approach of bus rapid transit (BRT) construction projects within the United States. DPA thesis, California Baptist University, USA.
Cuff, D C (1982) Negotiating architecture: a study of architects and clients in design practice. PhD thesis, University of California, Berkeley, USA.
Dabash, M S (2022) Applications of computer vision to improve construction site safety and monitoring. PhD thesis, University of Delaware, USA.
Dagenais, D A (2007) Introduction to good faith in construction contracts. Construction Management and Economics, 25(7), pp. 715-721. ISSN 1466433X
Dai, F; Rashidi, A; Brilakis, I and Vela, P (2013) Comparison of image-based and time-of-flight-based technologies for three-dimensional reconstruction of infrastructure. Journal of Construction Engineering and Management, 139(1), pp. 69-79. ISSN 0733-9364
Dainty, A R J (1998) A grounded theory of the determinants of women's under-achievement in large construction companies. PhD thesis, Loughborough University, UK.
Dainty, A R J; Bagilhole, B M and Neale, R H (1998) Improving the retention of construction professionals: A soft HRM approach. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Damirchilo, F (2021) Use of machine learning and data science on infrastructure transportation and construction projects. PhD thesis, Arizona State University, USA.
Davies, John P (2009) Alliance contracts and public sector governance. PhD thesis, Griffith University, Australia.
Davies, R and Harty, C F (2012) Control, surveillance and the 'dark side' of BIM. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Davis, C (2020) The influence of national culture on conflict in project management: How organizations manage conflict. PhD thesis, Northcentral University, USA.
Dayanand, N (1996) Scheduling payments in projects: An optimization framework. PhD thesis, Carnegie Mellon University, USA.
Dağkıran, G (2015) A multi agent risk analysis and sharing platform for international construction projects. PhD thesis, Middle East Technical University, Turkey.
De Toldi, T; Craig, S and Sushama, L (2022) Internal thermal mass for passive cooling and ventilation: Adaptive comfort limits, ideal quantities, embodied carbon. Buildings & Cities, 3(1), pp. 42-67. ISSN 2632-6655
Dewulf, G and Garvin, M J (2020) Responsive governance in PPP projects to manage uncertainty. Construction Management and Economics, 38(4), pp. 383-397. ISSN 01446193
Di Marco, M K (2011) The roles and impacts of boundary spanners and boundary objects in global project networks. PhD thesis, Columbia University, USA.
Diekmann, J E and Girard, M J (1995) Are contract disputes predictable? Journal of Construction Engineering and Management, 121(4), pp. 355-363. ISSN 0733-9364
Dikmen, I; Birgonul, M T; Ozorhon, B and Eren, K (2008) Critical success factors for partnering in the Turkish construction industry. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Dinesh, C P; Bari, A U; Dissanayake, R P G and Tamura, M (2013) Detecting and assessment of tsunami building damage using high-resolution satellite images with GIS data. International Journal of Disaster Resilience in the Built Environment, 4(2), pp. 132-144. ISSN 1759-5916
Ding, Q (2018) Using social media to evaluate public acceptance of infrastructure projects. PhD thesis, University of Maryland, College Park, USA.
Direitinho, Romao Manuel Leitao Carrapato (2020) Civil construction waste (RCC) management model supported by the analytic hierarchy process (AHP) method. PhD thesis, Universidade Federal de São Carlos, Brazil.
Dodanwala, T C; Shrestha, P and Santoso, D S (2021) Role conflict related job stress among construction project professionals: The moderating role of age and organization tenure. Construction Economics and Building, 21(4), pp. 21-37. ISSN 2204-9029
Dorrah, D H (2024) Development of integrated decision support framework for payment management and negotiation in construction projects. PhD thesis, University of Toronto, Canada.
Dulaimi, M F (2005) The influence of academic education and formal training on the project manager's behavior. Journal of Construction Research, 6(1), pp. 179-193. ISSN 1609-9451
Durham, J and White, R (2015) Collective resilience following mine clearance in Kurdish Iraq. International Journal of Disaster Resilience in the Built Environment, 6(2), pp. 156-167. ISSN 1759-5916
Dutra, Clezio Thadeu de Souza (2016) Sustainable public bidding for engineering works and services. PhD thesis, Universidade Federal Fluminense, Brazil.
Edirisinghe, R; Stranieri, A and Blismas, N (2016) Information visualisation for the wicked problem of safe construction design. Architectural Engineering and Design Management, 12(4), pp. 296-310. ISSN 1745-2007
Edirisinghe, V R D (2023) Framework for improved alternatives dispute resolution practice in the Sri Lankan constructions industry. PhD thesis, Liverpool John Moores University, UK.
Eiris, R (2020) iVisit: Using 360-degree interactive digital sites to practice problem-solving and collaboration within complex spatiotemporal contexts. PhD thesis, University of Florida, USA.
Eissa, R; Eid, M S and Elbeltagi, E (2021) Current applications of game theory in construction engineering and management research: A social network analysis approach. Journal of Construction Engineering and Management, 147(7): 0002085, ISSN 0733-9364
Eissa, R; Nabi, M A and El-Adaway, I H (2024) Risk–reward share allocation under different integrated project delivery relational structures: A monte-carlo simulation and cooperative game theoretic solutions approach. Journal of Construction Engineering and Management, 150(4): 04024013, ISSN 0733-9364
Ekung, S; Okonkwo, C and Nwosu, E (2021) Claims culture and client-contractors' willingness to engage in future projects: A multivariate analysis. African Journal of Built Environment Research, 5(1), pp. 19-40. ISSN 2414-0236
El-Adaway, I H; Abotaleb, I S; Eid, M S; May, S; Netherton, L and Vest, J (2018) Contract administration guidelines for public infrastructure projects in the United States and Saudi Arabia: Comparative analysis approach. Journal of Construction Engineering and Management, 144(6): 04018031, ISSN 0733-9364
El-Adaway, I H and Kandil, A A (2009) Contractors' claims insurance: A risk retention approach. Journal of Construction Engineering and Management, 135(9), pp. 819-825. ISSN 0733-9364
El-Adaway, I H and Kandil, A A (2010) Multiagent system for construction dispute resolution (MAS-COR). Journal of Construction Engineering and Management, 136(3), pp. 303-315. ISSN 0733-9364
El-adaway, I H (2008) Construction dispute mitigation through multi-agent based simulation and risk management modeling. PhD thesis, Iowa State University, USA.
Elder, John (2007) The history of the master builders association of NSW: The first hundred years. PhD thesis, University of Sydney, Australia.
Elhag, T; Eapen, S and Ballal, T (2020) Moderating claims and disputes through collaborative procurement. Construction Innovation, 20(1), pp. 79-95. ISSN 1471-4175
Elsayed, M A A; Lastovets, N; Pistore, L and Pelsmakers, S (2024) Summer-time performance of Finnish housing: Poe of five apartments. International Journal of Building Pathology and Adaptation, 43(8), pp. 1-25. ISSN 2398-4708
Elsherbiny, A (2021) Prediction of design error rework cost in EPC industrial projects. DEng thesis, George Washington University, USA.
Enshassi, A; Mohamed, S and El-Ghandour, S (2009) Problems associated with the process of claim management in Palestine: Contractors' perspective. Engineering, Construction and Architectural Management, 16(1), pp. 61-72. ISSN 0969-9988
Eom, C S J and Paek, J H (2009) Risk index model for minimizing environmental disputes in construction. Journal of Construction Engineering and Management, 135(1), pp. 34-41. ISSN 0733-9364
Eriksson, P E (2010) Partnering: What is it, when should it be used, and how should it be implemented? Construction Management and Economics, 28(9), pp. 905-917. ISSN 1466433X
Esguicero, Fabio Jose (2020) Framework applied to process modeling in municipal management of construction waste. PhD thesis, Universidade Estadual Paulista Júlio de Mesquita Filho, Brazil.
Estrin, J (2017) Impact of leadership strategies on perceived climate of safety at the construction job site. PhD thesis, Nova Southeastern University, USA.
Everett, J G; Halkali, H and Schlaff, T G (1998) Time-lapse video applications for construction project management. Journal of Construction Engineering and Management, 124(3), pp. 204-209. ISSN 0733-9364
Eyiah-Botwe, E (2017) Development of a sustainable stakeholder management framework for construction projects in Ghana. PhD thesis, University of Johannesburg, South Africa.
Ezulike, E I and Hoare, D J (1998) The need for education in alternative dispute resolution (ADR) in the construction industry. Engineering, Construction and Architectural Management, 5(2), pp. 144-149. ISSN 0969-9988
Fadnavis, Aishwarya Sunil (2026) An integrated coordination framework for construction procurement: Examining early supplier involvement through agent-based modeling. PhD thesis, University of Washington, USA.
Faheem Haider, M.; Aslam, M.; Khan, R. W. A. and Malik, M. S. A. (2026) Exploring the factors to improve complaint management system in building management through a case study. International Journal of Construction Management, 26(9), pp. 1777-1798. ISSN 1562-3599
Faircloth, Adam D (2022) Development of a non-destructive evaluation system for mass timber panels. MPhil thesis, Griffith University, Australia.
Fan, S L (2012) Modified time impact analysis method. Journal of Construction Engineering and Management, 138(2), pp. 227-233. ISSN 0733-9364
Faraji, A; Homayoon Arya, S; Ghasemi, E; Rashidi, M; Perera, S; Tam, V and Rahnamayiezekavat, P (2024) A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts. Construction Innovation, 24(1), pp. 384-406. ISSN 1471-4175
Faraziera, M R; Emma, M N and Jamaluddin, Y (2010) Legal issues of partnering in construction industry: Malaysia contract law system. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Fares, A; Elazouni, A and Al-Alawi, M (2025) Using game theory to negotiate win-win payment terms between contractors and subcontractors. Journal of Construction Engineering and Management, 151(5): 04025023, ISSN 0733-9364
Farias, Izaura Pereira (2014) Proposal of a construction waste management model for the eastern zone of the city of Teresina, Piauí. PhD thesis, Universidade Estadual Paulista Júlio de Mesquita Filho, Brazil.
Farmer, H K (2003) Managing maintenance of multiple domestic accommodation. PhD thesis, Loughborough University, UK.
Fatokun, A O (2018) Value for money integration in the renegotiation of public private partnership road projects. PhD thesis, University of Central Lancashire, UK.
Fedoruk, L E; Cole, R J; Robinson, J B and Cayuela, A (2015) Learning from failure: Understanding the anticipated-achieved building energy performance gap. Building Research & Information, 43(6), pp. 750-763. ISSN 0961-3218
Feldbauer, R R (2019) Mindful project management: a framework to enhance underperformance managing large hospital builds by incorporating principles adapted from High Reliability Organizations. PhD thesis, University of Liverpool, UK.
Fenn, P; Lowe, D and Speck, C (1997) Conflict and dispute in construction. Construction Management and Economics, 15(6), pp. 513-518. ISSN 01446193
Ferreira, Tiago de Vasconcelos Gonçalves (2025) High-resolution dynamic model integrated with BIM for performance evaluation in building water distribution systems. PhD thesis, Universidade de São Paulo, Brazil.
Finch, E (1992) Environmental assessment of construction projects. Construction Management and Economics, 10(1), pp. 5-18. ISSN 01446193
Finke, M R (1998) A better way to estimate and mitigate disruption. Journal of Construction Engineering and Management, 124(6), pp. 490-497. ISSN 0733-9364
Fischer, K; Leidel, K; Riemann, A and Alfen, H W (2010) An integrated risk management system (IRMS) for PPP projects. Journal of Financial Management of Property and Construction, 15(3), pp. 260-282. ISSN 1366-4387
Fisher, W H (2017) The use of arbitration in the construction industry in England and Wales: an evaluation of its continuing role following the Arbitration Act 1996. PhD thesis, University of Wolverhampton, UK.
Fletcher, S M; Gunning, J G and Coates, R (2014) Soft skills of senior contracts managers in Northern Ireland. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(1), pp. 35-45. ISSN 17514304
Forcada, N; Macarulla, M; Gangolells, M and Casals, M (2016) Handover defects: Comparison of construction and post-handover housing defects. Building Research & Information, 44(3), pp. 279-288. ISSN 0961-3218
Forcada, N; Macarulla, M and Love, P E D (2013) Assessment of residential defects at post-handover. Journal of Construction Engineering and Management, 139(4), pp. 372-378. ISSN 0733-9364
Forman, M and Haugbølle, K (2009) Arbitration and expert appraisals of defects in construction: What do companies learn? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Fox, J V S (2014) Incentives and limits in letters of intent: Are they worth the paper they're written on? International Journal of Law in the Built Environment, 6(3), pp. 214-232. ISSN 1756-1450
Francart, N; Höjer, M; Mjörnell, K; Orahim, A S; von Platten, J and Malmqvist, T (2020) Sharing indoor space: Stakeholders' perspectives and energy metrics. Buildings & Cities, 1(1), pp. 70-85. ISSN 2632-6655
Frei, M (2021) Data-driven building retrofit using a wireless sensor network. DSc thesis, ETH Zürich, Switzerland.
Fu, Y and Zhang, S (2015) The interaction of trust and contractual governance on dispute negotiation strategy in contractor-subcontractor relationships. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Gad, G M (2012) Effect of culture, risk, and trust on the selection of dispute resolution methods in international construction contracts. PhD thesis, Iowa State University, USA.
Gajpal, Y; Islam, M A and Elazouni, A (2026) Towards competitive contractors' bids: Optimizing selections of subcontractors and payment lags using branch and bound algorithm. Construction Management and Economics, 44(4), pp. 260-278. ISSN 0144-6193
Galaitsi, S E; Rand, K; Yeates, E; Talbot, C; O'Donnell, A; Pinigina, E and Linkov, I (2023) Stakeholder collaboration in the forecast-informed reservoir operations (firo) pilot project at lake mendocino, California. Built Environment Project and Asset Management, 13(6), pp. 880-895. ISSN 2044-124X
Gall, G (2012) Industrial conflict in the engineering construction industry in Britain. Construction Management and Economics, 30(7), pp. 535-544. ISSN 1466433X
Gan, X; Jia, J; Le, Y; Liu, T and Xue, Y (2025) Mitigating the aftermath of relationship conflict between the owners and contractors: A contract enforcement approach. Engineering, Construction and Architectural Management, 32(8), pp. 4949-4968. ISSN 0969-9988
Gao, Y (2018) Effects of interdependence asymmetry of parties in construction conflicts. PhD thesis, University of Hong Kong, Hong Kong.
Gardiner, P D and Simmons, J E L (1995) Case explorations in construction conflict management. Construction Management and Economics, 13(3), pp. 219-234. ISSN 01446193
Gatley, D (2004) A critical examination of building contracts in New Zealand: an investigation into the types of building contracts employed ; their formation and administration ; and into the incidence, nature and resolution of disputes resulting from their usage ; in the commercial and residential sectors of the construction industry in New Zealand. PhD thesis, RMIT University, Australia.
Gebken, Richard John (2006) Quantification of transactional dispute resolution costs for the U.S. Construction industry. PhD thesis, University of Texas at Austin, USA.
Gebken II, R J (2006) Quantification of transactional dispute resolution costs for the United States construction industry. PhD thesis, University of Texas at Austin, USA.
Gee, S (2019) The development of an innovative, lean, mobile factory system to manufacture timber frame closed panels in temporary locations for use in the Assembly of Houses in the Affordable Rented Sector. PhD thesis, University of Liverpool, UK.
Georg, S and Tryggestad, K (2009) On the emergence of roles in construction: The qualculative role of project management. Construction Management and Economics, 27(10), pp. 969-981. ISSN 1466433X
Gerstenberger, A J (2021) Modeling the likelihood of construction incidents using public data. EdD thesis, Teachers College, Columbia University, USA.
Gharouni Jafari, K and Noorzai, E (2021) Selecting the most appropriate project manager to improve the performance of the occupational groups in road construction projects in warm regions. Journal of Construction Engineering and Management, 147(10): 04021131, ISSN 0733-9364
Ghosh, S; Kochhar, K; Sharma, A; Kaushal, S; Agrawal, J; Garg, A; Kumar, A and Dugar, Y (2016) Investigating structure generated turbulence using an unmanned aerial vehicle: A prelude to optimal ventilation strategies in India's upcoming smart cities. Smart and Sustainable Built Environment, 5(4), pp. 372-392. ISSN 2046-6099
Gibbs, D-J (2017) Development of building information models (BIM) to support innovative time management and delay analysis. EngD thesis, Loughborough University, UK.
Gibson-Graham, J K; Hill, A and Law, L (2016) Re-embedding economies in ecologies: Resilience building in more than human communities. Building Research & Information, 44(7), pp. 703-716. ISSN 0961-3218
Gill, A; Gray, J; Skitmore, M and Callaghan, S (2015) Comparison of the effects of litigation and adr in South-East Queensland. International Journal of Construction Management, 15(3), pp. 254-263. ISSN 1562-3599
Goins, J and Moezzi, M (2013) Linking occupant complaints to building performance. Building Research & Information, 41(3), pp. 361-372. ISSN 0961-3218
Goodess, C; Berk, S; Ratna, S B; Brousse, O; Davies, M; Heaviside, C; Moore, G and Pineo, H (2021) Climate change projections for sustainable and healthy cities. Buildings & Cities, 2(1), pp. 812-836. ISSN 2632-6655
Gormley-Gallagher, A.; Amezaga, J.; Shucksmith, J.; Savic, D.; Templeton, M.; McAdam, E. and Jeffrey, P. (2015) Briefing: Negotiating value at the research-practice interface in the water sector. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(1), pp. 8-11. ISSN 1751-4304
Gorse, C A (2003) Conflict and conflict management in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Gorse, C A; Ellis, R and Hudson-Tyreman, A (2005) Prospective delay analysis and adjudication. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Gorse, C A; Emmitt, S and Lowis, M (1999) Problem solving and appropriate communication medium. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Gorse, C A; Emmitt, S; Lowis, M and Howarth, A (2000) A critical examination of methodologies for studying human communication in the construction industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Gould, N (1998) Alternative dispute resolution in the UK construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Gould, N and King, C (2010) The mediation of construction disputes: Recent research. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(1), pp. 29-39. ISSN 17514312
Graham, P; McFarlane, K and Taheri, M (2025) Developing criteria for effective building-sector commitments in nationally determined contributions. Buildings & Cities, 6(1), pp. 695-712. ISSN 2632-6655
Greeff, T N (2018) Justification for the recognition of a new nominate contract based on project defect management. LLD thesis, University of Pretoria, South Africa.
Gregory-Stevens, J; Frame, I and Henjewele, C (2016) Mediation in construction disputes in England. International Journal of Law in the Built Environment, 8(2), pp. 123-136. ISSN 1756-1450
Grinnell, R C (2017) Recipes for low carbon, adaptable design. PhD thesis, Loughborough University, UK.
Grosse, H (2015) Trust and construction projects: An auto-ethnographic exploration. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Grosse, H (2016) The insider's perspective -auto-ethnography in the construction industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Gruen, A; Behnisch, M and Kohler, N (2009) Perspectives in the reality-based generation, nD modelling, and operation of buildings and building stocks. Building Research & Information, 37(5-6), pp. 503-519. ISSN 0961-3218
Grytnes, R; Tutt, D E and Andersen, L P S (2020) Developing safety cooperation in construction: Between facilitating independence and tightening the grip. Construction Management and Economics, 38(11), pp. 977-992. ISSN 01446193
Grzeszczyk, G; Unterhitzenberger, C; Abdelmegid, M and Sainati, T (2025) Beyond guesswork: Predicting project delays and timelines with a forward-looking risk-adjusted approach. Construction Management and Economics, 43(12), pp. 1045-1059. ISSN 0144-6193
Gul, S (2012) The role of conflict & negotiation in the complexity of projects. PhD thesis, University of Southampton, UK.
Gunarathna, C; Yang, R J and Fernando, N (2018) Conflicts and management styles in the Sri Lankan commercial building sector. Engineering, Construction and Architectural Management, 25(2), pp. 178-201. ISSN 0969-9988
Gunduz, M and Elsherbeny, H A (2020) Critical assessment of construction contract administration using fuzzy structural equation modeling. Engineering, Construction and Architectural Management, 27(6), pp. 1233-1255. ISSN 0969-9988
Gunduz, M and Elsherbeny, H A (2021) Critical assessment of contract administration using multidimensional fuzzy logic approach. Journal of Construction Engineering and Management, 147(2): 04020162, ISSN 0733-9364
Guo, W.; Fang, D.; Lu, W. and Tan, Y. (2026) The ups and downs of collaboration: Investigating the u-curve between interorganizational routines and conflict resolution behaviors. Journal of Construction Engineering and Management, 152(10): 04026169, ISSN 0733-9364
Guo, S J (2002) Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering and Management, 128(4), pp. 287-295. ISSN 0733-9364
Guo, X (2008) Pricing and financing roads in transportation networks. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Gurgun, A P and Koc, K (2022) Administrative risks challenging the adoption of smart contracts in construction projects. Engineering, Construction and Architectural Management, 29(2), pp. 989-1015. ISSN 0969-9988
Gurgun, A P and Koc, K (2023) The role of contract incompleteness factors in project disputes: A hybrid fuzzy multi-criteria decision approach. Engineering, Construction and Architectural Management, 30(9), pp. 3895-3926. ISSN 0969-9988
Gustavsson, T K (2018) Liminal roles in construction project practice: Exploring change through the roles of partnering manager, building logistic specialist and BIM coordinator. Construction Management and Economics, 36(11), pp. 599-610. ISSN 01446193
Gómez-Chaparro, M; García-Sanz-Calcedo, J and Aunión-Villa, J (2020) Maintenance in hospitals with less than 200 beds: Efficiency indicators. Building Research & Information, 48(5), pp. 526-537. ISSN 0961-3218
Götze, V; Gerber, J D and Jehling, M (2024) Mapping municipal land policies: Applications of flexible zoning for densification. Buildings & Cities, 5(1), pp. 506-520. ISSN 2632-6655
Habib, S N H A (2017) Critical success factors and contractual risks for Private Finance 2 (PF2) projects implementing building information modelling (BIM). PhD thesis, University of Salford, UK.
Hadikusumo, B H W and Tobgay, S (2015) Construction claim types and causes for a large-scale hydropower project in Bhutan. Journal of Construction in Developing Countries, 20(1), pp. 49-63. ISSN 1823-6499
Haji Abdullah, M A b (2015) An investigation of the development of mediation in the UK construction industry. PhD thesis, University of Manchester, UK.
Halder, A. (2026) Modeling critical driving factors of stakeholder integration and their influences on construction megaproject performance: A regression-based analysis. Journal of Engineering, Design and Technology, 24(1), pp. 213-241. ISSN 1726-0531
Halligan, D W; Hester, W T and Thomas, H R (1987) Managing unforeseen site conditions. Journal of Construction Engineering and Management, 113(2), pp. 273-287. ISSN 0733-9364
Hammad, M M (2001) CPDICenter: Web-based virtual construction project document information center in support of claims preparation. PhD thesis, Concordia University, Canada.
Hamza, A (2002) Partnering in the construction industry: an empirical investigation into the critical success factors. PhD thesis, Nottingham Trent University, UK.
Han, W N; Tao, Y H; Zhu, J S; Wang, D W and Yang, R P (2026) Terrestrial laser scan planning for bridge structures at complex sites. Journal of Construction Engineering and Management, 152(2): 04025241, ISSN 0733-9364
Haniff, A and Ogunlana, S O (2015) Strategic alignment within a TMO: Perceptions of project success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364
Harmon, K M J (2003) Effectiveness of dispute review boards. Journal of Construction Engineering and Management, 129(6), pp. 674-679. ISSN 0733-9364
Harmon, K M J (2003) Dispute review boards and construction conflicts: Attitudes and opinions of construction industry members. PhD thesis, Nova Southeastern University, USA.
Harode, A; Thabet, W and Leite, F (2024) Formulation of feature and label space using modified Delphi in support of developing a machine-learning algorithm to automate clash resolution. Journal of Construction Engineering and Management, 150(3): 04023173, ISSN 0733-9364
Harran, M and Theunissen, H W (2019) Navigating the engineering literacy divide: design report collaboration practice realities. Journal of Engineering, Design and Technology, 17(1), pp. 77-101. ISSN 1726-0531
Hartman, F T (1993) Construction dispute reduction through an improved contracting process in the Canadian context. PhD thesis, Loughborough University, UK.
Hartmann, T (2011) Goal and process alignment during the implementation of decision support systems by project teams. Journal of Construction Engineering and Management, 137(12), pp. 1134-1141. ISSN 0733-9364
Harty, C (2005) Innovation in construction: A sociology of technology approach. Building Research & Information, 33(6), pp. 512-522. ISSN 0961-3218
Harty, C (2008) Implementing innovation in construction: Contexts, relative boundedness and actor-network theory. Construction Management and Economics, 26(10), pp. 1029-1041. ISSN 1466433X
Harty, C and Tryggestad, K (2012) The roles of representations in building design: Materiality and visualization. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Harty, C; Tryggestad, K and Jacobsen, P H (2015) Visualisations and calculations of spaces: Negotiating hospital design during on-boarding. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Hasannejad, A; Sardrud, J M and Shirzadi Javid, A A (2023) BIM-based clash detection improvement automatically. International Journal of Construction Management, 23(14), pp. 2431-2437. ISSN 1562-3599
Hassan, T M and McCaffer, R (2003) Virtual Enterprises in Construction: ICT, Social and Legal Dimensions. Journal of Construction Procurement, 9(1), ISSN 1358-9180
Hassanain, M A (2007) Post-occupancy indoor environmental quality evaluation of student housing facilities. Architectural Engineering and Design Management, 3(4), pp. 249-256. ISSN 1745-2007
He, C (2018) Public procurement: award mechanisms and implementation process. PhD thesis, Loughborough University, UK.
Heaphy, I (2013) NEC versus fidic. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 21-30. ISSN 17514304
Hijazi, A A; Perera, S; Calheiros, R N and Alashwal, A (2021) Rationale for the integration of BIM and blockchain for the construction supply chain data delivery: A systematic literature review and validation through focus group. Journal of Construction Engineering and Management, 147(10): 03121005, ISSN 0733-9364
Hill, C (2010) The concerns of health, safety and welfare within the tri-partite relationship surrounding work placement for construction. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Hinze, J; Hirakawa, J and Benjamin, N (1989) Comparison of labor agreements. Journal of Construction Engineering and Management, 115(1), pp. 90-107. ISSN 0733-9364
Ho, S P and Liu, L Y (2002) An option pricing-based model for evaluating the financial viability of privatized infrastructure projects. Construction Management and Economics, 20(2), pp. 143-156. ISSN 01446193
Ho, S P and Liu, L Y (2004) Analytical model for analyzing construction claims and opportunistic bidding. Journal of Construction Engineering and Management, 130(1), pp. 94-104. ISSN 0733-9364
Hoezen, M; Voordijk, H and Dewulf, G (2012) Contracting dynamics in the competitive dialogue procedure. Built Environment Project and Asset Management, 2(1), pp. 6-24. ISSN 2044-124X
Hoezen, Mieke (2012) The competitive dialogue procedure: Negotiations and commitment in inter-organisational construction projects. PhD thesis, University of Twente, Netherlands.
Hofstetter, M (2024) Community, markets, and conviviality : A political ecology of rural water supply. PhD thesis, Wageningen University and Research, Netherlands.
Hogan, J M (1983) The "great debate" over Panama: An analysis of controversy over the Carter-Torrijos Treaties of 1977. PhD thesis, University of Wisconsin - Madison, USA.
Hong, X and Proverbs, D (2003) Contractor relationships: A comparison in Japan, the UK and the US. Journal of Construction Procurement, 9(2), pp. 52-64. ISSN 1358-9180
Hooko, D K (1999) The private urban residential development process in Tamale, Ghana: an application of structure and agency institutionalism. PhD thesis, University of Aberdeen, UK.
Horgan, I (2014) The influence of an online collaboration tool on relationships in inter-organisational networks. PhD thesis, Victoria University, Australia.
Hosseini, A (2019) Data-driven modeling of in-service performance of flexible pavements, using life-cycle information. PhD thesis, Temple University, USA.
Howieson, J (2011) Adr for a built environment interdiscipline: Curriculum and practical applications. International Journal of Law in the Built Environment, 3(1), pp. 11-23. ISSN 1756-1450
Hu, H and Zhu, Y (2015) Social welfare-based concession model for build/operate/transfer contracts. Journal of Construction Engineering and Management, 141(1): 04014064, ISSN 0733-9364
Hu, Y; Castro-Lacouture, D; Eastman, C M and Navathe, S B (2021) Component change list prediction for BIM-based clash resolution from a graph perspective. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364
Huang, B (2017) A hierarchical multi-stakeholder principal-agent model for (anti-) corruption in public infrastructure procurement. PhD thesis, Cornell University, USA.
Huang, H; Zhang, C and Hammad, A (2021) Effective scanning range estimation for using tls in construction projects. Journal of Construction Engineering and Management, 147(9): 04021106, ISSN 0733-9364
Huang, J (2025) Structure-aware 3D building reconstruction. PhD thesis, Delft University of Technology, Netherlands.
Hugill, D (1999) Negotiating access: Presenting a credible project. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Hugill, D J (2001) An examination of project management team meetings in railway construction. PhD thesis, University of Manchester, UK.
Hunte, R S (2012) "My walk has never been average": Black tradeswomen negotiating intersections of race and gender in long-term careers in the U.S. building trades. PhD thesis, University of Manitoba, Canada.
Ibbs, C W (1985) Product specification practices and problems. Journal of Construction Engineering and Management, 111(2), pp. 157-172. ISSN 0733-9364
Ibbs, W (2005) Impact of change's timing on labor productivity. Journal of Construction Engineering and Management, 131(11), pp. 1219-1223. ISSN 0733-9364
Ibn Majdoub Hassani, Z; El Barkany, A; Jabri, A; El Abbassi, I and Darcherif, A M (2020) Hybrid approach for solving the integrated planning and scheduling production problem. Journal of Engineering, Design and Technology, 18(1), pp. 172-189. ISSN 1726-0531
Ibrahim, Y M; Kaka, A P; Aouad, G and Kagioglou, M (2008) As-built documentation of construction sequence by integrating virtual reality with time-lapse movies. Architectural Engineering and Design Management, 4(2), pp. 73-84. ISSN 1745-2007
Illankoon, I M C S; Tam, V W Y; Le, K N and Ranadewa, K A T O (2022) Causes of disputes, factors affecting dispute resolution and effective alternative dispute resolution for Sri Lankan construction industry. International Journal of Construction Management, 22(2), pp. 218-228. ISSN 1562-3599
Ilter, D (2012) Identification of the relations between dispute factors and dispute categories in construction projects. International Journal of Law in the Built Environment, 4(1), pp. 45-59. ISSN 1756-1450
Inácio, M F M (1999) The building deconstruction process and the debris trail: towards a dynamic model. PhD thesis, University of Salford, UK.
Ismail, S (2013) Analyzing coordination function within a governance structure: Evidence from case studies of selected housing projects in Malaysia. PhD thesis, University of Malaya, Malaysia.
Ismail, S and Haris, F A (2014) Constraints in implementing public private partnership (PPP) in Malaysia. Built Environment Project and Asset Management, 4(3), pp. 238-250. ISSN 2044-124X
Ismail, Z-A (2017) Maintenance management system (MMS) to support facilities management at Malaysian polytechnic. Smart and Sustainable Built Environment, 6(1), pp. 19-33. ISSN 2046-6099
Ittmann, J T (2020) Liability of the structural engineer: Establishing, quantifying, and managing risks. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Ivanoff, D J and Diekmann, J E (1989) Project-labor agreements in construction industry. Journal of Construction Engineering and Management, 115(4), pp. 567-584. ISSN 0733-9364
Jackson, J T (1990) Technical specifications' effect on construction. Journal of Construction Engineering and Management, 116(3), pp. 463-467. ISSN 0733-9364
Jackson, R M (1981) "A right to a job": A sociological history of carpentry and printing craft labor markets in the United States. PhD thesis, University of California, Berkeley, USA.
Jadhav, Ajay (2023) Development of scope of services for procurement of professional consultant services on transportation projects: A study of South carolina department of transportation. PhD thesis, Clemson University, USA.
Jafari, D M (2012) Resolution of multiparty construction disputes under the Singapore international arbitration legal framework. PhD thesis, National University of Singapore, Singapore.
Jagannathan, M and Delhi, V S K (2022) Identifying focus areas to decode the decision to litigate contractual disputes in construction. Engineering, Construction and Architectural Management, 29(8), pp. 2976-2998. ISSN 0969-9988
Jagannathan, M and Delhi, V S K (2023) Decoding a construction organisation's tendency to litigate: An understanding through financial statements. Built Environment Project and Asset Management, 13(3), pp. 453-470. ISSN 2044-124X
Jagannathan, Murali; Malla, Vijayeta; Delhi, Venkata Santosh Kumar and Renganaidu, Venkatesan (2025) Application of lean for early identification and avoidance of disputes in construction projects. Construction Innovation, 25(6), pp. 1752-1773. ISSN 1471-4175
Jagboro, G O and Alli, O R (1999) A study of the monetary value of extension of time in building project. Journal of Financial Management of Property and Construction, 4(3), pp. 39-46. ISSN 1366-4387
Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.
James, Ian E (2005) A study of ethical responses to contemporary cultural influences in the workplace: In particular the construction industry in Queensland with implications for vocational education and training. PhD thesis, Griffith University, Australia.
Jang, W; Yu, G; Jung, W; Kim, D and Han, S H (2018) Financial conflict resolution for public-private partnership projects using a three-phase game framework. Journal of Construction Engineering and Management, 144(3): 05017022, ISSN 0733-9364
Jarrouje, S; Lu, S L and Sexton, M (2024) Entrenched intransigence or emancipated enlightenment? Building or destroying something within the spotlight of conflict. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Javed, A A; Lam, P T I and Chan, A P C (2014) Change negotiation in public-private partnership projects through output specifications: An experimental approach based on game theory. Construction Management and Economics, 32(4), pp. 323-348. ISSN 01446193
Jayasinghe, H M; Sandanayake, Y G and Jayasinghe, R (2026) Managing conflicts in joint venture contracts in infrastructure construction projects in Sri Lanka. Built Environment Project and Asset Management, 16(2), pp. 415-436. ISSN 2044-124X
Jefferies, M; Brewer, G J and Gajendran, T (2014) Using a case study approach to identify critical success factors for alliance contracting. Engineering, Construction and Architectural Management, 21(5), pp. 465-480. ISSN 0969-9988
Jeffrey, J H (2010) Recurrent problems in the construction process: an action research study of the design and construction quality of hospital en-suites. PhD thesis, University of Salford, UK.
Jergeas, G F and Revay, S O (1993) Quantifying construction claims using the differential cost method. Construction Management and Economics, 11(2), pp. 163-166. ISSN 01446193
Jeschke, K N; Waldorff, S B; Dyreborg, J; Kines, P and Ajslev, J Z N (2021) Complaining about occupational safety and health: A barrier for collaboration between managers and workers on construction sites. Construction Management and Economics, 39(6), pp. 459-474. ISSN 01446193
Jezzini, Y; Assaad, R H and El-Adaway, I H (2025) Risk allocation model for price escalations in construction projects: Integrating bargaining game theory and probabilistic Bayesian modeling. Journal of Construction Engineering and Management, 151(9): 04025134, ISSN 0733-9364
Ji, A; Xue, X; Zhang, L; Luo, X and Man, Q (2025) A transformer-based deep learning method for automatic pixel-level crack detection and feature quantification. Engineering, Construction and Architectural Management, 32(4), pp. 2455-2486. ISSN 0969-9988
Jiang, A (2005) A decision support model for cost and activity-based performance measurement in steel construction. PhD thesis, University of Florida, USA.
Jiang, A (2012) Negotiating construction contracts through practical cash flow planning and analysis model. International Journal of Construction Management, 12(2), pp. 23-33. ISSN 1562-3599
Jiang, Y (2020) Determination of elevations for excavation operations using drone technologies. PhD thesis, Marquette University, USA.
Jin, H; Liu, S; Li, J and Liu, C (2020) A game-theoretic approach to developing a concession renegotiation framework for user-pays PPPs. International Journal of Construction Management, 20(6), pp. 642-652. ISSN 1562-3599
Joao, Z R (2021) Road construction assessment model (RC-AM) to prevent contract overbilling in Angola. PhD thesis, George Washington University, USA.
Johansen, A (2021) Influence of risk assessment on perceptions of contract negotiation and fraud prevention. DBA thesis, Capella University, USA.
Johansen, K W; Hong, K; Schultz, C and Teizer, J (2024) Automated quantification of construction workers’ exposure to falling object hazards. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 207-222. ISSN 17514304
Johari, S and Jha, K N (2020) Challenges of attracting construction workers to skill development and training programmes. Engineering, Construction and Architectural Management, 27(2), pp. 321-340. ISSN 0969-9988
Jones, K; Mosca, L; Whyte, J; Davies, A and Glass, J (2022) Addressing specialization and fragmentation: Product platform development in construction consultancy firms. Construction Management and Economics, 40(11-12), pp. 918-933. ISSN 01446193
Jones III, R C (1991) An economic analysis of national society of professional engineers versus United States. PhD thesis, University of California, Los Angeles, USA.
Jowitt, P W (1978) Decision-making in civil engineering systems. PhD thesis, Imperial College London, UK.
Juan, C and Olmos, F (2019) Public-private equity joint ventures and risk transfers in motorways of the sea. Built Environment Project and Asset Management, 9(5), pp. 669-682. ISSN 2044-124X
Jupp, B C (2003) Forecasting value in building projects. PhD thesis, Loughborough University, UK.
Kadefors, A (2005) Fairness in interorganizational project relations: Norms and strategies. Construction Management and Economics, 23(8), pp. 871-878. ISSN 01446193
Kaewsri, N and Tongthong, T (2014) Favorable female attributes in relation to career challenges of women engineers in the Thai construction industry. International Journal of Construction Education and Research, 10(3), pp. 222-236. ISSN 1557-8771
Kahvandi, Z; Melhado, S and Viana, M L (2023) Solutions to overcome integrated project delivery implementation barriers: A meta-synthesis approach. Journal of Construction in Developing Countries, 28(1), pp. 63-89. ISSN 1823-6499
Kaiser, M J and Lledare, W O (2006) The gulf of Mexico decommissioning market. Journal of Construction Engineering and Management, 132(8), pp. 815-826. ISSN 0733-9364
Kamara, J M; Anumba, C J and Evbuomwan, N F O (2000) Establishing and processing client requirements: A key aspect of concurrent engineering in construction. Engineering, Construction and Architectural Management, 7(1), pp. 15-28. ISSN 0969-9988
Kamat, K J (2003) Decision making and negotiation: Establishing social order on a construction site. PhD thesis, University of Birmingham, UK.
Kamel, M; Khallaf, R and Nosaier, I (2023) Net present value-time curve behaviour of public private partnership projects. International Journal of Construction Management, 23(11), pp. 1924-1931. ISSN 1562-3599
Kangari, R (1995) Construction documentation in arbitration. Journal of Construction Engineering and Management, 121(2), pp. 201-208. ISSN 0733-9364
Kangari, R (1995) Risk management perceptions and trends of U.S. Construction. Journal of Construction Engineering and Management, 121(4), pp. 422-429. ISSN 0733-9364
Karaz, Mahmoud Abdel Fattah Abdel Athim (2024) Construction waste management model for contractors using lean and BIM tools. PhD thesis, Universidade do Minho, Portugal.
Kashiwagi, K; Rubin, R A and Harris, M R (1988) Construction law and practice in Japan. Journal of Construction Engineering and Management, 114(1), pp. 104-113. ISSN 0733-9364
Kassab, M; Hegazy, T and Hipel, K (2010) Computerized DSS for construction conflict resolution under uncertainty. Journal of Construction Engineering and Management, 136(12), pp. 1249-1257. ISSN 0733-9364
Kassab, M; Hipel, K and Hegazy, T (2006) Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132(10), pp. 1043-1052. ISSN 0733-9364
Kassem, M; Dawood, N and Mitchell, D (2012) A decision support system for the selection of curtain wall systems at the design development stage. Construction Management and Economics, 30(12), pp. 1039-1053. ISSN 1466433X
Kavaarpuo, G; Tiwari, P and Martel, A (2026) Transaction costs and innovation outcomes: Lessons from early adopters of housebuilding innovations. Construction Innovation, 26(1), pp. 236-259. ISSN 1471-4175
Kendir-Beraha, Elif (2015) Learning from the construction site: An epistemological investigation of stonemasons and architects in action. PhD thesis, RMIT University, Australia.
Kennedy, P and Milligan, J L (2000) Cost of the adjudication process in the UK since the introduction of the Housing Grants, Construction and Regeneration Act 1996. Journal of Financial Management of Property and Construction, 5(3), pp. 171-180. ISSN 1366-4387
Kennedy, P; Morrison, A and Milne, D O (1997) Resolution of disputes arising from set-off clauses between main contractors and subcontractors. Construction Management and Economics, 15(6), pp. 527-537. ISSN 01446193
Khadour, L and Darkwa, J (2008) Tqem in the UK construction industry: Some key findings from a survey. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Khalid, M A; Hassan, M U; Ullah, F and Ahmed, K (2025) Integrated building information modeling and blockchain system for decentralized progress payments in construction projects. Journal of Engineering, Design and Technology, 23(5), pp. 1770-1796. ISSN 1726-0531
Khalilzadeh, M; Kebriyaii, O and Rezaei, R (2023) Identification and selection of stakeholder engagement strategies: Case study of an Iranian oil and gas construction project. International Journal of Construction Management, 23(3), pp. 484-494. ISSN 1562-3599
Khallaf, R (2016) Interactional risks associated with parties to a PPP project. PhD thesis, Purdue University, USA.
Khawaja, E U R and Mustapha, A (2021) Mitigating disputes and managing legal issues in the era of building information modelling. Journal of Construction in Developing Countries, 26(1), pp. 111-130. ISSN 1823-6499
Khazaeni, G and Khazaeni, A (2026) Multi-objective optimal allocation of construction project risks, ant colony optimization algorithm. International Journal of Building Pathology and Adaptation, 44(1), pp. 208-222. ISSN 2398-4708
Khoza, R B M (2021) Performance measurements on concession periods to forecast water infrastructure investment returns. PhD thesis, Walden University, USA.
Khurana, M; Garvin, M J and Mahalingam, A (2022) Synthesis of relational practices for PPP contracts and their linkage with governance mechanisms. Journal of Construction Engineering and Management, 148(12): 04022131, ISSN 0733-9364
Khurana, Mayank (2021) Investigation of contractual specification and implementation of relational approaches in public private partnership (PPP) projects. PhD thesis, Virginia Tech, USA.
Khurshid, M B (2010) A framework for establishing optimal performance thresholds for highway asset interventions. PhD thesis, Purdue University, USA.
Kibert, C J and Fard, M M (2012) Differentiating among low-energy, low-carbon and net-zero-energy building strategies for policy formulation. Building Research & Information, 40(5), pp. 625-637. ISSN 0961-3218
Kim, K (2002) Distributed coordination of project schedule changes: An agent-based compensatory negotiation approach. PhD thesis, Stanford University, USA.
Kim, S Y and Nguyen, V T (2022) Supply chain management in construction: Critical study of barriers to implementation. International Journal of Construction Management, 22(16), pp. 3148-3157. ISSN 1562-3599
Kineber, A F; Oke, A E; Ali, A H; Dosumu, O; Fakunle, K and Olanrewaju, O I (2025) Critical application areas of radio frequency identification (RFID) technology for sustainable construction in developing countries: The case of Nigeria. Journal of Engineering, Design and Technology, 23(3), pp. 895-916. ISSN 1726-0531
Kistler, L (2024) Engineering team success: Evaluating perceptions of teamwork processes and emergent states effects on team outcomes. PhD thesis, Clemson University, USA.
Koch, C (2018) Productivity measurement: The social construction of reduction through expansion. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Koch, C and Thuesen, C (2002) Knowledge management in contractors: Developing communities of practice to support the re-use of knowledge. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Koch, C and Vogelius, P (2006) Evaluation of web and pda-based quality assurance system on a building site. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Koo, H. J.; Guerra, B. C.; Saka, S. and Leite, F. (2026) Streamlining BIM coordination and clash resolution through risk and relevance analysis. Journal of Construction Engineering and Management, 152(7): 04026092, ISSN 0733-9364
Koskela, L (2017) Why is management research irrelevant? Construction Management and Economics, 35(1-2), pp. 4-23. ISSN 01446193
Kosovac, B (2007) A framework for managing information from heterogeneous, distributed, and autonomous sources in the architecture, engineering, construction, and facilities management domain. PhD thesis, University of British Columbia, Canada.
Kulkarni, S S; Chapman, C; Shah, H and Edwards, D J (2018) A computational design method for bio-mimicked horizontal axis tidal turbines. International Journal of Building Pathology and Adaptation, 36(2), pp. 188-209. ISSN 23984708
Kumaraswamy, M M (1998) Industry development through creative project packaging and integrated management. Engineering, Construction and Architectural Management, 5(3), pp. 228-237. ISSN 0969-9988
Kurniawan, F (2013) An integrated project evaluation tool for public-private partnership projects. PhD thesis, Heriot-Watt University, UK.
Kurniawan, F; Ogunlana, S and Motawa, I (2014) Stakeholders' expectations in utilising financial models for public-private partnership projects. Built Environment Project and Asset Management, 4(1), pp. 4-21. ISSN 2044-124X
Kurokawa, M (2015) Tracing client interests in the course of a project: Why are some client interests incorporated whereas others are not? PhD thesis, University of Reading, UK.
Kurokawa, M; Schweber, L and Hughes, W P (2014) Incorporation of different and changing client interests in the course of a project. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Kurokawa, M; Schweber, L and Hughes, W P (2015) Tracing client interests in the course of the project: Why are some client interests incorporated whereas others are not? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Kurokawa, M; Schweber, L and Hughes, W P (2017) Client engagement and building design: The view from actor-network theory. Building Research & Information, 45(8), pp. 910-925. ISSN 0961-3218
Kwawu, W and Hughes, W P (2005) The impact of relational contracting on the construction industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kwawu, W E K and Hughes, W P (2008) Strategies for aligning organizational incentive systems through contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Kwon, N; Park, M; Lee, H S; Ahn, J and Kim, S (2017) Construction noise prediction model based on case-based reasoning in the preconstruction phase. Journal of Construction Engineering and Management, 143(6): 04017008, ISSN 0733-9364
Kwon, N; Song, K; Lee, H S; Kim, J and Park, M (2018) Construction noise risk assessment model focusing on construction equipment. Journal of Construction Engineering and Management, 144(6): 04018034, ISSN 0733-9364
Kwon, T W; Lee, K T; Kim, J H and Kim, J J (2023) Proposal of hierarchical organization structure for negotiation consensus in multinational joint-client megaprojects: Case of us force relocation program in Korea. Journal of Construction Engineering and Management, 149(2): 05022019, ISSN 0733-9364
Kübelböck, G (2013) Constructing a conceptual framework for market intelligence in the European plant building industry. PhD thesis, University of Gloucestershire, UK.
Lam, P T I; Kumaraswamy, M M and Ng, T S T (2003) A comparative study of user perceptions on prescriptive specifications versus performance-based specifications. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Lamirande, M (2023) Exploring practices and understandings of designing inclusively. PhD thesis, Open University, UK.
Lane, P M M (2012) Can construction arbitration learn from adjudication? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(1), pp. 35-39. ISSN 17514312
Lane, P M M and Watson, M J (2010) Effectiveness of dispute adjudication boards, South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 171-177. ISSN 17514312
Larsson, R and Rudberg, M (2019) Impact of weather conditions on in situ concrete wall operations using a simulation-based approach. Journal of Construction Engineering and Management, 145(7): 05019009, ISSN 0733-9364
Laryea, S A and Hughes, W P (2009) Commercial reviews in the tender process of contractors. Engineering, Construction and Architectural Management, 16(6), pp. 558-572. ISSN 0969-9988
Lawani, K; Arias Abad, L A; Craig, N; Hare, B and Cameron, I (2024) Exploring emotional intelligence and conflict management styles in Dominican Republic construction industry. Journal of Engineering, Design and Technology, 22(1), pp. 89-119. ISSN 1726-0531
Le, T. T. D.; Do, S. T.; Tran, C. N. N. and Nguyen, V. T. (2026) Analysis of causal relationships and interactions between barriers to implementing BIM-nd in construction. International Journal of Construction Management, 26(8), pp. 1407-1427. ISSN 1562-3599
Lee, J. S. (2026) Visualising the impact of change orders on productivity in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 134-142. ISSN 1751-4304
Lee, C K; Yiu, T W and Cheung, S O (2021) Predicting intention to use alternative dispute resolution (ADR): An empirical test of theory of planned behaviour (TPB) model. International Journal of Construction Management, 21(1), pp. 27-40. ISSN 1562-3599
Lee, K R and Fenn, P (2007) Investigation of critical factors affecting successful mediation: Korean mediation users perspectives. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Lee, W V and Steemers, K (2017) Exposure duration in overheating assessments: A retrofit modelling study. Building Research & Information, 45(1-2), pp. 60-82. ISSN 0961-3218
Lehtinen, J and Aaltonen, K (2024) Community stakeholders' online engagement in infrastructure projects: a theory-testing single-case study. Construction Management and Economics, 42(8), pp. 758-786. ISSN 01446193
Lehtovaara, J; Seppänen, O and Peltokorpi, A (2022) Improving construction management with decentralised production planning and control: Exploring the production crew and manager perspectives through a multi-method approach. Construction Management and Economics, 40(4), pp. 254-277. ISSN 01446193
Leo, L S; Buccolieri, R and Di Sabatino, S (2018) Scale-adaptive morphometric analysis for urban air quality and ventilation applications. Building Research & Information, 46(8), pp. 931-951. ISSN 0961-3218
Lessani, A (2016) Decision analysis in construction claims. PhD thesis, University of Maryland, College Park, USA.
Leung, M Y and Liu, A M M (2003) Analysis of value and project goal specificity in value management. Construction Management and Economics, 21(1), pp. 11-19. ISSN 01446193
Leung, M-Y (2000) Value Management in construction projects. Unpublished PhD thesis, City University of Hong Kong, Hong Kong.
Leung, M-y and Yu, R K T (2003) An investigation of conflict resolution in the construction industry. Journal of Construction Procurement, 9(1), ISSN 1358-9180
Leung, R H M (2019) How one shall interpret 'spirit of mutual trust and co-operation' in NEC contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 14-20. ISSN 17514304
Lewis, T M (2007) Impact of globalization on the construction sector in developing countries. Construction Management and Economics, 25(1), pp. 7-23. ISSN 1466433X
Leyland, M R (2016) Patronage and the architectural profession: the country house in nineteenth-century Northamptonshire. PhD thesis, University of Leicester, UK.
Li, H X; Nair, S; Li, Y; Yahaya, A; Timms, W and Owolabi, A B (2026) Evaluating energy performance of educational buildings: A case study in Australia. Engineering, Construction and Architectural Management, 33(15), pp. 137-158. ISSN 0969-9988
Li, B (2003) Risk management of construction public private partnership projects. PhD thesis, Glasgow Caledonian University, UK.
Li, H; Arditi, D and Wang, Z (2012) Transaction-related issues and construction project performance. Construction Management and Economics, 30(2), pp. 151-164. ISSN 1466433X
Li, H; Arditi, D and Wang, Z (2014) Transaction costs incurred by construction owners. Engineering, Construction and Architectural Management, 21(4), pp. 444-458. ISSN 0969-9988
Li, J; Mao, L and Cao, J (2025) Process model for claim and payment management in a construction supply chain based on smart contracts. Journal of Construction Engineering and Management, 151(11): 04025172, ISSN 0733-9364
Li, K and Cheung, S O (2016) The potential of bias in multi-tier construction dispute resolution processes. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Li, K and Cheung, S O (2019) Unveiling cognitive biases in construction project dispute resolution through the lenses of third-party neutrals. Journal of Construction Engineering and Management, 145(11): 04019070, ISSN 0733-9364
Li, W (2008) An agent-based negotiation model for the sourcing of construction suppliers. PhD thesis, University of Hong Kong, Hong Kong.
Lima, Rosimeire Midori Suzuki Rosa (2012) Evaluation system of integrated construction and demolition waste management at the municipal level. PhD thesis, Universidade de São Paulo, Brazil.
Lin, S and Cheung, S O (2022) Exploring the concept of psychological distance and its impact on intention to settle in construction dispute negotiation. Journal of Construction Engineering and Management, 148(12): 04022133, ISSN 0733-9364
Lin, S and Cheung, S O (2022) Intention to settle as an indispensable element of negotiated construction dispute settlement. Journal of Construction Engineering and Management, 148(10): 04022113, ISSN 0733-9364
Lin, S and Cheung, S O (2025) What organizational justice brings to project dispute negotiation. Journal of Construction Engineering and Management, 151(4): 04025015, ISSN 0733-9364
Ling, F Y Y and Ng, W T (2011) Boosting performance of road infrastructure: A case study based on motorist satisfaction in Singapore. Built Environment Project and Asset Management, 1(2), pp. 211-225. ISSN 2044-124X
Lingard, H and Oswald, D (2020) Safety at the front line: Social negotiation of work and safety at the principal contractor-subcontractor interface. Journal of Construction Engineering and Management, 146(4): 04020024, ISSN 0733-9364
Lingard, H; Wakefield, R and Walker, D (2020) The client's role in promoting work health and safety in construction projects: Balancing contracts and relationships to effect change. Construction Management and Economics, 38(11), pp. 993-1008. ISSN 01446193
Liou, F M and Huang, C P (2008) Automated approach to negotiations of BOT contracts with the consideration of project risk. Journal of Construction Engineering and Management, 134(1), pp. 18-24. ISSN 0733-9364
Liou, F M; Yang, C H; Chen, B and Chen, W (2011) Identifying the Pareto-front approximation for negotiations of BOT contracts with a multi-objective genetic algorithm. Construction Management and Economics, 29(5), pp. 535-548. ISSN 1466433X
Liu, G.; Qin, Z.; Wu, H.; Jia, L. and Zhuo, J. (2026) Optimizing process efficiency in prefabricated building supply chain: The role of hybrid governance behaviors in reducing transaction costs. Engineering, Construction and Architectural Management, 33(5), pp. 3820-3842. ISSN 0969-9988
Liu, W; Feng, Z and Luo, X (2026) Study of a risk-sharing mechanism in a prefabricated building project supply chain. Journal of Construction Engineering and Management, 152(6): 04026063, ISSN 0733-9364
Liu, C; Cao, J; Duan, K and Wu, G (2023) Effect of network position on inter-team conflict and project success in megaprojects. Engineering, Construction and Architectural Management, 30(10), pp. 4955-4977. ISSN 0969-9988
Liu, C; González, V A; Lee, G; Cabrera-Guerrero, G and Zou, Y (2024) Understanding social interaction and physiological patterns in nonlean and Last Planner system-based project teams: A comparative study using immersive virtual reality. Journal of Construction Engineering and Management, 150(10): 04024131, ISSN 0733-9364
Liu, H; Zhang, F; Ma, R; Wang, L; Chen, Z; Zhang, Q and Guo, L (2024) Intelligent noncontact structural displacement detection method based on computer vision and deep learning. Journal of Construction Engineering and Management, 150(10): 04024127, ISSN 0733-9364
Liu, J and Cheah, C Y J (2009) Real option application in PPP/PFI project negotiation. Construction Management and Economics, 27(4), pp. 331-342. ISSN 1466433X
Liu, J; Cui, Z; Feng, Y; Perera, S and Han, J (2020) Impact of culture differences on performance of international construction joint ventures: The moderating role of conflict management. Engineering, Construction and Architectural Management, 27(9), pp. 2353-2377. ISSN 0969-9988
Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2020) Investment apportionments among participants of PPP rental retirement villages. Built Environment Project and Asset Management, 10(1), pp. 64-77. ISSN 2044-124X
Liyanawatta, T N; Francis, M and Ranadewa, K A T O (2024) Avoiding construction disputes: A comprehensive framework for pre-contract planning. International Journal of Construction Management, 24(12), pp. 1282-1294. ISSN 1562-3599
Lizarralde, G.; Wachsmuth, D.; Özdoğan, F. and Cossu, M. (2026) Critical reconstruction theory and the invention of post-disaster response. Buildings & Cities, 7(1), pp. 683-703. ISSN 2632-6655
Lombardi, P and Ferretti, V (2015) New spatial decision support systems for sustainable urban and regional development. Smart and Sustainable Built Environment, 4(1), pp. 45-66. ISSN 2046-6099
London, Kerry (2004) Construction supply chain procurement modelling. PhD thesis, University of Melbourne, Australia.
Loosemore, M (1999) Responsibility, power and construction conflict. Construction Management and Economics, 17(6), pp. 699-709. ISSN 01446193
Lopez, R and Amara, A (2018) Comparison of dispute boards and statutory adjudication in construction. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 70-78. ISSN 17514304
Lord, A M (1989) An investigation into the role of the project manager: A comparative study of project leadership, organisation and culture in UK defence contractors and engineering constructors. PhD thesis, Henley Business School, UK.
Love, P E D; Davis, P; Kerry London, K and Jasper, T (2008) Causal modelling of construction disputes. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Lowe, D J and Leiringer, R (2005) Commercial management in project-based organisations. Journal of Financial Management of Property and Construction, 10(1), pp. 3-18. ISSN 1366-4387
Lowe, J G (2010) Edinburgh trams: A case study of a complex project. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Lu, L-T (2003) The impact of cultural distance on the management style and performance of Japanese and Taiwanese joint ventures with local partners in China. PhD thesis, University of Leeds, UK.
Lu, W; Li, Z and Wang, S (2017) The role of justice for cooperation and contract's moderating effect in construction dispute negotiation. Engineering, Construction and Architectural Management, 24(1), pp. 133-153. ISSN 0969-9988
Lu, W; Zhang, L and Bai, F (2016) Bilateral learning model in construction claim negotiations. Engineering, Construction and Architectural Management, 23(4), pp. 448-463. ISSN 0969-9988
Lu, W; Zhang, L and Li, Z (2015) Influence of negotiation risk attitude and power on behaviors and outcomes when negotiating construction claims. Journal of Construction Engineering and Management, 141(2): 04014069, ISSN 0733-9364
Lu, Z; Liu, J and Bu, Z (2025) Influencing factors of the government's willingness to compensate in the early termination of PPP projects: Based on multiple cases in China. Construction Management and Economics, 43(10), pp. 823-848. ISSN 0144-6193
Lundula, N (2024) Influence of leaders’ conflict management skills on multicultural team management. PhD thesis, Walden University, USA.
Luo, M; Zhang, H; Wang, Z; Arens, E; Chen, W; Bauman, F S and Raftery, P (2021) Ceiling-fan-integrated air-conditioning: Thermal comfort evaluations. Buildings & Cities, 2(1), pp. 928-951. ISSN 2632-6655
Luvara, V G M and Benjamin, M (2025) Unveiling factors influencing the duration of arbitration practice in the Tanzania construction industry. International Journal of Building Pathology and Adaptation, 43(6), pp. 1612-1633. ISSN 2398-4708
Löfgren, A (2008) Making mobile meaning: Expectations and experiences of mobile computing usefulness in construction site management practice. PhD thesis, KTH Royal Institute of Technology, Sweden.
Löwstedt, M (2015) Strategizing in construction: Exploring practices and paradoxes. PhD thesis, Chalmers University of Technology, Sweden.
Ma, A (2009) Engineer's role in resolving disputes in offshore projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 191-196. ISSN 17514312
Ma, P (2023) A sociomateriality view of boundary spanning in BIM-enabled early facilities management involvement. PhD thesis, University of Hong Kong, Hong Kong.
Mahamivanan, H; Ghassemi, N; Tayarani Darbandy, M; Shoeibi, A; Hussain, S; Nasirzadeh, F; Alizadehsani, R; Nahavandi, D; Khosravi, A and Nahavandi, S (2025) Material recognition for construction quality monitoring using deep learning methods. Construction Innovation, 25(3), pp. 732-760. ISSN 1471-4175
Mahfouz, T; Davlyatov, S and Kandil, A (2016) Analysis of differing site condition litigation reasoning through statistical modeling. International Journal of Construction Education and Research, 12(4), pp. 285-302. ISSN 1557-8771
Mahmoudi, E; Stepien, M and König, M (2021) Optimisation of geotechnical surveys using a BIM-based geostatistical analysis. Smart and Sustainable Built Environment, 10(3), pp. 420-437. ISSN 2046-6099
Maiti, S and Choi, J H (2021) Investigation and implementation of conflict management strategies to minimize conflicts in the construction industry. International Journal of Construction Management, 21(4), pp. 337-352. ISSN 1562-3599
Malek, M S and Gundaliya, P J (2023) Negative factors in implementing public-private partnership in Indian road projects. International Journal of Construction Management, 23(2), pp. 234-242. ISSN 1562-3599
Mangano, G; Castelblanco, G; De Marco, A and Ottaviani, F M (2025) Exploring the drivers of concession period in transport public–private partnerships. Built Environment Project and Asset Management, 15(2), pp. 193-210. ISSN 2044-124X
Manowong, E and Ogunlana, S O (2006) Public hearings in Thailand's infrastructure projects: Effective participations? Engineering, Construction and Architectural Management, 13(4), pp. 343-363. ISSN 0969-9988
Mante, J (2014) Resolution of construction disputes arising from major infrastructure projects in developing countries: case study of Ghana. PhD thesis, University of Wolverhampton, UK.
Mante, J (2015) Resolving infrastructure-related construction disputes in developing countries: The Ghana experience. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Mante, J; Ndekugri, I; Ankrah, N and Hammond, F (2012) The influence of procurement methods on dispute resolution mechanism choice in construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Manzoni, B; Morris, P and Smyth, H (2012) Managing the performing paradox in architectural competitions. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Marquardt, G (2017) Economic analysis of contract choice, feelings of entitlement and contract enforcement in relationships governed by incomplete contracts. PhD thesis, University of Edinburgh, UK.
Marques, C P (2004) Selected issues in business and contractual relationships in private construction projects in Canada/China deals. PhD thesis, University of Calgary, Canada.
Marques Neto, José da Costa (2009) Study on municipal management of construction and demolition wastes in the turvo grande watershed (urghi-15). PhD thesis, Universidade de São Paulo, Brazil.
Marzouk, M and Moamen, M (2009) A framework for estimating negotiation amounts in construction projects. Construction Innovation, 9(2), pp. 133-148. ISSN 1471-4175
Mastrandrea, F (1991) The quantification of construction contractors' claims. PhD thesis, University of Reading, UK.
Matarneh, S (2024) Construction disputes causes and resolution methods: A case study from a developing country. Journal of Construction in Developing Countries, 29(1), pp. 139-161. ISSN 1823-6499
Matete, R; Emuze, F and Smallwood, J (2024) Controlling the risk of site dust exposures in South African construction. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Mawdesley, M J; Al-Jibouri, S H and Clark-Hughes, J (2002) A proactive control approach to agreeing entitlement to claims in construction. Journal of Financial Management of Property and Construction, 7(1), pp. 41-48. ISSN 1366-4387
McArthur, J (2023) Enrolment, technical mediation, and the obligatory passage point: a socio-technical examination of the Canada Green Building Council. PhD thesis, University of Edinburgh, UK.
McGuinness, K P (1983) A theory of mechanics' liens (and related remedies). SJD thesis, University of Toronto, Canada.
McKim, R A (1990) Risk management for the construction owner. PhD thesis, University of Waterloo, Canada.
Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.
Meinel, G; Hecht, R and Herold, H (2009) Analyzing building stock using topographic maps and GIS. Building Research & Information, 37(5-6), pp. 468-482. ISSN 0961-3218
Meldrum, A (2009) Measuring worker engagement as an aspect of health and safety performance in the construction industry: towards a best practice tool. PhD thesis, Glasgow Caledonian University, UK.
Menassa, C; Pea Mora, F and Pearson, N (2010) Study of real options with exogenous competitive entry to analyze dispute resolution ladder investments in architecture, engineering, and construction projects. Journal of Construction Engineering and Management, 136(3), pp. 377-390. ISSN 0733-9364
Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Menassa, C C; Mora, F P and Pearson, N (2009) Option pricing model to analyze cost-benefit trade-offs of adr investments in AEC projects. Journal of Construction Engineering and Management, 135(3), pp. 156-168. ISSN 0733-9364
Meng, S (2023) Development of a regional wind risk assessment framework for wood-frame single-family residential building stock. PhD thesis, University of California, Los Angeles, USA.
Michielsens, E (2016) Contextualising diversity management: challenging the effectiveness of the business case. PhD thesis, University of Westminster, UK.
Miers, R J (2001) Critical needs in current construction management education practices: The problem solving process as related to the curriculum. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.
Milner, A (2011) Contract interpretation: Potential for relaxing the exclusionary rule. International Journal of Law in the Built Environment, 3(3), pp. 205-221. ISSN 1756-1450
Mirza, M B; Malik, S; Afzal, N and Ali Kazmi, S J (2025) Examining the impact of conflict resolution, emotional intelligence on project team performance: A study in the construction industry of Pakistan. International Journal of Construction Management, 25(16), pp. 2030-2040. ISSN 1562-3599
Mirzaee, A M and Martek, I (2026) Utilizing multiple intelligences as a means to improving claim performance outcomes in project-based organizations. Engineering, Construction and Architectural Management, 33(1), pp. 532-551. ISSN 0969-9988
Mitropoulos, P and Howell, G (2001) Model for understanding, preventing, and resolving project disputes. Journal of Construction Engineering and Management, 127(3), pp. 223-231. ISSN 0733-9364
Mlitwa, N W B and Wanyonyi, D W (2015) Towards interactive open source based m-Learning solution: The m-Chisimba framework. Journal of Engineering, Design and Technology, 13(3), pp. 463-485.
Moehler, R C; Chan, P W and Greenwood, D (2008) The interorganisational influences on construction skills development in the UK. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Moeti, M; Jacques, E; Feng, W and North, C (2021) Modelling the effect of computation sampling on insight error in computational fluid dynamics scientific simulation. Journal of Engineering, Design and Technology, 19(1), pp. 263-290. ISSN 1726-0531
Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.
Mohamed, Y and AbouRizk, S (2005) Technical knowledge consolidation using theory of inventive problem solving. Journal of Construction Engineering and Management, 131(9), pp. 993-1001. ISSN 0733-9364
Mohammad Al-Naghi, A; Alaghbari, W and Barakat, T (2025) Impact of leadership skills on the success of large and medium construction projects management in Yemen. International Journal of Construction Management, 25(11), pp. 1346-1356. ISSN 1562-3599
Moloney, J; Globa, A; Wang, R; Khoo, C K and Tokede, O (2019) Hybrid environmental-media facades: Rationale and feasibility. Architectural Engineering and Design Management, 15(5), pp. 313-333. ISSN 1745-2007
Monteiro do Nascimento, F A; Neto, G D M P; Hazin Alencar, L and Valdes-Vasquez, R (2026) Multicriteria subcontractor selection model for construction activities in wind farm projects. International Journal of Construction Management, 26(5), pp. 772-788. ISSN 1562-3599
Moore, A W (2019) Middle matters: intermediaries and the practice of home energy retrofit. PhD thesis, University of Manchester, UK.
Moradi, S; Kähkönen, K; Klakegg, O J and Aaltonen, K (2021) Profile of project managers' competencies for collaborative construction projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Moselhi, O; Assem, I and El-Rayes, K (2005) Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3), pp. 354-359. ISSN 0733-9364
Moyo, T (2020) Integrating sustainability dimensions into construction labour productivity determinants in Zimbabwe. PhD thesis, Nelson Mandela University, South Africa.
Moyo, T; Mukawa, M; Moyo, C and Chigara, B (2023) Expected competencies of quantity surveyors in Zimbabwe. Journal of Construction in Developing Countries, 28(1), pp. 19-42. ISSN 1823-6499
Mulhorn, W L (1987) Sources of conflict as perceived by architects and New Jersey public school officials when involved in a building project. EdD thesis, Temple University, USA.
Musenero, L; Baroudi, B and Gunawan, I (2021) Application of dual concern theory in elucidating conflict behavior in infrastructure public-private partnership projects. Journal of Construction Engineering and Management, 147(7): 04021061, ISSN 0733-9364
Musenero, L; Baroudi, B and Gunawan, I (2023) Critical issues affecting dispute resolution practice in infrastructure public-private partnerships. Journal of Construction Engineering and Management, 149(3): 04023001, ISSN 0733-9364
Musenero, Leah (2023) Development of an integrated framework for constructive dispute resolution in infrastructure public-private partnership projects. PhD thesis, University of Adelaide, Australia.
Mustaffa, N E and Bowles, G (2004) Dispute avoidance mechanism in partnering arrangements. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Mustaffa, N E and Bowles, G (2005) Investigating the "hard" and "soft" issues of problem resolution in partnering: Defining the research boundaries. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Nagogo, U B (2022) A strategy for stakeholder engagement in public private partnership urban infrastructure provision in Nigeria. PhD thesis, University of Salford, UK.
Naji, K K; Gunduz, M and Naser, A F (2022) The effect of change-order management factors on construction project success: A structural equation modeling approach. Journal of Construction Engineering and Management, 148(9): 04022085, ISSN 0733-9364
Nakhi, A E (1995) Adaptive construction modelling within whole building dynamic simulation. PhD thesis, University of Strathclyde, UK.
Nash, S; Chinyio, E; Gameson, R and Suresh, S (2010) The dynamism of stakeholders' power in construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Nassar, N and AbouRizk, S (2016) Introduction to techniques for resolving project performance contradictions. Journal of Construction Engineering and Management, 142(8): 4016027, ISSN 0733-9364
Nathan, K V S K (1994) Submission to ICSID in breach of the convention: disputes in international civil engineering contracts. PhD thesis, Queen Mary University of London, UK.
Navon, R and Haskaya, I (2006) Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics, 24(12), pp. 1225-1229. ISSN 1466433X
Nazlim, B (2012) Resolving construction disputes in Dubai. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 85-90. ISSN 17514312
Ndekugri, I (1999) Performance bonds and guarantees: Construction owners and professionals beware. Journal of Construction Engineering and Management, 125(6), pp. 428-436. ISSN 0733-9364
Ndekugri, I and McDonnell, B (1999) Differing site conditions risks: A FIDIC/engineering and construction contract comparison. Engineering, Construction and Architectural Management, 6(2), pp. 177-187. ISSN 0969-9988
Ndekugri, I and Russell, V (2005) Insolvency and resolution of construction contract disputes by adjudication in the UK construction industry. Construction Management and Economics, 23(4), pp. 399-408. ISSN 01446193
Ness, D (2022) Towards sufficiency and solidarity: COP27 implications for construction and property. Buildings & Cities, 3(1), pp. 912-919. ISSN 2632-6655
New, K; Tyler, A; Friday, A; Hazas, M and Gormally, A (2023) Space temperature policy towards net-zero: Recommendations from a systematic review of UK HEI heating policies. Building Research & Information, 51(2), pp. 223-239. ISSN 0961-3218
Newsham, G R; Veitch, J A and Hu, Y V (2018) Effect of green building certification on organizational productivity metrics. Building Research & Information, 46(7), pp. 755-766. ISSN 0961-3218
Ng, K-W A (2009) Improving main contractors' site coordination in the Hong Kong building projects. PhD thesis, Loughborough University, UK.
Ng, S T and Li, W (2004) A multiagent system for negotiating construction bidding decisions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Nguyen, L D; Kneppers, J; García De Soto, B and Ibbs, W (2010) Analysis of adverse weather for excusable delays. Journal of Construction Engineering and Management, 136(12), pp. 1258-1267. ISSN 0733-9364
Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.
Nik Bakht, M (2015) Analyzing social network discussions of infrastructure projects: towards a bottom-up decision making environment. PhD thesis, University of Toronto, Canada.
Noller, Hanna and Tarik, Ayat (2025) The importance of multi-roles and code-switching in living labs. Buildings & Cities, 6(1), pp. 952-968. ISSN 2632-6655
Ntiyakunze, S K (2011) Conflicts in building projets in Tanzania: Analysis of causes and management approaches. PhD thesis, KTH Royal Institute of Technology, Sweden.
Nuruddin, A R; Abu Bakar, S P S and Jaafar, M (2015) Unveiling the challenges faced by Malaysian housing developers through government policy changes. Journal of Construction in Developing Countries, 20(2), pp. 37-52. ISSN 1823-6499
Nyein, T S and Hadikusumo, B H W (2021) Factors influencing the adoption of public-private partnership in low-cost housing development in Myanmar. Journal of Financial Management of Property and Construction, 26(3), pp. 337-365. ISSN 1366-4387
Nyström, J (2007) Partnering: Definition, theory and evaluation. PhD thesis, KTH Royal Institute of Technology, Sweden.
O'Neill, T; Spillane, J P and Carmody, S (2022) The composition and classification of interpersonal conflict in Irish construction small and medium-sized enterprises: A case study. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Ochieng, E G and Price, A D F (2010) Factors influencing effective performance of multi-cultural construction project teams. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Ocloo, William K (2023) Relationships between team composition, team climate and team effectiveness in engineering teams. PhD thesis, Texas Tech University, USA.
Odebode, O M (2004) Consideration of investment risk in build operate transfer infrastructure projects in Africa: Lenders' perspective. PhD thesis, University of Reading, UK.
Ojo, A E and Akinradewo, F O (2011) Essentials in arbitration clause for construction contract dispute resolution in Nigeria. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Oke, A E; Aliu, J O; Tamunosa Ojurongbe, E; Aigbavboa, C O; Aghimien, D O and Ebekozien, A (2026) Investigation of core and future competencies needed for quantity surveyors in Nigeria. International Journal of Construction Education and Research, 22(1), pp. 119-137. ISSN 1557-8771
Oktora, S I; Wulansari, I Y; Siagian, T H; Laksono, B C; Sugiandewi, N N R and Anindita, N (2024) Identifying the potential participation in natural disaster insurance: First attempt based on a national socio-economic survey in Indonesia. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 177-192. ISSN 1759-5916
Okudan, O and Çevikbaş, M (2022) Alternative dispute resolution selection framework to settle disputes in public-private partnership projects. Journal of Construction Engineering and Management, 148(9): 04022086, ISSN 0733-9364
Olanrewaju, A; Tan, Y Y and Soh, S N (2022) Defect characterisations in the Malaysian affordable housing. International Journal of Building Pathology and Adaptation, 40(4), pp. 539-568. ISSN 23984708
Olanrewaju, A A and Anavhe, P J (2014) Perceived claim sources in the Nigerian construction industry. Built Environment Project and Asset Management, 4(3), pp. 281-295. ISSN 2044-124X
Oliver, G (2007) Erosion of drawing as a thinking and collaborative tool. Building Research & Information, 35(5), pp. 571-575. ISSN 0961-3218
Olowoake, M A O (2015) A theoretical framework to support facilities maintenance management of higher education institutions buildings in Nigeria. PhD thesis, University of Salford, UK.
Omoraka, A E (2022) A principal component analysis of supply chain management skills for the Nigerian construction industry. International Journal of Construction Management, 22(12), pp. 2413-2421. ISSN 1562-3599
Ono, Eikichi (2025) Occupant-centric design for functional and thermal zoning at activity-based workspaces. PhD thesis, National University of Singapore, Singapore.
Onungwa, I O and Uduma-Olugu, N (2017) Building information modelling and collaboration in the Nigerian construction industry. Journal of Construction Business and Management, 1(2), pp. 1-10. ISSN 2521-0165
Orstavik, F (2018) Negotiating and knowing built quality. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Osman, I A (2022) Impacts of global pandemics on construction projects and dispute resolution provisions. PhD thesis, University of Illinois at Chicago, USA.
Pakgohar, A (2014) Hierarchical multi-project planning and supply chain management: an integrated framework. PhD thesis, University of Exeter, UK.
Palit, N (2017) Analysis of the project supply chains: coordination and fair allocation. PhD thesis, University of Sheffield, UK.
Pan, L-J (1996) A study of risk management in dealing with contracts in the construction industry. PhD thesis, University of Glasgow, UK.
Park, T; Kim, B and Kim, H (2013) Real option approach to sharing privatization risk in underground infrastructures. Journal of Construction Engineering and Management, 139(6), pp. 685-693. ISSN 0733-9364
Parker, P E (1992) Efficiency and the response to reform in Chinese urban construction enterprises: A production theory approach. PhD thesis, University of Washington, USA.
Patel, P. and Sturgill, R. (2026) An interpretive structure modeling approach to assess the value of underground utility as-builts. Journal of Construction Engineering and Management, 152(10): 04026164, ISSN 0733-9364
Patil, S K (2016) Determining influencing factors and predicting dispute outcome of variation claims in Indian construction contracts/ by Smita Krishnarao Patil. PhD thesis, Indian Institute of Technology Delhi, India.
Paulson, B C and Fondahl, J W (1983) Craft jurisdiction impact on construction. Journal of Construction Engineering and Management, 109(4), pp. 369-386. ISSN 0733-9364
Peace, S L (1999) Partnering in the UK building industry. PhD thesis, University of Reading, UK.
Pellegrino, R; Carbonara, N and Costantino, N (2019) Public guarantees for mitigating interest rate risk in PPP projects. Built Environment Project and Asset Management, 9(2), pp. 248-261. ISSN 2044-124X
Pellegrino, R; Ranieri, L; Costantino, N and Mummolo, G (2011) A real options-based model to supporting risk allocation in price cap regulation approach for public utilities. Construction Management and Economics, 29(12), pp. 1197-1207. ISSN 1466433X
Pelsmakers, S; Vereecken, E; Airaksinen, M and Elwell, C C A (2019) Void conditions and potential for mould growth in insulated and uninsulated suspended timber ground floors. International Journal of Building Pathology and Adaptation, 37(4), pp. 395-425. ISSN 23984708
Pena Mora, F A (1994) Design rationale for computer supported conflict mitigation during the design-construction process of large-scale civil engineering systems. PhD thesis, Massachusetts Institute of Technology, USA.
Peng, J and Zhang, Q (2025) Construction group conflict under resource overlap: A game theory approach. Engineering, Construction and Architectural Management, 32(1), pp. 156-171. ISSN 0969-9988
Petrescu, D; Petcou, C and Baibarac, C (2016) Co-producing commons-based resilience: Lessons from R-Urban. Building Research & Information, 44(7), pp. 717-736. ISSN 0961-3218
Pheng, L S and Hongbin, J (2006) Analysing ownership, locational and internalization advantages of Chinese construction mncs using rough sets analysis. Construction Management and Economics, 24(11), pp. 1149-1165. ISSN 1466433X
Phillips-Alonge, O K (2017) The influence of partnering on the occurrence and cost of construction conflicts and disputes. PhD thesis, Northcentral University, USA.
Phillips-Alonge, O K (2019) The influence of partnering on the occurrence of construction requirement conflicts and disputes. International Journal of Construction Management, 19(4), pp. 291-306. ISSN 1562-3599
Pierce Meyer, Kathryn Alisa (2018) Documenting architectural practice. PhD thesis, University of Texas at Austin, USA.
Potseluyko Amobi, L (2021) Improving business and technical operations within timber frame self-build housing sector by applying integrated VR/AR and BIM technologies. PhD thesis, Teesside University, UK.
Potts, K and Wall, M (2002) Managing the commissioning of building services. Engineering, Construction and Architectural Management, 9(4), pp. 336-344. ISSN 0969-9988
Pradhananga, P; Elzomor, M and Santi Kasabdji, G (2021) Identifying the challenges to adopting robotics in the US construction industry. Journal of Construction Engineering and Management, 147(5): 0733, ISSN 0733-9364
Pratama, L A (2023) Immersive visualization intervention on pull planning. PhD thesis, University of Washington, USA.
Prideaux, S and Roulstone, A (2009) Good practice for providing disabled people with reasonable access to the built environment: A comparative study of legislative provision. International Journal of Law in the Built Environment, 1(1), pp. 59-81. ISSN 1756-1450
Prolas, L A M (2019) In search of efficiency: an analysis of adjudication under the Ontario Construction Act. JD thesis, Queen's University Belfast, UK.
Qadir, N; Brooks, T and Quigg, E (2023) Potential for construction statutory adjudication in Pakistan: taking lessons from the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(2), pp. 91-102. ISSN 17514304
Qc, A N (2007) Expert evidence: Problems and safeguards. Construction Management and Economics, 25(7), pp. 785-790. ISSN 1466433X
Qi, B (2021) BIM and ontological-based framework for design, manufacturing, and assembling requirements checking of prefabricated component. PhD thesis, University of Florida, USA.
Raidén, A B (2016) Horseplay, care and hands on hard work: Gendered strategies of a project manager on a construction site. Construction Management and Economics, 34(7-8), pp. 508-521. ISSN 01446193
Raidén, A B; Räisänen, C and Caven, V (2012) Juggling work, family ... and life in academia: The case of the "new" man. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Raimi, T (2017) Achieving customer satisfaction in a private housing organisation in Nigeria. PhD thesis, University of Liverpool, UK.
Raisbeck, P (2019) Space oddity: Spatial design strategies and work place design. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Raisbeck, P; Millie, R and Maher, A (2010) Assessing integrated project delivery: A comparative analysis of IPD and alliance contracting procurement routes. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Raj, S; Hillig, J B and Hughes, W P (2009) Responsiveness to change by standard-form contract drafters in the construction industry: A case study of the FIDIC white book. International Journal of Law in the Built Environment, 1(3), pp. 205-220. ISSN 1756-1450
Rajak, S. and Vimal, K. E. K. (2026) Blockchain-based time impact analysis method for sustainable delay management in EPC projects. Journal of Construction Engineering and Management, 152(6): 04026074, ISSN 0733-9364
Rajiv, P; Logesh, R; Vinodh, S and Rajanayagam, D (2014) Financial feasibility and value engineering principles integrated quality function deployment for a manufacturing organization: A case study. Journal of Engineering, Design and Technology, 12(1), pp. 71-88. ISSN 1726-0531
Ramachandra, T; Rotimi, J O and Gunaratne, S (2014) Reasons for contractors' delay claims failures in Sri Lanka. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Ranasinghe, A (2012) Construction arbitration in Sri Lanka. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 91-94. ISSN 17514312
Rankin, K; Suji, M; Pandey, B; Baniya, J; Hirslund, D V; Limbu, B; Rawal, N and Shneiderman, S (2026) Negotiating expertise in nepal's post-earthquake disaster reconstruction. Buildings & Cities, 7(1), pp. 1-19. ISSN 2632-6655
Ranslem, D (2015) 'Temporary' relocation: Spaces of contradiction in South African law. International Journal of Law in the Built Environment, 7(1), pp. 55-71. ISSN 1756-1450
Raphael, B (2011) Multi-criteria decision making for collaborative design optimization of buildings. Built Environment Project and Asset Management, 1(2), pp. 122-136. ISSN 2044-124X
Rauscher, Kimberly (2024) Successful strategies government executive stakeholders use to mitigate higher project costs and user adoption failure rates. DBA thesis, Walden University, USA.
Reaney, M; Griffith, A; Watson, P A and Ellis, C (2000) Optimizing functional relationships for new residential developments. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Reaney, M; Griffith, A; Watson, P A and Ellis, C (2001) Construction cost control implications for the planning application process. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Ren, Z (2002) A multi-agent systems approach to construction claims negotiation. PhD thesis, Loughborough University, UK.
Ren, Z; Anumba, C J and Ugwu, O (2000) Towards a multi-agent system for construction claims negotiation. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Ren, Z; Anumba, G J and Ugwu, O O (2001) Construction claims management: Towards an agent-based approach. Engineering, Construction and Architectural Management, 8(3), pp. 185-197. ISSN 0969-9988
Retamal, F; Salazar, L A and Alarcón, L F (2022) Online monitoring and implementation of commitment management performance and its impact on project planning in four construction projects. Journal of Construction Engineering and Management, 148(10): 05022011, ISSN 0733-9364
Riad, N I (1990) MODA: An expert system for managing owner-directed acceleration. PhD thesis, Illinois Institute of Technology, USA.
Riad, N I; Arditi, D and Mohammadi, J (1994) Integrated system for managing owner-directed project acceleration. Journal of Construction Engineering and Management, 120(1), pp. 77-95. ISSN 0733-9364
Robinson, E (2021) Multi-stakeholder decision-making in low-energy building design optimization. PhD thesis, Loughborough University, UK.
Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.
Rodrigues, C A (2017) Life-cycle environmental and cost assessment of building retrofits: Evaluating conventional and streamlined approaches. PhD thesis, Universidade de Coimbra, Portugal.
Rohani, M; Shafabakhsh, G; Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(8), pp. 1053-1074. ISSN 0969-9988
Rose, T and Manley, K (2010) Motivational misalignment on an iconic infrastructure project. Building Research & Information, 38(2), pp. 144-156. ISSN 0961-3218
Roumboutsos, A and Anagnostopoulos, K P (2008) Public private partnership projects in Greece: Risk ranking and preferred risk allocation. Construction Management and Economics, 26(7), pp. 751-763. ISSN 1466433X
Roussac, A C and Bright, S (2012) Improving environmental performance through innovative commercial leasing: An Australian case study. International Journal of Law in the Built Environment, 4(1), pp. 6-22. ISSN 1756-1450
Royal, S; Lehoux, N and Blanchet, P (2022) New home warranty schemes: Developing a theoretical comparative framework using qualitative content analysis. International Journal of Building Pathology and Adaptation, 40(4), pp. 499-522. ISSN 23984708
Rumens, N (2013) Queering men and masculinities in construction: Towards a research agenda. Construction Management and Economics, 31(8), pp. 802-815. ISSN 1466433X
Ryan, C.; Spillane, J. P. and Bradley, J. G. (2025) The jurisdiction of adjudicators under the construction contracts act 2013: A case review. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 7-15. ISSN 1751-4304
Ryan, C; Spillane, J P and Bradley, J G (2023) Legal issues facing adjudication in the Irish construction industry: A discussion. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Ryan, C; Spillane, J P and Bradley, J G (2024) Barriers to the adoption of alternative dispute resolution within the Irish construction industry: A systematic literature review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Saeb, A; Danuri, M S M; Mohamed, O and Zakaria, N (2021) A mechanism for dispute resolution in the Iranian construction industry. Journal of Construction in Developing Countries, 26(1), pp. 205-226. ISSN 1823-6499
Saeb, A; Mohd Danuri, M S B; Zakaria, N B and Mohamed, O B (2020) A case study of dispute resolution methods pertaining to the construction standard form in Iran. International Journal of Construction Education and Research, 16(3), pp. 211-230. ISSN 1557-8771
Sajadfar, Narges (2022) Application of machine learning to automate classification and information extraction in industrial construction documents. PhD thesis, University of Alberta, Canada.
Salam, M; Killen, C and Forsythe, P (2025) Assessing interdisciplinary collaboration in the detailed design phase of construction projects: applying practice-based inter-organisational theories. International Journal of Construction Management, 25(2), pp. 238-247. ISSN 1562-3599
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Samaras, G D; Gkanas, N I and Vitsa, K C (2014) Assessing risk in dam projects using AHP and ELECTRE I. International Journal of Construction Management, 14(4), pp. 255-266. ISSN 1562-3599
Saufi, M; Yusof, L M and Rahman, R A (2025) Homebuyer complaints during defect liability period: Critical analysis of individual presumptions, defect discovery and post-rectifications factors. Journal of Engineering, Design and Technology, 23(5), pp. 1619-1652. ISSN 1726-0531
Savage, D (2010) Business networks and conflict management. PhD thesis, Queen's University Belfast, UK.
Schied Jr., E P (2012) Geometric information scheduling to identify and resolve spatial conflicts and increase efficiency of space use on construction projects. PhD thesis, Catholic University of America, USA.
Schweber, L. and Green, M. (2026) Negotiating net-zero carbon: An ant analysis of two buildings. Buildings & Cities, 7(1), pp. 791-807. ISSN 2632-6655
Scott, S and Harris, R A (2004) United Kingdom construction claims: Views of professionals. Journal of Construction Engineering and Management, 130(5), pp. 734-741. ISSN 0733-9364
Senaratne, S and Udawatta, N (2013) Managing intragroup conflicts in construction project teams: Case studies in Sri Lanka. Architectural Engineering and Design Management, 9(3), pp. 158-175. ISSN 1745-2007
Seneviratne, K; Amaratunga, D and Haigh, R (2017) Managing housing needs of post conflict housing reconstruction: Sri Lankan perspective. Engineering, Construction and Architectural Management, 24(2), pp. 275-288. ISSN 0969-9988
Serag-Eldin, Gamil M (2010) A conflict management model for architectural design collaboration. PhD thesis, University of California, USA.
Serpell Bley, A F (1990) Improved conceptual estimating performance using a knowledge-based approach. PhD thesis, University of Texas at Austin, USA.
Seymour, D and Low, S P (1990) The quality debate. Construction Management and Economics, 8(1), pp. 13-29. ISSN 01446193
Seymour, D; Mahroof, A; Rooke, J and Crook, D (1997) Objectivity in research: Negotiating a research and development role in an urban renewal department. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Shakeri, E (2002) An investigation of privately promoted infrastructure (ppi) strategy in developing countries: Public-private partnership (ppp) approach. PhD thesis, University of Manchester, UK.
Shalaby, A and Hassanein, A (2019) A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts. Engineering, Construction and Architectural Management, 26(6), pp. 1004-1023. ISSN 0969-9988
Shalwani, A and Lines, B C (2021) An empirical analysis of issue management in small building construction projects. International Journal of Construction Education and Research, 17(4), pp. 352-372. ISSN 1557-8771
Sharafi, A; Amalnick, M S and Taleizadeh, A A (2022) Optimal readjustment of contract variables and the financial outcome of PPP projects in the operation period. Construction Management and Economics, 40(2), pp. 87-103. ISSN 01446193
Shash, A A (1998) Bidding practices of subcontractors in Colorado. Journal of Construction Engineering and Management, 124(3), pp. 219-231. ISSN 0733-9364
Shaurette, M (2015) Higher hourly cost compensation for heavy equipment used in demolition activity. International Journal of Construction Education and Research, 11(4), pp. 280-291. ISSN 1557-8771
Shaw, C (2023) Understanding the need for a comparative framework when selecting an appropriate building technology for sustainable human settlements in South Africa. PhD thesis, University of Pretoria, South Africa.
Shen, L Y; Bao, H J; Wu, Y Z and Lu, W S (2007) Using bargaining-game theory for negotiating concession period for BOT-type contract. Journal of Construction Engineering and Management, 133(5), pp. 385-392. ISSN 0733-9364
Shi, Z (2024) A BIM-based and data-driven approach for comprehensive façade inspection guidance in cities. PhD thesis, New York University Tandon School of Engineering, USA.
Shi, Z; Park, K and Ergan, S (2025) A taxonomy of urban façade defects and their distribution on façade components: A data-driven analysis of historical inspection reports. Journal of Construction Engineering and Management, 151(10): 04025152, ISSN 0733-9364
Shields, R and West, K (2003) Innovation in clean-room construction: A case study of co-operation between firms. Construction Management and Economics, 21(4), pp. 337-344. ISSN 01446193
Shin, J and Won, J (2026) Automated framework for civil complaint analysis in road construction projects using natural language processing. Journal of Construction Engineering and Management, 152(2): 04025252, ISSN 0733-9364
Short, C A; Barrett, P; Dye, A and Sutrisna, M (2007) Impacts of value engineering on five capital arts projects. Building Research & Information, 35(3), pp. 287-315. ISSN 0961-3218
Shrestha, R B and Ogunlan, S (2006) Comparative study of power purchase agreements in the Nepalese environment. Journal of Financial Management of Property and Construction, 11(3), pp. 133-148. ISSN 1366-4387
Shrestha, R B and Ogunlana, S (2007) Direct stakeholder's perception of PPA clauses in the Nepalese environment. Journal of Construction in Developing Countries, 12(2), pp. 21-41. ISSN 1823-6499
Sidoli, J S (2021) Disputing in the built environment. PhD thesis, Open University, UK.
Sidoli Del Ceno, J (2011) An investigation into lawyer attitudes towards the use of mediation in commercial property disputes in England and Wales. International Journal of Law in the Built Environment, 3(2), pp. 182-198. ISSN 1756-1450
Sidoli del Ceno, J (2012) A process account of construction mediation. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Sidoli del Ceno, J (2014) Compulsory mediation: Civil justice, human rights and proportionality. International Journal of Law in the Built Environment, 6(3), pp. 286-299. ISSN 1756-1450
Sidoli del Ceno, J; George, H and Vols, M (2015) Adjudication in tenancy deposit scheme disputes: Agents' perspectives. International Journal of Law in the Built Environment, 7(2), pp. 162-172. ISSN 1756-1450
Sinclair, S (2016) Designing + (dis)assembling disputes: an ethnography of disputes & lawyers in the construction industry. PhD thesis, University of Westminster, UK.
Singh, S; Chinyio, E and Suresh, S (2018) The implementation of stakeholder management and building information modelling (BIM) in UK construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Singh, V V (2024) Data-driven production planning and control using work density for on-site building construction. PhD thesis, University of California, Berkeley, USA.
Singla, H K and Samanta, P K (2022) Identification of critical success factors (CSFs) for real estate developers (reds) in India. Journal of Financial Management of Property and Construction, 27(1), pp. 76-90. ISSN 1366-4387
Skaik, Samer Hisham (2017) Introducing review mechanisms into statutory construction adjudication. PhD thesis, Deakin University, Australia.
Sodeinde, O R (2024) Building damage assessment using remote sensing data and deep learning algorithms. PhD thesis, Tufts University, USA.
Soltani, Z (2018) Investigating the persuasiveness of forensic information models for jurors in construction disputes. PhD thesis, Texas A&M University, USA.
Song, X (2013) The application of insurance as a risk management tool for alternative dispute resolution (ADR) implementation in construction disputes. PhD thesis, Columbia University, USA.
Song, X; Peña-Mora, F; Menassa, C C and Arboleda, C A (2012) Insurance as a risk management tool for ADR implementation in construction disputes. Journal of Construction Engineering and Management, 138(1), pp. 14-21. ISSN 0733-9364
Stanic, N (2016) Assessment methods for structural and hydraulic properties of concrete sewer pipes. PhD thesis, Delft University of Technology, Netherlands.
Starzyk, G F (2014) Alliance contracting: Enforceability of the consensusdocs 300 mutual waiver of liability in us courts. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Steenhausen, P D (2003) Negotiating among mediators: Multiparty mediation in international politics. PhD thesis, University of Southern California, USA.
Stefańska, A; Sutkowska, M; Krawczyk, J; Kurcjusz, M; Chudzińska, A; Poćwierz, M and Dixit, S (2025) Ccc2023_possibilities of obtaining energy from aerodynamic phenomena occurring in selected housing estates in warsaw, Poland. International Journal of Construction Management, 25(12), pp. 1463-1476. ISSN 1562-3599
Stipanowich, T J (1997) At the cutting edge: Conflict avoidance and resolution in the US construction industry. Construction Management and Economics, 15(6), pp. 505-512. ISSN 01446193
Strahorn, S; Gajendran, T and Brewer, G (2014) Experiences of trust in construction project management: The influence of procurement mechanisms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Struck, C (2012) Uncertainty propagation and sensitivity analysis techniques in building performance simulation to support conceptual building and system design. PhD thesis, Eindhoven University of Technology, Netherlands.
Sturgill Jr., Roy E (2018) Risk management and practice alignment for utility coordination on transportation projects. PhD thesis, University of Kentucky, USA.
Styhre, A (2010) The culture of complaint in construction: Affirmative reflections on its role and function. Construction Management and Economics, 28(7), pp. 797-803. ISSN 1466433X
Suchocki, C; Błaszczak-Bąk, W; Janicka, J and Dumalski, A (2021) Detection of defects in building walls using modified optd method for down-sampling of point clouds. Building Research & Information, 49(2), pp. 197-215. ISSN 0961-3218
Sultan, Mohamed (2025) PPP contracts for healthcare facilities in Canada: Qualitative study to identify lessons learned. PhD thesis, Arizona State University, USA.
Sumanohar, Symon (2022) Statistical approach towards complexities resolution for design, building, and operation of data centers. DBA thesis, American Business Management and Technology College, Switzerland.
Sunarharum, T M; Sloan, M and Susilawati, C (2014) Re-framing planning decision-making: Increasing flood resilience in Jakarta. International Journal of Disaster Resilience in the Built Environment, 5(3), pp. 230-242. ISSN 1759-5916
Sunarharum, Tri Mulyani (2016) Collaborative planning for disaster resilience: The role of community engagement for flood risk management. PhD thesis, Queensland University of Technology, Australia.
Sunkanmi, A B (2023) An integrated conflict management model for the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Suriyanon, N; Sutheerawatthana, P; Kaewmoracharoen, M and Klansai, V (2023) The utility and value of contract terms: A case study on interior contractors. Construction Economics and Building, 23(1-2), pp. 77-94. ISSN 2204-9029
Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.
Sze, E; Kumaraswamy, M; Fung, A; Palaneeswaran, E and Wong, S (2004) Partnering with the tenants- Hong Kong experience. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Taiwo, D O (2022) Incremental development of a legal framework for arbitration in emerging markets: A case study of construction arbitration in Nigeria. PhD thesis, University of Essex, UK.
Tajul Ariffin H L and Sutrisna, M (2010) Developing a framework to minimize the occurrence of construction conflict and disputes in different procurement strategies: An initial review of literature. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Takim, R; Akintoye, A and Kelly, J (2004) Analysis of measures of construction project success in Malaysia. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Tam, C M and Tong, T K L (2011) Conflict analysis study for public engagement programme in infrastructure planning. Built Environment Project and Asset Management, 1(1), pp. 45-60. ISSN 2044-124X
Taniguchi, K; Kubota, S and Yasumuro, Y (2022) Quantitative visualization of physical barriers for vulnerable pedestrians based on photogrammetry. Construction Innovation, 22(3), pp. 604-623. ISSN 1471-4175
Tapia, Ricardo M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects. PhD thesis, Iowa State University, USA.
Tawalare, A and Laishram, B (2018) Relational contracting conceptual model for public sector construction organisations: An Indian context. Construction Economics and Building, 18(2), pp. 70-91. ISSN 2204-9029
Tawalare, A and Laishram, B (2020) Factors hindering effective partnering in Indian public sector construction organizations. Journal of Financial Management of Property and Construction, 25(1), pp. 83-105. ISSN 1366-4387
Teller, J (2001) An on-line glossary as a way to foster the construction of a common culture among urban experts, stakeholders and decision-makers. Construction Innovation, 1(4), pp. 259-271. ISSN 1471-4175
Teo, M M M and Loosemore, M (2012) A new research agenda into community-based protest in construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Tetteh, M O and Chan, A P C (2019) Review of concepts and trends in international construction joint ventures research. Journal of Construction Engineering and Management, 145(10): 04019057, ISSN 0733-9364
Tharun, T; Thounaojam, N; Devkar, G and Laishram, B (2025) Proactive contract theory-based resilience framework development for public-private partnerships. Construction Economics and Building, 25(2), pp. 253-275. ISSN 2204-9029
Thayaparan, M (2012) Contributions of women managers to the UK construction industry. PhD thesis, University of Salford, UK.
Thilakarathne, N; Rathnasinghe, A P; Kulatunga, U; Thurairajah, N and Weerasinghe, L (2023) An investigation of the conflict management strategies in international construction joint ventures of Sri Lanka. Journal of Financial Management of Property and Construction, 28(3), pp. 273-292. ISSN 1366-4387
Thomas, H R; Heuer, D W and Filippelli, R L (1984) Settlement of construction jurisdictional disputes. Journal of Construction Engineering and Management, 110(2), pp. 165-177. ISSN 0733-9364
Thuesen, C (2013) Pride and prejudice: Identity and collaboration in construction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Tian, S; Abdalla, A; Tang, Y; Zhang, G and Cao, X (2026) Construction disputes: A systematic review of definitions, antecedents, and resolutions. International Journal of Construction Management, 26(5), pp. 857-874. ISSN 1562-3599
Tiew, S Y; Aman Hashim, H and Zolkafli @ Zulkifly, U K (2025) Factors influencing the effectiveness of graduate architects as construction contract administrators (cca). Engineering, Construction and Architectural Management, 32(1), pp. 332-348. ISSN 0969-9988
Tiong, R L K (1995) Competitive advantage of equity in BOT tender. Journal of Construction Engineering and Management, 121(3), pp. 282-289. ISSN 0733-9364
Tiong, R L K (1996) CSFs in competitive tendering and negotiation model for BOT projects. Journal of Construction Engineering and Management, 122(3), pp. 205-211. ISSN 0733-9364
Tiong, R L K and Alum, J (1997) Distinctive winning elements in BOT tender. Engineering, Construction and Architectural Management, 4(2), pp. 83-94. ISSN 0969-9988
Tiong, R L K and Alum, J (1997) Final negotiation in competitive BOT tender. Journal of Construction Engineering and Management, 123(1), pp. 6-10. ISSN 0733-9364
Titus, K M; Blismas, N; Wakefield, R and Lombardo, R (2011) System archetypes underlying the problematic behaviourof construction activity in Kenya. Construction Management and Economics, 29(1), pp. 3-13. ISSN 1466433X
Tobin, A G V (2009) Conflict-resolution competencies for the construction professional. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 181-184. ISSN 17514312
Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria. PhD thesis, University of Calgary, Canada.
Tombesi, P (2008) Out of what? Locating the underpinnings of theory. Building Research & Information, 36(6), pp. 668-673. ISSN 0961-3218
Tracey, P G (2020) The influence of national culture on the preparation, evaluation and negotiation of claims on international construction projects: a constructivist grounded theory. PhD thesis, University of Salford, UK.
Trushell, I (2016) Everything's coming up (silk) roses. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Trushell, I and Egware, O (2015) Formal education and the practise of negotiation: Benefits for quantity surveyors. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Tryggestad, K; Hugosson, M and Søberg, P (2018) Managing risk and uncertainty in sustainable construction innovation: The role of the partnering contract. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Tsai, J S and Chi, C S F (2009) Influences of Chinese cultural orientations and conflict management styles on construction dispute resolving strategies. Journal of Construction Engineering and Management, 135(10), pp. 955-964. ISSN 0733-9364
Tsai, J S and Chi, C S F (2015) Learning for win-win collaboration. Journal of Construction Engineering and Management, 141(7): 4015013, ISSN 0733-9364
Turkan, Y; Bosché, F; Haas, C T and Haas, R (2013) Toward automated earned value tracking using 3D imaging tools. Journal of Construction Engineering and Management, 139(4), pp. 423-433. ISSN 0733-9364
Turrell, P (2001) Making the link between teaching and research and consultancy. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Twum, B A; Kabiri, S and Tutt, D (2023) Managing onsite production pressure and its impact on safety performance in construction: An activity theory analysis. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Tzoumis, K A (1992) The role of public involvement in managing political conflict: A comparative case study of public involvement activities in siting low-level radioactive waste disposal facilities. PhD thesis, Texas A&M University, USA.
Ucbenli, C (2010) A bargaining mechanism with incomplete information and its application in trilateral BOT negotiations. PhD thesis, Columbia University, USA.
Udeaja, Chika Emmanuel (2002) A decision support framework for construction material supply chain management using multi-agent systems. PhD thesis, London South Bank University, UK.
Ugwu, O O; Anumba, C J and Thorpe, A (2001) Ontology development for agent-based collaborative design. Engineering, Construction and Architectural Management, 8(3), pp. 211-224. ISSN 0969-9988
Uher, T E and Runeson, G (1984) Pre-tender and post-tender negotiations in Australia. Construction Management and Economics, 2(3), pp. 185-192. ISSN 01446193
Umar, A A; Zawawi, N A W A and Abdul Aziz, A R (2024) Do regional characteristics influence PPP contract governance skills requirements? Engineering, Construction and Architectural Management, 31(10), pp. 4146-4161. ISSN 0969-9988
Umar, A A; Zawawi, N A W A and Abdul-Aziz, A R (2019) Exploratory factor analysis of skills requirement for PPP contract governance. Built Environment Project and Asset Management, 9(2), pp. 277-290. ISSN 2044-124X
Umeokafor, N (2018) Community interventions in construction health and safety and the implications: Evidence from Nigeria. Journal of Financial Management of Property and Construction, 23(3), pp. 312-329. ISSN 1366-4387
Umeokafor, N; Evangelinos, K and Windapo, A (2022) Strategies for improving complex construction health and safety regulatory environments. International Journal of Construction Management, 22(7), pp. 1333-1344. ISSN 1562-3599
Un, B; Erdiş, E; Aydınlı, S; Genç, O and Alboga, O (2025) Forecasting the outcomes of construction contract disputes using machine learning techniques. Engineering, Construction and Architectural Management, 32(10), pp. 6421-6444. ISSN 0969-9988
Urup, L (2016) Integrated design-build management: studying institutional processes to understand project coordination & performance. PhD thesis, Chalmers University of Technology, Sweden.
Utomo, C and Rahmawati, Y (2020) Agreement options for negotiation on material location decision of housing development. Construction Innovation, 20(2), pp. 209-222. ISSN 1471-4175
Valdes-Vasquez, R and Clevenger, C M (2015) Piloting collaborative learning activities in a sustainable construction class. International Journal of Construction Education and Research, 11(2), pp. 79-96. ISSN 1557-8771
VanDemark, L P (2021) Mitigating risk of site development disputes. PhD thesis, University of Colorado at Denver, USA.
Vaz-Serra, P; Edwards, P and Aranda-Mena, G (2022) An early-stage project complexity assessment tool for the AEC industry. Construction Innovation, 22(2), pp. 242-262. ISSN 1471-4175
Vernali, R J (1992) The case of the California contractors state license board: A palette of conflict resolution strategies for the 1990s. DPA thesis, Golden Gate University, USA.
Verwey, J; Cumberlege, R and Crafford, G J (2023) Exploring the interplay between quantity surveyors' conflict-handling styles and personality traits. Journal of Construction Business and Management, 6(2), pp. 38-49. ISSN 2521-0165
Villa, J and Ariaratnam, S T (2013) Project management functions for the light industrial sector in Mexico. International Journal of Construction Education and Research, 9(3), pp. 163-182. ISSN 1557-8771
Vilventhan, A and Kalidindi, S N (2018) Utility relocation management in highway projects. Built Environment Project and Asset Management, 8(2), pp. 171-182. ISSN 2044-124X
Vo, H M; Yang, J B and Rangasamy, V (2025) A comprehensive review of delay analysis techniques for solving concurrent delays. Engineering, Construction and Architectural Management, 32(5), pp. 3495-3521. ISSN 0969-9988
Waara, F (2008) Mitigating contractual hazards in public procurement: A study of Swedish local authorities. Construction Management and Economics, 26(2), pp. 137-145. ISSN 1466433X
Wall, C J and Fellows, R (2010) The dispute resolution adviser (dra) system in Hong Kong. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(4), pp. 179-184. ISSN 17514312
Wamuziri, S and Jiang, M (2008) Role of export credit agencies in PFI/PPP projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(4), pp. 163-169. ISSN 17514312
Wang, D and Wang, Y (2023) The role of regulatory focus and team mindfulness in megaproject conflicts. Engineering, Construction and Architectural Management, 30(2), pp. 714-733. ISSN 0969-9988
Wang, Y; Ma, L and Fu, H (2024) Effect of social identity on megaproject managers' conflict management styles. Journal of Construction Engineering and Management, 150(10): 04024139, ISSN 0733-9364
Ward, P (2011) A UK and Australian perspective of the suitability of the scl protocols' provisions for dealing with float for adoption and use by the Australian construction industry. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Ward, P and Jefferies, M (2014) Are Australian standard forms of construction contract capable of dealing with the issue of extensions of time efficiently and effectively? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Weddikkara, C (2003) The impact of professional culture on dispute resolution in the building industries of Australia and Sri-Lanka. PhD thesis, Murdoch University, Australia.
Whaley, A (2020) Conflict and claims culture in construction. PhD thesis, University of Salford, UK.
Whang, S-W (2017) The influence of design-production management at the pre-production stage for major international projects in Korea. PhD thesis, University of Reading, UK.
White, A (1985) The critical path method and construction contracts: A polemic. Construction Management and Economics, 3(1), pp. 15-24. ISSN 01446193
Wijetunge, J J (2020) A multi-scenario assessment of the seismogenic tsunami hazard for Bangladesh. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 156-168. ISSN 1759-5916
Willoughby, K A (1999) Modelling assistance for project procurement and disposal decisions. PhD thesis, University of Calgary, Canada.
Wong, J K W; Maghrebi, M; Ahmadian Fard Fini, A; Alizadeh Golestani, M A; Ahmadnia, M and Er, M (2024) Development of a refined illumination and reflectance approach for optimal construction site interior image enhancement. Construction Innovation, 24(2), pp. 470-491. ISSN 1471-4175
Woodhead, R M and Downs, C G (2002) Facilitation as a research method to improve value management capabilities. Journal of Construction Research, 3(2), pp. 209-216. ISSN 1609-9451
Wu, C H; Hsieh, T Y; Cheng, W L and Lu, S T (2004) Grey relation analysis of causes for change orders in highway construction. Construction Management and Economics, 22(5), pp. 509-520. ISSN 01446193
Wu, Chee Shien Jeremy (2008) A comparative study of three international construction firms: Knowledge management infrastructures for optimising organisations' learning. PhD thesis, University of Sydney, Australia.
Wu, G; Hu, Z; Zheng, J; Zhao, X and Zuo, J (2021) Effects of structure characteristics of project network on conflicts and project success. Engineering, Construction and Architectural Management, 28(1), pp. 101-124. ISSN 0969-9988
Wu, Hongjuan (2021) Challenges of prefabricated housing in China: Supply chain, stakeholders, and transaction costs. PhD thesis, Delft University of Technology, Netherlands.
Wu, J; Kumaraswamy, M M and Soo, G (2011) Regulative measures addressing payment problems in the construction industry: A calculative understanding of their potential outcomes based on gametric models. Journal of Construction Engineering and Management, 137(8), pp. 566-573. ISSN 0733-9364
Wu, M; Wing Chau, K; Shen, Q and Yin Shen, L (2012) Net asset value-based concession duration model for BOT contracts. Journal of Construction Engineering and Management, 138(2), pp. 304-308. ISSN 0733-9364
Wu, S (2010) The impact of collaborative working on construction project performance. PhD thesis, Northumbria University, UK.
Wuni, I. Y. and Eshun, B. T. B. (2026) A state-of-the-art review of the application of interpretive structural modelling in construction management studies. International Journal of Construction Management, 26(10), pp. 2116-2136. ISSN 1562-3599
Wuni, I Y and Shen, G Q (2020) Stakeholder management in prefabricated prefinished volumetric construction projects: Benchmarking the key result areas. Built Environment Project and Asset Management, 10(3), pp. 407-421. ISSN 2044-124X
Xenidis, Y and Angelides, D (2005) The financial risks in build-operate-transfer projects. Construction Management and Economics, 23(4), pp. 431-441. ISSN 01446193
Xiao, Bo (2021) Deep learning-based framework of summarizing construction videos for vision-based monitoring of construction sites. PhD thesis, University of Alberta, Canada.
Xie, X (2002) Communications in construction design. PhD thesis, Loughborough University, UK.
Xie, X; Thorpe, A and Baldwin, A N (2000) A survey of communication issues in construction design. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Xu, J and Zhao, S (2017) Noncooperative game-based equilibrium strategy to address the conflict between a construction company and selected suppliers. Journal of Construction Engineering and Management, 143(8): 04017051, ISSN 0733-9364
Xu, Y and Turkan, Y (2020) BrIM and UAS for bridge inspections and management. Engineering, Construction and Architectural Management, 27(3), pp. 785-807. ISSN 0969-9988
Yamaguchi, H; Uher, T E and Runeson, G (2002) Negotiation analysis of risk allocation for PFI projects. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Yamaguchi, Hiroaki (2002) Risk allocation in privately financed projects. PhD thesis, University of New South Wales, Australia.
Yang, J B and Tsai, M K (2011) Computerizing ICBF method for schedule delay analysis. Journal of Construction Engineering and Management, 137(8), pp. 583-591. ISSN 0733-9364
Yang, J B and Yin, P C (2009) Isolated collapsed but-for delay analysis methodology. Journal of Construction Engineering and Management, 135(7), pp. 570-578. ISSN 0733-9364
Yap, J B H; Skitmore, M; Lim, Y W; Loo, S C and Gray, J (2022) Assessing the expected current and future competencies of quantity surveyors in the Malaysian built environment. Engineering, Construction and Architectural Management, 29(6), pp. 2415-2436. ISSN 0969-9988
Yearley T, H K B W (2013) Reducing building electricity use by increasing occupant perceived control. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Yitmen, I and Alibaba, H Z (2005) An investigation of self-sustaining finance systems for property development in North Cyprus. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Yiu, T W; Cheung, S O and Mok, F M (2006) Logistic likelihood analysis of mediation outcomes. Journal of Construction Engineering and Management, 132(10), pp. 1026-1036. ISSN 0733-9364
Yiu, T W; Cheung, S O and Siu, L Y (2012) Application of bandura's self-efficacy theory to examining the choice of tactics in construction dispute negotiation. Journal of Construction Engineering and Management, 138(3), pp. 331-340. ISSN 0733-9364
Yiu, T W and Chung, Y N (2014) Face-saving tactics as an aid to construction negotiation in Hong Kong. Engineering, Construction and Architectural Management, 21(6), pp. 609-630. ISSN 0969-9988
Yiu, T W and Lai, W Y (2009) Efficacy of trust-building tactics in construction mediation. Journal of Construction Engineering and Management, 135(8), pp. 683-689. ISSN 0733-9364
Yiu, T W and Law, Y M (2011) Moderating effect of equity sensitivity on behavior-outcome relationships in construction dispute negotiation. Journal of Construction Engineering and Management, 137(5), pp. 322-332. ISSN 0733-9364
Yiu, T W and Lee, H K (2011) How do personality traits affect construction dispute negotiation? Study of big five personality model. Journal of Construction Engineering and Management, 137(3), pp. 169-178. ISSN 0733-9364
Yiu, T W; Liu, T and Kwok, L C (2018) Explicating the role of relationship in construction claim negotiations. Journal of Construction Engineering and Management, 144(2): 04017114, ISSN 0733-9364
Yong-Woo, K and Rhee, B-D (2024) Incentive-based coordination for scheduled delivery in prefab construction. Construction Management and Economics, 42(7), pp. 624-639. ISSN 01446193
Yoon, J H and Pishdad-Bozorgi, P (2022) State-of-the-art review of blockchain-enabled construction supply chain. Journal of Construction Engineering and Management, 148(2): 03121008, ISSN 0733-9364
You, H; Xu, F and Du, J (2023) Improved boundary identification of stacked objects with sparse lidar augmentation scanning. Journal of Construction Engineering and Management, 149(11): 04023104, ISSN 0733-9364
Younis, G E (2010) Minimizing construction disputes. PhD thesis, University of Salford, UK.
Yousefi, S (2009) Attitude-based strategic and tactical negotiations for conflict resolution in construction. PhD thesis, University of Waterloo, USA.
Yousefzadeh, S; Spillane, J P; Lamont, L; McFadden, J and Lim, J P B (2015) Building information modelling (BIM) software interoperability: A review of the construction sector. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Yu, R K T and Leung, M Y (2001) Investigation of construction conflict resolution in Hong Kong. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Yu, T W (2007) A value management framework for systematic identification and precise representation of client requirements in the briefing process. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Zainul Abidin, N and Amir Shariffuddin, N A (2019) Engaging consultants in green projects: Exploring the practice in Malaysia. Smart and Sustainable Built Environment, 8(1), pp. 80-94. ISSN 2046-6099
Zakeri Afshar, A; Abbasianjahromi, H; Mirhosseini, S M and Ehsanifar, M (2025) Determining the range of negotiable prices for public–private partnership infrastructure projects: A simulation approach. International Journal of Building Pathology and Adaptation, 43(1), pp. 50-74. ISSN 2398-4708
Zapata-Lancaster, G and Tweed, C (2016) Tools for low-energy building design: An exploratory study of the design process in action. Architectural Engineering and Design Management, 12(4), pp. 279-295. ISSN 1745-2007
Zeberga, M S; Haaskjold, H and Hussein, B (2024) Digital technologies for preventing, mitigating, and resolving contractual disagreements in the AEC industry: A systematic literature review. Journal of Construction Engineering and Management, 150(6): 03124002, ISSN 0733-9364
Zeiler, W; Vissers, D; Maaijen, R and Boxem, G (2014) Occupants' behavioural impact on energy consumption: 'Human-in-the-loop' comfort process control. Architectural Engineering and Design Management, 10(1-2), pp. 108-130. ISSN 1745-2007
Zeng, C (2014) Automated building information extraction and evaluation from high-resolution remotely sensed data. PhD thesis, University of Western Ontario, Canada.
Zerihun, A; Beza, D and Idrisi, M J (2025) Factors affecting contractor and subcontractor relationship and their effects on building project performance: Case of Addis Ababa. International Journal of Construction Management, 25(14), pp. 1716-1724. ISSN 1562-3599
Zhang, L.; Liu, B.; Ding, T.; Zhang, S. and Fu, Y. (2026) Matching conflict profiles with contractual and relational governance to enhance cooperation in construction projects: Evidence from China. Engineering, Construction and Architectural Management, 33(3), pp. 2606-2624. ISSN 0969-9988
Zhang, L (2019) To insist or to concede? Chinese contractors' behavioural strategies when handling disputed construction claims. PhD thesis, University of Manchester, UK.
Zhang, L; Fenn, P and Fu, Y (2019) To insist or to concede? Contractors' behavioural strategies when handling disputed claims. Engineering, Construction and Architectural Management, 26(3), pp. 424-443. ISSN 0969-9988
Zhang, L; Fu, Y and Lu, W (2021) Contract enforcement for claimants' satisfaction with construction dispute resolution: Moderating role of shadow of the future, fairness perception, and trust. Journal of Construction Engineering and Management, 147(2): 04020168, ISSN 0733-9364
Zhang, S; Li, J; Li, Y and Zhang, X (2021) Revenue risk allocation mechanism in public-private partnership projects: Swing option approach. Journal of Construction Engineering and Management, 147(1): 04020153, ISSN 0733-9364
Zhang, X; Austin, S; Glass, J and Mills, G (2008) Toward collective organizational values: A case study in UK construction. Construction Management and Economics, 26(10), pp. 1009-1028. ISSN 1466433X
Zhang, Y; Chang, R; Mao, W; Zuo, J; Zhang, W E and Liu, L (2025) Low-cost ios-based automated detection of under-construction interior drywalls: An exploratory study. Journal of Construction Engineering and Management, 151(10): 05025012, ISSN 0733-9364
Zhang, Y; Xiao, B and Li, X (2024) Integrating virtual reality and consensus models for streamlined built environment design collaboration. Journal of Construction Engineering and Management, 150(4): 04024010, ISSN 0733-9364
Zhang, Z (2021) Participatory ergonomics in construction: Enabling practice-to-research-to-practice via the 2safemodel. PhD thesis, University of Washington, USA.
Zhao, S; Lu, T F; Statsenko, L; Koch, B and Garcia, C (2022) A framework for near real-time rom stockpile modelling to improve blending efficiency. Journal of Engineering, Design and Technology, 20(2), pp. 497-515. ISSN 1726-0531
Zhao, T and Dungan, J M (2014) Improved baseline method to calculate lost construction productivity. Journal of Construction Engineering and Management, 140(2): 06013006, ISSN 0733-9364
Zhou, H (2021) Institution building, organisational restructuring and everyday negotiations in Uganda's roads sector. PhD thesis, SOAS, University of London, UK.
Zhu, F; Wang, L; Yu, M and Yang, X (2020) Quality of conflict management in construction project context: Conceptualization, scale development, and validation. Engineering, Construction and Architectural Management, 27(5), pp. 1191-1211. ISSN 0969-9988
Zhu, L (2015) Design of a bankable and resilient financial arrangement for PPP projects using game theory with multi-agent simulation. PhD thesis, National University of Singapore, Singapore.
Zhu, Y; Brigham, J C and Fascetti, A (2025) Lidar-rgb data fusion for four-dimensional uav-based monitoring of reinforced concrete bridge construction: Case study of the fern hollow bridge reconstruction. Journal of Construction Engineering and Management, 151(1): 05024016, ISSN 0733-9364
Zou, W and Kumaraswamy, M (2009) Game theory based understanding of dynamic relationships between public and private sectors in PPPs. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
de Souza-Daw, T and Ross, R (2023) Fraud in higher education: A system for detection and prevention. Journal of Engineering, Design and Technology, 21(3), pp. 637-654. ISSN 1726-0531
de Souza-Daw, T; Ross, R; Nhan, T D; Hung, L A; Trung, N D Q; Chau, L H; Phuong, H M; Ngoc, L H and Nkhoma, M (2015) Design and evaluation of a low-cost street-level image capturing vehicle for south-east Asia. Journal of Engineering, Design and Technology, 13(4), pp. 579-595.
ng, S T; Fang, Y and Skitmore, R M (2008) Negotiation of on-site buffer stocks: A fuzzy non-structural fuzzy decision support system approach. Construction Innovation, 8(3), pp. 202-217. ISSN 1471-4175
ng, S T; Skitmore, M; Deng, M Z M and Nadeem, A (2004) Improving existing delay analysis techniques for the establishment of delay liabilities. Construction Innovation, 4(1), pp. 3-17. ISSN 1471-4175
ter Huurne, R B A; Olde Scholtenhuis, L L; Dorée, A G and van Oers, B (2024) Using formative interventions to study emerging technologies in construction practices: the case of the Ground Penetrating Radar. Construction Management and Economics, 42(11-12), pp. 943-962. ISSN 01446193
van den Hurk, M (2015) What's the deal? Standardizing contracts for public-private partnerships. PhD thesis, Universiteit Antwerpen, Belgium.
van der Meer, Jeroen (2021) Raising risk awareness in infrastructure tenders. PhD thesis, University of Twente, Netherlands.
Çevikbaş, M; Okudan, O and Işlk, Z (2022) New delay-analysis method using modified schedule and modified updated schedule for construction projects. Journal of Construction Engineering and Management, 148(11): 04022119, ISSN 0733-9364
Çıdık, M S (2020) Project managing the social value of built assets: A call for a focus on value manifestation. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Ünsal Altuncan, I and Tanyer, A M (2018) Context-dependent construction conflict management performance analysis based on competency theory. Journal of Construction Engineering and Management, 144(12): 04018112, ISSN 0733-9364