Items with Subject: concrete and cementitious materials

Number of items: 208.

Abadou, Y; Ghrieb, A; Bustamante, R and Faid, H (2020) Optimization by mixture design approach: Impact of marble and ceramic recycle on properties of mortar based on air lime. Journal of Engineering, Design and Technology, 18(6), pp. 1731-1747. ISSN 1726-0531

Abdel-Fattah, A (2013) Dynamic site layout planning model. PhD thesis, University of Calgary, Canada.

Abdelhamid, T S and Everett, J G (1999) Physiological demands of concrete slab placing and finishing work. Journal of Construction Engineering and Management, 125(1), pp. 47-52. ISSN 0733-9364

Aboshia, A M A; Rahmat, R A; Zain, M F M and Ismail, A (2017) Enhancing mortar strengths by ternary geopolymer binder of metakaolin, slag, and palm ash. International Journal of Building Pathology and Adaptation, 35(5), pp. 438-455.

Abou Houraira, A; Ouali, A; Elhammoumi, O and Fekri, A (2023) Effect of accelerated aging by temperature and moisture variation cycles on the durability of concrete. International Journal of Building Pathology and Adaptation, 41(3), pp. 533-548. ISSN 23984708

Abubakri, S; Mangat, P S; Grigoriadis, K and Starinieri, V (2025) Pore properties and moisture loss of repair mortars under low-impact microwave curing. International Journal of Building Pathology and Adaptation, 43(4), pp. 749-765. ISSN 2398-4708

Adio, Obafemi Adekunle (2022) An automated knowledge-based decision support system for managing non-conformances on australia's large infrastructure projects. PhD thesis, University of Melbourne, Australia.

Akanmu, A; Olayiwola, J and Olatunji, O A (2020) Musculoskeletal disorders within the carpentry trade: Analysis of timber flooring subtasks. Engineering, Construction and Architectural Management, 27(9), pp. 2577-2590. ISSN 0969-9988

Al Niyadi, R (2024) Public relations mediation in citizen engagement for Oman’s nation-building: The case of Oman vision 2040. PhD thesis, Lancaster University, UK.

Alabi, A G F; Ajiboye, T K and Olusegun, H D (2010) Investigating the cutting forces in heat treated medium carbon steel when turning on a lathe machine. Journal of Engineering, Design and Technology, 8(1), pp. 80-93. ISSN 1726-0531

Alanjari, P; Razavialavi, S and AbouRizk, S (2015) Hybrid genetic algorithm-simulation optimization method for proactively planning layout of material yard laydown. Journal of Construction Engineering and Management, 141(10): 06015001, ISSN 0733-9364

Alikhani, H and Latifi, M (2024) Evaluation of the healing performance of hot-mix asphalt containing waste steel shavings under different microwave induction healing cycles. Journal of Construction Engineering and Management, 150(1): 04023153, ISSN 0733-9364

Alkass, S; Arouian, A and Moselhi, O (1993) Computer-aided equipment selection for transporting and placing concrete. Journal of Construction Engineering and Management, 119(3), pp. 445-465. ISSN 0733-9364

Alkoc, E and Erbatur, F (1998) Simulation in concreting operations: A comparison of models and resource combinations. Engineering, Construction and Architectural Management, 5(2), pp. 159-173. ISSN 0969-9988

Alkoc, E and Erbatur, F (1998) Site expert: A prototype knowledge-based expert system. Engineering, Construction and Architectural Management, 5(3), pp. 238-251. ISSN 0969-9988

Almadhoob, Huda Mohamed Ali Hasan Husain (2020) Self-organising networks in complex infrastructure projects: the case of London Bank Station Capacity Upgrade Project. PhD thesis, University College London, UK.

Alsofyani, S (2021) An analysis of how culture influences the arbitration process used to resolve disputes on construction projects in Saudi Arabia. PhD thesis, University of Plymouth, UK.

Anike, E E; Saidani, M; Ganjian, E; Tyrer, M and Olubanwo, A O (2019) The potency of recycled aggregate in new concrete: a review. Construction Innovation, 19(4), pp. 594-613. ISSN 1471-4175

Anson, M and Siu, M F F (2020) Augmented balance point diagrams for matching site and concrete-supply resources. Journal of Construction Engineering and Management, 146(4): 04020021, ISSN 0733-9364

Anson, M; Tang, S L and Ying, K C (2002) Measurement of the performance of ready mixed concreting resources as data for system simulation. Construction Management and Economics, 20(3), pp. 237-250. ISSN 01446193

Anson, M and Wang, S Q (1998) Performance of concrete placing in Hong Kong buildings. Journal of Construction Engineering and Management, 124(2), pp. 116-124. ISSN 0733-9364

Anson, M; Ying, K C T and Siu, M F F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(8), pp. 1672-1695. ISSN 0969-9988

Antoni, A; Yonathan, A; Suryo, H E; Felio, C; Ghozali, K E and Hardjito, D (2021) Exploring the potential of low cement concrete through a student concrete competition. International Journal of Construction Education and Research, 17(1), pp. 37-51. ISSN 1557-8771

Anumba, C; Dainty, A R J; Ison, S G and Sergeant, A (2005) The application of GIS to construction labour market planning. Construction Innovation, 5(4), pp. 219-230. ISSN 1471-4175

Asa, E; Shrestha, M; Baffoe-Twum, E and Awuku, B (2020) Development of sustainable construction material from fly ash Class C. Journal of Engineering, Design and Technology, 18(6), pp. 1615-1640. ISSN 1726-0531

Aurangzeb, Q (2014) Impact of reclaimed asphalt pavements on pavement sustainability. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Babangida, I (2014) Hierarchical structuring and evaluation of risks, uncertainties and technical challenges faced by building refurbishment contractors. PhD thesis, University of Bolton, UK.

Babangida, I; Olubodun, F and Kangwa, J (2012) Building refurbishment: Holistic evaluation of barriers and opportunities. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Badger, W; Sullivan, K; Wiezel, A and Bopp, P H (2009) Profiling the leadership of project managers. International Journal of Construction Education and Research, 5(2), pp. 121-146. ISSN 1557-8771

Bagheri-Zadeh, S H; Kim, H; Hounsell, S; Wood, C R; Soleymani, H and King, M (2007) Field study of concrete maturity methodology in cold weather. Journal of Construction Engineering and Management, 133(11), pp. 827-835. ISSN 0733-9364

Bai, Y and Amirkhanian, S N (1994) Knowledge-based expert system for concrete mix design. Journal of Construction Engineering and Management, 120(2), pp. 357-373. ISSN 0733-9364

Balamurali Kanagaraj; Tattukolla Kiran; Anand N; Khalifa Al Jabri and Justin S (2023) Development and strength assessment of eco-friendly geopolymer concrete made with natural and recycled aggregates. Construction Innovation, 23(3), pp. 524-545. ISSN 1471-4175

Bambrick, B (1994) Construction of an island. Journal of Construction Engineering and Management, 120(1), pp. 223-227. ISSN 0733-9364

Barham, W; Al-Maabreh, A and Latayfeh, O (2023) Effect of using magnetic water on the mechanical properties of concrete exposed to elevated temperature. International Journal of Building Pathology and Adaptation, 41(5), pp. 1086-1098. ISSN 23984708

Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.

Basyouni, Y. A.; Shokry, H.; Murata, R. and Mahmoud, H. (2026) Novel development of affordable composite eco-cool roof tiles from waste materials: An experimental study. Architectural Engineering and Design Management, 22(3), pp. 900-925. ISSN 1745-2007

Beavers, J E; Moore, J R; Rinehart, R and Schriver, W R (2006) Crane-related fatalities in the construction industry. Journal of Construction Engineering and Management, 132(9), pp. 901-910. ISSN 0733-9364

Bernold, L E and Salim, M (1993) Placement-oriented design and delivery of concrete reinforcement. Journal of Construction Engineering and Management, 119(2), pp. 323-335. ISSN 0733-9364

Bew, M D (2017) Engineering better social outcomes through requirements management & integrated asset data processing. PhD thesis, University of Salford, UK.

Bilec, M M (2007) A hybrid life cycle assessment model for construction processes. PhD thesis, University of Pittsburgh, USA.

Bilec, Melissa M (2007) A hybrid life cycle assessment model for construction processess. PhD thesis, University of Pittsburgh, USA.

Bina, K and Moghadas, N (2021) BIM-abm simulation for emergency evacuation from conference hall, considering gender segregation and architectural design. Architectural Engineering and Design Management, 17(5-6), pp. 361-375. ISSN 1745-2007

Burke, C K A (2015) Generating social value through public sector construction procurement: A study of local authorities and SMEs. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Buyukyoran, F and Gundes, S (2018) Optimized real options-based approach for government guarantees in PPP toll road projects. Construction Management and Economics, 36(4), pp. 203-216. ISSN 01446193

Cai, H; Rahman, A; Su, X and Zhang, H (2014) A GIS-microscopic simulation approach for optimizing road barrier placement and configuration in university campus emergency evacuation. International Journal of Disaster Resilience in the Built Environment, 5(4), pp. 362-379. ISSN 1759-5916

Carlsson, V and Koch, C (2014) Shall we dance? Encounters for energy renovation of single family houses. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Carollo, Federica Carla (2023) Circularity in the construction and demolition waste management chain. PhD thesis, Politecnico di Milano, Italy.

Casady, C B and Baxter, D (2020) Pandemics, public-private partnerships (PPPs), and force majeure: COVID-19 expectations and implications. Construction Management and Economics, 38(12), pp. 1077-1085. ISSN 01446193

Celik, T (1989) Improving concrete quality by using an expert system. PhD thesis, Loughborough University, UK.

Chandra, Shailja (2006) Investigating green building assessment tools: a risk-analysis based approach. PhD thesis, University of New South Wales, Australia.

Chen, R; Tan, Y; Zhang, B; Shen, W; Liu, G and Wang, Z (2018) Installation of integral prefabricated bridge abutment and pier with flexible water stop curtain. Journal of Construction Engineering and Management, 144(9): 04018087, ISSN 0733-9364

Cheng, M Y and Yang, S C (2001) GIS-based cost estimates integrating with material layout planning. Journal of Construction Engineering and Management, 127(4), pp. 291-299. ISSN 0733-9364

De Oliveira, A L and Prudêncio, L R (2015) Evaluation of the superficial texture of concrete pavers using digital image processing. Journal of Construction Engineering and Management, 141(10): 04015034, ISSN 0733-9364

Demirel, H C (2022) Dealing with uncertainty in infrastructure public-private partnership projects. PhD thesis, Delft University of Technology, Netherlands.

Donohoe, S and Brooks, L (2007) Reflections on construction management procurement following Great Eastern Hotel company v. John laing. Construction Management and Economics, 25(7), pp. 701-708. ISSN 1466433X

Downey, M (2014) Selection and adoption of low and zero carbon technologies in social housing: a socio-technical network approach. PhD thesis, University of Reading, UK.

Dunlop, P and Smith, S (2000) Stochastic modelling of concrete operations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Dunlop, P G (2005) Investigation, modelling and planning of stochastic concrete placing operations. PhD thesis, University of Edinburgh, UK.

Dutta, A (2020) An in-depth investigation of the effects of work-related factors on the development of knee musculoskeletal disorders among construction roofers. PhD thesis, West Virginia University, USA.

Dutta, A; Breloff, S P; Dai, F; Sinsel, E W; Warren, C M and Wu, J Z (2020) Identifying potentially risky phases leading to knee musculoskeletal disorders during shingle installation operations. Journal of Construction Engineering and Management, 146(3): 04019118, ISSN 0733-9364

Duwebi, N; Gorse, C; Sturges, J and Bates, M (2017) Reporting corporate sustainability and the challenges of political rhetoric. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Ebrahimy, Y; AbouRizk, S M; Fernando, S and Mohamed, Y (2011) Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. Engineering, Construction and Architectural Management, 18(5), pp. 462-480. ISSN 0969-9988

Edike, U E; Adenuga, O A; Idusuyi, D U and Oke, A A (2025) Effect of curing media on the performance of clay bricks partially stabilised with pulverised cow bone ash. Journal of Engineering, Design and Technology, 23(2), pp. 442-457. ISSN 1726-0531

Eftekhari, M M (1996) Ventilator air flow measurement in new houses. Building Research & Information, 24(3), pp. 176-182. ISSN 0961-3218

El Ghazali, Y (2013) Implications of RFID in a supply chain: Process, knowledge management and performance. PhD thesis, Ecole Polytechnique, Montreal, Canada.

Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193

Elimov, R (2003) The control of concrete quality during slipforming operations. PhD thesis, Universite de Sherbrooke, Canada.

Fathi, M and Shrestha, P P (2022) Public-private partnership project performance analysis compared to design-build in highway projects. Journal of Construction Engineering and Management, 148(11): 04022118, ISSN 0733-9364

Fernandez-Solis, J L (2013) Building construction: A deterministic non-periodic flow-a case study of chaos theories in tracking production flow. Architectural Engineering and Design Management, 9(1), pp. 21-48. ISSN 1745-2007

Fletcher, S L (2001) Developing disassembly strategies for buildings to reduce the lifetime environmental impacts by applying a systems approach. PhD thesis, University of Sheffield, UK.

Forbes, D R; McGurnaghan, H; Graham, L D and Smith, S D (2004) Concrete placing productivity using a novel neural network design. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Gaddala, K and Raju, P S (2020) Optimal location of UPQC for power quality improvement: Novel hybrid approach. Journal of Engineering, Design and Technology, 18(6), pp. 1519-1541. ISSN 1726-0531

Gambatese, J A (2003) Controlled concrete demolition using expansive cracking agents. Journal of Construction Engineering and Management, 129(1), pp. 98-104. ISSN 0733-9364

Gashahun, A D (2022) Investigating sand quality effect on concrete strength: A case of debre markos and its vicinities. International Journal of Construction Management, 22(12), pp. 2234-2242. ISSN 1562-3599

Ghanbarpour, S; Mazaheripour, H; Mirmoradi, S H and Barari, A (2010) The effect of type and volume fraction (vf) of steel fiber on the mechanical properties of self-compacting concrete. Journal of Engineering, Design and Technology, 8(3), pp. 247-256. ISSN 1726-0531

Ghoddousi, P; Bahrami, N; Chileshe, N and Hosseini, M R (2014) Mapping site-based construction workers' motivation: Expectancy theory approach. Construction Economics and Building, 14(1), pp. 60-77. ISSN 2204-9029

Gonsalves, N; Ogunseiju, O R and Akanmu, A A (2024) Activity recognition from trunk muscle activations for wearable and non-wearable robot conditions. Smart and Sustainable Built Environment, 13(6), pp. 1370-1385. ISSN 2046-6099

Graham, D; Smith, S D and Tommelein, I D (2005) Cost of concrete placement for contractors. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Graham, L D; Smith, S D and Dunlop, P (2005) Lognormal distribution provides an optimum representation of the concrete delivery and placement process. Journal of Construction Engineering and Management, 131(2), pp. 230-238. ISSN 0733-9364

Hachem, A A K; Khatib, J M and Ezzedine El Dandachy, M (2025) Assessment of interfacial mortar-mortar bond and pure shear strength of metakaolin-based geopolymer. International Journal of Building Pathology and Adaptation, 43(4), pp. 732-748. ISSN 2398-4708

Henriksen, T; Lo, S; Knaack, U and Kirkegaard, P H (2023) Developing and testing a novel manufacturing method for complex geometry thin-walled gfrc panels by fabricating a 10 m high, self-supporting gfrc hyperbolic shell. Architectural Engineering and Design Management, 19(5), pp. 480-510. ISSN 1745-2007

Herbert, M (2000) Performance and the virtual team. PhD thesis, Loughborough University, UK.

Higham, A and Thomson, C (2015) An evaluation of construction professionals sustainability literacy in North West England. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Hinze, J and Parker, R (1988) Productivity study on extruded concrete curbing operations. Journal of Construction Engineering and Management, 114(2), pp. 256-262. ISSN 0733-9364

Hinze, J and Wiegand, F (1992) Role of designers in construction worker safety. Journal of Construction Engineering and Management, 118(4), pp. 677-684. ISSN 0733-9364

Holden, S L (2021) Land, materials, and construction site: Decommodification through alternative construction. PhD thesis, University of Manchester, UK.

Hong, Y; Hammad, A W A; Sepasgozar, S and Akbarnezhad, A (2019) BIM adoption model for small and medium construction organisations in Australia. Engineering, Construction and Architectural Management, 26(2), pp. 154-183. ISSN 0969-9988

Hopkin, T; Lu, S L; Rogers, P and Sexton, M G (2014) Placing defects at the heart of high quality new homes: The learning perspective. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Horne, M; Hill, R and Giddings, R (1999) Visualization of photovoltaic clad buildings. Building Research & Information, 27(2), pp. 96-108. ISSN 0961-3218

Isied, M M (2023) Critical assessment of asphalt mixture design procedures and asphalt mixture classification systems. PhD thesis, North Carolina State University, USA.

Jayawardane, A K; Price, A D and Harris, F C (1995) Measurement of brickwork and blockwork productivity: Part A: Productivity of operations can be improved by accurate estimating, good planning, optimum use of resources and having a sound knowledge of the productivity variables. Building Research & Information, 23(2), pp. 81-86. ISSN 0961-3218

Jin, H; Liu, S; Li, J and Liu, C (2023) Determination of government guarantee and revenue cap in public-private partnership contracts. Engineering, Construction and Architectural Management, 30(2), pp. 393-414. ISSN 0969-9988

Jin, R (2013) A statistical modeling approach to studying the effects of alternative and waste materials on green concrete properties. PhD thesis, Ohio State University, USA.

Johnston, D W; Kahn, K P and Phillips, J B (1989) Formwork pressures in tall and thick concrete walls. Journal of Construction Engineering and Management, 115(3), pp. 444-461. ISSN 0733-9364

Karami, S (2008) Using by-product industrial materials to replace all cement in construction products. PhD thesis, Coventry University, UK.

Karri, S K; Ponnada, M R and Veerni, L (2024) Durability and microstructure study of alkali-activated slag concrete with quartz sand subjected to different exposure conditions. Journal of Engineering, Design and Technology, 22(1), pp. 42-59. ISSN 1726-0531

Kerali, A G and Thomas, T H (2002) Effect of mix retention and curing on low-cement walling blocks. Building Research & Information, 30(5), pp. 362-366. ISSN 0961-3218

Kerali, A G and Thomas, T H (2004) Simple durability test for cement stabilized blocks. Building Research & Information, 32(2), pp. 140-145. ISSN 0961-3218

Khatib, J; ElKhatib, L; Assaad, J and El Kordi, A (2025) Properties of mortar containing phragmites australis ash. Journal of Engineering, Design and Technology, 23(2), pp. 666-681. ISSN 1726-0531

Kim, W S; Minh Tam, N and Jung, D H (2005) Experimental study on strength of cement stabilized clay. Journal of Engineering, Design and Technology, 3(2), pp. 116-126. ISSN 1726-0531

Kirgiz, M S (2011) Chemical properties of blended cement pastes. Journal of Construction Engineering and Management, 137(12), pp. 1036-1042. ISSN 0733-9364

Kishk, M and Oladunjoye, B (2009) Risk assessment and allocation in Nigerian oil and gas projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Knost, Benjamin (2022) Incorporating resilience in infrastructure investment decisions: Developed framework, specifications, estimations, and evaluation. PhD thesis, Ohio State University, USA.

Koutsomarkos, V (2023) Developing a fire robustness index for the built environment. PhD thesis, University of Edinburgh, UK.

Kumar, S; Singh, L K; Roy, L B; Kumar, R and Lal, D (2025) Enhancing the sustainability of slope stability in embankment construction by leveraging smart sensors and monitoring systems for data-driven insights. International Journal of Construction Management, 25(16), pp. 2102-2120. ISSN 1562-3599

Kumaraswamy, M M (1997) Productivity matters. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.

Lee, E B (2000) Constructability and productivity analysis for long life pavement rehabilitation strategies (LLPRS). PhD thesis, University of California, Berkeley, USA.

Lee, H S; Lee, J Y and Lee, J S (1999) Nonshored formwork system for top-down construction. Journal of Construction Engineering and Management, 125(6), pp. 392-399. ISSN 0733-9364

Leu, S S and Hwang, S T (2001) Optimal repetitive scheduling model with shareable resource constraint. Journal of Construction Engineering and Management, 127(4), pp. 270-280. ISSN 0733-9364

Li, J J (2023) A socio-technical framework to guide implementation and value realisation of distributed ledger technologies (DLT) in the construction sector. PhD thesis, Northumbria University, UK.

Lingard, H and Francis, V (2005) The decline of the 'traditional' family: Work-life benefits as a means of promoting a diverse workforce in the construction industry of Australia. Construction Management and Economics, 23(10), pp. 1045-1057. ISSN 01446193

Lingard, H; Pink, S; Hayes, J; McDermott, V and Harley, J (2016) Using participatory video to understand subcontracted construction workers' safety rule violations. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Lovencin, W (2006) Assessment of design and properties for flowable fill usage in highway pavement construction for conditions in Florida. PhD thesis, University of Florida, USA.

Lu, M and Anson, M (2004) Establish concrete placing rates using quality control records from Hong Kong building construction projects. Journal of Construction Engineering and Management, 130(2), pp. 216-224. ISSN 0733-9364

Lu, S L; Sexton, M G; Abbott, C and Jones, V (2007) What are the key turning points in female career progression? The case of a senior manager in a small construction firm. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Luo, S; Liu, Z; Yang, X; Lu, Q and Yin, J (2019) Construction technology of warm and hot mix epoxy asphalt paving for long-span steel bridge. Journal of Construction Engineering and Management, 145(12): 04019074, ISSN 0733-9364

Mah, D; Manrique, J D; Yu, H; Al-Hussein, M and Nasseri, R (2011) House construction CODN2/DN footprint quantification: A BIM approach. Construction Innovation, 11(2), pp. 161-178. ISSN 1471-4175

Mahdavinejad, M; Bemanian, M; Abolvardi, G and Elhamian, S M (2012) Analyzing the state of seismic consideration of architectural non-structural components (ANSCs) in design process (based on IBC). International Journal of Disaster Resilience in the Built Environment, 3(2), pp. 133-147. ISSN 1759-5916

Mamari, M A; Khan, H M; Al Saadi, S and Al Hashim, A (2025) Impact of windcatcher on the thermal comfort and indoor air quality in a modern house. Building Research & Information, 53(1-2), pp. 204-219. ISSN 0961-3218

Marzouk, M; Said, H and El-Said, M (2009) Framework for multiobjective optimization of launching girder bridges. Journal of Construction Engineering and Management, 135(8), pp. 791-800. ISSN 0733-9364

McWhirter, N and Shealy, T (2020) Case-based flipped classroom approach to teach sustainable infrastructure and decision-making. International Journal of Construction Education and Research, 16(1), pp. 3-23. ISSN 1557-8771

Mecca, S (1999) A model of construction planning procedure according to contingency theory. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Melete, Refiloe (2024) An analysis of the effectiveness of the infrastructure delivery management system in the South African government. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.

Mensah, S; Ameyaw, C; Abaitey, B A and Yeboah, H O (2022) Optimizing stabilization of laterite as walling unit. Journal of Engineering, Design and Technology, 20(6), pp. 1482-1498. ISSN 1726-0531

Mirzaee, A M; Hosseini, M R; Martek, I; Rahnamayiezekavat, P and Arashpour, M (2023) Mitigation of contractual breaches in international construction joint ventures under conditions of absent legal recourse: Case studies from Iran. Engineering, Construction and Architectural Management, 30(4), pp. 1481-1495. ISSN 0969-9988

Mohammed, R E (2007) An exploratory system dynamics model to investigate the relationships between errors that occur in construction documents in Saudi Arabia and their possible causes. PhD thesis, Heriot-Watt University, UK.

Mollo, L (2015) Influence of cement/sand ratio on behavior of cement mortar. Journal of Engineering, Design and Technology, 13(1), pp. 23-36.

Moon, S and Munira Chowdhury, A (2021) Utilization of prior information in neural network training for improving 28-day concrete strength prediction. Journal of Construction Engineering and Management, 147(5): 2047, ISSN 0733-9364

Moon, S; Zekavat, P R and Bernold, L E (2017) Dynamic quality control of process resource to improve concrete supply chain. Journal of Construction Engineering and Management, 143(5): 04016130, ISSN 0733-9364

Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.

Moselhi, O; Fazio, P and Hason, S (1992) Automation of concrete slab-on-grade construction. Journal of Construction Engineering and Management, 118(4), pp. 731-748. ISSN 0733-9364

Moussavi Nadoushani, Z S; Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(7), pp. 938-957. ISSN 0969-9988

Moussavi Nadoushani, Zahra Sadat (2018) A computational approach for estimating and minimizing construction-related and end-of-life carbon footprint of concrete structures. PhD thesis, University of New South Wales, Australia.

Muhammad, A; Usman, N and Gambo, N (2022) Effect of binary blended pozzolanic materials on properties of self-compacting concrete. International Journal of Construction Management, 22(7), pp. 1323-1332. ISSN 1562-3599

Muleya, F; Mulenga, B; Zulu, S L; Nwaubani, S; Tembo, C K and Mushota, H (2021) Investigating the suitability and cost-benefit of copper tailings as partial replacement of sand in concrete in Zambia: An exploratory study. Journal of Engineering, Design and Technology, 19(4), pp. 828-849. ISSN 1726-0531

Mzyece, D (2015) An investigation into the implementation of the Construction (Design and Management) Regulations in the construction industry. PhD thesis, University of Wolverhampton, UK.

Neamat, S D; Haido, J H and Wardeh, G (2025) Investigating pozzolanic glass waste's role in reinforcing ultra-high-performance concrete beams for enhanced sustainability. International Journal of Building Pathology and Adaptation, 43(4), pp. 633-651. ISSN 2398-4708

Nikmehr, B; Kafle, B and Al-Ameri, R (2024) Developing a sustainable self-compacting geopolymer concrete with 100% geopolymer-coated recycled concrete aggregate replacement. Smart and Sustainable Built Environment, 13(2), pp. 395-424. ISSN 2046-6099

Niveditha, M. and Palanisamy, T. (2026) Upcycling iron-rich industrial waste into a carbon-sequestering composite binder through optimized carbonation curing for structural applications. International Journal of Construction Management, 26(8), pp. 1471-1489. ISSN 1562-3599

O'Connor, J T; Leite, F and Ma, J W (2023) Expanding advanced work packaging to include commissioning and startup for industrial projects. Construction Innovation, 23(5), pp. 939-960. ISSN 1471-4175

Onturk, K; Firat, S; Yilmaz, G and Khatib, J (2022) Waste utilization to enhance performance of road subbase fill. Journal of Engineering, Design and Technology, 20(2), pp. 455-474. ISSN 1726-0531

Ostovar, M (2023) Environmental and social life cycle assessment (LCA) in transport infrastructure. PhD thesis, University of California, Davis, USA.

Pandey, S; Paudel, S; Devkota, K; Kshetri, K and Asteris, P G (2025) Machine learning unveils the complex nonlinearity of concrete materials' uniaxial compressive strength. International Journal of Construction Management, 25(6), pp. 635-649. ISSN 1562-3599

Pandian, A N and Palanivelu, A (2021) Metaheuristic optimization based placement of svcs with multiple objectives. Journal of Engineering, Design and Technology, 19(6), pp. 1586-1600. ISSN 1726-0531

Pareek, P; Han, S and Misra, S (2016) Application of Bayesian updating for real-time schedule estimation in a concreting operation. International Journal of Construction Management, 16(1), pp. 54-66. ISSN 1562-3599

Patil, S V; Balakrishna Rao, K and Nayak, G (2023) Prediction of recycled coarse aggregate concrete mechanical properties using multiple linear regression and artificial neural network. Journal of Engineering, Design and Technology, 21(6), pp. 1690-1709. ISSN 1726-0531

Peng, J L; Yen, T; Lin, Y; Wu, K L and Chen, W F (1997) Performance of scaffold frame shoring under pattern loads and load paths. Journal of Construction Engineering and Management, 123(2), pp. 138-145. ISSN 0733-9364

Pham, L T; Nguyen, T; Trinh, T; Nguyen, A; Do, Q; Bui, B and Xiao, J (2023) Development of 3D printers for concrete structures: Mix proportion design approach and laboratory testing. Smart and Sustainable Built Environment, 12(5), pp. 1056-1073. ISSN 2046-6099

Phelan, R S; Radjy, F; Haas, C and Hendrickson, C (1990) Computer-aided concrete-placement optimization. Journal of Construction Engineering and Management, 116(1), pp. 172-187. ISSN 0733-9364

Phraknoi, N (2022) Supply chain finance adoption: three is a crowd in entangled relationships. PhD thesis, Lancaster University, UK.

Pregenzer, L J; Seppanen, P J; Kunz, J C and Paulson, B C (1999) Value-added assessment of construction plans. Journal of Construction Engineering and Management, 125(4), pp. 242-248. ISSN 0733-9364

Price, T (2010) Site waste management plans, the designer and the CDM principal contractor. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(2), pp. 174-181. ISSN 0969-9988

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), pp. 577-587. ISSN 01446193

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) European construction contractors: A productivity appraisal of in situ concrete operations. Construction Management and Economics, 17(2), pp. 221-230. ISSN 01446193

Pérez, C T and Bastos Costa, D (2021) Increasing production efficiency through the reduction of transportation activities and time using 4D BIM simulations. Engineering, Construction and Architectural Management, 28(8), pp. 2222-2247. ISSN 0969-9988

Rahnamayie Zekavat, P (2014) Performance assessment of agile communication in construction. PhD thesis, University of New South Wales, Australia.

Rajagopalan, G (2019) Durability of alumina silicate concrete based on slag/fly ash blends against corrosion. Engineering, Construction and Architectural Management, 26(8), pp. 1641-1651. ISSN 0969-9988

Ramos, N M M and De Freitas, V P (2009) Experimental determination of the hygroscopic inertia of building materials. Building Research & Information, 37(3), pp. 293-299. ISSN 0961-3218

Rawlinson, F and Farrell, P (2008) Construction: A culture for concern? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Rethinam, A; Shivakumar, V D; Harish, L; Abhishek, M B; Ramana, G V; Madhusudana, R; Sah, R and Manjini, S (2015) Grain refinement of c-mn steel through thermo-mechanical processing. Journal of Engineering, Design and Technology, 13(2), pp. 282-297.

Ruhl, V R (1997) Computer-aided design and manufacturing of complex-shaped concrete formwork. DDes thesis, Harvard University, USA.

Rupasinghe, C S and De Silva Weliange, S (2024) Climate change adaptation and mitigation at individual level: Knowledge and attitudes among school teachers in Kalutara district. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 395-408. ISSN 1759-5916

Sadiqi, Zabihullah (2014) Post-disaster reconstruction projects: A logical framework for community participation. PhD thesis, Queensland University of Technology, Australia.

Sai Bharadwaj, B and Chennupati, S K (2023) Pli cancellation in ecg signal using intrinsic time scale decomposition with adaptive gain control. Journal of Engineering, Design and Technology, 21(6), pp. 1725-1745. ISSN 1726-0531

Sajjad, M; Jayasinghe, C and Perera, P (2024) Damage assessment automation for single storey detached masonry houses: a probabilistic approach. Building Research & Information, 52(5), pp. 551-563. ISSN 0961-3218

Santamaria Carrera, J L (2017) Quantifying the effect of construction site factors on concrete quality, costs and production rates. PhD thesis, University of New Mexico, USA.

Sarireh, M (2022) Examining the suitability of Tripoli as admixture in cement paste. International Journal of Construction Management, 22(16), pp. 3169-3174. ISSN 1562-3599

Schlueter, A (2010) Model-based, performance-oriented building design employing distributed service systems. DSc thesis, ETH Zürich, Switzerland.

Schuldt, S and El-Rayes, K (2018) Optimizing the planning of remote construction sites to minimize facility destruction from explosive attacks. Journal of Construction Engineering and Management, 144(5): 04018020, ISSN 0733-9364

Schünemann, C; Olfert, A; Schiela, D; Gruhler, K and Ortlepp, R (2020) Mitigation and adaptation in multifamily housing: Overheating and climate justice. Buildings & Cities, 1(1), pp. 36-55. ISSN 2632-6655

Shekhawat, P; Sharma, G and Singh, R M (2020) Durability analysis of eggshell powder–flyash geopolymer composite subjected to wetting–drying cycles. Journal of Engineering, Design and Technology, 18(6), pp. 2043-2060. ISSN 1726-0531

Sherratt, F; Sherratt, S and Ivory, C (2020) Challenging complacency in construction management research: The case of PPPs. Construction Management and Economics, 38(12), pp. 1086-1100. ISSN 01446193

Sherrin, C; McAllister, P and Nanda, A (2015) The persistence of distance: A macro-level perspective on European cross-border real estate development flows. Journal of Financial Management of Property and Construction, 20(2), pp. 147-169. ISSN 1366-4387

Shi, J; Liu, B; Tan, J; Dai, J; Chen, J and Ji, R (2020) Experimental studies and microstructure analysis for rapid-hardening cement emulsified asphalt mortar. Journal of Construction Engineering and Management, 146(12): 04020130, ISSN 0733-9364

Short, K M (2013) The impact of experiential learning: Assessing the outcomes of internship experiences for students entering the construction industry. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Shr, J F; Ran, B and Sung, C W (2004) Method to determine minimum contract bid for A + B+ I/D highway projects. Journal of Construction Engineering and Management, 130(4), pp. 509-516. ISSN 0733-9364

Sidwell, A C; Budiawan, D and ma, T (2001) The significance of the tendering contract on the opportunities for clients to encourage contractorled innovation. Construction Innovation, 1(2), pp. 107-116. ISSN 1471-4175

Singh, M M; Sawhney, A and Borrmann, A (2019) Integrating rules of modular coordination to improve model authoring in BIM. International Journal of Construction Management, 19(1), pp. 15-31. ISSN 1562-3599

Singh, S; Sharma, S K and Akbar, M A (2023) Heat resistance and sorptivity of an air-entrained concrete containing mineral admixtures and CBA. Journal of Engineering, Design and Technology, 21(2), pp. 527-551. ISSN 1726-0531

Skitmore, R M; Pettitt, A N and McVinish, R (2007) Gates' bidding model. Journal of Construction Engineering and Management, 133(11), pp. 855-863. ISSN 0733-9364

Smallwood, J (2005) The role of optimum health and safety (H&S) in construction marketing. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Smith, S (1998) Stochastic analysis of cyclic construction processes. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Smyth, H (2010) Construction industry performance improvement programmes: The UK case of demonstration projects in the 'continuous improvement' programme. Construction Management and Economics, 28(3), pp. 255-270. ISSN 1466433X

Sobuz, M H R; Meraz, M M; Saha, A; Akid, A S M; Hasan, N M S; Rahman, M and Safayet, M A (2024) Performance assessment of various seismic resistant systems for a multistory structure in different seismic zones of Bangladesh. Journal of Engineering, Design and Technology, 22(3), pp. 718-738. ISSN 1726-0531

Sourav, M M I; Russedul Islam, M; Mohibur Rahman, S and Istiak Jahan, M (2025) Heterogeneity in stakeholder's perceptions on delays in infrastructure projects: Scenario of Bangladesh. Engineering, Construction and Architectural Management, 32(6), pp. 3883-3913. ISSN 0969-9988

Stephenson, P (1988) Estimating, planning and control systems based on production data in the construction industry. PhD thesis, Sheffield City Polytechnic, UK.

Tang, S L; Ying, K C; Anson, M and Lu, M (2005) Rmcsim: A simulation model of a ready-mixed concrete plant serving multiple sites using multiple truckmixers. Construction Management and Economics, 23(1), pp. 15-31. ISSN 01446193

Thorpe, D and Zhuge, Y (2010) Advantages and disadvantages in using permeable concrete pavement as a pavement construction material. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Turner, P L (2017) A realist exploration of small firm tendering for public sector contracts: a micro-foundational study of capability. PhD thesis, Manchester Metropolitan University, UK.

Tuvayanond, W; Kamchoom, V and Prasittisopin, L (2026) Efficient machine learning for strength prediction of ready-mix concrete production (prolonged mixing). Construction Innovation, 26(2), pp. 369-394. ISSN 1471-4175

V Nithyapriyadharshini (2017) A study on the workplace issues faced by women labours in the construction industry in Chennai city. PhD thesis, Mother Teresa Womens University, India.

Vijaya Prasad, B; Paul Daniel, A P; Anand, N and Yadav, S K (2022) Strength and microstructure behaviour of high calcium fly ash based sustainable geo polymer concrete. Journal of Engineering, Design and Technology, 20(2), pp. 436-454. ISSN 1726-0531

Wang, S Q (1995) A methodology for comparing the productivities of the ready mixed concrete industries in major cities. Unpublished PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wang, S Q and Anson, M (2000) Comparison of the concreting productivities in Hong Kong and Beijing and a proposed comparison methodology. Construction Management and Economics, 18(3), pp. 363-372. ISSN 01446193

Waqar, A; Othman, I and Mansoor, M S (2026) Effect of human-centric technology adoption on sustainable construction success: A partial least square modeling. International Journal of Building Pathology and Adaptation, 44(1), pp. 36-54. ISSN 2398-4708

Wasserman, B (2012) Wash water in the mix: Effects on the compressive strength of concrete. International Journal of Construction Education and Research, 8(4), pp. 301-316. ISSN 1557-8771

Wefki, H; Salah, M; Elbeltagi, E; Elsheikh, A and Khallaf, R (2025) A generative design-based optimization model for multi-objective construction site layout planning. Engineering, Construction and Architectural Management, 32(8), pp. 5429-5455. ISSN 0969-9988

Wilson, J G and Gupta, N K (1996) Assessment of structure formation in fresh concrete by measurement of its electrical resistance. Building Research & Information, 24(4), pp. 209-212. ISSN 0961-3218

Winch, G and Campagnac, E (1995) The organization of building projects: An Anglo/French comparison. Construction Management and Economics, 13(1), pp. 3-14. ISSN 01446193

Winch, G M (2003) Models of manufacturing and the construction process: The genesis of re-engineering construction. Building Research & Information, 31(2), pp. 107-118. ISSN 0961-3218

Woodhead, R (1997) Exploring the hurdle rate in preparation for a value management workshop planning session. Journal of Financial Management of Property and Construction, 2(2), pp. 21-38. ISSN 1366-4387

Wright, J A (2005) An assessment of competitive advantage and market opportunities of UK construction companies operating in Europe. PhD thesis, University of Leeds, UK.

Ye, K; Zhu, W; Shan, Y and Li, S (2015) Effects of market competition on the sustainability performance of the construction industry: China case. Journal of Construction Engineering and Management, 141(9): 4015025, ISSN 0733-9364

Yuan, W; Yang, R; Yu, J; Zeng, Q and Yao, Z (2023) Control method of spray curing system for cement concrete members based on the adaboost.M1 algorithm. Construction Innovation, 23(1), pp. 178-192. ISSN 1471-4175

Zayed, T; Sharifi, M R; Baciu, S and Amer, M (2008) Slip-form application to concrete structures. Journal of Construction Engineering and Management, 134(3), pp. 157-168. ISSN 0733-9364

van Tonder, P and Low, M S (2021) The effect of CO loading on the properties of normal concrete vs fly ash concrete. Journal of Engineering, Design and Technology, 19(6), pp. 1472-1487. ISSN 1726-0531

This list was generated on Sat Aug 22 02:27:28 2026 UTC.