Abdullahi, I (2000) Development of a funding model for allocating capital grants to the federal universities in Nigeria. PhD thesis, Abertay University, UK.
Abdulrahman, A (2010) The development of a performance measurement framework for FE/HE co-location construction projects. PhD thesis, Heriot-Watt University, UK.
Adam, A (2019) Exploring construction challenges of the public client: A dynamic capabilities approach. PhD thesis, Chalmers University of Technology, Sweden.
Adebisi, E O; Ojo, S O and Alao, O O (2018) Assessment of factors influencing the failure and abandonment of multi-storey building projects in Nigeria. International Journal of Building Pathology and Adaptation, 36(2), pp. 210-231. ISSN 23984708
Adeleke, A (2017) Linking effective project management to business strategy in oil and gas industry through decision-making processes. PhD thesis, Northcentral University, USA.
Adeyemi, B S and Aigbavboa, C O (2024) An evaluation of the impacts of construction professionals' conflict on performance in the Nigerian construction industry. International Journal of Building Pathology and Adaptation, 42(3), pp. 469-482. ISSN 23984708
Adigbo, F A (2020) Stakeholder engagement and construction project performance in Ghana. PhD thesis, Northcentral University, USA.
Adu-Amankwa, N. A. N. and Rahimian, F. (2026) Harnessing blockchain-enabled digital twins for building commissioning: Examining practitioners' perspectives. Engineering, Construction and Architectural Management, 33(3), pp. 1891-1906. ISSN 0969-9988
Afzali Borujeni, S H; Zare, M and Adelzade Saadabadi, L (2024) Comparison of factors affecting the acceptance of the trenchless technology and open-trench method using ANP and AHP: Case study in Iran. Journal of Construction Engineering and Management, 150(1): 04023145, ISSN 0733-9364
Akpan, E O P and Igwe, O (2001) Methodology for determining price variation in project execution. Journal of Construction Engineering and Management, 127(5), pp. 367-373. ISSN 0733-9364
Al Ahbabi, M S (2014) Process protocol for the implementation of integrated project delivery in the UAE: A client perspective. PhD thesis, University of Salford, UK.
Al Ahbabi, M S M (2014) Process protocol for the implementation of integrated project delivery in the UAE: a client perspective. PhD thesis, University of Salford, UK.
Al Dinah, M (2022) Coordination issues and unethical practices in comparison with other determinants of delays and cost overruns in the construction industry: how do the participants respond? PhD thesis, University of Portsmouth, UK.
Al-Fadhali, N; Zainal, R; Kasim, N; Dodo, M; Kim Soon, N and Hasaballah, A H A (2019) The desirability of integrated influential factors (IIFS) model of internal stakeholder as a panacea to project completion delay in Yemen. International Journal of Construction Management, 19(2), pp. 128-136. ISSN 1562-3599
Alao, O O and Jagboro, G O (2017) Assessment of causative factors for project abandonment in Nigerian public tertiary educational institutions. International Journal of Building Pathology and Adaptation, 35(1), pp. 41-62.
Alao, O O; Jagboro, G O and Opawole, A (2018) Cost and time implications of abandoned project resuscitation: A case study of educational institutional buildings in Nigeria. Journal of Financial Management of Property and Construction, 23(2), pp. 185-201. ISSN 1366-4387
Alghamdi, A M (2022) A systemic approach for construction contract claims settlement in the Kingdom of Saudi Arabia. PhD thesis, University of Reading, UK.
Aminorlah, A I; Rahim, N A; Mohamed, Z and Mazlan, A N (2023) Critical delay factors in typical physical projects: The case of the ministry of home affairs in Malaysia. Journal of Construction in Developing Countries, 28(2), pp. 57-79. ISSN 1823-6499
Aouad, G F; Bakis, N; Amaratunga, D; Osbaldiston, S; Sun, M; Kishk, M; Al-Hajj, A and Pollock, R (2001) An integrated life cycle costing database: A conceptual framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Asiedu, R O; Frempong, N K and Alfen, H W (2017) Predicting likelihood of cost overrun in educational projects. Engineering, Construction and Architectural Management, 24(1), pp. 21-39. ISSN 0969-9988
Augenbroe, G; Castro, D and Ramkrishnan, K (2009) Decision model for energy performance improvements in existing buildings. Journal of Engineering, Design and Technology, 7(1), pp. 21-36. ISSN 1726-0531
Banwo, O (2016) The development of a procurement decision support system to enhance construction claims management practice. PhD thesis, Coventry University, UK.
Barbarosoglu, B V (2018) Early detection of maintainability issues in MEP systems using BIM. PhD thesis, Illinois Institute of Technology, USA.
Bolier, I (2025) From tinkering to transitioning: Cultivating innovation within public agencies operating in the construction industry. PhD thesis, Delft University of Technology, Netherlands.
Bordass, B (2020) Metrics for energy performance in operation: The fallacy of single indicators. Buildings & Cities, 1(1), pp. 260-276. ISSN 2632-6655
Buckingham, H (2010) Accommodating change? An investigation of the impacts of government contracting processes on third sector providers of homelessness services in South East England. PhD thesis, University of Southampton, UK.
Chow, L K and Ng, S T (2010) Delineating the performance standards of engineering consultants at design stage. Construction Management and Economics, 28(1), pp. 3-11. ISSN 1466433X
Chritamara, S (2017) An application of the real option framework to large infrastructure projects: evidence for Thailand's transportation system. PhD thesis, University of Newcastle upon Tyne, UK.
Cieraad, F D; Schraven, D F J and de Bruijne, M L C (2018) Investments under pressure: A real options approach to prepare for emergency asylum shelter in a multi actor setting. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Coram, W R (1997) The privatisaton of the property services agency. PhD thesis, University of Manchester, UK.
Damoah, I S (2015) An investigation into the causes and effects of project failure in government projects in developing countries: Ghana as a case study. PhD thesis, Liverpool John Moores University, UK.
Damoah, I S; Mouzughi, Y and Kumi, D K (2020) The effects of government construction projects abandonment: Stakeholders' perspective. International Journal of Construction Management, 20(5), pp. 462-479. ISSN 1562-3599
Damoah, I S; Tingbani, I; Kumi, D K; Akwei, C C and Amoako, I O (2022) Factors influencing school building construction projects abandonment. International Journal of Construction Management, 22(6), pp. 961-976. ISSN 1562-3599
Davies, R (2013) Healthcare built environment impacts, construction projects and organisational change. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Farmer, H K (2003) Managing maintenance of multiple domestic accommodation. PhD thesis, Loughborough University, UK.
Fernández, A I; Jarufe, J; Segarra, P and Cavieres, P (2025) Management of construction planning process in massive underground mining by integrating LPS and cit through action research. Journal of Construction Engineering and Management, 151(5): 04025024, ISSN 0733-9364
Foruzanmehr, A and Vellinga, M (2011) Vernacular architecture: Questions of comfort and practicability. Building Research & Information, 39(3), pp. 274-285. ISSN 0961-3218
Frommweiler, C and Poirier, E (2025) Facilitating the building commissioning process using building information modeling: An action-research project. Engineering, Construction and Architectural Management, 32(1), pp. 601-620. ISSN 0969-9988
Gatti, M P (2018) Maintenance, reconstruction and prevention for the regeneration of historic towns and centers. International Journal of Disaster Resilience in the Built Environment, 9(1), pp. 96-111. ISSN 1759-5916
George, M G (2003) The implementation of project management in the building construction field in the United Arab Emirates. PhD thesis, University of South Wales, UK.
Gharehbaghi, K; McManus, K; Georgy, M; Farnes, K; Pagliara, F and Myers, M (2024) Verifying the sustainability factors of mega transportation infrastructure: Sydney metro's commissioning through the "significance matrix" methodology. Journal of Engineering, Design and Technology, 22(1), pp. 22-41. ISSN 1726-0531
Gillis III, W L (2013) Development of an integrative commissioning methodology for new-building construction. PhD thesis, Missouri University of Science and Technology, USA.
Goins, J and Moezzi, M (2013) Linking occupant complaints to building performance. Building Research & Information, 41(3), pp. 361-372. ISSN 0961-3218
Gram-Hanssen, K; Georg, S; Christiansen, E and Heiselberg, P (2018) What next for energy-related building regulations? The occupancy phase. Building Research & Information, 46(7), pp. 790-803. ISSN 0961-3218
Hansen, D E (2021) Including commissioning during design phase benefits new construction: A qualitative case study. PhD thesis, Northcentral University, USA.
Harding, A M (1999) A global approach to project optimisation. PhD thesis, University of Edinburgh, UK.
He, C; Liu, M; Alves, T D C L; Scala, N M and Hsiang, S M (2022) Prioritizing collaborative scheduling practices based on their impact on project performance. Construction Management and Economics, 40(7-8), pp. 618-637. ISSN 01446193
Heffernan, E E (2015) Delivering zero carbon homes and sustainable communities: The potential of group self-build housing in England. PhD thesis, University of Plymouth, UK.
Hermans, M; Veldhuis, H; Huizing, D and Rots, S (2019) The embedding of the construction client role in Dutch municipalities and its effects on professionalism and organisational learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Hermans, M; Volker, L and Eisma, P (2014) A public commissioning maturity model for construction clients. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Hermans, M; van Zoest, S and Volker, L (2016) Assessing the maturity of public construction client organisations. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Hitchcock, R J (1996) Improving life-cycle information management through documentation of project objectives and design rationale. PhD thesis, University of California, Berkeley, USA.
Huang, Y L and Lin, T C (2023) Compound deferrable options for the valuation of multi-stage infrastructure investment projects. Construction Management and Economics, 41(8), pp. 670-686. ISSN 01446193
Huang, Y L and Pi, C C (2009) Valuation of multi-stage BOT projects involving dedicated asset investments: A sequential compound option approach. Construction Management and Economics, 27(7), pp. 653-666. ISSN 1466433X
Inayat, A; Melhem, H and Esmaeily, A (2015) Critical success factors in an agency construction management environment. Journal of Construction Engineering and Management, 141(1): 06014010, ISSN 0733-9364
Ioannidou, D; Zerbi, S; García de Soto, B and Habert, G (2018) Where does the money go? Economic flow analysis of construction projects. Building Research & Information, 46(4), pp. 348-366. ISSN 0961-3218
Islam, M S; Nepal, M P and Skitmore, M (2019) Modified fuzzy group decision-making approach to cost overrun risk assessment of power plant projects. Journal of Construction Engineering and Management, 145(2): 04018126, ISSN 0733-9364
Ismaeel, W S E (2020) An integrated model for energy-efficient building opening design. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Israel, B (2023) The impact of clients' procurement challenges on the substance goals of roads construction projects in songwe, Tanzania. International Journal of Construction Management, 23(12), pp. 2144-2150. ISSN 1562-3599
Jabang, S-W (2017) An investigation into the use of public procurement and commissioning to deliver community (societal) value. PhD thesis, University of Birmingham, UK.
Jaggar, D and Ross, A (2003) A survey into the effectiveness of web-based teaching of building design cost management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.
Jensen, P A (2012) Knowledge transfer from facilities management to building projects: A typology of transfer mechanisms. Architectural Engineering and Design Management, 8(3), pp. 170-179. ISSN 1745-2007
Jia, B; Yang, Y; Xie, B and Yu, X (2021) Novel geometric control technology for precast segmental bridges. Journal of Construction Engineering and Management, 147(4): 04021006, ISSN 0733-9364
Jijingi, A T (2019) A BIM-enabled procurement framework in new buildings for the Nigerian architecture, engineering and construction industry. PhD thesis, University of Portsmouth, UK.
Jimoh, I (2021) What explains the efficiency of major public project delivery in Nigeria? PhD thesis, University of Cambridge, UK.
Johannes, Koos (2023) Crafting intrapreneurial stewardship: An institutional perspective on client-led innovation in smart building maintenance. PhD thesis, University of Twente, Netherlands.
Johnson, A; Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1), pp. 41-61. ISSN 1726-0531
Kaiser, M J and Lledare, W O (2006) The gulf of Mexico decommissioning market. Journal of Construction Engineering and Management, 132(8), pp. 815-826. ISSN 0733-9364
Kaminsky, J (2013) Social sustainability of sanitation infrastructure in developing communities. PhD thesis, University of Colorado at Boulder, USA.
Kaminsky, J and Javernick-Will, A (2015) Theorizing the internal social sustainability of sanitation organizations. Journal of Construction Engineering and Management, 141(2): 04014071, ISSN 0733-9364
Kantola, M and Saari, A (2014) Commissioning for nearly zero-energy building projects. Construction Innovation, 14(3), pp. 370-382. ISSN 1471-4175
Kazemi, R M; Riley, D; Asadi, S and Delgoshaei, P (2017) Improving the performance profile of energy conservation measures at the Penn State University Park campus. Engineering, Construction and Architectural Management, 24(4), pp. 610-628. ISSN 0969-9988
Kelso M, R (2003) Automated commissioning of HVAC systems using first principle models. PhD thesis, Loughborough University, UK.
Khalid, M S (2010) Abandoned housing development: the Malaysian experience. PhD thesis, Heriot-Watt University, UK.
Kim, J H and Fisher, N (2001) Knowledge management for small occasional construction industry clients: A theoretical framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Kohn, M J (1970) The stock of unfinished construction in the USSR, 1950-1965: An efficiency problem in a centrally planned economy. PhD thesis, Yale University, USA.
Koo, Hyun Jeong (2021) Building design quality: Design complexity and BIM applications. Doctor thesis, University of Texas at Austin, USA.
Kuitert, L; Volker, L and Hermans, M (2016) Safeguarding public values by project-based construction clients: Leads for future research. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Kuitert, L; Volker, L and Hermans, M (2018) The impact of shifting values on the role and responsibilities of the construction client in delivering public goods. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Kuitert, L; Volker, L and Hermans, M H (2017) Public commissioning in a new era: Public value interests of construction clients. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kuitert, L; Volker, L and Hermans, M H (2019) Taking on a wider view: Public value interests of construction clients in a changing construction industry. Construction Management and Economics, 37(5), pp. 257-277. ISSN 01446193
Kuitert, L; Volker, L and Hermans, M H (2020) The public construction client of the future: Network-based collaborator in a traditional public administrative system. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Kuitert, Lizet (2021) The balancing act: How public construction clients safeguard public values in a changing construction industry. PhD thesis, Delft University of Technology, Netherlands.
Kumara, W H C D; Waidyasekara, K G A S and Weerasinghe, R P N P (2016) Building management system for sustainable built environment in Sri Lanka. Built Environment Project and Asset Management, 6(3), pp. 302-316. ISSN 2044-124X
Kuoribo, E; Yomoah, R; Owusu-Manu, D G; Acheampong, A; John Edwards, D and Debrah, C (2023) Assessing the interactive effects of the ethics of construction professionals on project performance in the Ghanaian construction industry. Engineering, Construction and Architectural Management, 30(10), pp. 5233-5252. ISSN 0969-9988
Lahdenperä, P and Koppinen, T (2009) Financial analysis of road project delivery systems. Journal of Financial Management of Property and Construction, 14(1), pp. 61-78. ISSN 1366-4387
Laroza, F A R (2025) Investigating construction delays in cold storage projects in the Philippines. International Journal of Construction Management, 25(6), pp. 661-671. ISSN 1562-3599
Larsen, J K; Lindhard, S M; Brunoe, T D and Jensen, K N (2018) The relation between pre-planning, commissioning and enhanced project performance. Construction Economics and Building, 18(2), pp. 1-14. ISSN 2204-9029
Lee, K J (2013) A formal and ontological approach to embed commissioning test protocol into building information model. PhD thesis, Carnegie Mellon University, USA.
Li, Shuyang (2020) Proactive design approaches for energy-efficient buildings. PhD thesis, University of California, USA.
Lomas, K J; Cook, M J and Short, C A (2009) Commissioning hybrid advanced naturally ventilated buildings: A US case study. Building Research & Information, 37(4), pp. 397-412. ISSN 0961-3218
Longhurst, Peta (2011) The foundations of madness: The role of the built environment in the mental institutions of New South Wales. PhD thesis, University of Sydney, Australia.
Lord, S-F; Noye, S; Ure, J; Tennant, M G and Fisk, D J (2016) Comparative review of building commissioning regulation: A quality perspective. Building Research & Information, 44(5-6), pp. 630-643. ISSN 0961-3218
Ma, A (2009) Engineer's role in resolving disputes in offshore projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 191-196. ISSN 17514312
Mahadkar, S; Mills, G and Price, A D F (2012) Stakeholder consultation practices within healthcare infrastructure planning: A conceptual approach to strategic asset management. Built Environment Project and Asset Management, 2(2), pp. 127-145. ISSN 2044-124X
Martino, Antonello (2017) The historical landscape of ports: From the definition of a methodology for the risk assessment to the identification of guidelines for port heritage preservation. PhD thesis, Politecnico di Bari, Italy.
McDonald, P R (1984) Construction claims costing for owners and contractors. Construction Management and Economics, 2(1), pp. 1-12. ISSN 01446193
Millett, S J; Dainty, A R J and Briscoe, G H (2001) Client procurement strategies: A cross-sectoral analysis. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Mirzaie, S (2022) Influence of BREEAM, BIM, and Soft Landings on lifecycle performance of two non-domestic buildings. PhD thesis, Heriot-Watt University, UK.
Mock, B and O'Connor, J (2022) Taxonomic categories for commissioning and startup hot spot strategies. Construction Innovation, 22(1), pp. 120-140. ISSN 1471-4175
Mock, B and O'Connor, J T (2019) High-value, low-effort industrial plant commissioning solution strategies. Construction Innovation, 19(4), pp. 653-671. ISSN 1471-4175
Mock, B and O’Connor, J T (2019) Owner and contractor solution strategies for industrial commissioning. Construction Innovation, 19(2), pp. 256-279. ISSN 1471-4175
Morsi, D M A; Ismaeel, W S E; El Hamed, A E A and Othman, A A E (2020) Applying LCA-BIM integration for a sustainable management process. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Nana-Addy, E; Musonda, I and Okoro, C (2022) Assessing causative characteristics of abandoned completed urban market projects in Ghana. Journal of Construction in Developing Countries, 27(2), pp. 147-161. ISSN 1823-6499
Nuako, F; Ghansah, F A and Adusei, T (2026) Critical success factors for cost overrun minimization in public construction projects in developing countries: The case of Ghana. Construction Innovation, 26(1), pp. 44-62. ISSN 1471-4175
O'Connor, J T; Choi, J O and Winkler, M (2016) Critical success factors for commissioning and start-up of capital projects. Journal of Construction Engineering and Management, 142(11): 04016060, ISSN 0733-9364
O'Connor, J T; Leite, F and Ma, J W (2023) Expanding advanced work packaging to include commissioning and startup for industrial projects. Construction Innovation, 23(5), pp. 939-960. ISSN 1471-4175
O'Connor, J T and Mock, B (2020) Responsibilities and accountabilities for industrial facility commissioning and startup activities. Construction Innovation, 20(4), pp. 625-645. ISSN 1471-4175
O'Connor, J T and Mock, B D (2019) Construction, commissioning, and startup execution: Problematic activities on capital projects. Journal of Construction Engineering and Management, 145(4): 04019009, ISSN 0733-9364
O'Connor, J T; Shrestha, B K; Winkler, M and Ouk Choi, J (2021) Relationship between commissioning and start-up success factors achievement and performance in capital projects. Journal of Construction Engineering and Management, 147(3): 04021001, ISSN 0733-9364
Obunwo, C U C (2016) A framework for enhancing project quality and customer satisfaction in government road construction projects in Rivers State, Nigeria. PhD thesis, University of Wolverhampton, UK.
Odiba, E (2018) A model for effective quality management practices in construction organisations: The case of Nigeria. PhD thesis, Loughborough University, UK.
Ogunnusi, M; Salman, H and Laing, R (2023) TOPSIS analysis for sustainable redevelopment potential of abandoned infrastructure in Nigeria. Built Environment Project and Asset Management, 13(1), pp. 73-88. ISSN 2044-124X
Ogunsemi, D R and Aje, I O (2006) A model for contractors' selection in Nigeria. Journal of Financial Management of Property and Construction, 11(1), pp. 33-44. ISSN 1366-4387
Ojo, E O (2019) Project managers’ capacity-planning practices for infrastructure projects in qatar. PhD thesis, Walden University, USA.
Olanrewaju, A and Tan, S Y (2018) An exploration into design criteria for affordable housing in Malaysia. Journal of Engineering, Design and Technology, 16(3), pp. 360-384. ISSN 1726-0531
Olanrewaju, O I; Chileshe, N; Adekunle, E O and Salihu, C (2024) Modelling the environmental, economic and social impacts of coronavirus pandemic on the construction industry. International Journal of Construction Management, 24(14), pp. 1485-1498. ISSN 1562-3599
Omopariola, E D; Windapo, A; Edwards, D J and Thwala, W D (2020) Contractors’ perceptions of the effects of cash flow on construction projects. Journal of Engineering, Design and Technology, 18(2), pp. 308-325. ISSN 1726-0531
Opawole, A (2018) Penalty mechanisms for enforcing concessionaire performance in public-private partnership contracts in Nigeria. Journal of Engineering, Design and Technology, 16(1), pp. 161-191.
Osei-Asibey, D; Ayarkwa, J; Baah, B; Afful, A E; Anokye, G and Nkrumah, P A (2025) Impact of time-based delay on public-private partnership (PPP) construction project delivery: Construction stakeholders' perspective. Journal of Financial Management of Property and Construction, 30(1), pp. 88-110. ISSN 1366-4387
Oyegoke, A S (2006) Building competence to manage contractual claims in international construction environment: The case of Finnish contractors. Engineering, Construction and Architectural Management, 13(1), pp. 96-113. ISSN 0969-9988
Pan, W (2010) Strategies for managing innovation in UK housebuilding. Engineering, Construction and Architectural Management, 17(1), pp. 78-88. ISSN 0969-9988
Papamichael, K (1999) Application of information technologies in building design decisions. Building Research & Information, 27(1), pp. 20-34. ISSN 0961-3218
Pasquire, C (2012) Positioning lean within an exploration of engineering construction. Construction Management and Economics, 30(8), pp. 673-685. ISSN 1466433X
Pieters, W D and Tzoneva, R (2021) Investigation of an iec 61850 standard-based process bus implementation of a protection and control scheme for parallelly connected transformers. Journal of Engineering, Design and Technology, 19(4), pp. 850-875. ISSN 1726-0531
Potemans, A; Volker, L and Hermans, M (2018) From agents to stewards? Experiences from a Dutch infrastructure case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Potts, K and Wall, M (2002) Managing the commissioning of building services. Engineering, Construction and Architectural Management, 9(4), pp. 336-344. ISSN 0969-9988
Ramos, M A P (2023) Determining factors and strategies to promote construction and demolition waste management on a local scale. PhD thesis, Universidade NOVA de Lisboa, Portugal.
Raouf, A M and Al-Ghamdi, S G (2023) Framework to evaluate quality performance of green building delivery: Construction and operational stage. International Journal of Construction Management, 23(2), pp. 253-267. ISSN 1562-3599
Render, N; Greenwood, D and Edge, J (2005) The other g.M.P: Good manufacturing practice and its importance in the validation of constructed pharmaceutical facilities. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Rezakhani, P (2023) Empirical study of housing recovery and property abandonment following valley fire in California: Insights from neighborhood characteristics and building attributes. International Journal of Disaster Resilience in the Built Environment, 14(5), pp. 628-639. ISSN 1759-5916
Ross, D G (1970) The construction of the railroads of Central America. PhD thesis, University of California, Santa Barbara, USA.
Rouhi, S (2011) Framework for owner's project requirements for total structural systems (OPRTSS). PhD thesis, Georgia Institute of Technology, USA.
Saari, A and Aalto, L (2006) Indoor environment quality contracts in building projects. Building Research & Information, 34(1), pp. 66-74. ISSN 0961-3218
Sadri, S L (1993) An integrated information system for building construction projects. PhD thesis, Georgia Institute of Technology, USA.
Salah Eldeen Ismaeel Elsayed Ahmed, Walaa (2014) Developing a systemic framework for applying LEED system: Managing energy and materials credits. PhD thesis, Politecnico di Milano, Italy.
Sanni-Anibire, M O; Mohamad Zin, R and Olatunji, S O (2022) Causes of delay in the global construction industry: A meta analytical review. International Journal of Construction Management, 22(8), pp. 1395-1407. ISSN 1562-3599
Sanni-Anibire, M O; Zin, R M and Olatunji, S O (2022) Machine learning model for delay risk assessment in tall building projects. International Journal of Construction Management, 22(11), pp. 2134-2143. ISSN 1562-3599
Shakoorian, A (2006) Performance assessment of building commissioning process as a quality assurance system. PhD thesis, Georgia Institute of Technology, USA.
Shehu, Z; Holt, G D; Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), pp. 52-68. ISSN 2044-124X
Short, C A; Cook, M and Lomas, K J (2009) Delivery and performance of a low-energy ventilation and cooling strategy. Building Research & Information, 37(1), pp. 1-30. ISSN 0961-3218
Sigonda, G G G (2000) The impact of infrastructural projects on the environment in Tanzania: The case of mindu dam. PhD thesis, University of Manchester, UK.
Singh, J and Anumba, C J (2024) Building commissioning process and documentation: A literature review and directions for future research. International Journal of Construction Management, 24(1), pp. 75-85. ISSN 1562-3599
Stout, Timothy J (2023) Schedule forecast optimization for the construction and commissioning of nuclear power plants. DEngr thesis, George Washington University, USA.
Taimu, M (2020) A contractor-driven stakeholder relationship management framework for botswana's construction industry. DBL thesis, University of South Africa, South Africa.
Takim, R (2005) A framework for successful construction project performance. PhD thesis, Glasgow Caledonian University, UK.
Tavassolirizi, M; Sarvari, H; Chan, D W M and Olawumi, T O (2022) Factors affecting delays in rail transportation projects using analytic network process: The case of Iran. International Journal of Construction Management, 22(14), pp. 2712-2723. ISSN 1562-3599
Taylor, M D (2003) Economic appraisal and risk analysis of construction automation. PhD thesis, Edinburgh Napier University, UK.
Taylor, M D and Wamuziri, S C (2002) Strategic construction mechatronics valuation: A real option-pricing approach. Journal of Financial Management of Property and Construction, 7(2), pp. 75-90. ISSN 1366-4387
Thawanapong, C and Tachakitkachorn, T (2026) The sequence of activities for digital twin implementation for building operations by industrial practitioners: A multiple case study analysis in Thailand. International Journal of Construction Management, 26(5), pp. 825-839. ISSN 1562-3599
Volker, L (2010) Dutch architectural design tenders explained from a sensemaking perspective. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Volker, L (2010) Deciding about design quality: value judgements and decision making in the selection of architects by public clients under European tendering regulations. PhD thesis, Delft University of Technology, Netherlands.
Wade, F and Han, Y (2024) Mapping supply chains for energy retrofit. Buildings & Cities, 5(1), pp. 388-399. ISSN 2632-6655
Weerasinghe, A S and Ramachandra, T (2018) Economic sustainability of green buildings: A comparative analysis of green vs non-green. Built Environment Project and Asset Management, 8(5), pp. 528-543. ISSN 2044-124X
White, N J (2006) Destruction of the contract through material changes. International Journal of Construction Education and Research, 2(1), pp. 43-51. ISSN 1557-8771
Whyte, J; Davies, A and Sexton, C (2022) Systems integration in infrastructure projects: seven lessons from Crossrail. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(3), pp. 103-109. ISSN 17514304
Woodhead, R (1997) Exploring the hurdle rate in preparation for a value management workshop planning session. Journal of Financial Management of Property and Construction, 2(2), pp. 21-38. ISSN 1366-4387
Wyrick, D A and Eschenbach, T G (1989) Remote oil and gas facility construction. Journal of Construction Engineering and Management, 115(2), pp. 228-236. ISSN 0733-9364
Yadavalli, H V; Krishna Mohan, T V; Rangarajan, S and Albert, S K (2022) Design, fabrication, testing and operation of a simulation facility for high temperature molten salt studies. Journal of Engineering, Design and Technology, 20(6), pp. 1369-1387. ISSN 1726-0531
Ye, K M (2013) A conceptual model to improve building commissioning in construction projects: Case studies of a public institution of higher learning in Malaysia. PhD thesis, University of Malaya, Malaysia.
jadidoleslami, S; Saghatforoush, E and Zare Ravasan, A (2021) Constructability obstacles: An exploratory factor analysis approach. International Journal of Construction Management, 21(3), pp. 312-325. ISSN 1562-3599