Items with Subject: client relations
Aagaard, L K and Madsen, L V (2022) Technological fascination and reluctance: Gendered practices in the smart home. Buildings & Cities, 3(1), pp. 677-691. ISSN 2632-6655
Abdi, A; Lind, H and Birgisson, B (2013) Payment mechanisms for winter road maintenance services. Construction Economics and Building, 13(4), pp. 18-31. ISSN 2204-9029
Abdul-Lateef, O A (2010) Quantitative analysis of criteria in university building maintenance in Malaysia. Construction Economics and Building, 10(3), pp. 51-61. ISSN 2204-9029
Abu Arqoub, M; Ghanbaripour, A N; Langston, C and Skulmoski, G (2023) Beyond design and delivery: Developing a model to measure end-user satisfaction (delight) in projects. Built Environment Project and Asset Management, 13(4), pp. 509-534. ISSN 2044-124X
Abu Arqoub, Muath (2022) Measuring end-user delight: Is success in project design and delivery enough? PhD thesis, Bond University, Australia.
Aburas, M (2020) Critical success factors for implementing ISO 9001 in UK construction projects. PhD thesis, University of Salford, UK.
Adam, A (2019) Exploring construction challenges of the public client: A dynamic capabilities approach. PhD thesis, Chalmers University of Technology, Sweden.
Adam, A and Lindahl, G (2017) Applying the dynamic capabilities framework in the case of a large public construction client. Construction Management and Economics, 35(7), pp. 420-431. ISSN 01446193
Adedokun, O A; Egbelakin, T; Adedokun, D O and Adafin, J (2023) Success criteria-based impacts of risk factors on education building projects in Southwestern Nigeria. Journal of Engineering, Design and Technology, 21(6), pp. 1901-1924. ISSN 1726-0531
Adewunmi, O A; Ibem, E and Amole, D (2014) Satisfaction of first-time residential clients with architectural services. Journal of Engineering, Design and Technology, 12(3), pp. 316-335.
Adewunmi, Y; Famuyiwa, F and Harrison, E (2009) Post occupancy evaluation of facilities in Nigerian private universities: A case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Aggiag, M A A (2005) The impact of client attributes on project success: a study of UK public construction projects. PhD thesis, Northumbria University, UK.
Agyekum, K; Ghansah, F A; Tetteh, P A and Amudjie, J (2021) The role of project managers (pms) in construction health and safety implementation in Ghana. Journal of Engineering, Design and Technology, 19(1), pp. 245-262. ISSN 1726-0531
Akuete, E; Nduka, D O and Ogundipe, K E (2022) Maintenance feedback mechanisms and limiting factors of post-occupancy evaluation in student residents of higher education institutions in Nigeria. Journal of Construction in Developing Countries, 27(2), pp. 17-41. ISSN 1823-6499
Al Ahbabi, M and Alshawi, M (2015) BIM for client organisations: A continuous improvement approach. Construction Innovation, 15(4), pp. 402-408. ISSN 1471-4175
Al Ahbabi, M S (2014) Process protocol for the implementation of integrated project delivery in the UAE: A client perspective. PhD thesis, University of Salford, UK.
Al Ahbabi, M S M (2014) Process protocol for the implementation of integrated project delivery in the UAE: a client perspective. PhD thesis, University of Salford, UK.
Al Solaiman, Sultan (2014) An empirical study of the factors impacting on the involvement of clients in Saudi Arabian construction projects. PhD thesis, Queensland University of Technology, Australia.
Al Zarooni, S; Abdou, A and Lewis, J (2011) Improving the client briefing for UAE public healthcare projects: Space programming guidelines. Architectural Engineering and Design Management, 7(4), pp. 251-265. ISSN 1745-2007
Al-Harthi, A S A (2016) Modelling the relationship between client activities and construction procurement performance in Oman. PhD thesis, Loughborough University, UK.
Alajmi, A M R F (2009) The delivery of value for money in public sector projects in Qatar. PhD thesis, University of Leeds, UK.
Algassim, Hesham M (2024) Developing an architectural technology adoption model considering organizational factors: Case of Saudi Arabia. PhD thesis, University of New South Wales, Australia.
Alharthi, A; Soetanto, R and Edum-Fotwe, F (2014) The changing role of the public client in construction procurement. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Aliakbarlou, S; Wilkinson, S and Costello, S B (2017) Exploring construction client values and qualities: Are these two distinct concepts in construction studies? Built Environment Project and Asset Management, 7(3), pp. 234-252. ISSN 2044-124X
Alkilani, S and Loosemore, M (2022) Project performance measurement for small-and-medium sized construction contractors in the Jordanian construction industry. Construction Management and Economics, 40(10), pp. 743-769. ISSN 01446193
Alsahly, F F M (2016) Improving the management of change requests in construction of large building projects in Saudi Arabia. PhD thesis, University of Hull, UK.
Alshawi, M; Engström, S and Hedgren, E (2012) Sustaining inertia? Construction clients' decision-making and information-processing approach to industrialized building innovations. Construction Innovation, 12(4), pp. 393-413. ISSN 1471-4175
Alshihre, F (2018) Development of a framework for client satisfaction in the Saudi construction industry. PhD thesis, University of Wolverhampton, UK.
Alshihre, F; Chinyio, E; Nzekwe-Excel, C and Daniel, E I (2023) Pursuing alignment of clients' and contractors' perceptions of client satisfaction in Saudi Arabian projects. Built Environment Project and Asset Management, 13(3), pp. 341-358. ISSN 2044-124X
Aluko, O R; Godwin Iroroakpo, I and Mewomo, M C (2021) Relationship between perceived service quality and client satisfaction indicators of engineering consultancy services in building projects. Journal of Engineering, Design and Technology, 19(2), pp. 557-577. ISSN 1726-0531
Ameh, O J and Daniel, E I (2017) Human resource management in the Nigerian construction firms: Practices and challenges. Journal of Construction Business and Management, 1(2), pp. 47-54. ISSN 2521-0165
Arabiat, A (2013) Modelling construction client risk performance using organisation behaviour parameters. PhD thesis, Loughborough University, UK.
Arditi, D and Koseoglu, H (1983) Factors affecting success in network applications in a developing country. Construction Management and Economics, 1(1), pp. 3-16. ISSN 01446193
Artpairin, A and Pinmanee, S (2023) Critical success factors in the management of petrochemical construction projects for contractors and subcontractors during the COVID-19 pandemic. International Journal of Construction Management, 23(11), pp. 1956-1968. ISSN 1562-3599
Aulich, H T (2013) The role of effective communication in the construction industry: A guide for education and health clients. Construction Economics and Building, 13(4), pp. 92-101. ISSN 2204-9029
Aunwong, P and Hadikusumo, B H W (2025) Digital 2D and 3D modelling for construction safety management in Thai construction projects. International Journal of Construction Management, 25(15), pp. 1778-1790. ISSN 1562-3599
Awuzie, B O and McDermott, P (2016) The role of contracting strategies in social value implementation. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 106-114. ISSN 17514304
Ayodeji, F J (2014) Evaluation of site managers' hindrances towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(3), pp. 348-363.
Badran, S S and Abdallah, A B (2025) Lean vs agile project management in construction: Impacts on project performance outcomes. Engineering, Construction and Architectural Management, 32(5), pp. 2844-2869. ISSN 0969-9988
Bae, S; Martin, C S and Asojo, A O (2021) Indoor environmental quality factors that matter to workplace occupants: An 11-year-benchmark study. Building Research & Information, 49(4), pp. 445-459. ISSN 0961-3218
Balali, V; Zalavadia, A and Heydarian, A (2020) Real-time interaction and cost estimating within immersive virtual environments. Journal of Construction Engineering and Management, 146(2): 04019098, ISSN 0733-9364
Bayraktar, M E (2006) A decision model to determine the optimal time-cost trade off in highway work zone projects. PhD thesis, Purdue University, USA.
Bell, N; Powell, C and Sykes, P (2015) Securing the well-being and engagement of construction workers: An initial appraisal of the evidence. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Berker, T and Woods, R (2025) Resistance against zero-emission neighbourhood infrastructuring: Key lessons from Norway. Buildings & Cities, 6(1), pp. 345-358. ISSN 2632-6655
Birgonul, M T and Ozdogan, I (1998) A proposed framework for governmental organizations in the implementation of build-operate-transfer (BOT) model. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Bloore, R D S (1991) The ascertainment of claims for delay and disruption. PhD thesis, University of Surrey, UK.
Bonham, M B (2013) Leading by example: New professionalism and the government client. Building Research & Information, 41(1), pp. 77-94. ISSN 0961-3218
Booker, J D; Lock, R; Williamson, S and Freire, G J (2016) Effective practices for the concept design of electromechanical systems. Journal of Engineering, Design and Technology, 14(3), pp. 489-506.
Boonyanan, A; Robinson, H; Fong, D and Naoum, S (2008) Relationship and knowledge management among construction development project members in Thailand: The clients' perspective. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 1: A portfolio of feedback techniques. Building Research & Information, 33(4), pp. 347-352. ISSN 0961-3218
Bordass, B and Leaman, A (2005) Making feedback and post-occupancy evaluation routine 3: Case studies of the use of techniques in the feedback portfolio. Building Research & Information, 33(4), pp. 361-375. ISSN 0961-3218
Borges, D B; Soares, C A P; Najjar, M; Costa, B B F D; Tam, V W Y and Haddad, A N (2025) Project success and critical success factors of construction projects from the perspective of a multicultural team: A case study in Guyana. International Journal of Construction Management, 25(10), pp. 1115-1129. ISSN 1562-3599
Bos-de Vos, M; Volker, L and Wamelink, H (2016) Real estate development by architectural firms: Is the business model future-proof? In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Bosch, A; Volker, L and Koutamanis, A (2015) BIM in the operations stage: Bottlenecks and implications for owners. Built Environment Project and Asset Management, 5(3), pp. 331-343. ISSN 2044-124X
Botha, P S and Scheepbouwer, E (2015) Christchurch rebuild, New Zealand: Alliancing with a difference. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(3), pp. 121-129. ISSN 17514304
Boudlal, Youssef Ait (2014) Project management and its relation to long-term project success: An empirically based theoretical framework. PhD thesis, University of Louisville, USA.
Boyd, D and Wild, A (1999) Construction projects as organization development. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Bresnen, M J and Haslam, C O (1991) Construction industry clients: A survey of their attributes and project management practices. Construction Management and Economics, 9(4), pp. 327-342. ISSN 01446193
Burtonshaw-Gunn, S A (2001) Strategic supply chain management: Critical success factors for partnering relationships within the UK construction industry. PhD thesis, Manchester Metropolitan University, UK.
Cardin, M-A (2011) Quantitative performance-based evaluation of a procedure for flexible design concept generation. PhD thesis, Massachusetts Institute of Technology, USA.
Carrick, D (2022) How factors of collaboration affect delivery of construction projects with a high degree of reliance on building services: an action research and cross-case study analysis of Edinburgh primary schools. DProf thesis, University of Salford, UK.
Castro, L; De Vecchi, R and Lamberts, R (2025) Design process for an occupant survey system to assess satisfaction with indoor environmental quality. Building Research & Information, 53(1-2), pp. 242-260. ISSN 0961-3218
Challender, J (2017) Trust in collaborative construction procurement strategies. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(3), pp. 115-124. ISSN 17514304
Challender, J; Farrell, P and Sherratt, F (2014) Partnering practices: An investigation of influences on project success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Challender, J; Farrell, P and Sherratt, F (2015) Exploration of factors which affect trust within the context of construction partnering. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Challender, J; Farrell, P and Sherratt, F (2016) Collaborative trust in UK further education (FE) procurement strategies. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Chang, T; Chi, S and Im, S B (2022) Understanding user experience and satisfaction with urban infrastructure through text mining of civil complaint data. Journal of Construction Engineering and Management, 148(8): 04022061, ISSN 0733-9364
Charousaei, M; Faizi, M and Khakzand, M (2025) The impact of the visual layout of university open space on students' behavior and satisfaction level: The case of Iran University of Science and Technology. Smart and Sustainable Built Environment, 14(4), pp. 992-1016. ISSN 2046-6099
Chen, H; Jin, Z; Su, Q and Yue, G (2021) The roles of captains in megaproject innovation ecosystems: The case of the Hong Kong‐zhuhai‐macau bridge. Engineering, Construction and Architectural Management, 28(3), pp. 662-680. ISSN 0969-9988
Cheng, J (2008) The impact of strategic decisions on construction client satisfaction: An assessment framework. PhD thesis, University of Wolverhampton, UK.
Cheng, J; Proverbs, D; Oduoza, C and Potts, K (2008) Investigating the interrelationship of strategic decisions and client satisfaction: A conceptual framework. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Cheng, J and Proverbs, D G (2004) The impact of strategic decisions on construction client satisfaction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Cheng, J; Proverbs, D G; Oduoza, C and Fleming, C (2005) A conceptual model towards the measurement of construction client satisfaction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Cheng, J; Proverbs, D G and Oduoza, C F (2006) The satisfaction levels of UK construction clients based on the performance of consultants: Results of a case study. Engineering, Construction and Architectural Management, 13(6), pp. 567-583. ISSN 0969-9988
Cheong, S P (2004) Functional briefing for whole life performance. PhD thesis, Loughborough University, UK.
Cherns, A B and Bryant, D T (1984) Studying the client's role in construction management. Construction Management and Economics, 2(2), pp. 177-184. ISSN 01446193
Chien, H-J (2003) Developing a digital nervous system for enhancing effectiveness of construction management and increasing commercial benefit in the UK construction industry. PhD thesis, University of Glamorgan, UK.
Chileshe, N and John Kikwasi, G (2014) Risk assessment and management practices (ramp) within the Tanzania construction industry: Implementation barriers and advocated solutions. International Journal of Construction Management, 14(4), pp. 239-254. ISSN 1562-3599
Chileshe N, K G J (2013) Perception of barriers to implementing risk assessment and management practices by construction professionals in Tanzania. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Chinyio, E (1999) An evaluation of construction clients' needs and preferences. PhD thesis, University of Wolverhampton, UK.
Chinyio, E A; Olomolaiye, P O; Kometa, S T and Harris, F C (1998) A needs-based methodology for classifying construction clients and selecting contractors. Construction Management and Economics, 16(1), pp. 91-98. ISSN 01446193
Chiozzi, Maria Alma (2020) A collaborative contracting framework supported by BIM and lean. PhD thesis, Queensland University of Technology, Australia.
Ciribizni, A and Galimberti, G (2005) H&S planning and 4D project scheduling. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Cook, M and Pasquire, C (2001) The relationship between the management of design projects and improved performance in the building services sector of the construction industry. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Dakhil, A J (2017) Building information modelling (BIM) maturity-benefits assessment relationship framework for UK construction clients. PhD thesis, University of Salford, UK.
Dangana, Z; Pan, W and Goodhew, S (2012) Delivering sustainable buildings in retail construction. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Dare, F T (2011) A novel methodology for e-learning space design in HEI campuses. PhD thesis, University of Wolverhampton, UK.
Davenport, D M (1997) Client satisfaction with construction cost: A comparative study of French and UK performance. Journal of Financial Management of Property and Construction, 2(3), pp. 77-94. ISSN 1366-4387
Davenport, D M (1998) A comparative study of the effectiveness of the UK and French construction industries in the achievement of satisfaction with performance as perceived by the construction client. PhD thesis, University of Central Lancashire, UK.
Davenport, D M and Smith, R (1995) International procurement systems: Assessment of required levels of client participation in construction projects. Journal of Construction Procurement, 1(1), pp. 38-49. ISSN 1358-9180
Debrah, C; Chan, A P C; Darko, A; Akowuah, E; Amudjie, J; Asare, K A B and Ghansah, F A (2025) A bibliometrix-based scientometric-systematic analysis and visualization of the global outlook on post-occupancy evaluation of green building. Building Research & Information, 53(8), pp. 1058-1074. ISSN 0961-3218
Denicol, Juliano (2019) Designing client organisations and supply chain strategies to deliver megaprojects. PhD thesis, University College London, UK.
Donkers, A; Yang, D; Guendouz, S and Wang, B (2024) Making sense of smart features in the smart office: A stated choice experiment of office user preferences. Building Research & Information, 52(4), pp. 388-401. ISSN 0961-3218
Dorée, A G (1996) Tendering practice of Dutch municipalities. PhD thesis, University of Twente, Netherlands.
Du, Q; Qi, X; Zou, P X W and Zhang, Y (2024) Bi-objective optimization framework for prefabricated construction service combination selection using genetic simulated annealing algorithm. Engineering, Construction and Architectural Management, 31(10), pp. 3921-3945. ISSN 0969-9988
Dulaimi, M; Stewart, I and Fenn, P (2006) Strategy: The motivation for innovation. Construction Innovation, 6(3), pp. 173-185. ISSN 1471-4175
Dunne, K O (2006) Effective leadership in the multi-faceted client organisation: A case study on the Olympic client coalition. PhD thesis, University College London, UK.
Ekstrom, M A (2002) Accounting for rater credibility when evaluating construction industry service providers. PhD thesis, Stanford University, USA.
El-Sheikh, A and Pryke, S D (2010) Network gaps and project success. Construction Management and Economics, 28(12), pp. 1205-1217. ISSN 1466433X
Elazouni, A; Alghazi, A and Selim, S Z (2015) Finance-based scheduling using meta-heuristics: Discrete versus continuous optimization problems. Journal of Financial Management of Property and Construction, 20(1), pp. 85-104. ISSN 1366-4387
Elhag, T M S and Boussabaine, A H (1999) Evaluation of construction cost and time attributes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Elhakeem, A A M (2006) An asset management framework for educational buildings with life-cycle cost analysis. PhD thesis, University of Waterloo, Canada.
Elhegazy, H; Ebid, A; Mahdi, I; Haggag, S and Abdul-Rashied, I (2021) Implementing QFD in decision making for selecting the optimal structural system for buildings. Construction Innovation, 21(2), pp. 345-360. ISSN 1471-4175
Elsayah, O S (2016) A framework for improvement of contractor selection procedures on major construction project in Libya. PhD thesis, Edinburgh Napier University, UK.
Emmitt, S; Christoffersen, A K and Sander, D (2004) Design management: A value based approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Endut, I R (2008) Framework for minimising time overruns of Malaysian construction projects. PhD thesis, Glasgow Caledonian University, UK.
Engström, S (2014) Overcoming barriers to innovation: Demonstrating an argument in favour of communication arenas. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Faheem Haider, M.; Aslam, M.; Khan, R. W. A. and Malik, M. S. A. (2026) Exploring the factors to improve complaint management system in building management through a case study. International Journal of Construction Management, 26(9), pp. 1777-1798. ISSN 1562-3599
Fapohunda, J A and Chileshe, N (2014) Essential factors towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(4), pp. 461-474.
Farag, F (2018) Understanding social value creation in public construction projects using systems thinking. PhD thesis, University of Salford, UK.
Finch, E (1992) Environmental assessment of construction projects. Construction Management and Economics, 10(1), pp. 5-18. ISSN 01446193
Formoso, C; Leite, F and Miron, L (2011) Client requirements management in social housing: A case study on the residential leasing program in Brazil. Journal of Construction in Developing Countries, 16(2), pp. 47-67. ISSN 1823-6499
Formoso, C T and Isatto, E L (2011) Three theoretical perspectives for understanding inter-firm coordination of construction project supply chains. Construction Economics and Building, 11(3), pp. 1-17. ISSN 2204-9029
Foroughi Sabzevar, M; Gheisari, M and Lo, L J (2021) Improving access to design information of paper-based floor plans using augmented reality. International Journal of Construction Education and Research, 17(2), pp. 178-198. ISSN 1557-8771
Fouiteh, I; Santelices, J D C; Susini, A and Patel, M K (2024) Operationalising building-related energy sufficiency measures in SMEs. Buildings & Cities, 5(1), pp. 368-387. ISSN 2632-6655
Frederiksen, N and Gottlieb, S C (2020) From partnership to firm: Hybridity as source of routine change. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Frödell, M; Josephson, P E and Lindahl, G (2008) Swedish construction clients' views on project success and measuring performance. Journal of Engineering, Design and Technology, 6(1), pp. 21-32. ISSN 1726-0531
Fu, M; Liu, R and Hon, C K H (2021) Walkability evaluation of building circulation based on user preference. Engineering, Construction and Architectural Management, 28(10), pp. 2904-2924. ISSN 0969-9988
Fuller, P A (2011) Improving lessons learnt outcomes in multi-phase project environments. PhD thesis, Loughborough University, UK.
Futcher, K (2001) Managing portfolios of projects. PhD thesis, Loughborough University, UK.
Gajjar, D (2016) Use of customer satisfaction to minimize risks. PhD thesis, Arizona State University, USA.
Gale, K (2013) An evaluation of performance improvement within public sector construction framework agreements. PhD thesis, Anglia Ruskin University, UK.
Galha, H M (1998) Quality in building design: A case study. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Gameson, R and Sher, W (2002) An investigation into project team dynamics and the utilization of virtual environments. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Ghansah, F A (2025) Digital twins for smart building at the facility management stage: A systematic review of enablers, applications and challenges. Smart and Sustainable Built Environment, 14(4), pp. 1194-1229. ISSN 2046-6099
Gluch, P and Svensson, I (2016) The organizational nexus of changing management practices for sustainable renovation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Gluch, P and Svensson, I (2018) On the nexus of changing public facilities management practices: Purposive and co-creative actions across multiple levels. Construction Management and Economics, 36(5), pp. 259-275. ISSN 01446193
Green, S D (1996) A metaphorical analysis of client organizations and the briefing process. Construction Management and Economics, 14(2), pp. 155-164. ISSN 01446193
Green, S D (1996) SMART value management: a group decision support methodology for building design. PhD thesis, University of Reading, UK.
Griffith, A (2007) Key considerations for delivering best value in the small building works portfolio of large client organizations. Construction Management and Economics, 25(8), pp. 903-909. ISSN 1466433X
Griffith, A (2011) Delivering best value in the small works portfolio of public sector organizations when using preferred contractors. Construction Management and Economics, 29(9), pp. 891-900. ISSN 1466433X
Griffith, A and Headley, J D (1995) Developing an effective approach to the procurement and management of small building works within large client organizations. Construction Management and Economics, 13(4), pp. 279-289. ISSN 01446193
Griffith, A and Headley, J D (1997) Using a weighted score model as an aid to selecting procurement methods for small building works. Construction Management and Economics, 15(4), pp. 341-348. ISSN 01446193
Gu, Y (2011) The impacts of real-time knowledge based personal lighting control on energy consumption, user satisfaction and task performance in offices. PhD thesis, Carnegie Mellon University, USA.
Guerrero, J R and Lindblad, H (2018) Client strategies for stimulating innovation in construction. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Gunning, J G (2000) Models of customer satisfaction and service quality as research instruments in construction management. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Gyoh, L E (1999) Design-management and planning for photovoltaic cladding systems within the UK construction industry: An optimal and systematic approach to procurement and installation of building integrated photovoltaics: An agenda for the 21st century. PhD thesis, University of Sheffield, UK.
Hamerski, D C; Formoso, C T and Isatto, E L (2025) Integrating lean production and agile project management: A planning and control model for multi-project environments in construction. International Journal of Construction Management, 25(12), pp. 1432-1441. ISSN 1562-3599
Haniff, A P (2017) The alignment of strategic objectives within the context of temporary multi-organisations. PhD thesis, Heriot-Watt University, UK.
Haroglu, H; Glass, J and Thorpe, T (2009) A study of professional perspectives on structural frame selection. Construction Management and Economics, 27(12), pp. 1209-1217. ISSN 1466433X
Hartog, L; Weijs-Perrée, M and Appel-Meulenbroek, R (2018) The influence of personality on user satisfaction: Multi-tenant offices. Building Research & Information, 46(4), pp. 402-416. ISSN 0961-3218
Harty, C; Tryggestad, K and Jacobsen, P H (2015) Visualisations and calculations of spaces: Negotiating hospital design during on-boarding. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Hassan, T M; McCaffer, R O N and Thorpe, T (1999) Emerging clients' needs for large scale engineering projects. Engineering, Construction and Architectural Management, 6(1), pp. 21-29. ISSN 0969-9988
Hassanain, M A (2007) Post-occupancy indoor environmental quality evaluation of student housing facilities. Architectural Engineering and Design Management, 3(4), pp. 249-256. ISSN 1745-2007
Hassanain, M A; Sanni-Anibire, M O and Mahmoud, A S (2024) An assessment of users' satisfaction with a smart building on university campus through post-occupancy evaluation. Journal of Engineering, Design and Technology, 22(4), pp. 1119-1135. ISSN 1726-0531
Hatush, Z and Skitmore, M (1997) Assessment and evaluation of contractor data against client goals using PERT approach. Construction Management and Economics, 15(4), pp. 327-340. ISSN 01446193
Hatush, Z A (1996) Contractor selection using the multiattribute utility theory. PhD thesis, University of Salford, UK.
Hauck, A J (1990) Development and evaluation of computerized construction estimating, pricing, and bidding programs using integrated applications software. PhD thesis, University of Maryland, College Park, USA.
Hedgren, E and Stehn, L (2014) The impact of clients' decision-making on their adoption of industrialized building. Construction Management and Economics, 32(1-2), pp. 126-145. ISSN 01446193
Henjewele, C; Sun, M and Fewings, P (2008) Uncertainties and the challenge of long-term value for money in the delivery of PFI projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Henjewele, C; Sun, M and Fewings, P (2011) Value for money optimisation and sustainability in PFI projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Herazo, Benjamin (2017) The influence of sustainability in project management practices in the building sector. PhD thesis, Université de Montréal, Canada.
Hermans, M; van Zoest, S and Volker, L (2016) Assessing the maturity of public construction client organisations. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Higham, A and Thomson, C (2015) An evaluation of construction professionals sustainability literacy in North West England. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Hill, C J; Howarth, T A P; McNamara, E T and Watson, P (1997) A TQM approach to construction education. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Hiyasat, R; Sosa, M and Ahmad, L (2023) Use of work-space at home under COVID-19 conditions in the UAE. Engineering, Construction and Architectural Management, 30(8), pp. 3142-3159. ISSN 0969-9988
Hogg, K (2000) The impact of information sequence in the construction domain. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Holt, G D and Edwards, D J (2005) Domestic builder selection in the uk housing repair and maintenance sector: a critique. Journal of Construction Research, 6(1), pp. 123-137. ISSN 1609-9451
Hua, Y; Zhang, Y and Ma, P (2024) The mediating effect of BIM application on the link between organizational support and BIM user satisfaction. Architectural Engineering and Design Management, 20(3), pp. 636-655. ISSN 1745-2007
Hussain, S; Fangwei, Z and Ali, Z (2019) Examining influence of construction projects' quality factors on client satisfaction using partial least squares structural equation modeling. Journal of Construction Engineering and Management, 145(5): 05019006, ISSN 0733-9364
Hussein, D (2020) A user preference modelling method for the assessment of visual complexity in building façade. Smart and Sustainable Built Environment, 9(4), pp. 483-501. ISSN 2046-6099
Ibiyemi, A; Adnan, Y M and Daud, M N (2014) An examination of the structure of sustainable facilities planning scale for user satisfaction in Nigerian universities. Construction Economics and Building, 14(3), pp. 58-73. ISSN 2204-9029
Ikediashi, D I (2024) Facilities management strategic roles and services quality performance in Nigeria’s banking sector. Journal of Engineering, Design and Technology, 22(5), pp. 1591-1615. ISSN 1726-0531
Ikediashi, D I; Ogunlana, S O and Odesola, I A (2015) Service quality and user satisfaction of outsourced facilities management services in Nigeria's public hospitals. Built Environment Project and Asset Management, 5(4), pp. 363-379. ISSN 2044-124X
Inançoğlu, S and Uzunoglu, S S (2022) Transformation of social housing kitchens over time: Nicosia göçmenköy social houses as a case study. International Journal of Building Pathology and Adaptation, 40(1), pp. 40-59. ISSN 23984708
Ishtiaque, T A; Wondimu, P A and Klakegg, O J (2025) Likelihood of early contractor involvement (ECI) benefits in infrastructure versus building projects: The client's perception. International Journal of Construction Management, 25(10), pp. 1227-1238. ISSN 1562-3599
Ishtiaque, T A; Wondimu, P A; Memic, N; Andersen, B S; Lædre, O and Klakegg, O J (2025) Ranking the benefits of early contractor involvement: a client's perspective. International Journal of Construction Management, 25(6), pp. 728-739. ISSN 1562-3599
Ishtiaque, T A and Klakegg, O J (2025) Effects of early contractor involvement in small construction projects: Lessons from Norway. Built Environment Project and Asset Management, 15(4), pp. 879-893. ISSN 2044-124X
Ismail, M R; Sun, M and Bowles, G (2021) A risk-oriented tender evaluation system for construction projects in Malaysia. Engineering, Construction and Architectural Management, 28(7), pp. 1887-1907. ISSN 0969-9988
Ison, S; Dainty, A and Wall, S (2004) The construction sector, congestion charging and exemptions. Engineering, Construction and Architectural Management, 11(6), pp. 386-394. ISSN 0969-9988
Işıklar Bengi, S and Toprakli, A Y (2025) Assessing experiential performance in basketball halls: a comparative measure through post-occupancy evaluation. Architectural Engineering and Design Management, 21(4), pp. 621-641. ISSN 1745-2007
Jacobsson, M and Linderoth, H C J (2012) User perceptions of ICT impacts in Swedish construction companies: 'It's fine, just as it is'. Construction Management and Economics, 30(5), pp. 339-357. ISSN 1466433X
Jensen, P A (2009) Design integration of facilities management: A challenge of knowledge transfer. Architectural Engineering and Design Management, 5(3), pp. 124-135. ISSN 1745-2007
Jesumoroti, C; Olanrewaju, A and Khor, S C (2024) Defects in Malaysian hospital buildings. International Journal of Building Pathology and Adaptation, 42(5), pp. 835-856. ISSN 2398-4708
Jones, M W (2009) An analysis of the impact of information systems on the level of trust in the construction industry. PhD thesis, Walden University, USA.
Kabo, F W (2006) Low-cost housing design and provision: A case study of Kenya. PhD thesis, University of Michigan, USA.
Kaka, A P (2001) The case for re-engineering contract payment mechanisms. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Kakitahi, J M (2014) Causality, magnitude and impact mitigation of rework in Uganda. PhD thesis, Lund University, Sweden.
Kamara, J M; Anumba, C J and Hobbs, B (1999) From briefing to client requirements processing. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Kampschroer, K and Heerwagen, J H (2005) The strategic workplace: Development and evaluation. Building Research & Information, 33(4), pp. 326-337. ISSN 0961-3218
Kapote, M M and Pimplikar, S S (2025) Identification of challenges and shortcomings in the selection of bidders on road projects in India: a study. International Journal of Construction Management, 25(7), pp. 760-769. ISSN 1562-3599
Karsten Winther, J; Nielsen, R; Schultz, C and Teizer, J (2021) Automated activity and progress analysis based on non-monotonic reasoning of construction operations. Smart and Sustainable Built Environment, 10(3), pp. 457-486. ISSN 2046-6099
Kaya, S; Hinks, J and Alexander, K (2005) Innovation in facilities supply chain. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kelly, J (2007) Making client values explicit in value management workshops. Construction Management and Economics, 25(4), pp. 435-442. ISSN 1466433X
Kelly, J R (2005) Managing client value at the strategic briefing stage of construction projects. PhD thesis, Heriot-Watt University, UK.
Kenley, R and Heywood, C (2000) Corporate real estate management practice: Contrasts between financial and service provision priorities in corporate and government organizations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Khalfan, M; McDermott, P and Cooper, R (2004) Integrating the supply chain within construction industry. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Khalifa, M; Farrell, P and Emam, H (2015) The concept of partnering in public–private partnership projects in the United Arab Emirates. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 277-284. ISSN 17514304
Khamkanya, T (2011) A holistic approach to workplace environments, management systems and new technologies in meeting corporate end-user requirements. PhD thesis, University of Ulster, UK.
Kim, H S (1998) Evaluation of quality during early design: A prerequisite to defining value for money for the client. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
King, A P (2008) Enhancing the effectiveness of design and build tendering. PhD thesis, Sheffield Hallam University, UK.
Kometa, S T (1995) An evaluation of client-generated risks in construction consultancies. PhD thesis, University of Wolverhampton, UK.
Kuitert, L; Volker, L and Hermans, M (2018) The impact of shifting values on the role and responsibilities of the construction client in delivering public goods. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Kuitert, L; Volker, L and Hermans, M H (2019) Taking on a wider view: Public value interests of construction clients in a changing construction industry. Construction Management and Economics, 37(5), pp. 257-277. ISSN 01446193
Kuitert, L; Volker, L and Hermans, M H (2020) The public construction client of the future: Network-based collaborator in a traditional public administrative system. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Kulatunga, K J (2008) Construction client and innovation: effect of client characteristics. PhD thesis, University of Salford, UK.
Kulczak-Dawkins, R P (2021) Managing sustainability through architectural design decision processes: influences of values and frames. PhD thesis, University of Brighton, UK.
Kumi, L; Jeong, J; Jeong, J and Mun, H (2025) Development of multimodal recommender system for advancing design for safety with expert validation. Journal of Construction Engineering and Management, 151(9): 04025114, ISSN 0733-9364
Kurokawa, M (2015) Tracing client interests in the course of a project: Why are some client interests incorporated whereas others are not? PhD thesis, University of Reading, UK.
Kurokawa, M; Schweber, L and Hughes, W P (2014) Incorporation of different and changing client interests in the course of a project. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Kurokawa, M; Schweber, L and Hughes, W P (2015) Tracing client interests in the course of the project: Why are some client interests incorporated whereas others are not? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Kussl, S and Wald, A (2025) The role of construction clients in digital innovation: Insights from scenario analysis. Construction Management and Economics, 43(5), pp. 381-404. ISSN 0144-6193
Kwok, T W; Chang, S and Li, H (2025) Understanding client satisfaction of prefabricated curtain wall in Hong Kong using xgboost and Pearson correlation. Engineering, Construction and Architectural Management, 32(2), pp. 1254-1277. ISSN 0969-9988
Kärnä, S and Junnonen, J-M (2017) Designers' performance evaluation in construction projects. Engineering, Construction and Architectural Management, 24(1), pp. 154-169. ISSN 0969-9988
Laitinen, J (1998) Model based construction process management. PhD thesis, KTH Royal Institute of Technology, Sweden.
Lallimo, J (2014) From pedagogical ideas to a school building: Analysis of user involvement in building design. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Lamberti, G; Boghetti, R; Fantozzi, F; Leccese, F and Salvadori, G (2025) Analysing the potential of open hotel review databases for IEQ assessment: A text mining approach. Building Research & Information, 53(1-2), pp. 261-279. ISSN 0961-3218
Langford, D A; Kennedy, P; Conlin, J and McKenzie, N (2003) Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements. Construction Management and Economics, 21(8), pp. 831-840. ISSN 01446193
Larsson, J and Simonsson, P (2012) Barriers and drivers for increased use of off-site bridge construction in Sweden. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Lee, C C T and Egbu, C (2005) Capturing client needs in refurbishment projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Lee, K T; Im, J B; Park, S J and Kim, J H (2025) Identifying improvements priorities in daycare centre space performance from teachers' perspectives: Application of importance–performance analysis and structural equation modelling. Engineering, Construction and Architectural Management, 32(1), pp. 639-672. ISSN 0969-9988
Lehtiranta, L; Kärnä, S; Junnonen, J M and Julin, P (2012) The role of multi-firm satisfaction in construction project success. Construction Management and Economics, 30(6), pp. 463-475. ISSN 1466433X
Leiringer, R; Green, S D and Raja, J Z (2009) Living up to the value agenda: The empirical realities of through-life value creation in construction. Construction Management and Economics, 27(3), pp. 271-285. ISSN 1466433X
Leopold, E and Bishop, D (1983) Design philosophy and practice in speculative housebuilding: Part 1. Construction Management and Economics, 1(2), pp. 119-144. ISSN 01446193
Li, S and Liu, M (2023) Reasonable kitchen space for urban residences: Based on an investigation in Beijing. Building Research & Information, 51(8), pp. 881-896. ISSN 0961-3218
Li, W X (2015) A performance management methodology for collaborative design and construction project teams. PhD thesis, Stanford University, USA.
Li, Z (2010) Highway work zone safety audits for safety improvements. Engineering, Construction and Architectural Management, 17(5), pp. 512-526. ISSN 0969-9988
Lin, S C J (2014) A decision making framework for procurement method selection for building maintenance projects: The case of public universities in Malaysia. PhD thesis, University of Malaya, Malaysia.
Lindblad, H (2016) Translating building information modelling: A study of the BIM implementation process at a large Swedish client organisation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Lindblad, H (2019) BIM in translation exploring client organisations as drivers for change in construction. PhD thesis, KTH Royal Institute of Technology, Sweden.
Lindblad, H and Guerrero, J R (2020) Client's role in promoting BIM implementation and innovation in construction. Construction Management and Economics, 38(5), pp. 468-482. ISSN 01446193
Lindblad, H and Gustavsson, T K (2018) Project managers as involuntary policy implementers? The case of implementing BIM. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Ling, F Y Y and Hien, M B T (2014) Boosting project outcomes through goal alignment: A case study of Vietnam. Construction Economics and Building, 14(2), pp. 73-86. ISSN 2204-9029
Ling, F Y Y; Ke, Y; Kumaraswamy, M M and Wang, S (2014) Key relational contracting practices affecting performance of public construction projects in China. Journal of Construction Engineering and Management, 140(1): 04013034, ISSN 0733-9364
Ling, F Y Y and Tran, H B T (2012) Ingredients to engender trust in construction project teams in Vietnam. Construction Innovation, 12(1), pp. 43-61. ISSN 1471-4175
Lingard, H; Oswald, D and Le, T (2019) Embedding occupational health and safety in the procurement and management of infrastructure projects: Institutional logics at play in the context of new public management. Construction Management and Economics, 37(10), pp. 567-583. ISSN 01446193
Liston, K M (2009) A mediated interaction approach to study the role of media use in team interaction. PhD thesis, Stanford University, USA.
Liu, A M M (1997) Developing a research model for project outcome evaluation. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Liu, H; Song, J and Wang, G (2020) Development of a tool for measuring building information modeling (BIM) user satisfaction: method selection, scale development and case study. Engineering, Construction and Architectural Management, 27(9), pp. 2409-2427. ISSN 0969-9988
Love, P E D; Edwards, D J; Watson, H and Davis, P (2010) Rework in civil infrastructure projects: Determination of cost predictors. Journal of Construction Engineering and Management, 136(3), pp. 275-282. ISSN 0733-9364
Love, P E D; Skitmore, M and Earl, G (1998) Selecting a suitable procurement method for a building project. Construction Management and Economics, 16(2), pp. 221-233. ISSN 01446193
Luambano, C; Kavishe, N; Zulu, S and Chileshe, N (2023) Drivers and challenges of vertical integration in the Tanzanian construction industry. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Luck, R (2010) Using objects to coordinate design activity in interaction. Construction Management and Economics, 28(6), pp. 641-655. ISSN 1466433X
Ludvig, K and Stenberg, A (2012) The actors and their roles in the meaning making process of an energy target. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Ludvig, K; Stenberg, A C and Gluch, P (2013) The value of communicative skills for developing an energy strategy. Building Research & Information, 41(6), pp. 611-621. ISSN 0961-3218
Ly, E; Anumba, C J and Carrillo, P M (2005) Knowledge management practices of construction project managers. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Makabate, C T (2021) Investigating the adoption of building information modelling (BIM) within the small medium enterprises (SMEs) in contracting and consulting organisatios in the South African construction industry. PhD thesis, University of Johannesburg, South Africa.
Male, S and Kelly, J (1989) Organizational responses of public sector clients in Canada to the implementation of value management: Lessons for the UK construction industry. Construction Management and Economics, 7(3), pp. 203-216. ISSN 01446193
Mangitung, D M (2005) Modelling the influence of periodic prequalification criteria on project performance. PhD thesis, University of Manchester, UK.
Manley, K and Chen, L (2016) The impact of client characteristics on the time and cost performance of collaborative infrastructure projects. Engineering, Construction and Architectural Management, 23(4), pp. 511-532. ISSN 0969-9988
Mansfield, N R (1990) The internationalisation of the British construction consulting sector and technology transfer in developing countries. PhD thesis, University of Strathclyde, UK.
Massyn, M and Lamont, S (2009) Applying the briefing process on the people s housing process projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Mastrandrea, F (1986) The liability of the construction project manager. Construction Management and Economics, 4(2), pp. 105-134. ISSN 01446193
Mbachu, J and Nkado, R (2006) Conceptual framework for assessment of client needs and satisfaction in the building development process. Construction Management and Economics, 24(1), pp. 31-44. ISSN 01446193
McCaa, B M (2021) Leadership style needed within small construction companies to optimize a safety climate. PhD thesis, Adler University, USA.
McClements, S (2013) Modelling construction consultant selection based on attributes of trust. PhD thesis, University of Ulster, UK.
McCord, J; McCord, M; Davis, P T; Haran, M and Rodgers, W J (2015) Understanding delays in housing construction: Evidence from Northern Ireland. Journal of Financial Management of Property and Construction, 20(3), pp. 286-319. ISSN 1366-4387
Mecca, S and Masera, M (1999) Technical risk analysis in construction by means of fmea methodology. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Meistad, T (2014) How energy efficient office buildings challenge and contribute to usability. Smart and Sustainable Built Environment, 3(2), pp. 110-131. ISSN 2046-6099
Menadue, Vanessa Rachel (2014) Green commercial office buildings: Environmental performance and user perceptions. PhD thesis, University of Adelaide, Australia.
Meng, K (2021) Performance measurement for UK construction projects. PhD thesis, University of Manchester, UK.
Meng, X and Brown, A (2018) Innovation in construction firms of different sizes: Drivers and strategies. Engineering, Construction and Architectural Management, 25(9), pp. 1210-1225. ISSN 0969-9988
Mesquita, Maria Julia de Moraes (2007) Subsidy for quality plans of buildings in the hospitality sector. PhD thesis, Universidade de São Paulo, Brazil.
Miles, D W J (1997) The development of intermediate construction enterprises. PhD thesis, Loughborough University, UK.
Mills, A; Maqsood, T; Khalfan, M and Walker, D (2011) Infrastructure development using alliances: Lessons and observations. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Moghaddam, S.; Dashti, M. S.; Alvanchi, A. and Khanzadi, M. (2026) An integrated BIM-based augmented reality framework for improving facility maintenance management. Engineering, Construction and Architectural Management, 33(3), pp. 2007-2047. ISSN 0969-9988
Mojela, T. W.; Laryea, S.; Zungu, Z. and Kwasafo, O. K. (2026) Client and contractor experiences in framework construction agreements in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 154-168. ISSN 1751-4304
Molenaar, K R (1997) Public sector design-build: A model for project selection. PhD thesis, University of Colorado at Boulder, USA.
Molenaar, K R and Songer, A D (1998) Model for public sector design-build project selection. Journal of Construction Engineering and Management, 124(6), pp. 467-479. ISSN 0733-9364
Musonda, I; Zulu, S L; Zulu, E and Kavishe, N (2025) Understanding clients' role in community stakeholder participation and influence on infrastructure sustainability—a stakeholder theory lens. International Journal of Construction Management, 25(4), pp. 419-427. ISSN 1562-3599
Nana-Addy, E; Musonda, I and Okoro, C (2022) Assessing causative characteristics of abandoned completed urban market projects in Ghana. Journal of Construction in Developing Countries, 27(2), pp. 147-161. ISSN 1823-6499
Naoum, S G (1994) Critical analysis of time and cost of management and traditional contracts. Journal of Construction Engineering and Management, 120(4), pp. 687-705. ISSN 0733-9364
Nassar, N K (2005) An integrated framework for evaluation, forecasting and optimization of performance of construction projects. PhD thesis, University of Alberta, Canada.
Ng, T; Palaneeswaran, E and Kumaraswamy, M (2008) Costs and benefits of ISO 9000-based quality management systems to construction contractors. Construction Economics and Building, 8(2), pp. 23-29. ISSN 2204-9029
Nguyen, T D H N; Park, S; Jeong, J and Ahn, Y (2026) Post occupancy evaluation of the relocatable modular construction method for temporary educational facilities. Engineering, Construction and Architectural Management, 33(1), pp. 785-809. ISSN 0969-9988
Nguyen, L H (2019) Relationships between critical factors related to team behaviors and client satisfaction in construction project organizations. Journal of Construction Engineering and Management, 145(3): 04019002, ISSN 0733-9364
Ning, Y and Ling, F Y Y (2014) Boosting public construction project outcomes through relational transactions. Journal of Construction Engineering and Management, 140(1): 04013037, ISSN 0733-9364
Nkado, R N and Mbachu, J I (2001) Modelling client needs and satisfaction in the built environment. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Novak, V M (2014) Design management of sustainability values: A learning organization perspective. Architectural Engineering and Design Management, 10(3-4), pp. 218-232. ISSN 1745-2007
Obunwo, C U C (2016) A framework for enhancing project quality and customer satisfaction in government road construction projects in Rivers State, Nigeria. PhD thesis, University of Wolverhampton, UK.
Ogbu, C P and Imafidon, M O (2022) Influence of selection criteria on clients' satisfaction with construction consultancy services in Nigeria. Journal of Engineering, Design and Technology, 20(6), pp. 1519-1537. ISSN 1726-0531
Oke, A E; Aigbavboa, C O and Raphiri, M M (2017) Students' satisfaction with hostel accommodations in higher education institutions. Journal of Engineering, Design and Technology, 15(5), pp. 652-666.
Okika, M C; Vermeulen, A and Pretorius, J H C (2025) A systematic approach to identify and manage supply chain risks in construction projects. Journal of Financial Management of Property and Construction, 30(1), pp. 42-66. ISSN 1366-4387
Oko, J A (2008) Ethical behaviour of Nigerian building industry professionals in the procurement of building projects. PhD thesis, University of Lagos, Nigeria.
Olanrewaju, A A and Anavhe, P J (2014) Perceived claim sources in the Nigerian construction industry. Built Environment Project and Asset Management, 4(3), pp. 281-295. ISSN 2044-124X
Olatokun, E O (2017) Requirement elicitation using knowledge capturing (kc) techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.
Olatokun, E O (2017) Requirement elicitation using knowledge capturing techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.
Olatunji, O A and Sher, W (2014) Perspectives on modelling BIM-enabled estimating practices. Construction Economics and Building, 14(4), pp. 32-53. ISSN 2204-9029
Ollár, A (2024) Spatial design for circularity in residential buildings: Exploring the case of the kitchen. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Omopariola, E D; Olanrewaju, O I; Albert, I; Oke, A E and Ibiyemi, S B (2024) Sustainable construction in the Nigerian construction industry: Unsustainable practices, barriers and strategies. Journal of Engineering, Design and Technology, 22(4), pp. 1158-1184. ISSN 1726-0531
Onungwa, I O and Uduma-Olugu, N (2017) Building information modelling and collaboration in the Nigerian construction industry. Journal of Construction Business and Management, 1(2), pp. 1-10. ISSN 2521-0165
Opoku, A and Tallon, A (2019) The role of project sponsors in defining and realising project benefits. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Ormeno Blanco, J. M. and Arranz, B. (2026) Exploring urban lighting design effect on citizens' emotions through the application of kansei methodology. Smart and Sustainable Built Environment, 15(3), pp. 991-1025. ISSN 2046-6099
Ormeno Blanco, J. M. and Arranz, B. (2026) Exploring urban lighting design effect on citizens´ emotions through the application of kansei methodology. Smart and Sustainable Built Environment, 15(3), pp. 991-1025. ISSN 2046-6099
Ospina Alvarado, A M (2011) Unified framework for construction project integration and its potential association with project performance. PhD thesis, Georgia Institute of Technology, USA.
Osuizugbo, I C and Adenuga, O A (2024) Decisive factors for decision-making to achieving sustainable procurement in construction projects. International Journal of Building Pathology and Adaptation, 42(6), pp. 1185-1202. ISSN 2398-4708
Otegbulu, A C; Osagie, J U and Famuyiwa, F (2009) A value hierarchy study of building services/components in commercial and residential developments: A comparative analysis. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Othman, A A E (2004) Value and risk management for dynamic brief development in construction. PhD thesis, Loughborough University, UK.
Othman, A A E (2007) Generating sustainable values and achieving client satisfaction in construction projects through maintenance management: The case of housing projects in abu dhabi, united arab emirates. Architectural Engineering and Design Management, 3(3), pp. 145-159. ISSN 1745-2007
Othman, A A E and Youssef, L Y W (2021) A framework for implementing integrated project delivery in architecture design firms in Egypt. Journal of Engineering, Design and Technology, 19(3), pp. 721-757. ISSN 1726-0531
Pettit, J H (2000) Clients: their role in the procurement of infrastructure projects. PhD thesis, Loughborough University, UK.
Phillips, S; Martin, J; Dainty, A and Price, A (2008) Analysis of the quality attributes used in establishing best value tenders in the UK social housing sector. Engineering, Construction and Architectural Management, 15(4), pp. 307-320. ISSN 0969-9988
Pilgrim, M J (2003) The application of visualisation techniques to the process of building performance analysis. PhD thesis, Loughborough University, UK.
Pittri, H; Agyekum, K; Kukah, A S; Asamoah, E; Gasue, R and Botchway, B (2026) Adoption strategies for health and safety technologies in the construction industry. Construction Economics and Building, 26(1), ISSN 2204-9029
Pocock, J B (1996) The relationship between alternative project approaches, integration, and performance. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Poon, J; Potts, K and Cooper, P (1999) Development of a new best practice model for building projects. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Potts, M (2017) A participatory study into the creation of a new infrastructure delivery system in the regulated UK water sector. PhD thesis, University of Salford, UK.
Potts, M; McDermott, P and Stephenson, A (2016) A systems approach to strategic infrastructure delivery. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(3), pp. 95-105. ISSN 17514304
Preece, C and Male, S (1997) Promotional literature for competitive advantage in UK construction firms. Construction Management and Economics, 15(1), pp. 59-69. ISSN 01446193
Preece, C and Tarawneh, S (1997) Service quality for client satisfaction on design & build projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Preece, C N (1993) A study of the management of promotion for competitive advantage in UK construction firms. PhD thesis, Heriot-Watt University, UK.
Preece, C N and Shafiei, M (1998) Development of client care initiatives in construction contracting organizations. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Prince, R F A (2011) The construction briefing process: evaluating the influence of personality traits on the performance of the consultant project manager. PhD thesis, Heriot-Watt University, UK.
Prochorskaite, A (2016) An investigation of the 'soft' features of sustainable and healthy housing design: exploring stakeholder preferences and their provision in new housing developments. PhD thesis, Liverpool John Moores University, UK.
Pryke, S D (2004) Analysing construction project coalitions: Exploring the application of social network analysis. Construction Management and Economics, 22(8), pp. 787-797. ISSN 01446193
Purushothaman, A and Thirumaran, K (2021) Evaluating the climate-responsive design strategies of vernacular buildings in konearirajapuram village, nagappattinam, India. International Journal of Building Pathology and Adaptation, 39(2), pp. 175-196. ISSN 23984708
Rajhans, K and Bhavsar, V (2023) Impending need of sustainable human resource management practices in construction industry: Evidence from India. International Journal of Construction Management, 23(13), pp. 2249-2259. ISSN 1562-3599
Randeree, K and Chaudhry, A G (2012) Leadership: style, satisfaction and commitment: An exploration in the United Arab Emirates' construction sector. Engineering, Construction and Architectural Management, 19(1), pp. 61-85. ISSN 0969-9988
Rashid, R A (1998) A model for an effective implementation of the government technology transfer policy in the Malaysian construction industry. PhD thesis, University of Reading, UK.
Razak, D S A; Mills, G and Roberts, A (2018) How do infrastructure owners build capabilities to reduce operational failure? In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Robinson, W G; Chan, P W and Lau, T (2016) Sensors and sensibility: Examining the role of technological features in servitizing construction towards greater sustainability. Construction Management and Economics, 34(1), pp. 4-20. ISSN 01446193
Rosander, L (2022) Same same but different: Dynamics of a pre-procurement routine and its influence on relational contracting models. Construction Management and Economics, 40(11-12), pp. 955-972. ISSN 01446193
Rosander, L and Kadefors, A (2023) Implementing relational contracting in a public client organization: The influence of policy clashes, resources and project autonomy. Construction Management and Economics, 41(8), pp. 651-669. ISSN 01446193
Rowlinson, S (2007) The temporal nature of forces acting on innovative IT in major construction projects. Construction Management and Economics, 25(3), pp. 227-238. ISSN 1466433X
Roza, C (2006) Environmental assessment: The Eden project. PhD thesis, University College London, UK.
Ruddock, L (1998) Comprehensive macro-information systems for the construction industry: An international perspective. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Ruddock, S (2009) Assessment of the built environment for healthcare: A case study in the development of an evaluation framework. PhD thesis, University of Salford, UK.
Rutter, D and Gidado, K (2004) Value for money and facilities performance: A systems approach. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Sadafi, N and Sharifi, M (2019) A study of the concept of Iranian traditional architecture in bazaars and shopping centres. Journal of Construction in Developing Countries, 23(2), pp. 151-165. ISSN 1823-6499
Salamati, A A (2001) Urban housing design in Iran in response to socio-cultural and environmental conditions. PhD thesis, University of Strathclyde, UK.
Sanni-Anibire, M O and Adenle, Y A (2024) Residential satisfaction of vertical urban settlements in Hong Kong. Journal of Engineering, Design and Technology, 22(6), pp. 1705-1722. ISSN 1726-0531
Saridaki, M and Haugbølle, K (2020) Informing early stage design through LCC data. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Savolainen, J M; Saari, A; Männistö, A and Kähkonen, K (2018) Indicators of collaborative design management in construction projects. Journal of Engineering, Design and Technology, 16(4), pp. 674-691. ISSN 1726-0531
Schoenefeldt, H (2020) Delivery of occupant satisfaction in the house of commons, 1950–2019. Buildings & Cities, 1(1), pp. 141-163. ISSN 2632-6655
Schönbeck, P (2022) Data based configuration decisions in hospital construction projects. PhD thesis, KTH Royal Institute of Technology, Sweden.
Seo, Y C and Hyan, C T (2004) Procurement system selection model reflecting past performance. Journal of Construction Procurement, 10(2),
Sezer, A A (2013) Indicators of environmental and productivity performance for building refurbishment projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Shah, M; Tang, L and Hughes, W P (2012) Exploring process, productivity and structure in design. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Sharmin, T and Khalid, R (2022) Post occupancy and participatory design evaluation of a marginalized low-income settlement in ahmedabad, India. Building Research & Information, 50(5), pp. 574-594. ISSN 0961-3218
Shen, Q; Li, H; Chung, J and Hui, P Y (2004) A framework for identification and representation of client requirements in the briefing process. Construction Management and Economics, 22(2), pp. 213-221. ISSN 01446193
Shen, Y (2013) An investigation of safety climate on Hong Kong construction sites. PhD thesis, University of Hong Kong, Hong Kong.
Silveira, B F and Costa, D B (2024) Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System. Construction Innovation, 24(4), pp. 1005-1025. ISSN 1471-4175
Simkoko, E E (1989) Analysis of factors impacting technology transfer in construction projects: Case studies from developing countries. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.
Singla, H. K. and Phadtare, M. (2026) Measuring construction contractor satisfaction from the lens of client performance: Empirical investigation in India. Journal of Construction Engineering and Management, 152(9): 04026133, ISSN 0733-9364
Smallwood, J (1998) Client influence on contractor health and safety in South Africa. Building Research & Information, 26(3), pp. 181-189. ISSN 0961-3218
Smallwood, J J (2004) The influence of clients on contractor health and safety (H&S). In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Smith, J (2005) An approach to developing a performance brief at the project inception stage. Architectural Engineering and Design Management, 1(1), pp. 3-20. ISSN 1745-2007
Smyth, H and Fitch, T (2009) Application of relationship marketing and management: A large contractor case study. Construction Management and Economics, 27(4), pp. 399-410. ISSN 1466433X
Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Towards an explicit design decision process: The case of the structural frame. Construction Management and Economics, 24(6), pp. 603-614. ISSN 1466433X
Soetanto, R; Dainty, A R J; Glass, J and Price, A D F (2006) Empirical evaluation of structural frame performance criteria: Realizing the potential of hybrid concrete construction. Journal of Construction Engineering and Management, 132(3), pp. 278-290. ISSN 0733-9364
Soetanto, R and Proverbs, D G (2001) Modelling client satisfaction levels: A comparison of multiple regression and artificial neural network techniques. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Soetanto, R and Proverbs, D G (2002) Modelling client satisfaction levels: The impact of contractor performance. Construction Economics and Building, 2(1), pp. 13-27. ISSN 2204-9029
Soetanto, R and Proverbs, D G (2004) Intelligent models for predicting levels of client satisfaction. Journal of Construction Research, 5(2), pp. 233-253. ISSN 1609-9451
Soewin, E and Chinda, T (2022) Development of a construction performance index in the construction industry: System dynamics modelling approach. International Journal of Construction Management, 22(10), pp. 1806-1817. ISSN 1562-3599
Sourani, A (2008) Realising sustainable construction through procurement stratergies. PhD thesis, Loughborough University, UK.
Souza, M P D and Fabricio, M M (2024) BIM and virtual reality for pre-design evaluation of building performance. Architectural Engineering and Design Management, 20(5), pp. 1260-1279. ISSN 1745-2007
Sporrong, J and Kadefors, A (2014) Municipal consultancy procurement: New roles and practices. Building Research & Information, 42(5), pp. 616-628. ISSN 0961-3218
Strahorn, S; Gajendran, T and Brewer, G (2014) Experiences of trust in construction project management: The influence of procurement mechanisms. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Straub, A (2002) Strategic technical management of housing stock: Lessons from Dutch housing associations. Building Research & Information, 30(5), pp. 372-381. ISSN 0961-3218
Takim, R and Akintoye, A (2002) Performance indicators for successful construction project performance. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Taleb, H M and Abumoeilak, L (2021) An assessment of different courtyard configurations in urban communities in the United Arab Emirates. Smart and Sustainable Built Environment, 10(1), pp. 67-89. ISSN 2046-6099
Tangkitsiri, W (2016) Modelling user satisfaction with transportation public-private partnership projects. PhD thesis, Heriot-Watt University, UK.
Tanyer, A M (2004) Implementation barriers of computer integrated construction: A usability perspective. PhD thesis, University of Salford, UK.
Tarawneh, S A (1999) Service quality and its relationship with client satisfaction and behavioural intentions in UK construction: The case of design and build contracting services. PhD thesis, University of Leeds, UK.
Tatari, M O (2009) Empirical analysis of construction enterprise information systems: Assessing the critical factors and benefits. PhD thesis, University of Maryland, College Park, USA.
Tengan, C; Aigbavboa, C O; Guribie, F and Annor-Asubonteng, J (2019) Analysis of the outcome features of effective monitoring and evaluation in construction project delivery. Journal of Engineering, Design and Technology, 17(6), pp. 1192-1201. ISSN 1726-0531
Thompson, N J (2003) Relationship marketing and client trust towards contractors within the large private building sector of the UK construction industry. PhD thesis, Oxford Brookes University, UK.
Thyssen, M H; Emmitt, S; Bonke, S and Kirk-Christoffersen, A (2010) Facilitating client value creation in the conceptual design phase of construction projects: A workshop approach. Architectural Engineering and Design Management, 6(1), pp. 18-30. ISSN 1745-2007
Tierney, G and Tennant, S (2016) Post occupancy evaluation (POE): A BREEAM excellent case study. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Tookey, J E; Kulatunga, K; Kulatunga, U; Amaratunga, D and Haigh, R (2011) Client's championing characteristics that promote construction innovation. Construction Innovation, 11(4), pp. 380-398. ISSN 1471-4175
Trigunarsyah, B (2017) Organizational culture influence on client involvement. Engineering, Construction and Architectural Management, 24(6), pp. 1155-1169. ISSN 0969-9988
Tucker, M P; Ogungbemi, Y O and Noor, M N M (2012) The socialization of outsourced employees in facilities management: A research agenda. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Tuffaha, F M; Assaf, S; Yasar Zakaria, Z and Hadidi, L A (2021) A framework for the performance assessment of construction contractors in Saudi Arabia. Built Environment Project and Asset Management, 11(2), pp. 195-213. ISSN 2044-124X
Tutesigensi, A and Oak, D P (2007) Feasibility of collaborative working at the second tier subcontractor level in a prime contract. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Umeokafor, N (2017) An appraisal of the barriers to client involvement in health and safety in Nigeria's construction industry. Journal of Engineering, Design and Technology, 15(4), pp. 471-487.
Umeokafor, N (2018) An investigation into public and private clients' attitudes, commitment and impact on construction health and safety in Nigeria. Engineering, Construction and Architectural Management, 25(6), pp. 798-815. ISSN 0969-9988
Utomo, C and Rahmawati, Y (2020) Agreement options for negotiation on material location decision of housing development. Construction Innovation, 20(2), pp. 209-222. ISSN 1471-4175
Vennström, A and Erik Eriksson, P (2010) Client perceived barriers to change of the construction process. Construction Innovation, 10(2), pp. 126-137. ISSN 1471-4175
Wai, S H; Aminah, M Y and Syuhaida, I (2013) Social infrastructure project success criteria: an exploratory study. International Journal of Construction Management, 13(3), pp. 95-104. ISSN 1562-3599
Walker, G (1999) A critical analysis into the factors that determine project management success: The case in railway engineering projects. PhD thesis, London South Bank University, UK.
Walker, G; Naoum, S and Howes, R (1997) Determinants of project management success. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Wamuziri, S (2009) Using electronic reverse auctions in project procurement: Perceptions of construction contractors. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Wandahl, S; Jacobsen, A; Lassen, A H; Poulsen, S B and Srensen, H (2011) User-driven innovation in a construction material supply network. Construction Innovation, 11(4), pp. 399-415. ISSN 1471-4175
Ward, S C; Curtis, B and Chapman, C B (1991) Objectives and performance in construction projects. Construction Management and Economics, 9(4), pp. 343-353. ISSN 01446193
Way, M and Bordass, B (2005) Making feedback and post-occupancy evaluation routine 2: Soft landings: involving design and building teams in improving performance. Building Research & Information, 33(4), pp. 353-360. ISSN 0961-3218
Weijs-Perrée, M; van de Koevering, J; Appel-Meulenbroek, R and Arentze, T (2019) Analysing user preferences for co-working space characteristics. Building Research & Information, 47(5), pp. 534-548. ISSN 0961-3218
Weldu, Y W (2016) Automated generation and visualization of initial construction schedules from building information models. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
White, A (2020) Operational performance and delivery structure of hospital facilities: empirical relationship analyses in Ontario, Canada. DBA thesis, University of Manchester, UK.
Whitman, C J; Prizeman, O; Walker, P and Gwilliam, J A (2020) Heritage retrofit and cultural empathy; a discussion of challenges regarding the energy performance of historic UK timber-framed dwellings. International Journal of Building Pathology and Adaptation, 38(2), pp. 386-404. ISSN 23984708
Winch, G; Usmani, A and Edkins, A (1998) Towards total project quality: A gap analysis approach. Construction Management and Economics, 16(2), pp. 193-207. ISSN 01446193
Windapo, A; Alade, K; Lefoka, M; Lefokotsane, K and Mundoma, T (2024) The role of construction managers' competencies in enhancing project performance. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
Windapo, A O and Goulding, J (2013) Value-based perspectives of stakeholders' building requirements in low cost and government subsidised housing projects in South Africa. Construction Innovation, 13(4), pp. 424-444. ISSN 1471-4175
Windapo, A O and Moghayedi, A (2020) Adoption of smart technologies and circular economy performance of buildings. Built Environment Project and Asset Management, 10(4), pp. 585-601. ISSN 2044-124X
Witmer, A P (2018) Contextual engineering assessment using an influence-identification tool. Journal of Engineering, Design and Technology, 16(6), pp. 889-909. ISSN 1726-0531
Wongbumru, T and Dewancker, B (2016) Post-occupancy evaluation of user satisfaction: A case study of "old" and "new" public housing schemes in Bangkok. Architectural Engineering and Design Management, 12(2), pp. 107-124. ISSN 1745-2007
Woodhead, R (1997) Exploring the hurdle rate in preparation for a value management workshop planning session. Journal of Financial Management of Property and Construction, 2(2), pp. 21-38. ISSN 1366-4387
Woodhead, R M (1999) The influence of paradigms and perspectives on the decision to build undertaken by large experienced clients of the UK construction industry. PhD thesis, University of Leeds, UK.
Worthing, D and Organ, S (2020) Conservation management plans: An examination of obstacles to, and opportunities for, producing an effective management tool. International Journal of Building Pathology and Adaptation, 38(4), pp. 573-588. ISSN 23984708
Wu, S (2010) The impact of collaborative working on construction project performance. PhD thesis, Northumbria University, UK.
Xia, B; Molenaar, K; Chan, A; Skitmore, M and Zuo, J (2013) Determining optimal proportion of design in design-build request for proposals. Journal of Construction Engineering and Management, 139(6), pp. 620-627. ISSN 0733-9364
Xiao, H and Proverbs, D (2002) The performance of contractors in Japan, the UK and the USA: A comparative evaluation of construction cost. Construction Management and Economics, 20(5), pp. 425-435. ISSN 01446193
Xiao, H and Proverbs, D (2002) Construction time performance: An evaluation of contractors from Japan, the UK and the US. Engineering, Construction and Architectural Management, 9(2), pp. 81-89. ISSN 0969-9988
Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), pp. 171-192. ISSN 1823-6499
Yasamis, F (1999) Contractor quality performance (CQP) evaluation model in pavement projects. PhD thesis, Illinois Institute of Technology, USA.
Yasamis, F; Arditi, D and Mohammadi, J (2002) Assessing contractor quality performance. Construction Management and Economics, 20(3), pp. 211-223. ISSN 01446193
Yeung, F Y (2007) Developing a partnering performance index (PPI) for construction projects: A fuzzy set theory approach. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Yeung, J F Y; Chan, A P C and Chan, D W M (2008) Establishing quantitative indicators for measuring the partnering performance of construction projects in Hong Kong. Construction Management and Economics, 26(3), pp. 277-301. ISSN 1466433X
Yeung, J F Y; Chan, A P C; Chan, D W M and Li, L K (2007) Development of a partnering performance index (PPI) for construction projects in Hong Kong: A Delphi study. Construction Management and Economics, 25(12), pp. 1219-1237. ISSN 1466433X
Yeung, J F Y; Chan, D W M; Chan, J H L and Lok, K L (2023) Development of a composite project performance index for the New Engineering Contract (necppi) of construction projects in Hong Kong: A Delphi study. International Journal of Construction Management, 23(16), pp. 2804-2817. ISSN 1562-3599
Yirenkyi-Fianko, A B and Chileshe, N (2012) Job satisfaction of professionals within the Ghanaian construction industry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Yu, A T W; Shen, Q; Kelly, J and Lin, G (2006) A value management approach to strategic briefing: An exploratory study. Architectural Engineering and Design Management, 2(4), pp. 245-259. ISSN 1745-2007
Yılmaz, M B and Rızvanoğlu, K (2022) Understanding users' behavioral intention to use voice assistants on smartphones through the integrated model of user satisfaction and technology acceptance: A survey approach. Journal of Engineering, Design and Technology, 20(6), pp. 1738-1764. ISSN 1726-0531
Zaid Alkilani, Suhair (2018) Performance measurement and improvement model for small and medium contractors in developing countries. PhD thesis, University of New South Wales, Australia.
Zemke, D M V and Pullman, M (2008) Assessing the value of good design in hotels. Building Research & Information, 36(6), pp. 543-556. ISSN 0961-3218
Zhang, L and Agapiou, A (2020) Influence diagrams for off-site construction manufacturing risk assessment in China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(4), pp. 145-162. ISSN 17514304
Zhang, L; Hu, H; Fang, Y; Qiang, Z and Cai, Y (2023) Preliminary CSI specification localization methodology matrix in China. International Journal of Construction Management, 23(6), pp. 935-944. ISSN 1562-3599
Zhang, Y; Xiao, B and Li, X (2024) Integrating virtual reality and consensus models for streamlined built environment design collaboration. Journal of Construction Engineering and Management, 150(4): 04024010, ISSN 0733-9364
Zhao, N and Ying, F (2019) Method selection: A conceptual framework for public sector PPP selection. Built Environment Project and Asset Management, 9(2), pp. 214-232. ISSN 2044-124X
Zhou, S; Ng, S T; Lee, S H; Xu, F J and Yang, Y (2020) A domain knowledge incorporated text mining approach for capturing user needs on BIM applications. Engineering, Construction and Architectural Management, 27(2), pp. 458-482. ISSN 0969-9988
Zubair, M U; Zhang, X and Hassan, M U (2024) Aligning expectations and perceptions of elevator maintenance stakeholders: An application of expectation confirmation theory. Building Research & Information, 52(4), pp. 418-430. ISSN 0961-3218
Up a level