Items with Subject: assessment methods
Abd-Elnaby, A-E H A and Reffat, R M (2024) Enhancing BIM-BEM integration: Solutions for efficient data exchange and energy performance assessment. Architectural Engineering and Design Management, 20(3), pp. 596-623. ISSN 1745-2007
Abdelkhalek, Sherif Ibrahim Farag Mohamed (2022) Managing the inspection process of concrete bridge decks. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Abdollahipour, S; Jeong, D H S; Burman, R R and Gunsaulis, F (2012) Performance assessment of on-grade horizontal directional drilling. Journal of Construction Engineering and Management, 138(3), pp. 458-468. ISSN 0733-9364
Abdullah, W M W (2010) Critical factors in project success: A study of public sector construction projects in Malaysia. PhD thesis, University of Malaya, Malaysia.
Abdulrahman, A (2010) The development of a performance measurement framework for FE/HE co-location construction projects. PhD thesis, Heriot-Watt University, UK.
Aboseif, E and Hanna, A S (2024) Benchmarking of construction projects performance for comparative assessment and performance improvement: A statistical quantitative approach. Engineering, Construction and Architectural Management, 31(7), pp. 2829-2851. ISSN 0969-9988
Abuelmaatti, A and Ahmed, V (2010) The potential of collaborative environments implementation in small and medium enterprises for the construction industry. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Adabre, M A; Chan, A P C and Edwards, D J (2023) Modeling relationship between success factors (policies) and critical success criteria (goals) for sustainable housing in developing countries. International Journal of Construction Management, 23(10), pp. 1642-1652. ISSN 1562-3599
Adedokun, O A; Egbelakin, T; Adedokun, D O and Adafin, J (2023) Success criteria-based impacts of risk factors on education building projects in Southwestern Nigeria. Journal of Engineering, Design and Technology, 21(6), pp. 1901-1924. ISSN 1726-0531
Adetunji, I O (2006) Sustainable construction: a web-based performance assessment tool. EngD thesis, Loughborough University, UK.
Adjei, E A (2015) Multi-objective optimisation of building design variables and its impact on office building performance: a case for Ghana. PhD thesis, University of Nottingham, UK.
Ahmad, T and Aibinu, A A (2017) Project delivery attributes influencing green building project outcomes: A review and future research directions. Built Environment Project and Asset Management, 7(5), pp. 471-489. ISSN 2044-124X
Ahmad, Tayyab (2020) An inquiry of conditions and criteria associated with Green Building project success. PhD thesis, University of Melbourne, Australia.
Aibinu, A A and Papadonikolaki, E (2020) Conceptualizing and operationalizing team task interdependences: BIM implementation assessment using effort distribution analytics. Construction Management and Economics, 38(5), pp. 420-446. ISSN 01446193
Akbari, S; Khanzadi, M and Gholamian, M R (2018) Building a rough sets-based prediction model for classifying large-scale construction projects based on sustainable success index. Engineering, Construction and Architectural Management, 25(4), pp. 534-558. ISSN 0969-9988
Akbari, S; Pour Rahimian, F; Sheikhkhoshkar, M; Banihashemi, S and Khanzadi, M (2020) Dynamic sustainable success prediction model for infrastructure projects: a rough set based fuzzy inference system. Construction Innovation, 20(4), pp. 545-567. ISSN 1471-4175
Akuete, E; Nduka, D O and Ogundipe, K E (2022) Maintenance feedback mechanisms and limiting factors of post-occupancy evaluation in student residents of higher education institutions in Nigeria. Journal of Construction in Developing Countries, 27(2), pp. 17-41. ISSN 1823-6499
Al Shalabi, F A (2016) BIM framework for energy and maintenance performance assessment for facility management. PhD thesis, Iowa State University, USA.
Al-Zahrani, J I (2013) The impact of contractors' attributes on construction project success. PhD thesis, University of Manchester, UK.
Alam, M (2009) Investigating the effectiveness of continuing professional development in project management. PhD thesis, University of Manchester, UK.
Alashwal, A M; Fareed, N F and Al-Obaidi, K M (2017) Determining success criteria and success factors for international construction projects for Malaysian contractors. Construction Economics and Building, 17(2), pp. 62-80. ISSN 2204-9029
Alhallaq, M. and Artan, D. (2026) Assessing contractors' circular economy performance: Barriers and system requirements. International Journal of Building Pathology and Adaptation, pp. 1-20. ISSN 2398-4708
Aliu, J and Aigbavboa, C (2023) Reviewing the roles of extracurricular activities in developing employability skills: A bibliometric review. International Journal of Construction Management, 23(10), pp. 1623-1632. ISSN 1562-3599
Almarri, K and Boussabaine, H (2017) Interdependency of the critical success factors and ex-post performance indicators of PPP projects. Built Environment Project and Asset Management, 7(5), pp. 546-556. ISSN 2044-124X
Almeida, Y. and Calejo, R. (2026) Innovation in public works management: Proposal for a performance evaluation model based on cost and deadline indicators. Construction Management and Economics, 44(9), pp. 721-740. ISSN 0144-6193
Altuwaijri, H A (2014) A study of the relationship between the use of GIS and project success in selected construction organizations. PhD thesis, Eastern Michigan University, USA.
Aluko, R O; Adenuga, O A; Kukoyi, P O; Soyingbe, A A and Oyedeji, J O (2016) Predicting the academic success of architecture students by pre-enrolment requirement: Using machine-learning techniques. Construction Economics and Building, 16(4), pp. 86-98. ISSN 2204-9029
Aluko, R O; Daniel, E I; Shamsideen Oshodi, O; Aigbavboa, C O and Abisuga, A O (2018) Towards reliable prediction of academic performance of architecture students using data mining techniques. Journal of Engineering, Design and Technology, 16(3), pp. 385-397. ISSN 1726-0531
Amies, P; Jin, X and Senaratne, S (2025) Achieving design-phase success in dam construction: An exploration of project success elements through factor analysis and structural equation modeling. International Journal of Construction Education and Research, 21(4), pp. 554-584. ISSN 1557-8771
Amies, P; Jin, X and Senaratne, S (2023) Systematic literature review on success criteria for dam engineering projects. Journal of Construction Engineering and Management, 149(1): 03122012, ISSN 0733-9364
Amies, P; Jin, X and Senaratne, S (2025) Identification of success criteria over life cycle of dam industry projects: A Delphi study. Construction Innovation, 25(3), pp. 689-709. ISSN 1471-4175
Amies, P; Jin, X and Senaratne, S (2025) Success in construction management of dams: An empirical study. International Journal of Construction Management, 25(10), pp. 1207-1217. ISSN 1562-3599
Attah, Tobenna Vincent (2025) GPA as a predictor of safety practices among U.S. College construction interns. PhD thesis, University of Arizona Global Campus, USA.
Bademosi, F M (2019) Robotics and automation in construction: Assessment of knowledge, skills and abilities necessary for talent cultivation in industry and education. PhD thesis, University of Florida, USA.
Baienat, S. and Iordanova, I. (2026) Quantifying building adaptability and circular performance through BIM: The adaptation intensity index (AII), circular adaptability performance (CAP), and digital adaptability passport (DAP). Smart and Sustainable Built Environment, pp. 1-22. ISSN 2046-6099
Balali, A; Moehler, R C and Valipour, A (2022) Ranking cost overrun factors in the mega hospital construction projects using Delphi-swara method: An Iranian case study. International Journal of Construction Management, 22(13), pp. 2577-2585. ISSN 1562-3599
Banerjee, A and Nayaka, R R (2022) A comprehensive overview on BIM-integrated cyber physical system architectures and practices in the architecture, engineering and construction industry. Construction Innovation, 22(4), pp. 727-748. ISSN 1471-4175
Barajei, C; Appiah-Kubi, E; Kheni, N A; Yalley, P P K and Iddrisu, W (2024) Success factors of pre-construction stages of Ghanaian public road construction project life cycle. International Journal of Construction Management, 24(13), pp. 1444-1453. ISSN 1562-3599
Barajei, C; Kusi, E; Ackon, F; Osman, A M; Mohammed, A M Z; Simpeh, F and Gyimah, F (2024) Success factors of the consultant selection stage of the Ghanaian public construction projects: The road sector’s perspective. Construction Economics and Building, 24(1-2), pp. 144-162. ISSN 2204-9029
Barbosa Resende, C (2021) Post-construction evaluation for work zones and construction engineers' training. PhD thesis, Iowa State University, USA.
Bassanino, M N (1999) The perception of computer generated architectural images. PhD thesis, University of Liverpool, UK.
Basurto, C; Kämpf, J H and Scartezzini, J-L (2017) Multi-criteria analysis for the integrated performance assessment of complex fenestration systems. Building Research & Information, 45(8), pp. 926-942. ISSN 0961-3218
Bataw, A (2016) On the integration of building information modelling in undergraduate civil engineering programmes in the United Kingdom. PhD thesis, University of Manchester, UK.
Boodai, F J (2014) Achieving construction project success through integration in the project delivery system from an owner's perspective. PhD thesis, University of Wisconsin - Madison, USA.
Brown, D C (2003) A methodology for selecting the construction team. PhD thesis, University of Southampton, UK.
Bukhari, Fakhri A (2011) A hierarchical evolutionary algorithmic design (head) system for generating and evolving building design models. PhD thesis, Queensland University of Technology, Australia.
Chan, A P L; Chan, A P C and Chan, D W M (2003) A study of managing healthcare projects in Hong Kong. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Chen, Q; Christy, A; Owens, M; Bortz, D; Greene, W and King, B (2012) Two-plus-two construction management programs and articulation agreements. International Journal of Construction Education and Research, 8(1), pp. 4-25. ISSN 1557-8771
Chen, R (2025) Investigation of mechanical and thermal performances and masonry quality for new raw soil-based insulating hollow bricks. Architectural Engineering and Design Management, 21(3), pp. 533-552. ISSN 1745-2007
Chen, W and Lai, J (2025) Performance assessment of residential building renovation: A scientometric analysis and qualitative review of literature. Smart and Sustainable Built Environment, 14(3), pp. 625-648. ISSN 2046-6099
Cheong, S P (2004) Functional briefing for whole life performance. PhD thesis, Loughborough University, UK.
Cheung, S O; Tam, C M; Tam, V; Cheung, K and Suen, H (2004) A web-based performance assessment system for environmental protection: Wepass. Construction Management and Economics, 22(9), pp. 927-935. ISSN 01446193
Chew, M Y L and De Silva, N (2004) Factorial method for performance assessment of building facades. Journal of Construction Engineering and Management, 130(4), pp. 525-533. ISSN 0733-9364
Childs, B R; Weidman, J E; Farnsworth, C B and Christofferson, J P (2017) Use of personality profile assessments in the us commercial construction industry. International Journal of Construction Education and Research, 13(4), pp. 267-83. ISSN 1557-8771
Collins, A and Baccarini, D (2004) Project success: A survey. Journal of Construction Research, 5(2), pp. 211-231. ISSN 1609-9451
Comodromos, George (2016) How academics respond, adapt and cope with the transformational changes in the Australian higher education sector. PhD thesis, Victoria University, Australia.
Dainty, A R J; Cheng, M I and Moore, D R (2003) Redefining performance measures for construction project managers: An empirical evaluation. Construction Management and Economics, 21(2), pp. 209-218. ISSN 01446193
Damdelen, O and Tansu, A (2022) Influence of recycled plastic on the thermal transmittance and sustainable assessment of concrete mixes. Journal of Construction Engineering and Management, 148(12): 04022135, ISSN 0733-9364
Doczy, R (2018) Risk-benefit analysis and optimization of LEED-certified school buildings design and construction: Statisitical and machine learning approaches. PhD thesis, Florida State University, USA.
Dodd, J and Langford, D A (1990) Construction management on one large project in London: A case study. Construction Management and Economics, 8(4), pp. 385-398. ISSN 01446193
Echeverria-Valiente, E; Garcia-Alvarado, R; Celis-D’Amico, F and Saelzer-Fuica, G (2019) Integrated design experiences for energy-efficient housing in Chile. Construction Innovation, 19(2), pp. 236-255. ISSN 1471-4175
El-Saboni, M A (2011) Interaction between electronic communication and perceived success in UAE construction projects. PhD thesis, University of Salford, UK.
Elkadi, Karim (2024) BIM-enabled facility management framework and simulation. PhD thesis, George Mason University, USA.
Elliott, J W; Thevenin, M K and Bigelow, B F (2017) Promoting CM student success: Establishing an academic performance benchmark given construction-education self-efficacy, motivation and planned behavior. International Journal of Construction Education and Research, 13(4), pp. 284-98. ISSN 1557-8771
Ellis, R C T (2001) Lessons in project management. PhD thesis, Loughborough University, UK.
Ellis, R C T; Wood, G D and Thorpe, T (2004) Technology-based learning and the project manager. Engineering, Construction and Architectural Management, 11(5), pp. 358-365. ISSN 0969-9988
Elwakil, E (2017) Integrating analytical hierarchy process and regression for assessing construction organizations' performance. International Journal of Construction Management, 17(1), pp. 76-88. ISSN 1562-3599
Erişen, S (2021) Incremental transformation of spatial intelligence from smart systems to sensorial infrastructures. Building Research & Information, 49(1), pp. 113-126. ISSN 0961-3218
Escamilla, E (2011) Investigation of project management planning practices for renovation of historical buildings in urban contexts located in Texas. PhD thesis, Texas A&M University, USA.
Fahri, J; Pollack, J and Kolar, D (2020) Identifying success criteria at the post-handover stage for international development projects. Construction Economics and Building, 20(4), pp. 103-119. ISSN 2204-9029
Fang, Y and Cho, Y K (2017) Effectiveness analysis from a cognitive perspective for a real-time safety assistance system for mobile crane lifting operations. Journal of Construction Engineering and Management, 143(4): 05016025, ISSN 0733-9364
Feghali, M and Raidén, A B (2016) Project management practice within the Lebanese real estate industry. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Fernández-Sols, J L; Pathak, R; Lavy, S; Beltrán, L O; Son, K and Kim, K (2011) Framework for selecting performance assessment tools for achieving LEED 3.0 credits. Architectural Engineering and Design Management, 7(4), pp. 236-250. ISSN 1745-2007
Frödell, M; Josephson, P E and Lindahl, G (2008) Swedish construction clients' views on project success and measuring performance. Journal of Engineering, Design and Technology, 6(1), pp. 21-32. ISSN 1726-0531
Georgy, M E (2000) Utility-based neurofuzzy approach for engineering performance assessment in industrial construction projects. PhD thesis, Purdue University, USA.
Georgy, M E; Chang, L M and Zhang, L (2005) Utility-function model for engineering performance assessment. Journal of Construction Engineering and Management, 131(5), pp. 558-568. ISSN 0733-9364
Getuli, V; Capone, P; Bruttini, A and Sorbi, T (2022) A smart objects library for BIM-based construction site and emergency management to support mobile VR safety training experiences. Construction Innovation, 22(3), pp. 504-530. ISSN 1471-4175
Ghanbaripour, A N; Langston, C; Tumpa, R J and Skulmoski, G (2024) Validating and testing a project delivery success model in construction: A mixed-method approach in Australia. Smart and Sustainable Built Environment, 13(3), pp. 532-559. ISSN 2046-6099
Ghanbaripour, Amir (2020) Improving the project delivery success of Australian construction project management practice. PhD thesis, Bond University, Australia.
Giustozzi, F (2012) Life cycle assessment of sustainable road pavements: Carbon footprinting and multi-attribute analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Graham, P M and Walker, D H T (2000) First steps towards acheiving environmental sustainability for developed projects: An holistic life-cycle procurement objective. Journal of Construction Procurement, 6(1), pp. 67-84. ISSN 1358-9180
Grosskopf, K R (2010) Post-disaster recovery and reconstruction safety training. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 322-333. ISSN 1759-5916
Guillermo, M A; Grau, D; Acevedo, S C and Rivera, T E (2014) How the design and assessment of instruction/learning strategies influence the academic performance of civil engineering students at Universidad Industrial de Santander, Colombia. Journal of Construction Engineering and Management, 140(4): B4014004, ISSN 0733-9364
Gunduz, M and Elsherbeny, H A (2020) Operational framework for managing construction-contract administration practitioners' perspective through modified Delphi method. Journal of Construction Engineering and Management, 146(3): 04019110, ISSN 0733-9364
Gunduz, M; Naji, K and Maki, O (2025) A framework for evaluating campus facility management performance in light of project critical success factors using a multidimensional fuzzy logic approach. Engineering, Construction and Architectural Management, 32(3), pp. 1715-1738. ISSN 0969-9988
Haniff, A P (2017) The alignment of strategic objectives within the context of temporary multi-organisations. PhD thesis, Heriot-Watt University, UK.
Hariri-Ardebili, M A (2015) Performance based earthquake engineering of concrete dams. PhD thesis, University of Colorado at Boulder, USA.
Hasan, N (2006) Developing a balanced scorecard model for evaluation of project management and performance. PhD thesis, University of Birmingham, UK.
Hasanzadeh, S; Esmaeili, B and Dodd, M D (2017) Impact of construction workers' hazard identification skills on their visual attention. Journal of Construction Engineering and Management, 143(10): 04017070, ISSN 0733-9364
Hassanein, A A G and Khalifa, R A (2007) Financial and operational performance indicators applied to public and private water and wastewater utilities. Engineering, Construction and Architectural Management, 14(5), pp. 479-492. ISSN 0969-9988
He, Q; Wang, T; Chan, A P C and Xu, J (2021) Developing a list of key performance indictors for benchmarking the success of construction megaprojects. Journal of Construction Engineering and Management, 147(2): 04020164, ISSN 0733-9364
Hermawan, F (2015) A strategic approach to enhancing sustainable practices in public building projects: a case study of Indonesian local authorities. PhD thesis, Coventry University, UK.
Heshmati, K; Shahabpoor, E; Walker, I; Ghanbari, S and Darby, A (2025) The effect of wind-induced vibrations in tall buildings on occupants' work performance. Building Research & Information, 53(8), pp. 949-964. ISSN 0961-3218
Hidayat, B (2013) The role of knowledge communication in the effective management of post-disaster reconstruction projects in Indonesia. PhD thesis, University of Salford, UK.
Hide, S (2003) Exploring accident causation in the construction industry. PhD thesis, Loughborough University, UK.
Higham, A and Stephenson, P (2014) Identifying project success criteria for UK social housing asset management schemes. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Horta, I M; Camanho, A S and Da Costa, J M (2010) Performance assessment of construction companies integrating key performance indicators and data envelopment analysis. Journal of Construction Engineering and Management, 136(5), pp. 581-594. ISSN 0733-9364
Horta, I M; Camanho, A S and Lima, A F (2013) Design of performance assessment system for selection of contractors in construction industry e-marketplaces. Journal of Construction Engineering and Management, 139(8), pp. 910-917. ISSN 0733-9364
Hurst, B E (2014) The effect of organizational commitment on project outcomes under common agency. PhD thesis, Capella University, USA.
Ibrahim, K; Oshodi, O S; Osuizugbo, I C; Owusu, E K; Ibrahim, A and Shakantu, K K (2024) The usage of social media for learning and teaching in the built environment: A perspective from students. International Journal of Construction Management, 24(8), pp. 902-910. ISSN 1562-3599
Ijaola, I A (2017) Training practices and task performance of professionals in construction firms in Lagos and Abuja, Nigeria. PhD thesis, University of Lagos, Nigeria.
Irewolede Aina, I; Godwin Iroroakpo, I and Michael Gbolagade, O (2021) Key training practice indicators for optimal site supervisors' utilisation in construction firms. Journal of Engineering, Design and Technology, 19(1), pp. 149-163. ISSN 1726-0531
Işık, Z (2009) A conceptual performance measurement framework for construction industry. PhD thesis, Middle East Technical University, Turkey.
Jack, R; Loveday, D; Allinson, D and Lomas, K (2018) First evidence for the reliability of building co-heating tests. Building Research & Information, 46(4), pp. 383-401. ISSN 0961-3218
Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.
Jalali, Farhang (2020) Quantifying pavement preservation performance using probabilistic deterioration modeling. PhD thesis, Auburn University, USA.
Jeelani, I; Han, K and Albert, A (2020) Development of virtual reality and stereo-panoramic environments for construction safety training. Engineering, Construction and Architectural Management, 27(8), pp. 1853-1876. ISSN 0969-9988
Kahandawa, R; Domingo, N; Chawynski, G and Uma, S R (2021) Factors impacting post-earthquake damage repair cost estimations. International Journal of Disaster Resilience in the Built Environment, 12(1), pp. 29-49. ISSN 1759-5916
Kam, C W (2000) Quality assurance of construction works in Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Kamal, P and Ahuja, S (2019) An ensemble-based model for prediction of academic performance of students in undergrad professional course. Journal of Engineering, Design and Technology, 17(4), pp. 769-781. ISSN 1726-0531
Kazar, G and Comu, S (2021) Effectiveness of serious games for safety training: A mixed method study. Journal of Construction Engineering and Management, 147(8): 04021091, ISSN 0733-9364
Khalil, N (2016) Incorporating risk mitigation into building performance rating tools (BPRTS) for Malaysia’s higher education building. PhD thesis, University of Malaya, Malaysia.
Khallaf, R; Naderpajouh, N and Hastak, M (2018) A systematic approach to develop risk registry frameworks for complex projects. Built Environment Project and Asset Management, 8(4), pp. 334-347. ISSN 2044-124X
Kiani Mavi, N; Brown, K; Fulford, R G and Goh, M (2025) An MCDM analysis of critical success criteria for medium and large construction projects in Australia and New Zealand. Engineering, Construction and Architectural Management, 32(8), pp. 5160-5193. ISSN 0969-9988
Kiani Mavi, N; Brown, K; Fulford, R and Goh, M (2024) Forecasting project success in the construction industry using adaptive neuro-fuzzy inference system. International Journal of Construction Management, 24(14), pp. 1550-1568. ISSN 1562-3599
Kim, A and Arditi, D (2010) Performance of MBE/DBE/WBE construction firms in transportation projects. Journal of Construction Engineering and Management, 136(7), pp. 768-777. ISSN 0733-9364
Kishk, M; Pollock, R; Atta, J and Power, L (2005) A structured model for performance assessment in property management. Journal of Financial Management of Property and Construction, 10(3), pp. 159-170. ISSN 1366-4387
Kishk, M a U C (2008) The impact of effective risk management on project success. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Kissi, E; Agyekum, K; Baiden, B K; Tannor, R A; Asamoah, G E and Andam, E T (2019) Impact of project monitoring and evaluation practices on construction project success criteria in Ghana. Built Environment Project and Asset Management, 9(3), pp. 364-382. ISSN 2044-124X
Koh, T Y (2010) The effects of social capital on construction project success: exploring the mediating role of projectlearning. PhD thesis, University of Hong Kong, Hong Kong.
Koops, L; van Loenhout, C; Bosch-Rekveldt, M; Hertogh, M and Bakker, H (2017) Different perspectives of public project managers on project success. Engineering, Construction and Architectural Management, 24(6), pp. 1294-1318. ISSN 0969-9988
Kramer, S W (2008) Does prior project management work experience have an effect on the academic achievement of university students in the classroom? International Journal of Construction Education and Research, 4(1), pp. 18-33. ISSN 1557-8771
Kumaraswamy, M M and Morris, D A (2002) Build-operate-transfer-type procurement in Asian megaprojects. Journal of Construction Engineering and Management, 128(2), pp. 93-102. ISSN 0733-9364
Kus, R H and Nygren, K (2002) Microenvironmental characterization of rendered autoclaved aerated concrete. Building Research & Information, 30(1), pp. 25-34. ISSN 0961-3218
Kusljic, D and Marenjak, S (2012) Evaluating political aspects of success for PPP/PFI sports hall in Croatia. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Labib, Y N; Lotfallah, W B; Hanna, A S and Boulos, N W (2021) Development and application of performance index for comparative assessment of public capital projects. Journal of Construction Engineering and Management, 147(2): 04020175, ISSN 0733-9364
Lam, E W M; Chan, A P C and Chan, D W M (2008) Determinants of successful design-build projects. Journal of Construction Engineering and Management, 134(5), pp. 333-341. ISSN 0733-9364
Langston, C (2013) Development of generic key performance indicators for PMBOK® using a 3D project integration model. Construction Economics and Building, 13(4), pp. 78-91. ISSN 2204-9029
Lansley, P R; Luck, R and Lupton, S (1995) The organization of construction research in British universities. Engineering, Construction and Architectural Management, 2(3), pp. 179-195. ISSN 0969-9988
Larsson, N K (1999) Development of a building performance rating and labelling system in Canada. Building Research & Information, 27(4-5), pp. 332-341. ISSN 0961-3218
Lavy, S; Garcia, J A; Scinto, P and Dixit, M K (2014) Key performance indicators for facility performance assessment: Simulation of core indicators. Construction Management and Economics, 32(12), pp. 1183-1204. ISSN 01446193
Lindhard, S and Larsen, J K (2016) Identifying the key process factors affecting project performance. Engineering, Construction and Architectural Management, 23(5), pp. 657-673. ISSN 0969-9988
Lines, B C; Sullivan, K T; Hurtado, K C and Savicky, J (2015) Planning in construction: Longitudinal study of pre-contract planning model demonstrates reduction in project cost and schedule growth. International Journal of Construction Education and Research, 11(1), pp. 21-39. ISSN 1557-8771
Liu, J; Guo, Y; Martek, I; Chen, C and Tian, J (2022) A phase-oriented evaluation framework for China's PPP projects. Engineering, Construction and Architectural Management, 29(9), pp. 3737-3753. ISSN 0969-9988
Liu, P (2025) Enhancing construction safety: Assessing training effectiveness using wearable sensing technology and optimizing work zone configuration through a behavioral approach. PhD thesis, University of Wyoming, USA.
Lokuge, W; Gamage, N and Setunge, S (2016) Fault tree analysis method for deterioration of timber bridges using an Australian case study. Built Environment Project and Asset Management, 6(3), pp. 332-344. ISSN 2044-124X
Louis, J (2016) Simulation analysis, monitoring, and control of operations. PhD thesis, Purdue University, USA.
Lützkendorf, T and Lorenz, D (2005) Sustainable property investment: Valuing sustainable buildings through property performance assessment. Building Research & Information, 33(3), pp. 212-234. ISSN 0961-3218
Ma, Y (2011) A semiotic framework for buildings performance assessment. PhD thesis, University of Reading, UK.
Maghiar, M; Sturges, D; Maurer, T and Jackson, M (2015) Exploration of student perceptions, behaviors and academic performance in construction management classes. International Journal of Construction Education and Research, 11(4), pp. 241-256. ISSN 1557-8771
Mahdad, S (2015) Achieving design quality in building projects: An evolving understanding of critical success factors and stakeholder attributes. PhD thesis, University of Warwick, UK.
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2023) A constructive system to assess the performance-based grading of construction labour through work-based training components and applications. Construction Economics and Building, 23(3-4), pp. 107-124. ISSN 2204-9029
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) Assessing the performance and productivity of labour in building construction projects through the application of work-based training practices. Construction Innovation, 24(2), pp. 558-583. ISSN 1471-4175
Martin, H; Sorhaindo, C and Welch, F (2014) Motivation of undergraduate civil engineering students for higher levels of academic success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Marzouk, M and Hamdala, D (2025) Phasing real estate projects considering profitability and customer satisfaction. Engineering, Construction and Architectural Management, 32(5), pp. 2942-2970. ISSN 0969-9988
Maurya, K K and Biswas, A (2021) Performance assessment of governance in Indian smart city development. Smart and Sustainable Built Environment, 10(4), pp. 653-680. ISSN 2046-6099
McElroy, L B (2009) Embedding integrated building performance assessment in design practice. PhD thesis, University of Strathclyde, UK.
McMahon, E; Spillane, J P and Bradley, J G (2023) When enough is not enough! Evaluating the minimum entry requirements for apprenticeships in Ireland. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Md Lasa, Y; Ahmad, N and Takim, R (2015) Critical success factors in obtaining project financing for private finance initiative projects in Malaysia. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Menadue, Vanessa Rachel (2014) Green commercial office buildings: Environmental performance and user perceptions. PhD thesis, University of Adelaide, Australia.
Ming Tam, C and Harris, F (1996) Model for assessing building contractors' project performance. Engineering, Construction and Architectural Management, 3(3), pp. 187-203. ISSN 0969-9988
Mohjah Mohammed, A; Al-Naim, M and El-Wakeel, H (2024) Developing a tool to assess the performance of educational built environments for students with multiple sclerosis. Architectural Engineering and Design Management, 20(3), pp. 494-509. ISSN 1745-2007
Motawa, I A; Price, A D F and Sher, W (1999) Implementing construction innovations. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Mughrabi, A O (2019) Change management capability maturity model for contractors in the Kuwaiti construction industry. PhD thesis, Heriot-Watt University, UK.
Munonye, C (2021) Determining the diurnal variation in comfort temperature in school buildings in the warm and humid climate. International Journal of Building Pathology and Adaptation, 39(5), pp. 766-781. ISSN 23984708
Müller, J M (2026) Living labs: A systematic review of success parameters and outcomes. Buildings & Cities, 7(1), pp. 92-109. ISSN 2632-6655
Naga Vamsi Krishna, J; Kota, S and Venkataraman, P B (2021) An impact of simulation labs on engineering students' academic performance: A critical investigation. Journal of Engineering, Design and Technology, 19(1), pp. 103-126. ISSN 1726-0531
Naji, K K; Gunduz, M and Mansour, M M (2024) Development of an integrated hybrid risk assessment system for construction disputes during the preconstruction phase using the Delphi method. Journal of Construction Engineering and Management, 150(7): 04024068, ISSN 0733-9364
Naveed, M H; Thaheem, M J; Khurshid, M B and Farooqui, R U H (2017) Performance assessment of construction engineering and management degree program in developing countries: Case of Pakistan. International Journal of Construction Education and Research, 13(1), pp. 3-23. ISSN 1557-8771
Nepal, Jaya (2015) Reliability-based performance assessment and optimum maintenance of corroded reinforced concrete structures. PhD thesis, University of Greenwich, UK.
Noorzai, E and Golabchi, M (2020) Selecting a proper construction system in small and medium mass housing projects, considering success criteria and construction volume and height. Journal of Engineering, Design and Technology, 18(4), pp. 883-903. ISSN 1726-0531
Nuako, F; Ghansah, F A and Adusei, T (2026) Critical success factors for cost overrun minimization in public construction projects in developing countries: The case of Ghana. Construction Innovation, 26(1), pp. 44-62. ISSN 1471-4175
Okehielem, N (2011) A benchmark for impact assessment of affordable housing. PhD thesis, University of Wolverhampton, UK.
Olugboyega, O; Edwards, D J; Windapo, A O; Omopariola, E D and Martek, I (2021) Development of a conceptual model for evaluating the success of BIM-based construction projects. Smart and Sustainable Built Environment, 10(4), pp. 681-701. ISSN 2046-6099
Onukwube, H N (2012) Leader influences on training effectiveness of construction professionals: The case of Nigeria. Journal of Construction in Developing Countries, 17(2), pp. 67-79. ISSN 1823-6499
Orgut, R E (2017) Metrics that matter: Improving project controls and analytics in construction industry. PhD thesis, North Carolina State University, USA.
Orgut, R E; Zhu, J; Batouli, M; Mostafavi, A and Jaselskis, E J (2018) Metrics that matter: Core predictive and diagnostic metrics for improved project controls and analytics. Journal of Construction Engineering and Management, 144(11): 04018100, ISSN 0733-9364
Osei-Kyei, R. and Chan, A. P. C. (2019) Model for predicting the success of public–private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007
Osei-Kyei, R and Chan, A P C (2018) Evaluating the project success index of public-private partnership projects in Hong Kong: The case of the Cross Harbour Tunnel. Construction Innovation, 18(3), pp. 371-391. ISSN 1471-4175
Osei-Kyei, R and Chan, A P C (2019) Model for predicting the success of public-private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007
Osei-Kyei, R; Narbaev, T; Atafo-Adabre, M; Chileshe, N and Ofori-Kuragu, J K (2023) Critical success criteria for retirement village public: private partnership housing. Construction Innovation, 23(5), pp. 1018-1037. ISSN 1471-4175
Oyewobi, L O; Abiola-Falemu, O and Ibironke, O T (2016) The impact of rework and organisational culture on project delivery. Journal of Engineering, Design and Technology, 14(2), pp. 214-237.
Park, H; Meacham, B J; Dembsey, N A and Goulthorpe, M (2014) Integration of fire safety and building design. Building Research & Information, 42(6), pp. 696-709. ISSN 0961-3218
Park, S H (2009) Whole life performance assessment: Critical success factors. Journal of Construction Engineering and Management, 135(11), pp. 1146-1161. ISSN 0733-9364
Patil, K R; Bhandari, S; Agrawal, A; Ayer, S K; Perry, L A and Hallowell, M R (2023) Analysis of youtube comments to inform the design of virtual reality training simulations to target emotional arousal. Journal of Construction Engineering and Management, 149(9): 04023077, ISSN 0733-9364
Peng, L.; Yang, H.; Ju, A.; Li, X. and Jiang, Z. (2026) Data-driven real-time digital twin framework for tunnel boring machine monitoring. Journal of Construction Engineering and Management, 152(9): 04026134, ISSN 0733-9364
Perez-Bella, J M; Dominguez-Hernandez, J; Cano-Suñen, E; Del Coz-Diaz, J J and Alvarez Rabanal, F P (2015) Improvement alternatives for determining the watertightness performance of building facades. Building Research & Information, 43(6), pp. 723-736. ISSN 0961-3218
Pouyandeh, F; Golabchi, M and Taghizadeh, K (2022) Providing a model to choose the most appropriate agile method in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(1), pp. 14-27. ISSN 17514304
Prachi Vinod, I; Gangadhar, M and Deepak, M D (2021) Identifying the performance areas affecting the project performance for Indian construction projects. Journal of Engineering, Design and Technology, 19(1), pp. 1-20. ISSN 1726-0531
Pridmore, A B (2009) Development of composite renewal systems for rapid rehabilitation and construction of bridge decks. PhD thesis, University of California, San Diego, USA.
Pulket, T (2008) Universal prediction model for construction litigation. PhD thesis, Illinois Institute of Technology, USA.
Puplampu, A B and Tutesigensi, A (2008) Blended learning for project management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Radujković, M; Sjekavica Klepo, M and Bosch-Rekveldt, M (2021) Breakdown of engineering projects' success criteria. Journal of Construction Engineering and Management, 147(11): 04021144, ISSN 0733-9364
Rahnamayie Zekavat, P (2014) Performance assessment of agile communication in construction. PhD thesis, University of New South Wales, Australia.
Ramprasad, V and Subbaiyan, G (2017) Perceived indoor environmental quality of classrooms and outcomes: A study of a higher education institution in India. Architectural Engineering and Design Management, 13(3), pp. 202-222. ISSN 1745-2007
Ramsey, D; El Asmar, M and Gibson, G E (2016) Quantitative performance assessment of single-step versus two-step design-build procurement. Journal of Construction Engineering and Management, 142(9): 04016033, ISSN 0733-9364
Rohman, M A; Doloi, H and Heywood, C A (2017) Success criteria of toll road projects from a community societal perspective. Built Environment Project and Asset Management, 7(1), pp. 32-44. ISSN 2044-124X
Rohman, Mohammad Arif (2017) Stakeholders' perspective on achieving project social benefit from Indonesian toll roads. PhD thesis, University of Melbourne, Australia.
Ruegg, R T and Fuller, S K (1985) The economics of fire protection: Fast-response residential sprinklers. Construction Management and Economics, 3(1), pp. 43-57. ISSN 01446193
Sadooghi, P and Kherani, N P (2022) Influence of metallo-dielectric optical properties on thermal resistance and solar heat gain coefficient of multi-pane glazing systems in hot and cold climates. Architectural Engineering and Design Management, 18(6), pp. 894-910. ISSN 1745-2007
Salameh, M; Touqan, B and Suliman, A (2024) Enhancing student satisfaction and academic performance through school courtyard design: A quantitative analysis. Architectural Engineering and Design Management, 20(4), pp. 911-927. ISSN 1745-2007
Sarkar, D and Sheth, A (2023) Public private partnership model for sustainable bus rapid transit system in Ahmedabad, India. International Journal of Construction Management, 23(7), pp. 1233-1243. ISSN 1562-3599
Schlueter, A (2010) Model-based, performance-oriented building design employing distributed service systems. DSc thesis, ETH Zürich, Switzerland.
Scott, L (2012) A framework for formative assessment led learning strategies for built environment higher education. PhD thesis, University of Salford, UK.
Scott, L and Fortune, C (2009) A grounded approach to the investigation of assessment practices in built environment undergraduate programmes. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Scott, L and Fortune, C (2010) Reshaping assessment practices in built environment undergraduate programmes: What heads of department report. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Scott, L and Fortune, C (2011) Formative assessment practices in built environment higher education programmes and the enhancement of the student learning experience. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Scott, L and Fortune, C J (2012) Framework for formative assessment learning strategies in built environment higher education programmes. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Sepasgozar, S M E (2023) Construction digital technology assimilation and absorption capability using measurement invariance of composite modeling. Journal of Construction Engineering and Management, 149(7): 04023041, ISSN 0733-9364
Shakoorian, A (2006) Performance assessment of building commissioning process as a quality assurance system. PhD thesis, Georgia Institute of Technology, USA.
Shands, M (2014) Building relevant leaders: Identifying the development needs of the modern construction leader. EdD thesis, University of St. Thomas (Minnesota), USA.
Shuaib, Salem Mohammed S (2016) Project management performance in Saudi Arabia: An exploratory study into the constructs that most influence project success. PhD thesis, University of Adelaide, Australia.
Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.
Slay, Peter Gordon Ronald (2019) Development of an ontology for project management success criteria and associated technical and personal competencies in an Australian engineering context. PhD thesis, University of New South Wales, Australia.
Smallwood, J J and Allen, C J (2020) The impact of a first-year orientation team building event: A longitudinal review. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Sobuz, M H R; Meraz, M M; Saha, A; Akid, A S M; Hasan, N M S; Rahman, M and Safayet, M A (2024) Performance assessment of various seismic resistant systems for a multistory structure in different seismic zones of Bangladesh. Journal of Engineering, Design and Technology, 22(3), pp. 718-738. ISSN 1726-0531
Soetanto, R (2002) Modelling satisfaction for main participants of the construction project coalition: a study of mutual performance assessment. PhD thesis, University of Wolverhampton, UK.
Soetanto, R and Proverbs, D G (2001) Modelling client satisfaction levels: A comparison of multiple regression and artificial neural network techniques. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Soetanto, R and Proverbs, D G (2002) Modelling client satisfaction levels: The impact of contractor performance. Construction Economics and Building, 2(1), pp. 13-27. ISSN 2204-9029
Soetanto, R and Proverbs, D G (2002) Modelling the satisfaction of contractors: The impact of client performance. Engineering, Construction and Architectural Management, 9(5-6), pp. 453-465. ISSN 0969-9988
Soetanto, R and Proverbs, D G (2004) Intelligent models for predicting levels of client satisfaction. Journal of Construction Research, 5(2), pp. 233-253. ISSN 1609-9451
Son, Junghye (2013) Key process attributes and success factors for collaborative academia-industry research in construction industry project management. PhD thesis, University of Texas at Austin, USA.
Songer, A D; Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(2), pp. 69-82. ISSN 1358-9180
Sousa, Rita dos Santos (2019) Production planning and control methodology for soil bioengineering works. PhD thesis, Universidade Federal de Santa Maria, Brazil.
Srivastava, A; Srivastava, D K and Misra, A K (2019) Spatial variability modeling and reliability analysis of flexible pavement through mechanistic–empirical model. Journal of Engineering, Design and Technology, 17(6), pp. 1129-1145. ISSN 1726-0531
Staykova, G and Underwood, J (2017) Assessing collaborative performance on construction projects through knowledge exchange: A UK rail strategic alliance case study. Engineering, Construction and Architectural Management, 24(6), pp. 968-987. ISSN 0969-9988
Stevenson, F and Baborska-Narozny, M (2018) Housing performance evaluation: Challenges for international knowledge exchange. Building Research & Information, 46(5), pp. 501-512. ISSN 0961-3218
Strasheim, B and Hugo, F (2013) A programme for continuing professional development of managers in the construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(6), pp. 313-322. ISSN 17514312
Succar, B; Sher, W and Williams, A (2012) Measuring BIM performance: Five metrics. Architectural Engineering and Design Management, 8(2), pp. 120-142. ISSN 1745-2007
Sun, Y and Goh, B H (2015) Contribution index based on green building certification systems. Construction Economics and Building, 15(2), pp. 31-48. ISSN 2204-9029
Talley, K G and Torres, A S (2018) Measuring the impact of using daily objectives to provide rapid feedback in construction courses. International Journal of Construction Education and Research, 14(2), pp. 95-117. ISSN 1557-8771
Tam, C M; Deng, Z M; Zeng, S X and Ho, C S (2000) Quest for continuous quality improvement for public housing construction in Hong Kong. Construction Management and Economics, 18(4), pp. 437-446. ISSN 01446193
Tam, G C K (2018) Managing project sustainability: a study of the construction industry in Hong Kong. PhD thesis, London South Bank University, UK.
Tamimi, M F (2022) Reliability and sensitivity analysis of civil and marine structures using machine-learning-assisted simulation. PhD thesis, Oklahoma State University, USA.
Tao, L and Kumaraswamy, M (2012) Unveiling relationships between contractor inputs and performance outputs. Construction Innovation, 12(1), pp. 86-98. ISSN 1471-4175
Tawfiq, O H (2007) Doing contracting differently. PhD thesis, University of Bristol, UK.
Tehrani, B M; BuHamdan, S and Alwisy, A (2024) Robotics in industrialized construction: An activity-based ranking system for assembly manufacturing tasks. Engineering, Construction and Architectural Management, 31(6), pp. 2264-2285. ISSN 0969-9988
Thevenin, M K; Elliott, J W and Bigelow, B F (2016) Mentors, role models, and observed differences in students' construction education self-efficacy and motivation. International Journal of Construction Education and Research, 12(3), pp. 162-178. ISSN 1557-8771
Tuffaha, F M; Assaf, S; Yasar Zakaria, Z and Hadidi, L A (2021) A framework for the performance assessment of construction contractors in Saudi Arabia. Built Environment Project and Asset Management, 11(2), pp. 195-213. ISSN 2044-124X
Ucci, M; Law, S; Andrews, R; Fisher, A; Smith, L; Sawyer, A and Marmot, A (2015) Indoor school environments, physical activity, sitting behaviour and pedagogy: A scoping review. Building Research & Information, 43(5), pp. 566-581. ISSN 0961-3218
Umer, Muhammad (2025) Spotting inventory: Autonomous item localization on active construction sites using a boston dynamics spot® with Bayesian filtering and object detection. PhD thesis, Auburn University, USA.
Usman, W. I.; Mazher, K. M.; Umer, W.; Wuni, I. Y.; Alshibani, A.; Ghaithan, A.; Nasir, A. R. and Mohammed, A. (2026) BIM-based construction accidents knowledge database management system: Centralized accessible information repository for enhanced learning from the past. Journal of Construction Engineering and Management, 152(9): 04026149, ISSN 0733-9364
Valero-Silva, N and Jones, A (2011) An evaluation of the customer satisfaction monitoring system in a decent homes programme. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Viswanathan, S K; Tripathi, K K and Jha, K N (2020) Influence of risk mitigation measures on international construction project success criteria: A survey of Indian experiences. Construction Management and Economics, 38(3), pp. 207-222. ISSN 01446193
Wadu Mesthrige, J and Kwong, H Y (2018) Criteria and barriers for the application of green building features in Hong Kong. Smart and Sustainable Built Environment, 7(3-4), pp. 251-276. ISSN 2046-6099
Wai, S H; Aminah, M Y and Syuhaida, I (2013) Social infrastructure project success criteria: an exploratory study. International Journal of Construction Management, 13(3), pp. 95-104. ISSN 1562-3599
Walker, G; Naoum, S and Howes, R (1997) Determinants of project management success. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Wallace Jr., J T (2016) Risk system interrelationships over a construction project's life cycle: A correlational study. PhD thesis, Capella University, USA.
Wang, Y; Goodrum, P M; Haas, C T and Glover, R W (2008) Craft training issues in American industrial and commercial construction. Journal of Construction Engineering and Management, 134(10), pp. 795-803. ISSN 0733-9364
Wao, J O; Ries, R; Flood, I; Lavy, S and Ozbek, M E (2016) Relationship between admission gre scores and graduation gpa scores of construction management graduate students. International Journal of Construction Education and Research, 12(1), pp. 37-53. ISSN 1557-8771
Williams, D (2019) Preventing harness-induced pathology in U.S. construction companies: A qualitative multiple case study. PhD thesis, University of Phoenix, USA.
Williamson, K C (2018) The effect of course time compression on academic performance in construction surveying. International Journal of Construction Education and Research, 14(4), pp. 277-294. ISSN 1557-8771
Woldesenbet, A K (2014) Highway infrastructure data and information integration & assessment framework: A data-driven decision-making approach. PhD thesis, Iowa State University, USA.
Wu, Huanyu (2020) Impacts of cross-regional mobility of construction and demolition waste in Australia. PhD thesis, University of Adelaide, Australia.
Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387
Yoo, Y J (2014) The development of green building performance assessment tool (GBPAT). PhD thesis, University of Wisconsin - Madison, USA.
Zavari, M and Afshar, M R (2023) The role of site manager transformational leadership in the construction project success. International Journal of Building Pathology and Adaptation, 41(5), pp. 1067-1085. ISSN 23984708
Zou, P X W (2004) Knowledge management practice in two Australian architecture-engineering-construction (AEC) companies. Construction Economics and Building, 4(2), pp. 19-32. ISSN 2204-9029
Ünsal Altuncan, I and Tanyer, A M (2018) Context-dependent construction conflict management performance analysis based on competency theory. Journal of Construction Engineering and Management, 144(12): 04018112, ISSN 0733-9364
Şentop Dümen, A and Tamer Bayazıt, N (2020) Enforcement of acoustic performance assessment in residential buildings and occupant satisfaction. Building Research & Information, 48(8), pp. 866-885. ISSN 0961-3218
Up a level