Items with Subject: accounting and finance
Abdou, A; Lewis, J and Radaideh, M (2003) An internet-based decision support system for healthcare project appraisal: A conceptual proposal. Construction Innovation, 3(3), pp. 145-155. ISSN 1471-4175
Abdullahi Ahmed, U; Noor Amila Wan Abdullah, Z and Abdul-Rashid, A-A (2021) Malaysian regulators' ranking of PPP contract governance skills. Built Environment Project and Asset Management, 11(1), pp. 88-102. ISSN 2044-124X
Abdullatif, M I (1992) A system for quality-related costs for construction projects. PhD thesis, University of Kansas, USA.
Abolkhair, K (2022) Cost certainty and timing of cost certainty in the construction projects of public universities. PhD thesis, University of Florida, USA.
Abraham, D (2011) Development of a true-cost concept for renewal of municipal underground pipeline systems. PhD thesis, University of Texas at Arlington, USA.
Abubakar, A (1992) A quantitative approach to cost monitoring and control of construction projects. PhD thesis, Loughborough University, UK.
Adafin, J; Rotimi, J O B and Wilkinson, S (2015) Why do the design stage elemental cost plan and final tender sum differ in New Zealand? Journal of Financial Management of Property and Construction, 20(2), pp. 116-131. ISSN 1366-4387
Adamtey, S (2021) Cost and time performance analysis of progressive design-build projects. Journal of Engineering, Design and Technology, 19(3), pp. 686-697. ISSN 1726-0531
Adesanya, A; Misra, S; Maskeliunas, R and Damasevicius, R (2021) Prospects of ocean-based renewable energy for West africa's sustainable energy future. Smart and Sustainable Built Environment, 10(1), pp. 37-50. ISSN 2046-6099
Adesi, M; Owusu-Manu, D G and Murphy, R (2018) Strategic competences for pricing quantity surveying consultancy services. Engineering, Construction and Architectural Management, 25(3), pp. 458-474. ISSN 0969-9988
Afetornu, C and Edum-Fotwe, F T (2005) Characterising project contingency budget in construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Afetornu, C; Edum-Fotwe, F T and McCaffer, R (2006) Estimating budget variability for road projects. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Aguocha, T (2023) Best practices for cost monitoring and control in construction projects: An exploratory case study. DBA thesis, National University, USA.
Agyekum, B; Kissi, E; Yamoah Agyemang, D and Badu, E (2018) Examining barriers for the utilization of non-traditional cost estimating models in developing countries: Ghanaian quantity surveyors' perspectives. Journal of Engineering, Design and Technology, 16(6), pp. 814-827. ISSN 1726-0531
Agyekum, K; Opoku, A; Oppon, A J and Opoku, D G J (2022) Obstacles to green building project financing: An empirical study in Ghana. International Journal of Construction Management, 22(15), pp. 2922-2930. ISSN 1562-3599
Agyekum-Mensah, G (2019) The degree of accuracy and factors that influence the uncertainty of SME cost estimates. International Journal of Construction Management, 19(5), pp. 413-426. ISSN 1562-3599
Ahiaga-Dagbui, D D; Love, P E D; Whyte, A and Boateng, P (2017) Costing and technological challenges of offshore oil and gas decommissioning in the UK North Sea. Journal of Construction Engineering and Management, 143(7): 05017008, ISSN 0733-9364
Ahmed Namadi, S i (2019) A framework for collaborative costing in the UK construction industry. PhD thesis, Nottingham Trent University, UK.
Aje, O I; Ogunsemi, D R and Odusami, K T (2009) The impact of contractors' management capability on cost and time performance of construction projects in Nigeria. Journal of Financial Management of Property and Construction, 14(2), pp. 171-187. ISSN 1366-4387
Akintoye, A (2000) Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18(1), pp. 77-89. ISSN 01446193
Akintoye, A S; Ajewole, O and Olomolaiye, P O (1992) Construction cost information management in Nigeria. Construction Management and Economics, 10(2), pp. 107-116. ISSN 01446193
Akintoye, S A (1991) Construction tender price index: modelling and forecasting trends. PhD thesis, University of Salford, UK.
Akintoye, S A and Skitmore, R M (1994) A comparative analysis of three macro price forecasting models. Construction Management and Economics, 12(3), pp. 257-270. ISSN 01446193
Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. PhD thesis, University of Liverpool, UK.
Al-Hajj, A and Horner, M W (1998) Modelling the running costs of buildings. Construction Management and Economics, 16(4), pp. 459-470. ISSN 01446193
Al-Hajj, A N (1991) Simple cost-significant models for total life-cycle costing in buildings. PhD thesis, University of Dundee, UK.
Al-Harbi, K M; Johnston, D W and Fayadh, H (1994) Building construction detailed estimating practices in saudi arabia. Journal of Construction Engineering and Management, 120(4), pp. 774-784. ISSN 0733-9364
Al-Hashimy, H. N. H. and Yao, J. (2026) The moderating role of electronic accounting information systems in enhancing efficiency in construction project management. Engineering, Construction and Architectural Management, 33(4), pp. 3308-3331. ISSN 0969-9988
Al-Hashimy, H N H; Yao, J; Pitchay, A A and Hussein, W N (2026) Leveraging computerized accounting information systems for sustainable construction: The role of digital practices, eco-innovation, and organizational sustainability culture in enhancing project performance. Journal of Construction Engineering and Management, 152(5): 04026042, ISSN 0733-9364
Al-Jibouri, S and Ogink, G (2009) Proposed model for integrating rams method in the design process in construction. Architectural Engineering and Design Management, 5(4), pp. 179-192. ISSN 1745-2007
Alashwal, A M and Chew, M Y (2017) Simulation techniques for cost management and performance in construction projects in Malaysia. Built Environment Project and Asset Management, 7(5), pp. 534-545. ISSN 2044-124X
Alavipour, S M R and Arditi, D (2019) Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management, 26(1), pp. 118-138. ISSN 0969-9988
Alhawamdeh, M and Lee, A (2025) A systematic review and meta-synthesis of the barriers of offsite construction projects. International Journal of Construction Management, 25(9), pp. 1087-1099. ISSN 1562-3599
Aligamhe, V I; Mustapa, M; Ogbu, C P and Misnan, M S (2024) Modelling cost-risk impact on Nigerian highway projects using multiple linear regression and artificial neural networks. Journal of Construction in Developing Countries, 29(2), pp. 107-128. ISSN 1823-6499
Aljohani, A (2019) Cost overrun causality model in Saudi Arabian public sector construction projects. PhD thesis, Robert Gordon University, UK.
Allahi, Fahimeh (2020) Development of simulation based approaches for cost estimation and effect analysis in industrial and humanitarian projects, including system dynamic model and Monte Carlo simulation. PhD thesis, Università degli Studi di Genova, Italy.
Almarri, K and Boussabaine, H (2021) Re-evaluating the risk costing agenda in PPP projects. Built Environment Project and Asset Management, 11(1), pp. 22-37. ISSN 2044-124X
Alolote Ibim, A and Dimkpa, K (2022) Assessing the cost accuracy of electrical works towards sustainable procurement of building services. International Journal of Construction Management, 22(10), pp. 1974-1982. ISSN 1562-3599
Alqahtani, A and Whyte, A (2013) Artificial neural networks incorporating cost significant items towards enhancing estimation for (life-cycle) costing of construction projects. Construction Economics and Building, 13(3), pp. 51-64. ISSN 2204-9029
Alqahtani, F (2017) The relationship between the values of Abu-Dhabi Police and the competencies of their project managers. PhD thesis, University of Wolverhampton, UK.
Alshahrani, S (2017) Development the a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.
Alshahrani, S A A D (2017) Development of a dispute resolution framework to improve the efficiency of dispute resolution in Saudi construction projects. PhD thesis, University of Salford, UK.
Alwisy, A; Bouferguene, A and Al-Hussein, M (2020) Framework for target cost modelling in construction projects. International Journal of Construction Management, 20(2), pp. 89-104. ISSN 1562-3599
Amadi, A I (2026) Construction economics at early stage: Order of cost estimating, life cycle costing and development appraisal of a proposed office complex. International Journal of Building Pathology and Adaptation, 44(1), pp. 70-90. ISSN 2398-4708
Amadi, A and Higham, A (2016) Geotechnical characterization of cost overrun drivers in highway projects: Predicated on heterogeneous ground conditions in the Niger delta region of Nigeria. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Amadi, A I (2016) Explaining cost overruns in highway projects: a geo-spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers. PhD thesis, University of Salford, UK.
Amuda Yusuf, G and Mohamed, S F (2014) Perceived benefits of adopting standard: based pricing mechanism for mechanical and electrical services installations. Construction Economics and Building, 14(2), pp. 104-119. ISSN 2204-9029
Amuda-Yusuf, G and Mohamed, S F (2015) Essential features of a building services standard method of measurement in Malaysia. Engineering, Construction and Architectural Management, 22(6), pp. 749-770. ISSN 0969-9988
Aouad, G F; Bakis, N; Amaratunga, D; Osbaldiston, S; Sun, M; Kishk, M; Al-Hajj, A and Pollock, R (2001) An integrated life cycle costing database: A conceptual framework. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Aouad, G F and Barrett, P S (1998) The feasibility of using hybrid concrete structures within the context of cost and time. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Arab, M Z M (2011) A function-based cost model for early cost advice on new-build schools projects. PhD thesis, Heriot-Watt University, UK.
Arif, F; Lodi, S H and Azhar, N (2015) Factors influencing accuracy of construction project cost estimates in Pakistan: Perception and reality. International Journal of Construction Management, 15(1), pp. 59-70. ISSN 1562-3599
Arja, M; Sauce, G and Souyri, B (2009) External uncertainty factors and LCC: A case study. Building Research & Information, 37(3), pp. 325-334. ISSN 0961-3218
Athapaththu, K I and Karunasena, G (2018) Framework for sustainable construction practices in Sri Lanka. Built Environment Project and Asset Management, 8(1), pp. 51-63. ISSN 2044-124X
Aye, L; Bamford, N; Charters, B and Robinson, J (1999) Environmentally sustainable development: A life cycle costing approach for a commercial office building in Melbourne, Australia. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Aye, L; Bamford, N; Charters, B and Robinson, J (2000) Environmentally sustainable development: A life-cycle costing approach for a commercial office building in Melbourne, Australia. Construction Management and Economics, 18(8), pp. 927-934. ISSN 01446193
Ayinla, K (2021) Development of a semantic knowledge modelling approach for evaluating offsite manufacturing production processes. PhD thesis, Birmingham City University, UK.
Ayinla, K; Cheung, F and Towe, B (2025) Time-driven activity-based costing (TDABC) model for performance optimization of offsite manufacturing methods housebuilding. Construction Management and Economics, 43(8), pp. 637-656. ISSN 0144-6193
Ayinla, K; Saka, A; Seidu, R and Madanayake, U (2023) The impact of artificial intelligence on construction costing practice. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Babalola, O and Adesanya, D A (2007) An evaluation of the level of accuracy of electrical services cost estimates in Nigeria. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Badawy, M.; Ibrahim, A.; Hamdy, K. and Aljohani, A. (2026) A comparative analysis of barriers to prefabricated construction adoption in emerging economies: A dual fuzzy-cb-SEM and PLS-SEM approach. International Journal of Construction Management, 26(9), pp. 1978-1998. ISSN 1562-3599
Badi, S and Diamantidou, D (2017) A social network perspective of building information modelling in Greek construction projects. Architectural Engineering and Design Management, 13(6), pp. 406-422. ISSN 1745-2007
Bae, J (2025) Supervised learning to covering cost risk through post-construction evaluation of transportation projects by project delivery methods. Engineering, Construction and Architectural Management, 32(9), pp. 5863-5884. ISSN 0969-9988
Bae, Y J (2016) Integrated design tool of building system optimization for building life cycle cost. PhD thesis, Purdue University, USA.
Baldwin, A N; Austin, S A and Pendlebury, M C (1997) Interface of early design and cost advice in the building design process. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Banwo, O O (2022) Development of a framework for building cost information management in Nigeria. PhD thesis, Coventry University, UK.
Barras, G C and Mayo, R E (1995) Minidirectional drilling for installation of underground electrical conduit. Journal of Construction Engineering and Management, 121(4), pp. 364-369. ISSN 0733-9364
Bartlett, E and Howard, N (2000) Informing the decision makers on the cost and value of green building. Building Research & Information, 28(5-6), pp. 315-324. ISSN 0961-3218
Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364
Bates, W and Dawood, N N (1998) Development of a risk allocation strategy for construction in the process industry: A knowledge approach. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Bates, William (1999) A strategy for the development of a knowledge based system for predicting out-turn costs of heavy engineering works within a multi-national cost consultancy. PhD thesis, Teesside University, UK.
Bennett, J and Ormerod, R N (1984) Simulation applied to construction projects. Construction Management and Economics, 2(3), pp. 225-263. ISSN 01446193
Betts, M (1990) Methods and data used by large building contractors in preparing tenders. Construction Management and Economics, 8(4), pp. 399-414. ISSN 01446193
Blackwood, D J (1998) Rationalisation of design cost estimation in the construction industry. PhD thesis, Abertay University, UK.
Blackwood, D J; Sarkar, S and Price, A D F (1997) A research methodology for modelling construction design service costs. Journal of Construction Procurement, 3(3), pp. 47-67. ISSN 1358-9180
Blampied, N B (2018) Parametric functions for conceptual and feasibility estimating in public highway project portfolios. PhD thesis, University of California, Berkeley, USA.
Boo, J H S (2001) Improving the accuracy of approximate estimates of building projects. Building Research & Information, 29(4), pp. 312-318. ISSN 0961-3218
Borja, Luis Claudio Alves (2019) Development of a quantitative method for predicting environmental aspects generated by construction sites. PhD thesis, Universidade Federal da Bahia, Brazil.
Bougrain, F (2012) Energy performance and public private partnership. Built Environment Project and Asset Management, 2(1), pp. 41-55. ISSN 2044-124X
Bourdakis, V (1994) Performance appraisal of sportshall and swimming pool buildings in Greece. PhD thesis, University of Bath, UK.
Boussabaine, A H and Kirkham, R J (2004) Simulation of maintenance costs in UK local authority sport centres. Construction Management and Economics, 22(10), pp. 1011-1020. ISSN 01446193
Bowen, P A and Edwards, P J (1998) Building cost planning and cost information management in South Africa. Journal of Construction Procurement, 4(1), pp. 16-26. ISSN 1358-9180
Bowles, G and Morgan, J (2016) An evaluation of the performance of a large-scale collaborative procurement initiative in the social housing sector. Engineering, Construction and Architectural Management, 23(1), pp. 60-74. ISSN 0969-9988
Bowles, Graeme (1995) Annual sinking fund modelling for housing association major repairs provision. PhD thesis, Abertay University, UK.
Bowron, J (2002) Re-engineering the project procurement process through concurrent engineering. PhD thesis, Loughborough University, UK.
Bray Jr., H G (1994) Domestic construction contractors and ISO 9000 registration. DE thesis, Louisiana Tech University, USA.
Bromilow, F J and Tucker, S N (1983) Terotechnological optimality in construction. Construction Papers, 2(1), pp. 41-50. ISSN 0144-8587
Burgett, J M and Chini, A R (2013) Effective energy efficiency measures for existing residential homes in the Florida market. International Journal of Construction Education and Research, 9(1), pp. 61-80. ISSN 1557-8771
Carollo, Federica Carla (2023) Circularity in the construction and demolition waste management chain. PhD thesis, Politecnico di Milano, Italy.
Cassandro, J; Mirarchi, C and Pavan, A (2025) A comprehensive literature review of 5D building information modelling using latent dirichlet allocation analysis. Construction Innovation, 25(7), pp. 331-357. ISSN 1471-4175
Cassimatis, P J (1967) The performance of the construction industry, 1946-1965. PhD thesis, New School for Social Research, USA.
Catalina, A J (2016) Development of a statistical theory-based capital cost estimating methodology for light rail transit corridor evaluation under varying alignment characteristics. PhD thesis, University of Kentucky, USA.
Chamikara, P B S; Perera, B A K S and Rodrigo, M N N (2020) Competencies of the quantity surveyor in performing for sustainable construction. International Journal of Construction Management, 20(3), pp. 237-251. ISSN 1562-3599
Chan, A P C (1999) Modelling building durations in Hong Kong. Construction Management and Economics, 17(2), pp. 189-196. ISSN 01446193
Chan, P W (2009) The dominance of practice in constructionarium: Exploring the challenges of linking theory and practice. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Chan, S L and Park, M (2005) Project cost estimation using principal component regression. Construction Management and Economics, 23(3), pp. 295-304. ISSN 01446193
Chanyotha, S (1991) Generic cost estimates, site screening, and site design of low- and intermediate-level waste system. PhD thesis, University of Arizona, USA.
Chao, L C (2010) Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(3), pp. 287-299. ISSN 1466433X
Charef, R (2019) A BIM-based framework to integrate a sustainable end-of-life into the asset lifecycle: towards the circular economy. PhD thesis, Coventry University, UK.
Che Haron, R (2017) Systems thinking paradigm in construction cost estimating reliability. PhD thesis, University of Reading, UK.
Chen, G; Zhang, G; Xie, Y M and Jin, X H (2012) Overview of alliancing research and practice in the construction industry. Architectural Engineering and Design Management, 8(2), pp. 103-119. ISSN 1745-2007
Chen, Y-K (1991) An analysis of decision strategy as applied to construction portfolios. PhD thesis, Stevens Institute of Technology, USA.
Cheng, J and Proverbs, D G (2004) The impact of strategic decisions on construction client satisfaction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Cherkos, F. D. and Kifle, K. T. (2026) Importance and interrelationship of stakeholder management critical success factors in Ethiopia mega construction projects. Built Environment Project and Asset Management, 16(2), pp. 242-262. ISSN 2044-124X
Choi, K C (1992) An object-oriented historical cost information base to support concurrent engineering. PhD thesis, University of California, Berkeley, USA.
Chong, H Y; Zhang, Y; Lee, C Y; Wang, F and Zhang, Y (2025) Synchronizing BIM cost models and bills of quantities for lifecycle audit trail cost management. Engineering, Construction and Architectural Management, 32(10), pp. 6566-6592. ISSN 0969-9988
Chovichien, V (1981) The discounted cost model and application to acquisition and utilization policies of construction equipment. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Clarke, L and Herrmann, G (2004) Cost vs. Production: Labour deployment and productivity in social housing construction in England, Scotland, Denmark and Germany. Construction Management and Economics, 22(10), pp. 1057-1066. ISSN 01446193
Cloete, Brent; Agumba, Justus; Adebowale, Oluseyi Julius and Meyer, Chris (2026) From readiness to implementation: A framework for BIM adoption in facilities management organisations. Journal of Construction Business and Management, 8(2), pp. 43-53. ISSN 2521-0165
Cole, R J and Sterner, E (2000) Reconciling theory and practice of life-cycle costing. Building Research & Information, 28(5-6), pp. 368-375. ISSN 0961-3218
Collins, A; Blondel, A A; Mensah, S and Manu, E (2021) Assessing the cost of competitive tendering in Ghana using transaction cost theory. Built Environment Project and Asset Management, 11(5), pp. 835-850. ISSN 2044-124X
Condon, E J (2006) The project game: Strategic estimating on major projects. PhD thesis, University of Calgary, Canada.
Coopman, J T (1998) Superintendent motivation and satisfaction related to the use of construction management for school facility projects. EdD thesis, Ball State University, USA.
Corbett, P and Rowley, P (1999) The use of bcis elemental cost data by quantity surveyors as part of cost planning techniques: The practitioners' perspective. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Costa, Simone Alves da (2015) Strategic cost management: Overview of teaching and research by the view of actor-network theory. PhD thesis, Universidade de São Paulo, Brazil.
Creedy, G D (2006) Risk factors leading to cost overrun in the delivery of highway construction projects. PhD thesis, Queensland University of Technology, Australia.
Cuellar Franca, R M (2013) Sustainability assessment framework for the residential construction sector in the UK. PhD thesis, University of Manchester, UK.
D'Incognito, M; Costantino, N and Migliaccio, G C (2015) Actors and barriers to the adoption of LCC and LCA techniques in the built environment. Built Environment Project and Asset Management, 5(2), pp. 202-216. ISSN 2044-124X
Darlow, G; Rotimi, J O B and Wajiha Mohsin, S (2022) Automation in New Zealand's offsite construction: A status update. Built Environment Project and Asset Management, 12(1), pp. 38-52. ISSN 2044-124X
Davies, A J (1995) Towards a method of measurement and cost control for civil engineering work in the petrochemical industry. PhD thesis, University of Northumbria at Newcastle, UK.
Dawood, N N and Dalakleidis, G D A (2002) Industrial review and development of a cost management system for the Greek construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Dayan, V; Chileshe, N and Hassanli, R (2022) A scoping review of information-modeling development in bridge management systems. Journal of Construction Engineering and Management, 148(9): 03122006, ISSN 0733-9364
DeJesus, I (2024) Strategies for implementing organizational change in the construction industry. DBA thesis, Walden University, USA.
Delgado, J M D; Oyedele, L; Bilal, M; Ajayi, A; Akanbi, L and Akinade, O (2020) Big data analytics system for costing power transmission projects. Journal of Construction Engineering and Management, 146(1): 05019017, ISSN 0733-9364
Demirkesen, S. (2025) Exploring the causes of sunk cost fallacy in the construction industry: Case of mega projects. Engineering, Construction and Architectural Management, 33(5), pp. 3761-3776. ISSN 0969-9988
Di Ruocco, G; Melella, R and Marino, V (2022) An integrated assessment method for the sustainability of the opaque building envelope in residential buildings with Italian gbc-home certification. Architectural Engineering and Design Management, 18(4), pp. 545-570. ISSN 1745-2007
Dib, H Y (2006) Visual information access and management for life cycle project management. PhD thesis, University of Florida, USA.
Dinh, T H; Dinh, T H and Götze, U (2024) Roadworks design: Study on selection of construction materials in the preliminary design phase based on economic performance. International Journal of Construction Management, 24(5), pp. 503-511. ISSN 1562-3599
Disney, O and Fahlstedt, O (2021) Site overheads: The lost dimension of improved productivity? In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Dixit, M K (2017) Embodied energy and cost of building materials: Correlation analysis. Building Research & Information, 45(5), pp. 508-523. ISSN 0961-3218
Dlakwa, M M (1990) Analysis of some problems in the management and cost control of public sector construction projects in Nigeria. PhD thesis, University of Stirling, UK.
Do, Q; Moriyani, M A; Le, C and Le, T (2023) Cost-weighted tf-idf: A novel approach for measuring highway project similarity based on pay items' cost composition and term frequency. Journal of Construction Engineering and Management, 149(8): 04023069, ISSN 0733-9364
Do, Q; Moriyani, M A; Le, T; Le, C and Piratla, K (2025) Enhanced highway project clustering framework to support project cost estimation. Journal of Construction Engineering and Management, 151(1): 04024191, ISSN 0733-9364
Doğan, S Z (2005) Using machine learning techniques for early cost prediction of structural systems of buildings. PhD thesis, Izmir Institute of Technology, Turkey.
Dozzi, P; Hartman, F; Tidsbury, N and Ashrafi, R (1996) More-stable owner-contractor relationships. Journal of Construction Engineering and Management, 122(1), pp. 30-35. ISSN 0733-9364
Duffield, C (1998) Commercial viability of privately financed heating systems in Europe: A case study. Engineering, Construction and Architectural Management, 5(1), pp. 3-8. ISSN 0969-9988
Dutch, W G (1989) The capital cost aspects of the environmental impact of new highways in association with the new design technique: the commercial route methodology. PhD thesis, Loughborough University, UK.
Eamon, C; Shinki, K; Wong, K H and Alsendi, A (2025) Assessment of pay item specific case-based reasoning approach for bridge unit cost estimation. Journal of Construction Engineering and Management, 151(12): 04025188, ISSN 0733-9364
Edwards, D J; Holt, G D and Harris, F C (2000) Estimating life cycle plant maintenance costs. Construction Management and Economics, 18(4), pp. 427-435. ISSN 01446193
Ekung, S; Odesola, I and Oladokun, M (2022) Dimensions of cost misperceptions obstructing the adoption of sustainable buildings. Smart and Sustainable Built Environment, 11(4), pp. 852-869. ISSN 2046-6099
Ekung, S; Odesola, I and Opoku, A (2022) Demystifying cost misperception as a challenge to green building adoption in Nigeria. Journal of Engineering, Design and Technology, 20(6), pp. 1716-1737. ISSN 1726-0531
El-Omari, S and Moselhi, O (2009) Data acquisition from construction sites for tracking purposes. Engineering, Construction and Architectural Management, 16(5), pp. 490-503. ISSN 0969-9988
Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3), pp. 401-420. ISSN 1471-4175
Elghaish, F and Abrishami, S (2021) A centralised cost management system: Exploiting EVM and abc within IPD. Engineering, Construction and Architectural Management, 28(2), pp. 549-569. ISSN 0969-9988
Elghaish, F; Abrishami, S; Abu Samra, S; Gaterell, M; Hosseini, M R and Wise, R (2021) Cash flow system development framework within integrated project delivery (IPD) using BIM tools. International Journal of Construction Management, 21(6), pp. 555-570. ISSN 1562-3599
Elghaish, F; Abrishami, S; Hosseini, M R and Abu-Samra, S (2020) Revolutionising cost structure for integrated project delivery: A BIM-based solution. Engineering, Construction and Architectural Management, 28(4), pp. 1214-1240. ISSN 0969-9988
Elghaish, F A K (2020) An automated IPD cost management system: BIM and blockchain based solution. PhD thesis, University of Portsmouth, UK.
Elhag, T M S (2004) Tender price modelling: artificial neural networks and regression techniques. PhD thesis, University of Liverpool, UK.
Elkhayat, Y O; Ibrahim, M G; Tokimatsu, K and Ali, A A M M (2020) Life cycle cost analysis on three high-performance glazing systems for an office building in New Cairo, Egypt. Architectural Engineering and Design Management, 17(1-2), pp. 131-145. ISSN 1745-2007
Ellis, R C T; Wood, G D and Keel, D A (2005) Value management practices of leading UK cost consultants. Construction Management and Economics, 23(5), pp. 483-493. ISSN 01446193
Emekci, Ş (2018) A life cycle costing based decision support tool for cost-optimal energy efficient design and/or refurbishments. PhD thesis, Middle East Technical University, Turkey.
Emsley, M W; Lowe, D J; Duff, A R; Harding, A and Hickson, A (2002) Data modelling and the application of a neural network approach to the prediction of total construction costs. Construction Management and Economics, 20(6), pp. 465-472. ISSN 01446193
Enshassi, A; Rashid Abdul Aziz, A and Karriri, A (2008) Investigating the overhead costs in construction projects in Palestine. Journal of Financial Management of Property and Construction, 13(1), pp. 35-47. ISSN 1366-4387
Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. PhD thesis, Polytechnic University, USA.
Fang, Y and Ng, S T (2011) Applying activity-based costing approach for construction logistics cost analysis. Construction Innovation, 11(3), pp. 259-281. ISSN 1471-4175
Fang, Y and Ng, S T (2019) Genetic algorithm for determining the construction logistics of precast components. Engineering, Construction and Architectural Management, 26(10), pp. 2289-2306. ISSN 0969-9988
Farran, M and Zayed, T (2012) New life-cycle costing approach for infrastructure rehabilitation. Engineering, Construction and Architectural Management, 19(1), pp. 40-60. ISSN 0969-9988
Fawcett, W; Hughes, M; Krieg, H; Albrecht, S and Vennström, A (2012) Flexible strategies for long-term sustainability under uncertainty. Building Research & Information, 40(5), pp. 545-557. ISSN 0961-3218
Ferreira Bastos, M; Loforte Ribeiro, F and Cardoso Teixeira, J (2005) Estimating of capital cost of underground car parking project. Journal of Financial Management of Property and Construction, 10(2), pp. 126-132. ISSN 1366-4387
Fieldson, R (2007) Towards a framework for sustainability in UK retail architecture. PhD thesis, University of Newcastle upon Tyne, UK.
Finch, E F (1989) A requisite decision model for the selection of mechanical and electrical services in buildings. PhD thesis, University of Reading, UK.
Fitzgerald, E and Akintoye, A (1995) The accuracy and optimal linear correction of UK construction tender price index forecasts. Construction Management and Economics, 13(6), pp. 493-500. ISSN 01446193
Flanagan, R; Kendell, A; Norman, G and Robinson, G D (1987) Life cycle costing and risk management. Construction Management and Economics, 5(4), ISSN 01446193
Friedman, A and Cammalleri, V (1997) Selection criteria for energy-efficient windows. Building Research & Information, 25(4), pp. 234-238. ISSN 0961-3218
Gadisa, B and Zhou, H (2021) Exploring influential factors leading to the poor performance of public construction project in Ethiopia using structural equation modelling. Engineering, Construction and Architectural Management, 28(6), pp. 1683-1712. ISSN 0969-9988
Gao, N and Touran, A (2020) Cost overruns and formal risk assessment program in US rail transit projects. Journal of Construction Engineering and Management, 146(5): 05020004, ISSN 0733-9364
Geekiyanage, D and Ramachandra, T (2020) Nexus between running costs and building characteristics of commercial buildings: Hedonic regression modelling. Built Environment Project and Asset Management, 10(3), pp. 389-406. ISSN 2044-124X
Geekiyanage, D; Ramachandra, T and Thurairajah, N (2018) A model for early stage estimation of operational expenses (opex) in commercial buildings. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Georgiadou, M C (2019) An overview of benefits and challenges of building information modelling (BIM) adoption in UK residential projects. Construction Innovation, 19(3), pp. 298-320. ISSN 1471-4175
Ghaeli, M R (1998) Pavement and bridge cost allocation analysis of the Intario intercity highway network. PhD thesis, University of Waterloo, USA.
Gharouni Jafari, K. and Noorzai, E. (2026) Challenging the status quo: Critical barriers to integrated project delivery implementation in Iran. Architectural Engineering and Design Management, 22(1), pp. 83-98. ISSN 1745-2007
Ghattas, R T (2018) Stakeholder perceptions of how to diminish cost overruns in large, United States government-financed construction projects under earned value management: A multiple case study. DBA thesis, Northcentral University, USA.
Gocmen, F C (2014) Infrastructure scaling and pricing. PhD thesis, Columbia University, USA.
Goh, B H and Sun, Y (2016) The development of life-cycle costing for buildings. Building Research & Information, 44(3), pp. 319-333. ISSN 0961-3218
Goh, Kai Chen (2011) Developing financial decision support for highway infrastructure sustainability. PhD thesis, Queensland University of Technology, Australia.
Goh, Y L (2004) The effect of higher workers' compensation premium rates on construction worker wages and the reporting of injuries. PhD thesis, University of Utah, USA.
Goodchild, B and Beatty, C (2000) Assessing the procurement practices of housing associations: A case study of new build in Scotland. Journal of Construction Procurement, 6(1), pp. 20-32. ISSN 1358-9180
Goodfellow-Smith, M (2019) How can finance and insurance institutions help deliver sustainable city infrastructure? PhD thesis, University of Birmingham, UK.
Gowri, K (1990) Knowledge-based system approach to building envelope design. PhD thesis, Concordia University, Canada.
Gowthaman, M; Gamage, I and Karunaratne, T (2025) Framework for managing deficiencies and inefficiencies in quantity surveying-related software implementation. Construction Economics and Building, 25(2), pp. 192-214. ISSN 2204-9029
Grada, M (2007) The impact of economic value added measure in assessing the business performance of UK construction companies. PhD thesis, Nottingham Trent University, UK.
Green, E; Lannon, S; Patterson, J; Variale, F and Iorwerth, H (2020) Decarbonising the welsh housing stock: From practice to policy. Buildings & Cities, 1(1), pp. 277-292. ISSN 2632-6655
Greer, Fiona Muriel (2021) Life-cycle environmental and economic management of airport infrastructure and operations. PhD thesis, University of California, USA.
Gregory, R A (1992) Development of a knowledge-based system approach for decision-making in construction projects. PhD thesis, University of Florida, USA.
Grimes, G A (2004) Recovering capital expenditures: The railroad industry paradox. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Guan, Z; Millard, S and Yang, Z (2008) CDIO and the Liverpool Constructionarium. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 77-83. ISSN 17514312
Gyadu-Asiedu, W; Danso, H and Asubonteng, J A (2013) Assessment of the performance of local and foreign road construction firms in Ghana. International Journal of Construction Management, 13(4), pp. 53-73. ISSN 1562-3599
Hajikazemi, S; Aaltonen, K; Ahola, T; Aarseth, W and Andersen, B (2020) Normalising deviance in construction project organizations: A case study on the collapse of Carillion. Construction Management and Economics, 38(12), pp. 1122-1138. ISSN 01446193
Hallowell, M (2010) Cost-effectiveness of construction safety programme elements. Construction Management and Economics, 28(1), pp. 25-34. ISSN 1466433X
Hanid, M (2014) Design science research as an approach to develop conceptual solutions for improving cost management in construction. PhD thesis, University of Salford, UK.
Harajli, H A (2009) Cost-benefit analysis of microgenerators: An integrated appraisal perspective. PhD thesis, University of Bath, UK.
Harding, A; Lowe, D; Hickson, A; Emsley, M and Duff, A R (1999) Implementation of a neural network model for the comparison of the cost of different procurement approaches. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Haroglu, H and Leiringer, R (2010) Achieving whole-life value: The challenges of service-led construction. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Hartwell, J C; Upadhyay, Y and Sourani, A (2019) Influential factors of life cycle management in education PFI projects. Built Environment Project and Asset Management, 9(2), pp. 302-314. ISSN 2044-124X
Hastak, M (1994) Decision support system for project cost control strategy and planning. PhD thesis, Purdue University, USA.
Hastak, M; Halpin, D W and Vanegas, J (1996) COMPASS: new paradigm for project cost control strategy and planning. Journal of Construction Engineering and Management, 122(3), pp. 254-264. ISSN 0733-9364
Hatamleh, M T; Hiyassat, M; Sweis, G J and Sweis, R J (2018) Factors affecting the accuracy of cost estimate: Case of Jordan. Engineering, Construction and Architectural Management, 25(1), pp. 113-131. ISSN 0969-9988
He, S (2018) A project-level infrastructure management framework for sustainable roadways. PhD thesis, Syracuse University, USA.
Hegazy, T and Ayed, A (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 124(3), pp. 210-218. ISSN 0733-9364
Hinze, J and Appelgate, L L (1991) Costs of construction injuries. Journal of Construction Engineering and Management, 117(3), pp. 537-550. ISSN 0733-9364
Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.
Holmlin, R M (2016) Pre-design methodology for establishing scope-budget and scope-duration alignment for capital projects. PhD thesis, George Washington University, USA.
Horsley, A; France, C and Quatermass, B (2003) Delivering energy efficient buildings: A design procedure to demonstrate environmental and economic benefits. Construction Management and Economics, 21(4), pp. 345-356. ISSN 01446193
Hu, M (2023) An evaluation of the retrofit net zero building performances: Life cycle energy, emissions and cost. Building Research & Information, 51(2), pp. 179-191. ISSN 0961-3218
Hu, M and Skibniewski, M (2022) The impact of the design team characteristics on the sustainable building construction cost: Structural equation model analysis. Architectural Engineering and Design Management, 18(5), pp. 614-630. ISSN 1745-2007
Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation. PhD thesis, University of Wisconsin - Madison, USA.
Huang, X (2012) Estimating the cost of engineering services using parametrics and the bathtub failure model. PhD thesis, University of Bath, UK.
Hussey, H J (2023) Establishing criteria for descriptions of building work which include practicality and intricacy. PhD thesis, University of Northumbria at Newcastle, UK.
Hwang, S (2011) Time series models for forecasting construction costs using time series indexes. Journal of Construction Engineering and Management, 137(9), pp. 656-662. ISSN 0733-9364
Hyung, W G; Kim, S and Jo, J K (2020) Improved similarity measure in case-based reasoning: A case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(2), pp. 561-578. ISSN 0969-9988
Ibbotson, K (2020) Prioritising carbon reduction in UK public sector flood and coastal risk management. PhD thesis, University of Bolton, UK.
Ibrahim, A.; Badawy, M. and Hamdy, K. (2026) Modeling interdependent constraints on modular construction: A constraint theory and fuzzy-PLS-SEM approach for developing countries. Journal of Engineering, Design and Technology, 24(3), pp. 734-754. ISSN 1726-0531
Igwe, U S; Mohamed, S F; Azwarie, M B M D; Nwofia, C M and Ihekweme, N M (2025) Assessment of post contract cost control issues in Nigeria: Quantity surveyors' perspective. International Journal of Construction Management, 25(14), pp. 1725-1735. ISSN 1562-3599
Ikediashi, D I and Okolie, K C (2022) An assessment of risks associated with contractor's cash flow projections in South-South, Nigeria. International Journal of Construction Management, 22(11), pp. 2051-2058. ISSN 1562-3599
Illankoon, Illankoon Mudiyanselage Chethana Sanathani (2018) A life-cycle cost model for green commercial office buildings with optimal green star credits. PhD thesis, Western Sydney University, Australia.
Ismail, M Z; Mohamad Ramly, Z; Darmansah, N F and Misnan, M S (2025) Rail construction cost risk management with bow-tie analysis: Contractor’s perspective. Built Environment Project and Asset Management, 15(4), pp. 753-771. ISSN 2044-124X
Ismail, S; Mohamad, R and Mohd Said, J (2022) Performance indicators for lifecycle process of public private partnership (PPP) projects in Malaysia. Built Environment Project and Asset Management, 12(5), pp. 704-718. ISSN 2044-124X
Jackson, G (2003) Contingency for cost control in project management: A case study. Construction Economics and Building, 3(1), pp. 1-12. ISSN 2204-9029
Jackson, S (2002) Project cost overruns and risk management. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Jacomit, A M and Granja, A D (2011) An investigation into the adoption of target costing on Brazilian public social housing projects. Architectural Engineering and Design Management, 7(2), pp. 113-127. ISSN 1745-2007
Jafari, A and Love, P E D (2013) Quality costs in construction: Case of Qom monorail project in iran. Journal of Construction Engineering and Management, 139(9), pp. 1244-1249. ISSN 0733-9364
Jagboro, G O and Alli, O R (1999) A study of the monetary value of extension of time in building project. Journal of Financial Management of Property and Construction, 4(3), pp. 39-46. ISSN 1366-4387
Jaggar, D and Ross, A (2003) A survey into the effectiveness of web-based teaching of building design cost management. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Jansen, B (2024) The circular kitchen: Perspectives for design and implementation. PhD thesis, Delft University of Technology, Netherlands.
Jaya, N M (2014) An activity-based cost controlling model for improving the management of construction project overheads. PhD thesis, University of Salford, UK.
Jayamaha, B H V H; Perera, B A K S; Gimhani, K D M and Rodrigo, M N N (2024) Adaptability of enterprise resource planning (ERP) systems for cost management of building construction projects in Sri Lanka. Construction Innovation, 24(5), pp. 1255-1279. ISSN 1471-4175
Ji, W and Abourizk, S M (2018) Data-driven simulation model for quality-induced rework cost estimation and control using absorbing Markov chains. Journal of Construction Engineering and Management, 144(8): 04018078, ISSN 0733-9364
Ji, Wenying (2018) Simulation-based analytics for fabrication quality-associated decision support. PhD thesis, University of Alberta, Canada.
Jiang, A (2005) A decision support model for cost and activity-based performance measurement in steel construction. PhD thesis, University of Florida, USA.
Jrade, A (2004) Integrated conceptual cost estimating and life cycle costing system for building projects. PhD thesis, Concordia University, Canada.
Jumas, D; Mohd-Rahim, F A; Zainon, N and Utama, W P (2018) Improving accuracy of conceptual cost estimation using MRA and ANFIS in Indonesian building projects. Built Environment Project and Asset Management, 8(4), pp. 348-357. ISSN 2044-124X
Jung, S (2010) Facility siting and layout optimization based on process safety. PhD thesis, Texas A&M University, USA.
Kabbani, I A (1993) Decision support life cycle analysis system in building design. PhD thesis, University of Colorado at Boulder, USA.
Kamaruddin S S, M M F and Mahbub R, Y R M (2013) Perception towards cost implication of mechanisation and automation approach in IBS projects in Malaysia. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Kaminsky, J A (2022) Improving public-private partnerships for renewable electricity infrastructure in lower- and middle-income countries. Journal of Construction Engineering and Management, 148(5): 04022012, ISSN 0733-9364
Kar, S and Jha, K N (2023) Examining the effect of material management practices on material availability and waste reduction in construction projects. Journal of Construction Engineering and Management, 149(8): 04023065, ISSN 0733-9364
Karim, A and Adeli, H (1999) CONSCOM: An OO construction scheduling and change management system. Journal of Construction Engineering and Management, 125(5), pp. 368-376. ISSN 0733-9364
Kazar, G; Mutlu, U and Tokdemir, O B (2023) Development of zero-based budgeting approach for multinational construction contractors. Engineering, Construction and Architectural Management, 30(10), pp. 5217-5232. ISSN 0969-9988
Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.
Kehily, D (2016) Leveraging building information modelling to address the barriers that prevent the widespread adoption of life cycle costing by quantity surveyors. PhD thesis, University of Salford, UK.
Kelly, J R (2005) Managing client value at the strategic briefing stage of construction projects. PhD thesis, Heriot-Watt University, UK.
Kern, A P and Formoso, C T (2006) A model for integrating cost management and production planning and control in construction. Journal of Financial Management of Property and Construction, 11(2), pp. 75-90. ISSN 1366-4387
Kim, C S and Liu, L Y (2007) Cost information model for managing multiple projects. Journal of Construction Engineering and Management, 133(12), pp. 966-974. ISSN 0733-9364
Kim, Y W; Han, S; Shin, S and Choi, K (2011) A case study of activity-based costing in allocating rebar fabrication costs to projects. Construction Management and Economics, 29(5), pp. 449-461. ISSN 1466433X
Kim, Y W and Kim, S C (2011) Cost analysis of information technology-assisted quality inspection using activity-based costing. Construction Management and Economics, 29(2), pp. 163-172. ISSN 1466433X
Kim, Y-W (2002) The implications of a new production paradigm for project cost control. PhD thesis, University of California, Berkeley, USA.
Kim, Yong-Su (1994) The development and application of a probabilistic model for risk analysis of life cycle cost predictions: For apartment buildings constructed by the Korea National Housing Corporation in Seoul, Korea. PhD thesis, University of New South Wales, Australia.
Kirkham, R J (2002) A stochastic whole life cycle cost model for a national health service acute care hospital building. PhD thesis, University of Liverpool, UK.
Kirkham, R J (2005) Re-engineering the whole life cycle costing process. Construction Management and Economics, 23(1), pp. 9-14. ISSN 01446193
Kirkham, R J; Alisa, M; Silva, A P d; Grindley, T and Brøndsted, J (2004) Rethinking whole life cycle cost based design decision-making. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kirkham, R J and Boussabaine, A H (2000) Developing a framework for whole of life costing in the national health service estate. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Kirkham, R J and Boussabaine, A H (2001) Modelling probability distributions of facilities management costs for an NHS acute care hospital building. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Kirkham, R J; Boussabaine, A H and Awwad, B H (2002) Probability distributions of facilities management costs for whole life cycle costing in acute care nhs hospital buildings. Construction Management and Economics, 20(3), pp. 251-261. ISSN 01446193
Kirkham, R J; Halim Boussabaine, A and Kirkham, M P (2002) Stochastic time series forecasting of electricity costs in an nhs acute care hospital building, for use in whole life cycle costing. Engineering, Construction and Architectural Management, 9(1), pp. 38-52. ISSN 0969-9988
Kishk, M (2002) Towards effective consideration of non-financial factors in the design and management of construction assets. Journal of Financial Management of Property and Construction, 7(3), pp. 163-174. ISSN 1366-4387
Kishk, M and Al-Hajj, A (2000) A fuzzy model and algorithm to handle subjectivity in life cycle costing based decision-making. Journal of Financial Management of Property and Construction, 5(1-2), pp. 93-104. ISSN 1366-4387
Kishk, M and Al-Hajj, A (2000) Fuzzy modelling of life cycle costs of alternatives with different lives. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Kishk, M; Al-Hajj, A and Pollock, R (2001) Inclusion of non-financial factors in life-cycle decision-making: A fuzzy approach. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Kishk, M; Al-Hajj, A and Pollock, R (2002) An innovative integrated approach to whole life costing. Journal of Financial Management of Property and Construction, 7(1), pp. 31-40. ISSN 1366-4387
Kishk, M; Al-Hajj, A; Pollock, R and Aouad, G F (2002) A generic database for whole life costing applications in construction. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kuo, Y-c (2004) Highway earthwork and pavement production rates for construction time estimation. PhD thesis, University of Texas at Austin, USA.
Kwok, C; Young, R J and Kirkham, R J (2010) Risk and asset management in privatization/private finance of public utiliities: A risk investigation of water infrastructure projects in China. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Laishram, B and Sood, R (2024) Challenges in implementation of 7D-BIM for infrastructure asset management: A systematic review. Construction Economics and Building, 24(3), pp. 95-117. ISSN 2204-9029
Langston, C (2013) The application of data envelopment analysis to the benchmarking of construction performance in Australian and American high-rise buildings. International Journal of Construction Management, 13(3), pp. 55-75. ISSN 1562-3599
Langston, C (2014) Construction efficiency: A tale of two developed countries. Engineering, Construction and Architectural Management, 21(3), pp. 320-335. ISSN 0969-9988
Langston, Craig A (1994) The determination of equivalent value in life-cost studies: An intergenerational approach. PhD thesis, University of Technology Sydney, Australia.
Langston, Y L and Langston, C (2007) Building energy and cost performance: An analysis of thirty Melbourne case studies. Construction Economics and Building, 7(1), pp. 1-18. ISSN 2204-9029
Langston, Y L and Langston, C A (2008) Reliability of building embodied energy modelling: An analysis of 30 Melbourne case studies. Construction Management and Economics, 26(2), pp. 147-160. ISSN 1466433X
Larsson, N and Clark, J (2000) Incremental costs within the design process for energy efficient buildings. Building Research & Information, 28(5-6), pp. 413-418. ISSN 0961-3218
Lawther, P M and Edwards, P J (2001) Design cost modelling: the way forward. Construction Economics and Building, 1(1), pp. 32-42. ISSN 2204-9029
Le, C; Jeong, H D; Damnjanovic, I and Bukkapatnam, S (2022) Pareto principle in scoping-phase cost estimating: A multiobjective optimization approach for selecting and applying optimal major work items. Journal of Construction Engineering and Management, 148(8): 04022076, ISSN 0733-9364
Le Gia, T T; Dang, H A; Dinh, V B; Tong, M Q; Nguyen, T K; Nguyen, H H and Nguyen, D Q (2022) A simulation-based multi-objective genetic optimization framework for efficient building design in early stages: Application for Vietnam's hot and humid climates. International Journal of Building Pathology and Adaptation, 40(3), pp. 305-326. ISSN 23984708
Lee, C Y-H (2010) A probabilistic approach to the life-cycle cost assessment of preventive maintenance strategies on flexible pavements. PhD thesis, University of California, Davis, USA.
Lee, H S and Yi, K J (1999) Application of mathematical matrix to integrate project schedule and cost. Journal of Construction Engineering and Management, 125(5), pp. 339-346. ISSN 0733-9364
Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures. PhD thesis, University of Michigan, USA.
Lee, J G; Lee, H S; Park, M and Seo, J (2022) Early-stage cost estimation model for power generation project with limited historical data. Engineering, Construction and Architectural Management, 29(7), pp. 2599-2614. ISSN 0969-9988
Lee, J S (2021) Life cycle costing for exterior materials on building façade. Journal of Construction Engineering and Management, 147(7): 2068, ISSN 0733-9364
Lee, M; Jeong, J and Lee, J (2025) Development of a quantitative assessment method for occupational accident risk of construction workers using resource and cost information in the preconstruction stage. Journal of Construction Engineering and Management, 151(12): 04025208, ISSN 0733-9364
Levander, E and Sardén, Y (2009) Maintenance and operating costs in off-site timber framed housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Li, H and Love, P E D (1997) Combining rule-based expert systems and artificial neural networks for mark-up estimation. Construction Management and Economics, 17(2), pp. 169-176. ISSN 01446193
Liang, D (2001) Improved reliability and economic modeling for new and retrofitted low-rise structures subjected to extreme wind hazards. PhD thesis, State University of New York at Buffalo, USA.
Liao, L; Man, Q; Teo, E A L; Li, L and Li, X (2014) Improving construction schedule and cost information feedback in building information modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(2), pp. 91-99. ISSN 17514304
Lim, T; Porras-Alvarado, J D and Zhang, Z (2019) Pricing of highway infrastructure for transportation asset management. Built Environment Project and Asset Management, 9(1), pp. 64-79. ISSN 2044-124X
Lindhard, S M (2024) Danish contractor's application of the budget: Identifying purpose and comparing the budgets application level across job-position. Construction Economics and Building, 24(4-5), pp. 1-17. ISSN 2204-9029
Ling, F Y Y and Khoo, W W (2016) Improving relationships in project teams in Malaysia. Built Environment Project and Asset Management, 6(3), pp. 284-301. ISSN 2044-124X
Liu, H (2024) Enhancing accuracy and security in BIM-based construction cost management leveraging AI and blockchain technologies. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Liu, Q; Ye, G; Feng, Y; Wang, C and Peng, Y (2020) Case-based insights into rework costs of residential building projects in China. International Journal of Construction Management, 20(4), pp. 347-355. ISSN 1562-3599
Liu, Y; Chang, R D; Zuo, J; Xiong, F and Dong, N (2023) What leads to the high capital cost of prefabricated construction in China: Perspectives of stakeholders. Engineering, Construction and Architectural Management, 30(2), pp. 805-832. ISSN 0969-9988
Lloyd, C A (2020) Modular manufacture and construction of small nuclear power generation systems. PhD thesis, University of Cambridge, UK.
Loduca, D P (2011) Exploratory study of barriers to use of Feigenbaum's quality cost strategy within design engineering firms. PhD thesis, Missouri University of Science and Technology, USA.
Love, P E D (2001) Determinants of rework in Australian construction projects. PhD thesis, Monash University, Australia.
Lovrenčić Butković, L; Mihić, M and Sigmund, Z (2023) Assessment methods for evaluating circular economy projects in construction: A review of available tools. International Journal of Construction Management, 23(5), pp. 877-886. ISSN 1562-3599
Lowe, D J (1996) Experiental learning in design cost estimating. PhD thesis, University of Manchester, UK.
Lu, W; Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(1), pp. 118-132. ISSN 0969-9988
Lucko, G; Anderson-Cook, C M and Vorster, M C (2006) Statistical considerations for predicting residual value of heavy equipment. Journal of Construction Engineering and Management, 132(7), pp. 723-732. ISSN 0733-9364
Luigi, Guzzoni (2022) Construction management of cultural heritage. Conservation of cultural heritage during its construction site stage. Building information modelling supporting on site information collection and management for cost control. PhD thesis, Politecnico di Milano, Italy.
Lundman, P (2011) Cost management for underground infrastructure projects a case study on cost increase and its causes. PhD thesis, Luleå University of Technology, Sweden.
Lützkendorf, T and Lorenz, D (2005) Sustainable property investment: Valuing sustainable buildings through property performance assessment. Building Research & Information, 33(3), pp. 212-234. ISSN 0961-3218
Maaz, Z. N.; Jamaludin, A. F.; Mohd Rahim, F. A.; Rashidi, A. and Darmansah, N. F. (2026) Artificial intelligence capabilities in project cost management in the Malaysian construction industry: An exploratory study. Engineering, Construction and Architectural Management, pp. 1-22. ISSN 0969-9988
Mackenzie, D I (2010) A review of project controls in the UK and methodologies to improve the processes. DProf thesis, Teesside University, UK.
Madushika, U G D and Ramachandra, T (2024) A comparative assessment of indirect green façade and conventional walls: perspective of life cycle cost. Built Environment Project and Asset Management, 14(5), pp. 697-712. ISSN 2044-124X
Maharjan, S; Shrestha, P P and Srirangam, D (2023) Impact of mobilization costs on schedule performance of highway projects. Engineering, Construction and Architectural Management, 30(5), pp. 2008-2025. ISSN 0969-9988
Mahmood, A (1992) Educational interests and needs of owner-managers of small building firms. PhD thesis, Heriot-Watt University, UK.
Mak, S; Wong, J and Picken, D (1998) The effect on contingency allowances of using risk analysis in capital cost estimating: A Hong Kong case study. Construction Management and Economics, 16(6), pp. 615-619. ISSN 01446193
Malin, N (2000) The cost of green materials. Building Research & Information, 28(5-6), pp. 408-412. ISSN 0961-3218
Manjia, M; Pettang, C and Abanda, F H (2011) Urban self-building labour cost modelling in Cameroon. Journal of Construction in Developing Countries, 16(2), pp. 69-90. ISSN 1823-6499
Marchiori, Fernanda Fernandes (2009) Developing a method to prepare unit cost item nets for buildings estimating. PhD thesis, Universidade de São Paulo, Brazil.
Marinelli, M and Lambropoulos, S (2013) Algorithmic method for scraper load-time optimization. Journal of Construction Engineering and Management, 139(5), pp. 459-465. ISSN 0733-9364
Marshall, H E (1987) Building economics in the United States. Construction Management and Economics, 5(4), ISSN 01446193
Marston, V K (1985) Interdependence of the functional element costs of buildings. PhD thesis, University of Portsmouth, UK.
Marzouk, M and Hamdala, D (2025) Phasing real estate projects considering profitability and customer satisfaction. Engineering, Construction and Architectural Management, 32(5), pp. 2942-2970. ISSN 0969-9988
Mat Noor, Noorsidi Aizuddin (2014) Framework of whole life cycle costing for Malaysian high rise residential property development. PhD thesis, Queensland University of Technology, Australia.
Matipa, W M (2008) Total cost management at the design stage using a building product model. PhD thesis, University College Cork, Ireland.
Matipa, W M; Bain, I A and Naik, B (2010) Cost optimization techniques for sustainable buildings: Analysis beyond energy performance certificates. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Matipa, W M; Cunningham, P and Naik, B (2010) Assessing the impact of new rules of cost planning on building information model (BIM) schema pertinent to quantity surveying practice. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Matipa, W M; Kelliher, D and Keane, M (2008) How a quantity surveyor can ease cost management at the design stage using a building product model. Construction Innovation, 8(3), pp. 164-181. ISSN 1471-4175
Matipa, W M; Kelliher, D and Keane, M (2009) A strategic view of ICT supported cost management for green buildings in the quantity surveying practice. Journal of Financial Management of Property and Construction, 14(1), pp. 79-89. ISSN 1366-4387
Maxwell, D A; Back, W E and Toon, J (1998) Optimization of crew configurations using activity-based costing. Journal of Construction Engineering and Management, 124(2), pp. 162-168. ISSN 0733-9364
Mbachu, A and Frei, M (2011) Diagnosing the strategic health of an organization from SWOT analysis results: Case study of the Australasian cost management profession. Construction Management and Economics, 29(3), pp. 287-303. ISSN 1466433X
McAnulty, S and Baroudi, B (2010) Construction challenges in remote Australian locations. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
McDonald, P R (1984) Construction claims costing for owners and contractors. Construction Management and Economics, 2(1), pp. 1-12. ISSN 01446193
McLellan, R (1994) The use of project management procedures by construction contractors. PhD thesis, University of Strathclyde, UK.
McMahon, P; Dawood, N N and Hobbs, B (1998) The utilization of it for managing ground information and optimizing earthworks. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
McMahon, P; Dawood, N N and Hobbs, B (1999) Development of an integrated ground modelling system. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
McQuillen, J L and Gary Hicks, R (1987) Construction of rubber-modified asphaut pavements. Journal of Construction Engineering and Management, 113(4), pp. 537-553. ISSN 0733-9364
Mellado, F; Wong, P F; Amano, K; Johnson, C and Lou, E C W (2020) Digitisation of existing buildings to support building assessment schemes: Viability of automated sustainability-led design scan-to-BIM process. Architectural Engineering and Design Management, 16(2), pp. 84-99. ISSN 1745-2007
Melo, Reymard Savio Sampaio de (2015) Guidelines for target costing introduction in the real estate products development proces. PhD thesis, Universidade Estadual de Campinas, Brazil.
Meng X, H F (2013) The application of whole life costing in PFI/PPP projects. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Michell, K; Bowen, P and Cattell, K (2007) Modeling the design team as a temporary management structure: Reality versus theory. Construction Economics and Building, 7(1), pp. 19-28. ISSN 2204-9029
Miller, J B (1995) Aligning infrastructure development strategy to meet current public needs. PhD thesis, Massachusetts Institute of Technology, USA.
Minato, T (1994) A methodology for project risk control: A work package-based approach using historical cost control data. PhD thesis, University of California, Berkeley, USA.
Minelli, P (2020) Improved methods for managing megaprojects. PhD thesis, Massachusetts Institute of Technology, USA.
Mohamed, Yamen (2023) Adopting modern methods of construction in low-income housing projects in Egypt. PhD thesis, London South Bank University, UK.
Mohammad Al-Naghi, A; Alaghbari, W and Barakat, T (2025) Impact of leadership skills on the success of large and medium construction projects management in Yemen. International Journal of Construction Management, 25(11), pp. 1346-1356. ISSN 1562-3599
Monyane, T G (2019) "A lean-led-evaluation" of infrastructure development improvement programme in South Africa. PhD thesis, Nelson Mandela University, South Africa.
Morrison, N (1984) The accuracy of quantity surveyors' cost estimating. Construction Management and Economics, 2(1), pp. 57-75. ISSN 01446193
Morrison, S; Callaghan, N; Tong, M and Thomson, C (2022) Quantity surveyors incorporating circularity at early project design stage: A literature review. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.
Moses, T; Heesom, D and Oloke, D (2020) Implementing 5D BIM on construction projects: Contractor perspectives from the UK construction sector. Journal of Engineering, Design and Technology, 18(6), pp. 1867-1888. ISSN 1726-0531
Mulu, T and Smith, N J (2008) Innovative road infrastructure financing in Jamaica and the developing countries. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Nabil, A (2016) P.A.L.M. - physical asset lifecycle modelling in the healthcare sector. PhD thesis, University College London, UK.
Naderi, M; Nazari, A; Shafaat, A and Abrishami, S (2025) Enhancing accuracy in construction overhead cost estimation: A novel integration of activity-based costing and building information modelling. Smart and Sustainable Built Environment, 14(3), pp. 758-775. ISSN 2046-6099
Nahvi, A (2019) Integrated stochastic economics performance evaluation of horizontal infrastructure systems. PhD thesis, Iowa State University, USA.
Nasereddin, M (2019) Conceptual tactical framework for optimizing whole-life cost of sustainable buildings in Jordan. PhD thesis, Loughborough University, UK.
Nassar, K M; Nassar, W M and Hegab, M Y (2005) Evaluating cost overruns of asphalt paving project using statistical process control methods. Journal of Construction Engineering and Management, 131(11), pp. 1173-1178. ISSN 0733-9364
Navon, R (1995) Economic benefits of lightweight versus conventional construction methods. Journal of Construction Engineering and Management, 121(1), pp. 27-36. ISSN 0733-9364
Navon, R and Arkin, H (1993) Economic comparison of an air-conditioner and a desert cooler for residences in arid areas. Construction Management and Economics, 11(1), pp. 62-70. ISSN 01446193
Ndoni, D and Elhag, T M S (2012) Improving project performance of PPP/PFI project-based organisations. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Newton, S (1983) Analysis of construction economics: a cost simulation model. PhD thesis, University of Strathclyde, UK.
Ng, S T; Cheung, S O; Skitmore, M and Wong, T C Y (2004) An integrated regression analysis and time series model for construction tender price index forecasting. Construction Management and Economics, 22(5), pp. 483-493. ISSN 01446193
Nguyen, H V (2010) Process-based cost modeling to support target value design. PhD thesis, University of California, Berkeley, USA.
Nguyen, N; Almarri, K and Boussabaine, H (2021) A risk-adjusted decoupled-net-present-value model to determine the optimal concession period of BOT projects. Built Environment Project and Asset Management, 11(1), pp. 4-21. ISSN 2044-124X
Nguyen Ngoc, H; Mohammed Abdelkader, E; Al-Sakkaf, A; Alfalah, G and Zayed, T (2024) A hybrid AHP-MAUT model for assessing competitiveness of construction companies: A case study of construction companies in Vietnam and Canada. Construction Innovation, 24(5), pp. 1320-1353. ISSN 1471-4175
Niknam, M (2015) A semantics-based approach to construction cost estimating. PhD thesis, Marquette University, USA.
Ning, X; Shan, M; Li, Z and Nie, Z (2025) Prediction of construction material prices based on the sliding window catboost model. Journal of Construction Engineering and Management, 151(12): 04025196, ISSN 0733-9364
O'Brien, W J (1998) Capacity costing approaches for construction supply-chain management. PhD thesis, Stanford University, USA.
O'Brien, W J and Fischer, M A (2000) Importance of capacity constraints to construction cost and schedule. Journal of Construction Engineering and Management, 126(5), pp. 366-373. ISSN 0733-9364
Obi, L; Arif, M and Goulding, J (2020) Low-cost housing: A cost management model for process integration and evaluation. Architectural Engineering and Design Management, 16(6), pp. 411-425. ISSN 1745-2007
Obi, L I (2017) Development of a system model for cost management in low-cost housing projects in Nigeria. PhD thesis, University of Salford, UK.
Obi, L I; Arif, M; Awuzie, B; Islam, R; Gupta, A D and Walton, R (2021) Critical success factors for cost management in public-housing projects. Construction Innovation, 21(4), pp. 625-647. ISSN 1471-4175
Obi, L I; Arif, M and Kulonda, D J (2017) Prioritizing cost management system considerations for Nigerian housing projects. Journal of Financial Management of Property and Construction, 22(2), pp. 135-153. ISSN 1366-4387
Oduro Asamoah, R; Offei-Nyako, K and Twumasi-Ampofo, K (2023) Relative importance of triggers influencing cost contingency determination for building contracts: the perspective of quantity surveyors. International Journal of Construction Management, 23(5), pp. 790-798. ISSN 1562-3599
Oduyemi, O; Okoroh, M and Dean, A (2014) Barriers to life cycle costing usage. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Oduyemi, O; Okoroh, M and Dean, A (2015) Developing an artificial neural network model for life cycle costing in buildings. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Oduyemi, O I (2015) Life cycle costing methodology for sustainable commerical office buildings. PhD thesis, University of Derby, UK.
Ogunlana, S O (1989) Accuracy in design cost estimating. PhD thesis, Loughborough University, UK.
Ogunsemi, D R and Jagboro, G O (2006) Time-cost model for building projects in Nigeria. Construction Management and Economics, 24(3), pp. 253-258. ISSN 01446193
Ojo, A; Ogunsina, O and Ogunsemi, D R (2022) Assessment of cost management practices of civil engineering (project procurement) organisations in ondo state, Nigeria. Journal of Financial Management of Property and Construction, 27(1), pp. 57-75. ISSN 1366-4387
Oke, A E; Ogunsemi, D R and Adeyelu, M (2019) Quadrant and gap analysis of required and exhibited quantity surveyors’ competencies. Journal of Engineering, Design and Technology, 17(6), pp. 1161-1173. ISSN 1726-0531
Olatunji, O A; Orundami, A O and Ogundare, O (2018) Causal relationship between material price fluctuation and project's outturn costs. Built Environment Project and Asset Management, 8(4), pp. 358-371. ISSN 2044-124X
Olatunji, S O; Olawumi, T O and Aje, I O (2017) Rethinking partnering among quantity-surveying firms in Nigeria. Journal of Construction Engineering and Management, 143(11): 05017018, ISSN 0733-9364
Oliva, Carolina Asensio (2019) Target value design in the real estate market with units for sale: Model and guidelines for implementation. PhD thesis, Universidade Estadual de Campinas, Brazil.
Omotayo, D T; Tan, S W and Ekundayo, D (2023) Sustainable construction and the versatility of the quantity surveying profession in Singapore. Smart and Sustainable Built Environment, 12(2), pp. 435-457. ISSN 2046-6099
Omotayo, T S (2017) Strategic realignment of the post-contract cost control process in the Nigerian construction industry using kaizen. PhD thesis, University of Salford, UK.
Onalaja, A A (2023) Improving costing in infrastructure projects to accommodate uncertainties. PhD thesis, Northumbria University, UK.
Opawole, A; Babatunde, S O; Kajimo-Shakantu, K and Ateji, O A (2020) Analysis of barriers to the application of life cycle costing in building projects in developing countries: A case of Nigeria. Smart and Sustainable Built Environment, 9(4), pp. 503-521. ISSN 2046-6099
Opoku, A and Ahmed, V (2014) Embracing sustainability practices in UK construction organizations: Challenges facing intra-organizational leadership. Built Environment Project and Asset Management, 4(1), pp. 90-107. ISSN 2044-124X
Opoku, A and Fortune, C (2011) The implementation of sustainable practices through leadership in construction organizations. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Osman, H M and El-Diraby, T E (2011) Knowledge-enabled decision support system for routing urban utilities. Journal of Construction Engineering and Management, 137(3), pp. 198-213. ISSN 0733-9364
Osunsanmi, T O; Gillies-Denning, E; Khaddour, L A; Olawumi, T O and Moobela, C (2025) Framework for the UK construction industry transition to net zero design: a Delphi techniques and structural equation model approach. International Journal of Construction Management, 25(5), pp. 495-509. ISSN 1562-3599
Otegbulu, A C and N.Onukwube, H (2007) Enhancing real estate investment through tero- value technology. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Oteng-Abayie, E F and Dramani, J B (2019) Time-frequency domain causality of prime building cost and macroeconomic indicators in Ghana: Implications for project selection. Construction Management and Economics, 37(5), pp. 243-256. ISSN 01446193
Oti, A H (2014) Building information modelling for sustainability appraisal of conceptual design of steel-framed buildings. PhD thesis, University of Nottingham, UK.
Oti, A H; Farrell, P; Abanda, F H; McMahon, P; Mahamadu, A M; Mzyece, D; Akintola, A A and Prinja, N (2022) A BIM-driven framework for integrating rules and regulations in the decommissioning of nuclear power plants. Construction Innovation, 22(4), pp. 809-830. ISSN 1471-4175
Owoyemi, J A (2018) Performance evaluation of higway transportation design-build project delivery: A case study. PhD thesis, University of Maryland, College Park, USA.
Owusu-Manu, D-G; John, E D; Adesi, M; Badu, E and Love, P E D (2016) Attaining fairness in construction cost consultancy pricing services: A case study in Ghana. Journal of Engineering, Design and Technology, 14(4), pp. 699-712.
Oyegoke, A S; Powell, R; Ajayi, S; Godawatte, G A G R and Akenroye, T (2022) Factors affecting the selection of effective cost control techniques in the UK construction industry. Journal of Financial Management of Property and Construction, 27(2), pp. 141-160. ISSN 1366-4387
Oyenubi, A. and Oyeyipo, O. O. (2026) Overcoming GenAI adoption barriers in construction cost management: Evidence from Nigeria. Construction Innovation, pp. 1-26. ISSN 1471-4175
Pan, W (2006) A decision support tool for optimising the use of offsite technologies in housebuilding. PhD thesis, Loughborough University, UK.
Pan, W; Gibb, A F and Dainty, A R J (2007) Perspective of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25(2), pp. 183-194. ISSN 1466433X
Pan, W; Gibb, A G F and Dainty, A R J (2008) Leading UK housebuilders' utilization of offsite construction methods. Building Research & Information, 36(1), pp. 56-67. ISSN 0961-3218
Pan, W; Gibb, A G F and Sellars, A B (2008) Maintenance cost implications of utilizing bathroom modules manufactured offsite. Construction Management and Economics, 26(10), pp. 1067-1077. ISSN 1466433X
Panopoulos, G D (2003) Economic aspects of safety in the Greek construction industry. PhD thesis, Aston University, UK.
Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Panwar, A and Jha, K N (2017) Trade-off between life cycle cost and greenhouse gas emission in construction projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Park, A and Chang, C Y (2013) Impacts of construction events on the project equity value of the Channel Tunnel project. Construction Management and Economics, 31(3), pp. 223-237. ISSN 1466433X
Pasqual, I R and Ekanayake, L (2025) Win–win approach to subcontracting in building construction: Sri Lankan perspective. Construction Economics and Building, 25(3-4), pp. 339-357. ISSN 2204-9029
Pasquire, C L and Gibb, A G F (2002) Considerations for assessing the benefits of standardisation and pre-assembly in construction. Journal of Financial Management of Property and Construction, 7(3), pp. 151-162. ISSN 1366-4387
Patel, M; Sherratt, F and Farrell, P (2012) Exploring human error through the safety talk of utilities distribution operatives. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Pendlebury, M C (2000) Techniques and strategies to improve conceptual and schematic design. PhD thesis, Loughborough University, UK.
Perera, A A D A J and Imriyas, K (2004) An integrated construction project cost information system using MS accesstm and MS projecttm. Construction Management and Economics, 22(2), pp. 203-211. ISSN 01446193
Petroutsatou, K; Georgopoulos, E; Lambropoulos, S and Pantouvakis, J P (2012) Early cost estimating of road tunnel construction using neural networks. Journal of Construction Engineering and Management, 138(6), pp. 679-687. ISSN 0733-9364
Phillips, S; Dainty, A and Price, A (2007) The development of a tender analysis support tool for use in social housing best value procurement. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Polson, D R (2020) Assessment of applications of optimisation to building design and energy modelling. PhD thesis, University of London, University College London, UK.
Poon, J L K (2001) Development of a process model for the design stage of building projects. PhD thesis, University of Wolverhampton, UK.
Potseluyko Amobi, L (2021) Improving business and technical operations within timber frame self-build housing sector by applying integrated VR/AR and BIM technologies. PhD thesis, Teesside University, UK.
Pout, C and Hitchin, E R (2009) Future environmental impacts of room air-conditioners in Europe. Building Research & Information, 37(4), pp. 358-368. ISSN 0961-3218
Praticò, F G and Giunta, M (2018) Proposal of a key performance indicator for railway track based on LCC and rams analyses. Journal of Construction Engineering and Management, 144(2): 04017104, ISSN 0733-9364
Preston, M E (1980) A concrete mixing system: market analysis, design and testing. PhD thesis, Loughborough University, UK.
Priyan, P.; Le, A.; Domingo, N. and To, T. H. Q. (2026) Zero-carbon refurbishment: Current practices and attitudes from a New Zealand interview study. International Journal of Building Pathology and Adaptation, 44(3), pp. 583-598. ISSN 2398-4708
Pryke, Stephen David (2002) UK construction in transition: developing a social network approach to the evaluation of new procurement and management strategies. PhD thesis, University College London, UK.
Pulaski, M H (2005) The alignment of sustainability and constructability: A continuous value enhancement process. PhD thesis, Pennsylvania State University, USA.
Quagraine, V K (2007) New strategies to improve the management capacity of contractors for labor-based methods in road rehabilitation in Ghana. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Quigley, D; Perara, S and Heaney, G (2007) Identifying the optimum balance across capital, life-cycle and environmental costs in new build construction projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Rahman, Muzibur (2022) Constructors' decision-support framework for nzeb projects. PhD thesis, Oklahoma State University, USA.
Rahman, S; Perera, S; Odeyinka, H and Bi, Y (2009) A knowledge-based decision support system for roofing materials selection and cost estimating: A conceptual framework and data modelling. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Raisbeck, P (2008) Perceptions of architectural design and project risk: Understanding the architects' role in a PPP project. Construction Management and Economics, 26(11), pp. 1145-1157. ISSN 1466433X
Raisbeck, P and Aibinu, A A (2010) Early stage cost estimation and the relationship of architects to quantity surveyors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Raisbeck, P; Millie, R and Maher, A (2010) Assessing integrated project delivery: A comparative analysis of IPD and alliance contracting procurement routes. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Rathnayaka, L S D; Malsha Nadeetharu, B K and Kulatunga, U (2024) Applicability of electronic document management system (EDMS) for the cost management of mega construction projects in Sri Lanka. Journal of Financial Management of Property and Construction, 29(2), pp. 314-330. ISSN 1366-4387
Rauscher, Kimberly (2024) Successful strategies government executive stakeholders use to mitigate higher project costs and user adoption failure rates. DBA thesis, Walden University, USA.
Raynsford, N (1999) The UK's approach to sustainable development in construction. Building Research & Information, 27(6), pp. 419-423. ISSN 0961-3218
Rehm, M and Ade, R (2013) Construction costs comparison between green and conventional office buildings. Building Research & Information, 41(2), pp. 198-208. ISSN 0961-3218
Riverso, M E (1984) A life cycle cost system for value engineering in building design and construction (economic, cost-codes, database). PhD thesis, Purdue University, USA.
Roberts, C J; Edwards, D J; Hosseini, M R; Mateo-Garcia, M and Owusu-Manu, D G (2019) Post-occupancy evaluation: A review of literature. Engineering, Construction and Architectural Management, 26(9), pp. 2084-2106. ISSN 0969-9988
Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.
Robson, A; Boyd, D and Thurairajah, N (2015) Are contractors' cost accounting practices up to the job of establishing improvement in site operations? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Robson, A; Boyd, D and Thurairajah, N (2016) Studying 'cost as information' to account for construction improvements. Construction Management and Economics, 34(6), pp. 418-431. ISSN 01446193
Rogan, A (1999) Inter-organisational relationships in the construction process. PhD thesis, University of the West of England, Bristol, UK.
Rosli, M F; Muhammad Tamyez, P F and Zahari, A R (2023) The effects of suitability and acceptability of lean principles in the flow of waste management on construction project performance. International Journal of Construction Management, 23(1), pp. 114-125. ISSN 1562-3599
Ross, A (2011) Supply chain management in an uncertain economic climate: A UK perspective. Construction Innovation, 11(1), pp. 5-13. ISSN 1471-4175
Ross, A and Goulding, J (2007) Supply chain transactional barriers to design cost management. Construction Innovation, 7(3), pp. 274-287. ISSN 1471-4175
Ruegg, R T and Fuller, S K (1985) The economics of fire protection: Fast-response residential sprinklers. Construction Management and Economics, 3(1), pp. 43-57. ISSN 01446193
Ruiz, J A; Granja, A D and Kowaltowski, D C C K (2014) Cost reallocation in social housing projects considering the desired values of end-users. Built Environment Project and Asset Management, 4(4), pp. 352-367. ISSN 2044-124X
Russell, J S; Gugel, J G and Radtke, M W (1994) Comparative analysis of three constructability approaches. Journal of Construction Engineering and Management, 120(1), pp. 180-195. ISSN 0733-9364
Rwelamila, P D and Hall, K A (1995) Total systems intervention: An integrated approach to time, cost and quality management. Construction Management and Economics, 13(3), pp. 235-241. ISSN 01446193
Sacks, A; Nisbet, A; Ross, J and Harinarain, N (2012) Life cycle cost analysis: A case study of Lincoln on the Lake. Journal of Engineering, Design and Technology, 10(2), pp. 228-254. ISSN 1726-0531
Said, H. and Cao, J. (2026) Optimizing building prefabrication strategies by balancing modularity and complicatedness. Journal of Construction Engineering and Management, 152(7): 04026097, ISSN 0733-9364
Sajid, Z W; Khan, S A; Hussain, F; Ullah, F; Khushnood, R A and Soliman, N (2026) Assessing economic and environmental performance of infill materials through BIM: A life cycle approach. Smart and Sustainable Built Environment, 15(1), pp. 9-39. ISSN 2046-6099
Salama, M A (2011) The relationship between the performance of the economy and the costing of building projects: a case study of school buildings in Egypt. PhD thesis, Heriot-Watt University, UK.
Salvado, F; Almeida, N and Vale e Azevedo, A (2020) Aligning financial and functional equivalent depreciations rates of building assets. Engineering, Construction and Architectural Management, 27(2), pp. 441-457. ISSN 0969-9988
Samuels, A F and Bruder, M J (1996) Construction representative: Scheduling and cost management. Journal of Construction Engineering and Management, 122(3), pp. 281-290. ISSN 0733-9364
Sarhan, S (2018) Institutional waste within the UK construction industry: an exploratory study. PhD thesis, Nottingham Trent University, UK.
Saridaki, M and Haugbølle, K (2020) Informing early stage design through LCC data. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Schexnayder, C J J (1980) Heavy construction equipment replacement economics. PhD thesis, Purdue University, USA.
Scott, D (1984) Economic evaluation of minor roading projects. Construction Management and Economics, 2(1), pp. 77-90. ISSN 01446193
Scott, J; Deveci, G; Edge, M and Martin, P (2004) Towards zero-heating: Affordable models for environmentally friendly housing in Scotland. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Senanayake, S M A H; Gunawardana, P A M; Perera, B A K S and Rajaratnam, D (2024) Examining the potential use of augmented reality in construction cost management tools and techniques. Journal of Engineering, Design and Technology, 22(6), pp. 1847-1869. ISSN 1726-0531
Serpell, A F (2004) Towards a knowledge-based assessment of conceptual cost estimates. Building Research & Information, 32(2), pp. 157-164. ISSN 0961-3218
Serugga, J; Kagioglou, M; Edwards, D; Talebi, S and Johns, N (2024) Key influences to cost modelling and analysis in off-site construction: Research trends and gap analysis. Architectural Engineering and Design Management, 20(6), pp. 1335-1356. ISSN 1745-2007
Seydel, J and Olson, D L (1990) Bids considering multiple criteria. Journal of Construction Engineering and Management, 116(4), pp. 609-623. ISSN 0733-9364
Shah, K L (1969) Techniques for estimating construction costs of waste treatment plants. PhD thesis, University of Oklahoma, USA.
Shah, R K; Dawood, N; Dean, J and Castro, S (2009) A virtual construction model of 4d planning in road project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Shahbodaghlou, F (1987) A feasibility model for use of weather protection in cold region construction. PhD thesis, Purdue University, USA.
Shahedi, F. and Abrishami, S. (2026) Adaptive construction scheduling with AI in 4D/5D BIM: Integrating weather data and activity-based costing. Smart and Sustainable Built Environment, pp. 1-15. ISSN 2046-6099
Shapira, A (1995) Rational design of shoring-tower-based formwork. Journal of Construction Engineering and Management, 121(3), pp. 255-260. ISSN 0733-9364
Sharma, N and Laishram, B (2025) Decoding the emergent patterns of cost of quality through the lens of sociotechnical systems: A bibliometric analysis. Journal of Construction Engineering and Management, 151(4): 03125002, ISSN 0733-9364
Sheamar, S; Wedawatta, G; Tennakoon, M; Palliyaguru, R and Antwi-Afari, M F (2024) The potential of new models of construction procurement to counter cost overruns in construction projects: An exploratory study from a contractors' perspective. Journal of Financial Management of Property and Construction, 29(2), pp. 211-228. ISSN 1366-4387
Shehu, Z; Holt, G D; Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), pp. 52-68. ISSN 2044-124X
Shi, Y and Collinge, W (2021) Inter-organisational collaboration in megaprojects: A dynamic model of collaborative and opportunistic behaviour. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Shohet, I M and Paciuk, M (2004) Service life prediction of exterior cladding components under standard conditions. Construction Management and Economics, 22(10), pp. 1081-1090. ISSN 01446193
Shohet, I M and Puterman, M (2004) Flat roofing systems: Towards integrated techno-economic analysis. Building Research & Information, 32(2), pp. 165-173. ISSN 0961-3218
Shrestha, K (2023) Cost comparison of highway rest area operations: In-house workforce versus outsourcing methods. Journal of Construction Engineering and Management, 149(8): 04023062, ISSN 0733-9364
Shrestha, K; Shrestha, P P and Lidder, M (2019) Life-cycle cost comparison of chip seal and striping: In-house workers versus private contractors. Engineering, Construction and Architectural Management, 26(6), pp. 927-944. ISSN 0969-9988
Sidwell, N C (1957) A critical examination of new constructional techniques and their influence on productivity in the building industry, with special reference to housing in south-east Scotland. PhD thesis, University of Edinburgh, UK.
Sinfield, J V and Einstein, H H (1998) Tunnel construction costs for tube transportation systems. Journal of Construction Engineering and Management, 124(1), pp. 48-57. ISSN 0733-9364
Sloan, B; McLeod, B N; Smith, R M and Goodall, W L (1996) A functional cost approach in the development and use of a project budget cost limit estimator (PBCLE) for capitol building works. Journal of Financial Management of Property and Construction, 1(1), pp. 89-100. ISSN 1366-4387
Smith, J; Georgiou, J; O’Keeffe, N and Love, P (2003) Design management in a design-construct organization. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.
Son, J; Khwaja, N and Milligan, D S (2019) Planning-phase estimation of construction time for a large portfolio of highway projects. Journal of Construction Engineering and Management, 145(4): 04019018, ISSN 0733-9364
Son, P V H and Hieu, H T (2023) Logistics model for precast concrete components using novel hybrid ant lion optimizer (ALO) algorithm. International Journal of Construction Management, 23(9), pp. 1560-1570. ISSN 1562-3599
Sonmez, R (2004) Selection of a probability distribution function for construction cost estimation. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Souchoroukov, P (2004) Improvement of cost estimating internal practice. PhD thesis, Cranfield University, UK.
Spencer, G R (1987) Integration of cost estimating with critical path scheduling. PhD thesis, Oklahoma State University, USA.
Standing, N A (1999) Value engineering and the contractor. PhD thesis, University of Leeds, UK.
Stanley, R and Thurnell, D (2014) The benefits of, and barriers to, implementation of 5D BIM for quantity surveying in New Zealand. Construction Economics and Building, 14(1), pp. 105-117. ISSN 2204-9029
Staub-French, S A (2002) Feature-driven activity-based cost estimating. PhD thesis, Stanford University, USA.
Sterner, E (2000) Life-cycle costing and its use in the Swedish building sector. Building Research & Information, 28(5-6), pp. 387-393. ISSN 0961-3218
Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost. PhD thesis, Luleå University of Technology, Sweden.
Stride, M; Hon, C K H; Liu, R and Xia, B (2020) The use of building information modelling by quantity surveyors in facilities management roles. Engineering, Construction and Architectural Management, 27(8), pp. 1795-1812. ISSN 0969-9988
Suckarieh, G (1984) Construction management control with microcomputers. Journal of Construction Engineering and Management, 110(1), pp. 72-78. ISSN 0733-9364
Sumanohar, Symon (2022) Statistical approach towards complexities resolution for design, building, and operation of data centers. DBA thesis, American Business Management and Technology College, Switzerland.
Sundararajan, S K and Tseng, C L (2017) Managing project performance risks under uncertainty: Using a dynamic capital structure approach in infrastructure project financing. Journal of Construction Engineering and Management, 143(8): 04017046, ISSN 0733-9364
Swaffield, L M and McDonald, A M (2008) The contractor's use of life cycle costing on PFI projects. Engineering, Construction and Architectural Management, 15(2), pp. 132-148. ISSN 0969-9988
Swaffield, L M and Pasquire, C L (1996) A critique of mechanical and electrical services cost planning: Existing methods and published information. Journal of Financial Management of Property and Construction, 1(3), pp. 23-42. ISSN 1366-4387
Swaffield, L M and Pasquire, C L (2000) Improving early cost advice for mechanical and electrical services by considering functions and client/design team communication. Journal of Financial Management of Property and Construction, 5(1-2), pp. 3-13. ISSN 1366-4387
Sweetnam, T; Spataru, C; Barrett, M and Carter, E (2019) Domestic demand-side response on district heating networks. Building Research & Information, 47(4), pp. 330-343. ISSN 0961-3218
Sällström Eriksson, L and Lidelöw, S (2025) Maintaining or replacing a building's windows: A comparative life cycle study. International Journal of Building Pathology and Adaptation, 43(4), pp. 766-786. ISSN 2398-4708
Tabatabai-Gargari, M and Elzarka, H M (1998) Integrated CAD/KBS approach for automating preconstruction activities. Journal of Construction Engineering and Management, 124(4), pp. 257-262. ISSN 0733-9364
Tadayon, M; Jaafar, M and Nasri, E (2012) An assessment of risk identification in large construction projects in Iran. Journal of Construction in Developing Countries, 17(S1), pp. 57-69. ISSN 1823-6499
Taheriattar, Reza (2018) Sustainability and adaptable/flexible infrastructure. PhD thesis, University of New South Wales, Australia.
Tam, V W Y and Le, K N (2008) On using the Gaussian and hyperbolic distributions to improve quality in construction. Journal of Engineering, Design and Technology, 6(2), pp. 112-123. ISSN 1726-0531
Tam, V W Y; Le, K N and Le, H N (2008) Using Gaussian and hyperbolic distributions for quality improvement in construction: Case study approach. Journal of Construction Engineering and Management, 134(7), pp. 555-561. ISSN 0733-9364
Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.
Tanko, B. L.; Oakley, J. T.; Jagun, Z. and Madanayake, U. (2026) Comparing 5D BIM costs: Stilt housing against conventional housing for flood management. Journal of Engineering, Design and Technology, 24(2), pp. 361-383. ISSN 1726-0531
Tavafzadeh Haghi, N; Ahmadian Nezhad Monfared, M; Hashemian, L and Bayat, A (2019) Capital cost comparison of pavements comprised of insulation layers: Case study in Edmonton, Canada. Journal of Construction Engineering and Management, 145(7): 04019038, ISSN 0733-9364
Taylor, M S (2021) Strategic management accounting practices in medium sized UK construction companies: a mixed-methods approach. PhD thesis, Nottingham Trent University, UK.
Taylor, R G and Bowen, P A (1987) Building price-level forecasting: An examination of techniques and applications. Construction Management and Economics, 5(1), pp. 21-44. ISSN 01446193
Tembo, C K; Muleya, F and Kanyemba, A (2024) An appraisal of cost management techniques used in the construction industry. International Journal of Construction Management, 24(1), pp. 10-18. ISSN 1562-3599
Tetteh, P A; Osei-Kyei, R and Tam, V W Y (2025) Strategies for sustainable financing of circular infrastructure projects: A systematic review. Construction Innovation, 25(7), pp. 235-267. ISSN 1471-4175
Theodorakopoulos, T F (2017) Integrated cost management system for delivering construction projects. PhD thesis, Loughborough University, UK.
Tochukwu, M G (2018) The development of 5D BIM framework to facilitate costing in contractor-led projects. PhD thesis, University of Wolverhampton, UK.
Toh, S C L; Wong, S Y and Ding, C S (2026) The impact of artificial intelligence on the quantity surveying profession in sarawak, Malaysia. Journal of Engineering, Design and Technology, 24(1), pp. 171-192. ISSN 1726-0531
Tokede, O. O.; Weththasinghe, K. K.; Kumer Shill, S.; Wijayasundara, M. and Subhani, M. (2025) Comparative evaluation of different material options for moment-resisting framing systems in buildings. Architectural Engineering and Design Management, 21(6), pp. 1541-1561. ISSN 1745-2007
Tokede, O and Ahiaga-Dagbui, D (2016) Evaluating the whole-life cost implication of revocability and disruption in office retrofit building projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Tokede, O; Udawatta, N and Luther, M (2018) Retrofitting heritage office buildings in the UK: A case study. Built Environment Project and Asset Management, 8(1), pp. 39-50. ISSN 2044-124X
Tokede, O O (2016) Developing whole-life cost models for retrofit options in office buildings. PhD thesis, Edinburgh Napier University, UK.
Tokede O, S B B A (2013) Preserving continuity in whole-life cost models for net-zero carbon buildings. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Tomlinson, J (1998) A premises occupancy cost forecasting model. PhD thesis, University of Liverpool, UK.
Torcellini, P; Pless, S and Leach, M (2014) A pathway for net-zero energy buildings: Creating a case for zero cost increase. Building Research & Information, 43(1), pp. 25-33. ISSN 0961-3218
Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364
Tran, H; Robert, D; Gunarathna, P and Setunge, S (2024) Estimating cost of bridge closure for bridge network rehabilitation priorities. Journal of Construction Engineering and Management, 150(7): 04024071, ISSN 0733-9364
Trost, S M (1998) A quantitative model for predicting the accuracy of early cost estimates for construction projects in the process industry. PhD thesis, Oklahoma State University, USA.
Trost, S M and Oberlender, G D (2003) Predicting accuracy of early cost estimates using factor analysis and multivariate regression. Journal of Construction Engineering and Management, 129(2), pp. 198-204. ISSN 0733-9364
Tunji-Olayeni, P F; Mosaku, T O; Fagbenle, O I and Amusan, L M (2016) Project management competencies of indigenous contractors in Nigeria. African Journal of Built Environment Research, 1(1), pp. 49-58. ISSN 2414-0236
Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.
Upadhyay, A K and Jain, K (2016) Modularity in nuclear power plants: A review. Journal of Engineering, Design and Technology, 14(3), pp. 526-542.
Van Noortwijk, J M (1996) Optimal maintenance decisions for hydraulic structures under isotropic deterioration. PhD thesis, Delft University of Technology, Netherlands.
Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.
Vereen, S C; Rasdorf, W and Hummer, J E (2016) Development and comparative analysis of construction industry labor productivity metrics. Journal of Construction Engineering and Management, 142(7): 4016020, ISSN 0733-9364
Victar, H C; Perera, B A K S; Palihakkara, A D and Dewagod, K G (2024) Roles and competencies of quantity surveyors in achieving a circular built environment: An investigation according to 3r principles. Smart and Sustainable Built Environment, 13(4), pp. 1015-1040. ISSN 2046-6099
Victoria, M; Perera, S and Davies, A (2015) Developing an early design stage embodied carbon prediction model: A case study. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Victoria, M F (2017) Developing decision support models for early stage embodied carbon management in buildings. PhD thesis, Northumbria University, UK.
Victoria, M F; Perera, S; Davies, A and Fernando, N (2017) Carbon and cost critical elements: A comparative analysis of two office buildings. Built Environment Project and Asset Management, 7(5), pp. 460-470. ISSN 2044-124X
Wachira, N; Root, D; Bowen, P and Olima, W (2008) Changing craft skills in the Kenyan construction sector. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Wallace, W A (1987) Capital costs versus costs-in-use: A content analysis of design team member communication patterns. Construction Management and Economics, 5(4), ISSN 01446193
Wamuziri, Sam (2026) Risk mitigation strategies in financing renewable energy projects in Sub-Saharan Africa. Journal of Construction Business and Management, 8(S1), pp. 62-71. ISSN 2521-0165
Wang, J and Lu, W (2022) A deployment framework for BIM localization. Engineering, Construction and Architectural Management, 29(1), pp. 407-430. ISSN 0969-9988
Wang, M (2014) Sensitivity analysis and evolutionary optimization for building design. PhD thesis, Loughborough University, UK.
Wang, Y; Zuo, J; Pan, M; Tu, B; Chang, R D; Liu, S; Xiong, F and Dong, N (2024) Cost prediction of building projects using the novel hybrid RA-ANN model. Engineering, Construction and Architectural Management, 31(6), pp. 2563-2582. ISSN 0969-9988
Wanigarathna, N; Jones, K; Pascale, F; Morga, M and Meslem, A (2023) Cost–benefit analysis to appraise technical mitigation options for earthquake-induced liquefaction disaster events. Journal of Financial Management of Property and Construction, 28(2), pp. 220-241. ISSN 1366-4387
Warszawski, A and Rosenfeld, Y (1994) Robot for interior-finishing works in building: Feasibility analysis. Journal of Construction Engineering and Management, 120(1), pp. 132-151. ISSN 0733-9364
Weerasinghe, A; Ramachandra, T and Rotimi, J O B (2016) A simplified model for predicting running cost of office buildings in Sri Lanka. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Weerasooriya, D; Ranadewa, K A T O and Perera, B A K S (2025) Facilitating the role of quantity surveyors through integration of cyber-physical systems. Journal of Engineering, Design and Technology, 23(3), pp. 871-894. ISSN 1726-0531
Whitely, Owen (2025) Strategies for reducing cost overruns on government-funded infrastructure projects in Jamaica. DBA thesis, Walden University, USA.
Wibowo, A (2006) CAPM-based valuation of financial government supports to infeasible and risky private infrastructure projects. Journal of Construction Engineering and Management, 132(3), pp. 239-248. ISSN 0733-9364
Wickramasinghe, V; Dias, P; Robert, D and Setunge, S (2024) From physical degradation condition ratings of building elements to lost value ratio bands. Built Environment Project and Asset Management, 14(6), pp. 858-873. ISSN 2044-124X
Wilkinson, S (1996) The current and potential use of life cycle costing in the New Zealand construction industry. Journal of Financial Management of Property and Construction, 1(3), pp. 43-52. ISSN 1366-4387
Willis, C J (2010) Measuring the performance of the construction industry through the use of project performance benchmarking metrics in conjunction with maturity modeling. PhD thesis, University of New Brunswick, Canada.
Willis, C J and Rankin, J H (2010) Measuring the maturity of Guyana's construction industry using the construction industry macro maturity model. Journal of Construction in Developing Countries, 15(2), pp. 87-116. ISSN 1823-6499
Windapo, A; Odediran, S; Moghayedi, A; Adediran, A and Oliphant, D (2017) Determinants of building construction costs in South Africa. Journal of Construction Business and Management, 1(1), pp. 8-13. ISSN 2521-0165
Wirahadikusumah, R and Abraham, D M (2003) Application of dynamic programming and simulation for sewer management. Engineering, Construction and Architectural Management, 10(3), pp. 193-208. ISSN 0969-9988
Wong, I L; Perera, S and Eames, P C (2010) Goal directed life cycle costing as a method to evaluate the economic feasibility of office buildings with conventional and TI-façades. Construction Management and Economics, 28(7), pp. 715-735. ISSN 1466433X
Wong, P S P; Holdsworth, S; Crameri, L and Lindsay, A (2019) Does carbon accounting have an impact on decision-making in building design? International Journal of Construction Management, 19(2), pp. 149-161. ISSN 1562-3599
Wood, B and Kenley, R (2004) The effectiveness of the bills of quantities in Australia. Journal of Construction Research, 5(2), pp. 291-309. ISSN 1609-9451
Wood, G; Davis, P; Eadie, R; Perera, S and Heaney, G (2011) Key process area mapping in the production of an e-capability maturity model for UK construction organisations. Journal of Financial Management of Property and Construction, 16(3), pp. 197-210. ISSN 1366-4387
Wuni, I Y; Shen, G Q P and Mahmud, A T (2022) Critical risk factors in the application of modular integrated construction: A systematic review. International Journal of Construction Management, 22(2), pp. 133-147. ISSN 1562-3599
Wyrick, D A and Eschenbach, T G (1989) Remote oil and gas facility construction. Journal of Construction Engineering and Management, 115(2), pp. 228-236. ISSN 0733-9364
Xiong, B; Newton, S; Li, V; Skitmore, M and Xia, B (2019) Hybrid approach to reducing estimating overfitting and collinearity. Engineering, Construction and Architectural Management, 26(10), pp. 2170-2185. ISSN 0969-9988
Xu, S; Liu, K and Tang, L C M (2015) Incorporation of expert reasoning into the BIM-based cost estimating process. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Xue, H; Zhang, S; Chen, J; Cong, W; Wu, G and Zhao, X (2024) Effects of organizational elements on emerging information and construction management technology implementation in building professionals: Moderating role of top management support. Journal of Construction Engineering and Management, 150(10): 04024123, ISSN 0733-9364
Yahya, K and Boussabaine, H (2010) Quantifying environmental impacts and eco-costs from brick waste. Architectural Engineering and Design Management, 6(3), pp. 189-206. ISSN 1745-2007
Yan, S (1992) Intermodal pricing and operations using network flow techniques. PhD thesis, Massachusetts Institute of Technology, USA.
Yang, R J and Zou, P X W (2016) Building integrated photovoltaics (BIPV): Costs, benefits, risks, barriers and improvement strategy. International Journal of Construction Management, 16(1), pp. 39-53. ISSN 1562-3599
Yao, M; Wang, F; Chen, Z and Ye, H (2020) Optimal incentive contract with asymmetric cost information. Journal of Construction Engineering and Management, 146(6): 04020054, ISSN 0733-9364
Yeo, K T (1982) A systems approach to cost management of large scale offshore oil projects. PhD thesis, University of Manchester, UK.
Yeung, D K L and Skitmore, M (2005) Data pooling for early-stage price forecasts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Yi, Yanqing (2025) New model for integration life cycle assessment and system dynamics to support the process of construction and demolition waste management. PhD thesis, Università degli Studi di Padova, Italy.
Yilmaz, S; Kumar, D; Hada, S; Demirkesen, S; Zhang, C and Li, H (2025) A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 25(8), pp. 861-875. ISSN 1562-3599
Ying, J F; Tookey, J and Roberti, J (2015) SCM competencies in construction: Issues and challenges in New Zealand. Journal of Engineering, Design and Technology, 13(4), pp. 522-538.
Yu, B (2007) Essays on structural analysis of procurement auctions. PhD thesis, Ohio State University, USA.
Zahed, S E; Shahooei, S; Farooghi, F; Shahandashti, M and Ardekani, S (2019) Life-cycle cost analysis of a short-haul underground freight transportation system for the DFW airport. Built Environment Project and Asset Management, 9(3), pp. 440-456. ISSN 2044-124X
Zhai, X; Reed, R and Mills, A (2014) Factors impeding the offsite production of housing construction in China: An investigation of current practice. Construction Management and Economics, 32(1-2), pp. 40-52. ISSN 01446193
Zhang, J and Jiang, S (2026) Review of artificial intelligence applications in construction management over the last five years. Engineering, Construction and Architectural Management, 33(1), pp. 361-379. ISSN 0969-9988
Zhang, X (2019) Application of queuing theory: A decision support model for construction companies in the implementation of 3D printing. PhD thesis, University of Florida, USA.
Zhang, Y; Liu, Y; Yu, R; Zuo, J and Dong, N (2025) Managing the high capital cost of prefabricated construction through stakeholder collaboration: A two-mode network analysis. Engineering, Construction and Architectural Management, 32(1), pp. 556-577. ISSN 0969-9988
Zhao, J (2014) Performance modeling and optimization solutions for networking systems. PhD thesis, University of Hong Kong, Hong Kong.
Zhou, J; Tam, V W Y; Qin, Y and Illankoon, C (2024) A critical review and comparative analysis of cost management on prefabricated construction research (2000–2022). International Journal of Construction Management, 24(9), pp. 997-1006. ISSN 1562-3599
Zhou, L and Lowe, D J (2004) Incorporating sustainable construction into PFI projects: An analysis of financial incentives and associated risks. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
de Lemos, T; Almeida, L; Betts, M and Eaton, D (2003) An examination on the sustainable competitive advantage of private finance initiative projects. Construction Innovation, 3(4), pp. 249-259. ISSN 1471-4175
de Melo, R S S; Do, D; Tillmann, P; Ballard, G and Granja, A D (2016) Target value design in the public sector: Evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(2), pp. 125-137. ISSN 1745-2007
fu, C; Kaya, S and Aouad, M K G (2007) The development of an IFC-based lifecycle costing prototype tool for building construction and maintenance: Integrating lifecycle costing to nD modelling. Construction Innovation, 7(1), pp. 85-98. ISSN 1471-4175
Up a level