International Journal of Construction Management - Volume 26

Number of items: 118.

Cheng, M Y; Vu, Q T and Aldo, A (2026) Automated BIM parametric design for optimal external wall tile planning. International Journal of Construction Management, 26(1), pp. 131-151. ISSN 1562-3599

AlTalhoni, A; Alwashah, Z; Liu, H; Abudayyeh, O; Kwigizile, V and Kirkpatrick, K (2026) Data-driven identification of key pricing factors in highway construction cost estimation during economic volatility. International Journal of Construction Management, 26(1), pp. 152-167. ISSN 1562-3599

Cândido, L F; Lima, S H D O and Machado Oliveira, F M (2026) Determinants of delay in small construction projects: Evidence from Brazil. International Journal of Construction Management, 26(1), pp. 168-184. ISSN 1562-3599

Sadeghi, J; Ahmadi, A and Phipps, R (2026) Internet of things in construction: Trends and adoption insights from a scientometric perspective. International Journal of Construction Management, 26(1), pp. 113-130. ISSN 1562-3599

Ombwayo, J; Kidombo, H and Gakuu, C (2026) Moderating influence of stakeholder involvement on the relationship between project management lifecycle and performance of slum upgrading projects: A case of Nairobi city county, Kenya. International Journal of Construction Management, 26(1), pp. 1-11. ISSN 1562-3599

Bosfield, R; Gibson, G E and Din, Z U (2026) Open repository development framework for knowledge sharing: Best practices in the architecture, engineering, and construction industry. International Journal of Construction Management, 26(1), pp. 12-28. ISSN 1562-3599

Lu, W; Du, L; Tam, V W Y; Feng, Q and Huo, L (2026) Sharing indexes and heterogeneity update of green building rating systems: Evidence of holistic comparative analysis. International Journal of Construction Management, 26(1), pp. 76-98. ISSN 1562-3599

Ottaviani, F M; De Marco, A; Narbaev, T and Ballesteros-Pérez, P (2026) Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, 26(1), pp. 99-112. ISSN 1562-3599

Safari, K and Ghandehariun, S (2026) An integrative BIM-based life cycle assessment framework to address uncertainties: A mixed-methods study under real construction project context. International Journal of Construction Management, 26(1), pp. 54-75. ISSN 1562-3599

Atiq Ur Rehman, M; Chaabane, A and Khan, S A (2026) A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: A case study in building renovation. International Journal of Construction Management, 26(1), pp. 29-53. ISSN 1562-3599

Zhang, J.; Saberian, M.; Roychand, R.; Li, J.; Li, C. Q.; Zhang, G. and Robert, D. (2026) Carbon footprint reduction in concrete using spent coffee grounds biochar: A life cycle perspective. International Journal of Construction Management, 26(10), pp. 2137-2153. ISSN 1562-3599

Bastos, R. A.; Pierott, R. M. R.; Navarro, L. L. L.; Tam, V. W. Y.; Najjar, M. K. and Haddad, A. N. (2026) Comparative analysis of communication in project management approaches: Waterfall, agile, and hybrid. International Journal of Construction Management, 26(10), pp. 2176-2204. ISSN 1562-3599

Tseladikae, T.; Agumba, J.; Ochieng, G.; Adebowale, O. J. and Edwards, D. (2026) Correlation analysis of project management practices and performance outcomes in social housing projects. International Journal of Construction Management, 26(10), pp. 2085-2100. ISSN 1562-3599

Valizadeh Kiamahalleh, M.; Gholampour, A.; Tang, Y. and Ngo, T. D. (2026) Delithiated β-spodumene as a partial cement replacement in waste-based concrete with recycled aggregates and sugarcane fiber. International Journal of Construction Management, 26(10), pp. 2245-2257. ISSN 1562-3599

Bhattacharya, K.; Sarkar, D. and Solanki, A. (2026) Evaluation of road safety factors in Indian urban cities using CFPR and fuzzy DEMATEL. International Journal of Construction Management, 26(10), pp. 2058-2084. ISSN 1562-3599

Thach, H. P.; Nguyen, L. D. and Nguyen, V. T. (2026) Integrating coastal segmentation on predictive modeling for data-driven bridge asset management. International Journal of Construction Management, 26(10), pp. 2228-2244. ISSN 1562-3599

Myint, K. Z. and Hadikusumo, B. H. W. (2026) Key factors influencing governance in transport infrastructure public-private partnership projects in Myanmar: Case study approach. International Journal of Construction Management, 26(10), pp. 2258-2278. ISSN 1562-3599

Shokoohi, F. and Vosoughifar, H. (2026) Multi-dimensional sensitivity analysis of lean and sustainable construction: A novel modified trapezoidal DEMATEL–ANP (mtda) approach for integrated project management. International Journal of Construction Management, 26(10), pp. 1999-2017. ISSN 1562-3599

Cheng, M. Y.; Sholeh, M. N. and Poetra, B. A. (2026) Predicting the construction cost-time tradeoff using optimized hybrid deep learning for risk preference decision making. International Journal of Construction Management, 26(10), pp. 2018-2044. ISSN 1562-3599

Tam, V. W. Y.; Fung, I. W. H.; Evangelista, A. C. J.; Zhou, Y.; Liu, L. and Chan, W. Y. (2026) Sustainable employability assessment of construction workers in Hong Kong: Challenges and improvement strategies. International Journal of Construction Management, 26(10), pp. 2205-2227. ISSN 1562-3599

Seun Oke, O.; Aliu, J. O.; Chukwuma, N. K. and Oke, A. E. (2026) Uncovering the drivers of green wall system adoption in construction: Insights from a developing country. International Journal of Construction Management, 26(10), pp. 2101-2115. ISSN 1562-3599

Patel, T.; Guo, B. H. W.; van der Walt, J. D. and Bapat, H. (2026) Vision-based automated road construction progress monitoring: Improved u-net segmentation approach. International Journal of Construction Management, 26(10), pp. 2154-2175. ISSN 1562-3599

Moda, H. M.; Alomirah, H. F.; Kuchazi, B. M.; Ibifunmilola, S. and Abuzerr, S. (2026) Workplace respirable crystalline silica dust exposure among construction workers in Nigeria: Perception and awareness cross-sectional study. International Journal of Construction Management, 26(10), pp. 2045-2057. ISSN 1562-3599

Wuni, I. Y. and Eshun, B. T. B. (2026) A state-of-the-art review of the application of interpretive structural modelling in construction management studies. International Journal of Construction Management, 26(10), pp. 2116-2136. ISSN 1562-3599

Yun Zhen, G W; Wai Wah, L; Sui Pheng, L and Shi Yee, W (2026) Application of building information modelling (BIM) technology in risk management of high-rise building (hrb) projects in Malaysia. International Journal of Construction Management, 26(2), pp. 332-348. ISSN 1562-3599

Esmaeili, I; Poças Martins, J and Castro, J M (2026) Computer vision-based CAD to BIM design change management: Case of building's lightings. International Journal of Construction Management, 26(2), pp. 234-255. ISSN 1562-3599

Chellappa, V and Luximon, Y (2026) Computer-aided technologies for posture-based ergonomic risk assessment in construction: A systematic review. International Journal of Construction Management, 26(2), pp. 316-331. ISSN 1562-3599

Mishra, S K; Upadhyay, B and Das, B B (2026) Exploring the role of metakaolin in binary and ternary blended 3D printable mortars: Deep insights into printability. International Journal of Construction Management, 26(2), pp. 185-203. ISSN 1562-3599

Zhao, N; Liu, Q; Li, H; Siamuzwe-Manase, V and Skitmore, M (2026) How does mindful leadership affect individual innovative behavior in megaprojects?–a cross-level study. International Journal of Construction Management, 26(2), pp. 349-364. ISSN 1562-3599

Silva, A S; de Melo, R R S; de Melo, R S S and Costa, D B (2026) Method for quality inspection during the execution of facades based on uas images and machine learning algorithms. International Journal of Construction Management, 26(2), pp. 277-294. ISSN 1562-3599

Tennakoon, T M M P; Chileshe, N; Rameezdeen, R; Ochoa, J J and Samaraweera, A (2026) Mixed methods framework for implementation research in the architecture, engineering, construction and operations industry. International Journal of Construction Management, 26(2), pp. 204-218. ISSN 1562-3599

Sudarsan, J S; Rajprasad, J; V. Gedam, V; A. Abhyankar, A; S. Sriram, N and Dharaskar, S (2026) Resilient and sustainable construction industry: Leveraging crisis and lean management. International Journal of Construction Management, 26(2), pp. 219-233. ISSN 1562-3599

Ali, A H; El Rifaee, M; Abdulai, S F and Elmousalami, H H (2026) A holistic model for assessing key success factors in mitigating challenges to modular integrated construction. International Journal of Construction Management, 26(2), pp. 256-276. ISSN 1562-3599

Li, L; Sandanayake, M; Yang, A; Izadyar, N; Chen, S; O'Brien, D and Vrcelj, Z (2026) A virtual platform for managing building inspections during the construction of detached dwellings. International Journal of Construction Management, 26(2), pp. 295-315. ISSN 1562-3599

Abdurezake, S K; Mengistu, D G; Abdela, S A and Tesfaye, B Z (2026) Construction professionals' retention practice in construction companies. International Journal of Construction Management, 26(3), pp. 365-380. ISSN 1562-3599

Olatunde, N A; Awodele, I A and Ramabodu, M S (2026) Delivery strategies of private building projects amid hyper-inflationary trends in Southwest Nigeria. International Journal of Construction Management, 26(3), pp. 482-495. ISSN 1562-3599

Ojo, L D; Chan, A P C and Sing, M C P (2026) Drivers of integrity-based approach to ethics management (ibaem) in the Nigerian construction organizations. International Journal of Construction Management, 26(3), pp. 396-411. ISSN 1562-3599

Sossah, J Y; Osei-Poku, G and Dorhetso, S N (2026) Exploring the feasibility of adopting autonomous drones for construction progress monitoring in Ghana. International Journal of Construction Management, 26(3), pp. 412-427. ISSN 1562-3599

Oke, A E; Aliu, J O; Firdaus, R B R; Precious Adebisi, B and Ramabodu, M S (2026) Implementing adaptive reuse in Nigeria: Challenges and pathways to low-carbon urban and rural development. International Journal of Construction Management, 26(3), pp. 381-395. ISSN 1562-3599

El-Khatib, A and Salhieh, S M (2026) Interconnected success factors for offsite modular construction in developing economies: A fuzzy-DEMATEL approach. International Journal of Construction Management, 26(3), pp. 445-469. ISSN 1562-3599

Mohamed, M; Abdelaty, A; Khresat, G and Abu El Rub, M (2026) Mapping the patterns of cost and time overruns in the U.S. Highway construction projects: A regional risk analysis. International Journal of Construction Management, 26(3), pp. 470-481. ISSN 1562-3599

Lan, R; Adenuga, O and Awolusi, I (2026) Professionals' perspectives on the factors causing construction project failures in developing countries: A case study of Lagos metropolis. International Journal of Construction Management, 26(3), pp. 511-535. ISSN 1562-3599

Sreram, P K and Thomas, A (2026) A discrete event simulation-based value stream map implementation scheme for small and medium enterprises (SMEs). International Journal of Construction Management, 26(3), pp. 428-444. ISSN 1562-3599

Peiroavar, M S and Davoudzadeh, T (2026) A stakeholder perspective on the challenges of sustainable material management in construction projects in developing countries: The case of Iran. International Journal of Construction Management, 26(3), pp. 496-510. ISSN 1562-3599

Opoku, R A (2026) Antecedents of construction project time overrun in ghana's public sector: The moderating role of political connection. International Journal of Construction Management, 26(4), pp. 537-560. ISSN 1562-3599

Thoradeniya, D; Jayasinghe, C; Ariyaratne, I E and Basnayake, G B M A (2026) Construction quality framework for school buildings: Damage detection and rectification prioritization. International Journal of Construction Management, 26(4), pp. 660-678. ISSN 1562-3599

Yildiz, S and Güneş, S (2026) Establishing a model for the selection of building materials: An application for roof coverings. International Journal of Construction Management, 26(4), pp. 718-733. ISSN 1562-3599

Yan, D; Ding, Y; Sunindijo, R Y; Wang, C C and Yang, Z (2026) Key factors in women's managerial advancement in the construction industry: Insights from machine learning. International Journal of Construction Management, 26(4), pp. 679-693. ISSN 1562-3599

Cheng, M Y; Wang, H T; Wu, Y W; Khitam, A F K and Li, Y M (2026) Multi-objective strategic travel network planning for post-earthquake bridge inspections. International Journal of Construction Management, 26(4), pp. 561-582. ISSN 1562-3599

Bigdellou, S and Chen, Q (2026) Quantification of economic influences on technology adoption and diffusion in the construction industry. International Journal of Construction Management, 26(4), pp. 621-638. ISSN 1562-3599

Raval, P; Sarkar, D and Solanki, A (2026) A comparative analysis of the application of fuzzy ANP and fuzzy TOPSIS methods for integrated building information modelling (BIM) and blockchain adoption in the construction sector. International Journal of Construction Management, 26(4), pp. 694-717. ISSN 1562-3599

Thi Binh, A D; Asif, M S; Fan, Y; Thi Cam, H L and Quang, H T (2026) The domino effect of risks on supply chain performance in disruptive times. International Journal of Construction Management, 26(4), pp. 583-603. ISSN 1562-3599

Yıldırım, A; Genç, O and Aydınlı, S (2026) An examination of the perceptions of occupational work ethics among construction professionals working in the public and private sectors: A factor analysis (fa) and hypothesis testing approach. International Journal of Construction Management, 26(4), pp. 604-620. ISSN 1562-3599

Wuni, I Y (2026) A systematic review and network meta-analysis of the risks of artificial intelligence in construction projects. International Journal of Construction Management, 26(4), pp. 639-659. ISSN 1562-3599

Malekaee Ashtiyani, F; Karimi Gavareshki, M H and Gheidar-Kheljani, J (2026) AI-based multi-layer framework for monitoring productivity and coordinating subcontractors in construction projects. International Journal of Construction Management, 26(5), pp. 905-924. ISSN 1562-3599

Meléndez, W; Saavedra, R; Garcés, G and Herrera, R (2026) Comparative analysis of quantity take-off in reinforcing steel bars in apartment buildings based on CAD and BIM method: A case study. International Journal of Construction Management, 26(5), pp. 751-771. ISSN 1562-3599

Tian, S; Abdalla, A; Tang, Y; Zhang, G and Cao, X (2026) Construction disputes: A systematic review of definitions, antecedents, and resolutions. International Journal of Construction Management, 26(5), pp. 857-874. ISSN 1562-3599

Moskowitz, J M and McCranie, J B (2026) Investigating the impact of army safety and occupational health management system implementation on safety performance indices: Case study of a U.S. Army corps of engineers district. International Journal of Construction Management, 26(5), pp. 840-856. ISSN 1562-3599

Azizibabani, M (2026) Investigating the interactions of the components affecting the social performance of open spaces in affordable housing projects. International Journal of Construction Management, 26(5), pp. 735-750. ISSN 1562-3599

Appireddy, K and George, G (2026) Lean tools for enhancing construction project performance: Integration of LPS and LBMS in utility power distribution projects. International Journal of Construction Management, 26(5), pp. 789-804. ISSN 1562-3599

Monteiro do Nascimento, F A; Neto, G D M P; Hazin Alencar, L and Valdes-Vasquez, R (2026) Multicriteria subcontractor selection model for construction activities in wind farm projects. International Journal of Construction Management, 26(5), pp. 772-788. ISSN 1562-3599

Madushika, U G D and Lu, W (2026) Policy strategies for green retrofitting adoption: A systematic review and future directions. International Journal of Construction Management, 26(5), pp. 805-824. ISSN 1562-3599

Li, Y and Zhong, R Y (2026) Spatial-temporal traceability and coordination in modular integrated construction: A future framework with hybrid digital twin and reinforcement learning. International Journal of Construction Management, 26(5), pp. 875-904. ISSN 1562-3599

Thawanapong, C and Tachakitkachorn, T (2026) The sequence of activities for digital twin implementation for building operations by industrial practitioners: A multiple case study analysis in Thailand. International Journal of Construction Management, 26(5), pp. 825-839. ISSN 1562-3599

Daoud, A O; KhairEldin, M; Ibrahim, A H and Toma, H M (2026) Adaptive neuro-fuzzy inference system for Egyptian residential construction waste prediction. International Journal of Construction Management, 26(6), pp. 1059-1077. ISSN 1562-3599

Sun, Y; Wang, L; Zhao, Y and Tiong, R L K (2026) Appraising institutional quality drivers of private capital participation in public–private partnership by dynamic qualitative comparative analysis. International Journal of Construction Management, 26(6), pp. 1078-1096. ISSN 1562-3599

Doume Ekale, M; Pavard, A; Benabderrahmane, K A and Andrew Poirier, E (2026) BIM adoption and implementation in the civil and transportation infrastructure sector: Analysis of governmental roadmaps and action plans. International Journal of Construction Management, 26(6), pp. 925-943. ISSN 1562-3599

Kelvin Ibrahim, M and Aliu, J O (2026) Bridging the digital divide: Strategies for successful technology implementation in the UK construction sector. International Journal of Construction Management, 26(6), pp. 1017-1032. ISSN 1562-3599

Yin, H (2026) Construction project information system management framework strategy based on version control and collaboration. International Journal of Construction Management, 26(6), pp. 1033-1058. ISSN 1562-3599

Kismet, B and Colakoglu, M B (2026) Developing a building-scale circularity indicator through fuzzy analytical hierarchy process and gini index-based circularity calculation methods. International Journal of Construction Management, 26(6), pp. 994-1016. ISSN 1562-3599

Babalola, H I and Aliu, J O (2026) Lean construction practices for enhancing project delivery in the construction industry: Examining the beneficial outcomes. International Journal of Construction Management, 26(6), pp. 1097-1111. ISSN 1562-3599

Nguyen, M V; Ha, K D and Nguyen, K V (2026) Linking corporate social responsibility and project performance: Role of collaboration and trust. International Journal of Construction Management, 26(6), pp. 960-973. ISSN 1562-3599

Kamma, R C and Jha, K N (2026) Significant causes of construction waste in road projects. International Journal of Construction Management, 26(6), pp. 944-959. ISSN 1562-3599

Guo, L; Zhang, S; Wu, P; Wang, J and Jiang, S (2026) A review on the global communication research in construction: A bibliometric perspective. International Journal of Construction Management, 26(6), pp. 974-993. ISSN 1562-3599

Parisi, L. and Donyavi, S. (2026) Advancing materials procurement processes in construction: A framework for optimising technology integration in SMEs' construction supply chains. International Journal of Construction Management, 26(7), pp. 1365-1389. ISSN 1562-3599

Arowoiya, V.; Oke, A.; Chan, M. and Adelusi, A. (2026) Benefits of adopting digital twin technology (dtt) in the Nigerian construction industry. International Journal of Construction Management, 26(7), pp. 1134-1148. ISSN 1562-3599

Laovisutthichai, V.; Viryasiri, T.; Low, S. P.; Sangnin, K.; Kramomtong, W. and Panjapiyakul, N. (2026) Collaborative architecture, engineering, construction, and operations (aeco) practice model for healthcare facilities in Thailand. International Journal of Construction Management, 26(7), pp. 1170-1190. ISSN 1562-3599

Alshboul, O. and Shehadeh, A. (2026) Conflict resolution and negotiation in construction projects using game theory: Achieving win-win outcomes. International Journal of Construction Management, 26(7), pp. 1341-1364. ISSN 1562-3599

Cherkos, F. D. and Shuka, J. K. (2026) Human resource management practices for successful performance of construction companies: Unveiling hierarchical importance and interplay. International Journal of Construction Management, 26(7), pp. 1113-1133. ISSN 1562-3599

Zoleykani, M. J. and Abbasianjahromi, H. (2026) Integrating ar and 4D-BIM for dynamic hazard management in construction projects. International Journal of Construction Management, 26(7), pp. 1239-1263. ISSN 1562-3599

Sayed Zayed, N.; Badawy Abu-Sena, A. B.; Attia, T. M. and Ahmed, A. (2026) Integrating recycled materials in road construction: A cost-effective and sustainable approach. International Journal of Construction Management, 26(7), pp. 1222-1238. ISSN 1562-3599

Ma, G.; Chen, Y. and Du, C. (2026) Intelligent optimization framework for tunnel construction organization driven by multi-source data and process-level simulation. International Journal of Construction Management, 26(7), pp. 1299-1319. ISSN 1562-3599

Cheng, M. Y.; Vu, Q. T. and Yang, L. K. (2026) Multidimensional fall risk assessment for the real-time monitoring of construction site worker safety. International Journal of Construction Management, 26(7), pp. 1191-1221. ISSN 1562-3599

Zhao, N.; Gao, K.; Li, H.; Talebian, N. and Skitmore, M. (2026) System dynamics simulation of factors influencing organizational resilience for subway construction in emergency situations. International Journal of Construction Management, 26(7), pp. 1149-1169. ISSN 1562-3599

Mararo, I. M.; Babafemi, A. J. and Aigbavboa, C. (2026) Towards understanding the perceptions of 3D construction printing in Kenya. International Journal of Construction Management, 26(7), pp. 1320-1340. ISSN 1562-3599

Anbar, D. R.; Deng, X.; Taha Alqershy, M. and Ullah, S. (2026) Unveiling interpersonal distrust as a mediator between contingent employees and knowledge hiding in international construction projects in the gulf region. International Journal of Construction Management, 26(7), pp. 1390-1405. ISSN 1562-3599

Tshatshu, Q.; Ndandani, Z. and Gwabavu, M. (2026) The effect of leadership styles on the professional development of project managers in South Africa. International Journal of Construction Management, 26(7), pp. 1264-1283. ISSN 1562-3599

Olusola, J. and Phung, Q. (2026) A framework for adopting smart contracts in the Nigerian construction industry. International Journal of Construction Management, 26(7), pp. 1284-1298. ISSN 1562-3599

Jafary, P.; Shojaei, D.; Rajabifard, A. and Ngo, T. (2026) AI-augmented construction cost estimation: An ensemble natural language processing (NLP) model to align quantity take-offs with cost indexes. International Journal of Construction Management, 26(8), pp. 1508-1526. ISSN 1562-3599

Park, J. and Moon, S. (2026) Advancing BIM adoption in infrastructure: Addressing standard development, geographic coordinate systems, and common data environment. International Journal of Construction Management, 26(8), pp. 1584-1598. ISSN 1562-3599

Le, T. T. D.; Do, S. T.; Tran, C. N. N. and Nguyen, V. T. (2026) Analysis of causal relationships and interactions between barriers to implementing BIM-nd in construction. International Journal of Construction Management, 26(8), pp. 1407-1427. ISSN 1562-3599

Farooq, M. and Paracha, A. T. (2026) Cost prediction of road construction projects in Pakistan using machine learning. International Journal of Construction Management, 26(8), pp. 1442-1470. ISSN 1562-3599

Al-Khiami, M. I.; Lindhard, S. M. and Wandahl, S. (2026) Cross-cultural analysis of movement patterns and work-related musculoskeletal disorders in Danish and Kuwaiti construction: Implications for targeted exoskeleton design. International Journal of Construction Management, 26(8), pp. 1690-1706. ISSN 1562-3599

Patel, T.; Scheepbouwer, E. and van der Walt, J. D. (2026) Decoding construction capacity in architecture, engineering, and construction industry: A state-of-the-art review. International Journal of Construction Management, 26(8), pp. 1629-1652. ISSN 1562-3599

Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599

Ghosh, B. and Karmakar, S. (2026) Development and application of a digitalised construction safety document management system for advanced constructions using building information modeling. International Journal of Construction Management, 26(8), pp. 1490-1507. ISSN 1562-3599

Lin Htet, N.; Peansupap, V. and Kaewmoracharoen, M. (2026) Influence of material attribute context and document layout variability on large language model performance in construction material specification. International Journal of Construction Management, 26(8), pp. 1669-1689. ISSN 1562-3599

Tafese, E. M. and Mengistu, D. G. (2026) Labor productivity management practice in construction companies. International Journal of Construction Management, 26(8), pp. 1527-1542. ISSN 1562-3599

Otasowie, O.; Aigbavboa, C.; Oke, A. and Adekunle, P. (2026) Redefining key activities in construction organisations: Towards the adoption of circular economy business model. International Journal of Construction Management, 26(8), pp. 1428-1441. ISSN 1562-3599

Niveditha, M. and Palanisamy, T. (2026) Upcycling iron-rich industrial waste into a carbon-sequestering composite binder through optimized carbonation curing for structural applications. International Journal of Construction Management, 26(8), pp. 1471-1489. ISSN 1562-3599

Zhao, S.; Guo, Y.; Wen, S.; Guo, Z.; Miao, A.; Li, D. and Guo, C. (2026) Worker health and safety in high-altitude tunnel construction: A study on oxygen supply standards and measures based on physiological indicators. International Journal of Construction Management, 26(8), pp. 1562-1583. ISSN 1562-3599

Kone, V. and Mahesh, G. (2026) The iprok ontology: A unified approach to managing construction project information. International Journal of Construction Management, 26(8), pp. 1599-1628. ISSN 1562-3599

Alsamarraie, M. M. and Mohd Ghazali, F. E. (2026) A novel framework for sustainable contracting process in organisational public procurement. International Journal of Construction Management, 26(8), pp. 1653-1668. ISSN 1562-3599

Mohamedein, S. M. and Nassar, A. H. (2026) Calculating cost contingency for residential construction projects in Egypt using a machine learning algorithm. International Journal of Construction Management, 26(9), pp. 1761-1776. ISSN 1562-3599

Stehn, L. and Erikshammar, J. (2026) Configuring innovation ecosystem capabilities for scaling digital innovation in construction. International Journal of Construction Management, 26(9), pp. 1944-1959. ISSN 1562-3599

Nkoba, N. and Amoah, C. (2026) Curbing corruption and unethical practices in construction projects. International Journal of Construction Management, 26(9), pp. 1799-1814. ISSN 1562-3599

Li, H.; Lyu, R.; Sheng, J.; Menadue, V. and Skitmore, M. (2026) Enhancing eco-efficiency in china's construction industry: Measurement, drivers, and policy implications using an ebm-tobit approach. International Journal of Construction Management, 26(9), pp. 1727-1745. ISSN 1562-3599

Gbiengu, P.; Khan, M.; Nnaji, C. and Karakhan, A. A. (2026) Enhancing employee retention in construction: Role of workforce sustainability attributes. International Journal of Construction Management, 26(9), pp. 1815-1835. ISSN 1562-3599

Faheem Haider, M.; Aslam, M.; Khan, R. W. A. and Malik, M. S. A. (2026) Exploring the factors to improve complaint management system in building management through a case study. International Journal of Construction Management, 26(9), pp. 1777-1798. ISSN 1562-3599

Liu, J.; Liu, H. and Li, Y. (2026) Facilitating collaborative construction and demolition waste governance: An sfic approach. International Journal of Construction Management, 26(9), pp. 1836-1857. ISSN 1562-3599

Khoa, V. D.; Chinda, T. and Nguyen, N. H. (2026) Knowledge management process to enhance construction competitiveness in the long term: System dynamics modelling approach. International Journal of Construction Management, 26(9), pp. 1960-1977. ISSN 1562-3599

Ammar, M. A. and Alattyih, W. (2026) Lingo optimization modelling of construction scheduling. International Journal of Construction Management, 26(9), pp. 1746-1760. ISSN 1562-3599

Junussova, T. and Nadeem, A. (2026) Modelling sustainable construction material management implementation strategy indicators in developed economies. International Journal of Construction Management, 26(9), pp. 1925-1943. ISSN 1562-3599

Zagia, F.; Kajewski, S.; Omrani, S. and Motamedisedeh, O. (2026) Prioritizing the key causes of construction project delay in different countries: A cross-sectional analysis of different project types. International Journal of Construction Management, 26(9), pp. 1879-1904. ISSN 1562-3599

Badawy, M.; Ibrahim, A.; Hamdy, K. and Aljohani, A. (2026) A comparative analysis of barriers to prefabricated construction adoption in emerging economies: A dual fuzzy-cb-SEM and PLS-SEM approach. International Journal of Construction Management, 26(9), pp. 1978-1998. ISSN 1562-3599

Ahankoob, A.; Calixto, V.; Abbasnejad, B. and Wong, P. S. P. (2026) A generative BIM approach for DfMA integration into building facade design. International Journal of Construction Management, 26(9), pp. 1858-1878. ISSN 1562-3599

Daoud, A. O.; Lal, R.; Gouda Mohamed, A.; Mohamed, M. and Wefki, H. (2026) An implementation framework for blockchain and smart contracts adoption in the egyptian construction sector. International Journal of Construction Management, 26(9), pp. 1707-1726. ISSN 1562-3599

Phyu, H. T. (2026) A systematic review of transparency in public-private partnerships: Current trends and future research directions. International Journal of Construction Management, 26(9), pp. 1905-1924. ISSN 1562-3599

This list was generated on Sat Aug 22 01:21:11 2026 UTC.