Items with Index Term: workspace
Aalto, L; Sirola, P; Kalliomäki-Levanto, T; Lahtinen, M; Ruohomäki, V; Salonen, H and Reijula, K (2019) User-centric work environments in modular healthcare facilities. Engineering, Construction and Architectural Management, 26(6), pp. 1047-1062. ISSN 0969-9988
Abrishami, S; Goulding, J; Pour, R F and Ganah, A (2015) Virtual generative BIM workspace for maximising AEC conceptual design innovation: A paradigm of future opportunities. Construction Innovation, 15(1), pp. 24-41. ISSN 1471-4175
Abrishami, S; Goulding, J and Rahimian, F (2021) Generative BIM workspace for AEC conceptual design automation: Prototype development. Engineering, Construction and Architectural Management, 28(2), pp. 482-509. ISSN 0969-9988
Akinci, B; Fischer, M and Kunz, J (2002) Automated generation of work spaces required by construction activities. Journal of Construction Engineering and Management, 128(4), pp. 306-315. ISSN 0733-9364
Akinci, B; Fischer, M; Kunz, J and Levitt, R (2002) Representing work spaces generically in construction method models. Journal of Construction Engineering and Management, 128(4), pp. 296-305. ISSN 0733-9364
Alhadidi, Suleiman (2023) Real-time architecture: Quantifying the spatial performance of workplaces. DDes thesis, Harvard University, USA.
Arayici, Y (2004) Requirements engineering in innovative systems developments for the construction industry. PhD thesis, University of Salford, UK.
Arayici, Y and Aouad, G (2004) Industry driven innovative systems development for the construction industry: The DIVERCITY project. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Bae, S; Martin, C S and Asojo, A O (2021) Indoor environmental quality factors that matter to workplace occupants: An 11-year-benchmark study. Building Research & Information, 49(4), pp. 445-459. ISSN 0961-3218
Bangwal, D and Tiwari, P (2019) Environmental design and awareness impact on organization image. Engineering, Construction and Architectural Management, 26(1), pp. 29-45. ISSN 0969-9988
Bassanino, M; Fernando, T and Wu, K C (2014) Can virtual workspaces enhance team communication and collaboration in design review meetings? Architectural Engineering and Design Management, 10(3-4), pp. 200-217. ISSN 1745-2007
Berawi, M A; Kim, A A; Naomi, F; Basten, V; Miraj, P; Medal, L A and Sari, M (2023) Designing a smart integrated workspace to improve building energy efficiency: An Indonesian case study. International Journal of Construction Management, 23(3), pp. 410-422. ISSN 1562-3599
Björnfot, A and Jongeling, R (2007) Application of line-of-balance and 4D CAD for lean planning. Construction Innovation, 7(2), pp. 200-211. ISSN 1471-4175
Blanc, F and Scanlon, K (2022) Sharing a home under lockdown in London. Buildings & Cities, 3(1), pp. 118-133. ISSN 2632-6655
Cai, Q Y; Ng, F F; Chen, H and Ding, Z K (2004) A framework for intelligent change management in the construction process. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Candido, C; Thomas, L; Haddad, S; Zhang, F; Mackey, M and Ye, W (2019) Designing activity-based workspaces: Satisfaction, productivity and physical activity. Building Research & Information, 47(3), pp. 275-289. ISSN 0961-3218
Cao, S; Duan, H; Guo, S; Wu, J; Ai, T and Jiang, H (2024) BIM-based task planning method for wheeled-legged rebar binding robot. Architectural Engineering and Design Management, 20(3), pp. 656-672. ISSN 1745-2007
Chauhan, H; Jang, Y and Jeong, I (2026) Assessing the impact of human-robot collaboration on worker productivity in construction through psychophysiological response analysis. Journal of Construction Engineering and Management, 152(3): 04025273, ISSN 0733-9364
Cho, Y-K (2000) Human-assisted rapid workspace modeling for construction equipment operations. PhD thesis, University of Texas at Austin, USA.
Choi, Y S; Lim, I; Kim, T; Cho, H and Kang, K I (2016) Case study of the core structure succeeding method for tall building construction. Journal of Construction Engineering and Management, 142(12): 05016017, ISSN 0733-9364
Chua, D K H; Yeoh, K W and Song, Y (2010) Quantification of spatial temporal congestion in four-dimensional computer-aided design. Journal of Construction Engineering and Management, 136(6), pp. 641-649. ISSN 0733-9364
Chung, K-H J (2010) Development of a collaborative briefing approach for infrastructure projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.
Clifford-Lindkvist, C and Elmualim, A (2008) The socio-technical shaping of innovation in facilities management. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Comu, S (2013) Examining the impact of facilitation on the performance of global project networks collaborating in virtual workspaces. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Comu, S; Iorio, J; Taylor, J E and Dossick, C S (2013) Quantifying the impact of facilitation on transactive memory system formation in global virtual project networks. Journal of Construction Engineering and Management, 139(3), pp. 294-303. ISSN 0733-9364
Dabirian, S; Moussazadeh, M; Khanzadi, M and Abbaspour, S (2023) Predicting the effects of congestion on labour productivity in construction projects using agent-based modelling. International Journal of Construction Management, 23(4), pp. 606-618. ISSN 1562-3599
Davis, M C (2011) Psychological and organisational issues in the design of buildings and workplaces. PhD thesis, University of Leeds, UK.
Domingo, L (2023) Influence of method and media interventions in creative remote design team collaboration. PhD thesis, Stanford University, USA.
Donkers, A; Yang, D; Guendouz, S and Wang, B (2024) Making sense of smart features in the smart office: A stated choice experiment of office user preferences. Building Research & Information, 52(4), pp. 388-401. ISSN 0961-3218
Edum-Fotwe, F T; Gregory, M J; Thorpe, A; Cooper, R and Deasley, P J (2002) Managing distributed design teams and processes: A cross-sector study of construction and aerospace. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
El-Rayes, K and Hyari, K (2005) Conlight: Lighting design model for nighttime highway construction. Journal of Construction Engineering and Management, 131(4), pp. 467-476. ISSN 0733-9364
Engelen, L; Chau, J; Young, S; Mackey, M; Jeyapalan, D and Bauman, A (2019) Is activity-based working impacting health, work performance and perceptions? A systematic review. Building Research & Information, 47(4), pp. 468-479. ISSN 0961-3218
Flores, M and Mourgues, C (2024) Impact of using a formalized methodology for conflict detection based on 4D-BIM. Journal of Construction Engineering and Management, 150(7): 04024059, ISSN 0733-9364
Forooraghi, M; Miedema, E; Ryd, N; Wallbaum, H and Babapour Chafi, M (2023) Relationship between the design characteristics of activity-based flexible offices and users' perceptions of privacy and social interactions. Building Research & Information, 51(5), pp. 588-604. ISSN 0961-3218
Francis, Matthew Charles (2020) Assessing impact of the built environment on academic research productivity. PhD thesis, RMIT University, Australia.
Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.
Garcia, C; Huebschman, R; Abraham, D M and Bullock, D M (2006) Using GPS to measure the impact of construction activities on rural interstates. Journal of Construction Engineering and Management, 132(5), pp. 508-515. ISSN 0733-9364
Garcia-Lopez, N P (2017) An activity and flow-based construction model for managing on-site work. PhD thesis, Stanford University, USA.
Garcia-Lopez, N P and Fischer, M (2024) Managing on-site production using an activity and flow-based construction model. Journal of Construction Engineering and Management, 150(1): 04023144, ISSN 0733-9364
Goldman, C M (2025) The built environment and employee well-being: An investigation into the attributes and impacts of supportive physical work environments in long-term care facilities. PhD thesis, University of Colorado at Denver, USA.
Graham, L T; Parkinson, T and Schiavon, S (2021) Lessons learned from 20 years of CBE's occupant surveys. Buildings & Cities, 2(1), pp. 166-184. ISSN 2632-6655
Guo, S J (2002) Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering and Management, 128(4), pp. 287-295. ISSN 0733-9364
He, C (2022) Integrate human and engineering aspects to facilitate construction scheduling under uncertainty. PhD thesis, North Carolina State University, USA.
Heesom, D (2004) An analytical system for space planning on construction sites. PhD thesis, University of Wolverhampton, UK.
Hemalattha, S and Vidjeapriya, R (2021) Developing an integrated framework for optimization of spatial requirements of construction equipment. Built Environment Project and Asset Management, 11(5), pp. 903-917. ISSN 2044-124X
Hipwood, T (2022) Adapting owner-occupied dwellings in the UK: Lessons for the future. Buildings & Cities, 3(1), pp. 297-315. ISSN 2632-6655
Hiyasat, R; Sosa, M and Ahmad, L (2023) Use of work-space at home under COVID-19 conditions in the UAE. Engineering, Construction and Architectural Management, 30(8), pp. 3142-3159. ISSN 0969-9988
Hochstatter, Kirk (2025) Collaborative project delivery governance and shared leadership in AEC building virtual teams. PhD thesis, University of Washington, USA.
Hyari, K and El-Rayes, K (2006) Field experiments to evaluate lighting performance in nighttime highway construction. Construction Management and Economics, 24(6), pp. 591-601. ISSN 1466433X
Hyari, K and El-Rayes, K (2006) Lighting requirements for nighttime highway construction. Journal of Construction Engineering and Management, 132(5), pp. 435-443. ISSN 0733-9364
Igwe, C; Nasiri, F and Hammad, A (2022) Construction workspace management: Critical review and roadmap. International Journal of Construction Management, 22(10), pp. 1960-1973. ISSN 1562-3599
Ilozor, B D and Ilozor, D B (2005) Open-plan attributes and effective facilities management. Journal of Engineering, Design and Technology, 3(1), pp. 1-11. ISSN 1726-0531
Ilozor, B D and Ilozor, D B (2005) Openplan attributes and effective facilities management. Journal of Engineering, Design and Technology, 3(1), pp. 1-11. ISSN 1726-0531
Joo, M.; Im, J. B.; Lee, K. T. and Kim, J. H. (2026) Comparative analysis of work performance and physiological response based on office types and indoor space design. Architectural Engineering and Design Management, 22(2), pp. 365-381. ISSN 1745-2007
Kampschroer, K and Heerwagen, J H (2005) The strategic workplace: Development and evaluation. Building Research & Information, 33(4), pp. 326-337. ISSN 0961-3218
Karnasuta, P (2004) An examination of the effects of web-based virtual working environments on team effectiveness within construction projects. PhD thesis, University of Reading, UK.
Kasana, D V (2021) Evaluating organizational readiness to implement change within the workplace. PhD thesis, University of North Carolina at Charlotte, USA.
Kaushik, A; Arif, M; Ebohon, O J; Arsalan, H; Rana, M Q and Obi, L (2023) Effect of indoor environmental quality on visual comfort and productivity in office buildings. Journal of Engineering, Design and Technology, 21(6), pp. 1746-1766. ISSN 1726-0531
Khabir, S and Vakilinezhad, R (2023) Energy and thermal analysis of DSF in the retrofit design of office buildings in hot climates. Architectural Engineering and Design Management, 19(6), pp. 642-664. ISSN 1745-2007
Kim, C (2004) Spatial information acquisition and its use for infrastructure operation and maintenance. PhD thesis, University of Texas at Austin, USA.
Kim, Jungsoo (2014) Impact of indoor environmental quality (IEQ) factors on occupant evaluation of workspaces. PhD thesis, University of Sydney, Australia.
Kokkonen, A (2017) Integrated project emerging within the daily project life through active participation. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Kong, M.; Son, Y. J.; Snyder, E.; Byun, K.; C. Pope, Z. and Hogan, C. J. (2026) Indoor environmental quality in the era of hybrid work: Comparing home and healthy office environments. Building Research & Information, 54(6), pp. 693-713. ISSN 0961-3218
Kwon, S-W (2003) Human-assisted fitting and matching of objects to sparse point clouds for rapid workspace modeling in construction automation. PhD thesis, University of Texas at Austin, USA.
Ladinski, V (2017) Designing for adaptability: The Gateshead Civic Centre. International Journal of Building Pathology and Adaptation, 35(4), pp. 380-396.
Lee, H S; Lee, J Y and Lee, J S (1999) Nonshored formwork system for top-down construction. Journal of Construction Engineering and Management, 125(6), pp. 392-399. ISSN 0733-9364
Leicht, R M (2009) A framework for planning effective collaboration using interactive workspaces. PhD thesis, Pennsylvania State University, USA.
Liang, C J; Wang, X; Kamat, V R and Menassa, C C (2021) Human-robot collaboration in construction: Classification and research trends. Journal of Construction Engineering and Management, 147(10): 03121006, ISSN 0733-9364
Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams. PhD thesis, University of Michigan, USA.
Lindkvist, C and Elmualim, A (2009) Developing new technology in facilities management through knowledge roles. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Loy, W. W.; Belek Fialho Teixeira, M. and Franzè, A. P. (2026) Ar-guided modular robotic bricklaying: A proof-of-concept system for human-in-the-loop construction workflows. Construction Innovation, ISSN 1471-4175
Ma, H; Zhang, H and Chang, P (2020) 4D-based workspace conflict detection in prefabricated building constructions. Journal of Construction Engineering and Management, 146(9): 04020112, ISSN 0733-9364
Markkanen, P and Herneoja, A (2024) Constructing a theory-informed workplace design framework: co-design case study for knowledge work environment satisfaction improvement. Building Research & Information, 52(8), pp. 870-886. ISSN 0961-3218
Mekid, S and Shang, M (2015) Concept of dependent joints in functional reconfigurable robots. Journal of Engineering, Design and Technology, 13(3), pp. 400-418.
Messi, Leonardo (2022) Development of a BIM-based simulator for workspace management in construction. PhD thesis, Università Politecnica delle Marche, Italy.
Migliore, A; Rossi-Lamastra, C and Tagliaro, C (2022) Are workspaces gender neutral? A literature review and a research agenda. Building Research & Information, 50(8), pp. 924-948. ISSN 0961-3218
Milián Bernal, D; Pelsmakers, S; Nisonen, E and Vanhatalo, J (2026) Working at home: Tactics to reappropriate the home. Buildings & Cities, 7(1), pp. 143-160. ISSN 2632-6655
Mirzaei, A; Nasirzadeh, F; Parchami Jalal, M and Zamani, Y (2018) 4D-BIM dynamic time-space conflict detection and quantification system for building construction projects. Journal of Construction Engineering and Management, 144(7): 04018056, ISSN 0733-9364
Mulvey, M B (2021) Digging for gold: Irish builders in post-war London - historical representations and realities. PhD thesis, National University of Ireland, Maynooth, Ireland.
Nam, T-J (2001) Investigations of collaborative design environments: a framework for real-time collaborative 3D CAD. PhD thesis, Brunel University, UK.
Oladiran, O; Hallam, P and Westlake, H (2025) Are the COVID-19 footprints fading? Analysing dynamics in work, corporate real estate strategies and building use. Building Research & Information, 53(7), pp. 929-947. ISSN 0961-3218
Ono, Eikichi (2025) Occupant-centric design for functional and thermal zoning at activity-based workspaces. PhD thesis, National University of Singapore, Singapore.
Oo, B L; Lim, T H B and Zhang, Y (2021) Women workforce in construction during the COVID-19 pandemic: Challenges and strategies. Construction Economics and Building, 21(4), pp. 38-59. ISSN 2204-9029
Parkinson, T; Schiavon, S; Kim, J and Betti, G (2023) Common sources of occupant dissatisfaction with workspace environments in 600 office buildings. Buildings & Cities, 4(1), pp. 17-35. ISSN 2632-6655
Pastore, L and Andersen, M (2019) Detecting trends and further development potential of contemporary façade design for workspaces. Architectural Engineering and Design Management, 15(4), pp. 267-281. ISSN 1745-2007
Pilanawithana, Nethmin M (2022) Developing resilience for safety management systems in the building repair and maintenance sector. PhD thesis, Western Sydney University, Australia.
Prabhakaran, A (2023) Development of interactive and distributed virtual environments for immersive communication in the furniture, fixture and equipment sector. PhD thesis, University of the West of England, Bristol, UK.
Prabhakaran, A; Mahamadu, A M; Mahdjoubi, L; Manu, P; Che Ibrahim, C K I and Aigbavboa, C O (2021) The effectiveness of interactive virtual reality for furniture, fixture and equipment design communication: An empirical study. Engineering, Construction and Architectural Management, 28(5), pp. 1440-1467. ISSN 0969-9988
Ransolin, N; Saurin, T A; Clay-Williams, R; Formoso, C T; Rapport, F and Cartmill, J (2025) Beyond the operating room: Built environment design knowledge supportive of resilient surgical services. Engineering, Construction and Architectural Management, 32(6), pp. 3804-3831. ISSN 0969-9988
Rasheed, E O and Rotimi, J O B (2024) The green office environment: New Zealand workers' perception of IEQ. Smart and Sustainable Built Environment, 13(5), pp. 1240-1259. ISSN 2046-6099
Rohani, M; Shafabakhsh, G; Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(8), pp. 1053-1074. ISSN 0969-9988
Roofigari-Esfahan, N and Razavi, S (2017) Uncertainty-aware linear schedule optimization: A space-time constraint-satisfaction approach. Journal of Construction Engineering and Management, 143(5): 04016132, ISSN 0733-9364
Roshani, D (2005) Integrated collaborative building design using internet technology. PhD thesis, University of Nottingham, UK.
Rwamamara, R; Norberg, H; Olofsson, T and Lagerqvist, O (2010) Using visualization technologies for design and planning of a healthy construction workplace. Construction Innovation, 10(3), pp. 248-266. ISSN 1471-4175
Said, H M M and Lucko, G (2016) Float types in construction spatial scheduling. Journal of Construction Engineering and Management, 142(12): 04016077, ISSN 0733-9364
Sailer, K; Thomas, M and Pachilova, R (2023) The challenges of hybrid work: An architectural sociology perspective. Buildings & Cities, 4(1), pp. 650-668. ISSN 2632-6655
Salhab, D; Pourrahimian, E and Hamzeh, F (2026) Integrating ontologies and AI for enhanced workspace planning and knowledge management. Journal of Construction Engineering and Management, 152(4): 04026031, ISSN 0733-9364
Salhab, D; Pourrahimian, E; Lindhard, S M and Hamzeh, F (2025) Patterns, 4D simulations, and artificial intelligence-driven insights: Redefining construction workspace management. Journal of Construction Engineering and Management, 151(8): 04025099, ISSN 0733-9364
Sandy, T (2018) High-accuracy mobile manipulation for on-site robotic building construction. DSc thesis, ETH Zürich, Switzerland.
Seppänen, O (2025) Integrated forecasting approach for takt and location-based scheduling. Journal of Construction Engineering and Management, 151(12): 04025199, ISSN 0733-9364
Shaaban, S M (2004) A user-centric approach for the development and evaluation of a visual interface to online information in the construction industry. PhD thesis, University of Newcastle upon Tyne, UK.
Shields, R and West, K (2003) Innovation in clean-room construction: A case study of co-operation between firms. Construction Management and Economics, 21(4), pp. 337-344. ISSN 01446193
Son, H and Kim, C (2013) Multiimaging sensor data fusion-based enhancement for 3D workspace representation for remote machine operation. Journal of Construction Engineering and Management, 139(4), pp. 434-444. ISSN 0733-9364
Soto Muñoz, J; Trebilcock Kelly, M; Flores-Alés, V and Ramírez-Vielma, R (2022) Understanding the perceived productivity of office occupants in relation to workspace thermal environment. Building Research & Information, 50(1-2), pp. 152-170. ISSN 0961-3218
Su, X (2013) A spatial temporal information model for construction planning. PhD thesis, Purdue University, USA.
Su, X and Cai, H (2014) Life cycle approach to construction workspace modeling and planning. Journal of Construction Engineering and Management, 140(7): 04014019, ISSN 0733-9364
Su, Y (2017) Unified quantitative modeling for integrated multi-objective project management with singularity functions. PhD thesis, Catholic University of America, USA.
Thomas, J; Giddings, B and Little, L (2006) An holistic evaluation of the workplace environment. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.
Thomas, L E (2017) Combating overheating: Mixed-mode conditioning for workplace comfort. Building Research & Information, 45(1-2), pp. 176-194. ISSN 0961-3218
Volpe, E (2024) Exploring inclusive spaces for early career women in civil engineering. PhD thesis, University of Florida, USA.
Vrijhoef, R (2019) Studying time presence on site as an indicator of productive time use by construction workers. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Wang, Q; Guo, Z; Mei, T; Li, Q and Li, P (2018) Labor crew workspace analysis for prefabricated assemblies' installation: A 4D-BIM-based approach. Engineering, Construction and Architectural Management, 25(3), pp. 374-411. ISSN 0969-9988
Watkins, M; Mukherjee, A; Onder, N and Mattila, K (2009) Using agent-based modeling to study construction labor productivity as an emergent property of individual and crew interactions. Journal of Construction Engineering and Management, 135(7), pp. 657-667. ISSN 0733-9364
Wilson, H K and Cotgrave, A J (2020) Learning space design: The presentation of a framework for the built environment discipline. International Journal of Construction Education and Research, 16(2), pp. 132-148. ISSN 1557-8771
Winch, G M and North, S (2006) Critical space analysis. Journal of Construction Engineering and Management, 132(5), pp. 473-481. ISSN 0733-9364
Xing, J (2024) Functional reasoning support for nuclear power plant field operators. PhD thesis, Carnegie Mellon University, USA.
Xu, X (2024) A multi-agent reinforcement learning task allocation framework for navigation sequences of construction robots. PhD thesis, New York University Tandon School of Engineering, USA.
Yeoh, K-W (2012) Construction requirements driven planning and scheduling. PhD thesis, National University of Singapore, Singapore.
Zhang, C (2017) Human-centered automation for resilience in acquiring construction field information. PhD thesis, Arizona State University, USA.
Zhou, T (2023) Embodied robot teleoperation in construction. PhD thesis, University of Florida, USA.
Zhu, Q; Zhou, T; Xia, P and Du, J (2022) Robot planning for active collision avoidance in modular construction: Pipe skids example. Journal of Construction Engineering and Management, 148(10): 04022114, ISSN 0733-9364
Zhu, Y; Ahmad, I and Wang, L (2009) Estimating work zone road user cost for alternative contracting methods in highway construction projects. Journal of Construction Engineering and Management, 135(7), pp. 601-608. ISSN 0733-9364
van den Berg, J; Appel-Meulenbroek, R; Kemperman, A and Sotthewes, M (2020) Knowledge workers' stated preferences for important characteristics of activity-based workspaces. Building Research & Information, 48(7), pp. 703-718. ISSN 0961-3218
Up a level