Items with Index Term: working hours
Adah, C A; Aghimien, D O and Oshodi, O (2025) Work–life balance in the construction industry: A bibliometric and narrative review. Engineering, Construction and Architectural Management, 32(1), pp. 38-58. ISSN 0969-9988
Aghimien, E I and Li, D H W (2022) Application of luminous efficacies for daylight illuminance data generation in subtropical Hong Kong. Smart and Sustainable Built Environment, 11(2), pp. 271-293. ISSN 2046-6099
Ahmed, K; Leung, M Y and Ojo, L D (2022) An exploratory study to identify key stressors of ethnic minority workers in the construction industry. Journal of Construction Engineering and Management, 148(5): 04022014, ISSN 0733-9364
Alvanchi, A; Lee, S and Abourizk, S (2012) Dynamics of working hours in construction. Journal of Construction Engineering and Management, 138(1), pp. 66-77. ISSN 0733-9364
Alzanati, A (2021) Complex building construction projects: reducing rework through facilitation of craftspeople's motivation in United Arab Emirates. PhD thesis, Bournemouth University, UK.
Bangaru, S S (2021) Fatigue monitoring through wearable sensors for construction workers. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Borg, J and Scott-Young, C M (2022) Contributing factors to turnover intentions of early career project management professionals in construction. Construction Management and Economics, 40(10), pp. 835-853. ISSN 01446193
Bowen, P; Cattell, K; Distiller, G and Edwards, P J (2008) Job satisfaction of South African quantity surveyors: An empirical study. Construction Management and Economics, 26(7), pp. 765-780. ISSN 1466433X
Bowen, P; Edwards, P and Lingard, H (2013) Workplace stress experienced by construction professionals in South Africa. Journal of Construction Engineering and Management, 139(4), pp. 393-403. ISSN 0733-9364
Caven, V (2009) Designing a career: Men and architecture. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Caven, V and Raidén, A B (2010) Work-life balance among architects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Cheung, C M; Bowen, P; Cattell, K and Davis, J (2020) Construction professionals' commitment to the organisation, work-life balance, and well-being. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Cioffi, J; Wilkes, L and Hartcher-O'Brien, J (2002) Outdoor workers and sun protection: Knowledge and behaviour. Construction Economics and Building, 2(2), pp. 10-14. ISSN 2204-9029
Clarke, N; Bradley, J G and Spillane, J P (2020) Mental health and well-being in micro-enterprises in the construction industry: An Irish perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Dang, M E (2020) An investigation into the policies and initiatives for work-life balance within selected construction companies in Nigeria. PhD thesis, University of Northumbria at Newcastle, UK.
Dodanwala, T C; Santoso, D S and Shrestha, P (2022) The mediating role of work–family conflict on role overload and job stress linkage. Built Environment Project and Asset Management, 12(6), pp. 924-939. ISSN 2044-124X
Donkers, A; Yang, D; Guendouz, S and Wang, B (2024) Making sense of smart features in the smart office: A stated choice experiment of office user preferences. Building Research & Information, 52(4), pp. 388-401. ISSN 0961-3218
Emuze, F (2017) The human contribution to unsafe construction acts and conditions in the central region of South Africa. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.
Geekiyanage, D and Ramachandra, T (2020) Nexus between running costs and building characteristics of commercial buildings: Hedonic regression modelling. Built Environment Project and Asset Management, 10(3), pp. 389-406. ISSN 2044-124X
Gunning, J G and Keaveney, M (1998) A transverse examination of occupational stress among a cross-disciplinary population of Irish construction professionals. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Haller, M and Stehn, L (2011) Evaluation of efficiency in housing construction design. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Kenny, J; Curran, M; Spillane, J P and Brooks, T (2021) Do you want some sauce on that? Factors influencing dietary habits among the Irish construction workforce: A case study review. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Laryea, S (2013) Nature of tender review meetings. Journal of Construction Engineering and Management, 139(8), pp. 927-940. ISSN 0733-9364
Lee, C (2023) Evaluating construction delays using productivity-based resource reallocation for economic feasibility. Engineering, Construction and Architectural Management, 30(4), pp. 1679-1696. ISSN 0969-9988
Li, H; Love, P E D and Drew, D S (2000) Effects of overtime work and additional resources on project cost and quality. Engineering, Construction and Architectural Management, 7(3), pp. 211-220. ISSN 0969-9988
Luczywek, Beata (2024) Essays on policy evaluations: Insights from public and labor economics. PhD thesis, University of California, San Diego, USA.
Manivannan, J; Loganathan, S; Kamalanabhan T J and Kalidindi, S N (2022) Investigating the relationship between occupational stress and work-life balance among Indian construction professionals. Construction Economics and Building, 22(2), pp. 27-51. ISSN 2204-9029
Morrison, E and Thurnell, D (2012) Working hours in a large New Zealand construction company. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Morrison, E and Thurnell, D (2012) Employee preferences for work-life benefits in a large New Zealand construction company. Construction Economics and Building, 12(1), pp. 12-25. ISSN 2204-9029
Omer, M M; Moyo, T; Al-Otaibi, A; Alawag, A M; Rizal Alias, A and Rahman, R A (2025) Critical factors affecting workplace well-being at construction sites across countries with different income levels. Construction Innovation, 25(1), pp. 104-130. ISSN 1471-4175
Omer, M M; Moyo, T; Alias, A R and Rahman, R A (2025) Development of workplace well-being indexes at construction sites. Journal of Engineering, Design and Technology, 23(4), pp. 1111-1136. ISSN 1726-0531
Oo, B L and Lim, B T H (2021) Changes in job situations for women workforce in construction during the COVID-19 pandemic. Construction Economics and Building, 21(2), pp. 34-57. ISSN 2204-9029
Osuizugbo, I C; Oshodi, O S; Kukoyi, P O; Yohanna, H S and Edike, U E (2025) Implementation of work-life balance strategies among construction companies in Lagos, Nigeria: Construction workers' perspectives. Journal of Engineering, Design and Technology, 23(3), pp. 998-1016. ISSN 1726-0531
Perera, B A K S; Ridmika, K I and Wijewickrama, M K C S (2022) Life management of the quantity surveyors working for contractors at sites: Female vs male. Construction Innovation, 22(4), pp. 962-986. ISSN 1471-4175
Powl, A and Skitmore, M (2005) Factors hindering the performance of construction project managers. Construction Innovation, 5(1), pp. 41-51. ISSN 1471-4175
Rasheed, E. O. and Wang, K. (2026) Do overall findings correlate with granular findings? An analysis of factors influencing office workers' thermal comfort and indoor air quality. International Journal of Building Pathology and Adaptation, 44(5), pp. 1211-1231. ISSN 2398-4708
Robertson, C M (2018) Migrant worker perceptions of life, work, health and safety in Kuwait: A construction industry perspective. PhD thesis, Auckland University of Technology, New Zealand.
Sandberg, R (2021) Illusions of freedom: Practice and contradictions in the work of construction site managers. PhD thesis, Chalmers University of Technology, Sweden.
Sang, K and Powell, A (2012) Gender inequality in the construction industry: Lessons from pierre bourdieu. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Sang, K J C (2007) Health and well-being in the architectural profession and the influence of gender. PhD thesis, Loughborough University, UK.
Sang, K J C; Dainty, A R J and Ison, S G (2004) The impact of the structure and culture of the construction industry on employee well-being: Directions for future research. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Sang, K J C; Dainty, A R J and Ison, S G (2007) Gender: A risk factor for occupational stress in the architectural profession? Construction Management and Economics, 25(12), pp. 1305-1317. ISSN 1466433X
Sang, K J C; Ison, S G and Dainty, A R J (2009) The job satisfaction of UK architects and relationships with work-life balance and turnover intentions. Engineering, Construction and Architectural Management, 16(3), pp. 288-300. ISSN 0969-9988
Shourkabi, A (2016) A study of designer time utilisation in Iranian construction consultancies. PhD thesis, Loughborough University, UK.
Sospeter, N. G.; Awuzie, B. O. and Ngowi, A. (2026) Restoring labour dignity: Analysing decent work improvement strategies in tanzania's circular construction supply chains. Built Environment Project and Asset Management, 16(3), pp. 578-596. ISSN 2044-124X
Styhre, A and Josephson, P E (2006) Revisiting site manager work: Stuck in the middle? Construction Management and Economics, 24(5), pp. 521-528. ISSN 1466433X
Suresh, S; Renukappa, S; Stride, M; Nicola Toor, R and Khan, A (2025) Women in the UK construction industry: Are we still clinging to the "old boys club"? Engineering, Construction and Architectural Management, 32(1), pp. 214-236. ISSN 0969-9988
Taghaddos, M; Pereira, E; Osorio-Sandoval, C; Hermann, U and Abourizk, S (2023) A data-driven approach for deploying safety policies for schedule planning in industrial construction projects: A case study. Journal of Construction Engineering and Management, 149(12): 05023013, ISSN 0733-9364
Tijani, B; Jin, X and Osei-Kyei, R (2021) Critical analysis of mental health research among construction project professionals. Journal of Engineering, Design and Technology, 19(2), pp. 467-496. ISSN 1726-0531
Townsend, K; Lingard, H; Bradley, L and Brown, K (2012) Complicated working time arrangements: Construction industry case study. Journal of Construction Engineering and Management, 138(3), pp. 443-448. ISSN 0733-9364
Tummalapudi, M (2022) Strategic factors for implementing a multiple career path construction doctoral program: A mixed methods study. PhD thesis, Colorado State University, USA.
Turner, M and Lingard, H (2011) Demands and resources of workers in the Australian construction industry: Identification and exploration using q methodology. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
V Nithyapriyadharshini (2017) A study on the workplace issues faced by women labours in the construction industry in Chennai city. PhD thesis, Mother Teresa Womens University, India.
Walsh, A J (2021) Cultural dissonance as a risk factor in the construction of megaprojects: The experience of western consultants working in the gulf cooperation council. DProf thesis, University of Salford, UK.
Wang, T; Abdallah, M; Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(1), pp. 82-100. ISSN 0969-9988
Wang, X; Du, M; Li, H X; Hasan, A and Ahmadian Fard Fini, A (2025) Gender inequality and challenges of women in the construction industry: An evidenced-based analysis from China. Engineering, Construction and Architectural Management, 32(13), pp. 213-233. ISSN 0969-9988
Wronska, M (2023) Designing and evaluating a participatory workplace nutrition intervention to improve the health and wellbeing of blue-collar (construction) workers. PhD thesis, University of Salford, UK.
Yip, B and Rowlinson, S (2009) Job redesign as an intervention strategy of burnout: Organizational perspective. Journal of Construction Engineering and Management, 135(8), pp. 737-745. ISSN 0733-9364
Yip, B L P (2007) Job burnout among construction professionals in Hong Kong: A moderator model with coping strategies. PhD thesis, University of Hong Kong, Hong Kong.
Yokouchi, N; Ambe, T; Fujisaki-Sueda-Sakai, M and Ozawa, K (2024) Workplace bullying and harassment in the Japanese construction industry: prevalence and associations with subjective health and work attractiveness. Construction Management and Economics, 42(8), pp. 741-757. ISSN 01446193
Up a level