Items with Index Term: work study
Barker, R (2006) Waste assessment and application of improvement techniques in UK private housebuilding supply chains. PhD thesis, Cardiff University, UK.
Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes. PhD thesis, Aston University, UK.
Bokor, O (2022) Improving labour productivity in construction. A hybrid machine learning approach. PhD thesis, University of Northumbria at Newcastle, UK.
Brito, Luiz Antonio Perrone Ferreira de (2006) Corrections in the determination of the sound power level obtained through intensimetry technique. PhD thesis, Universidade Estadual de Campinas, Brazil.
Brodetskaia, I; Sacks, R and Shapira, A (2011) A workflow model for systems and interior finishing works in building construction. Construction Management and Economics, 29(12), pp. 1209-1227. ISSN 1466433X
Cheetham, D W and Lewis, J (2001) Productivity, buildability and constructability: Is work study the missing link? In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Dutch, W G (1989) The capital cost aspects of the environmental impact of new highways in association with the new design technique: the commercial route methodology. PhD thesis, Loughborough University, UK.
Edwards, D J and Holt, G D (2010) Cost-effective risk assessment of hand-arm vibration exposure. Journal of Financial Management of Property and Construction, 15(2), pp. 158-175. ISSN 1366-4387
Kumaraswamy, M M (1997) Productivity matters. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.
Loganathan, S; Forsythe, P and Kalidindi, S N (2018) Work practices of onsite construction crews and their influence on productivity. Construction Economics and Building, 18(3), pp. 18-39. ISSN 2204-9029
Peer, S (1986) An improved systematic activity sampling technique for work study. Construction Management and Economics, 4(2), pp. 151-159. ISSN 01446193
Price, A D F (1986) An evaluation of production output for in situ concrete work. PhD thesis, Loughborough University, UK.
Sandagomika, H; Shringi, A; Mohandes, S R; Kineber, A F; Bazli, M and Arashpour, M (2024) Mixed reality-based approach for minimizing time uncertainty in prefabrication. Journal of Construction Engineering and Management, 150(11): 04024147, ISSN 0733-9364
Shafique, F (2020) Transformational leadership for sustainability in architecture engineering and construction project teams. PhD thesis, Michigan State University, USA.
Shapira, A and Goldfinger, D (2000) Work-input model for assembly and disassembly of high shoring towers. Construction Management and Economics, 18(4), pp. 467-477. ISSN 01446193
Shapira, A; Rosenfeld, Y and Mizrahi, I (2008) Vision system for tower cranes. Journal of Construction Engineering and Management, 134(5), pp. 320-332. ISSN 0733-9364
Vegad, K; Madurwar, M and Ralegaonkar, R (2014) Application of AV-ERP system for on-site project monitoring. Construction Innovation, 14(4), pp. 518-531. ISSN 1471-4175
Zakeri, M (1996) An evaluation of productivity and management practice in the Iranian construction industry. PhD thesis, University of Wolverhampton, UK.
Up a level