Items with Index Term: whole life cycle
Al-Saeed, Y; Parn, E; Edwards, D J and Scaysbrook, S (2019) A conceptual framework for utilising BIM digital objects (BDO) in manufacturing design and production: A case study. Journal of Engineering, Design and Technology, 17(5), pp. 960-984. ISSN 1726-0531
Almeida, Laura (2019) Energy-related occupant behaviour in green and non-rated buildings. PhD thesis, Western Sydney University, Australia.
Amuda Yusuf, G and Mohamed, S F (2014) Perceived benefits of adopting standard: based pricing mechanism for mechanical and electrical services installations. Construction Economics and Building, 14(2), pp. 104-119. ISSN 2204-9029
Awodele, O A (2012) Framework for managing risk in privately financed market projects in Nigeria. PhD thesis, Heriot-Watt University, UK.
Ayman Anwar, R (2022) Enhancing the integration of sustainability assessment within dynamic BIM enabled design projects. PhD thesis, Northumbria University, UK.
Bechem, E E (2023) A human touch to public-private partnerships for sustainable infrastructure development in the central African sub-region. PhD thesis, University of Manchester, UK.
Borg, M (2001) Environmental assessment of materials, components and buildings: Building-specific considerations, open-loop recycling, variations in assessment results and the usage phase of buildings. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.
Boussabaine, A H and Kirkham, R J (2004) Simulation of maintenance costs in UK local authority sport centres. Construction Management and Economics, 22(10), pp. 1011-1020. ISSN 01446193
Bridge, C and Carnemolla, P (2014) An enabling BIM block library: An online repository to facilitate social inclusion in Australia. Construction Innovation, 14(4), pp. 477-492. ISSN 1471-4175
Bromilow, F J and Tucker, S N (1983) Terotechnological optimality in construction. Construction Papers, 2(1), pp. 41-50. ISSN 0144-8587
Brunklaus, B; Thormark, C and Baumann, H (2010) Illustrating limitations of energy studies of buildings with LCA and actor analysis. Building Research & Information, 38(3), pp. 265-279. ISSN 0961-3218
Charles, S P R; Wanigarathna, N and Sherratt, F (2015) Construction project change: Investigating cost and benefits. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Chen, W (2019) Integration of building information modeling and internet of things for facility maintenance management. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Cheng, J and Proverbs, D G (2004) The impact of strategic decisions on construction client satisfaction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Crippa, J; Araujo, A M F; Bem, D; Ugaya, C M L and Scheer, S (2020) A systematic review of BIM usage for life cycle impact assessment. Built Environment Project and Asset Management, 10(4), pp. 603-618. ISSN 2044-124X
Dalla Valle, Anna (2019) Environment-driven change management in AEC firms: Life cycle perspective in practice. PhD thesis, Politecnico di Milano, Italy.
Enshassi, A; Ayash, A and Mohamed, S (2018) Key barriers to the implementation of energy-management strategies in building construction projects. International Journal of Building Pathology and Adaptation, 36(1), pp. 15-40. ISSN 23984708
Georgiadou, M C (2019) An overview of benefits and challenges of building information modelling (BIM) adoption in UK residential projects. Construction Innovation, 19(3), pp. 298-320. ISSN 1471-4175
Goncalves Sartori, Thais (2023) Improving whole building life cycle assessment software tools for decision-making. PhD thesis, Queensland University of Technology, Australia.
Henjewele, C; Sun, M and Fewings, P (2012) Analysis of factors affecting value for money in UK PFI projects. Journal of Financial Management of Property and Construction, 17(1), pp. 9-28. ISSN 1366-4387
Hosseini, S M A; De La Fuente, A and Pons, O (2016) Multicriteria decision-making method for sustainable site location of post-disaster temporary housing in urban areas. Journal of Construction Engineering and Management, 142(9): 04016036, ISSN 0733-9364
Hübner, D.; Moghayedi, A. and Michell, K. (2026) Affordable net-zero carbon housing in the Global South: Pathways towards a resilient built environment. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X
Ibrahim, A D (2007) The development of a procurement strategy for primary health care facilities in Nigeria. PhD thesis, Loughborough University, UK.
Ibrahim, A D; Price, A D F and Dainty, A R J (2006) The analysis and allocation of risks in public private partnerships in infrastructure projects in Nigeria. Journal of Financial Management of Property and Construction, 11(3), pp. 149-164. ISSN 1366-4387
Jaskula, K; Kifokeris, D; Papadonikolaki, E and Rovas, D (2025) Blockchain-based decentralized common data environment: User requirements and conceptual framework. Journal of Construction Engineering and Management, 151(9): 04025112, ISSN 0733-9364
Jayawardana, Jayawardanage Janappriya (2024) Investigating the sustainability of modern construction practices focusing on prefabricated construction. PhD thesis, RMIT University, Australia.
Jiang, W; Martek, I; Hosseini, M R and Chen, C (2021) Political risk management of foreign direct investment in infrastructure projects: Bibliometric-qualitative analyses of research in developing countries. Engineering, Construction and Architectural Management, 28(1), pp. 125-153. ISSN 0969-9988
Kakitahi, J M; Landin, A and Alinaitwe, H M (2013) An exploratory study of rework causality in Uganda. Construction Innovation, 13(3), pp. 266-280. ISSN 1471-4175
Khan, M W and Ali, Y (2020) Sustainable construction: Lessons learned from life cycle assessment (LCA) and life cycle cost analysis (LCCA). Construction Innovation, 20(2), pp. 191-207. ISSN 1471-4175
Kirkham, R J (2002) A stochastic whole life cycle cost model for a national health service acute care hospital building. PhD thesis, University of Liverpool, UK.
Kirkham, R J (2005) Re-engineering the whole life cycle costing process. Construction Management and Economics, 23(1), pp. 9-14. ISSN 01446193
Kirkham, R J; Alisa, M; Silva, A P d; Grindley, T and Brøndsted, J (2004) Rethinking whole life cycle cost based design decision-making. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Kirkham, R J and Boussabaine, A H (2001) Modelling probability distributions of facilities management costs for an NHS acute care hospital building. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.
Kirkham, R J; Boussabaine, A H and Awwad, B H (2002) Probability distributions of facilities management costs for whole life cycle costing in acute care nhs hospital buildings. Construction Management and Economics, 20(3), pp. 251-261. ISSN 01446193
Kirkham, R J; Halim Boussabaine, A and Kirkham, M P (2002) Stochastic time series forecasting of electricity costs in an nhs acute care hospital building, for use in whole life cycle costing. Engineering, Construction and Architectural Management, 9(1), pp. 38-52. ISSN 0969-9988
Korpela, J; Miettinen, R; Salmikivi, T and Ihalainen, J (2015) The challenges and potentials of utilizing building information modelling in facility management: The case of the center for properties and facilities of the University of Helsinki. Construction Management and Economics, 33(1), pp. 3-17. ISSN 01446193
Korpela J, M R (2013) BIM in facility management and maintenance: The case of Kaisa Library of Helsinki University. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Kwok, C; Young, R J and Kirkham, R J (2010) Risk and asset management in privatization/private finance of public utiliities: A risk investigation of water infrastructure projects in China. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Liu, J; Jiang, M; Wang, Z; Lu, M; Wang, L and Zhang, X (2025) A business model canvas for construction waste resource use under dual carbon targets. International Journal of Construction Management, 25(13), pp. 1570-1582. ISSN 1562-3599
Liu, W; Chan, A P C; Debrah, C and Darko, A (2026) Evaluating project success for emergency healthcare infrastructure based on the cloud matter-element model. Journal of Construction Engineering and Management, 152(5): 04026038, ISSN 0733-9364
Mat Noor, Noorsidi Aizuddin (2014) Framework of whole life cycle costing for Malaysian high rise residential property development. PhD thesis, Queensland University of Technology, Australia.
Matipa, W M; Bain, I A and Naik, B (2010) Cost optimization techniques for sustainable buildings: Analysis beyond energy performance certificates. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Matipa, W M; Cunningham, P and Naik, B (2010) Assessing the impact of new rules of cost planning on building information model (BIM) schema pertinent to quantity surveying practice. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Mohamed, I F; Edwards, D J; Mateo-Garcia, M; Costin, G and Thwala, W D D (2020) An investigation into the construction industry's view on fire prevention in high-rise buildings post Grenfell. International Journal of Building Pathology and Adaptation, 38(3), pp. 451-471. ISSN 23984708
Moore, N (2013) A model based system for contextual on-site construction planning in augmented reality. PhD thesis, University of Wolverhampton, UK.
Mootanah, D P (1999) A holistic approach to the management of risk and value in project management. PhD thesis, Anglia Polytechnic University, UK.
Mostavi, E (2018) Development of multiple criteria decision making instrument in designing of high performance commercial buildings. PhD thesis, Pennsylvania State University, USA.
Nordby, A S; Berge, B; Hakonsen, F and Hestnes, A G (2009) Criteria for salvageability: The reuse of bricks. Building Research & Information, 37(1), pp. 55-67. ISSN 0961-3218
Nyando, C K and van Breda Strasheim, J A (2012) Assessing labour-based construction works management processes. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(4), pp. 239-251. ISSN 17514312
Park, K; Hwang, Y; Seo, S and Seo, H (2003) Quantitative assessment of environmental impacts on life cycle of highways. Journal of Construction Engineering and Management, 129(1), pp. 25-31. ISSN 0733-9364
Pellegrini-Masini, G; Bowles, G; Peacock, A D; Ahadzi, M and Banfill, P F G (2010) Whole life costing of domestic energy demand reduction technologies: Householder perspectives. Construction Management and Economics, 28(3), pp. 217-229. ISSN 1466433X
Phillips, S; Dainty, A and Price, A (2007) The development of a tender analysis support tool for use in social housing best value procurement. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Rasmussen, F. N.; Birkved, M. and Birgisdóttir, H. (2020) Low-carbon design strategies for new residential buildings: Lessons from architectural practice. Architectural Engineering and Design Management, 16(5), pp. 374-390. ISSN 1745-2007
Rasmussen, F N; Birkved, M and Birgisdóttir, H (2020) Low- carbon design strategies for new residential buildings: lessons from architectural practice. Architectural Engineering and Design Management, 16(5), pp. 374-390. ISSN 1745-2007
Romeiras de Lemos, M T (2002) Sustainable competitive advantage in PFI: A systematic and holistic approach to identify the csfs in risk management in PFI, taking into account the whole life cycle. PhD thesis, University of Salford, UK.
Sapountzis, S (2013) An investigation into the development of an effective benefits realisation process for healthcare infrastructure projects. PhD thesis, University of Salford, UK.
Sasidharan, M P (2020) A risk-informed approach to setting economically-justifiable maintenance strategies for railway tracks. PhD thesis, University of Birmingham, UK.
Seadon, J and Tookey, J E (2019) Drivers for construction productivity. Engineering, Construction and Architectural Management, 26(6), pp. 945-961. ISSN 0969-9988
Shah R, W S R A (2013) Challenges and solutions for management of FRP usage in the UK rail sector. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Shrivastava, S (2012) Development of an energy information system for the construction phase of buildings: A contractor’s perspective. PhD thesis, University of Florida, USA.
Singh, R (2018) Defining models for project management processes. PhD thesis, King's College London, UK.
Szalay, Z (2008) Modelling building stock geometry for energy, emission and mass calculations. Building Research & Information, 36(6), pp. 557-567. ISSN 0961-3218
Theodorakopoulos, T F (2017) Integrated cost management system for delivering construction projects. PhD thesis, Loughborough University, UK.
Wang, Y; Li, Y and Zhuang, J (2025) Research on the green development path of prefabricated building industry based on intelligent technology. Engineering, Construction and Architectural Management, 32(12), pp. 8390-8422. ISSN 0969-9988
Wang, L; Lv, Y; Wang, T; Wan, S and Ye, Y (2025) Assessment of the impacts of the life cycle of construction waste on human health: Lessons from developing countries. Engineering, Construction and Architectural Management, 32(2), pp. 1348-1369. ISSN 0969-9988
Wang, N; Wang, H and Zhang, K (2022) The dynamics of changes in PPP projects: A meta-case analysis approach. Construction Management and Economics, 40(9), pp. 727-742. ISSN 01446193
Wu, J (2020) Optimization design of building isolation structure based on sustainable benefit analysis. International Journal of Building Pathology and Adaptation, 39(3), pp. 461-469. ISSN 23984708
Wu, S; Clements-Croome, D; Fairey, V; Albany, B; Sidhu, J; Desmond, D and Neale, K (2006) Reliability in the whole life cycle of building systems. Engineering, Construction and Architectural Management, 13(2), pp. 136-153. ISSN 0969-9988
Xenidis, Y and Angelides, D (2005) Identification and classification of risks in a new modelling process for build-operate-transfer projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Yue, J; Li, W; Cheng, J; Xiong, H; Xue, Y; Deng, X and Zheng, T (2023) A dynamic calculation model of the carbon footprint in the life cycle of hospital building: A case study in China. Engineering, Construction and Architectural Management, 30(10), pp. 4735-4761. ISSN 0969-9988
Zantke, G and Mangels, B (1999) Public sector client-private sector project: Transferring the state construction administration into private hands. Engineering, Construction and Architectural Management, 6(1), pp. 78-87. ISSN 0969-9988
Zhang, L and Agapiou, A (2020) Influence diagrams for off-site construction manufacturing risk assessment in China. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 174(4), pp. 145-162. ISSN 17514304
de Lemos, T; Almeida, L; Betts, M and Eaton, D (2003) An examination on the sustainable competitive advantage of private finance initiative projects. Construction Innovation, 3(4), pp. 249-259. ISSN 1471-4175
van den Berg, M; Voordijk, H and Adriaanse, A (2020) Information processing for end-of-life coordination: a multiple-case study. Construction Innovation, 20(4), pp. 647-671. ISSN 1471-4175
Up a level