Items with Index Term: weather

Number of items: 333.

Abas, M; Khattak, S B; Habib, T and Nadir, U (2022) Assessment of critical risk and success factors in construction supply chain: A case of Pakistan. International Journal of Construction Management, 22(12), pp. 2258-2266. ISSN 1562-3599

Abbas, G. M.; Meral Akgül, Ç and Dino, I. G. (2025) Resilient cooling of the Mediterranean office spaces under climate change. Architectural Engineering and Design Management, 21(6), pp. 1165-1186. ISSN 1745-2007

Abdelmageed, S; Abdelkhalek, S I F M; Hussien, M and Zayed, T (2024) A hybrid simulation model for modules installation in modular integrated construction projects. International Journal of Construction Management, 24(13), pp. 1407-1418. ISSN 1562-3599

Abdi, A (2014) Efficient winter road maintenance: A study of technical and contractual issues. PhD thesis, KTH Royal Institute of Technology, Sweden.

Abdi, A; Lind, H and Birgisson, B (2013) Payment mechanisms for winter road maintenance services. Construction Economics and Building, 13(4), pp. 18-31. ISSN 2204-9029

Abdulai, S F; Zayed, T; Taiwo, R and Ali, A H (2025) Hybrid statistical analysis of critical alignment factors in modular integrated construction. Journal of Construction Engineering and Management, 151(9): 04025129, ISSN 0733-9364

Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.

Abdulkareem, M (2016) Investigation of the daylighting and the thermal environment of Nigeria's low-income housing: the case of Abuja. PhD thesis, University of Portsmouth, UK.

AbouRizk, S M and Wales, R J (1997) Combined discrete-event/continuous simulation for project planning. Journal of Construction Engineering and Management, 123(1), pp. 11-20. ISSN 0733-9364

Abourizk, S M; Halpin, D W and Wilson, J R (1994) Fitting beta distributions based on sample data. Journal of Construction Engineering and Management, 120(2), pp. 288-305. ISSN 0733-9364

Abuhussain, M (2020) An assessment of the Saudi Residential Buildings Envelope Code under the current and future climate change scenarios: the case for Jeddah in the hot and humid climate region. PhD thesis, University of Liverpool, UK.

Adams, K A (2023) A multi-hazard cascading risk model for coastal rail infrastructure: numerical modelling & engineering failure analysis. PhD thesis, Brunel University, UK.

Adedeji, J A; Fadamiro, J A and Odeyale, T O (2020) Design toolkits for campus open spaces from post-occupancy evaluations of federal universities in South-West Nigeria. Built Environment Project and Asset Management, 10(2), pp. 296-311. ISSN 2044-124X

Adekunle, T O (2019) Summer performance, comfort, and heat stress in structural timber buildings under moderate weather conditions. Smart and Sustainable Built Environment, 8(3), pp. 220-242. ISSN 2046-6099

Agbo, E A; Izam, Y D and Ayegba, C (2022) Quantifying the impact of work environment factors on the variability of labour productivity in wall plastering. Journal of Construction in Developing Countries, 27(2), pp. 109-125. ISSN 1823-6499

Agyakwa-Baah, A and Chileshe, N (2010) Construction professionals perception of risk assesssment and management practices: Does length of service in construction industry matter. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Ahmadi Esfahani, N and Shahandashti, M (2020) Post-hazard labor wage fluctuations: A comparative empirical analysis among different sub-sectors of the U.S. Construction sector. Journal of Financial Management of Property and Construction, 25(3), pp. 313-330. ISSN 1366-4387

Ahuja, H N and Nandakumar, V (1985) Simulation model to forecast project completion time. Journal of Construction Engineering and Management, 111(4), pp. 325-342. ISSN 0733-9364

Al Omari, Mohammad K (2025) Application of the AI-enabled unmanned aerial systems in resolving highway construction claims. PhD thesis, University of Illinois at Chicago, USA.

Al-Refaie, A; Alashwal, A; Abdul-Samad, Z; Salleh, H and Elshafie, A (2023) Evaluation of weather-productivity models of construction labour for tropics. Built Environment Project and Asset Management, 13(2), pp. 238-252. ISSN 2044-124X

Al-saeed, Y W; Ahmed, A and Pärn, E A (2020) An 80-year projection of nZEB strategies in extreme climatic conditions of Iraq. International Journal of Building Pathology and Adaptation, 38(3), pp. 472-492. ISSN 23984708

Ali, F M M and Jones, K (2013) Negotiating community resilience in the city in a time of political change and deficit reduction. International Journal of Disaster Resilience in the Built Environment, 4(1), pp. 9-22. ISSN 1759-5916

Alinaitwe, H; Nyamutale, W and Tindiwensi, D (2014) Design phase constructability improvement strategies for highway projects in Uganda. Journal of Construction in Developing Countries, 19(1), pp. 127-140. ISSN 1823-6499

Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.

Alrefaie, A M; Abdul-Samad, Z; Salleh, H; Alashwal, A M and Amos, D (2023) Modelling labour productivity of reinforcement bar using polynomial regression: A study on a tropical country's weather. International Journal of Construction Management, 23(10), pp. 1633-1641. ISSN 1562-3599

Alvanchi, A and JavadiAghdam, S (2019) Job site weather index: an indicator for open environment construction projects. Construction Innovation, 19(1), pp. 110-124. ISSN 1471-4175

Amadi, A I (2021) A back-end view to climatic adaptation: Partitioning weather-induced cement demand variance in wet humid environment. International Journal of Building Pathology and Adaptation, 39(2), pp. 153-174. ISSN 23984708

Ammar, M A and Samy, M (2015) Learning curve modelling of gas pipeline construction in Egypt. International Journal of Construction Management, 15(3), pp. 229-238. ISSN 1562-3599

Amorim, Adriana Eloa Bento (2020) Construction workers remote estimate of the wbgt index in outdoor activities on concrete slabs. PhD thesis, Universidade Estadual de Campinas, Brazil.

Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation. PhD thesis, Purdue University, USA.

Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364

Anastasopoulos, P C; Labi, S; Bhargava, A and Mannering, F L (2012) Empirical assessment of the likelihood and duration of highway project time delays. Journal of Construction Engineering and Management, 138(3), pp. 390-398. ISSN 0733-9364

Andersen, M; Kleindienst, S; Yi, L; Lee, J; Bodart, M and Cutler, B (2008) An intuitive daylighting performance analysis and optimization approach. Building Research & Information, 36(6), pp. 593-607. ISSN 0961-3218

Apipattanavis, S (2007) Stochastic nonparametric methods for multi-site weather generation and flood frequency estimation: Applications to construction delay, hydrology and agricultural modeling. PhD thesis, University of Colorado at Boulder, USA.

Apipattanavis, S; Sabol, K; Molenaar, K R; Rajagopalan, B; Xi, Y; Blackard, B and Patil, S (2010) Integrated framework for quantifying and predicting weather-related highway construction delays. Journal of Construction Engineering and Management, 136(11), pp. 1160-1168. ISSN 0733-9364

Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2013) A new approach for modelling variability in residential construction projects. Construction Economics and Building, 13(2), pp. 83-92. ISSN 2204-9029

Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2014) Analysis of disruptions caused by construction field rework on productivity in residential projects. Journal of Construction Engineering and Management, 140(2): 04013053, ISSN 0733-9364

Arditi, D; Ayrancioglu, M and Shi, J J (2005) Worker safety issues in night-time highway construction. Engineering, Construction and Architectural Management, 12(5), pp. 487-501. ISSN 0969-9988

Arman, M H R (2014) Using option theory to manage risks in highway winter operations. PhD thesis, Purdue University, USA.

Ashuri, B; Wang, J; Shahandashti, M and Baek, M (2019) A data envelopment analysis (DEA) model for building energy benchmarking. Journal of Engineering, Design and Technology, 17(4), pp. 747-768. ISSN 1726-0531

Aslan, Zaki M (2008) The design of protective structures for the conservation and presentation of archaeological sites. PhD thesis, University College London, UK.

Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran. PhD thesis, Nottingham Trent University, UK.

Asnaashari, E; Knight, A; Hurst, A and Farahani, S S (2009) Causes of construction delays in Iran: Project management, logistics, technology and environment. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Atef Elhamy Kamel, M (2013) Encouraging walkability in GCC cities: Smart urban solutions. Smart and Sustainable Built Environment, 2(3), pp. 288-310. ISSN 2046-6099

Au, Chung Yu Maria (2013) An optimal contract strategy in managing extension of time provisions in building contracts. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Ayda Montaser, K and Heidari, S (2021) Optimizing window size by integrating energy and lighting analyses considering occupants' visual satisfaction. Built Environment Project and Asset Management, 11(4), pp. 673-686. ISSN 2044-124X

Ayodeji, F J (2014) Evaluation of site managers' hindrances towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(3), pp. 348-363.

Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.

Ayyub, B M and Haidar, A (1985) Decisions in construction operations. Journal of Construction Engineering and Management, 111(4), pp. 343-357. ISSN 0733-9364

Ballesteros-Pérez, P; Smith, S T; Lloyd-Papworth, J G and Cooke, P (2018) Incorporating the effect of weather in construction scheduling and management with sine wave curves: Application in the United Kingdom. Construction Management and Economics, 36(12), pp. 666-682. ISSN 01446193

Ballesteros-Pérez, P; del Campo-Hitschfeld, M L; González-Naranjo, M A and González-Cruz, M C (2015) Climate and construction delays: Case study in Chile. Engineering, Construction and Architectural Management, 22(6), pp. 596-621. ISSN 0969-9988

Banawi, A A (2013) Improving construction processes by integrating lean, green, and six-sigma. PhD thesis, University of Pittsburgh, USA.

Barcia, R M (1985) Construction production planning and optimal control. PhD thesis, University of Waterloo, Canada.

Bennett, J and Ormerod, R N (1984) Simulation applied to construction projects. Construction Management and Economics, 2(3), pp. 225-263. ISSN 01446193

Bilhaif, A (1990) The influence of high temperatures on the productivity of construction workers. PhD thesis, University of Reading, UK.

Birgonul, Z (2021) A receptive-responsive tool for customizing occupant's thermal comfort and maximizing energy efficiency by blending BIM data with real-time information. Smart and Sustainable Built Environment, 10(3), pp. 504-535. ISSN 2046-6099

Bortey, L; Edwards, D J; Roberts, C and Rillie, I (2025) Unravelling incipient accidents: A machine learning prediction of incident risks in highway operations. Smart and Sustainable Built Environment, 14(6), pp. 1991-2022. ISSN 2046-6099

Buzzelli, M D (2001) The Canadian urban housebuilding industry: Firm size structure and production methods in Ontario, 1945–2000. PhD thesis, McMaster University, Canada.

Cardellicchio, L (2021) Building defects in new iconic structures: The technical challenge and the economic impact of restoring the Jubilee Church in Rome. Architectural Engineering and Design Management, 17(1-2), pp. 146-166. ISSN 1745-2007

Cattaneo, S and Mola, F (2012) Assessing the quality control of self-consolidating concrete properties. Journal of Construction Engineering and Management, 138(2), pp. 197-205. ISSN 0733-9364

Cebrat, K; Narożny, J; Baborska-Narozny, M and Smektała, M (2025) Modelling site-specific outdoor temperature for buildings in urban environments. Buildings & Cities, 6(1), pp. 490-510. ISSN 2632-6655

Cepeda, D M; Sohail, M and Ogunlowo, O O (2018) Understanding the critical success factors for delivery of megaprojects in Colombia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 45-57. ISSN 17514304

Chan, E H W and Au, M C Y (2008) Relationship between organizational sizes and contractors' risk pricing behaviors for weather risk under different project values and durations. Journal of Construction Engineering and Management, 134(9), pp. 673-680. ISSN 0733-9364

Chand, A M and Loosemore, M (2016) Hospital learning from extreme weather events: Using causal loop diagrams. Building Research & Information, 44(8), pp. 875-888. ISSN 0961-3218

Chand A M, L M (2013) Reconceptualising hospital facility resilience to extreme weather events using a panarchy model. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Chang, T C; William, C and Crandall, K C (1990) Network resource allocation with support of a fuzzy expert system. Journal of Construction Engineering and Management, 116(2), pp. 239-260. ISSN 0733-9364

Chang, T-C (1987) Network resource allocation using an expert system with fuzzy logic reasoning. PhD thesis, University of California, Berkeley, USA.

Chi, S; Han, S and Kim, D Y (2013) Relationship between unsafe working conditions and workers' behavior and impact of working conditions on injury severity in U.S. Construction industry. Journal of Construction Engineering and Management, 139(7), pp. 826-838. ISSN 0733-9364

Chileshe, N; Boadua, A and Yirenkyi, F (2011) Perceptions of threat risk frequency and impact on construction projects in Ghana: Opinion survey findings. Journal of Construction in Developing Countries, 16(2), pp. 115-149. ISSN 1823-6499

Chileshe, N and Boadua Yirenkyi-Fianko, A (2012) An evaluation of risk factors impacting construction projects in Ghana. Journal of Engineering, Design and Technology, 10(3), pp. 306-329. ISSN 1726-0531

Chileshe, N; Kavishe, N and Edwards, D J (2021) Critical factors influencing the bid or no-bid decision of the indigenous small building contractors in Tanzania. Construction Innovation, 21(2), pp. 182-202. ISSN 1471-4175

Choi, J (2006) Quantifying the effects of interference through use of an alternative method of productivity estimation. PhD thesis, University of Florida, USA.

Chow, D H C (2005) Effects of future climate change and near-extreme weather on office building in the UK. PhD thesis, University of Manchester, UK.

Chu, L (2017) Incorporation of functional considerations in highway pavement design and operations. PhD thesis, National University of Singapore, Singapore.

Cohenca, D; Laufer, A and Ledbetter, W B (1989) Factors affecting construction planning efforts. Journal of Construction Engineering and Management, 115(1), pp. 70-89. ISSN 0733-9364

Crawley, J; McKenna, E; Gori, V and Oreszczyn, T (2020) Creating domestic building thermal performance ratings using smart meter data. Buildings & Cities, 1(1), pp. 1-13. ISSN 2632-6655

Daneshfar, M (2024) Integration of geospatial and environmental data to support building renovation. PhD thesis, Technische Universitaet Berlin, Germany.

Danforth, E M; Weidman, J E and Farnsworth, C B (2017) Strategies employed and lessons learned by commercial construction companies during economic recession and recovery. Journal of Construction Engineering and Management, 143(7): 04017027, ISSN 0733-9364

Darko, A; Glushakova, I; Boateng, E B and Chan, A P C (2023) Using machine learning to improve cost and duration prediction accuracy in green building projects. Journal of Construction Engineering and Management, 149(8): 04023061, ISSN 0733-9364

Dauber, V F (2003) Measuring and minimising waste in construction by applying lean thinking. PhD thesis, University of Dundee, UK.

Davies, A-M (2004) Using images to present stated preference information: an application to the built environment. PhD thesis, Robert Gordon University, UK.

Dawood, N (1998) Estimating project and activity duration: A risk management approach using network analysis. Construction Management and Economics, 16(1), pp. 41-48. ISSN 01446193

Dawood, N N and Neale, R H (1993) Forecasting the sales of precast concrete building products. Construction Management and Economics, 11(2), pp. 81-98. ISSN 01446193

De Dear, R; Kim, J; Candido, C and Deuble, M (2015) Adaptive thermal comfort in Australian school classrooms. Building Research & Information, 43(3), pp. 383-398. ISSN 0961-3218

Deacon, H A and Kajimo-Shakantu, K (2024) The prevalence of claims under the JBCC principal building agreement in South Africa. International Journal of Construction Management, 24(3), pp. 331-338. ISSN 1562-3599

Delgoshaei, P (2017) Semantic models and reasoning for building system operations: Focus on knowledge-based control and fault detection for HVAC. PhD thesis, University of Maryland, College Park, USA.

Desai, A (2012) Formulating an FM strategy for climate change mitigation and adaptation of commercial built assets. PhD thesis, University of Greenwich, UK.

Domínguez-Hernández, J; Pérez-Bella, J M; Alonso-Martínez, M; Cano-Suñén, E and del Coz-Díaz, J J (2017) Assessment of water penetration risk in building facades throughout Brazil. Building Research & Information, 45(5), pp. 492-507. ISSN 0961-3218

Dsouza, M; Phadtare, A; Vyas, S S; Shinde, Y and Jadhav, A (2024) Toward resilient development in rural area: some strategic recommendations based on contextual findings in Bhokardan Taluka, Jalna. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 699-727. ISSN 1759-5916

Du, H (2012) Modelling of building performance under the UK climate change projections and the prediction of future heating and cooling design loads in building spaces. PhD thesis, University of Northumbria at Newcastle, UK.

Durdyev, S (2021) Review of construction journals on causes of project cost overruns. Engineering, Construction and Architectural Management, 28(4), pp. 1241-1260. ISSN 0969-9988

Edwards, D J; Yang, J; Cabahug, R and Love, P E D (2005) Intelligence and maintenance proficiency: An examination of plant operators. Construction Innovation, 5(4), pp. 243-254. ISSN 1471-4175

Egwim, C N; Alaka, H; Toriola-Coker, L O; Balogun, H; Ajayi, S and Oseghale, R (2023) Extraction of underlying factors causing construction projects delay in Nigeria. Journal of Engineering, Design and Technology, 21(5), pp. 1323-1342. ISSN 1726-0531

El Kholy, S M (1991) Time and architecture: Problems of duration and sequence in architectural design. PhD thesis, University of Pennsylvania, USA.

El-Rayes, K and Moselhi, O (2001) Impact of rainfall on the productivity of highway construction. Journal of Construction Engineering and Management, 127(2), pp. 125-131. ISSN 0733-9364

El-Sawalhi, N I and Ajwa, H E A (2013) Mud building practices in construction projects in the Gaza Strip. International Journal of Construction Management, 13(2), pp. 13-26. ISSN 1562-3599

Emuze, F (2017) The human contribution to unsafe construction acts and conditions in the central region of South Africa. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Emuze F, S T S W (2013) Perceived impact of the market on the business of regional contractors: A South African context. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Enshassi, A; Arain, F and Tayeh, B (2012) Major causes of problems between contractors and subcontractors in the Gaza Strip. Journal of Financial Management of Property and Construction, 17(1), pp. 92-112. ISSN 1366-4387

Erkoreka, A; Flores-Abascal, I; Escudero, C; Martin, K; Millan, J A and Sala, J M (2020) Flat roof hygrothermal performance testing and evaluation. International Journal of Building Pathology and Adaptation, 38(1), pp. 148-175. ISSN 23984708

Eslamirad, N; Malekpour Kolbadinejad, S; Mahdavinejad, M and Mehranrad, M (2020) Thermal comfort prediction by applying supervised machine learning in green sidewalks of Tehran. Smart and Sustainable Built Environment, 9(4), pp. 361-374. ISSN 2046-6099

Faniran, O O and Caban, G (1998) Minimizing waste on construction project sites. Engineering, Construction and Architectural Management, 5(2), pp. 182-188. ISSN 0969-9988

Farooghi, F (2020) The effect of natural disasters on construction labor wage fluctuations: A spatial difference-in-difference analysis. PhD thesis, University of Texas at Arlington, USA.

Federle, M O; Rowings, J E and Devany, T S (1993) Model of career choice for craftworkers. Journal of Construction Engineering and Management, 119(1), pp. 105-114. ISSN 0733-9364

Few, J and Elwell, C A (2023) Applying the CO2 concentration decay tracer gas method in long-term monitoring campaigns in occupied homes: Identifying appropriate unoccupied periods and decay periods. International Journal of Building Pathology and Adaptation, 41(1), pp. 96-108. ISSN 23984708

Few, J F M (2021) Ventilation in occupied homes: measurement, performance and sociotechnical perspectives. PhD thesis, University College London, UK.

Fisher, D J; O'Neill, M W and Contreras, J C (1995) DS^2: Drilled shaft decision support system. Journal of Construction Engineering and Management, 121(1), pp. 86-94. ISSN 0733-9364

Ford, B; Wilson, R; Gillott, M; Ibraheem, O; Salmeron, J and Sanchez, F J (2012) Passive downdraught evaporative cooling: Performance in a prototype house. Building Research & Information, 40(3), pp. 290-304. ISSN 0961-3218

Galaitsi, S E; Rand, K; Yeates, E; Talbot, C; O'Donnell, A; Pinigina, E and Linkov, I (2023) Stakeholder collaboration in the forecast-informed reservoir operations (firo) pilot project at lake mendocino, California. Built Environment Project and Asset Management, 13(6), pp. 880-895. ISSN 2044-124X

Galiano-Garrigós, A; García-Figueroa, A; Rizo-Maestre, C and González-Avilés, Á (2019) Evaluation of BIM energy performance and CO2 emissions assessment tools: A case study in warm weather. Building Research & Information, 47(7), pp. 787-812. ISSN 0961-3218

Ghanbari, M; Rusch, R and Skitmore, M (2024) BIM-based environmental assessment of residential renovation projects during the operational phase. Architectural Engineering and Design Management, 20(3), pp. 624-635. ISSN 1745-2007

Ghodki, M K; Swarup, A and Pal, Y (2020) A new IR and sprinkler based embedded controller directed robotic arm for automatic cleaning of solar panel. Journal of Engineering, Design and Technology, 18(4), pp. 905-921. ISSN 1726-0531

Ghosh, S; Krishna, S R; Billton, J V; Srikanth, S A; Mohandas, S; Ashwin Ganesh, M and Shiv Kulin, C (2021) Countering tropical cyclonic storm impacts on low-rise houses. Smart and Sustainable Built Environment, 10(4), pp. 631-652. ISSN 2046-6099

Glass, A (2011) Analysis of building-integrated renewable energy systems in modern UK homes. EngD thesis, University of Manchester, UK.

Golizadeh, H; Hosseini, M R; Edwards, D J; Abrishami, S; Taghavi, N and Banihashemi, S (2019) Barriers to adoption of RPAs on construction projects: a task–technology fit perspective. Construction Innovation, 19(2), pp. 149-169. ISSN 1471-4175

Goodarzizad, P; Mohammadi Golafshani, E and Arashpour, M (2023) Predicting the construction labour productivity using artificial neural network and grasshopper optimisation algorithm. International Journal of Construction Management, 23(5), pp. 763-779. ISSN 1562-3599

Guan, L (2009) Implication of global warming on air-conditioned office buildings in Australia. Building Research & Information, 37(1), pp. 43-54. ISSN 0961-3218

Gyasi-Addo, A J and Bennadji, A (2020) Investigating the major causes of morphological transformations in the cbd of Accra and the impact on urban heat island intensity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Halligan, D W; Demsetz, L A; Brown, J D and Pace, C B (1994) Action-response model and loss of productivity in construction. Journal of Construction Engineering and Management, 120(1), pp. 47-64. ISSN 0733-9364

Ham, Y (2015) Vision-based building energy diagnostics and retrofit analysis using 3D thermography and building information modeling. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hammad, A; Akbarnezhad, A; Grzybowska, H; Wu, P and Wang, X (2019) Mathematical optimisation of location and design of windows by considering energy performance, lighting and privacy of buildings. Smart and Sustainable Built Environment, 8(2), pp. 117-137. ISSN 2046-6099

Hamouda, H and Abu-Shaaban, N (2014) Enhancing labour productivity within construction industry through analytical hierarchy process, the case of Gaza Strip. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Hamstead, Z; Coseo, P; Alkhaled, S; Boamah, E F; Hondula, D M; Middel, A and Rajkovich, N (2020) Thermally resilient communities: Creating a socio-technical collaborative response to extreme temperatures. Buildings & Cities, 1(1), pp. 218-232. ISSN 2632-6655

Handa, V K and Barcia, R M (1986) Construction production planning. Journal of Construction Engineering and Management, 112(2), pp. 163-177. ISSN 0733-9364

Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hassandokht Mashhadi, A; Handy, R; Farhadmanesh, M; Rashidi, A; Honda, T; Sleeth, D K and Henry, T (2022) Feasibility study of using nebulizer-retrofitted uavs at construction projects: The case study of residential jobsites in Utah. Journal of Construction Engineering and Management, 148(10): 05022009, ISSN 0733-9364

Hassanein, A (2003) Planning and scheduling highway construction using GIS and dynamic programming. PhD thesis, Concordia University, Canada.

Hassanein, A and Moselhi, O (2004) Planning and scheduling highway construction. Journal of Construction Engineering and Management, 130(5), pp. 638-646. ISSN 0733-9364

Hatamleh, M T; Moynihan, G P; Batson, R G; Alzarrad, A and Ogunrinde, O (2023) Risk assessment and ranking in the developing countries' construction industry: The case of Jordan. Engineering, Construction and Architectural Management, 30(4), pp. 1344-1364. ISSN 0969-9988

Hazrati, A (2016) Predicting construction labor productivity with Bayesian belief networks. PhD thesis, University of Nebraska - Lincoln, USA.

Hebiba, A M; Bouferguene, A; Moon, S and Han, S (2022) Wind-wise automated stability analysis for selection of tower crane and location. Journal of Construction Engineering and Management, 148(11): 04022127, ISSN 0733-9364

Hewage, K N (2007) Construction productivity improvement by worker motivation and it based communication. PhD thesis, University of Calgary, Canada.

Hinze, J and Couey, J (1989) Weather in construction contracts. Journal of Construction Engineering and Management, 115(2), pp. 270-283. ISSN 0733-9364

Holmes, S H; Phillips, T and Wilson, A (2016) Overheating and passive habitability: Indoor health and heat indices. Building Research & Information, 44(1), pp. 1-19. ISSN 0961-3218

Hong, S M; Paterson, G; Mumovic, D and Steadman, P (2014) Improved benchmarking comparability for energy consumption in schools. Building Research & Information, 42(1), pp. 47-61. ISSN 0961-3218

Hou, H (2023) Understanding building and urban environment interactions: an integrated framework for building occupancy modelling. PhD thesis, Imperial College London, UK.

Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364

Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364

Hu, Y; Zhang, M; Ren, W; Li, H; Zhang, J; Wang, L and Shuai, S (2025) Detecting loss of balance in construction workers using millimeter wave sensing. Journal of Construction Engineering and Management, 151(12): 04025202, ISSN 0733-9364

Huang, R Y and Halpin, D W (1995) Graphical-based method for transient evaluation of construction operations. Journal of Construction Engineering and Management, 121(2), pp. 222-229. ISSN 0733-9364

Huebner, G M; Watson, N E; Direk, K; McKenna, E; Webborn, E; Hollick, F; Elam, S and Oreszczyn, T (2021) Survey study on energy use in UK homes during COVID-19. Buildings & Cities, 2(1), pp. 952-969. ISSN 2632-6655

Hulio, Z H; Yousufzai, G and Jiang, W (2021) Statistical analysis of wind resource and energy potential assessment of quaidabad site, sindh Pakistan. Journal of Engineering, Design and Technology, 19(6), pp. 1291-1316. ISSN 1726-0531

Ibrahim, M N; Thorpe, D and Mahmood, M N (2019) Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia. Construction Innovation, 19(4), pp. 550-569. ISSN 1471-4175

Inyang, N I (2013) A framework for ergonomic assessment of residential construction tasks. PhD thesis, University of Alberta, Canada.

Itzhak-Ben-shalom, H.; Saroglou, T.; Multanen, V.; Vanunu, A.; Karnieli, A.; Katoshevski, D.; Davidovitch, N. and Meir, I. A. (2025) Environmental variables and air quality: Implications for planning and public health. Buildings & Cities, 6(1), pp. 597-618. ISSN 2632-6655

Jack, R; Loveday, D; Allinson, D and Lomas, K (2018) First evidence for the reliability of building co-heating tests. Building Research & Information, 46(4), pp. 383-401. ISSN 0961-3218

Jackson, D J (2020) Addressing the challenges of reducing greenhouse gas emissions in the construction industry: a multi-perspective approach. PhD thesis, University of Edinburgh, UK.

Jamalizadeh, A.; Kargar, V.; Haghighi, A.; Jahangiri, M.; Alimohammadlou, M. and Kamalinia, M. (2026) Identification and prioritization of preventive measures for crane overturning to enhance safety in asymmetric tandem lifting: Fuzzy logic approach. Journal of Construction Engineering and Management, 152(8): 04026126, ISSN 0733-9364

James, P D (2012) The specification of construction strategies for low and zero carbon homes: decision-making tools and the evaluation of whole life energy, carbon, cost and performance. PhD thesis, University of Manchester, UK.

Jarkas, A M (2015) Factors influencing labour productivity in Bahrain's construction industry. International Journal of Construction Management, 15(1), pp. 94-108. ISSN 1562-3599

Jarkas, A M; Al Balushi, R A and Raveendranath, P K (2015) Determinants of construction labour productivity in Oman. International Journal of Construction Management, 15(4), pp. 332-344. ISSN 1562-3599

Jergeas, G F and Revay, S O (1993) Quantifying construction claims using the differential cost method. Construction Management and Economics, 11(2), pp. 163-166. ISSN 01446193

Ji, Y; Lee, A and Fernando, T (2020) Dynamic thermal simulation of advanced natural ventilation in buildings: Current and future usage, UK exemplar. Architectural Engineering and Design Management, 16(4), pp. 293-309. ISSN 1745-2007

Jiang, Y and Wu, H (2007) A method for highway agency to estimate highway construction durations and set contract times. International Journal of Construction Education and Research, 3(3), pp. 199-216. ISSN 1557-8771

Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364

Kaluarachchi, Y (2013) The awareness of two stakeholders and the resilience of their built assets to extreme weather events in England. International Journal of Disaster Resilience in the Built Environment, 4(3), pp. 297-316. ISSN 1759-5916

Karunyasopon, P; Park, D Y; Le, D M and Chang, S (2024) Performance analysis of transparent BIPV/T double skin façades integrated with the decision-making algorithm for mixed-mode building ventilation. Architectural Engineering and Design Management, 20(5), pp. 1141-1163. ISSN 1745-2007

Katsanis, C J (1998) An empirical examination of the relationships between strategy, structure and performance in building industry organizations. PhD thesis, Universite de Montreal, Canada.

Kerali, A G and Thomas, T H (2004) Simple durability test for cement stabilized blocks. Building Research & Information, 32(2), pp. 140-145. ISSN 0961-3218

Khalifa, R I (2019) Evaluating project assessment techniques for high-profile transportation projects development and delivery: Case of state departments of transportation (DOTS) in the United States. PhD thesis, Portland State University, USA.

Kim, K and De La Garza, J M (2005) Critical path method with multiple calendars. Journal of Construction Engineering and Management, 131(3), pp. 330-342. ISSN 0733-9364

Kim, K P and Park, K S (2016) Primary BIM dataset for refurbishing flood risk vulnerable housing in the UK. Built Environment Project and Asset Management, 6(4), pp. 365-378. ISSN 2044-124X

Kim, S (2023) Disaster management and recovery: Estimating the disaster impacts on construction costs and evaluating the policy effects on disaster recovery. PhD thesis, University of Texas at Arlington, USA.

Kleerekoper, L; van den Dobbelsteen, A A J F; Hordijk, G J; van Dorst, M J and Martin, C L (2015) Climate adaptation strategies: Achieving insight in microclimate effects of redevelopment options. Smart and Sustainable Built Environment, 4(1), pp. 110-136. ISSN 2046-6099

Koch, C (2012) Contested overruns and performance of offshore wind power plants. Construction Management and Economics, 30(8), pp. 609-622. ISSN 1466433X

Kodikara Edirisinghe, R. and Gunathilake, L. (2026) An IoT-based heat stress management system for the construction industry. Engineering, Construction and Architectural Management, 33(3), pp. 2200-2219. ISSN 0969-9988

Koehn, E and Brown, G (1985) Climatic effects on construction. Journal of Construction Engineering and Management, 111(2), pp. 129-137. ISSN 0733-9364

Kumar, V S S (1993) Application of fuzzy set theory in construction management. PhD thesis, Indian Institute of Technology Delhi, India.

Kuo, S-F (1995) Decision support for irrigated project planning using a genetic algorithm. PhD thesis, Utah State University, USA.

Kurtzer, D; Blackmore, N; Farrugia, N and Chileshe, N (2020) Productivity enablers and inhibiting health and wellbeing practices of South Australian construction site-based workers: A qualitative study. International Journal of Construction Management, 20(8), pp. 882-899. ISSN 1562-3599

La, Anh Tuan (2016) Principal factors for public-private partnership (ppp) implementation in Vietnam: A mixed methods study. PhD thesis, University of Technology Sydney, Australia.

Lamb, S and Kwok, K C S (2017) Sopite syndrome in wind-excited buildings: Productivity and wellbeing impacts. Building Research & Information, 45(3), pp. 347-358. ISSN 0961-3218

Larsson, R (2021) Modelling and simulation of factors influencing on-site construction of concrete frameworks: Studying the effects of resource allocation, weather conditions, and climate-improved concrete. PhD thesis, Lund University, Sweden.

Larsson, R and Rudberg, M (2019) Impact of weather conditions on in situ concrete wall operations using a simulation-based approach. Journal of Construction Engineering and Management, 145(7): 05019009, ISSN 0733-9364

Larsson, R and Rudberg, M (2023) Effects of weather conditions on concrete work task productivity: a questionnaire survey. Construction Innovation, 23(2), pp. 306-321. ISSN 1471-4175

Lataniotis, C (2019) Data-driven uncertainty quantification for high-dimensional engineering problems. DSc thesis, ETH Zürich, Switzerland.

Laufer, A and Cohenca, D (1990) Factors affecting construction-planning outcomes. Journal of Construction Engineering and Management, 116(1), pp. 135-156. ISSN 0733-9364

Lee, J; Jang, K; Sparkling, A E and Kang, K (2026) Large language model-based construction site management for severe weather preparedness. Journal of Construction Engineering and Management, 152(1): 04025220, ISSN 0733-9364

Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities. PhD thesis, Oklahoma State University, USA.

Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364

Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193

Liang, Y; Ashuri, B and Sun, W (2020) Analysis of the variability of project cost and schedule performance in the design-build environment. Journal of Construction Engineering and Management, 146(6): 04020060, ISSN 0733-9364

Lindhard, S M (2024) Applying work measurements to identify productivity potentials: The case of prefabricated concrete elements. International Journal of Construction Management, 24(15), pp. 1668-1678. ISSN 1562-3599

Lisø, K R; Hygen, H O; Kvande, T and Thue, J V (2006) Decay potential in wood structures using climate data. Building Research & Information, 34(6), pp. 546-551. ISSN 0961-3218

Lisø, K R; Kvande, T and Thue, J V (2005) High-performance weather-protective flashings. Building Research & Information, 33(1), pp. 41-54. ISSN 0961-3218

Liu, X; Song, Y; Yi, W; Wang, X and Zhu, J (2018) Comparing the random forest with the generalized additive model to evaluate the impacts of outdoor ambient environmental factors on scaffolding construction productivity. Journal of Construction Engineering and Management, 144(6): 04018037, ISSN 0733-9364

Loosemore, M and Chand, A (2016) Barriers to building resilience to extreme weather events in Australian hospitals. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Loosemore, M; Chow, V and Harvison, T (2013) Inter-agency governance risk in managing hospital responses to extreme weather events in New South Wales, Australia: A facilities management perspective of shared situational awareness. Construction Management and Economics, 31(10), pp. 1072-1082. ISSN 1466433X

Loosemore, M; Chow, V and McGeorge, D (2014) Managing the health risks of extreme weather events by managing hospital infrastructure. Engineering, Construction and Architectural Management, 21(1), pp. 4-32. ISSN 0969-9988

Loosemore, M; Chow, V W and McGeorge, D (2012) Modelling the risks of extreme weather events for Australasian hospital infrastructure using rich picture diagrams. Construction Management and Economics, 30(12), pp. 1071-1086. ISSN 1466433X

Lopane, F D (2022) Spatial optimisation for resilient infrastructure services. PhD thesis, University of Newcastle upon Tyne, UK.

Lu, N and Liska, R W (2008) Designers' and general contractors' perceptions of offsite construction techniques in the united state construction industry. International Journal of Construction Education and Research, 4(3), pp. 177-188. ISSN 1557-8771

Lyu, P (2025) Assessing the impact of weather conditions on safety in construction environments: Data-driven approaches for learning from accidents. PhD thesis, Arizona State University, USA.

Madhlopa, A (2016) Effect of controlling airflow in a solar chimney on thermal load in a built environment. Journal of Engineering, Design and Technology, 14(2), pp. 286-309.

Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects. PhD thesis, University of Nevada, Las Vegas, USA.

Mahdy, M M M (2014) Applying architecture simulation tools to assess building sustainable design: adapting the Egyptian residential energy code for climate change. PhD thesis, University of Kent, UK.

Mahmud, A T (2021) Enhancing the understanding of cost overrun drivers in highway projects in Nigeria through system dynamics modelling. PhD thesis, Heriot-Watt University, UK.

Mahmud, A T; Ogunlana, S O and Hong, W T (2021) Key driving factors of cost overrun in highway infrastructure projects in Nigeria: A context-based perspective. Journal of Engineering, Design and Technology, 19(6), pp. 1530-1555. ISSN 1726-0531

Majdalani, J G (2010) Management, operation, and maintenance of wastewater systems. DE thesis, Lamar University - Beaumont, USA.

Mangitung, D M (2005) Modelling the influence of periodic prequalification criteria on project performance. PhD thesis, University of Manchester, UK.

Maqsoom, A; Choudhry, R M; Umer, M and Mehmood, T (2021) Influencing factors indicating time delay in construction projects: Impact of firm size and experience. International Journal of Construction Management, 21(12), pp. 1251-1262. ISSN 1562-3599

Martínez, A; Alonso, C; Martín-Consuegra, F; Pérez, G; Frutos, B and Gutiérrez, Á (2021) Experimental analysis of a prototype for a thermochromic trombe wall. Building Research & Information, 49(7), pp. 777-794. ISSN 0961-3218

Mason, B (2023) Advancing autonomous green stormwater infrastructure. PhD thesis, University of Michigan, USA.

Mavrogianni, A; Pathan, A; Oikonomou, E; Biddulph, P; Symonds, P and Davies, M (2017) Inhabitant actions and summer overheating risk in London dwellings. Building Research & Information, 45(1-2), pp. 119-142. ISSN 0961-3218

Mbabazi, A (2004) Quantification and analysis of construction claims. PhD thesis, University of Waterloo, Canada.

Mdibi, L; Van Zyl, R; Kosch, M and Ward, J (2021) A land-based hf transmitter for ionospheric propagation studies using superdarn radars. Journal of Engineering, Design and Technology, 19(6), pp. 1648-1659. ISSN 1726-0531

Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.

Memarian, B and Mitropoulos, P (2014) Production system design for speed and reliability: A case study in concrete construction. International Journal of Construction Education and Research, 10(3), pp. 181-200. ISSN 1557-8771

Michael Gbolagade, O; Inimbom Walter, I and Emuze, F (2021) Towards sustainability practices deployment in building construction projects in Nigeria. Smart and Sustainable Built Environment, 10(4), pp. 759-780. ISSN 2046-6099

Mills, E (2003) Climate change, insurance and the buildings sector: Technological synergisms between adaptation and mitigation. Building Research & Information, 31(3-4), pp. 257-277. ISSN 0961-3218

Mitkees, L; Heidarinejad, M; Sabatino, M and Stephens, B (2024) Occupant thermal comfort and indoor environmental conditions in Mies van der Rohe's S.R. Crown hall. Building Research & Information, 52(3), pp. 249-272. ISSN 0961-3218

Mohajeri, N; Walch, A; Gudmundsson, A; Heaviside, C; Askari, S; Wilkinson, P and Davies, M (2021) COVID-19 mobility restrictions: Impacts on urban air quality and health. Buildings & Cities, 2(1), pp. 759-778. ISSN 2632-6655

Mohamed, Emad (2021) Decision-support system for construction risk management in onshore wind projects. PhD thesis, University of Alberta, Canada.

Moohialdin, A S M; Lamari, F; Miska, M and Trigunarsyah, B (2020) Construction worker productivity in hot and humid weather conditions: A review of measurement methods at task, crew and project levels. Engineering, Construction and Architectural Management, 27(1), pp. 83-108. ISSN 0969-9988

Moohialdin, A S M; Lamari, F; Miska, M and Trigunarsyah, B (2023) Proximity activity intensity identification system in hot and humid weather conditions: Development and implementation. Journal of Construction Engineering and Management, 149(12): 04023122, ISSN 0733-9364

Moohialdin, Ammar (2020) A real-time worker activity intensity identification system for construction workers under hot and humid weather conditions. PhD thesis, Queensland University of Technology, Australia.

Moreno, M; Ortiz, R and Ortiz, P (2024) Remote sensing to assess the risk for cultural heritage: Forecasting potential collapses due to rainfall in historic fortifications. International Journal of Building Pathology and Adaptation, 42(1), pp. 92-113. ISSN 23984708

Moselhi, O and Hassanein, A (2003) Optimized scheduling of linear projects. Journal of Construction Engineering and Management, 129(6), pp. 664-673. ISSN 0733-9364

Moselhi, O and Khan, Z (2012) Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(3), pp. 272-296. ISSN 1471-4175

Moselhi, O and Nicholas, M J (1990) Hybrid expert system for construction planning and scheduling. Journal of Construction Engineering and Management, 116(2), pp. 221-238. ISSN 0733-9364

Moynihan, G; Zhou, H and Cui, Q (2009) Stochastic modeling for pavement warranty cost estimation. Journal of Construction Engineering and Management, 135(5), pp. 352-359. ISSN 0733-9364

Mun, H; Jeong, J; Jeong, J and Kumi, L (2025) Statistical hypothesis test approach considering workers' thermal comfort to determine nonworking days in different climate zones. Journal of Construction Engineering and Management, 151(9): 04025116, ISSN 0733-9364

Muslimin, R. and Brasier, N. (2026) An analysis of outdoor thermal comfort impact on pedestrian walking patterns at sub-hour timescales with agent-based modelling. Smart and Sustainable Built Environment, 15(3), pp. 1149-1176. ISSN 2046-6099

Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.

Nafe Assafi, M; Hoque, M I and Hossain, M M (2024) Investigating the causes of construction delay on the perspective of organization-sectors involved in the construction industry of Bangladesh. International Journal of Building Pathology and Adaptation, 42(4), pp. 788-817. ISSN 23984708

Naji, K K; Gunduz, M and Hamaidi, M F (2022) Major factors affecting construction waste management in infrastructure projects using structural equation model. Journal of Construction Engineering and Management, 148(10): 04022101, ISSN 0733-9364

Nguyen, L D; Kneppers, J; García De Soto, B and Ibbs, W (2010) Analysis of adverse weather for excusable delays. Journal of Construction Engineering and Management, 136(12), pp. 1258-1267. ISSN 0733-9364

Nicol, J F; Hacker, J; Spires, B and Davies, H (2009) Suggestion for new approach to overheating diagnostics. Building Research & Information, 37(4), pp. 348-357. ISSN 0961-3218

Nikolić, D (2011) Evaluating a simulation game in construction engineering education: The virtual construction simulator 3. PhD thesis, Pennsylvania State University, USA.

Noor, I (1992) A study of the variability of labour productivity in building trades. PhD thesis, University of Dundee, UK.

Ochiai, C (2022) Windbreak stonewalls in a mountainous village of Japan: A case study of tsuchigoya in hongu-cho, tanabe city. International Journal of Disaster Resilience in the Built Environment, 13(2), pp. 197-210. ISSN 1759-5916

Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Odeyinka, H A and Yusif, A (1997) The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2(3), pp. 31-44. ISSN 1366-4387

Oladokun, T T (2016) Effects of climate change on commercial properties in Lagos state, Nigeria. African Journal of Built Environment Research, 1(1), pp. 15-27. ISSN 2414-0236

Olanrewaju, A; Tan, Y Y and Soh, S N (2022) Defect characterisations in the Malaysian affordable housing. International Journal of Building Pathology and Adaptation, 40(4), pp. 539-568. ISSN 23984708

Ovararin, N (2001) Quantifying productivity loss due to field disruptions in masonry construction. PhD thesis, University of Texas at Austin, USA.

Owusu-Manu, D G; Ghansah, F A; Darko, A; Asiedu, R O and Edwards, D J (2020) Insurable and non-insurable risks in complex project deals: Case of the Ghanaian construction industry. Journal of Engineering, Design and Technology, 18(6), pp. 1971-1995. ISSN 1726-0531

Ozkan, A; Kesik, T; Yilmaz, A Z and O’Brien, W (2019) Development and visualization of time-based building energy performance metrics. Building Research & Information, 47(5), pp. 493-517. ISSN 0961-3218

O’Connor, J T; Rusch, S E and Schulz, M J (1987) Constructability concepts for engineering and procurement. Journal of Construction Engineering and Management, 113(2), pp. 235-248. ISSN 0733-9364

Padilla, E M and Carr, R I (1991) Resource strategies for dynamic project management. Journal of Construction Engineering and Management, 117(2), pp. 279-293. ISSN 0733-9364

Palme, M; Inostroza, L and Salvati, A (2018) Technomass and cooling demand in South America: A superlinear relationship? Building Research & Information, 46(8), pp. 864-880. ISSN 0961-3218

Palmer, J; Bennetts, H; Pullen, S; Zuo, J; Ma, T and Chileshe, N (2014) The effect of dwelling occupants on energy consumption: The case of heat waves in Australia. Architectural Engineering and Design Management, 10(1-2), pp. 40-59. ISSN 1745-2007

Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.

Pavitt, T C (2002) Managing construction interfaces within the building facade. PhD thesis, Loughborough University, UK.

Persson, U (2009) Management of sustainability in construction works. PhD thesis, Lund University, Sweden.

Phelan, R S; Radjy, F; Haas, C and Hendrickson, C (1990) Computer-aided concrete-placement optimization. Journal of Construction Engineering and Management, 116(1), pp. 172-187. ISSN 0733-9364

Pilgrim, M; Bouchlaghem, D; Loveday, D and Holmes, M (2002) Towards best practice in building analysis data representation. Construction Innovation, 2(2), pp. 117-130. ISSN 1471-4175

Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. PhD thesis, University of Texas at Austin, USA.

Poudel, O and Assaad, R H (2025) A real-time intelligent acoustic IoT-enabled embedded construction site monitoring and alert system: Integrating deep learning-based machine-listening algorithms, edge computing, and cloud computing. Journal of Construction Engineering and Management, 151(7): 04025075, ISSN 0733-9364

Pritchard, C (2005) Skin cancer prevention in the house building industry. PhD thesis, Nottingham Trent University, UK.

Purushothaman, M B and Kumar, S (2022) Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 294-312. ISSN 2046-6099

Ramalingam Rethnam, O. and Thomas, A. (2026) A physics-informed deep learning-based urban building thermal comfort modeling and prediction framework for identifying thermally vulnerable building stock. Smart and Sustainable Built Environment, 15(2), pp. 622-648. ISSN 2046-6099

Rasouli, S; Zhong, W; Singh, A K; Mohandes, S R; Antwi-Afari, M F; Cheung, C M and Manu, P (2024) The adoption of uav for construction safety management: A systematic literature review. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Rastogi, P; Laxo, A; Dewayne Cecil, L and Overbey, D (2022) Projected climate data for building design: Barriers to use. Buildings & Cities, 3(1), pp. 111-117. ISSN 2632-6655

Rener, A T (2022) Innovative methodologies to enhance productivity, supply chain, and sustainability in industrialized construction. PhD thesis, Lawrence Technological University, USA.

Rezaei, Mohammad (2019) Characterizing controlled low-strength materials (CLSM) for narrow-trench reinstatement. PhD thesis, University of Alberta, Canada.

Rezaei Nasab, S S; Tayefi Nasrabadi, A; Asadi, S and Haj Seiyed Taghia, S A (2022) Investigating the probability of designing net-zero energy buildings with consideration of electric vehicles and renewable energy. Engineering, Construction and Architectural Management, 29(10), pp. 4061-4087. ISSN 0969-9988

Royapoor, M (2015) An investigation into the energy and control implications of adaptive comfort in a modern office building. PhD thesis, University of Newcastle upon Tyne, UK.

Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.

Russell, M M; Howell, G; Hsiang, S M and Liu, M (2013) Application of time buffers to construction project task durations. Journal of Construction Engineering and Management, 139(10): 04013008, ISSN 0733-9364

Ryan, Peter William Joseph (2017) Unlocking the key to mega project delivery. PhD thesis, University of Melbourne, Australia.

Sadat, H and Thomas, N (2025) An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects. International Journal of Construction Management, 25(6), pp. 624-634. ISSN 1562-3599

Saha, Swapan Kumar (2002) Predicting realistic performance rate and optimum inspection rate in construction. PhD thesis, University of Western Sydney, Australia.

Sanders, S R (1989) An analysis of factors affecting labor productivity in masonry construction. PhD thesis, Pennsylvania State University, USA.

Sanders, S R and Thomas, H R (1991) Factors affecting masonry-lahok productivity. Journal of Construction Engineering and Management, 117(4), pp. 626-644. ISSN 0733-9364

Sanna, F (2018) Timber modern methods of construction: a comparative study. PhD thesis, Edinburgh Napier University, UK.

Santoso, D S; Joewono, T B; Wibowo, A; Sinaga, H P A and Santosa, W (2012) Public-private partnerships for tollway construction and operation: Risk assessment and allocation from the perspective of investors. Journal of Construction in Developing Countries, 17(2), pp. 45-66. ISSN 1823-6499

Sborz, J; Kalbusch, A and Henning, E (2024) Factors that determine hot and cold-water consumption in social housing apartments. Architectural Engineering and Design Management, 20(6), pp. 1669-1686. ISSN 1745-2007

Schafer, D W (2014) A conceptual framework for resilience engineering in construction safety. PhD thesis, Michigan State University, USA.

Scott, S (1993) The nature and effects of construction delays. Construction Management and Economics, 11(5), pp. 358-369. ISSN 01446193

Scott, S and Harris, R A (2004) United Kingdom construction claims: Views of professionals. Journal of Construction Engineering and Management, 130(5), pp. 734-741. ISSN 0733-9364

Seibert, J E and Evans, G W (1991) Time-constrained resource leveling. Journal of Construction Engineering and Management, 117(3), pp. 503-520. ISSN 0733-9364

Seong, J; Kim, H s and Jung, H J (2025) Development of a robust hazardous area tracking algorithm for pan-tilt-zoom (ptz) cameras at construction sites under harsh conditions. Engineering, Construction and Architectural Management, 32(13), pp. 384-405. ISSN 0969-9988

Shahbodaghlou, F (1987) A feasibility model for use of weather protection in cold region construction. PhD thesis, Purdue University, USA.

Shahedi, F. and Abrishami, S. (2026) Adaptive construction scheduling with AI in 4D/5D BIM: Integrating weather data and activity-based costing. Smart and Sustainable Built Environment, pp. 1-15. ISSN 2046-6099

Shahin, A; Abourizk, S M and Mohamed, Y (2011) Modeling weather-sensitive construction activity using simulation. Journal of Construction Engineering and Management, 137(3), pp. 238-246. ISSN 0733-9364

Shahin, A A (2007) A framework for cold weather construction simulation. PhD thesis, University of Alberta, Canada.

Shalwani, A (2021) Empirical analysis of issue management in small vertical construction projects: Relationship between project performance, project team actions, and issue types. PhD thesis, University of Kansas, USA.

Shalwani, A and Lines, B C (2021) An empirical analysis of the causes of cost and schedule growth for small healthcare and educational construction projects. International Journal of Construction Education and Research, 17(3), pp. 277-296. ISSN 1557-8771

Shan, Y (2014) Integrated information modeling of construction project productivity. PhD thesis, University of Colorado at Boulder, USA.

Shashwat, S; Zingre, K and Thurairajah, N (2022) Enhancing building energy efficiency estimation by integrating microclimate conditions. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Sheykhi, R (2016) Risk-based decision making support for construction corporate resource management. PhD thesis, Florida International University, USA.

Shi, M; Chen, C; Xiao, B and Seo, J (2024) Vision-based detection method for construction site monitoring by integrating data augmentation and semisupervised learning. Journal of Construction Engineering and Management, 150(5): 04024027, ISSN 0733-9364

Shirong, L (1996) New approach for optimization of overall construction schedule. Journal of Construction Engineering and Management, 122(1), pp. 7-13. ISSN 0733-9364

Shooshtarian, S and Ridley, I (2016) Determination of acceptable thermal range in outdoor built environments by various methods. Smart and Sustainable Built Environment, 5(4), pp. 352-371. ISSN 2046-6099

Shorthouse, E (2015) Climate change and buildings: the impact on human health. PhD thesis, University of Exeter, UK.

Sihabuddin, S S and Ariaratnam, S T (2009) Methodology for estimating emissions in underground utility construction operations. Journal of Engineering, Design and Technology, 7(1), pp. 37-64. ISSN 1726-0531

Singh Rajput, T and Thomas, A (2023) Optimizing passive design strategies for energy efficient buildings using hybrid artificial neural network (ann) and multi-objective evolutionary algorithm through a case study approach. International Journal of Construction Management, 23(13), pp. 2320-2332. ISSN 1562-3599

Smith, G R (1986) A conceptual construction project planning model (fuzzy sets, networks). PhD thesis, Purdue University, USA.

Smith, G R and Hancher, D E (1989) Estimating precipitation impacts for scheduling. Journal of Construction Engineering and Management, 115(4), pp. 552-566. ISSN 0733-9364

Stellacci, S; Domingos, L and Resende, R (2024) Integrated computational approaches for energy retrofit of historical buildings in extreme climate environments. International Journal of Building Pathology and Adaptation, 42(1), pp. 114-132. ISSN 23984708

Stenbeck, T (2007) Promoting innovation in transportation infrastructure maintenance: Incentives contracting and performance based specifications. PhD thesis, KTH Royal Institute of Technology, Sweden.

Stevens, J D and Murray, A L (1994) Modified roof erection system. Journal of Construction Engineering and Management, 120(4), pp. 828-837. ISSN 0733-9364

Su, Y S (2017) Rebuild, retreat or resilience: Urban flood vulnerability analysis and simulation in Taipei. International Journal of Disaster Resilience in the Built Environment, 8(2), pp. 110-122. ISSN 1759-5916

Su, Y-Y (2010) Construction crew productivity monitoring supported by location awareness technologies. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Sędzicki, D.; Nyka, L. and Cudzik, J. (2026) Algorithmic optimization of climbing plant positioning and cnc fabrication for urban microclimate enhancement. Building Research & Information, 54(5), pp. 588-610. ISSN 0961-3218

Taleb, H M and Abumoeilak, L (2021) An assessment of different courtyard configurations in urban communities in the United Arab Emirates. Smart and Sustainable Built Environment, 10(1), pp. 67-89. ISSN 2046-6099

Tan, A H (2015) While stands the colosseum: A ground-up exploration of ancient Roman construction techniques using virtual reality. PhD thesis, Ohio State University, USA.

Taylor, J; Simpson, C H; Vanhatalo, J; Sohail, H; Brousse, O and Heaviside, C (2025) Analysing cold-climate urban heat islands using personal weather station data. Buildings & Cities, 6(1), pp. 182-200. ISSN 2632-6655

Teixeira, Carla Fernanda Barbosa (2013) Analysis thermal performance of fiber cement tiles treated with white coatings and submitted to water spraying. PhD thesis, Universidade Estadual de Campinas, Brazil.

Teli, D; James, P A B and Jentsch, M F (2015) Investigating the principal adaptive comfort relationships for young children. Building Research & Information, 43(3), pp. 371-382. ISSN 0961-3218

Thomas, H R; Riley, D R and Sanvido, V E (1999) Loss of labor productivity due to delivery methods and weather. Journal of Construction Engineering and Management, 125(1), pp. 39-46. ISSN 0733-9364

Thomas, H R and Yiakoumls, I (1987) Factor model of construction productivity. Journal of Construction Engineering and Management, 113(4), pp. 623-639. ISSN 0733-9364

Thorpe, D and Karan, E (2008) Method for calculating schedule delay considering weather conditions. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Towner, M and Baccarini, D (2008) Risk pricing in construction tenders: how, who, what. Construction Economics and Building, 8(1), pp. 49-60. ISSN 2204-9029

Tran, D H; Tran, K N and Nguyen, N H (2025) A novel hybrid multiple objective optical microscope algorithm for fuzzy time, cost, and quality tradeoff in project management. International Journal of Construction Management, 25(10), pp. 1141-1153. ISSN 1562-3599

Walshaw, D (1991) Statistical analysis of wind speeds. PhD thesis, University of Sheffield, UK.

Wambeke, B W; Hsiang, S M and Liu, M (2011) Causes of variation in construction project task starting times and duration. Journal of Construction Engineering and Management, 137(9), pp. 663-677. ISSN 0733-9364

Wang, H-H (2010) A context-based representation and reasoning formalism to support construction safety planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Wang, J; Wang, G; Li, H; Han, S and Zhang, J (2024) Intelligent construction activity identification for all-weather site monitoring using 4D millimeter-wave technology. Journal of Construction Engineering and Management, 150(11): 04024150, ISSN 0733-9364

Wang, W C and Demsetz, L A (2000) Model for evaluating networks under correlated uncertainty: netcor. Journal of Construction Engineering and Management, 126(6), pp. 458-466. ISSN 0733-9364

Wang, Y; Zhu, S and Wong, A S T (2014) Cooling time estimation of newly placed hot-mix asphalt pavement in different weather conditions. Journal of Construction Engineering and Management, 140(5): 04014009, ISSN 0733-9364

Wedawatta, H G (2013) Resilience of construction SMEs to extreme weather events. PhD thesis, University of Salford, UK.

Westberg, K; Norén, J and Kus, H (2001) On using available environmental data in service life estimations. Building Research & Information, 29(6), pp. 428-439. ISSN 0961-3218

White, R R (2004) Managing and interpreting uncertainty for climate change risk. Building Research & Information, 32(5), pp. 438-448. ISSN 0961-3218

Wiguna, I P A (2005) The influence of risk on project performance in Indonesian building contracts. PhD thesis, University of Newcastle upon Tyne, UK.

Wiguna, I P A and Scott, S (2005) Nature of the critical risk factors affecting project performance in Indonesian building contracts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Williams, K; Gupta, R; Hopkins, D; Gregg, M; Payne, C; Joynt, J L R; Smith, I and Bates-Brkljac, N (2013) Retrofitting England's suburbs to adapt to climate change. Building Research & Information, 41(5), pp. 517-531. ISSN 0961-3218

Williams, R C; Hildreth, J C and Vorster, M C (2009) Highway construction data collection and treatment in preparation for statistical regression analysis. Journal of Construction Engineering and Management, 135(12), pp. 1299-1306. ISSN 0733-9364

Woldesenbet, A; Jeong, D H S and Oberlender, G D (2012) Daily work reports-based production rate estimation for highway projects. Journal of Construction Engineering and Management, 138(4), pp. 481-490. ISSN 0733-9364

Wurthmann, K A (2023) Designing photovoltaic arrays for groundwater pumping for remote agriculture using synthetically generated daily rainfall and irrigation needs. Journal of Engineering, Design and Technology, 21(6), pp. 1803-1826. ISSN 1726-0531

Xiang, Jianjun (2014) Extreme heat and workers' health in South Australia: Association, perceptions, and adaptations in the workplace. PhD thesis, University of Adelaide, Australia.

Xu, W; Cong, J and Proverbs, D G (2023) Evaluation of infrastructure resilience. International Journal of Building Pathology and Adaptation, 41(2), pp. 378-400. ISSN 23984708

Yin, Y-J (2010) Risk analysis of light-frame wood construction due to multiple hazards. PhD thesis, Michigan Technological University, USA.

Yogeswaran, K; Kumaraswamy, M M and Miller, D R A (1998) Claims for extensions of time in civil engineering projects. Construction Management and Economics, 16(3), pp. 283-293. ISSN 01446193

Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364

Zayed, T and Mohamed, E (2014) A case productivity model for automatic climbing system. Engineering, Construction and Architectural Management, 21(1), pp. 33-50. ISSN 0969-9988

Zhang, Z.; Wang, Y.; Liu, J.; Wang, Y.; Liu, C. and Geng, X. (2026) Transport risk assessment for China's prefabricated construction supply chain: Integrating game theory and fuzzy Bayesian network. Engineering, Construction and Architectural Management, pp. 1-24. ISSN 0969-9988

Zheng, D X M and Ng, S T (2005) Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. Journal of Construction Engineering and Management, 131(2), pp. 176-186. ISSN 0733-9364

Zhu, J; Zhang, C; Yuan, J; Pan, W; Xue, J and Lou, F (2025) An improved model for precast component transportation scheduling under dynamic traffic and weather conditions. Journal of Construction Engineering and Management, 151(11): 04025181, ISSN 0733-9364

Zuluaga Santa, C M (2018) Protecting bridge maintenance workers: Evaluating fall protection supplementary devices using virtual prototyping and wearable technology. PhD thesis, North Carolina State University, USA.

de Souza, L. P.; Melo, A. P.; Triana, M. A. and Lamberts, R. (2026) Thermal resilience and life cycle assessment of social housing: A discussion about limitations in Brazil. Architectural Engineering and Design Management, 22(2), pp. 382-401. ISSN 1745-2007

This list was generated on Sat Aug 22 02:09:06 2026 UTC.