A Kassem, M; Khoiry, M A and Hamzah, N (2020) Assessment of the effect of external risk factors on the success of an oil and gas construction project. Engineering, Construction and Architectural Management, 27(9), pp. 2767-2793. ISSN 0969-9988

Aagaard, L K and Madsen, L V (2022) Technological fascination and reluctance: Gendered practices in the smart home. Buildings & Cities, 3(1), pp. 677-691. ISSN 2632-6655

Abbas, N M A (2007) Construction claims in Saudi Arabia: a study of sources and associations of claims. PhD thesis, University of Strathclyde, UK.

Abbsaian-Hosseini, S A; Liu, M and Hsiang, S M (2019) Social network analysis for construction crews. International Journal of Construction Management, 19(2), pp. 113-127. ISSN 1562-3599

Abd Al-Jalil, Y Q (1998) Analysis of performance of tunnel boring machine-based systems. PhD thesis, University of Texas at Austin, USA.

Abdel-Razek, R H (1987) Computerised analyses of estimating inaccuracy and tender variability: causes, evaluation and consequences. PhD thesis, Loughborough University, UK.

Abdelgader, S H; Kurpinska, M; Abdelgader, H S; Omidi Moaf, F and Amran, M (2025) Study the impact of design method preference on the usefulness of concrete and on CO2 emissions. International Journal of Building Pathology and Adaptation, 43(4), pp. 804-825. ISSN 2398-4708

Abdelgader, S H; Kurpinska, M; Abdelgader, H S; Omidi Moaf, F and Amran, M (2025) Study the impact of design method preference on the usefulness of concrete and on CO₂ emissions. International Journal of Building Pathology and Adaptation, 43(4), pp. 804-825. ISSN 2398-4708

Abdelkhalek, Sherif Ibrahim Farag Mohamed (2022) Managing the inspection process of concrete bridge decks. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Abdelmageed, S; Abdelkhalek, S I F M; Hussien, M and Zayed, T (2024) A hybrid simulation model for modules installation in modular integrated construction projects. International Journal of Construction Management, 24(13), pp. 1407-1418. ISSN 1562-3599

Abdirad, H (2020) Developing digital project delivery routines around frequent disruptions: How do AEC organizations respond to disruptive information exchange requirements? PhD thesis, University of Washington, USA.

Abdul Ghani, N and Tutesigensi, A (2023) Managing change in megaprojects. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Abdul-Aziz, A R; Shiew yi, H and Jaafar, M (2007) Impact of firm characteristics on the value of resources for Malaysian private housing developers. Journal of Financial Management of Property and Construction, 12(2), pp. 95-106. ISSN 1366-4387

Abdulmajid, S A D (1967) Resource forecasting models for private housing projects. PhD thesis, University of Manchester, UK.

Abeysekera, W V K M (1997) A strategy for managing brickwork in Sri Lanka. PhD thesis, Loughborough University, UK.

Abidin, N Z (2005) Using value management to improve the consideration of sustainability within construction. PhD thesis, Loughborough University, UK.

Aboagye-Nimo, E and Raidén, A B (2019) Challenging standardisation by embracing ambiguities of site safety: The case of micro construction firms. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Abou Houraira, A; Ouali, A; Elhammoumi, O and Fekri, A (2023) Effect of accelerated aging by temperature and moisture variation cycles on the durability of concrete. International Journal of Building Pathology and Adaptation, 41(3), pp. 533-548. ISSN 23984708

Abourizk, S M; Halpin, D W and Wilson, J R (1994) Fitting beta distributions based on sample data. Journal of Construction Engineering and Management, 120(2), pp. 288-305. ISSN 0733-9364

Abu Bakar, R (1998) The management practices and organisational culture of large Malaysian construction contractors. PhD thesis, University of Reading, UK.

Abusalem, O (2020) Towards last planner system implementation in Gaza Strip, Palestine. International Journal of Construction Management, 20(5), pp. 367-384. ISSN 1562-3599

Abuwarda, Z; Mostafa, K; Morita, P and Hegazy, T (2024) Optimizing construction work-rest schedules and worker reassignment utilizing wristband physiological data. Journal of Construction Engineering and Management, 150(11): 04024149, ISSN 0733-9364

Acharya, N K; Dai Lee, Y and Man im, H (2006) Conflicting factors in construction projects: Korean perspective. Engineering, Construction and Architectural Management, 13(6), pp. 543-566. ISSN 0969-9988

Adafin, J; Rotimi, J O B and Wilkinson, S (2015) Why do the design stage elemental cost plan and final tender sum differ in New Zealand? Journal of Financial Management of Property and Construction, 20(2), pp. 116-131. ISSN 1366-4387

Adafin, J; Rotimi, J O B and Wilkinson, S (2020) Risk impact assessments in project budget development: Quantity surveyors' perspectives. International Journal of Construction Management, 20(1), pp. 13-28. ISSN 1562-3599

Adafin, J; Rotimi, J O B; Wilkinson, S and Mbachu, J (2019) An assessment of risk factors impacting budget variability in New Zealand commercial construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Ade-Ojo, O C (2022) Awareness of the LEED requirements for green housing development among built-environment professionals in Nigeria. Built Environment Project and Asset Management, 12(4), pp. 521-536. ISSN 2044-124X

Adebisi, E O; Ojo, S O and Alao, O O (2018) Assessment of factors influencing the failure and abandonment of multi-storey building projects in Nigeria. International Journal of Building Pathology and Adaptation, 36(2), pp. 210-231. ISSN 23984708

Adedokun, O; Aje, I; Awodele, O and Egbelakin, T (2022) Are the public tertiary education building projects devoid of risks in the Nigerian construction context? Journal of Financial Management of Property and Construction, 27(2), pp. 259-278. ISSN 1366-4387

Adenuga, O A (2008) Evaluation of maintenance management practice in public hospital, buildings in South-West, Nigeria. PhD thesis, University of Lagos, Nigeria.

Adesi, M; Murphy, R and Kehily, D (2018) The role of digitisation in the strategic planning process of Irish quantity surveying practices. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Adinyira, E; Adjei, E A G; Agyekum, K and Fugar, F D K (2021) Application of machine learning in predicting construction project profit in Ghana using support vector regression algorithm (svra). Engineering, Construction and Architectural Management, 28(5), pp. 1491-1514. ISSN 0969-9988

Afreen, M; Haq, F and Mukhtar, Z (2022) Flood susceptibility analysis of the panjkora valley Northern Pakistan, using frequencyratio approach. International Journal of Disaster Resilience in the Built Environment, 13(5), pp. 601-614. ISSN 1759-5916

Agbo, E A; Izam, Y D and Ayegba, C (2022) Quantifying the impact of work environment factors on the variability of labour productivity in wall plastering. Journal of Construction in Developing Countries, 27(2), pp. 109-125. ISSN 1823-6499

Aguilar-Carrasco, M T; Álvarez-López, A I; Bustamante, P; Álvarez Ríos, A I and Domínguez-Amarillo, S (2025) The impact of light adjustment versus tuneable white mode on ICU staff's circadian rhythms. Building Research & Information, 53(1-2), pp. 120-138. ISSN 0961-3218

Agyefi-Mensah, S; Kpamma, Z E and Hagan, D E (2022) Stair step geometry compliance with standard specifications for safety and usability: A study of selected university buildings in Ghana. International Journal of Building Pathology and Adaptation, 40(1), pp. 20-39. ISSN 23984708

Ahiakwo, O A (2015) Improving construction processes in Nigeria using the Last Planner® System. PhD thesis, University of Wolverhampton, UK.

Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387

Ahmed, A (2012) Pavement damage cost estimation using highway agency maintenance, rehabilitation, and reconstruction strategies. PhD thesis, Purdue University, USA.

Ahmed, M; Shakaib, M and Siddiqui, M A (2024) Analysis and comparison of flow velocities and in-cylinder temperature distributions to quantify oxides of nitrogen in a compression ignition engine using diesel and biodiesel fuels. Journal of Engineering, Design and Technology, 22(2), pp. 422-437. ISSN 1726-0531

Ahuja, H N and Nandakumar, V (1985) Simulation model to forecast project completion time. Journal of Construction Engineering and Management, 111(4), pp. 325-342. ISSN 0733-9364

Ailabouni, N; Painting, N and Ashton, P (2009) Factors affecting employee productivity in the UAE construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Aiyetan, Ayodeji; Das, Kumar Dillip and Ayodabo, Blessing (2026) Factors influencing procurement in construction: The role of clients and construction machinery in KwaZulu-Natal. Journal of Construction Business and Management, 8(S1), pp. 72-87. ISSN 2521-0165

Akade, S A (2017) Understanding the impact of culture on project execution in a developing country: an action research study of six international oil and gas companies in Nigeria. PhD thesis, University of Liverpool, UK.

Akadiri, P O and Fadiya, O O (2013) Empirical analysis of the determinants of environmentally sustainable practices in the UK construction industry. Construction Innovation, 13(4), pp. 352-373. ISSN 1471-4175

Akin, S; Eghbali, A; Nwagwu, C and Hertwich, E (2025) Western Asian and Northern African residential building stocks: archetype analysis. Buildings & Cities, 6(1), pp. 219-238. ISSN 2632-6655

Akinsola, A O (1997) An intelligent model of variations' contingency on constructions projects. PhD thesis, University of Wolverhampton, UK.

Akintoye, A; Renukappa, S and Lal, H (2012) The abolition of the contracts in writing rule in the 2009 Construction Act: Potential implications for UK adjudication. International Journal of Law in the Built Environment, 4(2), pp. 140-156. ISSN 1756-1450

Akpan, E O P and Igwe, O (2001) Methodology for determining price variation in project execution. Journal of Construction Engineering and Management, 127(5), pp. 367-373. ISSN 0733-9364

Akyol, B and Resatoglu, R (2019) Investigating the effect of solid and lightweight hollow block slabs on construction cost. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(2), pp. 70-79. ISSN 17514304

Al Nahyan, M T; Hawas, Y E and Raza, M (2021) An exploratory study of relationships between stakeholders' risk perceptions and their roles and experience in construction industry. International Journal of Construction Management, 21(7), pp. 738-754. ISSN 1562-3599

Al Zarooni, S; Abdou, A and Lewis, J (2011) Improving the client briefing for UAE public healthcare projects: Space programming guidelines. Architectural Engineering and Design Management, 7(4), pp. 251-265. ISSN 1745-2007

Al kailani, H.; Bhattacharjee, K.; Bonilla, M. and Nnaji, C. (2026) Tailoring perceived workforce sustainability strategies in the US construction industry. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Al kailani, H.; Bhattacharjee, K.; Bonilla, M. and Nnaji, C. (2026) Tailoring perceived workforce sustainability strategies in the US construction industry. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. PhD thesis, University of Liverpool, UK.

Al-Ghamdi, S G (2015) Advancing green building rating systems using life-cycle assessment. PhD thesis, University of Pittsburgh, USA.

Al-Hajj, A and Hamani, K (2011) Material waste in the UAE construction industry: Main causes and minimization practices. Architectural Engineering and Design Management, 7(4), pp. 221-235. ISSN 1745-2007

Al-Hajj, A and Horner, M W (1998) Modelling the running costs of buildings. Construction Management and Economics, 16(4), pp. 459-470. ISSN 01446193

Al-Hashimy, H N H (2025) The relationship between financial management strategies and firm financial performance: the moderating role of firm size. Journal of Financial Management of Property and Construction, 30(2), pp. 295-317. ISSN 1366-4387

Al-Jibouri, S and Ogink, G (2009) Proposed model for integrating rams method in the design process in construction. Architectural Engineering and Design Management, 5(4), pp. 179-192. ISSN 1745-2007

Al-Momani, A H (1996) Construction cost prediction for public school buildings in Jordan. Construction Management and Economics, 14(4), pp. 311-317. ISSN 01446193

Al-Omari, T (2004) Stochastic regression modelling of cost and duration overrun of construction projects implemented in Kuwait. PhD thesis, University of Liverpool, UK.

Al-Qawasmi, J (2019) Examining indicators coverage in a sample of sustainable building assessment systems. Architectural Engineering and Design Management, 15(2), pp. 101-120. ISSN 1745-2007

Al-Sakkaf, A; Bagchi, A; Zayed, T and Mahmoud, S (2023) Sustainability assessment model for heritage buildings. Smart and Sustainable Built Environment, 12(1), pp. 105-127. ISSN 2046-6099

Al-Sehali, J (2001) A framework for total quality management in the construction industry in Bahrain. PhD thesis, Loughborough University, UK.

Al-Suleiman, T I and Alatoom, Y I (2024) Development of pavement roughness regression models based on smartphone measurements. Journal of Engineering, Design and Technology, 22(4), pp. 1136-1157. ISSN 1726-0531

Al-Tabtabai, H; Kartam, N; Flood, I A N and Alex, A P (1997) Expert judgment in forecasting construction project completion. Engineering, Construction and Architectural Management, 4(4), pp. 271-293. ISSN 0969-9988

AlQahtany, A; Rezgui, Y and Li, H (2013) A proposed model for sustainable urban planning development for environmentally friendly communities. Architectural Engineering and Design Management, 9(3), pp. 176-194. ISSN 1745-2007

Aladağ, H and Işık, Z (2019) Design and construction risks in BOT type mega transportation projects. Engineering, Construction and Architectural Management, 26(10), pp. 2223-2242. ISSN 0969-9988

Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.

Alasad, R; Motawa, I and Ogunlana, S (2012) A system dynamics-based method for demand forecasting in infrastructure projects: A case of PPP projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Alhadidi, Suleiman (2023) Real-time architecture: Quantifying the spatial performance of workplaces. DDes thesis, Harvard University, USA.

Ali, A S; Azmi, N F and Baaki, T K (2018) Cost performance of building refurbishment works: The case of Malaysia. International Journal of Building Pathology and Adaptation, 36(1), pp. 41-62. ISSN 23984708

Alinaitwe, H and Ayesiga, R (2013) Success factors for the implementation of public-private partnerships in the construction industry in Uganda. Journal of Construction in Developing Countries, 18(2), pp. 1-14. ISSN 1823-6499

Aliu, J; Oke, A E; Oluwasogo Oyediran, A; Kanya, R A and Ukaha Onyeukwu, S (2026) From isolation to interaction: Evaluating social media awareness and adoption in a developing construction industry. Smart and Sustainable Built Environment, 15(1), pp. 273-293. ISSN 2046-6099

Allahi, Fahimeh (2020) Development of simulation based approaches for cost estimation and effect analysis in industrial and humanitarian projects, including system dynamic model and Monte Carlo simulation. PhD thesis, Università degli Studi di Genova, Italy.

Almarri, K and Boussabaine, H (2017) Interdependency of the critical success factors and ex-post performance indicators of PPP projects. Built Environment Project and Asset Management, 7(5), pp. 546-556. ISSN 2044-124X

Almazroa, D A (2003) Project delivery system decision framework using the weighting factors and analytic hierarchy process methods. PhD thesis, University of Pittsburgh, USA.

Alnuaimi, A S; Taha, R A; Al Mohsin, M and Al-Harthi, A S (2010) Causes, effects, benefits, and remedies of change orders on public construction projects in Oman. Journal of Construction Engineering and Management, 136(5), pp. 615-622. ISSN 0733-9364

Alotaibi, A B (2019) Project management: the implication of project management practices on project success in Saudi Arabia. PhD thesis, University of Portsmouth, UK.

Alsharif, M A (2017) Improving sustainability on university campuses in Saudi Arabia: An assessment of organisational and decision-related opportunities and barriers. PhD thesis, University of Reading, UK.

Alsohiman, N K (2017) Modelling variation for improving the management of construction engineering project outcomes in the Kingdom of Saudi Arabia. PhD thesis, University of Liverpool, UK.

Alsuliman, J; Bowles, G and Chen, Z (2012) Current practice of variation order management in the Saudi construction industry. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Alsuliman, J A (2014) Effective stakeholder engagement in variation order management at the design stage of public sector construction projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.

Alutaibi, A (2018) The impact of facility management practices on tenant satisfaction forresidential complexes in the Kingdom of Saudi Arabiaresidential complexes in the Kingdom of Saudi Arabia. PhD thesis, Loughborough University, UK.

Alves, T d C L (2005) Buffering practices in HVAC ductwork supply chains. PhD thesis, University of California, Berkeley, USA.

Alzeraa, A (2018) Impact of project communications effectiveness on construction disputes. PhD thesis, Wayne State University, USA.

Amekudzi, A (1999) Uncertainty analysis of national highway performance measures in the context of evolving analysis models and data. PhD thesis, Carnegie Mellon University, USA.

Amin, S H (2024) Predictive relationship in time and cost between planning and construction phases in capital projects. DBA thesis, Grand Canyon University, USA.

Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.

Aminian, E (2015) A study of inter-firm opportunism in the construction industry. PhD thesis, University of Manchester, UK.

Ammar, M A and Abdel-Maged, A F (2018) Modeling of LOB scheduling with learning development effect. International Journal of Construction Management, 18(6), pp. 517-526. ISSN 1562-3599

Anagnostopoulos, I (2018) Generating as-is BIMs of existing buildings: from planar segments to spaces. PhD thesis, University of Cambridge, UK.

Anand, K B and Ramamurthy, K (2003) Laboratory-based productivity study on alternative masonry systems. Journal of Construction Engineering and Management, 129(3), pp. 237-242. ISSN 0733-9364

Anderson, B and James, P (2021) Covid-19 lockdown: Impacts on gb electricity demand and CO2 emissions. Buildings & Cities, 2(1), pp. 134-149. ISSN 2632-6655

Anderson, J (2023) Reducing embodied carbon in the built environment: The role of environmental product declarations. PhD thesis, Open University, UK.

André, J P C G (2014) Determination of the main parameters affecting the performance of bridge falsework systems. PhD thesis, Oxford Brookes University, UK.

Ankrah, N A; Proverbs, D and Debrah, Y (2009) Factors influencing the culture of a construction project organisation: An empirical investigation. Engineering, Construction and Architectural Management, 16(1), pp. 26-47. ISSN 0969-9988

Anwer, S; Li, H; Umer, W; Antwi-Afari, M F; Mehmood, I; Yu, Y; Haas, C and Wong, A Y L (2023) Identification and classification of physical fatigue in construction workers using linear and nonlinear heart rate variability measurements. Journal of Construction Engineering and Management, 149(7): 04023057, ISSN 0733-9364

Appleton, B J A; Niaz, M A; Abourizk, S M; Al-Hussein, M and Mohamed, Y (2006) Priority rating logic simulation model for tower crane operations management. Journal of Construction Research, 7(1), pp. 133-147. ISSN 1609-9451

Apu, N and Sinha, R (2020) Seismic fragility assessment of ductile reinforced concrete building frames. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 425-442. ISSN 1759-5916

Arain, F M (2006) Knowledge-based decision support system (kbdss) for management of variation orders for school building projects in Singapore. PhD thesis, National University of Singapore, Singapore.

Arain, F M (2009) Leveraging on information technology to teach construction law to built environment students: A knowledge-based system approach. Journal of Construction in Developing Countries, 14(2), pp. 77-102. ISSN 1823-6499

Arain, F M and Pheng, L S (2005) How design consultants perceive potential causes of variation orders for institutional buildings in Singapore. Architectural Engineering and Design Management, 1(3), pp. 181-196. ISSN 1745-2007

Arain, F M and Pheng, L S (2007) Modeling for management of variations in building projects. Engineering, Construction and Architectural Management, 14(5), pp. 420-433. ISSN 0969-9988

Arashpour, M; Wakefield, R; Blismas, N and Lee, E W M (2013) A new approach for modelling variability in residential construction projects. Construction Economics and Building, 13(2), pp. 83-92. ISSN 2204-9029

Arida, M A (2024) Enhancing thermal comfort in commercial buildings: Contributions of machine learning algorithms for optimizing predictive thermal comfort indices. PhD thesis, North Carolina Agricultural and Technical State University, USA.

Ashuri, B and Lu, J (2010) Time series analysis of ENR construction cost index. Journal of Construction Engineering and Management, 136(11), pp. 1227-1237. ISSN 0733-9364

Ashuri, B; Shahandashti, S M and Lu, J (2012) Empirical tests for identifying leading indicators of ENR construction cost index. Construction Management and Economics, 30(11), pp. 917-927. ISSN 1466433X

Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364

Asiedu, R O; Frempong, N K and Nani, G (2016) Parametric time overrun estimation of building projects. Journal of Financial Management of Property and Construction, 21(3), pp. 253-268. ISSN 1366-4387

Assaf, S; Hassanain, M A; Abdallah, A; Sayed, A M Z and Alshahrani, A (2019) Significant causes of claims and disputes in construction projects in Saudi Arabia. Built Environment Project and Asset Management, 9(5), pp. 597-615. ISSN 2044-124X

Atkin, B (1993) Stereotypes and themes in building designs: Insights for model builders. Construction Management and Economics, 11(2), pp. 119-130. ISSN 01446193

Awuku, B; Asa, E and Baffoe-Twum, E (2024) Conceptual cost estimation of highway bid unit prices using ordinary kriging. International Journal of Construction Management, 24(3), pp. 351-360. ISSN 1562-3599

Ayhan, M; Dikmen, I and Talat Birgonul, M (2021) Predicting the occurrence of construction disputes using machine learning techniques. Journal of Construction Engineering and Management, 147(4): 04021022, ISSN 0733-9364

Ayo-Odifiri, S O (2025) A systematic review of the applicability of nature-based solutions for resilient urban residences in southern Nigeria. International Journal of Disaster Resilience in the Built Environment, 16(3), pp. 344-362. ISSN 1759-5908

Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.

Ayyub, B M and Haidar, A (1984) Project scheduling using fuzzy set concepts. Journal of Construction Engineering and Management, 110(2), pp. 189-204. ISSN 0733-9364

Azman, M A (2016) Bidding competitiveness: A comparative analysis of different bid auctions in Malaysia. Journal of Engineering, Design and Technology, 14(4), pp. 678-698.

Babaeian Jelodar, M; Yiu, T W and Wilkinson, S (2022) Empirical modeling for conflict causes and contractual relationships in construction projects. Journal of Construction Engineering and Management, 148(5): 04022017, ISSN 0733-9364

Babalola, A; Cheung, C M; Yunusa-Kaltungo, A; Manu, P and Bartolo, P (2024) A conceptual framework and tools characteristics for developing an immersive technology-based occupational health training mechanism. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Babalola, O and Adesanya, D A (2007) An evaluation of the level of accuracy of electrical services cost estimates in Nigeria. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Baek, F; Sohn, J; Bae, J; Kim, D and Lee, S (2026) Physical, cognitive, and emotional responses and their interrelated effects on human-robot team performance in construction. Journal of Construction Engineering and Management, 152(1): 04025224, ISSN 0733-9364

Baek, M and Ashuri, B (2019) Analysis of the variability of submitted unit price bids for asphalt line items in highway projects. Journal of Construction Engineering and Management, 145(4): 04019020, ISSN 0733-9364

Bahadorestani, A; Karlsen, J T and Motahari Farimani, N (2019) A comprehensive stakeholder-typology model based on salience attributes in construction projects. Journal of Construction Engineering and Management, 145(9): 04019048, ISSN 0733-9364

Baker, S; Ponniah, D and Smith, S (1999) Risk response techniques employed currently for major projects. Construction Management and Economics, 17(2), pp. 205-213. ISSN 01446193

Balamurali Kanagaraj; Tattukolla Kiran; Anand N; Khalifa Al Jabri and Justin S (2023) Development and strength assessment of eco-friendly geopolymer concrete made with natural and recycled aggregates. Construction Innovation, 23(3), pp. 524-545. ISSN 1471-4175

Ballesteros-Pérez, P; Skitmore, M; Cerezo-Narváez, A; González-Cruz, M C; Pastor-Fernández, A and Otero-Mateo, M (2021) Standard deviation of bids for construction contract auctions. Journal of Construction Engineering and Management, 147(8): 04021096, ISSN 0733-9364

Bansal, V K and Pal, M (2009) Extended GIS for construction engineering by adding direct sunlight visualisations on buildings. Construction Innovation, 9(4), pp. 406-419. ISSN 1471-4175

Barraza, G A; Back, W E and Mata, F (2004) Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), pp. 25-32. ISSN 0733-9364

Barraza, G A and Bueno, R A (2007) Probabilistic control of project performance using control limit curves. Journal of Construction Engineering and Management, 133(12), pp. 957-965. ISSN 0733-9364

Bates, William (1999) A strategy for the development of a knowledge based system for predicting out-turn costs of heavy engineering works within a multi-national cost consultancy. PhD thesis, Teesside University, UK.

Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.

Bayrak, T (2008) Semi automatic construction progress measurement using a combination of CAD modelling, photogrammetry and construction knowledge. PhD thesis, Heriot-Watt University, UK.

Beliveau, Y J (1984) A cost control model for on-site work activities for construction (estimating, cost-codes, forms). PhD thesis, Purdue University, USA.

Bello, A O; Isa, R B; Afolabi, O P; Arogundade, S and Khan, A A (2025) Drivers for the implementation of circular economy in the Nigerian aeco industry: A structural equation modelling approach. Journal of Engineering, Design and Technology, 23(3), pp. 953-972. ISSN 1726-0531

Bello, N A; Abdullahi, B C; Atilola, M I and Thontteh, E O (2023) Review of the methodological approach of analysing rental income of residential property in Abuja, Nigeria. Journal of Financial Management of Property and Construction, 28(1), pp. 107-126. ISSN 1366-4387

Bello, N A; Agava, Y H and Olanrele, O O (2021) Investment property typology analysis; evidence from Nigerian urban property returns and macroeconomic variables. African Journal of Built Environment Research, 5(1), pp. 77-96. ISSN 2414-0236

Bello W A, O K T (2013) Weak management of the predictability of contingency allowance in construction projects in Nigeria. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Benhaim, M (1997) Interfirm relationships within the construction industry: Towards the emergence of networks? A comparative study between France and the UK. PhD thesis, Brunel University, UK.

Benjaoran, V; Sooksil, N and Metham, M (2019) Effect of demand variations on steel bars cutting loss. International Journal of Construction Management, 19(2), pp. 137-148. ISSN 1562-3599

Bennett, J and Ferry, D (1990) Specialist contractors: A review of issues raised by their new role in building. Construction Management and Economics, 8(3), pp. 259-283. ISSN 01446193

Berente, N; Baxter, R and Lyytinen, K (2010) Dynamics of inter-organizational knowledge creation and information technology use across object worlds: The case of an innovative construction project. Construction Management and Economics, 28(6), pp. 569-588. ISSN 1466433X

Bergsdal, H; Brattebø, H; Bohne, R A and Müller, D B (2007) Dynamic material flow analysis for norway's dwelling stock. Building Research & Information, 35(5), pp. 557-570. ISSN 0961-3218

Bernold, L E (1985) Productivity transients in construction processes. PhD thesis, Georgia Institute of Technology, USA.

Betts, M (1990) Methods and data used by large building contractors in preparing tenders. Construction Management and Economics, 8(4), pp. 399-414. ISSN 01446193

Bhandiwad, M S; Dodamani, B M and M.D, D (2025) Effect of the drag coefficient on the performance of vertical porous baffles in a sloshing tank. Journal of Engineering, Design and Technology, 23(3), pp. 744-765. ISSN 1726-0531

Bienvenido-Huertas, D; Rubio-Bellido, C; Sánchez-García, D and Moyano, J (2019) Internal surface condensation risk in façades of Spanish social dwellings. Building Research & Information, 47(8), pp. 928-947. ISSN 0961-3218

Bilhaif, A (1990) The influence of high temperatures on the productivity of construction workers. PhD thesis, University of Reading, UK.

Birchall, S J (2011) An appraisal of the performance of a 'green' office building. PhD thesis, University of Leeds, UK.

Bishop, E A (1997) Talking shop: Egyptian engineers and Soviet specialists at the Aswan High Dam. PhD thesis, University of Chicago, USA.

Bonilla, M; Castelblanco, G and Rasdorf, W (2026) The paradox of project performance: The role of procurement, contextual, and contractor-related factors. Journal of Construction Engineering and Management, 152(6): 04026062, ISSN 0733-9364

Bordalo Faustino, P (2017) Public procurement award criteria in the EU member states: a comparative study of the discretionary powers of contracting authorities. PhD thesis, University of Nottingham, UK.

Borg, M (2001) Environmental assessment of materials, components and buildings: Building-specific considerations, open-loop recycling, variations in assessment results and the usage phase of buildings. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.

Borges, W F and Mário, P D C (2017) Five project-duration control methods in time units: Case study of a linearly distributed planned value. Journal of Construction Engineering and Management, 143(6): 05017002, ISSN 0733-9364

Borgeson, S and Brager, G (2011) Comfort standards and variations in exceedance for mixed-mode buildings. Building Research & Information, 39(2), pp. 118-133. ISSN 0961-3218

Botti, A (2020) The development of an early stage design tool to assess the risk of overheating for UK residential buildings. PhD thesis, University of Surrey, UK.

Bouchlaghem, K A D and Pasquire, C (2009) An information-led process framework for hybrid projects. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Bower, D A (1995) The creation of a proactive link between time and money. PhD thesis, University of Manchester, UK.

Boyd, P and Schweber, L (2012) Variations in the mainstreaming of sustainability: A case study approach. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Bradley, A; Li, H; Qin, H; Xi, W; Peel, D and Nisbet, N (2022) Requirements and process analysis for ports and waterways openbim ISO standards development. Construction Innovation, 22(4), pp. 705-726. ISSN 1471-4175

Bradley, P E (2019) Methodology for the sequence analysis of building stocks. Building Research & Information, 47(2), pp. 141-155. ISSN 0961-3218

Branco Pedro, J; Meijer, F and Visscher, H (2010) Building control systems of European Union countries: A comparison of tasks and responsibilities. International Journal of Law in the Built Environment, 2(1), pp. 45-59. ISSN 1756-1450

Braz, João Carlos Rocha (2014) Technical and economic evaluation of structural systems to eight floors residential buildings. PhD thesis, Universidade Estadual de Campinas, Brazil.

Bresnen, M J; Bryman, A E; Ford, J R; Beardsworth, A D and Keil, E T (1986) Leader orientation of construction site managers. Journal of Construction Engineering and Management, 112(3), pp. 370-386. ISSN 0733-9364

Bresnen, M J; Ford, J R; Bryman, A E; Keil, E T; Beardsworth, A D and Wray, K (1986) Labour recruitment strategies and selection practices on construction sites. Construction Management and Economics, 4(1), pp. 37-55. ISSN 01446193

Briscoe, G (1982) Recent trends in the construction occupations. Construction Papers, 1(3), pp. 55-63. ISSN 0144-8587

Brodetskaia, I; Sacks, R and Shapira, A (2013) Stabilizing production flow of interior and finishing works with reentrant flow in building construction. Journal of Construction Engineering and Management, 139(6), pp. 665-674. ISSN 0733-9364

Brooker, P (2011) Towards a code of professional conduct for construction mediators. International Journal of Law in the Built Environment, 3(1), pp. 24-47. ISSN 1756-1450

Brown, B H J (1974) An econometric forecasting model for a segment of the construction market. PhD thesis, Oklahoma State University, USA.

Brown, N; Wright, A J; Shukla, A and Stuart, G (2010) Longitudinal analysis of energy metering data from non-domestic buildings. Building Research & Information, 38(1), pp. 80-91. ISSN 0961-3218

Buckman, A H (2016) An exploration of the applications of increased information availability in smart buildings. PhD thesis, University of Sheffield, UK.

Buertey, J T; Dadadzogbor, E and Atsrim, F (2021) Procurement path influencing factors in Ghana: Managing the challenge of cultural shift. International Journal of Construction Management, 21(1), pp. 78-92. ISSN 1562-3599

Burroughs, S (2006) Strength of compacted earth: Linking soil properties to stabilizers. Building Research & Information, 34(1), pp. 55-65. ISSN 0961-3218

Bweupe, A S and Mwiya, B (2024) Quality management in ready-mix concrete production in Zambia. Journal of Construction Business and Management, 7(1), pp. 1-15. ISSN 2521-0165

Cades, A-P (2018) Influence of psychological capital and thinking perspectives on construction safety climate and performance. PhD thesis, Walden University, USA.

Caetano, L F; de Souza, H A and Gomes, A P (2022) Effect of the exposed steel structure on the thermal performance of buildings. Architectural Engineering and Design Management, 18(1), pp. 38-55. ISSN 1745-2007

Calvert, J; Price, V; Winch, C; Clarke, L; Sahin-Dikmen, M; Bilodeau, P L and Dionne, E (2026) Climate literacy and labour agency in vocational education and training. Buildings & Cities, 7(1), pp. 378-395. ISSN 2632-6655

Cardellino, P; Araneda, C and García Alvarado, R (2018) Interventions in the classroom–the influence of spatial organisation on educational interaction in Uruguay. Architectural Engineering and Design Management, 14(6), pp. 413-426. ISSN 1745-2007

Carrillo, P (1996) Technology transfer on joint venture projects in developing countries. Construction Management and Economics, 14(1), pp. 45-54. ISSN 01446193

Castelblanco, G; Fenoaltea, E M; De Marco, A and Chiaia, B (2025) Influence of macroeconomic factors on construction costs: An analysis of project cases. Construction Management and Economics, 43(3), pp. 196-212. ISSN 0144-6193

Castelblanco, G; Narbaev, T; Osei-Kyei, R; Serikbay, D; Mukashev, Y and Guevara, J (2025) Pandemic risks in PPPs: comparative analysis within developing countries. International Journal of Construction Management, 25(4), pp. 456-468. ISSN 1562-3599

Cattell, D W (2012) An overview of component unit pricing theory. Construction Management and Economics, 30(1), pp. 81-92. ISSN 1466433X

Chakraborty, B and Das, S (2014) MGNEGRA and water management: Sustainability issues of built forms in rural India. Journal of Construction in Developing Countries, 19(2), pp. 33-50. ISSN 1823-6499

Chambers, M L (2021) Fine particulate air pollution and accident risk: Three essays. PhD thesis, Vanderbilt University, USA.

Champion, R (2005) Acceleration in construction and engineering contracts. PhD thesis, University of London, UK.

Chan, Y K; Huang, C H; Chao Yi, N; Tseng, H H; Lin, C H; Chang, R F and Chan, M H (2026) A study of detection systems for safety guardrails at construction sites: Innovative applications of image processing and perspective correction. Journal of Construction Engineering and Management, 152(4): 04026018, ISSN 0733-9364

Chan, A P C; Lai, M K; Tam, C M and Akintoye, A (2001) Analysis of construction cost variation factors. Journal of Financial Management of Property and Construction, 6(1), pp. 51-60. ISSN 1366-4387

Chan, A P C and Yeong, C M (1995) A comparison of strategies for reducing variations. Construction Management and Economics, 13(6), pp. 467-473. ISSN 01446193

Chandra, V and Loosemore, M (2004) Women's self-perception: An inter-sector comparison of construction, legal and nursing professionals. Construction Management and Economics, 22(9), pp. 947-956. ISSN 01446193

Chandrasekara, C M K N K; Weerasinghe, K D N; Pathirana, S and Piyadasa, R U K (2018) Stresses over surface water sources in a human dominated environment: A case study in Hamilton canal, Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 9(2), pp. 184-197. ISSN 1759-5916

Chang, Chen-Yu (2002) An economic interpretation of construction procurement behaviour for the commercial and industrial buildings. PhD thesis, University College London, UK.

Chang, H-P (2010) Relationships among supply chain management, strategic alliances, and organizational performance with implications for the construction industry. PhD thesis, Lynn University, USA.

Chang, W and Xue, C Q L (2021) Government and its aid buildings: The governmental influence on the design and management of China-aided stadium projects after 2000. Architectural Engineering and Design Management, 17(1-2), pp. 36-49. ISSN 1745-2007

Chapman, C (2023) Green and grey drainage infrastructure: costs and benefits of reducing surface water flood risk. PhD thesis, University of Oxford, UK.

Charoenngam, C; Coquinco, S T and Hadikusumo, B H W (2003) Web-based application for managing change orders in construction projects. Construction Innovation, 3(4), pp. 197-215. ISSN 1471-4175

Charoenngam, C and Maqsood, T (2001) A qualitative approach in problem solving process tracing of construction site engineers. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Chau, K W and Wang, Y S (2005) An analyseis of productivity growth in the construction industry: A non-parametric approach. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Cheah, C Y J and Liu, J (2005) Real option evaluation of complex infrastructure projects: The case of dabhol power. Journal of Financial Management of Property and Construction, 10(1), pp. 55-68. ISSN 1366-4387

Chen, S.; Guan, Z.; Zhang, Z.; Guo, H. and Han, Y. (2026) Impact of construction workers' physical fatigue on unsafe behavior: An ecg-based field experiment study. Journal of Construction Engineering and Management, 152(8): 04026128, ISSN 0733-9364

Chen, G (2023) Enhance collaboration reliability at task level for construction projects using blockchain technology. PhD thesis, North Carolina State University, USA.

Chen, H L (2009) Model for predicting financial performance of development and construction corporations. Journal of Construction Engineering and Management, 135(11), pp. 1190-1200. ISSN 0733-9364

Chen, J H; Yang, L R; Chen, W H and Chang, C K (2008) Case-based allocation of onsite supervisory manpower for construction projects. Construction Management and Economics, 26(8), pp. 805-814. ISSN 01446193

Chen, L and Mohamed, S (2010) The strategic importance of tacit knowledge management activities in construction. Construction Innovation, 10(2), pp. 138-163. ISSN 1471-4175

Chen, P; Qiang, M and Wang, J N (2009) Project management in the Chinese construction industry: Six-case study. Journal of Construction Engineering and Management, 135(10), pp. 1016-1026. ISSN 0733-9364

Chen, Q; Jin, R and Soboyejo, A (2013) Understanding a contractor's regional variations in safety performance. Journal of Construction Engineering and Management, 139(6), pp. 641-653. ISSN 0733-9364

Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Chen, Y; Chen, S; Hu, C; Jin, L and Zheng, X (2020) Novel probabilistic cost estimation model integrating risk allocation and claim in hydropower project. Journal of Construction Engineering and Management, 146(8): 04020092, ISSN 0733-9364

Chin, C S (2009) Process capability and performance improvement. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Chin, C-S (2008) An investigation to improve construction information flows. PhD thesis, University of Wisconsin - Madison, USA.

Chomicka, B A (2013) Drivers and cost implications of quality failures in commercial offices. PhD thesis, Glasgow Caledonian University, UK.

Chondol, T; Panda, A K; Gupta, A K; Agrawal, N and Kaur, A (2021) The role of perception of local government officials on climate change and resilient development: A case of uttarakhand, India. International Journal of Disaster Resilience in the Built Environment, 12(2), pp. 184-195. ISSN 1759-5916

Chong, H Y; Zin, R M and Chong, S C (2013) Employing data warehousing for contract administration: E-dispute resolution prototype. Journal of Construction Engineering and Management, 139(6), pp. 611-619. ISSN 0733-9364

Chow, L K and Ng, S T (2005) Establishing a quantitaive performance evaluation framework through fuzzy membership functions. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Choy, C F (2011) Revisiting the 'Bon Curve'. Construction Management and Economics, 29(7), pp. 695-712. ISSN 1466433X

Christian, J and Hachey, D (1995) Effects of delay times on production rates in construction. Journal of Construction Engineering and Management, 121(1), pp. 20-26. ISSN 0733-9364

Christudason, A; Kenna, P and Lujanen, M (2010) Legal challenges in ensuring regular maintenance and repairs of owner-occupied apartment blocks. International Journal of Law in the Built Environment, 2(2), pp. 178-197. ISSN 1756-1450

Chua, D K H; Shen, L J and Bok, S H (2003) Constralnt-based planning with integrated production scheduler over internet. Journal of Construction Engineering and Management, 129(3), pp. 293-301. ISSN 0733-9364

Conroy, G (1997) CONSERV: A methodology for the management of capital projects and concurrent engineering design using knowledge based technology. PhD thesis, Cranfield University, UK.

Cooke, John Richard (1973) Methods of documentation and administration of building contracts. PhD thesis, University of New South Wales, Australia.

Cooke, R S (2006) The use of alternative energy technologies in buildings: the influence of engineering consultants. EngD thesis, Brunel University, UK.

Corbett, P and Rowley, P (1999) The use of bcis elemental cost data by quantity surveyors as part of cost planning techniques: The practitioners' perspective. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Cox, R F (1994) Case studies of employee participation programs in construction and their effects on absenteeism. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Craighill, A L (2002) Lifecycle assessment and evaluation of construction and demolition waste management. PhD thesis, University of East Anglia, UK.

Da Rocha, C G; Kemmer, S L and Meneses, L (2016) Managing customization strategies to reduce workflow variations in house building projects. Journal of Construction Engineering and Management, 142(8): 5016005, ISSN 0733-9364

Da Rocha, C G; Wijayaratna, K; Jong, K and Haller, D (2023) Examining off-site construction from a flow viewpoint. Journal of Construction Engineering and Management, 149(3): 05023001, ISSN 0733-9364

Dada, J O and Jagboro, G O (2007) An evaluation of the impact of risk on project cost overrun in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 12(1), pp. 37-44. ISSN 1366-4387

Dair, C M (2000) An evaluation of the UK regulatory system for the redevelopment of contaminated land. PhD thesis, University of Sussex, UK.

Dang, X; Wang, M; Deng, X; Mao, H and He, P (2025) What affects the corporate social responsibility practices of Chinese international contractors considering dynamic interactions? A hybrid structural equation modeling–fuzzy cognitive map approach. Engineering, Construction and Architectural Management, 32(4), pp. 2646-2671. ISSN 0969-9988

Das, R and Nakano, M (2023) A multi-criteria decision-making model using socio-technical attributes for transportation bridge maintenance prioritisation. International Journal of Construction Management, 23(4), pp. 579-585. ISSN 1562-3599

Dash, A (2021) Determinants of evs adoption: A study on green behavior of consumers. Smart and Sustainable Built Environment, 10(1), pp. 125-137. ISSN 2046-6099

Dave, N; Guduru, R; Misra, A K and Sharma, A K (2022) Experimental evaluation of bond behavior in controlled, binary and quaternary concretes developed using scms. Journal of Engineering, Design and Technology, 20(6), pp. 1430-1448. ISSN 1726-0531

Dawood, N (1998) Estimating project and activity duration: A risk management approach using network analysis. Construction Management and Economics, 16(1), pp. 41-48. ISSN 01446193

Dawood, N N and Bates, W (2000) A decision support system specification for out-turn cost and cost escalation in the heavy engineering industry. Engineering, Construction and Architectural Management, 7(4), pp. 330-346. ISSN 0969-9988

Dayanand, N (1996) Scheduling payments in projects: An optimization framework. PhD thesis, Carnegie Mellon University, USA.

De Dear, R; Kim, J; Candido, C and Deuble, M (2015) Adaptive thermal comfort in Australian school classrooms. Building Research & Information, 43(3), pp. 383-398. ISSN 0961-3218

Dell'Anna, F; Bottero, M; Becchio, C; Corgnati, S P and Mondini, G (2020) Designing a decision support system to evaluate the environmental and extra-economic performances of a nearly zero-energy building. Smart and Sustainable Built Environment, 9(4), pp. 413-442. ISSN 2046-6099

Demirel, H C (2022) Dealing with uncertainty in infrastructure public-private partnership projects. PhD thesis, Delft University of Technology, Netherlands.

Demirel, H Ç; Volker, L; Leendertse, W and Hertogh, M (2019) Dealing with contract variations in PPPs: Social mechanisms and contract management in infrastructure projects. Journal of Construction Engineering and Management, 145(11): 04019073, ISSN 0733-9364

Denny, J (2025) Organizing change: A single case study exploring the perceptions of self-determination in high school employees during a building renovation. EdD thesis, Baylor University, USA.

Deshpande, S D (1988) Some facility planning techniques for construction site layouts. PhD thesis, Indian Institute of Technology Delhi, India.

Dias, J L; Silva, A; Chai, C; Gaspar, P L and De Brito, J (2014) Neural networks applied to service life prediction of exterior painted surfaces. Building Research & Information, 42(3), pp. 371-380. ISSN 0961-3218

Din, A (2020) Accounting for carbon impacts in buildings: a rating procedure. PhD thesis, London Metropolitan University, UK.

Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(3), pp. 287-298. ISSN 0969-9988

Do, S T; Nguyen, V T and Nguyen, N H (2023) Relationship networks between variation orders and claims/disputes causes on construction project performance and stakeholder performance. Engineering, Construction and Architectural Management, 30(9), pp. 3817-3839. ISSN 0969-9988

Doloi, H (2010) Benchmarking a new design management system using process simulation approach. Construction Innovation, 10(1), pp. 42-59. ISSN 1471-4175

Downey, M (2014) Selection and adoption of low and zero carbon technologies in social housing: a socio-technical network approach. PhD thesis, University of Reading, UK.

Dozzi, S P; Abourizk, S M and Schroeder, S L (1996) Utility-theory model for bid markup decisions. Journal of Construction Engineering and Management, 122(2), pp. 119-124. ISSN 0733-9364

Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates. PhD thesis, Oklahoma State University, USA.

Duffy, G A; Oberlender, G D and Seok Jeong, D H (2011) Linear scheduling model with varying production rates. Journal of Construction Engineering and Management, 137(8), pp. 574-582. ISSN 0733-9364

Duksh, Y S; Kaushik, B K; Sarkar, S and Singh, R (2013) Analysis of propagation delay and power with variation in driver size and number of shells in multi walled carbon nanotube interconnects. Journal of Engineering, Design and Technology, 11(1), pp. 19-33. ISSN 1726-0531

Dursun, O and Stoy, C (2012) Determinants of construction duration for building projects in Germany. Engineering, Construction and Architectural Management, 19(4), pp. 444-468. ISSN 0969-9988

Eamon, C; Shinki, K; Wong, K H and Alsendi, A (2025) Assessment of pay item specific case-based reasoning approach for bridge unit cost estimation. Journal of Construction Engineering and Management, 151(12): 04025188, ISSN 0733-9364

Easa, S M (1987) Earthwork allocations with nonconstant unit costs. Journal of Construction Engineering and Management, 113(1), pp. 34-50. ISSN 0733-9364

Easa, S M (1989) Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2), pp. 302-316. ISSN 0733-9364

Echeverry, D; Ibbs, C W and Burati, J (1988) Graduated unit price payment schedules. Journal of Construction Engineering and Management, 114(1), pp. 1-18. ISSN 0733-9364

Edirisinghe, R and Jadhav, A (2017) Is the smart safety vest a brutal innovation? Evaluation of microclimate performance using a thermal manikin. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Ekemode, B G (2020) Impact of urban regeneration on commercial property values in Osogbo, Osun State, Nigeria. Smart and Sustainable Built Environment, 9(4), pp. 557-571. ISSN 2046-6099

Ekung, S; Okonkwo, C and Nwosu, E (2021) Claims culture and client-contractors' willingness to engage in future projects: A multivariate analysis. African Journal of Built Environment Research, 5(1), pp. 19-40. ISSN 2414-0236

Ekung, S; Opoku, A and Okonkwo, C (2023) Organisational learning and sustainability of service-based firms: A canonical correlation analysis. International Journal of Construction Management, 23(13), pp. 2160-2170. ISSN 1562-3599

El-Dabaa, R and Abdelmohsen, S (2023) Integrating performance indicators in the production rules of shape-shifting grammars for architectural adaptive façade systems. Architectural Engineering and Design Management, 19(4), pp. 419-437. ISSN 1745-2007

El-Kelesh, A M and Hassan, D A (2023) Impact of ground conditions and excavation depth on selection of excavation support system. International Journal of Construction Management, 23(15), pp. 2539-2550. ISSN 1562-3599

El-Razek, M E A; Bassioni, H and El-Salam, W A (2007) Investigation into the causes of claims in Egyptian building construction. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

El-Sharkawy, A R (1993) Pricing construction contracts under inflation. PhD thesis, North Carolina State University, USA.

Elazouni, A and Salem, O A (2011) Progress monitoring of construction projects using pattern recognition techniques. Construction Management and Economics, 29(4), pp. 355-370. ISSN 1466433X

Elazouni, A M and Basha, I M (1996) Evaluating the performance of construction equipment operators in Egypt. Journal of Construction Engineering and Management, 122(2), pp. 109-114. ISSN 0733-9364

Elhag, T; Eapen, S and Ballal, T (2020) Moderating claims and disputes through collaborative procurement. Construction Innovation, 20(1), pp. 79-95. ISSN 1471-4175

Ellis, L; Martin, H and Ramcharitar, S (2019) Factors influencing triple constraints in public sector projects in Trinidad and Tobago. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 157-169. ISSN 17514304

Elmualim, A A and Govender, K (2008) Communities of practice in UK large contracting firms: Contrasting application and non-utilized merits. Architectural Engineering and Design Management, 4(3-4), pp. 149-159. ISSN 1745-2007

Elnady, Ahmed Abdelrady Okasha Mohamed (2023) An integrated framework for balancing contractor's workload versus capacity using system dynamics. PhD thesis, University of Alberta, Canada.

Ensafi, Mahnaz (2022) Work order prioritization using neural networks to improve building operation. PhD thesis, Virginia Tech, USA.

Erbatur, O C (2012) A methodology for estimating construction unit bid prices. DEng thesis, Texas A&M University, USA.

Espinoza, R D (2011) Contingency estimating using option pricing theory: Closing the gap between theory and practice. Construction Management and Economics, 29(9), pp. 913-927. ISSN 1466433X

Eufrasio Espinosa, R M (2015) A visio-spatial life cycle energy model of building materials within a bioregional context: Mapping the embodied energy of fired clay bricks in Cuitzeo, Mexico. PhD thesis, University of Sheffield, UK.

Eze, E C; Sofolahan, O; Ugulu, R A and Ameyaw Effah, E E (2025) Bolstering circular economy in construction through digitalisation. Construction Innovation, 25(6), pp. 1774-1796. ISSN 1471-4175

Ezeokoli, N B; Komolafe, T B and Olukolajo, M A (2019) Macroeconomic fluctuations and event centres' return dynamics in akure commercial property market, Nigeria. African Journal of Built Environment Research, 3(1), pp. 29-40. ISSN 2414-0236

Fagbenle, O I; Adeyemi, A Y and Adesanya, D A (2004) The impact of non-financial incentives on bricklayers' productivity in Nigeria. Construction Management and Economics, 22(9), pp. 899-911. ISSN 01446193

Famiyeh, S; Amoatey, C T; Adaku, E and Agbenohevi, C S (2017) Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana. Journal of Engineering, Design and Technology, 15(2), pp. 181-198.

Faubel, C.; Mowen, D.; Miri, M.; Demarquet Alban, U.; Martinez-Molina, A. and Alamaniotis, M. (2026) Multimodal transformer models for real-time estimation of indoor environmental quality in educational settings. Smart and Sustainable Built Environment, pp. 1-37. ISSN 2046-6099

Fauth, J; Nørkjær Gade, P; Kaiser, S; Raj, K; Goul Pedersen, J; Olsson, P O; Nisbet, N; Mastrolembo Ventura, S; Hirvensalo, A; Granja, J; Urban, H; Rutešić, S; Verstraeten, R; Raitviir, C R; Kallinen, A R; Schranz, C; Stojanov, T and Tekavec, J (2025) Investigating building permit processes across Europe: Characteristics and patterns. Building Research & Information, 53(4), pp. 417-434. ISSN 0961-3218

Fawcett, T and Killip, G (2014) Anatomy of low carbon retrofits: Evidence from owner-occupied superhomes. Building Research & Information, 42(4), pp. 434-445. ISSN 0961-3218

Feng, P P-Y (2009) Causes and effects of rework on the delivery of healthcare facilities in California. PhD thesis, University of California, Berkeley, USA.

Few, J F M (2021) Ventilation in occupied homes: measurement, performance and sociotechnical perspectives. PhD thesis, University College London, UK.

Figliola, A (2023) Digital workflow for climate resilient building façade generation. Building Research & Information, 51(3), pp. 257-278. ISSN 0961-3218

Finegan, E; Kelly, G and O’Sullivan, G (2020) Comparative analysis of passivhaus simulated and measured overheating frequency in a typical dwelling in Ireland. Building Research & Information, 48(6), pp. 681-699. ISSN 0961-3218

Finnie, D; Ali, N A and Park, K (2019) Design development post contract signing in New Zealand: Client's or contractor's cost? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(4), pp. 146-156. ISSN 17514304

Flynn, C (2020) Risk transfer in operational public private partnerships in the education sector. PhD thesis, Queen's University Belfast, UK.

Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.

Franks, M S (2024) Managing complexity and uncertainty in megaprojects: A case study of Fort Friendly’s transformational megaprogram. DBA thesis, National University, USA.

Galbraith, G H; Guo, J S and McLean, R C (2000) The effect of temperature on the moisture permeability of building materials. Building Research & Information, 28(4), pp. 245-259. ISSN 0961-3218

Gan, V J L (2022) BIM-based building geometric modeling and automatic generative design for sustainable offsite construction. Journal of Construction Engineering and Management, 148(10): 04022111, ISSN 0733-9364

Garcia-Lopez, N P (2017) An activity and flow-based construction model for managing on-site work. PhD thesis, Stanford University, USA.

Garcia-Lopez, N P and Fischer, M (2024) Managing on-site production using an activity and flow-based construction model. Journal of Construction Engineering and Management, 150(1): 04023144, ISSN 0733-9364

García-León, R A; Quintero-Quintero, W and Rodriguez-Castilla, M (2020) Thermal analysis of three motorcycle disc brakes. Smart and Sustainable Built Environment, 9(2), pp. 208-226. ISSN 2046-6099

Gatley, D (2004) A critical examination of building contracts in New Zealand: an investigation into the types of building contracts employed ; their formation and administration ; and into the incidence, nature and resolution of disputes resulting from their usage ; in the commercial and residential sectors of the construction industry in New Zealand. PhD thesis, RMIT University, Australia.

Gaur, S and Tawalare, A (2024) Assessing the implications of BIM on sustainability of construction projects through design risk management. Built Environment Project and Asset Management, 14(3), pp. 470-489. ISSN 2044-124X

Gelisen, G (2010) Automated productivity based schedule animation (APBSA). PhD thesis, Polytechnic Institute of New York University, USA.

Gelisen, G and Griffis, F H (2014) Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis. Journal of Construction Engineering and Management, 140(4): B4013007, ISSN 0733-9364

Ghannad, P and Lee, Y C (2023) Optimizing modularization of residential housing designs for rapid postdisaster mass production of housing. Journal of Construction Engineering and Management, 149(7): 04023046, ISSN 0733-9364

Gharaie, Ehsan (2011) House completion time in Australia: Workflow planning approach. PhD thesis, RMIT University, Australia.

Gidado, K (1993) Numerical index of complexity in building construction with particular consideration to its effect on production time. PhD thesis, University of Brighton, UK.

Ginigaddara, B; Perera, S; Feng, Y; Rahnamayiezekavat, P and Thomson, R (2023) Development of offsite construction skill profile prediction models using mixed-effect regression analysis. Construction Management and Economics, 41(10), pp. 820-839. ISSN 01446193

Ginigaddara, Buddhini (2022) Developing a skill profile prediction model for typologies of offsite construction. PhD thesis, Western Sydney University, Australia.

Godoy-Shimizu, D; Armitage, P; Steemers, K and Chenvidyakarn, T (2011) Using display energy certificates to quantify schools' energy consumption. Building Research & Information, 39(6), pp. 535-552. ISSN 0961-3218

Golizadeh, H and Namini, S B (2015) Predicting the significant characteristics of concrete containing palm oil fuel ash. Journal of Construction in Developing Countries, 20(1), pp. 85-98. ISSN 1823-6499

Goncikowski, M (2024) Research by design: determining the form of the initial architectural concept of a skyscraper building in warsaw. Architectural Engineering and Design Management, 20(1), pp. 1-31. ISSN 1745-2007

Goodchild, B and Beatty, C (2000) Assessing the procurement practices of housing associations: A case study of new build in Scotland. Journal of Construction Procurement, 6(1), pp. 20-32. ISSN 1358-9180

Goodhew, S; Bird, P and Paterson, I (1997) The financial implications of using natural ventilation to reduce the levels of radon gas within an existing 'period' dwelling. Journal of Financial Management of Property and Construction, 2(2), pp. 85-104. ISSN 1366-4387

Gordon, C M (1994) Choosing appropriate construction contracting method. Journal of Construction Engineering and Management, 120(1), pp. 196-210. ISSN 0733-9364

Grady, K (1980) The provision of public buildings in the West Riding of Yorkshire, c.1600-1840. PhD thesis, University of Leeds, UK.

Gram-Hanssen, K (2010) Residential heat comfort practices: Understanding users. Building Research & Information, 38(2), pp. 175-186. ISSN 0961-3218

Gram-Hanssen, K (2014) New needs for better understanding of household's energy consumption: behaviour, lifestyle or practices? Architectural Engineering and Design Management, 10(1-2), pp. 91-107. ISSN 1745-2007

Gransberg, D D and Molenaar, K (2003) A synthesis of design-builder selection methods for public infrastructure projects. Journal of Construction Procurement, 9(2), pp. 40-51. ISSN 1358-9180

Greenwood, D J and Shaglouf, A A (1997) Comparison between planned and actual durations in medium sized building projects. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Greenwood, J P (2007) An examination of the performance based building code on the design of a commercial building. Construction Economics and Building, 7(1), pp. 37-44. ISSN 2204-9029

Grey Rodriguez, F C (2019) Space-mate: A framework to harmonize occupant well-being and building sustainability. PhD thesis, Stanford University, USA.

Griffiths, G (1999) Construction procurement arrangements of housing associations in liverpool. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Grobler, K (2000) Improving the effectiveness and image of the building and civil construction process. EngD thesis, University of Johannesburg, South Africa.

Gruneberg, S and Folwell, K (2013) The use of gross fixed capital formation as a measure of construction output. Construction Management and Economics, 31(4), pp. 359-368. ISSN 1466433X

Gu, T.; Hu, J.; Song, X.; Yan, H. and Chen, Z. (2026) How to enhance the urban community resilience from the perspective of social networks? A case study of xuzhou, China. Engineering, Construction and Architectural Management, 33(7), pp. 5340-5363. ISSN 0969-9988

Guerra-Santin, O and Itard, L (2010) Occupants' behaviour: Determinants and effects on residential heating consumption. Building Research & Information, 38(3), pp. 318-338. ISSN 0961-3218

Guo, S; Tang, B; Liang, K; Zhou, X and Li, J (2021) Comparative analysis of the patterns of unsafe behaviors in accidents between building construction and urban railway construction. Journal of Construction Engineering and Management, 147(5): 04021027, ISSN 0733-9364

Gurmu, A and Miri, M P (2025) Machine learning regression for estimating the cost range of building projects. Construction Innovation, 25(2), pp. 577-593. ISSN 1471-4175

Gutierrez-Bucheli, L.; Muñoz, S.; Couper, R. and Maxwell, D. W. (2026) Mapping the landscape of productivity in construction research: An umbrella review of trends, gaps and future directions. Engineering, Construction and Architectural Management, 33(15), pp. 516-539. ISSN 0969-9988

Götze, V; Gerber, J D and Jehling, M (2024) Mapping municipal land policies: Applications of flexible zoning for densification. Buildings & Cities, 5(1), pp. 506-520. ISSN 2632-6655

H M, C S (2018) Impact of construction practices on sustainable environment: a study at Bangalore. PhD thesis, Shri Jagdishprasad Jhabarmal Tibarewala University, India.

Hacker, M E; Kaminsky, J; Faust, K M and Rauch, S (2020) Regulatory enforcement approaches for mass population displacement. Journal of Construction Engineering and Management, 146(5): 1820, ISSN 0733-9364

Hadizadeh-Bazaz, M.; Navarro, I. J. and Yepes, V. (2026) Smart integration of non-destructive damage detection and life-cycle assessment for sustainable maintenance of coastal bridges. Smart and Sustainable Built Environment, pp. 1-27. ISSN 2046-6099

Haga, Heitor Cesar Riogi (2008) Production and sales sectors of materials in the house construction production chain: Diagnosis for the development of technological foresight studies. PhD thesis, Universidade de São Paulo, Brazil.

Hajibabai, L; Aziz, Z and Peña-Mora, F (2011) Visualizing greenhouse gas emissions from construction activities. Construction Innovation, 11(3), pp. 356-370. ISSN 1471-4175

Haksever, A M (1998) Information overload in construction project management. PhD thesis, University of Reading, UK.

Halaweh, M M (2012) System management of construction projects based on industrial engineering prespective with impact on net profit. PhD thesis, State University of New York at Binghamton, USA.

Haller, M; Lu, W; Stehn, L and Jansson, G (2015) An indicator for superfluous iteration in offsite building design processes. Architectural Engineering and Design Management, 11(5), pp. 360-375. ISSN 1745-2007

Hallowell, M R and Gambatese, J A (2010) Qualitative research: Application of the Delphi method to CEM research. Journal of Construction Engineering and Management, 136(1), pp. 99-107. ISSN 0733-9364

Haltenhoff, C E (1987) Construction management performance under dual services agreements. Journal of Construction Engineering and Management, 113(4), pp. 640-647. ISSN 0733-9364

Hamdan, Azreen Sharina (2025) Developing a tailored framework for digital transformation in UK small, micro and medium construction enterprises: Evidence from greater manchester. PhD thesis, University of Salford, UK.

Hamidane, H; Ababneh, A; Messabhia, A and Xi, Y (2020) Modeling of chloride penetration in concrete structures under freeze-thaw cycles. International Journal of Building Pathology and Adaptation, 38(1), pp. 127-147. ISSN 23984708

Hamilton, I G; Summerfield, A J; Lowe, R; Ruyssevelt, P; Elwell, C A and Oreszczyn, T (2013) Energy epidemiology: A new approach to end-use energy demand research. Building Research & Information, 41(4), pp. 482-497. ISSN 0961-3218

Hamilton-MacLaren, F; Loveday, D and Mourshed, M (2009) The calculation of embodied energy in new build UK housing. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Hammad, Mohammed (2018) Estimating, allocating and managing schedule and cost contingency in construction projects. PhD thesis, University of New South Wales, Australia.

Han, F (2021) Measurement of resilience performance for infrastructure construction project delivery. PhD thesis, University of New Mexico, USA.

Han, S; Lee, S and Peña-Mora, F (2012) Identification and quantification of non-value-adding effort from errors and changes in design and construction projects. Journal of Construction Engineering and Management, 138(1), pp. 98-109. ISSN 0733-9364

Han, Y; Feng, Z; Zhang, J; Jin, R and Aboagye-Nimo, E (2019) Employees' safety perceptions of site hazard and accident scenes. Journal of Construction Engineering and Management, 145(1): 04018117, ISSN 0733-9364

Hanif, H; Khurshid, M B; Lindhard, S M and Aslam, Z (2016) Impact of variation orders on time and cost in mega hydropower projects of Pakistan. Journal of Construction in Developing Countries, 21(2), pp. 37-53. ISSN 1823-6499

Hanmer, C; Few, J; Hollick, F; Elam, S and Oreszczyn, T (2026) Tracking energy signatures of British homes from 2020 to 2025. Buildings & Cities, 7(1), pp. 176-195. ISSN 2632-6655

Hardie, M; Khan, S; O'Donnell, A and Miller, G (2007) The efficacy of waste management plans in Australian commercial construction refurbishment projects. Construction Economics and Building, 7(2), pp. 26-36. ISSN 2204-9029

Harinarain, N and Haupt, T C (2016) Mission: Studio based learning in construction. The University of KwaZulu-Natal case study. Journal of Engineering, Design and Technology, 14(1), pp. 160-181.

Haroglu, H; Glass, J and Thorpe, T (2009) A study of professional perspectives on structural frame selection. Construction Management and Economics, 27(12), pp. 1209-1217. ISSN 1466433X

Haron, Z and Yahya, K (2009) Monte Carlo analysis for prediction of noise from a construction site. Journal of Construction in Developing Countries, 14(1), pp. 1-14. ISSN 1823-6499

Harris, F C (1979) A model for evaluating the effects of weather on construction projects. PhD thesis, Loughborough University, UK.

Hartley, S (2018) Craft Education in the United Kingdom and the United States: a cross-cultural examination of ideals, approaches and solutions. PhD thesis, University of York, UK.

Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hassandokht Mashhadi, A; Handy, R; Farhadmanesh, M; Rashidi, A; Honda, T; Sleeth, D K and Henry, T (2022) Feasibility study of using nebulizer-retrofitted uavs at construction projects: The case study of residential jobsites in Utah. Journal of Construction Engineering and Management, 148(10): 05022009, ISSN 0733-9364

Hatamleh, M T; Moynihan, G P; Batson, R G; Alzarrad, A and Ogunrinde, O (2023) Risk assessment and ranking in the developing countries' construction industry: The case of Jordan. Engineering, Construction and Architectural Management, 30(4), pp. 1344-1364. ISSN 0969-9988

Havenvid, M I; Hulthén, K; Linné, Å and Sundquist, V (2016) Renewal in construction projects: Tracing effects of client requirements. Construction Management and Economics, 34(11), pp. 790-807. ISSN 01446193

Heaphy, I (2013) NEC versus fidic. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(1), pp. 21-30. ISSN 17514304

Henjewele, C; Sun, M and Fewings, P (2011) Value for money optimisation and sustainability in PFI projects. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.

Henjewele, C; Sun, M and Fewings, P (2012) Analysis of factors affecting value for money in UK PFI projects. Journal of Financial Management of Property and Construction, 17(1), pp. 9-28. ISSN 1366-4387

Henneberry, J and Rowley, S (2002) Property market processes and development outcomes in cities and regions. Journal of Financial Management of Property and Construction, 7(1), pp. 3-15. ISSN 1366-4387

Heravi, G and Eslamdoost, E (2015) Applying artificial neural networks for measuring and predicting construction-labor productivity. Journal of Construction Engineering and Management, 141(10): 04015032, ISSN 0733-9364

Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(1), pp. 49-61. ISSN 01446193

Hermans, M; Veldhuis, H; Huizing, D and Rots, S (2019) The embedding of the construction client role in Dutch municipalities and its effects on professionalism and organisational learning. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Higgins, D M (2013) The black swan effect and the impact on Australian property forecasting. Journal of Financial Management of Property and Construction, 18(1), pp. 76-89. ISSN 1366-4387

Hill, C (2010) The concerns of health, safety and welfare within the tri-partite relationship surrounding work placement for construction. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Hill, S (1997) The complex effects of obstructions on horizontal illuminance in interior lighting design. PhD thesis, University of Reading, UK.

Hinkel, M P (2022) Three essays on labor market regulation in the American construction industry. PhD thesis, Michigan State University, USA.

Hipwood, T (2018) Understanding teleological influences on owner-occupier home improvements: Implications for encouraging low carbon retrofit. PhD thesis, Cardiff University, UK.

Hollar, D A; Rasdorf, W; Liu, M; Hummer, J E; Arocho, I and Hsiang, S M (2013) Preliminary engineering cost estimation model for bridge projects. Journal of Construction Engineering and Management, 139(9), pp. 1259-1267. ISSN 0733-9364

Holmes, S H; Phillips, T and Wilson, A (2016) Overheating and passive habitability: Indoor health and heat indices. Building Research & Information, 44(1), pp. 1-19. ISSN 0961-3218

Hong, G-S (1989) Efficiency of a regulated housing market: With rent controls, transaction costs and centralized matching costs. PhD thesis, Northwestern University, USA.

Hong, S M; Paterson, G; Mumovic, D and Steadman, P (2014) Improved benchmarking comparability for energy consumption in schools. Building Research & Information, 42(1), pp. 47-61. ISSN 0961-3218

Hopfe, C J (2009) Uncertainty and sensitivity analysis in building performance simulation for decision support and design optimization. PhD thesis, Eindhoven University of Technology, Netherlands.

Hoque, M I; Hasan, M and Datta, S D (2026) Undrained shear strength of soft clay reinforced with encapsulated stone dust columns. International Journal of Building Pathology and Adaptation, 44(1), pp. 1-14. ISSN 2398-4708

Horsthuis, C (2016) The importance of organisational slack as an unexplored determinant of firm level innovation and performance in the construction context. PhD thesis, Loughborough University, UK.

Hosseini, A (2019) Data-driven modeling of in-service performance of flexible pavements, using life-cycle information. PhD thesis, Temple University, USA.

Hosseini Sabzevari, S A; Mehdipour, H and Aslani, F (2024) An assessment of flash flood susceptibility in Golestan province, Iran, using multiple computational approaches. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 341-356. ISSN 1759-5916

Howes, R (2000) Improving the performance of earned value analysis as a construction project management tool. Engineering, Construction and Architectural Management, 7(4), pp. 399-411. ISSN 0969-9988

Hu, Chengdi (2023) Essays on labor market and college education in China. PhD thesis, University of Rochester, USA.

Hu, K (2011) Three essays on modeling complex dynamic problems in health and safety. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Hu, M; Nippala, E; Kallioharju, K and Pelsmakers, S (2022) Monte Carlo simulation approach to understand the cost variance for energy retrofit projects: Comparative study of Finland and the United States. Construction Management and Economics, 40(3), pp. 207-222. ISSN 01446193

Hu, X; Hu, X; Cui, Q; Li, Y; Lemckert, C and Wei, A (2022) Spatial-temporal analysis for the business performance of construction consultancy services in China. Engineering, Construction and Architectural Management, 29(10), pp. 3997-4014. ISSN 0969-9988

Hu, X and Liu, C (2018) Measuring efficiency, effectiveness and overall performance in the Chinese construction industry. Engineering, Construction and Architectural Management, 25(6), pp. 780-797. ISSN 0969-9988

Hu, Z; Chen, S and Zhang, X (2014) Value for money and its influential factors: An empirical study of PPP projects in Japan. Built Environment Project and Asset Management, 4(2), pp. 166-179. ISSN 2044-124X

Huang, J (2020) Infrastructure, the economy and policy. PhD thesis, University of Oxford, UK.

Huang, J; Han, D; Zhang, H and Cui, W (2024) Framework and case study for the assembly accuracy prediction of prefabricated buildings using BIM and tls. Architectural Engineering and Design Management, 20(6), pp. 1427-1453. ISSN 1745-2007

Huang, Y (2010) Sustainable infrastructure system modeling under uncertainties and dynamics. PhD thesis, University of California, Davis, USA.

Hughes, M; Palmer, J; Cheng, V and Shipworth, D (2013) Sensitivity and uncertainty analysis of england's housing energy model. Building Research & Information, 41(2), pp. 156-167. ISSN 0961-3218

Hulio, Z H and Jiang, W (2020) An assessment of effects of non-stationary operational conditions on wind turbine under different wind scenario. Journal of Engineering, Design and Technology, 18(1), pp. 102-121. ISSN 1726-0531

Hulio, Z H; Yousufzai, G and Jiang, W (2021) Statistical analysis of wind resource and energy potential assessment of quaidabad site, sindh Pakistan. Journal of Engineering, Design and Technology, 19(6), pp. 1291-1316. ISSN 1726-0531

Hussein, D (2020) A user preference modelling method for the assessment of visual complexity in building façade. Smart and Sustainable Built Environment, 9(4), pp. 483-501. ISSN 2046-6099

Hussey, H J (2023) Establishing criteria for descriptions of building work which include practicality and intricacy. PhD thesis, University of Northumbria at Newcastle, UK.

Hutcheson, John M (1979) Administration of building contracts with particular reference to the builder's financial control. PhD thesis, University of New South Wales, Australia.

Huuhka, S and Saarimaa, S (2018) Adaptability of mass housing: Size modification of flats as a response to segregation. International Journal of Building Pathology and Adaptation, 36(4), pp. 408-426. ISSN 23984708

Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Hyari, K H; Shatarat, N and Khalafallah, A (2017) Handling risks of quantity variations in unit-price contracts. Journal of Construction Engineering and Management, 143(10): 04017079, ISSN 0733-9364

Hyung, W G; Kim, S and Jo, J K (2020) Improved similarity measure in case-based reasoning: A case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(2), pp. 561-578. ISSN 0969-9988

Ibem, E O; Anosike, M N; Azuh, D E and Mosaku, T O (2011) Work stress among professionals in the building construction industry in Nigeria. Construction Economics and Building, 11(3), pp. 46-57. ISSN 2204-9029

Ibrahim, A; Ali, H; Abuhendi, F and Jaradat, S (2020) Thermal seasonal variation and occupants' spatial behaviour in domestic spaces. Building Research & Information, 48(4), pp. 364-378. ISSN 0961-3218

Idrissi Gartoumi, K; Aboussaleh, M and Zaki, S (2024) Implementing lean construction to improve quality and megaproject construction: A case study. Journal of Financial Management of Property and Construction, 29(1), pp. 1-22. ISSN 1366-4387

Ilbeigi, M; Ashuri, B and Shayegh, S (2016) Price adjustment clauses and submitted bid prices for major asphalt line items in highway projects. Journal of Construction Engineering and Management, 142(5): 04015103, ISSN 0733-9364

Ilter, D (2012) Identification of the relations between dispute factors and dispute categories in construction projects. International Journal of Law in the Built Environment, 4(1), pp. 45-59. ISSN 1756-1450

Ioannou, P G and Leu, S S (1993) Average-bid method: competitive bidding strategy. Journal of Construction Engineering and Management, 119(1), pp. 131-147. ISSN 0733-9364

Ireland, V (1985) The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects. Construction Management and Economics, 3(1), pp. 59-87. ISSN 01446193

Isaksson, T (2002) Model for estimation of time and cost based on risk evaluation applied on tunnel projects. PhD thesis, Kungliga Tekniska Hogskolan, Sweden.

Iseley, D T (1988) Automated methods for the trenchless placement of underground utility systems. PhD thesis, Purdue University, USA.

Ismaeel, W S E; Alamoudy, F O and Sameh, R (2023) How renovation activities may jeopardise indoor air quality: Accounting for short and long-term symptoms of sick building syndrome in educational buildings. Architectural Engineering and Design Management, 19(4), pp. 360-377. ISSN 1745-2007

Iyer, K C and Sagheer, M (2011) A real options based traffic risk mitigation model for build-operate-transfer highway projects in India. Construction Management and Economics, 29(8), pp. 771-779. ISSN 1466433X

Jacob, J C; Pandit, D and Sen, J (2023) An explorative study on transient cooling pattern and energy efficiency while using micro-zonal occupant-centric control. Architectural Engineering and Design Management, 19(4), pp. 340-359. ISSN 1745-2007

Jacob, J C; Pandit, D and Sen, J (2025) Developing a validated simulation model of micro-zonal air-conditioning to evaluate thermal comfort parameters. Architectural Engineering and Design Management, 21(2), pp. 289-314. ISSN 1745-2007

Jafarzadeh, R; Ingham, J M; Walsh, K Q; Hassani, N and Ghodrati Amiri, G R (2015) Using statistical regression analysis to establish construction cost models for seismic retrofit of confined masonry buildings. Journal of Construction Engineering and Management, 141(5): 04014098, ISSN 0733-9364

Jagboro, G O and Alli, O R (1999) A study of the monetary value of extension of time in building project. Journal of Financial Management of Property and Construction, 4(3), pp. 39-46. ISSN 1366-4387

Jansson, G; Lundkvist, R and Olofsson, T (2015) The role of experience feedback channels in the continuous development of house-building platforms. Construction Innovation, 15(2), pp. 236-255. ISSN 1471-4175

Jaramillo, L V (2019) Implementations of resilience engineering for natural system disturbances: A panarchical perspective. PhD thesis, University of New Mexico, USA.

Jarkas, A M and Bitar, C G (2014) Factors affecting construction labor productivity in Kuwait. Journal of Construction Engineering and Management, 138(7), pp. 811-820. ISSN 0733-9364

Jayasekara, R U; Jayathilaka, G S; Siriwardana, C; Amaratunga, D; Haigh, R; Bandara, C and Dissanayake, R (2023) Identifying gaps in early warning mechanisms and evacuation procedures for tsunamis in Sri Lanka, with a special focus on the use of social media. International Journal of Disaster Resilience in the Built Environment, 14(1), pp. 1-20. ISSN 1759-5916

Jenner, M S (1997) Designing high performance teams for projects: a study of 49 project teams in the UK construction industry. PhD thesis, Open University, UK.

Jeyakumar, R (2013) The implementation and effectiveness of value engineering in the United Arab Emirates. PhD thesis, University of Glamorgan, UK.

Jiang, H (2006) Chinese multinational construction firms in international and domestic markets: A re-examination of the eclectic paradigm. PhD thesis, National University of Singapore, Singapore.

Jiang, H and Liu, C (2011) Forecasting construction demand: A vector error correction model with dummy variables. Construction Management and Economics, 29(9), pp. 969-979. ISSN 1466433X

Jiang, H and Liu, C (2014) A panel vector error correction approach to forecasting demand in regional construction markets. Construction Management and Economics, 32(12), pp. 1205-1221. ISSN 01446193

Jiang, H; Xu, Y and Liu, C (2013) Construction price prediction using vector error correction models. Journal of Construction Engineering and Management, 139(11): 4013022, ISSN 0733-9364

Jin, Y (2013) Evaluating infrastructure performance to assist facility management toward sustainable systems. PhD thesis, Michigan Technological University, USA.

Jobe, K (2017) A flexible housing approach for self-help housing in Botswana. PhD thesis, University of Bath, UK.

Johnson, A; Rotimi, J O B and Wilkinson, S (2021) An evaluation of risk factors impacting project budget performance in New Zealand. Journal of Engineering, Design and Technology, 19(1), pp. 41-61. ISSN 1726-0531

Johnson, R M and Babu, R I I (2020) Time and cost overruns in the UAE construction industry: A critical analysis. International Journal of Construction Management, 20(5), pp. 402-411. ISSN 1562-3599

Johnsson, H (2013) Production strategies for pre-engineering in house-building: Exploring product development platforms. Construction Management and Economics, 31(9), pp. 941-958. ISSN 1466433X

Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.

Josephson, P E and Chao, M (2014) Use and non-use of time in construction of new multi-dwelling buildings in Sweden. International Journal of Construction Management, 14(1), pp. 28-35. ISSN 1562-3599

Jung, H; Seo, W and Kang, Y (2023) Differences in workers' safety behavior by project size and risk level of work in South Korea. Journal of Construction Engineering and Management, 149(5): 04023028, ISSN 0733-9364

Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364

Junga, W J (1981) The building cycle, shorter cycles of residential construction and federal housing programs: An empirical and theoretical analysis. PhD thesis, University of Connecticut, USA.

Kagan, Paula Brumer Franceschini (2024) Occupant behaviour modelling for building performance simulation of naturally ventilated school classrooms. PhD thesis, Universidade Estadual de Campinas, Brazil.

Kahaduwa, A and Rajapakse, L (2022) Review of climate change impacts on reservoir hydrology and long-term basin-wide water resources management. Building Research & Information, 50(5), pp. 515-526. ISSN 0961-3218

Kaka, A P (1996) Towards more flexible and accurate cash flow forecasting. Construction Management and Economics, 14(1), pp. 35-44. ISSN 01446193

Kaka, A P and Khosrowshahi, F (1996) Effect of different procurement routes on contractors' cash flows. Engineering, Construction and Architectural Management, 3(1-2), pp. 133-145. ISSN 0969-9988

Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988

Kaka, A P and Price, A D (1994) A survey of contractors' corporate planning and financial budgeting: Contractors lack effective and accurate methods of corporate planning, financial budgeting and cashflow forecasting identified in survey of 15 british construction companies. Building Research & Information, 22(3), pp. 174-182. ISSN 0961-3218

Kaka, A P F (1990) Corporate financial model for construction contractors. PhD thesis, Loughborough University, UK.

Kallman, J W (1998) Loss control project decision models for the construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Kanwar, V S; Dutta, H; Dutt, I; Kumar, A; Prakasam, C and Kanwar, M (2022) Impact and awareness of COVID-19 on rural communities: An empirical study of India. Built Environment Project and Asset Management, 12(3), pp. 486-502. ISSN 2044-124X

Kapelko, M and Abbott, M (2017) Productivity growth and business cycles: Case study of the Spanish construction industry. Journal of Construction Engineering and Management, 143(5): 05016026, ISSN 0733-9364

Karatas, I and Budak, A (2024) Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Engineering, Construction and Architectural Management, 31(3), pp. 1123-1144. ISSN 0969-9988

Karshenas, S (1981) Probabilistic evaluation of safety of buildings during construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kashem, S B (2019) Housing practices and livelihood challenges in the hazard-prone contested spaces of rural Bangladesh. International Journal of Disaster Resilience in the Built Environment, 10(5), pp. 420-434. ISSN 1759-5916

Kassa, R; Ogundare, T I; Lines, B; Smithwick, J and Sullivan, K (2024) Comparative analysis of human traits and tendencies: General vs. specialty contractor project managers. International Journal of Construction Education and Research, 20(3), pp. 284-300. ISSN 15578771

Katsanis, C J (1998) An empirical examination of the relationships between strategy, structure and performance in building industry organizations. PhD thesis, Universite de Montreal, Canada.

Katz, J I (2014) Quantifying "cliffs" in design space. Journal of Engineering, Design and Technology, 12(3), pp. 374-388.

Kazar, G and Comu, S (2022) Exploring the relations between the physiological factors and the likelihood of accidents on construction sites. Engineering, Construction and Architectural Management, 29(1), pp. 456-475. ISSN 0969-9988

Kazemi, Hamidreza (2014) Evaluating the effectiveness and hydrological performance of green infrastructure stormwater control measures. PhD thesis, University of Louisville, USA.

Keane, C (2012) Essays in social policy and labour economics. PhD thesis, University College Dublin, Ireland.

Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.

Kehinde, J O and Aiyetan, O A (2002) A study of the nature of contractual claims in building contracts in Nigeria. Journal of Financial Management of Property and Construction, 7(3), pp. 197-202. ISSN 1366-4387

Kenley, R and Wilson, O D (1986) A construction project cash flow model: an idiographic approach. Construction Management and Economics, 4(3), pp. 213-232. ISSN 01446193

Kern, A P; Postay, R; Schneck, E R; Mancio, M; González, M A S and Guerra, G (2021) Cost and environmental impacts reduction through building compactness. Engineering, Construction and Architectural Management, 28(4), pp. 1176-1195. ISSN 0969-9988

Kerns, W R (1971) Criteria for determining economic priorities in awarding sewage facility construction grants. PhD thesis, Pennsylvania State University, USA.

Khosrowshahi, F (1997) Construction activity in the UK recent trends and projections. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Khosrowshahi, F (1999) Neural network model for contractors' pre-qualification for local authority projects. Engineering, Construction and Architectural Management, 6(3), pp. 315-328. ISSN 0969-9988

Kifokeris, D; Tjell, J; Viklund-Tallgren, M; Farah, L N and Roupé, M (2020) Challenges in the digital transformation of lean design methods: A case study. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Kikwasi, G J (2023) Claims in construction projects: How causes are linked to effects? Journal of Engineering, Design and Technology, 21(6), pp. 1710-1724. ISSN 1726-0531

Kim, D Y; Han, S H and Kim, H (2008) Discriminant analysis for predicting ranges of cost variance in international construction projects. Journal of Construction Engineering and Management, 134(6), pp. 398-410. ISSN 0733-9364

Kim, J S (1995) Reliability-based design of a retaining wall. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Kim, K; Cho, Y and Kim, K (2018) BIM-driven automated decision support system for safety planning of temporary structures. Journal of Construction Engineering and Management, 144(8): 04018072, ISSN 0733-9364

Kim, Y and Ham, Y (2024) Revealing the impact of heat radiation on construction: A microclimate simulation using meteorological data and geometric modeling. Journal of Construction Engineering and Management, 150(4): 04024016, ISSN 0733-9364

Kindangen, J I (1996) Artificial neural networks and naturally ventilated buildings. Building Research & Information, 24(4), pp. 203-208. ISSN 0961-3218

Kishk, M; Pollock, R and Okhuahesogie, E (2004) Sensitivity of simulated whole-life costs to input probability distributions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Kissi, E; Ahadzie, D K; Adjei-Kumi, T and Badu, E (2017) Rethinking the challenges to the pricing of projects in the Ghanaian construction industry. Journal of Engineering, Design and Technology, 15(5), pp. 700-719.

Kleindienst, S and Andersen, M (2012) Comprehensive annual daylight design through a goal-based approach. Building Research & Information, 40(2), pp. 154-173. ISSN 0961-3218

Ko, T; Lee, J and David Jeong, H (2024) Project requirements prioritization through NLP-driven classification and adjusted work items analysis. Journal of Construction Engineering and Management, 150(3): 04023171, ISSN 0733-9364

Koehn, E and Musser, K (1983) OSHA regulations effects on construction. Journal of Construction Engineering and Management, 109(2), pp. 233-244. ISSN 0733-9364

Koirala, M P; Thapa, N; Giri, O P and Sha, R K (2025) Evaluation of variation orders on road construction projects in rural Nepal. Construction Economics and Building, 25(3-4), pp. 311-338. ISSN 2204-9029

Kong, A T and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(1), pp. 51-62. ISSN 2204-9029

Konstantinou, T; de Jonge, T; Oorschot, L; El Messlaki, S; van Oel, C and Asselbergs, T (2020) The relation of energy efficiency upgrades and cost of living, investigated in two cases of multi-residential buildings in the Netherlands. Smart and Sustainable Built Environment, 9(4), pp. 615-633. ISSN 2046-6099

Koo, K J and Park, S C (2012) GA-based fuel-efficient transfer path selection model for delivering construction materials. Journal of Construction Engineering and Management, 138(6), pp. 725-732. ISSN 0733-9364

Krainer, Christiane Wagner Mainardes (2021) Model of social capital accumulation in civil construction companies. PhD thesis, Universidade Tecnológica Federal do Paraná, Brazil.

Kramer, R; Schellen, L and Schellen, H (2018) Adaptive temperature limits for air-conditioned museums in temperate climates. Building Research & Information, 46(6), pp. 686-697. ISSN 0961-3218

Krasnokutskaya, E (2003) Identification and estimation in highway procurement auctions under unobserved heterogeneity. PhD thesis, Yale University, USA.

Krych, K; Heeren, N and Hertwich, E G (2021) Factors influencing the life-cycle GHG emissions of Brazilian office buildings. Buildings & Cities, 2(1), pp. 856-873. ISSN 2632-6655

Kulkarni, S S; Chapman, C; Shah, H and Edwards, D J (2018) A computational design method for bio-mimicked horizontal axis tidal turbines. International Journal of Building Pathology and Adaptation, 36(2), pp. 188-209. ISSN 23984708

Kumar, R; Chandrashekhar, I K and Singh, S P (2017) Quantification of construction project risks by analysis of past dispute cases. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Kumar, S and Bansal, V K (2019) Use of GIS in locating TFs safely on a construction site in hilly regions. International Journal of Construction Management, 19(4), pp. 341-353. ISSN 1562-3599

Kumar, S; Dhingra, A and Singh, B (2018) Lean-kaizen implementation: A roadmap for identifying continuous improvement opportunities in Indian small and medium sized enterprise. Journal of Engineering, Design and Technology, 16(1), pp. 143-160.

Kwawu, W; Elhag, T and Ballal, T (2010) Knowledge transfer processes in PFI/PPP: Critical success factors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kwok-Chun, W and Walker, A (2000) Property rights implications of public-private joint ventures. Construction Management and Economics, 18(2), pp. 131-138. ISSN 01446193

Lahdenperä, P (2024) Design–build with a development phase: An initiation and the first trials. Construction Economics and Building, 24(4-5), pp. 18-42. ISSN 2204-9029

Lahouti, A (2017) Cue-based decision-making in construction work crews: An agent-based modeling approach. PhD thesis, Michigan State University, USA.

Lam, K C and Oshodi, O S (2015) The capital budgeting evaluation practices (2014) of contractors in the Hong Kong construction industry. Construction Management and Economics, 33(7), pp. 587-600. ISSN 01446193

Lam, T Y M and Siwingwa, N (2017) Risk management and contingency sum of construction projects. Journal of Financial Management of Property and Construction, 22(3), pp. 237-251. ISSN 1366-4387

Lam, T Y M; Brock, T and Gale, K S (2025) Is "design and build" suitable for social housing projects in the UK housing crisis? Built Environment Project and Asset Management, 15(4), pp. 863-878. ISSN 2044-124X

Lan, O B; Ling, F Y Y and Soo, A (2014) Information feedback and bidders' competitiveness in construction bidding. Engineering, Construction and Architectural Management, 21(5), pp. 571-585. ISSN 0969-9988

Langford, D A; Kennedy, P; Conlin, J and McKenzie, N (2003) Comparison of construction costs on motorway projects using measure and value and alternative tendering initiative contractual arrangements. Construction Management and Economics, 21(8), pp. 831-840. ISSN 01446193

Langston, Y L and Langston, C (2007) Building energy and cost performance: An analysis of thirty Melbourne case studies. Construction Economics and Building, 7(1), pp. 1-18. ISSN 2204-9029

Lansley, P; McCreadie, C; Tinker, A; Flanagan, S and Goodacre, K (2004) Adapting the homes of older people: A case study of costs and savings. Building Research & Information, 32(6), pp. 468-483. ISSN 0961-3218

Larsen, G D (2011) Understanding the early stages of the innovation diffusion process: Awareness, influence and communication networks. Construction Management and Economics, 29(10), pp. 987-1002. ISSN 01446193

Larsson, B; Sundqvist, J and Emmitt, S (2006) Component manufacturers' perceptions of managing innovation. Building Research & Information, 34(6), pp. 552-564. ISSN 0961-3218

Laura Pisello, A; Xu, X; Taylor, J E and Cotana, F (2012) Network of buildings' impact on indoor thermal performance. Smart and Sustainable Built Environment, 1(1), pp. 73-86. ISSN 2046-6099

Lawani, K; Billy, H and Cameron, I (2021) Conceptualising self-determination theory as an indicator for improving construction worker motivation. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Lawson, W R (1996) Life cycle energy analysis of buildings revisited. Journal of Financial Management of Property and Construction, 1(3), pp. 83-94. ISSN 1366-4387

Lee, B-H (2011) Forecasting wheat yield and quality conditional on weather information and estimating construction costs of agricultural facilities. PhD thesis, Oklahoma State University, USA.

Lee, C K and Foo, M Y (2020) Risk attitudes and the big five personality traits: A study on construction project practitioners in Malaysia. International Journal of Construction Management, 22(13), pp. 2435-2445. ISSN 1562-3599

Lee, F-P B (2009) Factors affecting the profitability of construction companies in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Lee, G and Kim, S (2012) Case study of mass customization of double-curved metal façade panels using a new hybrid sheet metal processing technique. Journal of Construction Engineering and Management, 138(11), pp. 1322-1330. ISSN 0733-9364

Lee, H S; Yu, J H and Kim, S K (2004) Impact of labor factors on workflow. Journal of Construction Engineering and Management, 130(6), pp. 918-923. ISSN 0733-9364

Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures. PhD thesis, University of Michigan, USA.

Lee, J and Ham, Y (2021) Physiological sensing-driven personal thermal comfort modelling in consideration of human activity variations. Building Research & Information, 49(5), pp. 512-524. ISSN 0961-3218

Lee, S (2001) Simulation analysis of productivity variation affected by accident risk in underground construction operations. PhD thesis, Purdue University, USA.

Lee, S-H (2003) A process model for controlling project productivity of highway construction operations. PhD thesis, University of Florida, USA.

Lees, E (2016) The polluter pays principle and the remediation of the land. International Journal of Law in the Built Environment, 8(1), pp. 2-20. ISSN 1756-1450

Leishman, C and Warren, F (2006) Private housing design customization through house type substitution. Construction Management and Economics, 24(2), pp. 149-158. ISSN 01446193

Lema, N M (1996) Construction labour productivity analysis and benchmarking: the case of Tanzania. PhD thesis, Loughborough University, UK.

Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193

Leu, S S and Lin, Y C (2008) Project performance evaluation based on statistical process control techniques. Journal of Construction Engineering and Management, 134(10), pp. 813-819. ISSN 0733-9364

Levis, James William (2013) A mathematical programming life-cycle assessment model for solid waste management decision making. PhD thesis, North Carolina State University, USA.

Lewis, S J and Greenwood, D J (2002) The treatment of risk in construction contracts under PFI/PPP. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Li, H.; Lyu, R.; Sheng, J.; Menadue, V. and Skitmore, M. (2026) Enhancing eco-efficiency in china's construction industry: Measurement, drivers, and policy implications using an ebm-tobit approach. International Journal of Construction Management, 26(9), pp. 1727-1745. ISSN 1562-3599

Li, L; Cui, X; Wang, J; Jin, H and Xu, H (2026) Automated tracking of worker and heavy equipment on tunnel construction sites: Deep-learning framework. Journal of Construction Engineering and Management, 152(2): 04025237, ISSN 0733-9364

Li, F G N; Smith, A Z P; Biddulph, P; Hamilton, I G; Lowe, R; Mavrogianni, A; Oikonomou, E; Raslan, R; Stamp, S; Stone, A; Summerfield, A J; Veitch, D; Gori, V and Oreszczyn, T (2015) Solid-wall U-values: Heat flux measurements compared with standard assumptions. Building Research & Information, 43(2), pp. 238-252. ISSN 0961-3218

Li, H; Xu, Z and Demeulemeester, E (2015) Scheduling policies for the stochastic resource leveling problem. Journal of Construction Engineering and Management, 141(2): 04014072, ISSN 0733-9364

Li, J; Zhu, J and Guan, C (2024) Mitigating fatigue in tunnel construction through illumination: Evidence from virtual reality. Journal of Construction Engineering and Management, 150(11): 04024165, ISSN 0733-9364

Li, Y; Zhang, L; Liu, X and Li, X (2025) A project scheduling optimization model for reducing construction dust emissions based on variability in meteorological conditions. Journal of Construction Engineering and Management, 151(11): 04025171, ISSN 0733-9364

Lihakanga, R (2022) Generic wireless sensor network for dynamic monitoring of a new generation of building material. PhD thesis, Heriot-Watt University, UK.

Lim, E C (1996) The analysis of productivity in building construction. PhD thesis, Loughborough University, UK.

Lim, T K; Park, S M; Lee, H C and Lee, D E (2016) Artificial neural network-based slip-trip classifier using smart sensor for construction workplace. Journal of Construction Engineering and Management, 142(2): 04015065, ISSN 0733-9364

Lin, S L (2021) Environmental risk and delay analysis: Lessons learned from the california high speed rail project. DEnv thesis, University of California, Los Angeles, USA.

Lindhard, S (2014) Understanding the effect of variation in a production system. Journal of Construction Engineering and Management, 140(11): 4014051, ISSN 0733-9364

Lindhard, S M (2024) Applying work measurements to identify productivity potentials: The case of prefabricated concrete elements. International Journal of Construction Management, 24(15), pp. 1668-1678. ISSN 1562-3599

Lindhard, S M; Hamzeh, F; Gonzalez, V A; Wandahl, S and Ussing, L F (2019) Impact of activity sequencing on reducing variability. Journal of Construction Engineering and Management, 145(3): 04019001, ISSN 0733-9364

Lindhard, S M; Neve, H; Terje Kalsaas, B; Møller, D E and Wandahl, S (2022) Ranking and comparing key factors causing time-overruns in on-site construction. International Journal of Construction Management, 22(14), pp. 2724-2730. ISSN 1562-3599

Ling, C S; Ahmad, M H and Ossen, D R (2007) The effect of geometric shape and building orientation on minimising solar insolation on high-rise buildings in hot humid climate. Journal of Construction in Developing Countries, 12(1), pp. 27-38. ISSN 1823-6499

Lingard, H; Cooke, T and Blismas, N (2011) Coworkers' response to occupational health and safety: An overlooked dimension of group-level safety climate in the construction industry. Engineering, Construction and Architectural Management, 18(2), pp. 159-175. ISSN 0969-9988

Lingard, H; Warmerdam, A and Shooshtarian, S (2019) Getting the balance right: Regulating occupational health and safety planning and coordination in the Australian construction industry. Engineering, Construction and Architectural Management, 26(4), pp. 599-617. ISSN 0969-9988

Lingard, H C; Cooke, T and Blismas, N (2009) Group-level safety climate in the Australian construction industry: Within-group homogeneity and between-group differences in road construction and maintenance. Construction Management and Economics, 27(4), pp. 419-432. ISSN 1466433X

Lingard, H C; Cooke, T and Blismas, N (2010) Safety climate in conditions of construction subcontracting: A multi-level analysis. Construction Management and Economics, 28(8), pp. 813-825. ISSN 1466433X

Liow, K H (2000) Corporate financial reporting of Singapore property companies: Issues and evidence. Journal of Financial Management of Property and Construction, 5(3), pp. 149-158. ISSN 1366-4387

Liu, D; Wang, Y; Chen, J and Zhang, Y (2020) Intelligent compaction practice and development: a bibliometric analysis. Engineering, Construction and Architectural Management, 27(5), pp. 1213-1232. ISSN 0969-9988

Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.

Liu, M (2007) Work flow variability and labor productivity loss for construction projects. PhD thesis, University of California, Berkeley, USA.

Liu, Margaret Ze-Yu (2016) Energy efficiency retrofits of tertiary education buildings: An investigation of case studies in New South Wales. PhD thesis, University of Sydney, Australia.

Liu, R and Fischer, M (2025) A context taxonomy for construction field crew members. Journal of Construction Engineering and Management, 151(3): 04024214, ISSN 0733-9364

Liu, X; Song, Y; Yi, W; Wang, X and Zhu, J (2018) Comparing the random forest with the generalized additive model to evaluate the impacts of outdoor ambient environmental factors on scaffolding construction productivity. Journal of Construction Engineering and Management, 144(6): 04018037, ISSN 0733-9364

Loke, M K; Lee, W P and Yap, J B H (2025) Effective practical strategies for statutory adjudication in construction disputes: Perspectives from adjudicators. International Journal of Construction Management, 25(12), pp. 1488-1499. ISSN 1562-3599

Loosemore, M; Daniele, F and Lim, B T H (2020) Integrating ex-offenders into the Australian construction industry. Construction Management and Economics, 38(10), pp. 877-893. ISSN 01446193

Lu, S L and Sexton, M (2006) Innovation in small construction knowledge-intensive professional service firms: A case study of an architectural practice. Construction Management and Economics, 24(12), pp. 1269-1282. ISSN 1466433X

Lu, W; Li, Z and Wang, S (2017) The role of justice for cooperation and contract's moderating effect in construction dispute negotiation. Engineering, Construction and Architectural Management, 24(1), pp. 133-153. ISSN 0969-9988

Lum, S K (2003) Market efficiency and technical analysis in the Singapore property market. Journal of Financial Management of Property and Construction, 8(1), pp. 29-39. ISSN 1366-4387

Lundberg, O; Nylén, D and Sandberg, J (2022) Unpacking construction site digitalization: The role of incongruence and inconsistency in technological frames. Construction Management and Economics, 40(11-12), pp. 987-1002. ISSN 01446193

Lundman, P (2011) Cost management for underground infrastructure projects a case study on cost increase and its causes. PhD thesis, Luleå University of Technology, Sweden.

Luo, L; Niu, X; Jiang, K; Bo, Q and Zhou, D (2026) Fuzzy cognitive map-based approach for measuring megaproject complexity considering dynamic interactions. Journal of Construction Engineering and Management, 152(2): 04025255, ISSN 0733-9364

Luo, L; Zhang, L and He, Q (2020) Linking project complexity to project success: A hybrid SEM-FCM method. Engineering, Construction and Architectural Management, 27(9), pp. 2591-2614. ISSN 0969-9988

Luo, L; Zhang, L; Zheng, X and Wu, G (2022) A hybrid approach for investigating impacts of leadership dynamics on project performance. Engineering, Construction and Architectural Management, 29(5), pp. 1965-1990. ISSN 0969-9988

Luo, M; Zhang, H; Wang, Z; Arens, E; Chen, W; Bauman, F S and Raftery, P (2021) Ceiling-fan-integrated air-conditioning: Thermal comfort evaluations. Buildings & Cities, 2(1), pp. 928-951. ISSN 2632-6655

Löwstedt, M (2014) "Taking off my glasses in order to see": Exploring practice on a building site using self-reflexive ethnograph. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Löwstedt, M (2015) 'Taking off my glasses in order to see': Exploring practice on a building site using self-reflexive ethnography. Construction Management and Economics, 33(5-6), pp. 404-414. ISSN 01446193

Löwstedt, M and Räisänen, C (2012) 'Playing back-spin balls': Narrating organizational change in construction. Construction Management and Economics, 30(9), pp. 795-806. ISSN 1466433X

Ma, G; Gu, L and Li, N (2015) Scenario-based proactive robust optimization for critical-chain project scheduling. Journal of Construction Engineering and Management, 141(10): 04015030, ISSN 0733-9364

Ma, L; Reed, R and Jin, X (2018) Identify the equilibrium of residential construction output: A vector error correction model approach. Engineering, Construction and Architectural Management, 25(1), pp. 21-38. ISSN 0969-9988

Maali, O M (2022) Management practices to improve adoption and employee well-being during organizational changes in the AEC industry. PhD thesis, University of Kansas, USA.

MacIntyre, S; McCord, M; Davis, P T; Zacharopoulos, A and McCord, J A (2023) A spatial examination of solar PV adopters in Northern Ireland: The role of housing market and socio-economic characteristics. Journal of Financial Management of Property and Construction, 28(3), pp. 317-350. ISSN 1366-4387

Macedo, B S and Ferreira, M L R (2023) Welder learning curves behaviour: "Focus on welding productivity with the tig process of marine platforms stainless steel pipes". Engineering, Construction and Architectural Management, 30(2), pp. 496-513. ISSN 0969-9988

Magdub, R H (2006) Application of the lump sum turnkey contracts in Libyan civil law with reference to English law and international practice. PhD thesis, Glasgow Caledonian University, UK.

Magoda, C M; Gryzagoridis, J and Kanyarusoke, K (2021) Effective heat conductivity of Honeycomb (porous) composite panel. Journal of Engineering, Design and Technology, 19(4), pp. 876-887. ISSN 1726-0531

Mahamid, I (2017) Effect of change orders on rework in highway projects in Palestine. Journal of Financial Management of Property and Construction, 22(1), pp. 62-76. ISSN 1366-4387

Mahamood, S Z H and Fathi, M S (2022) Seismic building design work process using building information modeling (BIM) technology for Malaysian government projects. International Journal of Disaster Resilience in the Built Environment, 13(2), pp. 211-232. ISSN 1759-5916

Mahapatra, K; Gustavsson, L and Hemstrm, K (2012) Multi-storey wood-frame buildings in Germany, Sweden and the UK. Construction Innovation, 12(1), pp. 62-85. ISSN 1471-4175

Mahdjoubi, L (2001) An investigation of computer-generated architectural representations on design decision-tasks. PhD thesis, University of Newcastle upon Tyne, UK.

Mahfouz, T; Davlyatov, S and Kandil, A (2016) Analysis of differing site condition litigation reasoning through statistical modeling. International Journal of Construction Education and Research, 12(4), pp. 285-302. ISSN 1557-8771

Mahjoubpour, B; Nasirzadeh, F; Mohammad Hosein Zadeh Golabchi, M; Ramezani Khajehghiasi, M and Mir, M (2018) Modeling of workers' learning behavior in construction projects using agent-based approach: The case study of a steel structure project. Engineering, Construction and Architectural Management, 25(4), pp. 559-573. ISSN 0969-9988

Mahmoud, S; Hussein, M; Zayed, T and Fahmy, M (2022) Multiobjective optimization model for the life cycle cost-sustainability trade-off problem of building upgrading using a generic sustainability assessment tool. Journal of Construction Engineering and Management, 148(7): 04022050, ISSN 0733-9364

Mak, S; Wong, J and Picken, D (1998) The effect on contingency allowances of using risk analysis in capital cost estimating: A Hong Kong case study. Construction Management and Economics, 16(6), pp. 615-619. ISSN 01446193

Malakhatka, E; Shafqat, O; Sandoff, A and Thuvander, L (2025) Positive energy districts and energy communities: How living labs create value. Buildings & Cities, 6(1), pp. 783-799. ISSN 2632-6655

Manamgoda, M G N; Perera, B A K S and Perera, C S R (2018) Impact of interest rates of bank loans on road construction: The case of Sri Lanka. Journal of Engineering, Design and Technology, 16(4), pp. 518-532. ISSN 1726-0531

Manamperi, S; Munmulla, T; Navaratnam, S and Zhang, G (2026) Impact of economic inflation on the mental health of construction professionals: A quantitative study. Journal of Construction Engineering and Management, 152(1): 04025228, ISSN 0733-9364

Mangitung, D M (2005) Modelling the influence of periodic prequalification criteria on project performance. PhD thesis, University of Manchester, UK.

Mani, S.; Karunasena, G.; Hosseini, M. R. and Hasan, A. (2026) Building circularity performance model: A weighted multi-level assessment framework aligned with ISO standards. Smart and Sustainable Built Environment, ISSN 2046-6099

Manninen, D L (1981) Labor force migration associated with nuclear power plant construction. PhD thesis, University of Washington, USA.

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) Evaluating the efficiency and productivity of general workers in structural work practices of building construction through work-based training applications. International Journal of Construction Management, 24(3), pp. 339-350. ISSN 1562-3599

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) Assessing the performance and productivity of labour in building construction projects through the application of work-based training practices. Construction Innovation, 24(2), pp. 558-583. ISSN 1471-4175

Maqsoom, A; Choudhry, R M; Umer, M and Mehmood, T (2021) Influencing factors indicating time delay in construction projects: Impact of firm size and experience. International Journal of Construction Management, 21(12), pp. 1251-1262. ISSN 1562-3599

Marsh, R (2017) Building lifespan: Effect on the environmental impact of building components in a Danish perspective. Architectural Engineering and Design Management, 13(2), pp. 80-100. ISSN 1745-2007

Martin, J C; Akande, K and Falconer, R A (2010) Innovations from the Halcrow-Cardiff university strategic collaboration. Engineering, Construction and Architectural Management, 17(1), pp. 46-64. ISSN 0969-9988

Martin, L and Root, D (2007) Reflections and observations on the use of broad-based survey methods on the South African construction sector. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Marzouk, M and Mohamed, E (2018) Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(1), pp. 90-108. ISSN 1471-4175

Matarneh, S (2024) Construction disputes causes and resolution methods: A case study from a developing country. Journal of Construction in Developing Countries, 29(1), pp. 139-161. ISSN 1823-6499

Mathews, J D (2000) Optimisation and decision support during the conceptual stage of building design: New techniques based on the genetic algorithm. PhD thesis, University of Plymouth, UK.

Mawdesley, M J; Al-Jibouri, S H and Clark-Hughes, J (2002) A proactive control approach to agreeing entitlement to claims in construction. Journal of Financial Management of Property and Construction, 7(1), pp. 41-48. ISSN 1366-4387

Mayouf, M and Gilligan, C (2024) Synthesis towards unveiling the complexity underlying underpayment for subcontractors in construction. Journal of Financial Management of Property and Construction, 29(1), pp. 168-192. ISSN 1366-4387

Mbachu, J (2011) Sources of contractor's payment risks and cash flow problems in the New Zealand construction industry: Project team's perceptions of the risks and mitigation measures. Construction Management and Economics, 29(10), pp. 1027-1041. ISSN 01446193

McCord, M; Davis, P T; Haran, M; McGreal, S and McIlhatton, D (2012) Spatial variation as a determinant of house price: Incorporating a geographically weighted regression approach within the Belfast housing market. Journal of Financial Management of Property and Construction, 17(1), pp. 49-72. ISSN 1366-4387

McGowan, P H (1994) Integrated cost and time models for measuring, valuing and controlling construction projects. PhD thesis, University of Dundee, UK.

McLeish, D C A (1978) House building productivity: A study of labour requirements on Scottish house building sites using activity sampling methods. PhD thesis, Aston University, UK.

Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.

Melgarejo, J A (1987) A decision model for human error in the design and construction process. PhD thesis, University of Michigan, USA.

Mell, Ian Caleb (2010) Green infrastructure: Concepts, perceptions and its use in spatial planning. PhD thesis, University of Newcastle upon Tyne, UK.

Meng, S (2023) Development of a regional wind risk assessment framework for wood-frame single-family residential building stock. PhD thesis, University of California, Los Angeles, USA.

Menoka, B (2014) Stakeholder engagement and sustainability-related project performance in construction. PhD thesis, Liverpool John Moores University, UK.

Merchant, A and Bajaj, D (2002) An analysis of the use of the "design-build" project delivery system by interior design firms, and its effectiveness in delivering fit-out projects. Journal of Construction Procurement, 8(1), pp. 17-34. ISSN 1358-9180

Mhundwa, R and Simon, M (2021) Electrical energy prediction using a surface fitting model for an on-farm direct expansion bulk milk cooler (DXBMC) in South Africa. Journal of Engineering, Design and Technology, 19(3), pp. 778-794. ISSN 1726-0531

Mickovski S B, B J D S M J (2013) Innovative use of ECC (NEC) for procurement and management of infrastructure projects with limited funding: Bervie Braes case study. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Milberg, C T (2006) Application of tolerance management to civil systems. PhD thesis, University of California, Berkeley, USA.

Min, Y and Lee, H W (2024) Adoption inequalities and causal relationship between residential electric vehicle chargers and heat pumps. Journal of Construction Engineering and Management, 150(5): 04024025, ISSN 0733-9364

Mircheva, B K (2009) Infrastructure: The building block for exports in sub-Saharan Africa? PhD thesis, American University, USA.

Mirzaei, Z (2015) An investigation of methodologies to determine the most sustainable bridge work programs. DSc thesis, ETH Zürich, Switzerland.

Mishmish, M and El-Sayegh, S M (2018) Causes of claims in road construction projects in the UAE. International Journal of Construction Management, 18(1), pp. 26-33. ISSN 1562-3599

Mofolasayo, A (2025) Multi-variable evaluation of factors that contribute to the environmental impact of onsite and offsite building construction: An illustration using roof panel fastening schedule. International Journal of Construction Management, 25(16), pp. 1938-1951. ISSN 1562-3599

Mohareb, E; Gillich, A and Bristow, D (2022) Participation in domestic energy retrofit programmes: Key spatio-temporal drivers. Buildings & Cities, 3(1), pp. 356-375. ISSN 2632-6655

Mohieldin, Y A (1989) Analysis of construction processes with nonstationary work task durations. PhD thesis, University of Maryland, College Park, USA.

Mohsini, R A and Davidson, C H (1992) Determinants of performance in the traditional building process. Construction Management and Economics, 10(4), pp. 343-359. ISSN 01446193

Molenaar, K R (1997) Public sector design-build: A model for project selection. PhD thesis, University of Colorado at Boulder, USA.

Momade, M H; Shahid, S; Falah, G; Syamsunur, D and Estrella, D (2023) Review of construction labor productivity factors from a geographical standpoint. International Journal of Construction Management, 23(4), pp. 697-707. ISSN 1562-3599

Moon, S; Choi, E and Hong, S (2016) Creation of robust design alternatives for temporary construction in value engineering. Journal of Construction Engineering and Management, 142(3): 04015086, ISSN 0733-9364

Moore, D R and Dainty, A R J (2000) Work-group communication patterns in design and build project teams: An investigative framework. Journal of Construction Procurement, 6(1), pp. 44-55. ISSN 1358-9180

Moriyani, M A; Le, C; Le, T and Pirim, H (2026) Beyond one-size-fits-all: A novel data-driven framework for quantifying bidding competition intensity in highway design-bid-build contracts. Journal of Construction Engineering and Management, 152(3): 04026006, ISSN 0733-9364

Morris, J; Rogerson, J and Jared, G (1998) A tool for modelling the briefing and design decision making processes in construction. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Moselhi, O and Hassanein, A (2003) Optimized scheduling of linear projects. Journal of Construction Engineering and Management, 129(6), pp. 664-673. ISSN 0733-9364

Moselhi, O and Khan, Z (2012) Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(3), pp. 272-296. ISSN 1471-4175

Moselhi, O and Nicholas, M J (1990) Hybrid expert system for construction planning and scheduling. Journal of Construction Engineering and Management, 116(2), pp. 221-238. ISSN 0733-9364

Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175

Mousavi, Milad (2025) Evolving and proactive risk modelling in underground working environments. PhD thesis, University of New South Wales, Australia.

Moussavi Nadoushani, Z S; Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(7), pp. 938-957. ISSN 0969-9988

Mucheti, Alexsander Silva (2025) Experimental and numerical analysis of nailed soil structures in urban areas. PhD thesis, Universidade Estadual de Campinas, Brazil.

Muleya, F (2014) Modelling wheeled construction plant performance in clay and sandy terrain: a terramechanics perspective. PhD thesis, Anglia Ruskin University, UK.

Mulville, M; Jones, K and Huebner, G (2014) The potential for energy reduction in UK commercial offices through effective management and behaviour change. Architectural Engineering and Design Management, 10(1-2), pp. 79-90. ISSN 1745-2007

Mun, H; Jeong, J; Jeong, J and Kumi, L (2025) Statistical hypothesis test approach considering workers' thermal comfort to determine nonworking days in different climate zones. Journal of Construction Engineering and Management, 151(9): 04025116, ISSN 0733-9364

Munhos, M M and da Silva, A M (2024) Eco-roofs: Influence of shape and material variations on surface temperature, rainwater volume and quality. Architectural Engineering and Design Management, 20(6), pp. 1709-1724. ISSN 1745-2007

Munonye, C (2021) Determining the diurnal variation in comfort temperature in school buildings in the warm and humid climate. International Journal of Building Pathology and Adaptation, 39(5), pp. 766-781. ISSN 23984708

Mwakabole, G C; Gurmu, A T and Tivendale, L (2019) Investigation of the challenges facing public-private partnership projects in Australia. Construction Economics and Building, 19(1), pp. 57-74. ISSN 2204-9029

Mwelu, N; Davis, P R; Ke, Y; Watundu, S and Jefferies, M (2021) Success factors for implementing Uganda's public road construction projects. International Journal of Construction Management, 21(6), pp. 598-614. ISSN 1562-3599

Mwelu, N; Watundu, S and Moya, M (2024) Demand side perception on success factors for implementing public road construction projects. Journal of Construction in Developing Countries, 29(1), pp. 1-22. ISSN 1823-6499

Müller, B (2016) Policy gaps: Future challenges for research. Building Research & Information, 44(3), pp. 338-341. ISSN 0961-3218

Na, R (2013) Property rights analysis of building material pricing. PhD thesis, University of Hong Kong, Hong Kong.

Naderpajouh, N; Mahdavi, A; Hastak, M and Aldrich, D P (2014) Modeling social opposition to infrastructure development. Journal of Construction Engineering and Management, 140(8): 04014029, ISSN 0733-9364

Nagar, S (2015) Internationalisation of New Zealand civil construction firms: opportunities and challenges in Asia. PhD thesis, Auckland University of Technology, New Zealand.

Naji, K K; Gunduz, M and Maki, O (2023) Development of a campus facility management operational framework using a modified Delphi method. Journal of Construction Engineering and Management, 149(7): 04023052, ISSN 0733-9364

Napolitan, C L (1995) Improvement to the forecast precision of the factor model for masonry productivity. PhD thesis, Pennsylvania State University, USA.

Nassar, K and Hosny, O (2012) Solving the least-cost route cut and fill sequencing problem using particle swarm. Journal of Construction Engineering and Management, 138(8), pp. 931-942. ISSN 0733-9364

Navarro-Astor, E C V (2012) Architects in Spain: A profession under risk. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Navendren, D; Manu, P; Shelbourn, M and Mahamadu, A M (2014) Challenges to building information modelling implementation in UK: Designers' perspectives. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Navon, R and Arkin, H (1993) Economic comparison of an air-conditioner and a desert cooler for residences in arid areas. Construction Management and Economics, 11(1), pp. 62-70. ISSN 01446193

Newman, W H (1934) The building industry and business cycles. PhD thesis, University of Chicago, USA.

Ng, K F (2017) Sustainable housing and railway developments over space and time. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Ng, S T; Mak, M M Y; Skitmore, R M; Lam, K C and Varnam, M (2001) The predictive ability of bromilow's time-cost model. Construction Management and Economics, 19(2), pp. 165-173. ISSN 01446193

Nguyen, D A; Garvin, M J and Gonzalez, E E (2018) Risk allocation in U.S. Public-private partnership highway project contracts. Journal of Construction Engineering and Management, 144(5): 04018017, ISSN 0733-9364

Nguyen, L D and Ibbs, W (2010) Case law and variations in cumulative impact productivity claims. Journal of Construction Engineering and Management, 136(8), pp. 826-833. ISSN 0733-9364

Nguyen, P H D; Lines, B C and Tran, D Q (2018) Best-value procurement in design-bid-build construction projects: Empirical analysis of selection outcomes. Journal of Construction Engineering and Management, 144(10): 04018093, ISSN 0733-9364

Nguyen, T T (2017) Modeling of CLT creep behavior and real-time hybrid simulation of a CLT-LiFS building. PhD thesis, University of Alabama, USA.

Nguyen, Tuan Anh (2019) Options and flexibility in PPP toll road projects. PhD thesis, University of New South Wales, Australia.

Nguyen, V T and Do, S T (2023) Assessing the relationship chain among causes of variation orders, project performance, and stakeholder performance in construction projects. International Journal of Construction Management, 23(9), pp. 1592-1602. ISSN 1562-3599

Nikkhah Manesh, S (2020) Temporal and spatial analysis of the wage gap for women and underrepresented minorities in the architecture, engineering, and construction (AEC) workforce. PhD thesis, University of Nevada, Las Vegas, USA.

Nilsson, S (2003) Durability of district heating pipes. PhD thesis, Chalmers Tekniska Hogskola, Sweden.

Nobe, M D (1996) Decision support for real estate development cost estimating. PhD thesis, Texas A&M University, USA.

Noktehdan, M; Shahbazpour, M; Zare, M R and Wilkinson, S (2019) Innovation management and construction phases in infrastructure projects. Journal of Construction Engineering and Management, 145(2): 04018135, ISSN 0733-9364

Noor, I (1992) A study of the variability of labour productivity in building trades. PhD thesis, University of Dundee, UK.

Noruwa, B I (2020) Application and effects of emerging technologies on variation minimisation in the UK construction projects. PhD thesis, Coventry University, UK.

Noruwa, B I; Arewa, A O and Merschbrock, C (2022) Effects of emerging technologies in minimising variations in construction projects in the UK. International Journal of Construction Management, 22(11), pp. 2199-2206. ISSN 1562-3599

Nouh, A; Elkasaby, E and Hussein, K (2023) Establishment of prediction system for cost of defect liability phase in construction project. Construction Innovation, 23(2), pp. 467-486. ISSN 1471-4175

Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.

Nwodo, M N (2020) Investigation of exergy-based life cycle assessment of buildings. PhD thesis, University of Florida, USA.

O'Connor, M G (2016) Labour market institutions in the Brazilian variety of capitalism since 2003: Evidence from the construction industry. PhD thesis, University of York, UK.

Obi, L I (2017) Development of a system model for cost management in low-cost housing projects in Nigeria. PhD thesis, University of Salford, UK.

Obieje, I D (2019) Improving the achievement of value for money in construction procurement under the Nigerian Public Procurement Act (2007). PhD thesis, University of Salford, UK.

Obunwo, C; Chinyio, E and Suresh, S (2015) Relative contributions of project quality to customer satisfaction in Nigerian road construction projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ochieng, E G (2008) Framework for managing multi-cultural project teams. PhD thesis, Loughborough University, UK.

Odeyinka, H; Lowe, J and Kaka, A (2012) Regression modelling of risk impacts on construction cost flow forecast. Journal of Financial Management of Property and Construction, 17(3), pp. 203-221. ISSN 1366-4387

Odeyinka, H A (2003) The development and validation of models for assessing risk impacts on construction cash flow forecast. PhD thesis, Glasgow Caledonian University, UK.

Odeyinka, H A; Lowe, J and Kaka, A (2008) An evaluation of risk factors impacting construction cash flow forecast. Journal of Financial Management of Property and Construction, 13(1), pp. 5-17. ISSN 1366-4387

Odeyinka, H A; Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(5), pp. 423-439. ISSN 01446193

Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Odeyinka, H A; Lowe, J G and Kaka, A P (2002) A construction cost flow risk assessment model. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Odeyinka, H A and Yusif, A (1997) The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2(3), pp. 31-44. ISSN 1366-4387

Oduro Asamoah, R; Offei-Nyako, K and Twumasi-Ampofo, K (2023) Relative importance of triggers influencing cost contingency determination for building contracts: the perspective of quantity surveyors. International Journal of Construction Management, 23(5), pp. 790-798. ISSN 1562-3599

Oke, A E; Aliu, J O; Tamunosa Ojurongbe, E; Aigbavboa, C O; Aghimien, D O and Ebekozien, A (2026) Investigation of core and future competencies needed for quantity surveyors in Nigeria. International Journal of Construction Education and Research, 22(1), pp. 119-137. ISSN 1557-8771

Okoyeh, I. I. and Ezezue, A. M. (2026) Assessment of noise levels in architectural design studios in universities in South-East Nigeria. International Journal of Building Pathology and Adaptation, 44(3), pp. 704-719. ISSN 2398-4708

Okunola, A; Akanmu, A and Afolabi, A O (2025) Assessment of active back-support exoskeleton for carpentry task: Muscle activity and range of motion. Journal of Engineering, Design and Technology, 23(6), pp. 1797-1814. ISSN 1726-0531

Olabanji, O M and Mpofu, K (2020) Adopting hybridized multicriteria decision model as a decision tool in engineering design. Journal of Engineering, Design and Technology, 18(2), pp. 451-479. ISSN 1726-0531

Oladapo, A A (2007) A quantitative assessment of the cost and time impact of variation orders on construction projects. Journal of Engineering, Design and Technology, 5(1), pp. 35-48. ISSN 1726-0531

Olatokun, E O (2017) Requirement elicitation using knowledge capturing (kc) techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.

Olatokun, E O (2017) Requirement elicitation using knowledge capturing techniques during the client briefing process for improved client satisfaction in the UK construction industry. PhD thesis, University of Salford, UK.

Olatunji, O A; Orundami, A O and Ogundare, O (2018) Causal relationship between material price fluctuation and project's outturn costs. Built Environment Project and Asset Management, 8(4), pp. 358-371. ISSN 2044-124X

Olayiwola, J; Yusuf, A; Akanmu, A; Gonsalves, N and Abraham, Y (2024) Efficacy of annotated video-based learning environment for drawing students' attention to construction practice concepts. Journal of Construction Engineering and Management, 150(1): 04023155, ISSN 0733-9364

Olojede, B O; Opawole, A; Jagboro, G O and Alao, O O (2023) Examination of roles performed by public sector organizations in the procurement of public-private partnership projects. International Journal of Building Pathology and Adaptation, 41(2), pp. 495-511. ISSN 23984708

Olomolaiye, P O (1988) An evaluation of bricklayers' motivation and productivity. PhD thesis, Loughborough University, UK.

Oloufa, A A; Eltahan, A A and Papacostas, C S (1994) Integrated GIS for construction site investigation. Journal of Construction Engineering and Management, 120(1), pp. 211-222. ISSN 0733-9364

Olugboyega, O; Ejohwomu, O A and Omopariola, E D (2025) Examining the mediating roles of social malaise and religious manipulations in corruption manifestations: The case of the construction sector. Engineering, Construction and Architectural Management, 32(3), pp. 1457-1477. ISSN 0969-9988

Onaran, B E (1996) The construction of professional identity in architecture and landscape architecture: Convictions about skills, knowledge, and professional roles in design. PhD thesis, University of Wisconsin - Madison, USA.

Oo, B L; Abdul-Aziz, A R and Lim, Y M (2011) Information feedback and learning in construction bidding. Construction Economics and Building, 11(3), pp. 33-44. ISSN 2204-9029

Oo, B L; Lo, H P and Lim, B T H (2012) The effect of bidding success in construction bidding. Engineering, Construction and Architectural Management, 19(1), pp. 25-39. ISSN 0969-9988

Orooji, F (2015) Risk-based wind loss and mitigation for residential wood framed construction. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Osipova, E and Eriksson, P E (2011) How procurement options influence risk management in construction projects. Construction Management and Economics, 29(11), pp. 1149-1158. ISSN 1466433X

Oswald, D; Sherratt, F and Smith, S D (2017) An investigation into a health & safety rewards system on a large construction project. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Otegbulu, A C; Osagie, J U and Famuyiwa, F (2009) A value hierarchy study of building services/components in commercial and residential developments: A comparative analysis. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Othman, N (1997) Management of variations in construction contracts. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Ottaviani, F M; De Marco, A; Narbaev, T and Ballesteros-Pérez, P (2026) Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, 26(1), pp. 99-112. ISSN 1562-3599

Owusu-Manu, D G; Babon-Ayeng, P; Kissi, E; Edwards, D J; Okyere-Antwi, D and Elgohary, H (2023) Green construction and environmental performance: An assessment framework. Smart and Sustainable Built Environment, 12(3), pp. 565-583. ISSN 2046-6099

Oyewole, M O; Komolafe, M O and Gbadegesin, J T (2023) Understanding stakeholders' opinion and willingness on the adoption of sustainable residential property features in a developing property market. International Journal of Construction Management, 23(2), pp. 358-370. ISSN 1562-3599

Ozdemir, B and Kumral, M (2017) Stochastic assessment of the material haulage efficiency in the earthmoving industry. Journal of Construction Engineering and Management, 143(8): 05017013, ISSN 0733-9364

O’Brien, J J; Kreitzberg, F C and Mikes, W F (1985) Network scheduling variations for repetitive work. Journal of Construction Engineering and Management, 111(2), pp. 105-116. ISSN 0733-9364

Padala, S P S and Goyal, A (2025) Early stage cost prediction model for Indian building construction projects using artificial neural networks. Journal of Financial Management of Property and Construction, 30(3), pp. 377-397. ISSN 1366-4387

Panas, A and Pantouvakis, J P (2010) Comparative analysis of operational coefficients' impact on excavation operations. Engineering, Construction and Architectural Management, 17(5), pp. 461-475. ISSN 0969-9988

Panas, A and Pantouvakis, J P (2018) On the use of learning curves for the estimation of construction productivity. International Journal of Construction Management, 18(4), pp. 301-309. ISSN 1562-3599

Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.

Park, M; Lee, M H; Lee, H S and Hwang, S (2010) Boost, control, or both of Korean housing market: 831 countermeasures. Journal of Construction Engineering and Management, 136(6), pp. 693-701. ISSN 0733-9364

Parkin, A; Herrera, M and Coley, D A (2020) Net-zero buildings: When carbon and energy metrics diverge. Buildings & Cities, 1(1), pp. 86-99. ISSN 2632-6655

Parra, H A; Zuñiga-Collazos, A and Cruz-Caicedo, L F (2023) Impact of external risks on international construction projects success: Evidence from commonwealth caribbean islands. Journal of Construction in Developing Countries, 28(1), pp. 113-132. ISSN 1823-6499

Patel, D J and Patel, D A (2025) Development of demolition project hazard index using the possibility approach. International Journal of Construction Management, 25(3), pp. 301-311. ISSN 1562-3599

Patil, S K (2016) Determining influencing factors and predicting dispute outcome of variation claims in Indian construction contracts/ by Smita Krishnarao Patil. PhD thesis, Indian Institute of Technology Delhi, India.

Pearson, A D (2014) An investigation of climatically responsive ultra-low energy housing in rural Scotland: a case study. PhD thesis, University of Dundee, UK.

Pennington, D E (1977) A cost analysis of the construction management method of school facility construction. EdD thesis, Indiana University, USA.

Pereira, P F; Ramos, N M M and Simões, M L (2020) Data-driven occupant actions prediction to achieve an intelligent building. Building Research & Information, 48(5), pp. 485-500. ISSN 0961-3218

Perera, B A K S; Ekanayake, B J; Jayalath, C and Jayathilaka, G R H (2021) A study on variation-specific disputes that arise in road projects in Sri Lanka: A qualitative approach. International Journal of Construction Management, 21(6), pp. 571-581. ISSN 1562-3599

Perera, B A K S; Sirimewan, D C and Senadeera, A D (2021) Management of variations in the public-sector building construction projects in Sri Lanka. Journal of Engineering, Design and Technology, 19(6), pp. 1601-1619. ISSN 1726-0531

Pham, S V H and Nguyen, K V T (2025) Performance review of RTI IMS software for automatic road surface damages identification. International Journal of Construction Management, 25(4), pp. 439-455. ISSN 1562-3599

Philips-Ryder, M; Zuo, J and Jin, X H (2013) Evaluating document quality in construction projects: subcontractors' perspective. International Journal of Construction Management, 13(3), pp. 77-94. ISSN 1562-3599

Phua, F T T (2006) Predicting construction firm performance: An empirical assessment of the differential impact between industry- and firm-specific factors. Construction Management and Economics, 24(3), pp. 309-320. ISSN 01446193

Pin, T H and Scott, W F (1994) Bidding model for refurbishment work. Journal of Construction Engineering and Management, 120(2), pp. 257-273. ISSN 0733-9364

Ping Ho, S; Lin, Y H; Wu, H L and Chu, W (2009) Empirical test of a model for organizational governance structure choices in construction joint ventures. Construction Management and Economics, 27(3), pp. 315-324. ISSN 1466433X

Pirooz Far Poorang, A E (2008) Mass-constomisation: The application on design, fabrication and implementation (DFI) processes of building envelopes. PhD thesis, University of Sheffield, UK.

Pittri, H; Agyekum, K; Kukah, A S; Asamoah, E; Gasue, R and Botchway, B (2026) Adoption strategies for health and safety technologies in the construction industry. Construction Economics and Building, 26(1), ISSN 2204-9029

Pocobelli, D P (2021) Heritage building information model (BIM) for scientific data. PhD thesis, University College London, UK.

Polat, G; Arditi, D and Mungen, U (2007) Simulation-based decision support system for economical supply chain management of rebar. Journal of Construction Engineering and Management, 133(1), pp. 29-39. ISSN 0733-9364

Ponnaluru, S S; Marsh, T L and Brady, M (2012) Spatial price analysis of used construction equipment: The case of excavators. Construction Management and Economics, 30(11), pp. 981-994. ISSN 1466433X

Poshdar, M; González, V A; Raftery, G M and Orozco, F (2014) Characterization of process variability in construction. Journal of Construction Engineering and Management, 140(11): 5014009, ISSN 0733-9364

Pozzer, A E; Rausch, C and Leite, F (2025) Methodology for evaluating the uncertainty of embodied carbon assessments in construction projects across project phases. Journal of Construction Engineering and Management, 151(10): 04025158, ISSN 0733-9364

Prabhakaran, A (2023) Development of interactive and distributed virtual environments for immersive communication in the furniture, fixture and equipment sector. PhD thesis, University of the West of England, Bristol, UK.

Prasad, K V; Vasugi, V; Venkatesan, R and Bhat, N S (2019) Critical causes of time overrun in Indian construction projects and mitigation measures. International Journal of Construction Education and Research, 15(3), pp. 216-238. ISSN 1557-8771

Prasad K V; Vasugi V; Venkatesan R and Bhat, N (2019) Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction, 24(1), pp. 58-78. ISSN 1366-4387

Prasertrungruang, T and Hadikusumo, B H W (2008) System dynamics modelling of machine downtime for small to medium highway contractors. Engineering, Construction and Architectural Management, 15(6), pp. 540-561. ISSN 0969-9988

Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of reinforcement fixing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(4), pp. 350-358. ISSN 0969-9988

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) Construction resource/method factors influencing productivity for high rise concrete construction. Construction Management and Economics, 17(5), pp. 577-587. ISSN 01446193

Proverbs, D G; Holt, G D and Olomolaiye, P O (1999) European construction contractors: A productivity appraisal of in situ concrete operations. Construction Management and Economics, 17(2), pp. 221-230. ISSN 01446193

Puddicombe, M S (1998) Interorganizational project strategy: contracts, contacts, and performance in the building industry. PhD thesis, Boston University, USA.

Puddicombe, M S (2009) Why contracts: Evidence. Journal of Construction Engineering and Management, 135(8), pp. 675-682. ISSN 0733-9364

Pushpakumara, B H J; Gunasekara, M T and Gannile, Y M T D (2023) Variation of mechanical and chemical properties of old and new clay bricks. Journal of Construction Engineering and Management, 149(4): 04023006, ISSN 0733-9364

Queiroz, N; Fernandes, L and Fernando Oscar Ruttkay, P (2024) Comparison of fast daylighting climate-based simulation methods for parametric design: Two-phase, three-phase method and path tracing. Architectural Engineering and Design Management, 20(3), pp. 559-577. ISSN 1745-2007

Rachid, Z; Toufik, B and Mohammed, B (2019) Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), pp. 371-381. ISSN 1562-3599

Radzi, A R; K.S, A; Alias, A R; Algahtany, M and Rahman, R A (2025) Modeling the factors affecting workplace well-being at construction sites: a cross-regional multigroup analysis. Journal of Engineering, Design and Technology, 23(4), pp. 1087-1110. ISSN 1726-0531

Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364

Rahmani, F; Tadayon, A and van der Walt, J D (2025) Managing client-contractors' working relationship in construction projects: A holistic approach. Engineering, Construction and Architectural Management, 32(13), pp. 362-383. ISSN 0969-9988

Ramadan, R; Ghanem, H; Khatib, J M and ElKordi, A M (2025) Effect of plant-based natural fibers on the mechanical properties and volume change of cement paste. International Journal of Building Pathology and Adaptation, 43(4), pp. 693-711. ISSN 2398-4708

Ramos, N M M and De Freitas, V P (2009) Experimental determination of the hygroscopic inertia of building materials. Building Research & Information, 37(3), pp. 293-299. ISSN 0961-3218

Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.

Randall, T (2011) Construction engineering requirements for integrating laser scanning technology and building information modeling. Journal of Construction Engineering and Management, 137, pp. 797-805. ISSN 0733-9364

Rasch, S B (1985) An examination of the wage contour hypothesis: Wage leadership in the united states construction industry. PhD thesis, University of Kansas, USA.

Rashid, M J; Chowdhooree, I; Aziz, T and Hossain, M (2024) Determining the climate adaptive capacity of urban actors: A case study of Mongla port-town in Bangladesh. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 617-635. ISSN 1759-5916

Ratcliffe, J. W.; Alnaqshabandy, H.; Fox, M. and Goodhew, S. (2026) Optimising thermal performance in historic solid wall buildings: The role of orientation, natural insulation and building simulation. International Journal of Building Pathology and Adaptation, pp. 1-18. ISSN 2398-4708

Ratcliffe, J. W.; Alnaqshabandy, H.; Fox, M. and Goodhew, S. (2026) Optimising thermal performance in historic solid wall buildings: The role of orientation, natural insulation and building simulation. International Journal of Building Pathology and Adaptation, pp. 1-18. ISSN 2398-4708

Rauf, A; Attoye, D E and Crawford, R H (2024) Evaluating the impact of material service life on embodied energy of residential villas in the United Arab Emirates. Engineering, Construction and Architectural Management, 31(13), pp. 244-270. ISSN 0969-9988

Rezaei, Mohammad (2019) Characterizing controlled low-strength materials (CLSM) for narrow-trench reinstatement. PhD thesis, University of Alberta, Canada.

Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.

Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(2), pp. 181-197. ISSN 1466433X

Roofigari-Esfahan, N and Razavi, S (2017) Uncertainty-aware linear schedule optimization: A space-time constraint-satisfaction approach. Journal of Construction Engineering and Management, 143(5): 04016132, ISSN 0733-9364

Rosado, Lais Peixoto (2019) Life cycle assessment of construction and demolition waste management in a Brazilian watershed. PhD thesis, Universidade Estadual de Campinas, Brazil.

Rosander, L (2022) Same same but different: Dynamics of a pre-procurement routine and its influence on relational contracting models. Construction Management and Economics, 40(11-12), pp. 955-972. ISSN 01446193

Rosander, L and Kadefors, A (2023) Implementing relational contracting in a public client organization: The influence of policy clashes, resources and project autonomy. Construction Management and Economics, 41(8), pp. 651-669. ISSN 01446193

Rossetto, Daniel Marc (2024) Incentivising the recovery and utilisation of construction and demolition waste. PhD thesis, University of Adelaide, Australia.

Roy, S; Majumder, S; Bhattacharya, S and Sardar, I H (2021) Simulation and analysis of the effects of room surface reflectance combinations on a proposed retrofit illumination system of an office. Journal of Engineering, Design and Technology, 19(6), pp. 1620-1647. ISSN 1726-0531

Royal, S; Lehoux, N and Blanchet, P (2023) Comparative case study research: An international analysis of nine home warranty schemes. International Journal of Building Pathology and Adaptation, 41(4), pp. 789-824. ISSN 23984708

Rukwaro, R W and Kieti, R M (2019) Spatial design parameters for residential extensions: The case of Buru Buru estate in Nairobi, Kenya. Architectural Engineering and Design Management, 15(1), pp. 29-47. ISSN 1745-2007

Runeson, K G (1988) Methodology and method for price-level forecasting in the building industry. Construction Management and Economics, 6(1), pp. 49-55. ISSN 01446193

Rupasinghe, C S and De Silva Weliange, S (2024) Climate change adaptation and mitigation at individual level: Knowledge and attitudes among school teachers in Kalutara district. International Journal of Disaster Resilience in the Built Environment, 15(3), pp. 395-408. ISSN 1759-5916

Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.

Russell, M M; Howell, G; Hsiang, S M and Liu, M (2013) Application of time buffers to construction project task durations. Journal of Construction Engineering and Management, 139(10): 04013008, ISSN 0733-9364

Russell, M M; Hsiang, S M; Liu, M and Wambeke, B (2014) Causes of time buffer and duration variation in construction project tasks: Comparison of perception to reality. Journal of Construction Engineering and Management, 140(6): 4014016, ISSN 0733-9364

Russell, M M; Liu, M; Howell, G and Hsiang, S M (2015) Case studies of the allocation and reduction of time buffer through use of the last planner system. Journal of Construction Engineering and Management, 141(2): 04014068, ISSN 0733-9364

Russell, M M; Liu, M and Hsiang, S M (2015) Planning for uncertainty: Use of structural equation modelling to determine the causal structure of time buffer allocation. Construction Management and Economics, 33(10), pp. 783-798. ISSN 01446193

Sacks, R; Seppänen, O; Priven, V and Savosnick, J (2017) Construction flow index: A metric of production flow quality in construction. Construction Management and Economics, 35(1-2), pp. 45-63. ISSN 01446193

Sadat, H and Thomas, N (2025) An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects. International Journal of Construction Management, 25(6), pp. 624-634. ISSN 1562-3599

Sadeghi, Naimeh (2015) A hybrid fuzzy discrete event simulation framework for analysis of stochastic and subjective uncertainties in construction projects. PhD thesis, University of Alberta, Canada.

Safari, K and Ghandehariun, S (2026) An integrative BIM-based life cycle assessment framework to address uncertainties: A mixed-methods study under real construction project context. International Journal of Construction Management, 26(1), pp. 54-75. ISSN 1562-3599

Sahu, A and Shanmugapriya, S (2025) A practical approach of partial striking technique in high-rise buildings. Engineering, Construction and Architectural Management, 32(2), pp. 987-1009. ISSN 0969-9988

Saket, M M (1986) Cost-significance applied to estimating and control of construction projects. PhD thesis, University of Dundee, UK.

Salama, M and Habib, A P (2009) Investigating the causes of variation within the construction projects in UAE. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Salama, M; Kaka, A and Leishman, C (2005) The relationship between the performance of the economy and the cost of construction of educational buildings in Egypt: A preliminary study. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Salas, R I (2020) Empirical evaluation of construction safety: Insights from economic trends, national cultures and workplace injury rates. PhD thesis, University of Colorado at Boulder, USA.

Salhab, D; Lindhard, S M and Hamzeh, F (2024) Schedule compression and emerging waste in construction: An assessment of overlapping activities. Engineering, Construction and Architectural Management, 31(12), pp. 4920-4941. ISSN 0969-9988

Salhab, D; Møller, D E; Lindhard, S M; Hamzeh, F; Randrup, M and Pilgaard, A (2022) Accounting for variability: Identifying critical activities as a supplement to the critical path. Journal of Construction Engineering and Management, 148(5): 04022019, ISSN 0733-9364

Salih, F and El-Adaway, I H (2024) Quantifying the impact of technology utilization on schedule and cost performance in construction projects. Journal of Construction Engineering and Management, 150(8): 04024078, ISSN 0733-9364

Salmalian, K; Alijani, A and Ramezannejad Azarboni, H (2023) An analogy between analytical, approximate and numerical methods in nonlinear buckling of functionally graded columns. Journal of Engineering, Design and Technology, 21(3), pp. 883-901. ISSN 1726-0531

Sami Kashkooli, A M (2013) A critical building lifecycle assessment framework for building designers and decision makers. PhD thesis, University of Sheffield, UK.

Sammour, F; Xu, J; Wang, X; Hu, M and Zhang, Z (2026) Responsible AI in construction safety: Systematic evaluation of large language models and prompt engineering. Journal of Construction Engineering and Management, 152(1): 04025217, ISSN 0733-9364

Sandanayake, M; Kumanayake, R and Peiris, A (2022) Environmental impact assessments during construction stage at different geographic levels: a cradle-to-gate analysis of using sustainable concrete materials. Engineering, Construction and Architectural Management, 29(4), pp. 1731-1752. ISSN 0969-9988

Sanderford, A R; McCoy, A P and Keefe, M J (2018) Adoption of energy star certifications: Theory and evidence compared. Building Research & Information, 46(2), pp. 207-13. ISSN 0961-3218

Sanna, F (2018) Timber modern methods of construction: a comparative study. PhD thesis, Edinburgh Napier University, UK.

Sanni-Anibire, M O and Adenle, Y A (2024) Residential satisfaction of vertical urban settlements in Hong Kong. Journal of Engineering, Design and Technology, 22(6), pp. 1705-1722. ISSN 1726-0531

Sanusi, I E (2019) Optimal and adaptive control frameworks using reinforcement learning for time-varying dynamical systems. PhD thesis, University of Sheffield, UK.

Scales, Jeffrey G (2021) Including generative mechanisms in project scheduling using hybrid simulation. PhD thesis, University of Technology Sydney, Australia.

Schmitt, R L (1998) Development of statistically based methods to determine QC/QA testing levels for hot-mix asphalt construction. PhD thesis, University of Wisconsin - Madison, USA.

Schneider, K (2023) Three essays on investment-based asset pricing. PhD thesis, University of Manchester, UK.

Schweber, L (2013) The effect of BREEAM on clients and construction professionals. Building Research & Information, 41(2), pp. 129-145. ISSN 0961-3218

Schweber, L and Haroglu, H (2014) Comparing the fit between BREEAM assessment and design processes. Building Research & Information, 42(3), pp. 300-317. ISSN 0961-3218

Scognamiglio, A (2014) Essays in labor economics and political economy. PhD thesis, Massachusetts Institute of Technology, USA.

Scott, D and Kagiri, M (1992) Choosing the most appropriate method of construction with computer assistance. Construction Management and Economics, 10(2), pp. 153-177. ISSN 01446193

Seed, L (2015) The dynamics of BIM adoption: a mixed methods study of BIM as an innovation within the United Kingdom construction industry. PhD thesis, University of Huddersfield, UK.

Shafaat, A (2016) Designing project systems in presence of variations. PhD thesis, Purdue University, USA.

Shafabakhsh, G; Kashi, E and Tahani, M (2018) Analysis of runway pavement response under aircraft moving load by FEM. Journal of Engineering, Design and Technology, 16(2), pp. 233-243. ISSN 1726-0531

Shahandashti, M; Ashuri, B and Mostaan, K (2018) Automatic fault detection for building integrated photovoltaic (BIPV) systems using time series methods. Built Environment Project and Asset Management, 8(2), pp. 160-170. ISSN 2044-124X

Shahandashti, S M and Ashuri, B (2013) Forecasting Engineering News-Record construction cost index using multivariate time series models. Journal of Construction Engineering and Management, 139(9), pp. 1237-1243. ISSN 0733-9364

Sharma, D K (2012) Design of availabilty payment mechanism for public private partnerships. PhD thesis, University of Maryland, College Park, USA.

Sharma, N K; Hargreaves, T and Pallett, H (2023) Social justice implications of smart urban technologies: An intersectional approach. Buildings & Cities, 4(1), pp. 315-333. ISSN 2632-6655

Shash, A A H (1988) A probabilistic model for U.S. Nuclear power construction times. PhD thesis, University of Texas at Austin, USA.

Shehadeh, A; Alshboul, O and Hamedat, O (2022) Risk assessment model for optimal gain-pain share ratio in target cost contract for construction projects. Journal of Construction Engineering and Management, 148(2): 04021197, ISSN 0733-9364

Sherratt, F S (2012) Constructing safety on sites: an exploration of the social construction of safety on large UK construction sites. PhD thesis, University of Bolton, UK.

Shi, J J; Cheung, S O and Arditi, A (2001) Construction delay computation method. Journal of Construction Engineering and Management, 127(1), pp. 60-65. ISSN 0733-9364

Shiha, A; Dorra, E M and Nassar, K (2020) Neural networks model for prediction of construction material prices in Egypt using macroeconomic indicators. Journal of Construction Engineering and Management, 146(3): 04020010, ISSN 0733-9364

Shin, H J (1994) Fuzzy approach to construction activity estimation. PhD thesis, Loughborough University, UK.

Shipton, C (2013) Making changes: an ethnography of client changes on a construction project. PhD thesis, University of Reading, UK.

Shipworth, M; Firth, S K; Gentry, M I; Wright, A J; Shipworth, D T and Lomas, K J (2010) Central heating thermostat settings and timing: Building demographics. Building Research & Information, 38(1), pp. 50-69. ISSN 0961-3218

Shirley, C L M (2000) Firm inventory behavior and the returns from infrastructure investment. PhD thesis, University of California, Berkeley, USA.

Shohet, I M and Perelstein, E (2004) Decision support model for the allocation of resources in rehabilitation projects. Journal of Construction Engineering and Management, 130(2), pp. 249-257. ISSN 0733-9364

Shooshtarian, S; Lingard, H and Wong, P S P (2020) Using the cost of construction work to trigger legislative duties for WHS: The Australian experience. Built Environment Project and Asset Management, 10(3), pp. 369-387. ISSN 2044-124X

Shooshtarian, S and Ridley, I (2016) Determination of acceptable thermal range in outdoor built environments by various methods. Smart and Sustainable Built Environment, 5(4), pp. 352-371. ISSN 2046-6099

Short, C A; Song, J; Mottet, L; Chen, S; Wu, J and Ge, J (2018) Challenges in the low-carbon adaptation of China's apartment towers. Building Research & Information, 46(8), pp. 899-930. ISSN 0961-3218

Showalter, W E and Halpin, D W (2008) Dynamic programming approach to optimization of site remediation. Journal of Construction Engineering and Management, 134(10), pp. 820-827. ISSN 0733-9364

Shrestha, P and Behzadan, A H (2018) Chaos theory-inspired evolutionary method to refine imperfect sensor data for data-driven construction simulation. Journal of Construction Engineering and Management, 144(3): 04018001, ISSN 0733-9364

Shrestha, R; Ko, T and Lee, J (2025) Quantifying project uncertainties: Leveraging historical bid and change order data for automated detection of cost and schedule impacts in new projects. Journal of Construction Engineering and Management, 151(4): 04025017, ISSN 0733-9364

Shrestha, Rabin (2024) Prediction of cost and schedule changes in transportation projects through historical bid and change order document analysis – using Oklahoma dot project cases. PhD thesis, University of Nevada, Las Vegas, USA.

Shugran, A A and Ghazali, F E M (2025) Understanding the effects of variation orders on construction project success: insights from the Jordanian context. International Journal of Construction Management, 25(5), pp. 519-529. ISSN 1562-3599

Siebelink, S; Voordijk, H J T; Endedijk, M D and Adriaanse, A M (2025) Exploring strategies for managing maturity variations among project partners: From underperformance and controlling weak links to stretching capabilities. Construction Management and Economics, 43(4), pp. 243-261. ISSN 0144-6193

Siebelink, Sander (2021) Maturities in building information modelling: A multi-level perspective. PhD thesis, University of Twente, Netherlands.

Siew, R Y J (2016) Assessing the readiness of sustainability reporting tools (SRTs) for an age-friendly built environment. Journal of Financial Management of Property and Construction, 21(2), pp. 122-136. ISSN 1366-4387

Siew, Yung (2014) Evaluating and enhancing the impact of sustainability reporting tools (SRTs). PhD thesis, University of New South Wales, Australia.

Simpson, S; Banfill, P; Haines, V; Mallaband, B and Mitchell, V (2016) Energy-led domestic retrofit: Impact of the intervention sequence. Building Research & Information, 44(1), pp. 97-115. ISSN 0961-3218

Singh, A (2017) Corporate social responsibility in construction firms operating in the UK. PhD thesis, University of Reading, UK.

Singh, A; Connaughton, J and Davies, R (2015) Making sense of corporate social responsibility strategies in construction organisations in the UK. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Singh, J (2021) BIM-based automatic piping layout design and schedule optimization. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Skitmore, M and Cheung, F K T (2007) Explorations in specifying construction price forecast loss functions. Construction Management and Economics, 25(5), pp. 449-465. ISSN 1466433X

Skitmore, M and Ng, S T (2002) Analytical and approximate variance of total project cost. Journal of Construction Engineering and Management, 128(5), pp. 456-460. ISSN 0733-9364

Small, E P (1999) Development of a methodology for the integration of seismic risk mitigation activities in project and network level bridge management systems. PhD thesis, State University of New York at Buffalo, USA.

Smith, B A V (2016) Assessment of carbon and nutrient export from a peatland windfarm construction site. PhD thesis, University of Glasgow, UK.

Sobieraj, J and Metelski, D (2023) Identification of the key investment project management factors in the housing construction sector in Poland. International Journal of Construction Management, 23(1), pp. 1-12. ISSN 1562-3599

Sobuz, M H R; Meraz, M M; Saha, A; Akid, A S M; Hasan, N M S; Rahman, M and Safayet, M A (2024) Performance assessment of various seismic resistant systems for a multistory structure in different seismic zones of Bangladesh. Journal of Engineering, Design and Technology, 22(3), pp. 718-738. ISSN 1726-0531

Sommerville, J (2011) Ethical views of micro-enterprises delivering project and asset management services in West-Central Scotland. Built Environment Project and Asset Management, 1(1), pp. 91-103. ISSN 2044-124X

Song, X (2013) The application of insurance as a risk management tool for alternative dispute resolution (ADR) implementation in construction disputes. PhD thesis, Columbia University, USA.

Song, X; Peña-Mora, F; Menassa, C C and Arboleda, C A (2012) Insurance as a risk management tool for ADR implementation in construction disputes. Journal of Construction Engineering and Management, 138(1), pp. 14-21. ISSN 0733-9364

Songer, A D; Molenaar, K R and Robinson, G D (1996) Selection factors and success criteria for design-build in the USA and UK. Journal of Construction Procurement, 2(2), pp. 69-82. ISSN 1358-9180

Soo, A and Oo, B L (2010) The effect of information feedback in construction bidding. Construction Economics and Building, 10(1-2), pp. 65-75. ISSN 2204-9029

Soo, A and Oo, B L (2014) The effect of construction demand on contract auctions: An experiment. Engineering, Construction and Architectural Management, 21(3), pp. 276-290. ISSN 0969-9988

Soo, Alexander (2015) The effect of construction demand on inexperienced bidders' bidding behaviour. PhD thesis, University of Sydney, Australia.

Sourani, A and Sohail, M (2015) The Delphi method: Review and use in construction management research. International Journal of Construction Education and Research, 11(1), pp. 54-76. ISSN 1557-8771

Spangenberg, S; Hannerz, H and Tüchsen, F (2005) Hospitalized injuries among bridge and tunnel construction workers. Construction Management and Economics, 23(3), pp. 237-240. ISSN 01446193

Sparkling, A E (2018) Collaborative project delivery practices, goal alignment, and performance in architecture, engineering, and construction project teams. PhD thesis, Michigan State University, USA.

Srivastava, A; Srivastava, D K and Misra, A K (2019) Spatial variability modeling and reliability analysis of flexible pavement through mechanistic–empirical model. Journal of Engineering, Design and Technology, 17(6), pp. 1129-1145. ISSN 1726-0531

Stella, C; Ceppi, G and D’Appolonia, E (1990) Temporary tunnel support using jet-grouted cylinders. Journal of Construction Engineering and Management, 116(1), pp. 35-53. ISSN 0733-9364

Stephen, M and Picken, D (2000) Using risk analysis to determine construction project contingencies. Journal of Construction Engineering and Management, 126(2), pp. 130-136. ISSN 0733-9364

Sterner, E (2002) Green procurement of buildings: Estimation of environmental impact and life-cycle cost. PhD thesis, Luleå University of Technology, Sweden.

Stretton, Alan William (1977) The building industry and employment creation in Manila, The Philippines. PhD thesis, Australian National University, Australia.

Subramanyan, H; Sawant, P H and Bhatt, V (2012) Construction project risk assessment: Development of model based on investigation of opinion of construction project experts from India. Journal of Construction Engineering and Management, 138(3), pp. 409-421. ISSN 0733-9364

Sullivan, J; Asmar, M E; Chalhoub, J and Obeid, H (2017) Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. Journal of Construction Engineering and Management, 143(6): 04017009, ISSN 0733-9364

Sultan, Mohamed (2025) PPP contracts for healthcare facilities in Canada: Qualitative study to identify lessons learned. PhD thesis, Arizona State University, USA.

Summa, S.; Mircoli, A.; Potena, D.; Ulpiani, G.; Diamantini, C. and Di Perna, C. (2022) Combining artificial intelligence and building engineering technologies towards energy efficiency: The case of ventilated façades. Construction Innovation, 24(7), pp. 44-64. ISSN 1471-4175

Summerfield, A J; Lowe, R J and Oreszczyn, T (2010) Two models for benchmarking UK domestic delivered energy. Building Research & Information, 38(1), pp. 12-24. ISSN 0961-3218

Sun, Z (2000) Reliability-based method for stability of mine entry design and evaluation. PhD thesis, West Virginia University, USA.

Sunday, O A (2010) Impact of variation orders on public construction projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Suprun, Emiliya (2018) An integrated systems model of construction innovation in the Russian federation. PhD thesis, Griffith University, Russia.

Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.

Sutrisna, M and Potts, K (2002) Analysing typical factors for the early prediction of variations. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Sutrisna, M; Potts, K and Proverbs, D (2004) Quotation mechanism for pre-pricing variations in civil engineering projects: A quest for best practice. Journal of Financial Management of Property and Construction, 9(1), pp. 13-26. ISSN 1366-4387

Sweis, G J (2000) Impact of conversion technology on productivity in masonry construction. PhD thesis, Northwestern University, USA.

Ta'i, Behnam (1994) Critical evaluation of stormwater management practices on urban construction sites in the Sydney region. PhD thesis, University of New South Wales, Australia.

Tabatabaei Sameni, S (2019) Overheating investigation in UK social housing flats built to the Passivhaus standard. PhD thesis, Coventry University, UK.

Taemthong, W (2002) Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost. PhD thesis, University of Michigan, USA.

Tam, C M and Tong, T K L (2005) Multiple gmdh models for estimating resource requirements. Construction Innovation, 5(2), pp. 115-131. ISSN 1471-4175

Tam, C M and Tong, T K L (2008) Locating large-scale harbour-front project developments using SIR method with grey aggregation approach. Construction Innovation, 8(2), pp. 120-136. ISSN 1471-4175

Tam, C M; Tong, T K L; Leung, A W T and Chiu, G W C (2002) Site layout planning using nonstructural fuzzy decision support system. Journal of Construction Engineering and Management, 128(3), pp. 220-231. ISSN 0733-9364

Tam, V W Y and Shen, L Y (2010) On applications of an optimal price-time bidding model in Hong Kong foundation projects. Construction Innovation, 10(1), pp. 14-24. ISSN 1471-4175

Tam, V W Y and Zeng, S X (2014) Employee job satisfaction in engineering firms. Engineering, Construction and Architectural Management, 21(4), pp. 353-368. ISSN 0969-9988

Tan, S Y and Zainon, N (2023) Impact of COVID-19 pandemic on the quantity surveying practices in Malaysia. Engineering, Construction and Architectural Management, 30(8), pp. 3480-3508. ISSN 0969-9988

Tanaka, M (2008) Essays on durability and the Japanese housing market. PhD thesis, Johns Hopkins University, USA.

Tang, S (2025) Natural language processing (NLP)-based framework for construction quantity take off from building information models. PhD thesis, Western Michigan University, USA.

Tang, Z (2005) Developing complete conditional probability tables from fractional data for Bayesian belief networks in engineering decision making. PhD thesis, University of Toronto, Canada.

Tapper, H (1997) Welfare assessment of public investment in a CGE model. TaknDr thesis, Kungliga Tekniska Hogskolan, Sweden.

Tatum, C B (1983) Decision-making in structuring construction project organizations. PhD thesis, Stanford University, USA.

Tatum, C B (1986) Potential mechanisms for construction innovation. Journal of Construction Engineering and Management, 112(2), pp. 178-191. ISSN 0733-9364

Tatum, C B and Fawcett, R P (1986) Organizational alternatives for large projects. Journal of Construction Engineering and Management, 112(1), pp. 49-61. ISSN 0733-9364

Taylor, M D; Fisher, A and Wamuziri, S C (2009) A comparison of modern methods of bathroom construction: A project case study. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Teo, P (2014) The effect of procurement on competition and flexibility : determining the suitability of public-private partnerships in major infrastructure projects. PhD thesis, Queensland University of Technology, Australia.

Thomas, H R (2000) Schedule acceleration, work flow, and labor productivity. Journal of Construction Engineering and Management, 126(4), pp. 261-267. ISSN 0733-9364

Thomas, H R; Rees, S W and Lloyd, R M (1996) Measured heat losses through a real ground floor slab. Building Research & Information, 24(1), pp. 15-26. ISSN 0961-3218

Thomas, H R and Završki, I (1999) Construction baseline productivity: Theory and practice. Journal of Construction Engineering and Management, 125(5), pp. 295-303. ISSN 0733-9364

Thompson, M J (2023) Environmental sustainability of small wastewater treatment systems and pathways for improvement. PhD thesis, University of Nebraska - Lincoln, USA.

Thompson Jr., R C (2012) Risk measurement, allocation, and pricing in network schedule systems. PhD thesis, Catholic University of America, USA.

Thomson, C S; El-Haram, M A and Emmanuel, R (2009) Mapping knowledge during sustainability assessment within a PPP school project. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Thomson, C S; El-Haram, M A; Hardcastle, C and Horner, R M W (2008) Developing an urban sustainability assessment protocol reflecting the project lifecycle. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Tokarczyk, J A (2011) An examination of strategic challenges and opportunities in the wood-based building product industry. PhD thesis, Oregon State University, USA.

Tokede, O. O.; Weththasinghe, K. K.; Kumer Shill, S.; Wijayasundara, M. and Subhani, M. (2025) Comparative evaluation of different material options for moment-resisting framing systems in buildings. Architectural Engineering and Design Management, 21(6), pp. 1541-1561. ISSN 1745-2007

Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria. PhD thesis, University of Calgary, Canada.

Toma, H. M.; Abdelazim, A. N. and Ibrahim, A. H. (2026) Assessment of estimation performance for activities' cost and time in construction projects using statistical process control. Engineering, Construction and Architectural Management, 33(4), pp. 2669-2695. ISSN 0969-9988

Tommelein, I D (1998) Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), pp. 279-288. ISSN 0733-9364

Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364

Tomrukcu, G; Kizildag, H; Avgan, G; Dal, O; Ganic Saglam, N; Ozdemir, E and Ashrafian, T (2026) A systematic approach to manual calibration and validation of building energy simulation. Smart and Sustainable Built Environment, 15(1), pp. 203-230. ISSN 2046-6099

Tonini de Araújo, M; de Souza, H A and Gomes, A P (2022) Computer simulation of moisture transfer in walls: Impacts on the thermal performance of buildings. Architectural Engineering and Design Management, 18(4), pp. 453-472. ISSN 1745-2007

Toolanen, B (2008) Lean contracting relational contracting influenced by lean thinking. PhD thesis, Luleå University of Technology, Sweden.

Tran, H; Robert, D; Gunarathna, P and Setunge, S (2023) Stochastic prediction of road network degradation based on field monitoring data. Journal of Construction Engineering and Management, 149(10): 04023096, ISSN 0733-9364

Trinius, W (1999) Environmental assessment in building and construction goals and scope definition as key to methodology choices. DrTech thesis, Kungliga Tekniska Hogskolan, Sweden.

Tseng, C-H (2006) Safety performance analyzer for constructed environments (SPACE). PhD thesis, Ohio State University, USA.

Tserng, H P; Yin, S Y L and Li, S (2006) Developing a resource supply chain planning system for construction projects. Journal of Construction Engineering and Management, 132(4), pp. 393-407. ISSN 0733-9364

Turner, D (2017) Variations of the project sponsor role and benefits realisation: A phenomenographic study. PhD thesis, Sheffield Hallam University, UK.

Tutesigensi, A and Parcell, K (2007) Benefits of mobile telephones for construction contractors in the United Kingdom. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Twyford, J W (2007) Additional payments under construction contracts. Construction Management and Economics, 25(7), pp. 739-745. ISSN 1466433X

Uhanovita A.C, N; K.A.T.O, R and Parameswaran, A (2025) Poka-yoke to minimise variations: A framework for building projects. Construction Innovation, 25(3), pp. 972-993. ISSN 1471-4175

Ujene, A O and Edike, U E (2015) Relationships among internal stakeholders in construction projects: A cognitive evaluation for sustainable team integration in Nigeria. International Journal of Construction Management, 15(1), pp. 71-81. ISSN 1562-3599

V E, S; Shin, C and Cho, Y (2021) Efficient energy consumption prediction model for a data analytic-enabled industry building in a smart city. Building Research & Information, 49(1), pp. 127-143. ISSN 0961-3218

Vacanas, Y and Danezis, C (2021) An overview of the risk of delay in Cyprus construction industry. International Journal of Construction Management, 21(4), pp. 369-381. ISSN 1562-3599

Valkonen, T; Lindberg, A; Alhava, O; Talebi, S; Koskela, L and Seppänen, O (2026) Tolerance management in prefabrication of mechanical, electrical, and plumbing installations. Construction Management and Economics, 44(4), pp. 279-299. ISSN 0144-6193

Van Der Meulen, G J R and Money, A H (1984) The bidding game. Journal of Construction Engineering and Management, 110(2), pp. 153-164. ISSN 0733-9364

Vargas, G; Lawrence, R and Stevenson, F (2017) The role of lobbies: Short-term thermal transitions. Building Research & Information, 45(7), pp. 759-782. ISSN 0961-3218

Vidalakis, C; Abanda, F H and Oti, A H (2020) BIM adoption and implementation: focusing on SMEs. Construction Innovation, 20(1), pp. 128-147. ISSN 1471-4175

Vidalakis, C and Sommerville, J (2013) Transportation responsiveness and efficiency within the building supply chain. Building Research & Information, 41(4), pp. 469-481. ISSN 0961-3218

Vidanapathirana, M; Perera, N; Emmanuel, R and Coorey, S (2025) High-rise building density optimization for air quality improvement and investment potential. Built Environment Project and Asset Management, 15(3), pp. 467-482. ISSN 2044-124X

Viking, A and Stehn, L (2015) Exploring Swedish local planning authorities'perceptions of standardized housing construction. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Vinodh, S and Ravikumar, R (2012) Application of probabilistic finite element analysis for crane hook design. Journal of Engineering, Design and Technology, 10(2), pp. 255-275. ISSN 1726-0531

Votto, R; Lee Ho, L and Berssaneti, F (2020) Applying and assessing performance of earned duration management control charts for EPC project duration monitoring. Journal of Construction Engineering and Management, 146(3): 04020001, ISSN 0733-9364

Wacker, J G (1975) An econometric investigation into scale returns in the contract construction industry accounting for regional variations. PhD thesis, Wayne State University, USA.

Wagle, S; Gopalakrishnan, B; Li, H; Liu, Z; Chaudhari, S and Sundaramoorthy, S (2024) Simulating energy performance of buildings: a study using eQUEST and Energy Star® portfolio manager. Architectural Engineering and Design Management, 20(5), pp. 997-1018. ISSN 1745-2007

Waldman, B; Huang, M and Simonen, K (2020) Embodied carbon in construction materials: A framework for quantifying data quality in epds. Buildings & Cities, 1(1), pp. 625-636. ISSN 2632-6655

Walker, D H T and Vines, M W (1997) Construction time performance in multi-unit residential construction: Insight into the role of procurement methods. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Wallace, W A (1987) Capital costs versus costs-in-use: A content analysis of design team member communication patterns. Construction Management and Economics, 5(4), ISSN 01446193

Wallace, W A (1987) The influence of design team communication content upon the architectural decision making process in the pre-contract design stages. PhD thesis, Heriot-Watt University, UK.

Walsh, K D; Houston, W N and Houston, S L (1997) Field implications of current compaction specification design practices. Journal of Construction Engineering and Management, 123(4), pp. 363-370. ISSN 0733-9364

Wambeke, B W (2011) Identifying, prioritizing, and reducing variation of construction related tasks. PhD thesis, North Carolina State University, USA.

Wambeke, B W; Hsiang, S M and Liu, M (2011) Causes of variation in construction project task starting times and duration. Journal of Construction Engineering and Management, 137(9), pp. 663-677. ISSN 0733-9364

Wambeke, B W; Liu, M and Hsiang, S M (2012) Using last planner and a risk assessment matrix to reduce variation in mechanical related construction tasks. Journal of Construction Engineering and Management, 138(4), pp. 491-498. ISSN 0733-9364

Wan, S K M; Kumaraswamy, M M and Liu, D T C (2009) Contributors to construction debris from electrical and mechanical work in Hong Kong infrastructure projects. Journal of Construction Engineering and Management, 135(7), pp. 637-646. ISSN 0733-9364

Wang, C; Liu, M; Hsiang, S M and Leming, M L (2012) Causes and penalties of variation: Case study of a precast concrete slab production facility. Journal of Construction Engineering and Management, 138(6), pp. 775-785. ISSN 0733-9364

Wang, C H and Mei, Y H (1998) Model for forecasting construction cost indices in Taiwan. Construction Management and Economics, 16(2), pp. 147-157. ISSN 01446193

Wang, D Y and Wang, X (2025) Can reputation system complement limited inspection accuracy in deterring opportunistic claims? Engineering, Construction and Architectural Management, 32(3), pp. 1435-1456. ISSN 0969-9988

Wang, J (2022) BIM and construction dispute management. PhD thesis, University of Manchester, UK.

Wang, J and Ashuri, B (2017) Predicting ENR construction cost index using machine-learning algorithms. International Journal of Construction Education and Research, 13(1), pp. 47-63. ISSN 1557-8771

Wang, J; Han, J; Chen, J; Ding, G; Feng, G; Liu, T and Guo, B (2022) Experimental and numerical study on the dynamic response of a superthick backfill subgrade under high-speed railway loading: A case study of qianjiang-zhangjiajie-changde railway. Journal of Construction Engineering and Management, 148(12): 05022014, ISSN 0733-9364

Wang, N and Horner, R M W (2007) Fuzzy rule based system approach to assess cleaning costs of carpet flooring. Journal of Financial Management of Property and Construction, 12(1), pp. 25-36. ISSN 1366-4387

Wang, S (2019) An exact architectural practice: Strategies for post-digital architectural design in China’s construction context. PhD thesis, The Chinese University of Hong Kong, Hong Kong.

Wang, S; Park, S; Kim, J and Kim, J (2025) Safety helmet monitoring on construction sites using yolov10 and advanced transformer architectures with surveillance and body-worn cameras. Journal of Construction Engineering and Management, 151(11): 04025186, ISSN 0733-9364

Wang, T K; Ford, D N; Chong, H Y and Zhang, W (2018) Causes of delays in the construction phase of Chinese building projects. Engineering, Construction and Architectural Management, 25(11), pp. 1534-1551. ISSN 0969-9988

Wang, W; Guo, J; Tian, Q; Peng, Y; Yu, B and Cao, Z (2024) Layout optimization for stormwater harvesting facilities in coal ports considering stochasticity of underlying surface types. Journal of Construction Engineering and Management, 150(10): 04024132, ISSN 0733-9364

Wang, X; Chen, Y; Liu, B; Shen, Y and Sun, H (2013) A total factor productivity measure for the construction industry and analysis of its spatial difference: A case study in China. Construction Management and Economics, 31(10), pp. 1059-1071. ISSN 1466433X

Wang, Y (1998) An analysis of the technical efficiency in Hong Kong's construction industry. PhD thesis, University of Hong Kong, Hong Kong.

Wang, Y S and Chau, K W (1997) An evaluation of the efficiency of construction industry in Hong Kong using the DEA approach. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Warrier, G A and Palaniappan, S (2025) Uncertainty in the embodied energy assessment of buildings: a case of EWS type low-cost house in India. International Journal of Construction Management, 25(8), pp. 911-922. ISSN 1562-3599

Waskett, P R (1999) Management of the building design process with the analytical design planning technique. PhD thesis, Loughborough University, UK.

Wedding, G C (2008) Understanding sustainability in real estate: A focus on measuring and communicating success in green building. PhD thesis, University of North Carolina at Chapel Hill, USA.

Wei, L; Liu, G; Liu, W; Li, W and Yuan, Y (2023) Airborne infection risk in classrooms based on environment and occupant behavior measurement under COVID-19 epidemic. Building Research & Information, 51(6), pp. 701-716. ISSN 0961-3218

Weiss, T (2021) Energy flexibility and shiftable heating power of building components and technologies. Smart and Sustainable Built Environment, 10(4), pp. 740-758. ISSN 2046-6099

Weitkamp, T K B (2024) Uncharted territory: Mapping diverse and dispersed smallholder irrigation in Sub-Saharan Africa through remote sensing. PhD thesis, Wageningen University and Research, Netherlands.

Wetherington, L E (1992) The effect of variations in management techniques on construction productivity. PhD thesis, University of Florida, USA.

Whang, S W; Flanagan, R and Kim, K P (2025) An analysis of the optimal research and development investment level of contractor using the panel threshold regression model. International Journal of Construction Management, 25(16), pp. 2007-2019. ISSN 1562-3599

Wheat, P E (2013) Econometric cost analysis in vertically separated railways. PhD thesis, University of Leeds, UK.

White, A (2020) Operational performance and delivery structure of hospital facilities: empirical relationship analyses in Ontario, Canada. DBA thesis, University of Manchester, UK.

Whittaker, J D (1970) A study of competitive bidding with particular reference to the construction industry. PhD thesis, City, University of London, UK.

Wibowo, A (2024) Ex ante required rates of return and related factors in Indonesian PPP infrastructure projects. Built Environment Project and Asset Management, 14(2), pp. 228-243. ISSN 2044-124X

Wickramasinghe, V; Dias, P; Robert, D and Setunge, S (2024) From physical degradation condition ratings of building elements to lost value ratio bands. Built Environment Project and Asset Management, 14(6), pp. 858-873. ISSN 2044-124X

Wijetunge, J J (2020) A multi-scenario assessment of the seismogenic tsunami hazard for Bangladesh. International Journal of Disaster Resilience in the Built Environment, 11(2), pp. 156-168. ISSN 1759-5916

Wild, S; Gailius, A; Hansen, H; Pederson, L and Szwabowski, J (1997) Pozzolanic properties of a variety of European clay bricks. Building Research & Information, 25(3), pp. 170-175. ISSN 0961-3218

Wilson, I E (2003) Digitally enabling the construction virtual enterprise. PhD thesis, University of Salford, UK.

Windapo, A; Adediran, A and Olugboyega, O (2019) Procurement strategies influencing small and medium contractor development in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(6), pp. 253-263. ISSN 17514304

Windapo, A and Moghayedi, A (2018) Building material price differentiation across geographic locations in South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(6), pp. 243-254. ISSN 17514304

Wong, E T T; Norman, G and Flanagan, R (2000) A fuzzy stochastic technique for project selection. Construction Management and Economics, 18(4), pp. 407-414. ISSN 01446193

Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.

Wood, G; Davis, P and Olaleye, A (2011) The effects of adding real estate into mixed-asset portfolios in South Africa. Journal of Financial Management of Property and Construction, 16(3), pp. 272-282. ISSN 1366-4387

Wright, C E (1980) The energy requirements of residential developments. PhD thesis, University of Surrey, UK.

Wu, D.; Wang, T.; Chan, P. and Gruis, V. (2026) Integration of circular economy principles into Dutch social housing procurement: Technological, organizational and environmental practices, challenges and development potentials. Smart and Sustainable Built Environment, pp. 1-21. ISSN 2046-6099

Wu, X; Tian, Z; Tian, C; Wang, Y and Li, J (2019) New design-day method for building cooling load calculation in China. Building Research & Information, 47(8), pp. 901-911. ISSN 0961-3218

Wu, X and Xu, F (2021) Detection model for unbalanced bidding in railway construction projects: Considering the risk of quantity variation. Journal of Construction Engineering and Management, 147(7): 04021055, ISSN 0733-9364

Wågø, S and Berker, T (2014) Architecture as a strategy for reduced energy consumption? An in-depth analysis of residential practices' influence on the energy performance of passive houses. Smart and Sustainable Built Environment, 3(3), pp. 192-206. ISSN 2046-6099

Xenidis, Y and Angelides, D (2005) Identification and classification of risks in a new modelling process for build-operate-transfer projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Xia, B; Chan, A P C and Yeung, J F Y (2011) Developing a fuzzy multicriteria decision-making model for selecting design-build operational variations. Journal of Construction Engineering and Management, 137(12), pp. 1176-1184. ISSN 0733-9364

Xiao, H and Proverbs, D (2002) An investigation into factors influencing construction costs based on Japanese, UK and US contractor practice. Construction Economics and Building, 2(2), pp. 27-35. ISSN 2204-9029

Xiao, H and Proverbs, D (2003) Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332. ISSN 0969-9988

Xu, J; Jin, R; Piroozfar, P; Wang, Y; Kang, B G; Ma, L; Wanatowski, D and Yang, T (2018) Constructing a BIM climate-based framework: Regional case study in China. Journal of Construction Engineering and Management, 144(11): 04018105, ISSN 0733-9364

Xu, Ming (2010) The value of critical project decisions: measurement and modelling. PhD thesis, University of Melbourne, Australia.

Yakın, Ö and Güncü, A. (2026) Post-disaster housing recovery models in Turkey: A case study of the 2020 İzmir seferihisar earthquake. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 239-257. ISSN 1759-5908

Yan, X and Kim, Y C (2018) A conceptual framework of ITSMCA for a building collapse accident. Engineering, Construction and Architectural Management, 25(6), pp. 721-737. ISSN 0969-9988

Yang, I T (2005) Chance-constrained time-cost tradeoff analysis considering funding variability. Journal of Construction Engineering and Management, 131(9), pp. 1002-1012. ISSN 0733-9364

Yang, X; Wang, S; Jiang, Y; Wang, L; Li, P and Wang, S (2025) Theoretical and experimental analysis of stress variations in precast concrete segment linings during double-shield TBM excavation of subway tunnels. Journal of Construction Engineering and Management, 151(6): 04025040, ISSN 0733-9364

Yap, J. B. H.; Tan, Z. Y.; Skitmore, M.; Loo, S. C. and Yong, F. Y. Y. (2026) Unmasking green procurement: What drives adoption in developing-country construction? Construction Management and Economics, 44(5), pp. 337-358. ISSN 0144-6193

Yap, J B H; Lim, B L; Skitmore, M and Gray, J (2022) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 800-822. ISSN 1726-0531

Ye, Y X; Shan, M; Gao, X; Li, Q and Zhang, H (2024) Examining causes of disputes in subcontracting litigation cases using text mining and natural language processing techniques. International Journal of Construction Management, 24(15), pp. 1617-1629. ISSN 1562-3599

Yemoh, O O; Opoku, R; Takyi, G; Adomako, E K; Uba, F and Obeng, G (2025) Green building adaptation in hot-humid climates: Assessment of coconut and corn husk fiber composite bricks as energy-efficient building envelopes. International Journal of Building Pathology and Adaptation, 43(6), pp. 1522-1540. ISSN 2398-4708

Yizhe, T and Youjie, L (1992) Unbalanced bidding on contracts with. Variation trends in client-provided quantities. Construction Management and Economics, 10(1), pp. 69-80. ISSN 01446193

Yogeswaran, K (1998) Sources, causes and minimisation of contractual claims in civil engineering projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Yogeswaran, K; Kumaraswamy, M M and Miller, D R A (1997) Perceived sources and causes of construction claims. Journal of Construction Procurement, 3(3), pp. 3-26. ISSN 1358-9180

Yoo, W S (2007) An information-based decision making framework for evaluating and forecasting a project cost and completion date. PhD thesis, Ohio State University, USA.

Yoo, Wi Sung and Hadipriono Tan, Fabian (2007) An information-based decision making framework for evaluation and forecasting a project cost and completion date. PhD thesis, The Ohio State University, USA.

Yuan, F; Tang, M and Hong, J (2020) Efficiency estimation and reduction potential of the Chinese construction industry via SE-DEA and artificial neural network. Engineering, Construction and Architectural Management, 27(7), pp. 1533-1552. ISSN 0969-9988

Yuan, L L (1998) Analysing operating costs of town councils. Journal of Financial Management of Property and Construction, 3(1), pp. 83-92. ISSN 1366-4387

Yuan, W; Yang, R; Yu, J; Zeng, Q and Yao, Z (2023) Control method of spray curing system for cement concrete members based on the adaboost.M1 algorithm. Construction Innovation, 23(1), pp. 178-192. ISSN 1471-4175

Yue, H; Ye, G; Cao, H; Liu, Q; Xiang, Q and Luo, Y (2024) Exploring the internal influence mechanism of group safety behavior of construction workers: Qualitative method approach. Journal of Construction Engineering and Management, 150(11): 04024163, ISSN 0733-9364

Yun Zhen, G W; Wai Wah, L; Sui Pheng, L and Shi Yee, W (2026) Application of building information modelling (BIM) technology in risk management of high-rise building (hrb) projects in Malaysia. International Journal of Construction Management, 26(2), pp. 332-348. ISSN 1562-3599

Yung, P and Agyekum-Mensah, G (2012) Productivity losses in smoking breaks on construction sites: A case study. Engineering, Construction and Architectural Management, 19(6), pp. 636-646. ISSN 0969-9988

Yıldırım, A; Genç, O and Aydınlı, S (2026) An examination of the perceptions of occupational work ethics among construction professionals working in the public and private sectors: A factor analysis (fa) and hypothesis testing approach. International Journal of Construction Management, 26(4), pp. 604-620. ISSN 1562-3599

Zakeri, M (1996) An evaluation of productivity and management practice in the Iranian construction industry. PhD thesis, University of Wolverhampton, UK.

Zakieh, R (1991) Quantity-significance and its application to construction project modelling. PhD thesis, University of Dundee, UK.

Zaneldin, E K (2020) Investigating the types, causes and severity of claims in construction projects in the UAE. International Journal of Construction Management, 20(5), pp. 385-401. ISSN 1562-3599

Zhai, Y (2022) Evaluation for optimisation: Design for assembly in panel construction. PhD thesis, The Chinese University of Hong Kong, Hong Kong.

Zhang, S.; Zhong, B.; Sepasgozar, S. M. E.; Xia, Z.; Zhong, X. and Guan, Q. (2026) Toward a federated cross-organizational construction safety knowledge recommendation: A dual-incentive mechanism integrating worker satisfaction. Journal of Construction Engineering and Management, 152(10): 04026159, ISSN 0733-9364

Zhang, J; Wang, T and Zhang, L (2021) Legal risk assessment framework for international PPP projects based on metanetwork. Journal of Construction Engineering and Management, 147(8): 04021090, ISSN 0733-9364

Zhang, K; Cui, Q and DeCorla-Souza, P (2025) Performance and efficiency diffusion of us surface transportation public-private partnerships. Journal of Construction Engineering and Management, 151(1): 04024192, ISSN 0733-9364

Zhang, M; Cheng, W and Wang, Y (2018) Multiple-fault classification for hot-mix asphalt production by machine learning. Journal of Construction Engineering and Management, 144(5): 04018024, ISSN 0733-9364

Zhang, Xutong (2025) Physics-guided machine learning for condition assessment of building structures in operational environments. PhD thesis, University of Technology Sydney, Australia.

Zhang, Y; Zhang, M; Gao, F and Li, J (2025) Inverse problem method application in building physics numerical optimization: New insight into ideal envelope properties determination. Architectural Engineering and Design Management, 21(2), pp. 252-267. ISSN 1745-2007

Zhang, Y; Wang, W; Mi, L; Sun, G; Qiao, L; Tao, M and Wang, L (2025) Uncovering the organizational vulnerability toward construction project accidents: Bertopic-based text mining analysis. Journal of Construction Engineering and Management, 151(11): 04025179, ISSN 0733-9364

Zhao, F.; Shi, S. and Fu, X. (2026) Research on decision-making of project financing models based on tri-reference point theory: Evidence from public-private partnerships (PPPs) in China. Engineering, Construction and Architectural Management, 27(5), pp. 1-28. ISSN 0969-9988

Zhao, S; Lu, T F; Statsenko, L; Koch, B and Garcia, C (2022) A framework for near real-time rom stockpile modelling to improve blending efficiency. Journal of Engineering, Design and Technology, 20(2), pp. 497-515. ISSN 1726-0531

Zhao, Y (2016) Green supply chain management drivers/pressures, practices and performance in Chinese construction industry. PhD thesis, Anglia Ruskin University, UK.

Zhou, X; Wang, Y and Gong, E (2025) Investigation of the factors driving engineering insurance consumption in china’s construction industry: A hybrid approach. Engineering, Construction and Architectural Management, 32(5), pp. 3236-3258. ISSN 0969-9988

Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.

de Leon, D E (1996) Integrating socioeconomics in the development of criteria for optimal aseismic design of r/c buildings. PhD thesis, University of California, Irvine, USA.

ng, S T; Fang, Y and Ugwu, O O (2008) Modelling construction material logistics system with stochastic Petri nets. Construction Innovation, 8(1), pp. 46-60. ISSN 1471-4175

van Marken Lichtenbelt, W; Hanssen, M; Pallubinsky, H; Kingma, B and Schellen, L (2017) Healthy excursions outside the thermal comfort zone. Building Research & Information, 45(7), pp. 819-827. ISSN 0961-3218

van Tonder, F and Rwelamila, P D (2024) A comparison of low-cost housing units for varying climatic regions in South Africa: A knowledge management approach. Smart and Sustainable Built Environment, 13(5), pp. 1310-1329. ISSN 2046-6099

van Uden, M; Wamelink, H; van Bueren, E and Heurkens, E (2025) Aligning practices towards a circular economy in the architecture, engineering, and construction sector: Seven transitions in different stages of reconfiguration. Construction Management and Economics, 43(2), pp. 153-174. ISSN 0144-6193

Çevikbaş, M; Okudan, O and Işlk, Z (2022) New delay-analysis method using modified schedule and modified updated schedule for construction projects. Journal of Construction Engineering and Management, 148(11): 04022119, ISSN 0733-9364

Özer, S and Jacoby, S (2024) Space standards in affordable housing in England. Building Research & Information, 52(6), pp. 611-626. ISSN 0961-3218