Items with Index Term: validation

Number of items: 962.

Abd Jamil, A H and Fathi, M S (2020) Enhancing BIM-based information interoperability: Dispute resolution from legal and contractual perspectives. Journal of Construction Engineering and Management, 146(7): 05020007, ISSN 0733-9364

AbdElMottaleb, Mohamed (2025) AI in project management: Machine learning application for construction scheduling. PhD thesis, University of Salford, UK.

Abdelaal, A; Ma, J; Zhang, H; Shobeiri, V and Xie, Y M (2026) Bio-stabilized modular rammed earth blocks for sustainable and aesthetic construction. Construction Innovation, 26(9), pp. 1-20. ISSN 1471-4175

Abdenour, J I (2021) A cost estimation model for improving the budget estimates of industrial plant construction projects. DEng thesis, George Washington University, USA.

Abdul Ghafar, M and Ibrahim, R (2025) Quantifying AEC professionals' cross-work culture productivity: Comparison between Malaysian and UK projects during industrialized building project. Smart and Sustainable Built Environment, 14(4), pp. 921-942. ISSN 2046-6099

Abdul Rahman, N.; Belayutham, S. and Che Ibrahim, C. K. I. (2026) Socio-technical dynamics of barriers to sustainable railway projects in Malaysia. Built Environment Project and Asset Management, 16(3), pp. 637-654. ISSN 2044-124X

Abdul Razak, R.; Alias, A. R.; A.Rahman, R. and Lee, Y. S. (2026) Embedding circular economy in infrastructure through social strategies: PLS SEM approach. Journal of Engineering, Design and Technology, 24(5), pp. 1215-1234. ISSN 1726-0531

Abdullahi, B; Ibrahim, Y M; Ibrahim, A and Bala, K (2020) Development of e-tendering evaluation system for Nigerian public sector. Journal of Engineering, Design and Technology, 18(1), pp. 122-149. ISSN 1726-0531

Abeysinghe, S; De Zoysa, C J; Siriwardana, C; Bandara, C and Dissanayake, R (2023) Integrating disaster resilience into green rating systems: a modification of the Sri Lankan green building rating tool. Smart and Sustainable Built Environment, 12(4), pp. 765-786. ISSN 2046-6099

Abideen, D; Yunusa-Kaltungo, A; Manu, P and Cheung, C (2023) Expert verification of information requirements for integrating building information modelling with operation and maintenance. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.

Abideen, Dania Khairy (2024) A framework for integrating building information modelling with operations and maintenance for buildings. PhD thesis, University of Manchester, UK.

Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria. PhD thesis, University of Salford, UK.

Abkar, M M A; Yunus, R; Harouache, A; Gamil, Y and Al-Shameri, A S A S (2025) The adoption of automation technology for the mitigation of material waste on construction sites in the Malaysian construction industry. International Journal of Construction Management, 25(5), pp. 530-541. ISSN 1562-3599

Abourizk, S M and Halpin, D W (1990) Probabilistic simulation studies for repetitive construction processes. Journal of Construction Engineering and Management, 116(4), pp. 575-594. ISSN 0733-9364

Abu-Shabeen, N N (2008) Development of multi-criteria decision analysis models for bidding and contractor selection. PhD thesis, Edinburgh Napier University, UK.

Abubakar, S Y (1998) Investigation of factors affecting rural road maintenance: the case of Sokoto State, Nigeria. PhD thesis, Loughborough University, UK.

Abuhussain, M (2020) An assessment of the Saudi Residential Buildings Envelope Code under the current and future climate change scenarios: the case for Jeddah in the hot and humid climate region. PhD thesis, University of Liverpool, UK.

Addy, M. N.; Addo, E. T.; Abdulai, S. F.; Kwofie, T. E.; Aigbavboa, C. O. and Adade-Boateng, A. O. (2026) E-procurement acceptance in the Ghanaian public sector: An application of an extended technology acceptance model (TAM) in the construction industry. Journal of Engineering, Design and Technology, 24(2), pp. 494-515. ISSN 1726-0531

Adedokun, O; Egbelakin, T and Omotayo, T (2024) Random forest and path diagram taxonomies of risks influencing higher education construction projects. International Journal of Construction Management, 24(1), pp. 66-74. ISSN 1562-3599

Adeyemi, H O; Adejuyigbe, S B; Ismaila, S O and Adekoya, A F (2015) Low back pain assessment application for construction workers. Journal of Engineering, Design and Technology, 13(3), pp. 419-434.

Adibzadeh, S; Adibzadeh, B and Akbari, A (2025) Environmental components affecting location in iran's national housing planning. International Journal of Construction Management, 25(16), pp. 2020-2029. ISSN 1562-3599

Adinyira, E; Adjei, E A G; Agyekum, K and Fugar, F D K (2021) Application of machine learning in predicting construction project profit in Ghana using support vector regression algorithm (svra). Engineering, Construction and Architectural Management, 28(5), pp. 1491-1514. ISSN 0969-9988

Adjei-Kumi, T (1997) The development of an intelligent system for visual simulation of construction projects. PhD thesis, University of Strathclyde, UK.

Afolabi, A; Ibem, E; Aduwo, E; Tunji-Olayeni, P; Oluwunmi, O and Ayo-Vaughan, E (2022) Gauging parameters for e-procurement acquisition in construction businesses in Nigeria. International Journal of Construction Management, 22(3), pp. 426-435. ISSN 1562-3599

Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364

Agyekum, K; Botchway, S Y; Adinyira, E and Opoku, A (2022) Environmental performance indicators for assessing sustainability of projects in the Ghanaian construction industry. Smart and Sustainable Built Environment, 11(4), pp. 918-950. ISSN 2046-6099

Agyekum, K; Goodier, C and Oppon, J A (2022) Key drivers for green building project financing in Ghana. Engineering, Construction and Architectural Management, 29(8), pp. 3023-3050. ISSN 0969-9988

Ahadzie, D K (2007) A model for predicting the performance of project managers in mass house building projects in Ghana. PhD thesis, University of Wolverhampton, UK.

Ahadzie, D K; Proverbs, D G and Olomolaiye, P O (2008) Model for predicting the performance of project managers at the construction phase of mass house building projects. Journal of Construction Engineering and Management, 134(8), pp. 618-629. ISSN 0733-9364

Ahiaga-Dagbui, D D (2014) Rethinking construction cost overruns: an artificial neural network approach to construction cost estimation. PhD thesis, University of Edinburgh, UK.

Ahiaga-Dagbui, D D and Smith, S D (2014) Dealing with construction cost overruns using data mining. Construction Management and Economics, 32(7-8), pp. 682-694. ISSN 01446193

Ahiaga-Dagbui D D, S S D (2013) My cost runneth over: Data mining to reduce construction cost overruns. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Ahmadu, H A; Ibrahim, Y M; Ibrahim, A D and Abdullahi, M (2015) Modelling building construction durations. Journal of Financial Management of Property and Construction, 20(1), pp. 65-84. ISSN 1366-4387

Ahmed, A L (2019) Development of conceptual constructs for organisational BIM adoption and their systematic application within the UK architecture sector. PhD thesis, University of Sheffield, UK.

Ahmed Gouda, M and Marzouk, M (2024) A BIM-based semantic approach for fund-allocation of building components. Architectural Engineering and Design Management, 20(3), pp. 471-493. ISSN 1745-2007

Aigwi, I E; Nwadike, A N; Le, A T H; Rotimi, F E; Sorrell, T; Jafarzadeh, R and Rotimi, J (2022) Prioritising optimal underutilised historical buildings for adaptive reuse: A performance-based MCDA framework validation in auckland, New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 181-204. ISSN 2046-6099

Ailabouni, N; Painting, N and Ashton, P (2009) Factors affecting employee productivity in the UAE construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Aka, A; Isah, A D; Eze, C J and Timileyin, O (2020) Application of lean manufacturing tools and techniques for waste reduction in Nigerian bricks production process. Engineering, Construction and Architectural Management, 27(3), pp. 658-679. ISSN 0969-9988

Akcamete, A (2011) A formal approach for managing facility change information and capturing change history as part of building information models (BIMs). PhD thesis, Carnegie Mellon University, USA.

Akin, S; Ergun, O; Surer, E and Gursel Dino, I (2021) An immersive performative architectural design tool with daylighting simulations: A building information modeling-based approach. Engineering, Construction and Architectural Management, 28(4), pp. 1319-1344. ISSN 0969-9988

Akinsola, A O (1997) An intelligent model of variations' contingency on constructions projects. PhD thesis, University of Wolverhampton, UK.

Akoh, S R (2018) Risk management framework for highway construction projects in Nigeria. PhD thesis, Heriot-Watt University, UK.

Al Dairi, J S S (2017) The design and development of a knowledge-based lean six sigma maintenance system for sustainable buildings. PhD thesis, University of Bradford, UK.

Al Sabah, R (2014) Evaluating the impact of construction risks on project success in the Arabian Gulf region (AGR) construction industry from the perspective of multinational firms. PhD thesis, University of Wisconsin - Madison, USA.

Al-Azemi, K (2012) Risk management for build, operate and transfer projects within Kuwait. PhD thesis, Loughborough University, UK.

Al-Hashimy, H N H (2025) The relationship between financial management strategies and firm financial performance: the moderating role of firm size. Journal of Financial Management of Property and Construction, 30(2), pp. 295-317. ISSN 1366-4387

Al-Humaidi, H M (2007) A fuzzy logic approach to model delays in construction projects. PhD thesis, Ohio State University, USA.

Al-Joma, M and Mangin, J C (2004) A scheduling model for repetitive activities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Al-Khazraji, M S; Jweeg, M J and Bakhy, S H (2024) Free vibration analysis of a laminated honeycomb sandwich panel: A suggested analytical solution and a numerical validation. Journal of Engineering, Design and Technology, 22(2), pp. 316-343. ISSN 1726-0531

Al-Mutairi, Y (2015) Development of implementation strategies for offsite construction techniques in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Al-Sabah, R; Menassa, C C and Hanna, A (2014) Evaluating impact of construction risks in the Arabian gulf region from perspective of multinational architecture, engineering and construction firms. Construction Management and Economics, 32(4), pp. 382-402. ISSN 01446193

Al-Saeed, Y; Edwards, D J and Scaysbrook, S (2020) Automating construction manufacturing procedures using BIM digital objects (BDOs): Case study of knowledge transfer partnership project in UK. Construction Innovation, 20(3), pp. 345-377. ISSN 1471-4175

Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings. PhD thesis, Heriot-Watt University, UK.

Al-Sinaidi, A A (2002) Computation of construction contractor capability. PhD thesis, Florida Institute of Technology, USA.

Al-Tabbaa, O and Rustom, R (2011) General framework for designing multi-use simulation modules for estimating project durations. Construction Innovation, 11(3), pp. 321-337. ISSN 1471-4175

Alaka, H A; Oyedele, L O; Owolabi, H A; Ajayi, S O; Bilal, M and Akinade, O O (2016) Methodological approach of construction business failure prediction studies: A review. Construction Management and Economics, 34(11), pp. 808-842. ISSN 01446193

Alani, Y (2023) A semantic framework for the life cycle of water assets data exchange. PhD thesis, Teesside University, UK.

Alankarage, S; Chileshe, N; Samaraweera, A; Rameezdeen, R and Edwards, D J (2023) Organisational BIM maturity models and their applications: A systematic literature review. Architectural Engineering and Design Management, 19(6), pp. 567-585. ISSN 1745-2007

Alansari, A M (2019) Risk assessment for marine construction projects. PhD thesis, Claremont Graduate University, USA.

Alexander, D; Hallowell, M and Gambatese, J (2017) Precursors of construction fatalities. I: Iterative experiment to test the predictive validity of human judgment. Journal of Construction Engineering and Management, 143(7): 04017023, ISSN 0733-9364

Alexander, D; Hallowell, M and Gambatese, J (2017) Precursors of construction fatalities. II: Predictive modeling and empirical validation. Journal of Construction Engineering and Management, 143(7): 04017024, ISSN 0733-9364

Algraiw, I H A (2015) The engagement of expert opinions in the modeling of multi-attribute decision making for the selection of project delivery methods in building construction. PhD thesis, Missouri University of Science and Technology, USA.

Alhallaq, M. and Artan, D. (2026) Assessing contractors' circular economy performance: Barriers and system requirements. International Journal of Building Pathology and Adaptation, pp. 1-20. ISSN 2398-4708

Alhamoudi, A. M. and Osunsanmi, T. O. (2026) Modelling the training strategies for reskilling UK construction workers in the Fourth Industrial Revolution era: A structural equation model approach. Smart and Sustainable Built Environment, 15(5), pp. 1967-1990. ISSN 2046-6099

Alhawamdeh, M (2020) An interpretivist approach for the development of a behavioural framework to support the adoption of waste minimisation behaviour of contractors: the case study of Jordan. PhD thesis, University of Salford, UK.

Ali, A B M (2019) A composite index for enhancing sustainability within public housing projects in Libya. PhD thesis, University of Salford, UK.

Ali, A S and Au-Yong, C P (2022) Risk factors in the refurbishment design process: The case of Malaysia. International Journal of Building Pathology and Adaptation, 40(4), pp. 622-635. ISSN 23984708

Ali, S (2022) Identification of key factors that aid the decision on whether to refurbish-reuse or demolish-rebuild existing and newly designed buildings and highways. PhD thesis, London South Bank University, UK.

Aliu, J and Aigbavboa, C O (2021) Structural determinants of graduate employability: Impact of university and industry collaborations. Journal of Engineering, Design and Technology, 19(5), pp. 1080-1100. ISSN 1726-0531

Aljassmi, Hamad Abdulla (2013) Analysis of complex mechanisms of defect generation in construction projects. PhD thesis, University of New South Wales, Australia.

Aljassmi, Hamad Abdulla (2013) Analysis of complex mechanisms of defect generation in construction projects generation in construction projects. PhD thesis, University of New South Wales, Australia.

Alkharmany, A (2017) Project management: The effect of saudi national culture on the attitudes of key stakeholders towards delay in construction projects in Saudi Arabia. PhD thesis, University of Brighton, UK.

Allahi, Fahimeh (2020) Development of simulation based approaches for cost estimation and effect analysis in industrial and humanitarian projects, including system dynamic model and Monte Carlo simulation. PhD thesis, Università degli Studi di Genova, Italy.

Allan, B; Sweis, R and Sweis, G (2026) Assessing the challenges affecting blockchain adoption in the Jordanian construction industry: Pestel framework approach. Built Environment Project and Asset Management, 16(2), pp. 357-376. ISSN 2044-124X

Allouche, E N (2001) A decision-support model for selection of a trenchless construction method. PhD thesis, University of Alberta, Canada.

Almalki, M; Salman, B; Salem, O and Ammoury, M (2026) A decision-support framework for accelerated wastewater pipeline construction: Integrating economic, social, environmental, and technical criteria. Journal of Construction Engineering and Management, 152(3): 04025263, ISSN 0733-9364

Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.

Almazrouei, M; Khalid, K and Davidson, R (2021) Safety climate of UAE petroleum industry: a cross-validation using confirmatory factor analytic approach. Journal of Engineering, Design and Technology, 19(4), pp. 943-965. ISSN 1726-0531

Almutairi, M (2019) The influence of national culture on health and safety performance in Kuwait oil and gas sector construction projects. PhD thesis, University of Salford, UK.

Alnsour, M A M (2020) Integrating sustainability assessment into public works development in Jordan. PhD thesis, University of Leeds, UK.

Alremeithi, A A; Riaz, Z and Khan, M (2025) What constitutes citizens' recycling behavior: Insights from handling municipal solid waste in the UAE. Smart and Sustainable Built Environment, 14(4), pp. 1017-1037. ISSN 2046-6099

Alruqi, W M and Hallowell, M R (2019) Critical success factors for construction safety: Review and meta-analysis of safety leading indicators. Journal of Construction Engineering and Management, 145(3): 04019005, ISSN 0733-9364

Alsamarraie, M. M. and Mohd Ghazali, F. E. (2026) A novel framework for sustainable contracting process in organisational public procurement. International Journal of Construction Management, 26(8), pp. 1653-1668. ISSN 1562-3599

Alshboul, O. and Shehadeh, A. (2026) Conflict resolution and negotiation in construction projects using game theory: Achieving win-win outcomes. International Journal of Construction Management, 26(7), pp. 1341-1364. ISSN 1562-3599

Alshdiefat, A S (2018) Developing an assessment model for the adoption of building information modelling to reduce the cost of change orders in the Jordanian construction industry. PhD thesis, University of Salford, UK.

Alshehri, A R (2016) Quality management system for building maintenance. PhD thesis, Heriot-Watt University, UK.

Alsubaey, M H (2017) A hybrid machine learning and text-mining approach for the automated generation of early warnings in construction project management. PhD thesis, Cranfield University, UK.

Alsulamy, S (2015) Developing a performance measurement framework for municipal construction projects in Saudi Arabia. PhD thesis, Edinburgh Napier University, UK.

Alsuliman, J A (2014) Effective stakeholder engagement in variation order management at the design stage of public sector construction projects in Saudi Arabia. PhD thesis, Heriot-Watt University, UK.

Altalhoni, A; Liu, H; Abudayyeh, O; Kwigizile, V; Huang, W C and Kirkpatrick, K (2025) Robust forecasting models for highway construction cost indices during pandemic-era inflation. Journal of Construction Engineering and Management, 151(8): 04025101, ISSN 0733-9364

Althaqafi, Torky (2015) Using stakeholder theory to explain the development and operation of safety culture and systems to improve safety performance in the construction industry in Saudi Arabia. PhD thesis, University of Adelaide, Australia.

Alves, T d C L; Milberg, C and Walsh, K D (2012) Exploring lean construction practice, research, and education. Engineering, Construction and Architectural Management, 19(5), pp. 512-525. ISSN 0969-9988

Alzahrani, S (2015) Dynamic simulation of the impact of risk events and risk cost in KSA PPP projects. PhD thesis, University of Liverpool, UK.

Alzohbi, M G M (2015) A framework for evaluating material management performance in Jordanian concrete building projects. PhD thesis, Sheffield Hallam University, UK.

Amadi, A and Higham, A P (2020) A cost trajectory to environmentally adaptive building construction in wet humid settings. International Journal of Building Pathology and Adaptation, 38(1), pp. 68-88. ISSN 23984708

Amekudzi, A (1999) Uncertainty analysis of national highway performance measures in the context of evolving analysis models and data. PhD thesis, Carnegie Mellon University, USA.

Amer, F; Koh, H Y and Golparvar-Fard, M (2021) Automated methods and systems for construction planning and scheduling: Critical review of three decades of research. Journal of Construction Engineering and Management, 147(7): 0002093, ISSN 0733-9364

Amini Khafri, Amin (2018) A framework for forecasting project estimate at completion using historical and current performance data. PhD thesis, University of Alberta, Canada.

Amiri, Mojtaba and Saghatforoush, Ehsan (2026) From exploration to prioritization: Advancing BIM-IOT integration for construction health and safety improvement. Journal of Construction Business and Management, 8(S1), pp. 125-139. ISSN 2521-0165

Amos, D; Au-Yong, C P and Musa, Z N (2020) Developing key performance indicators for hospital facilities management services: A developing country perspective. Engineering, Construction and Architectural Management, 27(9), pp. 2715-2735. ISSN 0969-9988

Andalib, M (2026) Predictive modelling for contract selection in construction through data mining and machine learning: Insights from agency theory. International Journal of Construction Education and Research, 22(1), pp. 138-163. ISSN 1557-8771

Antwi-Afari, M F; Li, H; Umer, W; Yu, Y and Xing, X (2020) Construction activity recognition and ergonomic risk assessment using a wearable insole pressure system. Journal of Construction Engineering and Management, 146(7): 04020077, ISSN 0733-9364

Anvuur, A M; Kumaraswamy, M M and Mahesh, G (2011) Building relationally integrated value networks (RIVANS). Engineering, Construction and Architectural Management, 18(1), pp. 102-120. ISSN 0969-9988

Anwer, S; Li, H; Umer, W; Antwi-Afari, M F; Mehmood, I; Yu, Y; Haas, C and Wong, A Y L (2023) Identification and classification of physical fatigue in construction workers using linear and nonlinear heart rate variability measurements. Journal of Construction Engineering and Management, 149(7): 04023057, ISSN 0733-9364

Arayici, Y (2004) Requirements engineering in innovative systems developments for the construction industry. PhD thesis, University of Salford, UK.

Asghari, V; Wang, Y; Biglari, A J; Hsu, S C and Tang, P (2022) Reinforcement learning in construction engineering and management: A review. Journal of Construction Engineering and Management, 148(11): 03122009, ISSN 0733-9364

Ashkanani, S (2023) Project management of large and complex-projects: The case of “lng megaprojects in the state of Qatar”. PhD thesis, Hamad Bin Khalifa University, Qatar.

Aslam, M (2021) Optimizing selection and implementation protocols of lean construction tools and techniques for rapid initial successes. PhD thesis, North Dakota State University, USA.

Asmar, M E; Hanna, A S and Whited, G C (2011) New approach to developing conceptual cost estimates for highway projects. Journal of Construction Engineering and Management, 137(11), pp. 942-949. ISSN 0733-9364

Atasoy, G (2013) Visualizing and interacting with construction project performance information. PhD thesis, Carnegie Mellon University, USA.

Attalla, M M A M (2000) Reconstruction of operating facilities: A model for project management. PhD thesis, University of Waterloo, Canada.

Augenbroe, G; Castro, D and Ramkrishnan, K (2009) Decision model for energy performance improvements in existing buildings. Journal of Engineering, Design and Technology, 7(1), pp. 21-36. ISSN 1726-0531

Awale, Raman (2016) An exploratory study of a 'creating shared value' (CSV) concept for achieving firm competitiveness in Hong Kong construction firms. PhD thesis, University of Hong Kong, Hong Kong.

Ayeni, Reuben Ebenmosi (2025) Intelligent project duration estimating system: An AI-based predictive approach for construction time estimation. PhD thesis, London South Bank University, UK.

Ayhan, M (2019) Development of dispute prediction and resolution method selection models for construction disputes. PhD thesis, Middle East Technical University, Turkey.

Ayinla, K (2021) Development of a semantic knowledge modelling approach for evaluating offsite manufacturing production processes. PhD thesis, Birmingham City University, UK.

Ayman Anwar, R (2022) Enhancing the integration of sustainability assessment within dynamic BIM enabled design projects. PhD thesis, Northumbria University, UK.

Ayoade, O A (2013) Measuring the impact of institutional and sustainability influences on renewed housing development strategies: implications for the shared equity housing model. PhD thesis, University of Salford, UK.

Azhar, N (2014) Integrated construction project delivery system in the U.S. Public sector: An information modeling framework. PhD thesis, Florida International University, USA.

Aziz, Z (2005) Context-aware information delivery for mobile construction workers. PhD thesis, Loughborough University, UK.

Aziz, Z; Alzaabi, E and Syazli Fathi, M (2023) Prioritisation of resilience criteria and performance indicators for road emergencies crisis response: An analytic hierarchy process (AHP) approach. Journal of Financial Management of Property and Construction, 28(2), pp. 178-205. ISSN 1366-4387

Azzouz, A (2018) Current perspectives and future directions of BIM assessment methods. PhD thesis, University of Bath, UK.

Azzouz, A and Papadonikolaki, E (2020) Boundary-spanning for managing digital innovation in the AEC sector. Architectural Engineering and Design Management, 16(5), pp. 356-373. ISSN 1745-2007

Bademosi, F M (2019) Robotics and automation in construction: Assessment of knowledge, skills and abilities necessary for talent cultivation in industry and education. PhD thesis, University of Florida, USA.

Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.

Bahadir, M (2025) Predicting construction project durations in Europe using regression analysis methodology. DEngr thesis, George Washington University, USA.

Baienat, S. and Iordanova, I. (2026) Quantifying building adaptability and circular performance through BIM: The adaptation intensity index (AII), circular adaptability performance (CAP), and digital adaptability passport (DAP). Smart and Sustainable Built Environment, pp. 1-22. ISSN 2046-6099

Bala, K; Bustani, S A and Waziri, B S (2014) A computer-based cost prediction model for institutional building projects in Nigeria: An artificial neural network approach. Journal of Engineering, Design and Technology, 12(4), pp. 519-530.

Ballesteros-Pérez, P; Phua, F T T and Mora-Melià, D (2019) Human resource allocation to multiple projects based on members' expertise, group heterogeneity, and social cohesion. Journal of Construction Engineering and Management, 145(2): 04018134, ISSN 0733-9364

Balogun, O J (2019) Innovation in quantity surveying practice firms: an investigation of innovation response during compressed pre-contract timelines in Nigeria. PhD thesis, University of Salford, UK.

Banawi, A A (2013) Improving construction processes by integrating lean, green, and six-sigma. PhD thesis, University of Pittsburgh, USA.

Barnes, C J (1999) A methodology for the concurrent design of products and their assembly sequence. PhD thesis, Cranfield University, UK.

Barr, D W J (2004) The department of trade and industry key performance indicators: A critical appraisal. PhD thesis, University of Southampton, UK.

Barra, B. Q.; Soares, C. A. P.; de Castro, I. P. and Longo, O. C. (2026) Framework for extracting project quantities for construction cost estimation using 5D BIM in an openBIM environment. Journal of Engineering, Design and Technology, pp. 1-24. ISSN 1726-0531

Bartley, T; McMahon, C and Denton, S (2016) Information flows in highway project delivery. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Basaran, Y.; Aladag, H. and Isik, Z. (2026) Machine learning-based dynamic model for on-site subcontractor performance management. Engineering, Construction and Architectural Management, 33(7), pp. 5592-5624. ISSN 0969-9988

Batista, L T; Franco, J R Q; Fakury, R H; Porto, M F; Alves, L V R and Kohlmann, G S (2024) BIM-IoT-FM integration: strategy for implementation of sustainable water management in buildings. Smart and Sustainable Built Environment, 13(5), pp. 1096-1116. ISSN 2046-6099

Battikha, M (2000) A computer-based system for construction quality management with application to highway pavements. PhD thesis, University of British Columbia, Canada.

Bauch, G T (1999) A statistical project control tool for engineering managers. PhD thesis, University of Houston, USA.

Bayona Malo, A A (2025) Evidence-based strategies to define, differentiate, and prevent serious injury and fatality exposure in construction. PhD thesis, University of Colorado at Boulder, USA.

Beauregard, M A (2019) Maintaining performance evidence-based educational facility management through a decision-support tool leveraging prior empirical research. PhD thesis, Arizona State University, USA.

Belpoliti, V; Said, Z; Hachicha, A A and Altan, H (2024) Simulated and monitored electrical energy balance in a solar house in Dubai, UAE. Architectural Engineering and Design Management, 20(5), pp. 1100-1117. ISSN 1745-2007

Bendak, S and Alhammadi, A A (2019) A multi-criteria decision-making approach to minimising fire risk in detached house designs. Journal of Engineering, Design and Technology, 17(6), pp. 1146-1160. ISSN 1726-0531

Berends, T C (2007) Contracting economics of large engineering and construction projects. PhD thesis, Delft University of Technology, Netherlands.

Bersson, T F (2012) A framework for application of system engineering process models to sustainable design of high performance buildings. PhD thesis, George Washington University, USA.

Besenyöi, Z (2022) Towards a BIM-supported facility management knowledge management system for energy efficient building operations by rule-based code compliance checking. PhD thesis, Technische Universitaet Berlin, Germany.

Besklubova, S; Zhong, R Y and Tan, B Q (2025) An integrated model of a prefabrication hub feasibility assessment: A Hong Kong case. International Journal of Construction Management, 25(11), pp. 1300-1312. ISSN 1562-3599

Bhattacharya, S and Momaya, K S (2021) Actionable strategy framework for digital transformation in AECO industry. Engineering, Construction and Architectural Management, 28(5), pp. 1397-1422. ISSN 0969-9988

Bhawani, S (2021) A function-based lean construction methods ontology supporting the lean implementation planning process developed for construction projects. PhD thesis, Pennsylvania State University, USA.

Blay, K B; Tuuli, M M and France-Mensah, J (2019) Managing change in BIM-level 2 projects: Benefits, challenges, and opportunities. Built Environment Project and Asset Management, 9(5), pp. 581-596. ISSN 2044-124X

Boateng, E B (2021) The role of human safety interventions on co-workers’ safety outcomes in construction projects. PhD thesis, University of Newcastle, Australia.

Borg Axisa, G and Borg, R P (2024) Climate change adaptation in Malta: Assessment of skills in the built environment. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 668-679. ISSN 1759-5916

Bosher, L; Dainty, A; Carrillo, P and Glass, J (2007) Built-in resilience to disasters: A pre-emptive approach. Engineering, Construction and Architectural Management, 14(5), pp. 434-446. ISSN 0969-9988

Boukamp, F (2006) Modeling of and reasoning about construction specifications to support automated defect detection. PhD thesis, Carnegie Mellon University, USA.

Boussabaine, A H and Kirkham, R J (2004) Simulation of maintenance costs in UK local authority sport centres. Construction Management and Economics, 22(10), pp. 1011-1020. ISSN 01446193

Boussabaine, A H; Kirkham, R J and Grew, R G (1999) Estimating the cost of energy usage in sport centres: A comparative modelling approach. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Brandon, P S and Ribeiro, F L (1998) A knowledge-based system for assessing applications for house renovation grants. Construction Management and Economics, 16(1), pp. 57-69. ISSN 01446193

Brennan M, C A (2013) Development of a measure to assess attitudes towards sustainable development in the built environment: A pilot. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Bresnen, M; Lennie, S J and Marshall, N (2025) Partnering in construction re-visited: Gauging progress in industry practice and prospects for advances in academic research. Construction Management and Economics, 43(1), pp. 59-77. ISSN 0144-6193

Bypaneni, S P K (2017) A Bayesian network-based decision framework for selecting project delivery methods in highway construction. PhD thesis, University of Kansas, USA.

Cabahug, R R; Edwards, D J and Nicholas, J (2004) Classifying plant operator maintenance proficiency: Examining personal variables. Building Research & Information, 32(2), pp. 119-127. ISSN 0961-3218

Cai, K Q (2007) Business process model for process improvement: an investigation of the tendering process in aconstruction company. PhD thesis, University of Hong Kong, Hong Kong.

Caldas, C H; Kim, J Y; Haas, C T; Goodrum, P M and Zhang, D (2015) Method to assess the level of implementation of productivity practices on industrial projects. Journal of Construction Engineering and Management, 141(1): 04014061, ISSN 0733-9364

Calvetti, D (2021) Electronic productivity performance monitoring of construction workers. PhD thesis, Universidade do Porto, Portugal.

Casady, C B (2019) Assessing public-private partnership (PPP) governance, institutionalization, and market maturity in the United States and abroad. PhD thesis, Stanford University, USA.

Cavalcante, Marcelo Gadelha (2019) Formation of operational risk in civil construction. PhD thesis, Universidade de Fortaleza, Brazil.

Cebrat, K; Narożny, J; Baborska-Narozny, M and Smektała, M (2025) Modelling site-specific outdoor temperature for buildings in urban environments. Buildings & Cities, 6(1), pp. 490-510. ISSN 2632-6655

Cemesova, A (2013) Enhancing BIM-based data transfer to support the design of low energy buildings. PhD thesis, Cardiff University, UK.

Cha, H S (2003) Selecting value management processes for implementation on capital facility projects. PhD thesis, University of Texas at Austin, USA.

Cha, H S and O'Connor, J T (2005) Optimizing implementation of value management processes for capital projects. Journal of Construction Engineering and Management, 131(2), pp. 239-251. ISSN 0733-9364

Chahrour, R; Hafeez, M A; Ahmad, A M; Sulieman, H I; Dawood, H; Rodriguez-Trejo, S; Kassem, M; Naji, K K and Dawood, N (2021) Cost-benefit analysis of BIM-enabled design clash detection and resolution. Construction Management and Economics, 39(1), pp. 55-72. ISSN 01446193

Chan, A P C; Chan, M W; Oppong, G D; Adabre, M A; Darko, A and Liu, W (2025) Developing a project surveillance system to monitor and control building projects: The case of Hong Kong. International Journal of Construction Management, 25(16), pp. 1952-1967. ISSN 1562-3599

Chan, Y K; Huang, C H; Chao Yi, N; Tseng, H H; Lin, C H; Chang, R F and Chan, M H (2026) A study of detection systems for safety guardrails at construction sites: Innovative applications of image processing and perspective correction. Journal of Construction Engineering and Management, 152(4): 04026018, ISSN 0733-9364

Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Chan, T-W C (2007) Improving the estimation of project overheads in construction companies in Hong Kong. PhD thesis, Loughborough University, UK.

Chan, W H and Lu, M (2008) Materials handling system simulation in precast viaduct construction: Modeling, analysis, and implementation. Journal of Construction Engineering and Management, 134(4), pp. 300-310. ISSN 0733-9364

Chang, J; Jaskula, K; Papadonikolaki, E; Rovas, D and Parlikad, A K (2024) Can blockchain prevent the deterioration of building handover information quality for higher education institutions? Built Environment Project and Asset Management, 14(4), pp. 509-528. ISSN 2044-124X

Chang, M (2016) Investigating and improving bridge management system methodologies under uncertainty. PhD thesis, Utah State University, USA.

Chang, S-W (2002) Development and assessment of the Tier II work force strategy implementation index. PhD thesis, University of Texas at Austin, USA.

Chau, A D (2018) Conceptual cost estimation decision support system in university construction projects. PhD thesis, University of Alabama, USA.

Che Ibrahim, C K I; Costello, S B and Wilkinson, S (2017) Validation of a team integration assessment tool in road infrastructure alliance projects. International Journal of Construction Management, 17(2), pp. 151-164. ISSN 1562-3599

Chen, H; Zhu, Y and Luo, X (2022) Tablegraph: An image segmentation-based table knowledge interpretation model for civil and construction inspection documentation. Journal of Construction Engineering and Management, 148(10): 04022103, ISSN 0733-9364

Chen, J H; Hayati, D W; Su, Y M; Wijatmiko, I and Purnamasari, R (2019) Improving preliminary cost estimation in Indonesia using support vector regression. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(1), pp. 25-33. ISSN 17514304

Chen, K (2015) A strategic decision making framework for organisational BIM implementation. PhD thesis, Cardiff University, UK.

Chen, K; Loo, S C and Alias, A (2024) A bibliometric review of maturity model studies in the construction industry. Journal of Construction in Developing Countries, 29(2), pp. 129-145. ISSN 1823-6499

Chen, L and Manley, K (2014) Validation of an instrument to measure governance and performance on collaborative infrastructure projects. Journal of Construction Engineering and Management, 140(5): 04014006, ISSN 0733-9364

Chen, S (2013) Improving value for money in public-private partnership infrastructure projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Chen, Y (2008) Using mobile computing for construction site information management. PhD thesis, University of Newcastle upon Tyne, UK.

Chen, Y and Kamara, J M (2008) Using mobile computing for construction site information management. Engineering, Construction and Architectural Management, 15(1), pp. 7-20. ISSN 0969-9988

Chen, Yu (2024) Improving information requirements management in complex rail transport projects. PhD thesis, University of Technology Sydney, Australia.

Chen, Yuxuan (2024) Investigation of faults in air-conditioning systems in commercial buildings: Occurrence, diagnostic validation, and energy impacts. PhD thesis, University of Nebraska - Lincoln, USA.

Cheng, J (2008) The impact of strategic decisions on construction client satisfaction: An assessment framework. PhD thesis, University of Wolverhampton, UK.

Cheng, M Y; Chang, Y H and Korir, D (2019) Novel approach to estimating schedule to completion in construction projects using sequence and nonsequence learning. Journal of Construction Engineering and Management, 145(11): 04019072, ISSN 0733-9364

Cheng, Y (2005) Development of bridge management systems using fuzzy case-based reasoning. PhD thesis, Kansas State University, USA.

Cheung, F K T (2005) Development and testing of a method for forecasting prices of multi-storey buildings during the early design stage: The storey enclosure method revisited. PhD thesis, Queensland University of Technology, Australia.

Cheung, F K T and Skitmore, M (2006) A modified storey enclosure model. Construction Management and Economics, 24(4), pp. 391-405. ISSN 01446193

Cheung, F K T; Wong, M W L and Skitmore, M (2008) A study of clients' and estimators' tolerance towards estimating errors. Construction Management and Economics, 26(4), pp. 349-362. ISSN 1466433X

Chiang, Y H; Tang, B S and Wong, F (2008) Volume building as competitive strategy. Construction Management and Economics, 26(2), pp. 161-176. ISSN 1466433X

Chigara, B (2018) Integrating sustainability principles in construction health and safety management practices in Zimbabwe. PhD thesis, Nelson Mandela University, South Africa.

Chileshe, N and Watson, P (2004) The measurement of quality management levels within UK construction SMEs: Development and validation of TQ-SMART. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Chileshe, N; Watson, P; Maslow, D and Belokorovin, E (2005) The deployment of total quality management (TQM): The Russian experience. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Chinowsky, P S; Molenaar, K and Bastias, A (2007) Measuring achievement of learning organizations in construction. Engineering, Construction and Architectural Management, 14(3), pp. 215-227. ISSN 0969-9988

Cho, C; Kim, K; Park, J and Cho, Y K (2018) Data-driven monitoring system for preventing the collapse of scaffolding structures. Journal of Construction Engineering and Management, 144(8): 04018077, ISSN 0733-9364

Choi, K; Lee, E B; Ibbs, C W and Kim, Y W (2009) Multifaceted public outreach and cost-benefit analysis for its effectiveness validation. Construction Management and Economics, 27(8), pp. 771-782. ISSN 1466433X

Choi, K and Lee, H W (2016) Deconstructing the construction industry: A spatiotemporal clustering approach to profitability modeling. Journal of Construction Engineering and Management, 142(10): 04016051, ISSN 0733-9364

Choi, K; Lee, H W; Bae, J and Bilbo, D (2016) Time-cost performance effect of change orders from accelerated contract provisions. Journal of Construction Engineering and Management, 142(3): 04015085, ISSN 0733-9364

Chong, D; Wang, Y; Chen, L and Yu, B (2016) Modeling and validation of energy consumption in asphalt mixture production. Journal of Construction Engineering and Management, 142(12): 04016069, ISSN 0733-9364

Choo, H J (2003) Distributed planning and coordination to support lean construction. PhD thesis, University of California, Berkeley, USA.

Christiansen, T R (1994) Modeling efficiency and effectiveness of coordination in engineering design teams. PhD thesis, Stanford University, USA.

Chunduri, S (2014) Development of planning and design phases of an integrative building lifecycle process model for advanced energy retrofit projects. PhD thesis, Pennsylvania State University, USA.

Chung, K-H J (2010) Development of a collaborative briefing approach for infrastructure projects in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Chung, S (2024) Potential issue identification for country risks in international construction projects from news articles. PhD thesis, Seoul National University, Republic of Korea.

Correia, Marcia Castilho (2019) Assessment of the quality of architectural projects for public health research laboratories: Sustainability and biosafety. PhD thesis, Universidade Federal do Rio de Janeiro, Brazil.

Costa, L; Barbosa, M B A; Baldam, R D L and Coelho, T D P (2019) Challenges of process modeling in architecture and engineering to execute projects and public works. Journal of Construction Engineering and Management, 145(1): 05018015, ISSN 0733-9364

Crawford, R H (2005) Validation of the use of input-output data for embodied energy analysis of the Australian construction industry. Journal of Construction Research, 6(1), pp. 71-90. ISSN 1609-9451

Crippa, J; Boeing, L C; Caparelli, A P A; da Costa, M R M M; Scheer, S; Araujo, A M F and Bem, D (2018) A BIM–LCA integration technique to embodied carbon estimation applied on wall systems in Brazil. Built Environment Project and Asset Management, 8(5), pp. 491-503. ISSN 2044-124X

Cummins, A; Graham, B; Thomas, K and Lucey, T (2016) The effectiveness of managing through trust the middle management layer of a construction company: Proposed ethnographic research. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Damrianant, Jirawat (1999) Petri net-based systems for construction-process modelling and simulation. PhD thesis, University of New South Wales, Australia.

Dan, Y and Liu, G (2024) Integrated scheduling optimization of production and transportation for precast component with delivery time window. Engineering, Construction and Architectural Management, 31(8), pp. 3335-3355. ISSN 0969-9988

Dangana, S (2015) A decision support framework for selecting innovative sustainable technologies for delivering low carbon retail buildings. PhD thesis, University of Plymouth, UK.

Danso, F O; Agyekum, K; Manu, P; Adinyira, E; Ahadzie, D K and Badu, E (2024) Examining the perception of site workers of their risk-taking behaviours on construction sites in Ghana. Engineering, Construction and Architectural Management, 31(8), pp. 2997-3023. ISSN 0969-9988

Das, P; Perera, S; Senaratne, S and Osei-Kyei, R (2025) A smart modern construction enterprise maturity model for business scenarios leading to industry 4.0. Smart and Sustainable Built Environment, 14(1), pp. 23-49. ISSN 2046-6099

Daud, M N; Adnan, Y M; Mohd, I and Aziz, A A (2011) Developing a model for Malaysia's office classification. Building Research & Information, 39(3), pp. 301-313. ISSN 0961-3218

Dave, Malay (2019) High performance prefab housing: towards an evaluation framework for design, sustainability and affordability. PhD thesis, University of New South Wales, Australia.

Davies, A J (1995) Towards a method of measurement and cost control for civil engineering work in the petrochemical industry. PhD thesis, University of Northumbria at Newcastle, UK.

De Cicco, S (2004) Design and development of an information management system for highway construction specifications. PhD thesis, University of Wisconsin - Madison, USA.

De Filippi, Giancarlo Azevedo (2017) Method for production planning and management of time in real estate projects. PhD thesis, Universidade de São Paulo, Brazil.

Deepa, G; Niranjana, A J and Balu, A S (2025) A hybrid machine learning approach for early cost estimation of pile foundations. Journal of Engineering, Design and Technology, 23(1), pp. 306-322. ISSN 1726-0531

Del Caño, A and De La Cruz, M P (2002) Integrated methodology for project risk management. Journal of Construction Engineering and Management, 128(6), pp. 473-485. ISSN 0733-9364

Deng, L. and Zu, F. (2026) Promoting public housing development on private land: The case of Hong Kong. Engineering, Construction and Architectural Management, pp. 1-24. ISSN 0969-9988

Deng, F and Smyth, H (2013) Contingency-based approach to firm performance in construction: Critical review of empirical research. Journal of Construction Engineering and Management, 139(10): 04013004, ISSN 0733-9364

Dewlaney, K S; Hallowell, M R and Fortunato Iii, B R (2012) Safety risk quantification for high performance sustainable building construction. Journal of Construction Engineering and Management, 138(8), pp. 964-971. ISSN 0733-9364

Dias, Sara Maria Santos Soares (2023) Design, development and validation of construction elements made of composite wood waste. PhD thesis, Universidade de Coimbra, Portugal.

Dias Jr., A (1994) A managerial and financial study on the involvement of private sector companies in the development, construction, operation, and ownership of infrastructure projects. PhD thesis, University of Michigan, USA.

Dinis, F A M (2023) Development and validation of BIM-based natural user interfaces for non-geometrical information management. PhD thesis, Universidade do Porto, Portugal.

Dissanayake, N; Xia, B; Skitmore, M; Trigunarsyah, B and Menadue, V (2026) Developing a generic fuzzy multi-attribute analysis model for EPC contractor selection. Built Environment Project and Asset Management, 16(1), pp. 1-19. ISSN 2044-124X

Dissanayake, N; Xia, B; Skitmore, M; Trigunarsyah, B and Menadue, V (2023) Ranked generic criteria for EPC contractor selection. Engineering, Construction and Architectural Management, 30(10), pp. 4933-4954. ISSN 0969-9988

Do, Q; Moriyani, M A; Le, T; Le, C and Piratla, K (2025) Enhanced highway project clustering framework to support project cost estimation. Journal of Construction Engineering and Management, 151(1): 04024191, ISSN 0733-9364

Doan, D T (2019) Enhancing green star certification by improving bim uptake through system dynamics modelling. PhD thesis, Auckland University of Technology, New Zealand.

Domingos, L; Sousa, M J; Resende, R; Pizarro Miranda, B; Rego, S and Ferreira, R (2024) Establishment of a smart building assessment framework in the context of smart cities. Built Environment Project and Asset Management, 14(5), pp. 798-813. ISSN 2044-124X

Donato, V (2017) Towards design process validation integrating graph theory into BIM. Architectural Engineering and Design Management, 13(1), pp. 22-38. ISSN 1745-2007

Du, Y; Yuan, J; Wang, S; Liu, Y and Zeng, N (2025) Leveraging blockchain to anchor information for supervision in PPP projects: A conceptual framework. Engineering, Construction and Architectural Management, 32(4), pp. 2745-2770. ISSN 0969-9988

DuBois, P J (1996) An efficient method to accurately predict general condition costs in the building construction industry. PhD thesis, Colorado School of Mines, USA.

Duan, P; Zhou, J and Tao, S (2023) Risk events recognition using smartphone and machine learning in construction workers' material handling tasks. Engineering, Construction and Architectural Management, 30(8), pp. 3562-3582. ISSN 0969-9988

Duong, T B A; Pham, T; Truong, Q H; Nguyen, K; Pham, C H; Hoang, T H and Pham, T H (2023) Risk in sustainable construction supply chains: Construct development and measurement validation. Construction Management and Economics, 41(8), pp. 634-650. ISSN 01446193

Duzkale, A K (2013) Reducing uncertainty in bid preparation phase of cost estimating for structural steel. PhD thesis, Catholic University of America, USA.

Ebekozien, A and Aigbavboa, C O (2024) Improving quantity surveying education through continually updating curriculum digitalisation to meet industry requirements. Journal of Engineering, Design and Technology, 22(5), pp. 1523-1543. ISSN 1726-0531

Edouard, M B; Camille, J; Vincent, B and Améziane, A (2025) Design for mixed model final assembly line (dfmmfal): A new tool for assembly interface identification based on assembly process planning. Journal of Engineering, Design and Technology, 23(1), pp. 143-160. ISSN 1726-0531

Edwards, D J; Cabahug, R R and Nicholas, J (2003) The impact of training and education characteristics upon plant operator maintenance proficiency. Journal of Engineering, Design and Technology, 1(2), pp. 119-134. ISSN 1726-0531

Edwards, D J and Holt, G D (2001) Predicting construction plant maintenance expenditure. Building Research & Information, 29(6), pp. 417-427. ISSN 0961-3218

Edwards, D J; Holt, G D and Harris, F C (2000) A model for predicting plant maintenance costs. Construction Management and Economics, 18(1), pp. 65-75. ISSN 01446193

Ekyalimpa, Ronald (2015) A distributed simulation approach for contractor company performance management in the construction industry. PhD thesis, University of Alberta, Canada.

El Asmar, M; Hanna, A S and Loh, W Y (2016) Evaluating integrated project delivery using the project quarterback rating. Journal of Construction Engineering and Management, 142(1): 04015046, ISSN 0733-9364

El-Abbasy, M S; Senouci, A; Zayed, T; Mirahadi, F and Parvizsedghy, L (2014) Condition prediction models for oil and gas pipelines using regression analysis. Journal of Construction Engineering and Management, 140(6): 4014013, ISSN 0733-9364

El-Adaway, I H and Kandil, A A (2010) Multiagent system for construction dispute resolution (MAS-COR). Journal of Construction Engineering and Management, 136(3), pp. 303-315. ISSN 0733-9364

El-Hamrawy, S A K; El-Maaty, A E A and Akal, A Y (2017) Proposed models to measure the quality of highway projects regression analysis vs statistical: fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988

El-Hamrawy, S A-K; Abu El-Maaty, A E and Akal, A Y (2017) Proposed models to measure the quality of highway projects: Regression analysis vs statistical-fuzzy approach. Engineering, Construction and Architectural Management, 24(6), pp. 988-1003. ISSN 0969-9988

El-Sabek, L M and McCabe, B Y (2018) Framework for managing integration challenges of last planner system in IMPs. Journal of Construction Engineering and Management, 144(5): 04018022, ISSN 0733-9364

El-Saboni, M A (2011) Interaction between electronic communication and perceived success in UAE construction projects. PhD thesis, University of Salford, UK.

Elgendi, E M O (2016) An automated dynamic site layout planning system: a case study of Egypt. PhD thesis, University of Salford, UK.

Elghaish, F; Matarneh, S T and Alhusban, M (2022) The application of "deep learning" in construction site management: Scientometric, thematic and critical analysis. Construction Innovation, 22(3), pp. 580-603. ISSN 1471-4175

Elkadi, Karim (2024) BIM-enabled facility management framework and simulation. PhD thesis, George Mason University, USA.

Elliott, J W (2013) Development of the construction training attitudes and intentions scale. PhD thesis, Colorado State University, USA.

Elliott, J W; Perkins, M and Thevenin, M K (2018) Measuring undergraduate students’ construction education domain self-efficacy, motivation, and planned behavior: Validation of a concise survey instrument. International Journal of Construction Education and Research, 14(4), pp. 235-256. ISSN 1557-8771

Elmousalami, H H (2020) Artificial intelligence and parametric construction cost estimate modeling: State-of-the-art review. Journal of Construction Engineering and Management, 146(1): 03119008, ISSN 0733-9364

Elmousalami, H H; Elyamany, A H and Ibrahim, A H (2018) Predicting conceptual cost for field canal improvement projects. Journal of Construction Engineering and Management, 144(11): 04018102, ISSN 0733-9364

Elsayah, O S (2016) A framework for improvement of contractor selection procedures on major construction project in Libya. PhD thesis, Edinburgh Napier University, UK.

Elsayegh, A (2021) Collaborative planning in the construction industry: A holistic framework for assessing collaborative planning practices and predicting project performance. PhD thesis, Missouri University of Science and Technology, USA.

Elsonoki, M M (2022) Towards enhancing value engineering practice in the Libyan construction industry. PhD thesis, Universiti Tun Hussein Onn, Malaysia.

Elwakil, E (2017) Integrating analytical hierarchy process and regression for assessing construction organizations' performance. International Journal of Construction Management, 17(1), pp. 76-88. ISSN 1562-3599

Emere, C E (2024) An integrated sustainable building construction model for project delivery in South Africa. PhD thesis, University of Johannesburg, South Africa.

Entner, D; Prante, T; Vosgien, T; Zăvoianu, A C; Saminger-Platz, S; Schwarz, M and Fink, K (2019) Potential identification and industrial evaluation of an integrated design automation workflow. Journal of Engineering, Design and Technology, 17(6), pp. 1085-1109. ISSN 1726-0531

Enz, D L (2009) Construction project administration and management for mitigating work zone crashes and fatalities: An integrated risk management model. PhD thesis, Iowa State University, USA.

Erol, H H (2020) Incorporating complexity into risk management:An integrated risk assessment process for mega construction projects. PhD thesis, Middle East Technical University, Turkey.

Evans, M (2022) Strategic frameworks for managing lean construction on megaprojects: towards global integrated delivery and corporate governance. PhD thesis, University of Bolton, UK.

Evans, M and Farrell, P (2023) A strategic framework managing challenges of integrating lean construction and integrated project delivery on construction megaprojects, towards global integrated delivery transformative initiatives in multinational organisations. Journal of Engineering, Design and Technology, 21(2), pp. 376-416. ISSN 1726-0531

Evans, M; Farrell, P; Elbeltagi, E and Dion, H (2023) Barriers to integrating lean construction and integrated project delivery (IPD) on construction megaprojects towards the global integrated delivery (gid) in multinational organisations: Lean IPD&gid transformative initiatives. Journal of Engineering, Design and Technology, 21(3), pp. 778-818. ISSN 1726-0531

Evans, R C (2002) Dynamic cash flow forecasting model for construction contractors. PhD thesis, University of Liverpool, UK.

Ezeldin, A S and Soliman, A (2009) Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42-55. ISSN 0733-9364

Fadnavis, Aishwarya Sunil (2026) An integrated coordination framework for construction procurement: Examining early supplier involvement through agent-based modeling. PhD thesis, University of Washington, USA.

Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.

Fahmy, A; Hassan, T; Bassioni, H and McCaffer, R (2020) Dynamic scheduling model for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 313-330. ISSN 2044-124X

Fahmy, Sami W (2005) Comparative analysis of expected and actual performance of public design-build projects. PhD thesis, University of Calgary, Canada.

Falorca, J F (2019) Main functions for building maintenance management: An outline application. International Journal of Building Pathology and Adaptation, 37(5), pp. 490-509. ISSN 23984708

Fang, Y and Cho, Y K (2017) Effectiveness analysis from a cognitive perspective for a real-time safety assistance system for mobile crane lifting operations. Journal of Construction Engineering and Management, 143(4): 05016025, ISSN 0733-9364

Faraji, A; Homayoon Arya, S; Ghasemi, E; Rashidi, M; Perera, S; Tam, V and Rahnamayiezekavat, P (2024) A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts. Construction Innovation, 24(1), pp. 384-406. ISSN 1471-4175

Farias, F (2013) Contemporary strategies for sustainable design. PhD thesis, Texas A&M University, USA.

Farooq, M. and Paracha, A. T. (2026) Cost prediction of road construction projects in Pakistan using machine learning. International Journal of Construction Management, 26(8), pp. 1442-1470. ISSN 1562-3599

Fathi, M S (2009) Micro- and macro-level context-aware information delivery for construction programme managers. PhD thesis, Loughborough University, UK.

Faubel, C.; Mowen, D.; Miri, M.; Demarquet Alban, U.; Martinez-Molina, A. and Alamaniotis, M. (2026) Multimodal transformer models for real-time estimation of indoor environmental quality in educational settings. Smart and Sustainable Built Environment, pp. 1-37. ISSN 2046-6099

Fawcett, W and Song, J Y (2009) Modelling the use of space and time in the knowledge economy. Building Research & Information, 37(3), pp. 312-324. ISSN 0961-3218

Fayek, A (1998) Competitive bidding strategy model and software system for bid preparation. Journal of Construction Engineering and Management, 124(1), pp. 1-10. ISSN 0733-9364

Fayek, Aminah (1996) A competitive estimating and tendering strategy model for use in the civil engineering construction industry. PhD thesis, University of Melbourne, Australia.

Februandari, A (2020) Authenticity in cultural built heritage: Learning from Chinese indonesians' houses. International Journal of Building Pathology and Adaptation, 38(2), pp. 262-278. ISSN 23984708

Fernandes, A G G (2014) Improving and embedding project management practice in organisations. PhD thesis, University of Southampton, UK.

Fernando, L. S.; Kulatunga, U.; Ranadewa, T. and Keraminiyage, K. P. (2026) Accelerating disaster recovery: An agile approach to enhancing community disaster resilience. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 181-202. ISSN 1759-5908

Fernando, N; T.A, K D and Zhang, H (2024) An artificial neural network (ann) approach for early cost estimation of concrete bridge systems in developing countries: The case of Sri Lanka. Journal of Financial Management of Property and Construction, 29(1), pp. 23-51. ISSN 1366-4387

Filippi, Giancarlo Azevedo de (2017) Method for production planning and deadline management of real estate ventures. PhD thesis, Universidade de São Paulo, Brazil.

Fiorineschi, L; Bacci, T; Frillici, F S S; Cubeda, S; Volpe, Y; Rotini, F; Carfagni, M and Facchini, B (2023) Non-reactive test rig for combustor-turbine interaction studies in industrial gas turbines. Journal of Engineering, Design and Technology, 21(3), pp. 758-777. ISSN 1726-0531

Flood, I and Issa, R R A (2010) Empirical modeling methodologies for construction. Journal of Construction Engineering and Management, 136(1), pp. 36-48. ISSN 0733-9364

Fobiri, G; Musonda, I and Muleya, F (2025) Unlocking the full potential of reality capture for construction project cost monitoring: A mixed review. Journal of Engineering, Design and Technology, 23(3), pp. 830-853. ISSN 1726-0531

Fobiri, Godfred (2024) A framework to apply reality capture technology for interim payment valuation of construction projects. PhD thesis, University of Johannesburg, South Africa.

Forbes, D; Smith, S and Horner, M (2008) Tools for selecting appropriate risk management techniques in the built environment. Construction Management and Economics, 26(11), pp. 1241-1250. ISSN 1466433X

Forbes, D; Smith, S D and Horner, M (2007) A case-based reasoning approach for selecting risk management techniques. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Formoso, C T (1991) A knowledge based framework for planning house building projects. PhD thesis, University of Salford, UK.

Fortunato Iii, B R; Hallowell, M R; Behm, M and Dewlaney, K (2012) Identification of safety risks for high-performance sustainable construction projects. Journal of Construction Engineering and Management, 138(4), pp. 499-508. ISSN 0733-9364

Francis, A (2016) A chronographic protocol for modelling construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 168-177. ISSN 17514304

Francis, Valerie Elizabeth (2013) Women and their career progression in the Australian construction industry. PhD thesis, University of Melbourne, Australia.

Fraser, C (1999) A non-results-based effectiveness index for construction site managers. Construction Management and Economics, 17(6), pp. 789-798. ISSN 01446193

Gaber, B; Zhan, C; Han, X; Omar, M and Li, G (2024) Employing ANN for daylight and energy prediction of hot climate office buildings: A case study of new cairo, Egypt. Architectural Engineering and Design Management, 20(6), pp. 1752-1776. ISSN 1745-2007

Galbraith, G H; McLean, R C and Guo, J S (1998) Moisture permeability data presented as a mathematical relationship. Building Research & Information, 26(3), pp. 157-168. ISSN 0961-3218

Ganah, A A M (2003) Computer visualisation support for buildability. PhD thesis, Loughborough University, UK.

Gao, J (2011) A characterization framework to document and compare BIM implementations on construction projects. PhD thesis, Stanford University, USA.

Gardiner, P D (1993) Conflict analysis in construction project management. PhD thesis, Durham University, UK.

Gayen, P. and Hajela, A. (2026) Modern heritage assessment index: A quantitative approach for assessing the cultural significance of modern heritage. Architectural Engineering and Design Management, 22(1), pp. 206-234. ISSN 1745-2007

Gbadegesin, J T and Aluko, B T (2014) Public private partnerships/private finance initiatives for financing infrastructure in public tertiary institutions in Nigeria. Built Environment Project and Asset Management, 4(2), pp. 199-215. ISSN 2044-124X

Gerges, M (2020) Building information modelling for fire evacuation in high-rise residential buildings. PhD thesis, Loughborough University, UK.

Getuli, V; Capone, P; Bruttini, A and Sorbi, T (2022) A smart objects library for BIM-based construction site and emergency management to support mobile VR safety training experiences. Construction Innovation, 22(3), pp. 504-530. ISSN 1471-4175

Ghaffari, A (2013) Developing a mathematical model for profit sharing amongst partners in consulting engineering companies of construction projects. PhD thesis, Savitribai Phule Pune University, India, India.

Ghalenoei, N; Babaeian Jelodar, M; Paes, D; Sutrisna, M and Rahmani, D (2025) Offsite construction and BIM integration framework across project life cycle. Journal of Construction Engineering and Management, 151(7): 05025002, ISSN 0733-9364

Ghanbaripour, A N; Langston, C; Tumpa, R J and Skulmoski, G (2024) Validating and testing a project delivery success model in construction: A mixed-method approach in Australia. Smart and Sustainable Built Environment, 13(3), pp. 532-559. ISSN 2046-6099

Ghansah, F A and Lu, W (2025) Cyber-physical systems and digital twins for "cognitive building" in the construction industry. Construction Innovation, 25(3), pp. 787-818. ISSN 1471-4175

Gharehbaghi, K; Farnes, K and Hurst, N (2025) A novel method of refining the performance of rail systems: An evaluation of system dynamics using discrete event simulation. Smart and Sustainable Built Environment, 14(2), pp. 536-556. ISSN 2046-6099

Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.

Gispert, D E; Yitmen, I; Sadri, H and Taheri, A (2025) Development of an ontology-based asset information model for predictive maintenance in building facilities. Smart and Sustainable Built Environment, 14(3), pp. 740-757. ISSN 2046-6099

Gladovic, C (2026) Hard hats, soft skills: A responsive scaffold model for construction management education. Construction Economics and Building, 26(1), ISSN 2204-9029

Goh, Kai Chen (2011) Developing financial decision support for highway infrastructure sustainability. PhD thesis, Queensland University of Technology, Australia.

Gondia, A; Siam, A; El-Dakhakhni, W and Nassar, A H (2020) Machine learning algorithms for construction projects delay risk prediction. Journal of Construction Engineering and Management, 146(1): 04019085, ISSN 0733-9364

Gonsalves, N; Ogunseiju, O R and Akanmu, A A (2024) Activity recognition from trunk muscle activations for wearable and non-wearable robot conditions. Smart and Sustainable Built Environment, 13(6), pp. 1370-1385. ISSN 2046-6099

Goodrum, P M; Haas, C T; Caldas, C; Zhai, D; Yeiser, J and Homm, D (2011) Model to predict the impact of a technology on construction productivity. Journal of Construction Engineering and Management, 137(9), pp. 678-688. ISSN 0733-9364

Govender, N; Laryea, S and Watermeyer, R (2022) A framework for assessing quality of tender documents. Built Environment Project and Asset Management, 12(4), pp. 573-589. ISSN 2044-124X

Graebert, R F (2015) The implementation of building energy management in commercial real estate and impacts on building energy performance. PhD thesis, Stanford University, USA.

Graham, T E (2002) Infrastructure engineering evaluation and assessment using geographic information system and the analytic hierarchy process: A cross-discipline approach. DEng thesis, Morgan State University, USA.

Grau, D; Cruz Rios, F and Sherman, R (2021) Project validation: A set-based and concurrent design approach to inform owner's authorization decision on complex projects. Journal of Construction Engineering and Management, 147(10): 04021132, ISSN 0733-9364

Gravitt, D D (2004) The development and validation of a bar code based residential construction quality inspection procedure. PhD thesis, Indiana State University, USA.

Grey Rodriguez, F C (2019) Space-mate: A framework to harmonize occupant well-being and building sustainability. PhD thesis, Stanford University, USA.

Gruneberg, S and Folwell, K (2013) The use of gross fixed capital formation as a measure of construction output. Construction Management and Economics, 31(4), pp. 359-368. ISSN 1466433X

Gu, T; Hao, E; Dirks, K; Kieu, M and Zhang, R (2026) Enhancing residents' satisfaction in old community renewal: Application and validation of an extended expectation-disconfirmation theory model. Journal of Construction Engineering and Management, 152(4): 04026023, ISSN 0733-9364

Gumusburun Ayalp, G and Ay, I (2021) Model validation of factors limiting the use of prefabricated construction systems in Turkey. Engineering, Construction and Architectural Management, 28(9), pp. 2610-2636. ISSN 0969-9988

Gunduz, M and Al-Ajji, I (2022) Employment of CHAID and crt decision tree algorithms to develop bid/no-bid decision-making models for contractors. Engineering, Construction and Architectural Management, 29(9), pp. 3712-3736. ISSN 0969-9988

Gunduz, M; Sirin, O and Al Nawaiseh, H M (2024) Assessment of critical project success factors for management of pavement construction using the Delphi approach. Journal of Construction Engineering and Management, 150(4): 04024020, ISSN 0733-9364

Guo, B H W; Yiu, T W; González, V A and Goh, Y M (2017) Using a pressure-state-practice model to develop safety leading indicators for construction projects. Journal of Construction Engineering and Management, 143(2): 04016092, ISSN 0733-9364

Gusmao Brissi, S and Debs, L (2024) Principles for adopting offsite construction in design and construction companies focused on multifamily projects in the USA. Engineering, Construction and Architectural Management, 31(11), pp. 4308-4329. ISSN 0969-9988

Hachem, A A K; Khatib, J M and Ezzedine El Dandachy, M (2025) Assessment of interfacial mortar-mortar bond and pure shear strength of metakaolin-based geopolymer. International Journal of Building Pathology and Adaptation, 43(4), pp. 732-748. ISSN 2398-4708

Hadizadeh-Bazaz, M.; Navarro, I. J. and Yepes, V. (2026) Smart integration of non-destructive damage detection and life-cycle assessment for sustainable maintenance of coastal bridges. Smart and Sustainable Built Environment, pp. 1-27. ISSN 2046-6099

Halder, A. (2026) Modeling critical driving factors of stakeholder integration and their influences on construction megaproject performance: A regression-based analysis. Journal of Engineering, Design and Technology, 24(1), pp. 213-241. ISSN 1726-0531

Hallowell, M R; Bhandari, S and Alruqi, W (2020) Methods of safety prediction: Analysis and integration of risk assessment, leading indicators, precursor analysis, and safety climate. Construction Management and Economics, 38(4), pp. 308-321. ISSN 01446193

Hallowell, M R and Gambatese, J A (2010) Population and initial validation of a formal model for construction safety risk management. Journal of Construction Engineering and Management, 136(9), pp. 981-990. ISSN 0733-9364

Ham, N; Moon, S; Kim, J H and Kim, J J (2018) Economic analysis of design errors in BIM-based high-rise construction projects: Case study of Haeundae L project. Journal of Construction Engineering and Management, 144(6): 05018006, ISSN 0733-9364

Hamdan, Azreen Sharina (2025) Developing a tailored framework for digital transformation in UK small, micro and medium construction enterprises: Evidence from greater manchester. PhD thesis, University of Salford, UK.

Hamida, A; Alsudairi, A; Alshaibani, K and Alshamrani, O (2021) Environmental impacts cost assessment model of residential building using an artificial neural network. Engineering, Construction and Architectural Management, 28(10), pp. 3190-3215. ISSN 0969-9988

Hamida, H and Alshibani, A (2021) A multi-criteria decision-making model for selecting curtain wall systems in office buildings. Journal of Engineering, Design and Technology, 19(4), pp. 904-931. ISSN 1726-0531

Hamida, M B and Hassanain, M A (2022) A framework model for AEC/FM knowledge in adaptive reuse projects. Journal of Engineering, Design and Technology, 20(3), pp. 624-648. ISSN 1726-0531

Han, B and Leite, F (2021) Measuring the impact of immersive virtual reality on construction design review applications: Head-mounted display versus desktop monitor. Journal of Construction Engineering and Management, 147(6): 04021042, ISSN 0733-9364

Han, Bing (2022) Implementing virtual reality-based design review in the construction industry. PhD thesis, University of Texas at Austin, USA.

Hanna, A S; Chang, C K; Lackney, J A and Sullivan, K T (2007) Impact of overmanning on mechanical and sheet metal labor productivity. Journal of Construction Engineering and Management, 133(1), pp. 22-28. ISSN 0733-9364

Hanna, A S and Iskandar, K A (2017) Quantifying and modeling the cumulative impact of change orders. Journal of Construction Engineering and Management, 143(10): 04017076, ISSN 0733-9364

Harbin, K B (2020) A decision analysis tool for building renovations regarding adaptive reuse. PhD thesis, University of Alabama, USA.

Hare, W J (2006) Integration of health and safety planning in construction project management through the development of a best practice gateway model. PhD thesis, Glasgow Caledonian University, UK.

Hashim, H M; Ng, Y G; Talib, O and Md Tamrin, S B (2019) Content validation of flood disaster preparedness action (FDPA) items among small and medium enterprises (SME) business. International Journal of Disaster Resilience in the Built Environment, 10(1), pp. 2-13. ISSN 1759-5916

Hassan, M M and Gruber, S (2008) Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation, 8(1), pp. 7-22. ISSN 1471-4175

Hassanein, A A G and Khalil, B N L (2006) Building Egypt 1: a general indicator cost index for the Egyptian construction industry. Engineering, Construction and Architectural Management, 13(5), pp. 463-480. ISSN 0969-9988

Hassanein, A A G and Khalil, B N L (2006) Developing general indicator cost indices for the Egyptian construction industry. Journal of Financial Management of Property and Construction, 11(3), pp. 181-194. ISSN 1366-4387

Haymaker, J (2004) The perspective approach: Enabling engineers to construct and integrate views and generate an evolving project model. PhD thesis, Stanford University, USA.

He, P; Qin, L; Yuan, Y and Yuan, J (2025) Action reliability assessment framework for automated construction labor measurements: Case study on plastering operations. Journal of Construction Engineering and Management, 151(8): 05025006, ISSN 0733-9364

Helaly, H; El-Rayes, K; Ignacio, E J and Joan, H J (2025) Comparison of machine-learning algorithms for estimating cost of conventional and accelerated bridge construction methods during early design phase. Journal of Construction Engineering and Management, 151(3): 04025004, ISSN 0733-9364

Hesselink, L; Vahdatikhaki, F; Harmsen, Y and Voordijk, H (2024) Usability analysis of virtual-reality-enabled digital twin for the inspection of sewage pumping stations. International Journal of Construction Management, 24(13), pp. 1419-1430. ISSN 1562-3599

Heydari, M; Heravi, G; Raeisinafchi, R and Karimi, H (2024) A dynamic model to assess the role of site supervision systems in the safety performance of construction projects. Journal of Construction Engineering and Management, 150(3): 04024001, ISSN 0733-9364

Hijazi, A A; Perera, S; Calheiros, R N and Alashwal, A (2021) Rationale for the integration of BIM and blockchain for the construction supply chain data delivery: A systematic literature review and validation through focus group. Journal of Construction Engineering and Management, 147(10): 03121005, ISSN 0733-9364

Hilal, M; Maqsood, T and Abdekhodaee, A (2019) A hybrid conceptual model for BIM in FM. Construction Innovation, 19(4), pp. 531-549. ISSN 1471-4175

Hilu, K A and Hiyassat, M A (2024) Qualitative assessment of resilience in construction projects. Construction Innovation, 24(5), pp. 1297-1319. ISSN 1471-4175

Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.

Hollar, D A (2011) Predicting preliminary engineering costs for highway projects. PhD thesis, North Carolina State University, USA.

Hon, C K H; Chan, A P C and Yam, M C H (2013) Determining safety climate factors in the repair, maintenance, minor alteration, and addition sector of Hong Kong. Journal of Construction Engineering and Management, 139(5), pp. 519-528. ISSN 0733-9364

Hon, C K H; Sun, C; Xia, B; Jimmieson, N L; Way, K A and Wu, P P Y (2022) Applications of Bayesian approaches in construction management research: A systematic review. Engineering, Construction and Architectural Management, 29(5), pp. 2153-2182. ISSN 0969-9988

Honda, Wilson Saburo (2016) Sustainability certificate of corporate offices buildings in Brazil. PhD thesis, Universidade de São Paulo, Brazil.

Horsthuis, C; Thomson, D S and Fernie, S (2012) The case for slack to promote innovative behaviour in construction firms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Hosny, F.; El-Damaty, M.; Mantha, B. R. K. and Abu Dabous, S. (2026) Analysis and modeling of delays during construction handover stage for building projects: A case study of United Arab Emirates. International Journal of Building Pathology and Adaptation, 44(3), pp. 658-684. ISSN 2398-4708

Hou, H (2023) Understanding building and urban environment interactions: an integrated framework for building occupancy modelling. PhD thesis, Imperial College London, UK.

Hu, W; Dong, J; Hwang, B G; Ren, R and Chen, Z (2020) Network planning of urban underground logistics system with hub-and-spoke layout: Two phase cluster-based approach. Engineering, Construction and Architectural Management, 27(8), pp. 2079-2105. ISSN 0969-9988

Hu, Y; Zhang, M; Ren, W; Li, H; Zhang, J; Wang, L and Shuai, S (2025) Detecting loss of balance in construction workers using millimeter wave sensing. Journal of Construction Engineering and Management, 151(12): 04025202, ISSN 0733-9364

Hua Y Y, C I Y S (2013) Development of a conceptual model for organizational learning culture and innovation diffusion in construction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Huang, R Y (2006) A performance-based bridge LCCA model using visual inspection inventory data. Construction Management and Economics, 24(10), pp. 1069-1081. ISSN 1466433X

Huang, W H; Tserng, H P; Jaselskis, E J and Lee, S Y (2014) Dynamic threshold cash flow-based structural model for contractor financial prequalification. Journal of Construction Engineering and Management, 140(10): 04014047, ISSN 0733-9364

Hudson, F S; Sutrisna, M and Chawynski, G (2021) A certification framework for managing the risks of non-compliance and non-conformance building products: A Western Australian perspective. International Journal of Building Pathology and Adaptation, 39(2), pp. 312-343. ISSN 23984708

Hulathdoowage, N D; Karunasena, G; Udawatta, N and Liu, C (2024) Essential parameters in stepwise retrofitting for long-term emission reduction in residential buildings. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Hung, C-C (1999) A study of factors affecting the implementation of ISO 9000 in Taiwan's construction industry. DIT thesis, University of Northern Iowa, USA.

Hussain, A.; Che Ibrahim, C. K. I.; Belayutham, S.; Manu, P. and Cheung, C. (2026) Exploring regulatory capabilities for design for safety in construction: The case of Malaysia. Built Environment Project and Asset Management, 16(2), pp. 221-241. ISSN 2044-124X

Hussain, R S (2017) Investigating the business process implications of managing road works and street works. PhD thesis, Loughborough University, UK.

Hussien, A (2017) ARGILE: a conceptual framework combining augmented reality with agile philosophy for the UK construction industry. PhD thesis, Liverpool John Moores University, UK.

Huynh, N M; Le-Hoai, L; Chuong Nguyen, V H and Tran, C (2025) An assessment framework for underground construction methods in the pre-construction stage: a technical perspective. International Journal of Construction Management, 25(3), pp. 265-277. ISSN 1562-3599

Hwang, S; Blay, K; Osmani, M and Wang, M (2026) Blockchain-integrated relational project governance. Journal of Construction Engineering and Management, 152(3): 04026003, ISSN 0733-9364

Hwang, B G (2006) Development of a performance measurement system for the delivery of pharmaceutical capital facility projects. PhD thesis, University of Texas at Austin, USA.

Hwang, S (2010) Cross-validation of short-term productivity forecasting methodologies. Journal of Construction Engineering and Management, 136(9), pp. 1037-1046. ISSN 0733-9364

Hwang, S Y (2007) Proactive planning and control of construction productivity and cost using time series data. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Ibrahim, A D (2007) The development of a procurement strategy for primary health care facilities in Nigeria. PhD thesis, Loughborough University, UK.

Ibrahim, H; Wardeh, G; Fares, H and Ghorbel, E (2025) Mechanical and fracture properties of mortars reinforced with glass fibre and prepared with different cement types. International Journal of Building Pathology and Adaptation, 43(4), pp. 712-731. ISSN 2398-4708

Ibrahim, K I; Costello, S B and Wilkinson, S (2015) Validation of a model for assessing alliance team integration. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Ibrahim, M N (2022) Risk management in construction of megahousing projects in Egypt. PhD thesis, London South Bank University, UK.

Ibrahim, M W W (2018) Improving project performance by mitigating out-of-sequence work and assessing construction readiness. PhD thesis, University of Wisconsin - Madison, USA.

Ikerd II, W F (2021) Level of acceptance (LOA) for scan-to-BIM creation. PhD thesis, University of Denver, USA.

Ilhan, B and Yaman, H (2010) Measuring the effectiveness of it utilization in construction: A different point of view. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Illankoon, Illankoon Mudiyanselage Chethana Sanathani (2018) A life-cycle cost model for green commercial office buildings with optimal green star credits. PhD thesis, Western Sydney University, Australia.

Inyang, N I (2013) A framework for ergonomic assessment of residential construction tasks. PhD thesis, University of Alberta, Canada.

Iqbal, M.; Lin, Z.; Ahmed, R. I.; Ahmad, N. and Hussain, K. (2026) Exploring the paths to big data analytics implementation success in construction projects: An integrated approach. Engineering, Construction and Architectural Management, 33(7), pp. 5418-5444. ISSN 0969-9988

Isa, R; Emuze, F; Das, D and Awuzie, B O (2018) Modeling a transformational route to infrastructure sustainability in South Africa. Built Environment Project and Asset Management, 8(2), pp. 147-159. ISSN 2044-124X

Jacques de Sousa, L; Poças Martins, J; Sanhudo, L and Santos Baptista, J (2024) Automation of text document classification in the budgeting phase of the construction process: A systematic literature review. Construction Innovation, 24(7), pp. 292-318. ISSN 1471-4175

Jafarzadeh, R; Ingham, J M; Walsh, K Q; Hassani, N and Ghodrati Amiri, G R (2015) Using statistical regression analysis to establish construction cost models for seismic retrofit of confined masonry buildings. Journal of Construction Engineering and Management, 141(5): 04014098, ISSN 0733-9364

Jagannathan, M and Delhi, V S K (2023) Paths leading contractual disputes to litigation. Built Environment Project and Asset Management, 13(6), pp. 846-861. ISSN 2044-124X

Jain, Nishesh (2021) Reducing the performance gap using calibrated simulation models. PhD thesis, University College London, UK.

Jang, Y; Jeong, I B; Cho, Y K and Ahn, Y (2019) Predicting business failure of construction contractors using long short-term memory recurrent neural network. Journal of Construction Engineering and Management, 145(11): 04019067, ISSN 0733-9364

Jarrah, R T (2007) Planning for, facilitating, and evaluating design effectiveness. PhD thesis, University of Texas at Austin, USA.

Jayaram, S (2009) Development of payload housing for temperature and pressure control of bio fuel cells for space applications. Journal of Engineering, Design and Technology, 7(3), pp. 323-334. ISSN 1726-0531

Jayasuriya, Sajani (2018) A systematic stakeholder management framework for managing public private partnership projects in Australia. PhD thesis, RMIT University, Australia.

Jayawardana, Jayawardanage Janappriya (2024) Investigating the sustainability of modern construction practices focusing on prefabricated construction. PhD thesis, RMIT University, Australia.

Jeelani, I; Albert, A and Gambatese, J A (2017) Why do construction hazards remain unrecognized at the work interface? Journal of Construction Engineering and Management, 143(5): 04016128, ISSN 0733-9364

Jiang, L (2016) A constructability review ontology to support automated rule checking leveraging building information models. PhD thesis, Pennsylvania State University, USA.

Jimenez-Roa, Lisandro Arturo (2020) Data-driven damage detection for bridges through vibration structural health monitoring. EngD thesis, University of Twente, Netherlands.

Jin, B and Xu, X (2025) Rental price index forecasts of residential properties using Gaussian process regressions. Journal of Financial Management of Property and Construction, 30(3), pp. 416-454. ISSN 1366-4387

Jin, R (2013) A statistical modeling approach to studying the effects of alternative and waste materials on green concrete properties. PhD thesis, Ohio State University, USA.

Joao, Z R (2021) Road construction assessment model (RC-AM) to prevent contract overbilling in Angola. PhD thesis, George Washington University, USA.

Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.

Joubert, G D and Raji, A K (2025) Development and validation of a real-time testbed for renewable energy integration studies: South African grid code case study. Journal of Engineering, Design and Technology, 23(1), pp. 1-20. ISSN 1726-0531

Jung, Y (1997) Information systems planning methodology for the construction industry. PhD thesis, University of Texas at Austin, USA.

Junussova, T. and Nadeem, A. (2026) Modelling sustainable construction material management implementation strategy indicators in developed economies. International Journal of Construction Management, 26(9), pp. 1925-1943. ISSN 1562-3599

Kabundu, E K (2020) A housing affordability and tenure of choice quantum deliverable model in South Africa. PhD thesis, Nelson Mandela Metropolitan University, South Africa.

Kahoul, H; Belhour, S; Bellaouar, A and Dron, J P (2019) Fatigue life prediction of upper arm suspension using strain life approach. Journal of Engineering, Design and Technology, 17(1), pp. 25-40. ISSN 1726-0531

Kaka, A P (2001) Turnover forecasting for contracting companies based on published information. Journal of Financial Management of Property and Construction, 6(3), pp. 217-229. ISSN 1366-4387

Kam, C; Song, M H and Senaratna, D (2017) VDC scorecard: Formulation, application, and validation. Journal of Construction Engineering and Management, 143(3): 04016100, ISSN 0733-9364

Kam, C K H (2005) Dynamic decision breakdown structure: Ontology, methodology, and framework for information management in support of decision-enabling tasks in the building industry. PhD thesis, Stanford University, USA.

Kamal, E M and Flanagan, R (2012) Understanding absorptive capacity in Malaysian small and medium sized (SME) construction companies. Journal of Engineering, Design and Technology, 10(2), pp. 180-198. ISSN 1726-0531

Kamal, P and Ahuja, S (2019) An ensemble-based model for prediction of academic performance of students in undergrad professional course. Journal of Engineering, Design and Technology, 17(4), pp. 769-781. ISSN 1726-0531

Kamardeen, I (2015) Critically reflective pedagogical model: A pragmatic blueprint for enhancing learning and teaching in construction disciplines. Construction Economics and Building, 15(4), pp. 63-75. ISSN 2204-9029

Kamps, M; van den Boomen, M; van den Bogaard, J and Hertogh, M (2024) Intergenerational transfer of engineering expertise: Knowledge continuity management in storm surge barrier engineering. Built Environment Project and Asset Management, 14(6), pp. 874-891. ISSN 2044-124X

Karadag, I; Güzelci, O Z and Alaçam, S (2023) Edu-ai: A twofold machine learning model to support classroom layout generation. Construction Innovation, 23(4), pp. 898-914. ISSN 1471-4175

Karaiskos, P; Munian, Y; Martinez-Molina, A and Alamaniotis, M (2026) Indoor air quality prediction modeling for a naturally ventilated fitness building using rnn-LSTM artificial neural networks. Smart and Sustainable Built Environment, 15(1), pp. 384-406. ISSN 2046-6099

Karki, S and Hadikusumo, B (2023) Machine learning for the identification of competent project managers for construction projects in Nepal. Construction Innovation, 23(1), pp. 1-18. ISSN 1471-4175

Kashwani, G A (2017) Enhancing the implementation of safety engineering systems in oil and gas construction projects in the UAE. PhD thesis, Heriot-Watt University, UK.

Katsuragawa, C M; Lucko, G; Isaac, S and Su, Y (2021) Fuzzy linear and repetitive scheduling for construction projects. Journal of Construction Engineering and Management, 147(3): 04021002, ISSN 0733-9364

Kavishe, N and Chileshe, N (2022) Development and validation of public-private partnerships framework for delivering housing projects in developing countries: A case of Tanzania. International Journal of Construction Management, 22(5), pp. 873-890. ISSN 1562-3599

Kavishe, N; Jefferson, I and Chileshe, N (2018) An analysis of the delivery challenges influencing public-private partnership in housing projects: The case of Tanzania. Engineering, Construction and Architectural Management, 25(2), pp. 202-240. ISSN 0969-9988

Kazar, G and Comu, S (2021) Effectiveness of serious games for safety training: A mixed method study. Journal of Construction Engineering and Management, 147(8): 04021091, ISSN 0733-9364

Keane, P J (1994) A computer-aided systematic approach to time delay analysis for extension of time claims on construction projects. PhD thesis, Loughborough University, UK.

Kebriyaii, O; Heidari, A; Khalilzadeh, M and Pamucar, D (2025) A green project scheduling with material ordering problem considering cost constraints and quality of materials. Engineering, Construction and Architectural Management, 32(8), pp. 4991-5018. ISSN 0969-9988

Keraminiyage, K and Piyatadsananon, P (2013) Achieving success in post-disaster resettlement programmes through better coordination between spatial and socio-economic/cultural factors. International Journal of Disaster Resilience in the Built Environment, 4(3), pp. 352-372. ISSN 1759-5916

Kereri, J O (2020) The effects of relational and social behaviors exhibited by construction project team members on relationship quality and project outcomes. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.

Keskin, B; Salman, B and Koseoglu, O (2022) Architecting a BIM-based digital twin platform for airport asset management: A model-based system engineering with sysml approach. Journal of Construction Engineering and Management, 148(5): 04022020, ISSN 0733-9364

Kestle, L; Storey, B and Potangaroa, R (2008) Towards the validation of a conceptual design management model for remote site projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Khaleghi, S and Jadmavinejad, A (2024) Flood susceptibility mapping in anthropogenic wetland area, Shadegan County, Southwest of Iran. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 212-226. ISSN 1759-5916

Khalid, M A; Hassan, M U; Ullah, F and Ahmed, K (2025) Integrated building information modeling and blockchain system for decentralized progress payments in construction projects. Journal of Engineering, Design and Technology, 23(5), pp. 1770-1796. ISSN 1726-0531

Khalid, K; Khalid, K and Davidson, R (2024) A multi-group assessment of safety culture among engineering students in the United Arab Emirates. Journal of Engineering, Design and Technology, 22(2), pp. 501-515. ISSN 1726-0531

Khalilzadeh, M; Balafshan, R and Hafezalkotob, A (2020) Multi-objective mathematical model based on fuzzy hybrid multi-criteria decision-making and FMEA approach for the risks of oil and gas projects. Journal of Engineering, Design and Technology, 18(6), pp. 1997-2016. ISSN 1726-0531

Khallaf, R; Naderpajouh, N and Hastak, M (2018) A systematic approach to develop risk registry frameworks for complex projects. Built Environment Project and Asset Management, 8(4), pp. 334-347. ISSN 2044-124X

Khan, Mona (2025) System of systems framework for structured risk analysis in complex engineering projects involving alliance. PhD thesis, RMIT University, Australia.

Khudhair, A (2022) Knowledge-based automatic OpenBIM data exchanging framework supporting holistic building design. PhD thesis, Cardiff University, UK.

Kiani Mavi, N; Brown, K; Fulford, R and Goh, M (2024) Forecasting project success in the construction industry using adaptive neuro-fuzzy inference system. International Journal of Construction Management, 24(14), pp. 1550-1568. ISSN 1562-3599

Kim, H (2002) Knowledge discovery and machine learning in construction project databases. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kim, J I (2016) Framework for dynamic generation and evaluation of excavation schedules for hard rock tunnels in preconstruction and construction. PhD thesis, Stanford University, USA.

Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. PhD thesis, University of Florida, USA.

Kim, M (2017) Noncontact quality assessment of precast concrete elements using 3D laser scanning and building information modeling. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Kim, T W and Fischer, M (2014) Automated generation of user activity-space pairs in space-use analysis. Journal of Construction Engineering and Management, 140(5): 04014007, ISSN 0733-9364

Kissi, J (2012) Improving innovation and project performance in construction professional services firms: the leadership role of middle managers. PhD thesis, Loughborough University, UK.

Kiziltas, S (2008) An automated approach for developing integrated model-based construction project histories to support estimation of activity production rates. PhD thesis, Carnegie Mellon University, USA.

Kliewer, J E (1994) Development of performance based test procedures for asphalt mixtures. PhD thesis, Oregon State University, USA.

Ko, C H and Cheng, M Y (2007) Dynamic prediction of project success using artificial intelligence. Journal of Construction Engineering and Management, 133(4), pp. 316-324. ISSN 0733-9364

Kodikara Edirisinghe, R. and Gunathilake, L. (2026) An IoT-based heat stress management system for the construction industry. Engineering, Construction and Architectural Management, 33(3), pp. 2200-2219. ISSN 0969-9988

Kolar, Duro (2017) Improving the link between project management and strategy to optimise project success. PhD thesis, RMIT University, Australia.

Kolawole, O M (2023) A model for improving ethics in construction materials and products supply chain using blockchain. PhD thesis, London South Bank University, UK.

Kone, V. and Mahesh, G. (2026) The iprok ontology: A unified approach to managing construction project information. International Journal of Construction Management, 26(8), pp. 1599-1628. ISSN 1562-3599

Krönert, N (2010) Requiements engineering in construction (Anforderungs-engineering im bauwesen). DSc thesis, ETH Zürich, Switzerland.

Kumar, V and Lin, E T A (2020) Conceptualizing "COBieEvaluator": A rule based system for tracking asset changes using COBie datasheets. Engineering, Construction and Architectural Management, 27(5), pp. 1093-1118. ISSN 0969-9988

Kumi, L; Jeong, J; Jeong, J and Mun, H (2025) Development of multimodal recommender system for advancing design for safety with expert validation. Journal of Construction Engineering and Management, 151(9): 04025114, ISSN 0733-9364

Kuoribo, E; Amoah, P; Kissi, E; Edwards, D J; Gyampo, J A and Thwala, W D (2024) Analysing the effect of multicultural workforce/teams on construction productivity. Journal of Engineering, Design and Technology, 22(3), pp. 969-990. ISSN 1726-0531

Lai, X; Huang, J; Lin, S; Hu, C; Mao, N; Liu, J and Chen, Q (2023) Efficiency scoring for subway tunnel construction based on shield-focused big data and Gaussian broad learning system. Journal of Construction Engineering and Management, 149(12): 04023132, ISSN 0733-9364

Laitinen, K; Luhtala, M; Örmä, M and Vaismaa, K (2024) Productivity development enablers in the infrastructure sector: Capability maturity model integration approach. Built Environment Project and Asset Management, 14(2), pp. 201-227. ISSN 2044-124X

Lam, K C; Thomas Ng, S; Hu, T; Skitmore, M and Cheung, S O (2000) Decision support system for contractor pre-qualification: Artificial neural network model. Engineering, Construction and Architectural Management, 7(3), pp. 251-266. ISSN 0969-9988

Lam, P T I; Wong, F W H; Chan, A P C; Shea, W C Y and Lau, J W S (2012) A scheme design buildability assessment model for building projects. Construction Innovation, 12(2), pp. 216-238. ISSN 1471-4175

Lam, T (2017) A web-based Decision Support System to assist SMEs to broker risks and rewards for BIM adoption. PhD thesis, University of the West of England, Bristol, UK.

Lan, Roy Uzoma (2025) Advancing workplace safety through intelligent monitoring: Applications of artificial intelligence and computer vision in high-risk industrial environments. PhD thesis, The University of Texas at San Antonio, USA.

Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.

Lasshof, B and Stoy, C (2016) Estimation models for heating energy and electricity costs. Construction Management and Economics, 34(9), pp. 622-640. ISSN 01446193

Lavy, S and Shohet, I M (2004) Integrated maintenance management of hospital buildings: A case study. Construction Management and Economics, 22(1), pp. 25-34. ISSN 01446193

Le, P L; Jarroudi, I; Dao, T M and Chaabane, A (2021) Integrated construction supply chain: An optimal decision-making model with third-party logistics partnership. Construction Management and Economics, 39(2), pp. 133-155. ISSN 01446193

Lee, G and Lee, S (2022) Importance of testing with independent subjects and contexts for machine-learning models to monitor construction workers' psychophysiological responses. Journal of Construction Engineering and Management, 148(9): 04022082, ISSN 0733-9364

Lee, J M (2010) Automated checking of building requirements on circulation over a range of design phases. PhD thesis, Georgia Institute of Technology, USA.

Leo, L S; Buccolieri, R and Di Sabatino, S (2018) Scale-adaptive morphometric analysis for urban air quality and ventilation applications. Building Research & Information, 46(8), pp. 931-951. ISSN 0961-3218

Leoto, R and Lizarralde, G (2019) Challenges for integrated design (ID) in sustainable buildings. Construction Management and Economics, 37(11), pp. 625-642. ISSN 01446193

Lester, E (2022) An exploration of mentorship as a resource for knowledge sharing in the built environment. PhD thesis, University of Salford, UK.

Leu, S S; Huang, K J; Hung, C C W and Wu, P L (2024) Revolutionizing steel building project cost overrun risk assessment by Bayesian network. Engineering, Construction and Architectural Management, 31(12), pp. 4975-4987. ISSN 0969-9988

Ley, J D (2004) An environmental and material flow analysis of the UK steel construction sector. EngD thesis, Cardiff University, UK.

Li, H X; Nair, S; Li, Y; Yahaya, A; Timms, W and Owolabi, A B (2026) Evaluating energy performance of educational buildings: A case study in Australia. Engineering, Construction and Architectural Management, 33(15), pp. 137-158. ISSN 0969-9988

Li, D and Lu, M (2017) Automated generation of work breakdown structure and project network model for earthworks project planning: A flow network-based optimization approach. Journal of Construction Engineering and Management, 143(1): 04016086, ISSN 0733-9364

Li, H T (2013) Modeling and evaluating multi-stakeholder multi-objective decisions during public participation in major infrastructure and constructionprojects. PhD thesis, University of Hong Kong, Hong Kong.

Li, P; Wang, Q; Guo, Z; Mei, T; Li, Q; Qiao, S and Zuo, W (2022) Identifying falling-from-height hazards in building information models: A voxelization-based method. Journal of Construction Engineering and Management, 148(2): 04021203, ISSN 0733-9364

Li, S; Wang, J and Xu, Z (2025) Automated compliance checking for BIM models based on Chinese-NLP and knowledge graph: An integrative conceptual framework. Engineering, Construction and Architectural Management, 32(6), pp. 3832-3856. ISSN 0969-9988

Li, W (2008) An agent-based negotiation model for the sourcing of construction suppliers. PhD thesis, University of Hong Kong, Hong Kong.

Li, X; Han, S; Gül, M; Al-Hussein, M and El-Rich, M (2018) 3D visualization-based ergonomic risk assessment and work modification framework and its validation for a lifting task. Journal of Construction Engineering and Management, 144(1): 04017093, ISSN 0733-9364

Liang, Houhao (2024) Unmanned ground vehicle-driven indoor monitoring: Enhancing routine data acquisition and on-site deployment. PhD thesis, National University of Singapore, Singapore.

Liang, L (2005) Small project benchmarking. PhD thesis, University of Texas at Austin, USA.

Liao, L; Ye, Y; Wei, N; Li, H and Fan, C (2024) Exploring blockchain technology acceptance among non-managerial construction practitioners in Shenzhen, China. Engineering, Construction and Architectural Management, 31(5), pp. 2053-2076. ISSN 0969-9988

Lihakanga, R (2022) Generic wireless sensor network for dynamic monitoring of a new generation of building material. PhD thesis, Heriot-Watt University, UK.

Likita, A J; Jelodar, M B; Vishnupriya, V and Rotimi, J O B (2025) A guideline for BIM and lean integrated construction practice. Smart and Sustainable Built Environment, 14(4), pp. 1264-1291. ISSN 2046-6099

Lim, B T H; Ling, F Y Y; Ibbs, C W; Raphael, B and Ofori, G (2012) Mathematical models for predicting organizational flexibility of construction firms in Singapore. Journal of Construction Engineering and Management, 138(3), pp. 361-375. ISSN 0733-9364

Lin, K Y and Soibelman, L (2007) Knowledge-assisted retrieval of online product information in architectural/engineering/construction. Journal of Construction Engineering and Management, 133(11), pp. 871-879. ISSN 0733-9364

Lin, K-Y (2005) Knowledge-assisted retrieval of online product information in A/E/C (architecture/engineering/construction). PhD thesis, University of Illinois at Urbana-Champaign, USA.

Lines, B (2014) Action research approach to implementation of APDMS within owner organizations strategic management and overcoming resistance to change in the AEC industry. PhD thesis, Arizona State University, USA.

Ling, Y Y (2002) Model for predicting performance of architects and engineers. Journal of Construction Engineering and Management, 128(5), pp. 446-455. ISSN 0733-9364

Linner, T; Pan, W; Hu, R; Zhao, C; Iturralde, K; Taghavi, M; Trummer, J; Schlandt, M and Bock, T (2020) A technology management system for the development of single-task construction robots. Construction Innovation, 20(1), pp. 96-111. ISSN 1471-4175

Liu, W; Feng, Z and Luo, X (2026) Study of a risk-sharing mechanism in a prefabricated building project supply chain. Journal of Construction Engineering and Management, 152(6): 04026063, ISSN 0733-9364

Liu, B; Lu, X; Hu, X; Li, L and Li, Y (2022) What's wrong with the public participation of urban regeneration project in China: A study from multiple stakeholders' perspectives. Engineering, Construction and Architectural Management, 29(1), pp. 91-109. ISSN 0969-9988

Liu, C; M.E. Sepasgozar, S; Shirowzhan, S and Mohammadi, G (2022) Applications of object detection in modular construction based on a comparative evaluation of deep learning algorithms. Construction Innovation, 22(1), pp. 141-159. ISSN 1471-4175

Liu, H (2017) The impact of owner practices and procedures on construction project safety performance. PhD thesis, University of Kentucky, USA.

Liu, J; Duan, L; Lin, S; Miao, J and Zhao, J (2024) Semantic web-based crud operation and constraint validation for IFC-based information management. Journal of Construction Engineering and Management, 150(10): 04024135, ISSN 0733-9364

Liu, J; Shahi, A; Haas, C T; Goodrum, P and Caldas, C H (2014) Validation methodologies and their impact in construction productivity research. Journal of Construction Engineering and Management, 140(10): 04014046, ISSN 0733-9364

Liu, K and El-Gohary, N (2022) Bridge deterioration knowledge ontology for supporting bridge document analytics. Journal of Construction Engineering and Management, 148(6): 04022030, ISSN 0733-9364

Liu, M; Han, S and Lee, S (2016) Tracking-based 3D human skeleton extraction from stereo video camera toward an on-site safety and ergonomic analysis. Construction Innovation, 16(3), pp. 348-367. ISSN 1471-4175

Liu, Z (2014) Building information modelling (BIM) aided waste minimisation framework. PhD thesis, Loughborough University, UK.

Lopez de Ortigosa, D A (1993) Forecasting construction costs in hyper-inflated economies. PhD thesis, University of Texas at Austin, USA.

Lostuvali, B; Alves, T C L and Modrich, R U (2014) Learning from the cathedral hill hospital project during the design and preconstruction phases. International Journal of Construction Education and Research, 10(3), pp. 160-180. ISSN 1557-8771

Lowe, D J (1996) Experiental learning in design cost estimating. PhD thesis, University of Manchester, UK.

Lu, W; Ghansah, F A and Xu, J (2023) A category and index hybrid (cih) approach to measuring the level of prefabrication. International Journal of Construction Management, 23(15), pp. 2658-2669. ISSN 1562-3599

Lu, W; Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(1), pp. 118-132. ISSN 0969-9988

Lu, Y; Sood, T; Chang, R and Liao, L (2022) Factors impacting integrated design process of net zero energy buildings: An integrated framework. International Journal of Construction Management, 22(9), pp. 1700-1712. ISSN 1562-3599

Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.

Lucko, G (2011) Modeling the residual market value of construction equipment under changed economic conditions. Journal of Construction Engineering and Management, 137, pp. 806-816. ISSN 0733-9364

Lucko, G; Anderson-Cook, C M and Vorster, M C (2006) Statistical considerations for predicting residual value of heavy equipment. Journal of Construction Engineering and Management, 132(7), pp. 723-732. ISSN 0733-9364

Lucko, G and Rojas, E M (2010) Research validation: Challenges and opportunities in the construction domain. Journal of Construction Engineering and Management, 136(1), pp. 127-135. ISSN 0733-9364

Lueprasert, K (1996) Constructability knowledge acquisition: A machine learning approach. PhD thesis, Purdue University, USA.

Lv, X and El-Gohary, N M (2016) Discovering context-specific integration practices for integrating NEPA into statewide and metropolitan project planning processes. Journal of Construction Engineering and Management, 142(11): 04016056, ISSN 0733-9364

Maaz, Z. N.; Jamaludin, A. F.; Mohd Rahim, F. A.; Rashidi, A. and Darmansah, N. F. (2026) Artificial intelligence capabilities in project cost management in the Malaysian construction industry: An exploratory study. Engineering, Construction and Architectural Management, pp. 1-22. ISSN 0969-9988

MacArulla, M; Forcada, N; Casals, M; Gangolells, M; Fuertes, A and Roca, X (2013) Standardizing housing defects: Classification, validation, and benefits. Journal of Construction Engineering and Management, 139(8), pp. 968-976. ISSN 0733-9364

Maduka, N S (2017) The role of knowledge management in assisting key stakeholders in making informed decisions in delivering sustainable retrofitted building projects. PhD thesis, Northumbria University, UK.

Magoda, C M; Gryzagoridis, J and Kanyarusoke, K (2021) Effective heat conductivity of Honeycomb (porous) composite panel. Journal of Engineering, Design and Technology, 19(4), pp. 876-887. ISSN 1726-0531

Mahamadu, A M; Mahdjoubi, L and Booth, C A (2014) Determinants of building information modelling (BIM) acceptance for supplier integration: A conceptual model. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Mahammedi, C.; Mahdjoubi, L.; Booth, C.; Butt, T. E. and Al-mhdawi, M. K. S. (2026) The design and validation of a decision support system (DSS) for the preliminary risk assessment of brownfield sites (prabs). Smart and Sustainable Built Environment, 15(3), pp. 1255-1276. ISSN 2046-6099

Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects. PhD thesis, University of Nevada, Las Vegas, USA.

Mahdi, I M; Khalil, A H; Mahdi, H A and Mansour, D M M (2022) Decision support system for optimal bridge' maintenance. International Journal of Construction Management, 22(3), pp. 342-356. ISSN 1562-3599

Mahdiputra, Suyanto (2007) Organisational learning in UK construction companies. PhD thesis, Northumbria University, UK.

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.

Mahmoud, A S; Hamdan Ahmad, M; Mohd Yatim, Y and Aminu Dodo, Y (2022) Safety performance framework at construction site for self-regulation by building developers. Engineering, Construction and Architectural Management, 29(9), pp. 3394-3414. ISSN 0969-9988

Makarfi, U U (2022) Digital prototype framework for understanding building information modelling adoption: Nigerian small and medium architectural firms. PhD thesis, University of Salford, UK.

Malaeb, Z and Hamzeh, F R (2022) IPD-inspired framework for measuring stakeholder integration in public-private partnerships. Construction Innovation, 22(1), pp. 160-184. ISSN 1471-4175

Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.

Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) A training guide for the reinforcement of continuous professional development of engineers and project managers on performance and productivity improvement practices in construction. International Journal of Construction Management, 24(13), pp. 1475-1484. ISSN 1562-3599

Mansuri, L E and Patel, D A (2022) Artificial intelligence-based automatic visual inspection system for built heritage. Smart and Sustainable Built Environment, 11(3), pp. 622-646. ISSN 2046-6099

Marcos, Micheline Helen Cot (2015) Method of obtaining environmental impact data, during the design development process through use of BIM tool. PhD thesis, Universidade de São Paulo, Brazil.

Marks, E D; Cheng, T and Teizer, J (2013) Laser scanning for safe equipment design that increases operator visibility by measuring blind spots. Journal of Construction Engineering and Management, 139(8), pp. 1006-1014. ISSN 0733-9364

Marquardt, G (2017) Economic analysis of contract choice, feelings of entitlement and contract enforcement in relationships governed by incomplete contracts. PhD thesis, University of Edinburgh, UK.

Marques Neto, José da Costa (2009) Study on municipal management of construction and demolition wastes in the turvo grande watershed (urghi-15). PhD thesis, Universidade de São Paulo, Brazil.

Martin, H; Garner, M; Manewa, A and Chadee, A (2025) Validating the relative importance of technology diffusion barriers– exploring modular construction design-build practices in the UK. International Journal of Construction Education and Research, 21(1), pp. 3-23. ISSN 1557-8771

Martins, S S; Evangelista, A C J; Hammad, A W A; Tam, V W Y and Haddad, A (2022) Evaluation of 4D BIM tools applicability in construction planning efficiency. International Journal of Construction Management, 22(15), pp. 2987-3000. ISSN 1562-3599

Martínez-Carricondo, P; Carvajal-Ramírez, F; Yero-Paneque, L and Agüera-Vega, F (2020) Combination of nadiral and oblique UAV photogrammetry and HBIM for the virtual reconstruction of cultural heritage. Case study of Cortijo del Fraile in Níjar, Almería (Spain). Building Research & Information, 48(2), pp. 140-159. ISSN 0961-3218

Marzouk, M and Ashmawy, M M (2021) Assessment of highways concrete and asphalt pavements using superiority inferiority ranking technique. Construction Innovation, 21(2), pp. 259-278. ISSN 1471-4175

Masood, R; Roy, K; Gonzalez, V A and Lim, J B P (2024) Ameliorating supply chains of prefabricated housebuilding: An integrated performance framework. Journal of Construction Engineering and Management, 150(6): 04024044, ISSN 0733-9364

Mastrolembo Ventura, Silvia (2019) The role of virtual reality in digitally-enabled design review: Procedural guidelines for the effective implementation of immersive virtual environments for usability-focused analysis. PhD thesis, Politecnico di Milano, Italy.

Matarneh, S T (2019) BIM-based information exchange framework to support facilities management systems. PhD thesis, University of Portsmouth, UK.

Matoseiro Dinis, F; Rodrigues, R and Pedro da Silva Poças Martins, J (2024) Development and validation of natural user interfaces for semantic enrichment of BIM models using open formats. Construction Innovation, 24(1), pp. 196-220. ISSN 1471-4175

Matthews, J C (2010) Integrated, multi-attribute decision support system for the evaluation of underground utility construction methods. PhD thesis, Louisiana Tech University, USA.

Matthews, J D (1996) A project partnering approach to the main contractor - sub contractor relationship. PhD thesis, Loughborough University, UK.

Mbabu, Alex (2025) Digital twins in lean strategic facility management in the UK healthcare sector: A proposed framework to enabling lean strategic facility management in healthcare operations in the UK. PhD thesis, University of Salford, UK.

McCoy, A; Thabet, W and Badinelli, R (2011) Defining a commercialisation model for residential construction innovation: Industry case studies. Construction Innovation, 11(1), pp. 114-132. ISSN 1471-4175

Mello Saraiva Caldeira, L M and Brito, A (2014) Use of soil-rock mixtures in dam construction. Journal of Construction Engineering and Management, 140(8): 04014030, ISSN 0733-9364

Memon, F A (2023) Stakeholder engagement in managing scope change during the execution phase of UK construction projects. PhD thesis, University of Bedfordshire, UK.

Menassa, C C (2009) Quantitative framework to evaluate alternative dispute resolution investments in architecture engineering and construction projects using option and real option theory. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Menches, C L (2006) Effect of pre-construction planning on electrical project performance. PhD thesis, University of Wisconsin - Madison, USA.

Menches, C L and Hanna, A S (2006) Quantitative measurement of successful performance from the project manager's perspective. Journal of Construction Engineering and Management, 132(12), pp. 1284-1293. ISSN 0733-9364

Menches, C L; Hanna, A S; Nordheim, E V and Russell, J S (2008) Impact of pre-construction planning and project characteristics on performance in the US electrical construction industry. Construction Management and Economics, 26(8), pp. 855-869. ISSN 01446193

Meng, Q and Zhu, S (2022) Construction activity classification based on vibration monitoring data: A supervised deep-learning approach with time series randaugment. Journal of Construction Engineering and Management, 148(9): 04022090, ISSN 0733-9364

Mensah, S; Nani, G and Ayarkwa, J (2022) Contractors' adaptation to environmentally sustainable construction: A micro-level implementation framework. Smart and Sustainable Built Environment, 11(4), pp. 832-851. ISSN 2046-6099

Minchin, R E; Hammons, M I and Ahn, J (2008) A construction quality index for highway construction. Construction Management and Economics, 26(12), pp. 1313-1324. ISSN 1466433X

Minchin, R E and Thomas, H R (2003) Validation of vibration-based onboard asphalt density measuring system. Journal of Construction Engineering and Management, 129(1), pp. 1-7. ISSN 0733-9364

Moghayedi, A. and Awuzie, B. (2026) Unlocking sustainability futures: A framework for digital product passports and material banks in a circular built environment. Construction Innovation, 26(9), pp. 135-166. ISSN 1471-4175

Mohamedein, S. M. and Nassar, A. H. (2026) Calculating cost contingency for residential construction projects in Egypt using a machine learning algorithm. International Journal of Construction Management, 26(9), pp. 1761-1776. ISSN 1562-3599

Mohammad Ahmad, A; Rodriguez Trejo, S; Hafeez, M A; Dawood, N; Kassem, M and Naji, K K (2023) Drivers for energy analysis towards a BIM-enabled information flow. Smart and Sustainable Built Environment, 12(3), pp. 507-533. ISSN 2046-6099

Mohammadi, P; Asgari, S; Rashidi, A and Alder, R (2025) Culvert inspection framework using hybrid xgboost and risk-based prioritization: Utah case study. Journal of Construction Engineering and Management, 151(6): 04025052, ISSN 0733-9364

Mohammed, A; Zayed, T; Nasiri, F and Bagchi, A (2024) Asset management-based resilience index formulation for pavements via principal components analysis. Construction Innovation, 24(3), pp. 830-845. ISSN 1471-4175

Mohammed Abdelkader, E; Zayed, T; Elshaboury, N and Taiwo, R (2025) A hybrid Bayesian optimization-based deep learning model for modeling the condition of saltwater pipes in Hong Kong. International Journal of Construction Management, 25(1), pp. 46-62. ISSN 1562-3599

Mohd Zin, I N (2014) Knowledge sharing approaches in Malaysian construction organisations for improved performance. PhD thesis, University of Salford, UK.

Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.

Molenaar, K R (2005) Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131(3), pp. 343-353. ISSN 0733-9364

Moret, Y and Einstein, H H (2016) Construction cost and duration uncertainty model: Application to high-speed rail line project. Journal of Construction Engineering and Management, 142(10): 05016010, ISSN 0733-9364

Morley, D; Lu, M and Abourizk, S (2014) Identification of invariant average weighted haul distance to simplify earthmoving simulation modeling in planning site grading operations. Journal of Construction Engineering and Management, 140(12): 04014057, ISSN 0733-9364

Moschandreas, D J; Yoon, S H and Demirev, D (2006) Validation of the indoor environmental quality conceptual model. Building Research & Information, 34(5), pp. 483-495. ISSN 0961-3218

Mostafa, S; Chileshe, N and Abdelhamid, T S (2016) Lean and agile integration within offsite construction using discrete event simulation: A systematic literature review. Construction Innovation, 16(4), pp. 483-525. ISSN 1471-4175

Mostafa, S; Tam, V W; Dumrak, J and Mohamed, S (2020) Leagile strategies for optimizing the delivery of prefabricated house building projects. International Journal of Construction Management, 20(8), pp. 867-881. ISSN 1562-3599

Motaleb, O H (2014) Development of a risk response model to handle delays of construction projects in the United Arab Emirates. PhD thesis, Robert Gordon University, UK.

Motawa, I A (2001) Simulating the implementation of technological innovations in construction. PhD thesis, Loughborough University, UK.

Moura, Paula Kvitko de (2022) Guidelines for the development of innovative solutions in the construction industry. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.

Mourgues, C (2009) Method to produce field instructions from product and process models. PhD thesis, Stanford University, USA.

Mourshed, M (2006) Interoperability-based optimisation of architectural design. PhD thesis, Loughborough University, UK.

Moussa, M A E-F M (2013) Unified simulation methodology and project risk assessment framework. PhD thesis, University of Calgary, Canada.

Moyo, T.; Raliile, M.; Edwards, D. J. and Chigara, B. (2026) Construct validation for technical sustainability as the fourth pillar for achieving sustainable construction: A case for Zimbabwe. Construction Innovation, 26(9), pp. 233-263. ISSN 1471-4175

Moyo, T (2020) Integrating sustainability dimensions into construction labour productivity determinants in Zimbabwe. PhD thesis, Nelson Mandela University, South Africa.

Mrazovic, N and Fischer, M (2022) Assessment framework for additive manufacturing in the AEC industry. Journal of Construction Engineering and Management, 148(5): 04022013, ISSN 0733-9364

Muaz, Fagiar (2019) Forensic schedule information modeling for analysis of time claims in construction projects. PhD thesis, University of Alberta, Canada.

Muhammed-Yakubu, N (2023) A BIM-based information management schema for construction activities data-flow across the project life cycle. PhD thesis, University of the West of England, Bristol, UK.

Mun, H.; Jeong, J.; Jeong, J. and Kumi, L. (2026) Unsupervised learning approach for benchmark models to identify construction projects with high accident risk levels. Engineering, Construction and Architectural Management, 33(5), pp. 3777-3798. ISSN 0969-9988

Munir, M (2020) Development of a building information modelling asset value realisation model. PhD thesis, University of Liverpool, UK.

Munir, Mustapha (2020) Development of a building information modelling asset (bimasset) value realisation model. PhD thesis, University of Liverpool, UK.

Murguia, D; Demian, P and Soetanto, R (2017) A systemic BIM innovation model in the construction supply chain. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Muya, M (1999) A systematic approach for improving construction materials logistics. PhD thesis, Loughborough University, UK.

Mwemezi, B. R.; Kikwasi, G. J. and Phoya, S. (2026) Development and validation of a framework for improving health and safety risk management at informal construction sites in Tanzania. Journal of Engineering, Design and Technology, 24(2), pp. 403-426. ISSN 1726-0531

Mzyece, D (2015) An investigation into the implementation of the Construction (Design and Management) Regulations in the construction industry. PhD thesis, University of Wolverhampton, UK.

Nafe Assafi, M; Hossain, M M; Chileshe, N and Datta, S D (2023) Development and validation of a framework for preventing and mitigating construction delay using 4D BIM platform in bangladeshi construction sector. Construction Innovation, 23(5), pp. 1255-1278. ISSN 1471-4175

Naiduwa Handi, C M (2021) Effects of construction project social capital on individual safety performance: the mediating role of work engagement. PhD thesis, University of Hong Kong, Hong Kong.

Najafi, M.; Rahimian, F.; Zaki Abdelaziz, Y.; Poppe, J. and Rodriguez Trejo, S. (2026) User-side regime dynamics and design-use misalignments in circular construction transitions. Engineering, Construction and Architectural Management, pp. 1-33. ISSN 0969-9988

Nakhi, A E (1995) Adaptive construction modelling within whole building dynamic simulation. PhD thesis, University of Strathclyde, UK.

Nani, G; Mensah, I and Adjei-Kumi, T (2017) Duration estimation model for bridge construction projects in Ghana. Journal of Engineering, Design and Technology, 15(6), pp. 754-777.

Naoum, S and Haidar, A L I (2000) A hybrid knowledge base system and genetic algorithms for equipment selection. Engineering, Construction and Architectural Management, 7(1), pp. 3-14. ISSN 0969-9988

Nasereddin, M (2019) Conceptual tactical framework for optimizing whole-life cost of sustainable buildings in Jordan. PhD thesis, Loughborough University, UK.

Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.

Nassereddine, H M (2019) Design, development and validation of an augmented reality-enabled production strategy process for the construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Naumets, S and Lu, M (2021) Investigation into explainable regression trees for construction engineering applications. Journal of Construction Engineering and Management, 147(8), ISSN 0733-9364

Nawaz, A; Jiang, W and Akhtar, S (2025) Exploring the role of servant leadership, teamwork, and organizational learning in the success of construction projects: A focus on project nature as a moderator. Journal of Construction Engineering and Management, 151(10): 04025154, ISSN 0733-9364

Nawi, M N M (2012) Development of a framework of critical success factors (CSFs) for effective integrated design team delivery in Malaysian IBS projects. PhD thesis, University of Salford, UK.

Newaz, M T (2019) The psychological contract to measure safety outcomes on construction sites. PhD thesis, University of Newcastle, Australia.

Newaz, M T; Davis, P R; Jefferies, M and Pillay, M (2019) Validation of an agent-specific safety climate model for construction. Engineering, Construction and Architectural Management, 26(3), pp. 462-478. ISSN 0969-9988

Neya, I; Yamegueu, D; Messan, A; Coulibaly, Y; Ouedraogo, A L S N and Ayite, Y M X D (2025) Effect of cement and geopolymer stabilization on the thermal comfort: Case study of an earthen building in Burkina Faso. International Journal of Building Pathology and Adaptation, 43(3), pp. 283-301. ISSN 2398-4708

Ng, Y. Y.; Ma, Q. and Yam, M. C. H. (2026) Optimizing subcontractor selection: A dual-model AHP framework for aligning client and contractor priorities in construction. Journal of Engineering, Design and Technology, 24(4), pp. 869-893. ISSN 1726-0531

Ngowtanasuwan, G and Hadikusumo, B H W (2017) System dynamics modelling for BIM adoption in Thai architectural and engineering design industry. Construction Innovation, 17(4), pp. 457-474. ISSN 1471-4175

Nguyen, M. V.; Khanh, H. D.; Phan, C. T. and Thuc, L. D. (2025) Exploring the awareness of construction employees on mental health problems: Applying the health belief model. Engineering, Construction and Architectural Management, 33(5), pp. 3485-3515. ISSN 0969-9988

Nikkhoo, P (2022) A systematic method to reduce the duration impact of change events on construction projects. PhD thesis, Stanford University, USA.

Niu, M (2017) Developing a process to measure safety climate under the aconstruction working environment. PhD thesis, Pennsylvania State University, USA.

Nolla, Ieda Maria (2023) HBIM in the management of cultural assets. PhD thesis, Universidade de São Paulo, Brazil.

Nouh, A; Elkasaby, E and Wageh, O (2024) Dynamic approach for investigating delivery system effects on infrastructure project performance. Engineering, Construction and Architectural Management, 31(12), pp. 4791-4808. ISSN 0969-9988

Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.

Nwadike, A N and Wilkinson, S (2022) An evidence-based framework validation for building code improvement in New Zealand. Engineering, Construction and Architectural Management, 29(8), pp. 3072-3090. ISSN 0969-9988

Nwankwo, D C (2023) Improving approaches to material inventory management in construction industry in the UK. DBA thesis, University of Wales Trinity Saint David, UK.

Nyqvist, R; Peltokorpi, A and Seppänen, O (2024) Uncertainty network modeling method for construction risk management. Construction Management and Economics, 42(4), pp. 346-365. ISSN 01446193

O'Connor, J T; Torres, N and Woo, J (2016) Sustainability actions during the construction phase. Journal of Construction Engineering and Management, 142(7): 4016016, ISSN 0733-9364

Obi, L I (2017) Development of a system model for cost management in low-cost housing projects in Nigeria. PhD thesis, University of Salford, UK.

Obiri, K A; Bjeirmi, B; Moore, D and Boateng, P (2020) Infrastructure development in the West African extractive industry: A system thinking approach. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Ochieng, E G (2008) Framework for managing multi-cultural project teams. PhD thesis, Loughborough University, UK.

Odeyinka, H A (2003) The development and validation of models for assessing risk impacts on construction cash flow forecast. PhD thesis, Glasgow Caledonian University, UK.

Odiba, E; Demian, P and Ruikar, K (2021) Development of a conceptual framework for effective quality management practices in construction organisations. Journal of Construction Business and Management, 5(1), pp. 1-16. ISSN 2521-0165

Odimabo, O (2016) Risk management system to guide building construction projects in developing countries: a case study of Nigeria. PhD thesis, University of Wolverhampton, UK.

Ofori, J. N. A.; Tomori, M. and Ogunseiju, O. (2026) A predictive framework for optimizing cognition during human-wearable robot interactions in the construction industry. Journal of Construction Engineering and Management, 152(10): 04026160, ISSN 0733-9364

Ofori-Kuragu, J K and Osei-Kyei, R (2021) Mainstreaming pre-manufactured offsite processes in construction: are we nearly there? Construction Innovation, 21(4), pp. 743-760. ISSN 1471-4175

Ogwueleka, A C (2015) Evaluation of incentive mechanisms on performance-based contracting systems in South Africa and Nigeria. PhD thesis, University of Pretoria, South Africa.

Ojo, L D; Ogunsemi, D R and Ogunsina, O (2022) Conceptual framework of value management adoption in the Nigerian construction industry. Construction Innovation, 22(4), pp. 939-961. ISSN 1471-4175

Okakpu, A I (2019) Investigating the effectiveness of adopting building information modelling for refurbishment of complex buildings: Case study of auckland. PhD thesis, Auckland University of Technology, New Zealand.

Oke, A E and Ogunsemi, D R (2016) Structural equation modelling of construction bond administration. Journal of Financial Management of Property and Construction, 21(3), pp. 192-211. ISSN 1366-4387

Okeyinka, O M (2016) The applicability of recycled waste paper as lightweight building materials. PhD thesis, University of Wolverhampton, UK.

Okorafor, C; Emuze, F; Das, D; Awuzie, B O and Haupt, T (2020) An artefact for improving the delivery of building energy retrofit project in South Africa. Built Environment Project and Asset Management, 10(4), pp. 619-635. ISSN 2044-124X

Okudan, O; Budayan, C and Dikmen, I (2020) Development of a conceptual life cycle performance measurement system for build-operate-transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(6), pp. 1635-1656. ISSN 0969-9988

Okudan, O; Budayan, C and Dikmen, I (2021) Development of a conceptual life cycle performance measurement system for build–operate–transfer (BOT) projects. Engineering, Construction and Architectural Management, 28(6), pp. 1635-1656. ISSN 0969-9988

Oladiran, O J; Ogunsanmi, O E and Dada, M O (2019) Frameworks for material waste minimization on Nigerian building projects. Journal of Construction Business and Management, 3(1), pp. 45-61. ISSN 2521-0165

Olagunju, O A (2014) The development of a framework for sustainable housing delivery in Lagos, Nigeria. PhD thesis, University of Wolverhampton, UK.

Olawumi, T O and Chan, D W M (2021) Green-building information modelling (green-BIM) assessment framework for evaluating sustainability performance of building projects: A case of Nigeria. Architectural Engineering and Design Management, 17(5-6), pp. 458-477. ISSN 1745-2007

Oliveira, Nylvandir Liberato Fernandes de (2018) Risk analysis in civil construction projects in Brazil: A measurement method. PhD thesis, Universidade Federal Fluminense, Brazil.

Olivieri, Hylton (2016) Integrating production planning and controlling systems for construction projects. PhD thesis, Universidade Estadual de Campinas, Brazil.

Oloke, D (2003) Development of a web-based off-highway plant information system. PhD thesis, University of Wolverhampton, UK.

Olugboyega, O (2024) Differential relationships in the BIM implementation process in a developing country: The role of essential BIM implementation strategies. Engineering, Construction and Architectural Management, 31(8), pp. 3283-3307. ISSN 0969-9988

Omar, B (2012) Context-aware services delivery in the construction supply chain. PhD thesis, University of Reading, UK.

Onalaja, A A (2023) Improving costing in infrastructure projects to accommodate uncertainties. PhD thesis, Northumbria University, UK.

Ong, H Y; Wang, C and Zainon, N (2018) Developing a quality-embedded EVM tool to facilitate the iron triangle in architectural, construction, and engineering practices. Journal of Construction Engineering and Management, 144(9): 04018079, ISSN 0733-9364

Ongkowijoyo, C and Doloi, H (2017) Determining critical infrastructure risks using social network analysis. International Journal of Disaster Resilience in the Built Environment, 8(1), pp. 5-26. ISSN 1759-5916

Onukwugha, V C (1991) Optimising the constructional and technological aspects of management for mass housing schemes in Nigeria. PhD thesis, University of Lagos, Nigeria.

Onyenobi, T; Hudson, J and Ormerod, M (2006) Impact of building geometry on fire spread rate. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Oppong, G D; Chan, A P C; Ameyaw, E E; Frimpong, S and Dansoh, A (2021) Fuzzy evaluation of the factors contributing to the success of external stakeholder management in construction. Journal of Construction Engineering and Management, 147(11): 04021142, ISSN 0733-9364

Orgut, R E (2017) Metrics that matter: Improving project controls and analytics in construction industry. PhD thesis, North Carolina State University, USA.

Orgut, R E; Zhu, J; Batouli, M; Mostafavi, A and Jaselskis, E J (2018) Metrics that matter: Core predictive and diagnostic metrics for improved project controls and analytics. Journal of Construction Engineering and Management, 144(11): 04018100, ISSN 0733-9364

Oshodi, O S; Thwala, W D; Odubiyi, T B; Abidoye, R B and Aigbavboa, C O (2019) Using neural network model to estimate the rental price of residential properties. Journal of Financial Management of Property and Construction, 24(2), pp. 217-230. ISSN 1366-4387

Osorio-Sandoval, C A (2021) BIM-based construction simulation modelling. PhD thesis, University of Nottingham, UK.

Othman, Z M Z (2007) Classifying the aptitude of Civil Engineering Project Managers using Multivariate Discriminant Analysis. PhD thesis, Loughborough University, UK.

Ottaviani, F M; De Marco, A; Narbaev, T and Ballesteros-Pérez, P (2026) Work rate-based indicators for improving project performance regression models. International Journal of Construction Management, 26(1), pp. 99-112. ISSN 1562-3599

Ovrawah, Victor (2025) Automated prefabrication in the Australian residential building sector: Current state of development and adoption barriers. PhD thesis, Bond University, Australia.

Owusu-Manu, D G; Babon-Ayeng, P; Kissi, E; Edwards, D J; Okyere-Antwi, D and Elgohary, H (2023) Green construction and environmental performance: An assessment framework. Smart and Sustainable Built Environment, 12(3), pp. 565-583. ISSN 2046-6099

Oyegoke, A S (2007) Specialist task organisations procurement approach for re-engineering construction project processes. DSc thesis, Teknillinen Korkeakoulu (Helsinki), Finland.

Oyegoke, A S; Ajayi, S; Abbas, M A and Ogunlana, S (2024) Development of Adapt-ABLE smart system: An end-to-end system for speeding up disabled housing adaptation process. International Journal of Building Pathology and Adaptation, 42(4), pp. 531-552. ISSN 23984708

Oyetunji, A A (2001) Methodology for selecting project delivery and contract strategies for capital projects. PhD thesis, Texas A&M University, USA.

Padala, S P S (2025) A BIM-integrated multi objective optimization model for sustainable building construction management. Construction Innovation, 25(6), pp. 1727-1751. ISSN 1471-4175

Padala, S P S (2020) Matrix-based framework for modeling changes across multiple entity types in construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Padala, S P S; Maheswari, J U and Hirani, H (2022) Identification and classification of change causes and effects in construction projects. International Journal of Construction Management, 22(14), pp. 2788-2807. ISSN 1562-3599

Paik, S M; Leviakangas, P and Choi, J (2022) Making most of BIM in design: Analysis of the importance of design coordination. International Journal of Construction Management, 22(12), pp. 2225-2233. ISSN 1562-3599

Pakalapati, K; Khalafalla, M and Rueda-Benavides, J (2022) Using moving-window cross-validation algorithm to optimize bid-based cost estimating data usage. International Journal of Construction Management, 22(15), pp. 2855-2863. ISSN 1562-3599

Pan, W (2006) A decision support tool for optimising the use of offsite technologies in housebuilding. PhD thesis, Loughborough University, UK.

Pancholi, J and Devkar, D G (2023) Analyzing the influence of organizational culture in projects using Last Planner System. Construction Economics and Building, 23(3-4), pp. 143-169. ISSN 2204-9029

Panuwatwanich, K; Stewart, R A and Mohamed, S (2009) Validation of an empirical model for innovation diffusion in Australian design firms. Construction Innovation, 9(4), pp. 449-467. ISSN 1471-4175

Paris, D E (2002) A residential satisfaction decision support system for affordable housing. PhD thesis, Georgia Institute of Technology, USA.

Parisi, F; Sangiorgio, V; Parisi, N; Mangini, A M; Fanti, M P and Adam, J M (2024) A new concept for large additive manufacturing in construction: Tower crane-based 3D printing controlled by deep reinforcement learning. Construction Innovation, 24(1), pp. 8-32. ISSN 1471-4175

Park, H-K (2001) Cash flow forecasting model using moving weights of cost categories for general contractor on jobsite. PhD thesis, University of Wisconsin - Madison, USA.

Park, M and Peña-Mora, F (2004) Reliability buffering for construction projects. Journal of Construction Engineering and Management, 130(5), pp. 626-637. ISSN 0733-9364

Pasquire, C; Ballard, G; Zimina, D and Pasquire, C L (2011) Applying lean thinking in commercial management. Journal of Financial Management of Property and Construction, 16(1), pp. 64-72. ISSN 1366-4387

Pasquire, C L and King, J H J (2000) Project team performance within the Scottish water market based private finance initiative. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Patacas, J (2019) A framework and common data environment for the development and management of asset information models. PhD thesis, Teesside University, UK.

Patel, T.; Guo, B. H. W.; van der Walt, J. D. and Bapat, H. (2026) Vision-based automated road construction progress monitoring: Improved u-net segmentation approach. International Journal of Construction Management, 26(10), pp. 2154-2175. ISSN 1562-3599

Patel, T; Scheepbouwer, E and van der Walt, J D (2025) Optimizing infrastructure procurement: A predictive model for procurement delivery method selection in New Zealand context. International Journal of Construction Management, 25(14), pp. 1736-1748. ISSN 1562-3599

Patel, T.; Scheepbouwer, E. and van der Walt, J. D. (2026) Decoding construction capacity in architecture, engineering, and construction industry: A state-of-the-art review. International Journal of Construction Management, 26(8), pp. 1629-1652. ISSN 1562-3599

Patil, K. R.; Ayer, S. and Bhandari, S. (2026) Enhancing construction safety training through emotion-eliciting virtual reality. Engineering, Construction and Architectural Management, 33(15), pp. 276-298. ISSN 0969-9988

Patil, S S (2000) Optimal owner contractor relationships based on capital project competencies. PhD thesis, Texas A&M University, USA.

Paz, Diogo Henrique Fernandes da (2019) Development of a system to support integrated management of construction and demolition waste. PhD thesis, Universidade Federal de Pernambuco, Brazil.

Pekmezci, B Y and Polat Pekmezci, I (2022) Development of shear strength index test probe: Its application on historic structures. International Journal of Building Pathology and Adaptation, 40(5), pp. 693-711. ISSN 23984708

Pellicer, E; Yepes, V; Correa, C L and Alarcón, L F (2014) Model for systematic innovation in construction companies. Journal of Construction Engineering and Management, 140(4): B4014001, ISSN 0733-9364

Perera, U S; Siriwardana, C and Pitigala Liyana Arachchi, I S (2024) Development of critical infrastructure resilience index for cities in Sri Lanka. International Journal of Disaster Resilience in the Built Environment, 15(2), pp. 193-211. ISSN 1759-5916

Perrenoud, A; Short, E and Cowan, D (2023) Development and validation of elements for the construction risk maturity assessment (CRMA). International Journal of Construction Education and Research, 19(1), pp. 42-60. ISSN 1557-8771

Persson, U (2009) Management of sustainability in construction works. PhD thesis, Lund University, Sweden.

Phaobunjong, K (2002) Parametric cost estimating model for conceptual cost estimating of building construction projects. PhD thesis, University of Texas at Austin, USA.

Phythian, G J (1991) Applications of knowledge-based expert systems in recurrent competitive bidding. PhD thesis, Loughborough University, UK.

Pidgeon, A and Dawood, N (2023) Verification and validation of a framework for collaborative BIM implementation, measurement and management (cimm). Smart and Sustainable Built Environment, 12(4), pp. 847-871. ISSN 2046-6099

Pishdad-Bozorgi, P; De La Garza, J M and Austin, R B (2016) Readiness assessment for flash tracking. Journal of Construction Engineering and Management, 142(12): 06016005, ISSN 0733-9364

Pongpeng, J (2002) Multicriteria and multidecision-makers in tender evaluation. PhD thesis, Queensland University of Technology, Australia.

Pongpeng, J and Liston, J (2003) Tensem: A multicriteria and multidecision-makers' model in tender evaluation. Construction Management and Economics, 21(1), pp. 21-30. ISSN 01446193

Porter, D and Glick, S (2022) Spatial visualization in construction management education: A review and validation of the literature using professionals and related practitioners. International Journal of Construction Education and Research, 18(1), pp. 17-31. ISSN 1557-8771

Portugal, M. A. and Scur, G. (2026) Sustainability in stalled public works: A framework for measuring economic, social and environmental impacts. Construction Management and Economics, 44(7), pp. 481-498. ISSN 0144-6193

Postnikova, O; Bamgbade, J A and Wong, N H (2022) Performance index for public housing in East Malaysia. Architectural Engineering and Design Management, 18(5), pp. 652-670. ISSN 1745-2007

Pourzolfaghar, Z (2011) Improving knowledge capture during conceptual design phase of building projects. PhD thesis, Universiti Putra Malaysia, Malaysia.

Prabhakaran, A; Mahamadu, A M; Mahdjoubi, L; Booth, C and Aigbavboa, C (2023) Virtual reality utility and usefulness in the furniture, fixture and equipment sector: A validation of interactive and distributed immersion. Smart and Sustainable Built Environment, 12(4), pp. 787-819. ISSN 2046-6099

Prakash, A and Phadtare, M (2018) Service quality for architects: Scale development and validation. Engineering, Construction and Architectural Management, 25(5), pp. 670-686. ISSN 0969-9988

Prasertrungruang, T and Hadikusumo, B H W (2009) Modeling the dynamics of heavy equipment management practices and downtime in large highway contractors. Journal of Construction Engineering and Management, 135(10), pp. 939-947. ISSN 0733-9364

Praticò, F G (2007) Quality and timeliness in highway construction contracts: A new acceptance model based on both mechanical and surface performance of flexible pavements. Construction Management and Economics, 25(3), pp. 305-313. ISSN 1466433X

Praticò, F G (2013) New road surfaces: Logical bases for simple quality-related pay adjustments. Journal of Construction Engineering and Management, 139(11): 4013020, ISSN 0733-9364

Price, A D F and Chahal, K (2006) A strategic framework for change management. Construction Management and Economics, 24(3), pp. 237-251. ISSN 01446193

Pridmore, A B (2009) Development of composite renewal systems for rapid rehabilitation and construction of bridge decks. PhD thesis, University of California, San Diego, USA.

Proverbs, D G (1998) A best practice for high-rise insitu concrete construction based on French, German and UK contractor performance measures. PhD thesis, University of Wolverhampton, UK.

Pulugurta, H (2007) Development of pavement condition forecasting models. PhD thesis, University of Toledo, USA.

Puri, V (2012) Incorporation of continuous activities into activity cycle diagram based discrete event simulation for construction operations. PhD thesis, Purdue University, USA.

Puri, V and Martinez, J C (2013) Modeling of simultaneously continuous and stochastic construction activities for simulation. Journal of Construction Engineering and Management, 139(8), pp. 1037-1045. ISSN 0733-9364

Puybaraud, M-C (2001) A model of the role of management in construction fire safety failure scenarios. PhD thesis, Heriot-Watt University, UK.

Qi, K. and Lu, M. (2026) A data-driven framework for quantifying physical workload in construction using posture-hour metrics. Journal of Construction Engineering and Management, 152(7): 04026100, ISSN 0733-9364

Quaigrain, R A and Issa, M H (2018) Development and validation of disability management indicators for the construction industry. Journal of Engineering, Design and Technology, 16(1), pp. 81-100.

Rad, H N and Khosrowshahi, F (1998) Quality measurement in construction projects. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Radzi, A R; Azmi, N F; Kamaruzzaman, S N and Rahman, R A (2025) Modeling the critical assessment criteria for construction readiness of BIM-based projects: PLS-SEM approach. Journal of Construction Engineering and Management, 151(6): 04025063, ISSN 0733-9364

Rahmani Asl, M (2015) A building information model (BIM) based framework for performance optimization. PhD thesis, Texas A&M University, USA.

Rajendran, S and Gambatese, J A (2009) Development and initial validation of sustainable construction safety and health rating system. Journal of Construction Engineering and Management, 135(10), pp. 1067-1075. ISSN 0733-9364

Ramaji, I J and Memari, A M (2016) Product architecture model for multistory modular buildings. Journal of Construction Engineering and Management, 142(10): 04016047, ISSN 0733-9364

Ramalingam Rethnam, O and Thomas, A (2024) Urban building energy modelling-based framework to analyze the effectiveness of the community-wide implementation of national energy conservation codes. Smart and Sustainable Built Environment, 13(5), pp. 1213-1239. ISSN 2046-6099

Ramli, A H (2014) Relationships between safety climate factors and occupational safety and health level of awareness in Malaysian government agencies. PhD thesis, University of Malaya, Malaysia.

Ranasinghe, K A M K (1990) Analytical method for quantification of economic risks during feasibility analysis for large engineering projects. PhD thesis, University of British Columbia, Canada.

Ranasinghe, M and Russell, A D (1992) Analytical approach for economic risk quantification of large engineering projects : Validation. Construction Management and Economics, 10(1), pp. 45-68. ISSN 01446193

Rankin, J H (2000) Computer-assisted construction planning. PhD thesis, University of British Columbia, Canada.

Rashid, K B A and Morledge, R (1999) Strategies to remove or alleviate constraints affecting the processes of construction procurement in Malaysia. Journal of Construction Procurement, 5(1), pp. 27-41. ISSN 1358-9180

Rashidi, M H and Kashani, H (2023) Bayesian modeling of labor earnings in construction. Journal of Construction Engineering and Management, 149(2): 4022168, ISSN 0733-9364

Rashidian, S; Drogemuller, R and Omrani, S (2024) An integrated building information modelling, integrated project delivery and lean construction maturity model. Architectural Engineering and Design Management, 20(6), pp. 1454-1470. ISSN 1745-2007

Ravirala, V (1995) Multi-criteria optimization methodologies for highway program development. PhD thesis, Rensselaer Polytechnic Institute, USA.

Razia, B; Larkham, P and Thurairajah, N (2019) Risk assessment and risk engagement in the construction industry within conflict zones. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Reed, W G and Gordon, E B (2000) Integrated design and building process: What research and methodologies are needed? Building Research & Information, 28(5-6), pp. 325-337. ISSN 0961-3218

Reinhardt, J (2003) Navigational models for effective and efficient interaction with integrated product and process models on construction sites. PhD thesis, Carnegie Mellon University, USA.

Reis, J S and Lucko, G (2016) Productivity scheduling method with maximum constraints. International Journal of Construction Management, 16(1), pp. 77-93. ISSN 1562-3599

Rekapalli, P V and Martinez, J C (2011) Discrete-event simulation-based virtual reality environments for construction operations: Technology introduction. Journal of Construction Engineering and Management, 137(3), pp. 214-224. ISSN 0733-9364

Render, N; Greenwood, D and Edge, J (2005) The other g.M.P: Good manufacturing practice and its importance in the validation of constructed pharmaceutical facilities. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Ribeiro, F J L T (1995) Assessment of applications for the house renovations grants system: An IT support framework. PhD thesis, University of Salford, UK.

Rizzi, Dario (2025) Tools for sustainable design strategies: Optimization of integrated BIM-blockchain technologies and protocols for the application of minimum environmental criteria. PhD thesis, Università degli Studi di Ferrara, Italy.

Robin, R O A (2023) Building information modelling (BIM) performance evaluation model in the Malaysian construction industry. PhD thesis, Universiti Tun Hussein Onn, Malaysia.

Rohde, L; Jensen, R L; Larsen, O K; Jønsson, K T and Larsen, T S (2021) Holistic indoor environmental quality assessment as a driver in early building design. Building Research & Information, 49(4), pp. 460-481. ISSN 0961-3218

Rudeli, N; Santilli, A; Puente, I and Viles, E (2017) Statistical model for schedule prediction: Validation in a housing-cooperative construction database. Journal of Construction Engineering and Management, 143(11): 04017083, ISSN 0733-9364

Russell, M M (2013) Allocation of time buffer to construction project task durations. PhD thesis, North Carolina State University, USA.

Sachs, T; Tiong, R and Wagner, D (2007) Political risk quantification using fuzzy set approach. Journal of Financial Management of Property and Construction, 12(2), pp. 107-126. ISSN 1366-4387

Sackey, E (2014) A Sociotechnical Systems Analysis of Building Information Modelling (STSaBIM) Implementation in Construction Organisations. PhD thesis, Loughborough University, UK.

Sadeh, H; Mirarchi, C; Shahbodaghlou, F and Pavan, A (2023) Predicting the trends and cost impact of COVID-19 OSHA citations on US construction contractors using machine learning and simulation. Engineering, Construction and Architectural Management, 30(8), pp. 3461-3479. ISSN 0969-9988

Sadick, A M; Hasan, A and Ahiaga-Dagbui, D D (2026) Modeling sustainability discourse in the construction industry: A deep-learning approach. Journal of Construction Engineering and Management, 152(4): 04026026, ISSN 0733-9364

Saeidlou, S and Ghadiminia, N (2024) A construction cost estimation framework using DNN and validation unit. Building Research & Information, 52(1-2), pp. 38-48. ISSN 0961-3218

Saghatforoush, E; Hosseini Nourzad, S H; Zareravasan, A and Jadidoleslami, S (2023) Enablers for BIM application in architectural design: A robust exploratory factor analysis approach. International Journal of Construction Management, 23(9), pp. 1549-1559. ISSN 1562-3599

Sagoo, A S (2014) A decision support system for evaluating local authority housing maintenance strategies in the United Kingdom. PhD thesis, University of Derby, UK.

Sahin, C. and Yildirim, N. (2026) Revisiting digital technology adoption in the construction industry: Practice-informed, context-specific validation of existing knowledge. Smart and Sustainable Built Environment, pp. 1-29. ISSN 2046-6099

Said, H M M and Lucko, G (2016) Float types in construction spatial scheduling. Journal of Construction Engineering and Management, 142(12): 04016077, ISSN 0733-9364

Saif, W and Alshibani, A (2024) A close-range photogrammetric model for tracking and performance-based forecasting earthmoving operations. Construction Innovation, 24(1), pp. 164-195. ISSN 1471-4175

Saini, M; Arif, M and Kulonda, D J (2019) Challenges to transferring and sharing of tacit knowledge within a construction supply chain. Construction Innovation, 19(1), pp. 15-33. ISSN 1471-4175

Salvaraji, L.; Toha, H. R.; Mohd Aris, N.; Hanafi, N. S.; Kumareswaran, S.; Abd Razak, M. F. and Ibrahim, M. F. (2026) A community-based disaster risk management framework for chemical emergency preparedness in Johor, Malaysia. International Journal of Disaster Resilience in the Built Environment, 17(3), pp. 389-405. ISSN 1759-5908

Sandanayake, M; Kumanayake, R and Peiris, A (2022) Environmental impact assessments during construction stage at different geographic levels: a cradle-to-gate analysis of using sustainable concrete materials. Engineering, Construction and Architectural Management, 29(4), pp. 1731-1752. ISSN 0969-9988

Sandanayake, M S; Vrcelj, Z; Bouras, Y; Chau, H W and Hastings, P (2024) Simplified rating tool to evaluate sustainable practices of small-scale infrastructure projects in Australia – a comparative review. Smart and Sustainable Built Environment, 13(5), pp. 1260-1280. ISSN 2046-6099

Sangiorgio, V; Uva, G and Fatiguso, F (2018) Optimized AHP to overcome limits in weight calculation: Building performance application. Journal of Construction Engineering and Management, 144(2): 04017101, ISSN 0733-9364

Sankaran, Bharathwaj (2017) Civil integrated management for highway infrastructure projects: Analyses of trends, specifications, impact, and maturity. PhD thesis, University of Texas at Austin, USA.

Sanvido, V E (1988) Conceptual construction process model. Journal of Construction Engineering and Management, 114(2), pp. 294-310. ISSN 0733-9364

Sapian, A R (2009) Validation of the computational fluid dynamics method for predicting wind flow around a high-rise building in an urban boundary layer condition. Journal of Construction in Developing Countries, 14(2), pp. 1-20. ISSN 1823-6499

Sapountzis, S (2013) An investigation into the development of an effective benefits realisation process for healthcare infrastructure projects. PhD thesis, University of Salford, UK.

Sarhan, J G; Xia, B; Fawzia, S; Karim, A; Olanipekun, A O and Coffey, V (2020) Framework for the implementation of lean construction strategies using the interpretive structural modelling (ISM) technique: A case of the Saudi construction industry. Engineering, Construction and Architectural Management, 27(1), pp. 1-23. ISSN 0969-9988

Sarhan, Jamil Ghazi I (2018) Development of a lean construction framework for the Saudi Arabian construction industry. PhD thesis, Queensland University of Technology, Australia.

Sarihi, M; Shahhosseini, V and Banki, M T (2020) Multiskilled project management workforce assignment across multiple projects regarding competency. Journal of Construction Engineering and Management, 146(12): 04020134, ISSN 0733-9364

Saunders, L W (2013) Measuring safety attitude differences in the construction supply chain. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Sawhney, A; Agnihotri, R and Paul, V K (2014) Grand challenges for the Indian construction industry. Built Environment Project and Asset Management, 4(4), pp. 317-334. ISSN 2044-124X

Schuler, M. L.; Albertson, L.; Katz, L. E.; Armanios, D. E. and Faust, K. M. (2026) Drawn from experience: Coproducing a graphic guide with arctic water sector workers. Journal of Construction Engineering and Management, 152(9): 04026146, ISSN 0733-9364

Sebastian, R; Claeson-Jonsson, C and Di Giulio, R (2013) Performance-based procurement for low-disturbance bridge construction projects. Construction Innovation, 13(4), pp. 394-409. ISSN 1471-4175

Seboni, L (2016) Improving the existing project manager-to-project practice of a specific organization (organization A) in Botswana. PhD thesis, University of Leeds, UK.

Seethapathy, S and Henderson, J H (2017) Management of construction waste in nuclear and thermal power plant projects in India. Journal of Construction in Developing Countries, 22(S1), pp. 19-46. ISSN 1823-6499

Selvam, G; Kamalanandhini, M; Velpandian, M and Shah, S (2025) Duration and resource constraint prediction models for construction projects using regression machine learning method. Engineering, Construction and Architectural Management, 32(9), pp. 5743-5763. ISSN 0969-9988

Selĺs, M E S; Rubio, J A C and Mullor, J R (2008) Development of a quantification proposal for hidden quality costs: Applied to the construction sector. Journal of Construction Engineering and Management, 134(10), pp. 749-757. ISSN 0733-9364

Shafabakhsh, G A; Kashi, E and Akbari, A (2016) A comparison effect of aircraft main gear configuration on runway damages by led and fe method. Journal of Engineering, Design and Technology, 14(2), pp. 362-372.

Shafi, J.; Ijaz, R.; Kumar, Y. and Ijaz, M. F. (2026) Prediction of air quality levels to support sustainable development goal 11 using multiple deep learning classifiers. Smart and Sustainable Built Environment, 15(5), pp. 1877-1916. ISSN 2046-6099

Shahtaheri, M; Haas, C T and Salimi, T (2017) A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects. Engineering, Construction and Architectural Management, 24(1), pp. 40-60. ISSN 0969-9988

Shakoorian, A (2006) Performance assessment of building commissioning process as a quality assurance system. PhD thesis, Georgia Institute of Technology, USA.

Shang, G; Pheng, L S and Fai, B P K (2025) Receptiveness of mass-engineered timber (MET) residential buildings among young stakeholders. Smart and Sustainable Built Environment, 14(3), pp. 696-714. ISSN 2046-6099

Shang, G; Pheng, L S and Zhong Xia, R L (2024) Adoption of smart contracts in the construction industry: An institutional analysis of drivers and barriers. Construction Innovation, 24(5), pp. 1401-1421. ISSN 1471-4175

Shari, Zalina (2011) Development of a sustainability assessment framework for Malaysian office buildings using a mixed-methods approach. PhD thesis, University of Adelaide, Australia.

Shehadeh, A and Alshboul, O (2025) Game theory integration in construction management: A comprehensive approach to cost, risk, and coordination under uncertainty. Journal of Construction Engineering and Management, 151(5): 04025039, ISSN 0733-9364

Shelake, A G and Gogate, N G (2026) An integrated risk prioritization and determination of activity-wise delay (irpad) framework for enhancing schedule management in tunnel projects. Engineering, Construction and Architectural Management, 33(1), pp. 763-784. ISSN 0969-9988

Shen, Q; Lo, K K and Wang, Q (1998) Priority setting in maintenance management: A modified multi-attribute approach using analytic hierarchy process. Construction Management and Economics, 16(6), pp. 693-702. ISSN 01446193

Shen, Q and Spedding, A (1998) Priority setting in planned maintenance: practical issues in using the multi-attribute approach. Building Research & Information, 26(3), pp. 169-180. ISSN 0961-3218

Shen, X; Lu, M and Chen, W (2011) Tunnel-boring machine positioning during microtunneling operations through integrating automated data collection with real-time computing. Journal of Construction Engineering and Management, 137(1), pp. 72-85. ISSN 0733-9364

Shi, Q; Yao, L; Bi, C and Zhu, J (2025) Dynamic incentive mechanisms in mega project-risk management considering the participation of the insurance company. Engineering, Construction and Architectural Management, 32(9), pp. 5792-5813. ISSN 0969-9988

Shi, J J (1999) A neural network based system for predicting earthmoving production. Construction Management and Economics, 17(4), pp. 463-471. ISSN 01446193

Shi, J J (2002) Three methods for verifying and validating the simulation of a construction operation. Construction Management and Economics, 20(6), pp. 483-491. ISSN 01446193

Shiha, A; Dorra, E M and Nassar, K (2020) Neural networks model for prediction of construction material prices in Egypt using macroeconomic indicators. Journal of Construction Engineering and Management, 146(3): 04020010, ISSN 0733-9364

Shin, D H (2007) Strategic development of AR systems for industrial construction. PhD thesis, Purdue University, USA.

Shirazi, D H and Toosi, H (2023) Deep multilayer perceptron neural network for the prediction of Iranian dam project delay risks. Journal of Construction Engineering and Management, 149(4): 04023011, ISSN 0733-9364

Shrestha, P P and Batista, J R (2022) Transition from traditional to alternative project delivery methods in water and wastewater project: Executive decision-makers' perspective. Engineering, Construction and Architectural Management, 29(7), pp. 2665-2688. ISSN 0969-9988

Shrestha, Rabin (2024) Prediction of cost and schedule changes in transportation projects through historical bid and change order document analysis – using Oklahoma dot project cases. PhD thesis, University of Nevada, Las Vegas, USA.

Siddiqi, K M (1997) Framework for analyzing construction alternatives with respect to environmental laws. PhD thesis, Georgia Institute of Technology, USA.

Siddiqui, M K (2008) Coordination of distributed schedules in a heterogeneous environment: identification of conflicts using schedule mappings. PhD thesis, University of Texas at Austin, USA.

Sinesilassie, E G (2017) Determinants of success of public construction projects in Ethiopia. PhD thesis, Indian Institute of Technology Delhi, India.

Sinesilassie, E G; Tripathi, K K; Tabish, S Z S and Jha, K N (2019) Modeling success factors for public construction projects with the SEM approach: Engineer's perspective. Engineering, Construction and Architectural Management, 26(10), pp. 2410-2431. ISSN 0969-9988

Skinner, D W H (1974) An investigation of the contractor's use of bills of quantities. PhD thesis, Aston University, UK.

Skinner, D W H (1979) An analysis of the utility of bills of quantities in the process of building contracting. PhD thesis, Aston University, UK.

Skitmore, M (1992) Parameter prediction for cash flow forecasting models. Construction Management and Economics, 10(5), pp. 397-413. ISSN 01446193

Skitmore, M and Drew, D (2003) The analysis of pre-tender building price forecasting performance: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 36-42. ISSN 0969-9988

Slicher, A W R (1997) A strategic decision support system for a consulting engineering firm using a hybrid neural network-expert system approach. PhD thesis, University of Leeds, UK.

Sloan, B; McLeod, B N; Smith, R M and Goodall, W L (1996) A functional cost approach in the development and use of a project budget cost limit estimator (PBCLE) for capitol building works. Journal of Financial Management of Property and Construction, 1(1), pp. 89-100. ISSN 1366-4387

Smith, G and Ceranic, B (2008) Spatial layout planning in sub-surface rail station design for effective fire evacuation. Architectural Engineering and Design Management, 4(2), pp. 99-120. ISSN 1745-2007

Smith, N J (1986) The study of criticality: An investigation based on network theory into the relationship between time and cost in civil engineering bridgeworks contracts and the measurement of the effects of change. PhD thesis, University of Manchester Institute of Science and Technology, UK.

Smith, S D (1994) Production estimation of earthmoving operations using a discrete-event simulation model. PhD thesis, University of Edinburgh, UK.

Sodangi, M (2021) Overcoming the constraints to the adoption of sustainable civil engineering practices. International Journal of Construction Management, 21(5), pp. 490-507. ISSN 1562-3599

Sodeinde, O R (2024) Building damage assessment using remote sensing data and deep learning algorithms. PhD thesis, Tufts University, USA.

Soetanto, R and Proverbs, D G (2001) Modelling client satisfaction levels: A comparison of multiple regression and artificial neural network techniques. In: Akintoye, A (ed.) Proceedings of 17th Annual ARCOM Conference, 5-7 September 2001, Salford, UK.

Soetanto, R and Proverbs, D G (2002) Modelling client satisfaction levels: The impact of contractor performance. Construction Economics and Building, 2(1), pp. 13-27. ISSN 2204-9029

Solnosky, R L (2013) Integrated structural process model: An inclusive non-material specific approach to determining the required tasks and information exchanges for structural building information modeling. PhD thesis, Pennsylvania State University, USA.

Soltanmohammadlou, N.; Hon, C. K. H.; Drogemuller, R.; Motamedisedeh, O. and Rahimian, F. (2026) Modelling risk factors in earthmoving equipment operations on Australian construction sites: A fuzzy DEMATEL approach. Engineering, Construction and Architectural Management, 33(3), pp. 2118-2153. ISSN 0969-9988

Somboonpisan, J and Limsawasd, C (2021) Environmental weight for bid evaluation to promote sustainability in highway construction projects. Journal of Construction Engineering and Management, 147(4): 04021013, ISSN 0733-9364

Song, M H and Fischer, M (2020) Generating a daily bill of materials at level of development 400 using the smallest workface boundary. Journal of Construction Engineering and Management, 146(5): 04020035, ISSN 0733-9364

Sonkor, Muammer Semih (2026) A cybersecurity decision-support framework for technology integration in the built environment. PhD thesis, New York University Tandon School of Engineering, USA.

Sonson, S J (2018) Performance measurement and management within construction firms in Saint Lucia. PhD thesis, University of Salford, UK.

Sooksil, N and Benjaoran, V (2014) Validation of construction safety equilibrium model on high-rise building construction project in Thailand. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Sourani, A (2008) Realising sustainable construction through procurement stratergies. PhD thesis, Loughborough University, UK.

Sourani, A and Sohail, M (2015) The Delphi method: Review and use in construction management research. International Journal of Construction Education and Research, 11(1), pp. 54-76. ISSN 1557-8771

Spearman, P (2015) Using sustainable development as a competitive strategy. DBA thesis, Walden University, USA.

Spiteri, J (1998) A critical analysis of occupational and organisational strategy in UK: architectural and quantity surveying practices. PhD thesis, University of Leeds, UK.

Sruthilaya, D; Vilventhan, A and Gopal, P R C (2025) Development of a project complexity measurement model for metro rail projects. Engineering, Construction and Architectural Management, 32(4), pp. 2728-2744. ISSN 0969-9988

Staffa Junior, L B; Bastos Costa, D; Torres Nogueira, J L and Silva, A S (2025) Web platform for building roof maintenance inspection using uas and artificial intelligence. International Journal of Building Pathology and Adaptation, 43(1), pp. 4-28. ISSN 2398-4708

Stojanovic, V; Falconer, R; Blackwood, D; Paterson, G; Fleming, M and Bell, S (2014) Interactive visualisation of heat loss and gain for early-stage energy appraisal of the built environment. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Stover, B D (2004) Validation and evaluation of a disability measure for upper extremity musculoskeletal disorder screening in the workplace and prognostic factors of long-term disability. PhD thesis, University of Washington, USA.

Su, Y; Wang, J; Shou, W; Wu, P; Wu, C and Xu, S (2026) Intentions prediction for human–robot collaboration in utility tunnel maintenance. Engineering, Construction and Architectural Management, 33(15), pp. 1-21. ISSN 0969-9988

Sufianto, Heru (2013) A fire safety improvement framework for residential buildings: A socio-ecological behaviour modification approach. PhD thesis, University of New South Wales, Australia.

Sultan, Mohamed (2025) PPP contracts for healthcare facilities in Canada: Qualitative study to identify lessons learned. PhD thesis, Arizona State University, USA.

Sunkanmi, A B (2023) An integrated conflict management model for the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Suo, W.; Li, J.; Zhang, J. and Wang, L. (2026) A feature-driven risk allocation modeling methodology for transport infrastructure public-private partnership projects. Journal of Construction Engineering and Management, 152(10): 04026174, ISSN 0733-9364

Suraji, A (2001) Development and validation of a theory of construction accident causation. PhD thesis, University of Manchester, UK.

Suresh, S (2006) Knowledge capture in small and medium enterprises in the UK construction industry. PhD thesis, Glasgow Caledonian University, UK.

Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.

Suzuki, K (2017) The impact of national culture on communication management - japanese contractors in singapore construction industry. PhD thesis, National University of Singapore, Singapore.

Suzuki, K (2018) The impact of national culture on communication management: Japanese contractors in Singapore construction industry. PhD thesis, National University of Singapore, Singapore.

Swaffield, J A (2005) Transient identification of defective trap seals. Building Research & Information, 33(3), pp. 245-256. ISSN 0961-3218

Swai, L (2022) Development of a conceptual framework for enhancing payment practices in the UK construction industry. PhD thesis, Coventry University, UK.

Sylvie, J R; Thomas, S R; Lee, S H; Chapman, R E and Smith, R T (2013) Development and interpretation of the security rating index. Journal of Construction Engineering and Management, 139(2), pp. 185-194. ISSN 0733-9364

Symonds, P; Taylor, J; Mavrogianni, A; Davies, M; Shrubsole, C; Hamilton, I and Chalabi, Z (2017) Overheating in English dwellings: Comparing modelled and monitored large-scale datasets. Building Research & Information, 45(1-2), pp. 195-208. ISSN 0961-3218

Taheri, Ali (2024) The framework of an infrastructure performance model based on the concepts of civil integrated management (CIM). PhD thesis, Florida State University, USA.

Takim, R (2005) A framework for successful construction project performance. PhD thesis, Glasgow Caledonian University, UK.

Tanabe, S (2022) A risk allocation framework for public private partnerships (PPP) water infrastructure projects in Sri Lanka. PhD thesis, University of the West of England, Bristol, UK.

Tang, L (2011) Effective and efficient briefing in public private partnership projects in the construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Tang, Y; Lim, P G and Gan, S W (2012) Forecasting capability of a construction organization model: 10 years later. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Tarawneh, S A (1999) Service quality and its relationship with client satisfaction and behavioural intentions in UK construction: The case of design and build contracting services. PhD thesis, University of Leeds, UK.

Tarhuni, S M (2013) An investigation into the management of knowledge in a historic building conservation organisation in Tripoli, Libya. PhD thesis, University of Newcastle upon Tyne, UK.

Taroun, A (2012) Decision support system (DSS) for construction project risk analysis and evaluation via evidential reasoning (ER). PhD thesis, University of Manchester, UK.

Taylor, M D (2003) Economic appraisal and risk analysis of construction automation. PhD thesis, Edinburgh Napier University, UK.

Teizer, J (2006) Real-time spatial modeling to detect and track resources on construction sites. PhD thesis, University of Texas at Austin, USA.

Tene Nengou, C B (2019) Framework for the effective implementation of building regulations and policies: The case of Sub-Sahara African countries. PhD thesis, University of Nottingham, UK.

Teshnehdel, S; Soflaei, F and Shokouhian, M (2020) Assessment of solar shading performance of courtyard houses in desert climate of Kashan, Iran. Architectural Engineering and Design Management, 16(6), pp. 473-492. ISSN 1745-2007

Thajudeen, S; Lennartsson, M and Elgh, F (2020) Identification of challenges and success factors in industrialised house building design. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(1), pp. 27-37. ISSN 17514304

Thomas, S R (1996) An assessment tool for improving project team communications. PhD thesis, University of Texas at Austin, USA.

Thrassou, A (2002) Strategic marketing management of the small consultancy firm: The case of small Cypriot architectural and/or civil engineering firms. PhD thesis, University of Leeds, UK.

Tian, Z; He, Q and Wang, T (2025) How to mobilize owner-dynamic capabilities in megaprojects? A tripartite evolutionary game approach. Engineering, Construction and Architectural Management, 32(3), pp. 1478-1498. ISSN 0969-9988

Timm, J F G; Maciel, V G and Passuello, A (2023) Green public procurement model for environmental assessment of constructive systems. International Journal of Construction Management, 23(4), pp. 718-728. ISSN 1562-3599

Toke, L K and Kalpande, S D (2022) Strategic planning to investigate the decision index of organization for effective total quality management implementation: in context of Indian small and medium enterprises. Journal of Engineering, Design and Technology, 20(3), pp. 749-776. ISSN 1726-0531

Tomrukcu, G; Kizildag, H; Avgan, G; Dal, O; Ganic Saglam, N; Ozdemir, E and Ashrafian, T (2026) A systematic approach to manual calibration and validation of building energy simulation. Smart and Sustainable Built Environment, 15(1), pp. 203-230. ISSN 2046-6099

Torres Formoso, C (1991) A knowledge-based framework for planning house building projects. PhD thesis, University of Salford, UK.

Toǧan, V; Sulub, A S; Eirgash, M A and Mostofi, F (2026) Project scheduling to minimize the time and cost in large-scale construction projects with repulsion-based improved arithmetic optimization. Journal of Construction Engineering and Management, 152(3): 04025277, ISSN 0733-9364

Tran, D Q and Molenaar, K R (2014) Exploring critical delivery selection risk factors for transportation design and construction projects. Engineering, Construction and Architectural Management, 21(6), pp. 631-647. ISSN 0969-9988

Tran, D Q; Nguyen, L D and Faught, A (2017) Examination of communication processes in design-build project delivery in building construction. Engineering, Construction and Architectural Management, 24(6), pp. 1319-1336. ISSN 0969-9988

Tsai, H; Wang, L C and Lee, J W (2006) Exploration of ranking method of group decision making. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Tse, T-c (2009) The interoperability of building information models and document models in the Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Tsimopoulou, V (2015) Economic optimisation of flood risk management projects. PhD thesis, Delft University of Technology, Netherlands.

Tu, B; Zuo, J; Chang, R D; Webber, R J; Xiong, F and Dong, N (2023) A system dynamic model for assessing the level of BIM implementation in construction phase: A China case study. Engineering, Construction and Architectural Management, 30(4), pp. 1321-1343. ISSN 0969-9988

Tuholski, S J (2008) Transformation, flow, and value constellations in AEC projects. PhD thesis, University of California, Berkeley, USA.

Tuzmen, A (2002) A distributed process management system for collaborative building design. Engineering, Construction and Architectural Management, 9(3), pp. 209-221. ISSN 0969-9988

Upadhyaya, Deep Shaileshkumar (2024) Investigation on the adequacy of health and safety management in Indian construction sector. PhD thesis, Gujarat Technological University, India.

Upstill-Goddard, J D (2016) Towards a framework to enable construction small and medium-sized enterprises (SMEs) to manage sustainability. EngD thesis, Loughborough University, UK.

Ur Rehman, H S; Raza, M A; Masood, R; Khan, M A; Alamgir, S; Javed, M A; Roy, K and Lim, J B P (2023) A multi-facet BIM based approach for green building design of new multi-family residential building using LEED system. International Journal of Construction Management, 23(12), pp. 2024-2038. ISSN 1562-3599

Van Tam, N. (2026) Evaluating risk distribution: A stakeholder-driven causal analysis of genai adoption risks in construction project management. Journal of Construction Engineering and Management, 152(7): 04026098, ISSN 0733-9364

Victoria, M F (2017) Developing decision support models for early stage embodied carbon management in buildings. PhD thesis, Northumbria University, UK.

Vinodh, S; Somanaathan, M and Arvind, K R (2013) Development of value stream map for achieving leanness in a manufacturing organization. Journal of Engineering, Design and Technology, 11(2), pp. 129-141. ISSN 1726-0531

Von Kluge, P. N.; Doumia, B. and Sengha, G. G. (2026) Nonlinear soil-structure interaction effects on eccentric seismic pounding and torsional response of adjacent buildings: Experimental validation and reduced-order modelling. Architectural Engineering and Design Management, 22(3), pp. 809-843. ISSN 1745-2007

Wah, L W (2015) Impact of organisational culture on Malaysian international contractors’ bidding decisions. PhD thesis, University of Malaya, Malaysia.

Waibel, C (2018) Simulation-based optimization of buildings and multi-energy systems. DSc thesis, ETH Zürich, Switzerland.

Wallace, W A (1987) Capital costs versus costs-in-use: A content analysis of design team member communication patterns. Construction Management and Economics, 5(4), ISSN 01446193

Wang, Z.; Hu, X.; Wei, A.; Yang, W. and Dong, Z. (2026) A blockchain-based system for just-in-time in construction supply chains. Built Environment Project and Asset Management, 16(2), pp. 377-395. ISSN 2044-124X

Wang, H-H (2010) A context-based representation and reasoning formalism to support construction safety planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Wang, J; Li, M; Moorhead, M and Skitmore, M (2025) Forecasting financial distress in listed Chinese construction firms: Leveraging ensemble learning and non-financial variables. Construction Management and Economics, 43(3), pp. 175-195. ISSN 0144-6193

Wang, N (2022) Spoken dialogue system for information extraction from building information models using artificial intelligence. PhD thesis, University of Florida, USA.

Wang, S; Park, S; Kim, J and Kim, J (2025) Safety helmet monitoring on construction sites using yolov10 and advanced transformer architectures with surveillance and body-worn cameras. Journal of Construction Engineering and Management, 151(11): 04025186, ISSN 0733-9364

Wang, Y; Zhu, S and Wong, A S T (2014) Cooling time estimation of newly placed hot-mix asphalt pavement in different weather conditions. Journal of Construction Engineering and Management, 140(5): 04014009, ISSN 0733-9364

Wang, Zhichen (2025) Framework for automated change propagation from building information models to building energy models. PhD thesis, Carnegie Mellon University, USA.

Wauters, M and Vanhoucke, M (2015) Study of the stability of earned value management forecasting. Journal of Construction Engineering and Management, 141(4): 04014086, ISSN 0733-9364

Webb, D H (2018) Development of risk-based measurements and metrics for sustainability quantification of manufactured and constructed systems. PhD thesis, University of Maryland, College Park, USA.

Webb, E (2014) Management of multi-cultural teams on international joint venture megaprojects in Asia. PhD thesis, Loughborough University, UK.

Weeks, J A (1978) Identification and validation of the safety and health competencies for vocational building trades as related to construction industry safety standards. PhD thesis, University of Michigan, USA.

Wiliem, Leonard (2008) Incorporating interdependence in risk likelihood analysis to enhance diagnostics in condition monitoring. PhD thesis, Queensland University of Technology, Australia.

Withana-Gamage, I S (2011) A waste minimisation framework for the procurement of design and build construction projects. PhD thesis, Loughborough University, UK.

Woldesenbet, A K (2014) Highway infrastructure data and information integration & assessment framework: A data-driven decision-making approach. PhD thesis, Iowa State University, USA.

Wolfenden, Alison K (2004) Decision support system for the evaluation and comparison of concession project investments. PhD thesis, Griffith University, Australia.

Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.

Wong, K W J (2007) Development of selection evaluation and system intelligence analytic models for the intelligent building control systems. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wong, W H (2007) Developing and implementing an empirical system for scoring buildability of designs in the Hong Kong construction industry. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Wood, X; Ghimire, P; Kim, S; Barutha, P and Jeong, H D (2024) Framework for evaluating the success of integrated project delivery in the industrial construction sector: A mixed methods approach & machine learning application. Construction Economics and Building, 24(1-2), pp. 94-118. ISSN 2204-9029

Wright, P H (1989) Key factors for the evaluation of the quality of rural shelter structures. EdD thesis, West Virginia University, USA.

Wu, H; Shen, G; Lin, X; Li, M; Zhang, B and Li, C Z (2020) Screening patents of ICT in construction using deep learning and NLP techniques. Engineering, Construction and Architectural Management, 27(8), pp. 1891-1912. ISSN 0969-9988

Wu, J; Sadraddin, H L; Ren, R; Zhang, J and Shao, X (2021) Invariant signatures of architecture, engineering, and construction objects to support BIM interoperability between architectural design and structural analysis. Journal of Construction Engineering and Management, 147(1): 04020148, ISSN 0733-9364

Wu, J; Yan, B; Sun, G; Liu, M; Li, Y and Zhou, C (2025) Research on the construction-forming model of a single-layer orthogonal saddle-shaped cable net with an opening. Journal of Construction Engineering and Management, 151(9): 05025008, ISSN 0733-9364

Xie, B; Wang, Z; Xu, Y and Cui, L (2025) How does bricolage drive knowledge innovation in engineering project organizations? Engineering, Construction and Architectural Management, 32(12), pp. 8571-8591. ISSN 0969-9988

Xie, H (2005) User model-driven architecture for information retrieval in construction project management. PhD thesis, University of Florida, USA.

Xu, X and Zhang, Y (2024) Office property price index forecasting using neural networks. Journal of Financial Management of Property and Construction, 29(1), pp. 52-82. ISSN 1366-4387

Xu, Yuqing (2025) Enhancing reliability and efficiency of upfront embodied carbon assessment leveraging openbim, llm, DES, and blockchain. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Yan, H.; Liu, C.; Yang, X.; Li, X. and Li, J. (2026) Digital twin-enabled 3D near-misses prediction method based on trajectories and postures for proactive construction safety management. Engineering, Construction and Architectural Management, pp. 1-27. ISSN 0969-9988

Yang, J B and Chen, Y F (2025) S-curve adjustment approaches for a force majeure event: COVID-19 as an example. Engineering, Construction and Architectural Management, 32(3), pp. 1621-1642. ISSN 0969-9988

Yeung, D and Skitmore, M (2012) A method for systematically pooling data in very early stage construction price forecasting. Construction Management and Economics, 30(11), pp. 929-939. ISSN 1466433X

Yin, X; Bouferguene, A and Al-Hussein, M (2020) Data-driven sewer pipe data random generation and validation. Journal of Construction Engineering and Management, 146(12): 04020131, ISSN 0733-9364

Yoon, Jong Han (2023) Blockchain-enabled smart contract system for creating system-based trust in subcontracting process. PhD thesis, Georgia Institute of Technology, USA.

Yu, J; Guo, J; Zhang, Q; Xing, L and Lv, S (2026) Two-stage algorithm for automatic repair of pavement cracks. Engineering, Construction and Architectural Management, 33(1), pp. 144-170. ISSN 0969-9988

Yu, A; Shen, Q P; Kelly, J and Hunter, K (2004) Development of a value management framework for the formation of project briefs. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Yu, A T W; Shen, Q; Kelly, J and Hunter, K (2006) Investigation of critical success factors in construction project briefing by way of content analysis. Journal of Construction Engineering and Management, 132(11), pp. 1178-1186. ISSN 0733-9364

Yu, M; Wang, L; Ruan, W and Zheng, W (2025) Robust optimization for precast component production scheduling considering component transfer. Journal of Construction Engineering and Management, 151(10): 04025156, ISSN 0733-9364

Yu, W D; Chang, H K; Hsu, Y Y; Cheng, S T and Wang, K W (2020) Pretendering decision model for contractor selection of public procurement projects. Journal of Construction Engineering and Management, 146(11): 04020126, ISSN 0733-9364

Yu, Y (2022) Use inspired research in using virtual reality for safe operation of exemplar critical infrastructure systems. PhD thesis, Rutgers The State University of New Jersey, School of Graduate Studies, USA.

Yuan, X (2016) A cyber-physical systems (CPS) approach to temporary structures monitoring. PhD thesis, Pennsylvania State University, USA.

Yumul, John (2025) Evaluation of machine learning models to predict cost overruns for New York city capital projects. DEngr thesis, George Washington University, USA.

Yunus, Riduan (2012) Decision making guidelines for sustainable construction of industrialised building systems. PhD thesis, Queensland University of Technology, Australia.

Zaalouk, A; Altaf, M S and Han, S (2025) Operations-oriented supply chain master planning in panelized construction using hybrid multiagent simulation. Journal of Construction Engineering and Management, 151(10): 04025206, ISSN 0733-9364

Zahiroddiny, S (2016) Understanding the impact of building information modelling (BIM) on construction projects' communication patterns. PhD thesis, University of Northumbria at Newcastle, UK.

Zahoor, H; Chan, A P C; Utama, W P; Gao, R and Memon, S A (2017) Determinants of safety climate for building projects: SEM-based cross-validation study. Journal of Construction Engineering and Management, 143(6): 05017005, ISSN 0733-9364

Zaid Alkilani, Suhair (2018) Performance measurement and improvement model for small and medium contractors in developing countries. PhD thesis, University of New South Wales, Australia.

Zaman, A A U; Abdelaty, A; Yamany, M S; Jacobs, F and Marzouk, M (2025) Integrating 3D photogrammetry and game engine for construction safety training. Built Environment Project and Asset Management, 15(4), pp. 844-862. ISSN 2044-124X

Zarghami, S A (2022) Forecasting project duration in the face of disruptive events: A resource-based approach. Journal of Construction Engineering and Management, 148(5): 04022016, ISSN 0733-9364

Zarghami, S A (2024) No scheduling problem but rather a rescheduling problem: Measuring robustness of schedule network in construction projects. Journal of Construction Engineering and Management, 150(2): 04023157, ISSN 0733-9364

Zayed, T M (2001) Assessment of productivity for concrete bored pile construction. PhD thesis, Purdue University, USA.

Zeinali Kalkhoran, A; Platt, L S; Iovine, N; Brown, S and Pollitt, B (2025) An agent-based modeling approach for infection prevention predesign: simulating the spread of pathogens between humans and the environment in an Intensive Care Unit. Architectural Engineering and Design Management, 21(4), pp. 746-767. ISSN 1745-2007

Zeng, N; Liu, Y; Wang, C; Chen, Q; Liu, Y and Li, Q (2026) On- and off-site coordination in a modular construction supply chain: Domain-spanning production flow framing and evaluation. Journal of Construction Engineering and Management, 152(2): 04025245, ISSN 0733-9364

Zeng, C (2014) Automated building information extraction and evaluation from high-resolution remotely sensed data. PhD thesis, University of Western Ontario, Canada.

Zhai, P; Wang, J and Zhang, L (2023) Extracting worker unsafe behaviors from construction images using image captioning with deep learning-based attention mechanism. Journal of Construction Engineering and Management, 149(2): 04022164, ISSN 0733-9364

Zhan, H; Hwang, B G and Jabbar, S B B A (2025) An integrated approach to assessing digitalization of integrated digital delivery projects. Journal of Construction Engineering and Management, 151(6): 04025044, ISSN 0733-9364

Zhang, L. and Ge, Q. (2026) Offsite construction risk management agent: A gpts based analysis model. Engineering, Construction and Architectural Management, 33(7), pp. 5625-5644. ISSN 0969-9988

Zhang, S; Zhang, S; Zhao, Z; Liu, H; Wang, C; Wang, X and Yan, L (2026) BIM and semantic web-based circular design system for sustainable construction management of hydropower engineering. Journal of Construction Engineering and Management, 152(3): 04026002, ISSN 0733-9364

Zhang, D; Haas, C T; Goodrum, P M; Caldas, C H and Granger, R (2012) Construction small-projects rework reduction for capital facilities. Journal of Construction Engineering and Management, 138(12), pp. 1377-1385. ISSN 0733-9364

Zhang, J and Jiang, S (2025) Construction safety decision-making system based on improved integration of case-based reasoning and rule-based reasoning. Journal of Construction Engineering and Management, 151(9): 04025130, ISSN 0733-9364

Zhang, J; Zou, W and Kumaraswamy, M (2015) Developing public private people partnership (4P) for post disaster infrastructure procurement. International Journal of Disaster Resilience in the Built Environment, 6(4), pp. 468-484. ISSN 1759-5916

Zhang, L and El-Gohary, N M (2017) Human-centered value analysis: Building-value aggregation based on human values and building-system integration. Journal of Construction Engineering and Management, 143(8): 04017040, ISSN 0733-9364

Zhang, L and El-Gohary, N M (2021) Axiology-based valuation modeling for human-centered decision making in building planning and design. Journal of Construction Engineering and Management, 147(11): 04021138, ISSN 0733-9364

Zhang, M; Cheng, W and Wang, Y (2018) Multiple-fault classification for hot-mix asphalt production by machine learning. Journal of Construction Engineering and Management, 144(5): 04018024, ISSN 0733-9364

Zhang, N; Hwang, B G; Deng, X and Tay, F (2024) Exploring critical success factors for collaborative contracting implementation in the Singapore construction industry. Engineering, Construction and Architectural Management, 31(2), pp. 919-938. ISSN 0969-9988

Zhang, Q; Oo, B L and Lim, B T H (2023) Key practices and impact factors of corporate social responsibility implementation: Evidence from construction firms. Engineering, Construction and Architectural Management, 30(5), pp. 2124-2154. ISSN 0969-9988

Zhang, R P; Lingard, H and Nevin, S (2015) Development and validation of a multilevel safety climate measurement tool in the construction industry. Construction Management and Economics, 33(10), pp. 818-839. ISSN 01446193

Zhang, Y; Minchin, R E and Agdas, D (2017) Forecasting completed cost of highway construction projects using LASSO regularized regression. Journal of Construction Engineering and Management, 143(10): 04017071, ISSN 0733-9364

Zhao, H (2017) Distributed building information modeling in multidisciplinary collaboration. DSc thesis, ETH Zürich, Switzerland.

Zhao, J (2020) Towards a proactive real-time data-driven musculoskeletal disorders prevention approach in construction. PhD thesis, Pennsylvania State University, USA.

Zhao, X; Hwang, B-G and Low, S P (2016) An enterprise risk management knowledge-based decision support system for construction firms. Engineering, Construction and Architectural Management, 23(3), pp. 369-384. ISSN 0969-9988

Zheng, Y; Tang, L and Chau, K W (2025) BIM investment decision model (BIDM): Evaluation of features and proposal of a regression model based on the LASSO method. Journal of Financial Management of Property and Construction, 30(2), pp. 232-255. ISSN 1366-4387

Zhou, W (2009) An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation. PhD thesis, University of Wolverhampton, UK.

Zhu, F; Wang, L; Yu, M and Yang, X (2020) Quality of conflict management in construction project context: Conceptualization, scale development, and validation. Engineering, Construction and Architectural Management, 27(5), pp. 1191-1211. ISSN 0969-9988

Zimmerman, A and Martin, M (2001) Post-occupancy evaluation: Benefits and barriers. Building Research & Information, 29(2), pp. 168-174. ISSN 0961-3218

Zou, P X W; Chen, Y and Chan, T Y (2010) Understanding and improving your risk management capability: Assessment model for construction organizations. Journal of Construction Engineering and Management, 136(8), pp. 854-863. ISSN 0733-9364

Zou, Y; Kiviniemi, A and Jones, S W (2016) Developing a tailored rbs linking to BIM for risk management of bridge projects. Engineering, Construction and Architectural Management, 23(6), pp. 727-750. ISSN 0969-9988

Zu, F and Zhang, X (2025) Integrating a DfMA guideline matrix to facilitate value engineering workshops for construction projects. Journal of Construction Engineering and Management, 151(7): 04025083, ISSN 0733-9364

al Nageim, H; Nagar, R and Lisboa, P J G (2007) Comparison of neural network and binary logistic regression methods in conceptual design of tall steel buildings. Construction Innovation, 7(3), pp. 240-253. ISSN 1471-4175

de Feijter, F J (2023) Trust in circular design: Active stakeholder participation in Chinese and Dutch housing retrofit projects. Building Research & Information, 51(1), pp. 105-118. ISSN 0961-3218

Çalışkan, E B (2022) A data-driven requirement elicitation system for pre-project stage. PhD thesis, Middle East Technical University, Turkey.

Özdemir, M (2015) A fuzzy structural equation model to analyze relationships between determinants of safety performance in construction sites: Development of a safety performance index assessment tool. PhD thesis, Middle East Technical University, Turkey.

This list was generated on Sat Aug 22 01:40:51 2026 UTC.