Items with Index Term: user requirement
Abu Hammad, A A (2003) A decision support system for manufactured housing production process planning and facility layout. PhD thesis, University of Cincinnati, USA.
Al-Yami, A M and Price, A D F (2005) Exploring conceptual linkages between value engineering and sustainable construction. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Allen, S (1997) Information management for housing maintenance: a systemic view. PhD thesis, University of Salford, UK.
Bouazza, T (2019) The design of healthcare facilities: knowledge, methods and effectiveness. PhD thesis, Northumbria University, UK.
Bouazza, T and Greenwood, D (2020) An investigation of performance gaps in the design of UK healthcare facilities. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Carey, G (2017) An evaluation of how VfM can be achieved from a government's perspective in relation to school building projects in Ireland. PhD thesis, University of Salford, UK.
Chan, S L and Leung, N N (2004) Prototype web-based construction project management system. Journal of Construction Engineering and Management, 130(6), pp. 935-943. ISSN 0733-9364
Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.
Fahmy, A; Hassan, T; Bassioni, H and McCaffer, R (2020) Dynamic scheduling model for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 313-330. ISSN 2044-124X
Fathi, M S (2009) Micro- and macro-level context-aware information delivery for construction programme managers. PhD thesis, Loughborough University, UK.
Giupponi, N and Thomson, C (2020) The implication of advances in community mapping through spatial information technologies for urban regeneration projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Glad, W (2012) Housing renovation and energy systems: The need for social learning. Building Research & Information, 40(3), pp. 274-289. ISSN 0961-3218
Gwimile, T A (2026) Holistic maintenance management for higher learning institution buildings in Tanzania. International Journal of Building Pathology and Adaptation, 44(1), pp. 223-240. ISSN 2398-4708
Hadjri, K (1992) The viability of 'no-fines' for the production of appropriate housing in Algeria. PhD thesis, CNAA, Oxford Polytechnic, UK.
Hansen, K L and Vanegas, J A (2003) Improving design quality through briefing automation. Building Research & Information, 31(5), pp. 379-386. ISSN 0961-3218
Inançoğlu, S and Uzunoglu, S S (2022) Transformation of social housing kitchens over time: Nicosia göçmenköy social houses as a case study. International Journal of Building Pathology and Adaptation, 40(1), pp. 40-59. ISSN 23984708
Jaskula, K; Kifokeris, D; Papadonikolaki, E and Rovas, D (2025) Blockchain-based decentralized common data environment: User requirements and conceptual framework. Journal of Construction Engineering and Management, 151(9): 04025112, ISSN 0733-9364
Jia, J (2017) Multi-criteria evaluation in support of the decision-making process in highway construction projects. PhD thesis, Florida International University, USA.
Khamkanya, T (2011) A holistic approach to workplace environments, management systems and new technologies in meeting corporate end-user requirements. PhD thesis, University of Ulster, UK.
Kridan, A B and Goulding, J S (2005) Change management and human resource management as potential success areas for knowledge management implementation within the Libyan banking sector. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kumara, W H C D; Waidyasekara, K G A S and Weerasinghe, R P N P (2016) Building management system for sustainable built environment in Sri Lanka. Built Environment Project and Asset Management, 6(3), pp. 302-316. ISSN 2044-124X
Lam, E W M; Chan, A P C; Olawumi, T O; Wong, I and Kazeem, K O (2024) Critical factors that influence lean premise design implementation: A case of Hong Kong high-rise buildings. Architectural Engineering and Design Management, 20(6), pp. 1612-1628. ISSN 1745-2007
Lavikka, R H; Kyrö, R; Peltokorpi, A and Särkilahti, A (2019) Revealing change dynamics in hospital construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 1946-1961. ISSN 0969-9988
Liu, N (2010) Analysing functionalities of project extranets in construction: a provision and requirement approach. PhD thesis, University of Salford, UK.
Mitrovic, D; Male, S; Hunter, I A N and Watson, A (1999) Large scale engineering project process and user requirements. Engineering, Construction and Architectural Management, 6(1), pp. 38-50. ISSN 0969-9988
Nakajima, T (1972) Modeling and optimization of the building process for systems building. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Nazeer, F S; Kamardeen, I and Hasan, A (2024) Research needs for enhancing pre-occupancy evaluation of buildings. Built Environment Project and Asset Management, 14(4), pp. 529-546. ISSN 2044-124X
Nazeer, F S; Kamardeen, I and Hasan, A (2025) Establishment of an end-user engaged building design framework. Built Environment Project and Asset Management, 15(1), pp. 106-124. ISSN 2044-124X
Nazeer, S F and De Silva, N (2016) Tbpe scoring framework for tropical buildings. Built Environment Project and Asset Management, 6(2), pp. 174-186. ISSN 2044-124X
Nourbakhsh, M; Mohamad Zin, R; Irizarry, J; Zolfagharian, S and Gheisari, M (2012) Mobile application prototype for onsite information management in construction industry. Engineering, Construction and Architectural Management, 19(5), pp. 474-494. ISSN 0969-9988
Pilgrim, M J (2003) The application of visualisation techniques to the process of building performance analysis. PhD thesis, Loughborough University, UK.
Roza, C (2006) Environmental assessment: The Eden project. PhD thesis, University College London, UK.
Ruiz, J A; Granja, A D and Kowaltowski, D C C K (2014) Cost reallocation in social housing projects considering the desired values of end-users. Built Environment Project and Asset Management, 4(4), pp. 352-367. ISSN 2044-124X
Serugga, J; Kagioglou, M and Tzortzopoulos, P (2020) Value generation in front-end design of social housing with QFD and multiattribute utility theory. Journal of Construction Engineering and Management, 146(4): 04020019, ISSN 0733-9364
Sikorsky, C S (1990) Product and process integration for the US design-construction industry. PhD thesis, Texas A&M University, USA.
Tan, H C (2006) A methodology for the 'live' capture and reuse of project knowledge in construction. PhD thesis, Loughborough University, UK.
Theodorakopoulos, T F (2017) Integrated cost management system for delivering construction projects. PhD thesis, Loughborough University, UK.
Trinius, W and Sjöström, C (2005) Service life planning and performance requirements. Building Research & Information, 33(2), pp. 173-181. ISSN 0961-3218
Whitaker, R (2022) The influence of end user requirements to inform built asset design. PhD thesis, Leeds Beckett University, UK.
Wikberg, F; Olofsson, T and Ekholm, A (2014) Design configuration with architectural objects: Linking customer requirements with system capabilities in industrialized house-building platforms. Construction Management and Economics, 32(1-2), pp. 196-207. ISSN 01446193
Up a level