Items with Index Term: usability

Number of items: 220.

Aalto, L; Sirola, P; Kalliomäki-Levanto, T; Lahtinen, M; Ruohomäki, V; Salonen, H and Reijula, K (2019) User-centric work environments in modular healthcare facilities. Engineering, Construction and Architectural Management, 26(6), pp. 1047-1062. ISSN 0969-9988

AbdElMottaleb, Mohamed (2025) AI in project management: Machine learning application for construction scheduling. PhD thesis, University of Salford, UK.

Abdeen, F N; Gunatilaka, R N; Sepasgozar, S M E and Edwards, D J (2024) The usability of a novel mobile augmented reality application for excavation process considering safety and productivity in construction. Construction Innovation, 24(4), pp. 892-911. ISSN 1471-4175

Adefila, A; Abuzeinab, A; Whitehead, T and Oyinlola, M (2020) Bottle house: Utilising appreciative inquiry to develop a user acceptance model. Built Environment Project and Asset Management, 10(4), pp. 567-583. ISSN 2044-124X

Afolabi, A; Yusuf, A and Akanmu, A (2025) Effect of a passive shoulder-support exoskeleton on muscle activity, range of motion, discomfort, and exertion during painting tasks. Journal of Construction Engineering and Management, 151(5): 04025027, ISSN 0733-9364

Agyefi-Mensah, S; Kpamma, Z E and Hagan, D E (2022) Stair step geometry compliance with standard specifications for safety and usability: A study of selected university buildings in Ghana. International Journal of Building Pathology and Adaptation, 40(1), pp. 20-39. ISSN 23984708

Akin, S; Ergun, O; Surer, E and Gursel Dino, I (2021) An immersive performative architectural design tool with daylighting simulations: A building information modeling-based approach. Engineering, Construction and Architectural Management, 28(4), pp. 1319-1344. ISSN 0969-9988

Al Nasseri, H A; Widen, K and Aulin, R (2016) A taxonomy of planning and scheduling methods to support their more efficient use in construction project management. Journal of Engineering, Design and Technology, 14(3), pp. 580-601.

Al-Hafith, O; Bk, S and de Wilde, P (2023) Assessing annual thermal comfort extent in central courtyards: Baghdad as a case study. Smart and Sustainable Built Environment, 12(3), pp. 660-681. ISSN 2046-6099

Al-Khiami, M. I. and Lindhard, Sø M. (2026) On-site evaluation of back-support exoskeleton effectiveness in construction: A multiple case study of physical performance, ergonomic comfort, and user acceptance among masonry workers. Journal of Construction Engineering and Management, 152(10): 04026167, ISSN 0733-9364

Albeaino, G; Eiris, R; Gheisari, M and Issa, R R (2022) Dronesim: A VR-based flight training simulator for drone-mediated building inspections. Construction Innovation, 22(4), pp. 831-848. ISSN 1471-4175

Algassim, Hesham M (2024) Developing an architectural technology adoption model considering organizational factors: Case of Saudi Arabia. PhD thesis, University of New South Wales, Australia.

Alhallaq, M. and Artan, D. (2026) Assessing contractors' circular economy performance: Barriers and system requirements. International Journal of Building Pathology and Adaptation, pp. 1-20. ISSN 2398-4708

Alleem, R (2012) A usability based model for suggestion system evaluation of infrastructure organisations in the UAE. PhD thesis, University of Salford, UK.

Almahmoud, Essam (2014) Social sustainability health check: A model for evaluating and optimising social value creation in construction projects. PhD thesis, University of Melbourne, Australia.

Alnsour, M A M (2020) Integrating sustainability assessment into public works development in Jordan. PhD thesis, University of Leeds, UK.

Alqahtani, D (2022) A sustainability assessment framework for public-private partnerships (PPPs) in highway projects. PhD thesis, Syracuse University, USA.

Alzaed, A (2012) User centered passive building design. PhD thesis, University of Liverpool, UK.

Andreu, I C and Oreszczyn, T (2004) Architects need environmental feedback. Building Research & Information, 32(4), pp. 313-328. ISSN 0961-3218

Angelino, M (2019) Developing better design standards for the construction industry. EngD thesis, University of Bristol, UK.

Arafa, E A B (2015) The impact of knowledge management on project success. PhD thesis, University of Portsmouth, UK.

Atasoy, G (2013) Visualizing and interacting with construction project performance information. PhD thesis, Carnegie Mellon University, USA.

Atasoy, G; Ertaymaz, U; Dikmen, I and Talat Birgonul, M (2022) Empowering risk communication: Use of visualizations to describe project risks. Journal of Construction Engineering and Management, 148(5): 04022015, ISSN 0733-9364

Ayman Anwar, R (2022) Enhancing the integration of sustainability assessment within dynamic BIM enabled design projects. PhD thesis, Northumbria University, UK.

Aziz, Hayder (2007) A methodology for the distributed and collaborative management of engineering knowledge. PhD thesis, Cranfield University, UK.

Baborska-Narożny, M and Stevenson, F (2019) Service controls interfaces in housing: Usability and engagement tool development. Building Research & Information, 47(3), pp. 290-304. ISSN 0961-3218

Baghaei, M (2024) Developing a framework and understanding the key influencing factors for the implementation of the internet of things (IoT) in the UK construction sector. PhD thesis, University of Salford, UK.

Bahrami, S (2021) Product information quality: A sustainability challenge in design and construction. PhD thesis, Lund University, Sweden.

Bahrami, S and Zeinali, D (2023) The sustainability challenge of product information quality in the design and construction of facades: Lessons from the grenfell tower fire. Smart and Sustainable Built Environment, 12(3), pp. 488-506. ISSN 2046-6099

Baienat, S. and Iordanova, I. (2026) Quantifying building adaptability and circular performance through BIM: The adaptation intensity index (AII), circular adaptability performance (CAP), and digital adaptability passport (DAP). Smart and Sustainable Built Environment, pp. 1-22. ISSN 2046-6099

Balouktsi, M (2020) Carbon metrics for cities: Production and consumption implications for policies. Buildings & Cities, 1(1), pp. 233-259. ISSN 2632-6655

Beh, H J; Rashidi, A; Talei, A and Lee, Y S (2022) Developing engineering students' capabilities through game-based virtual reality technology for building utility inspection. Engineering, Construction and Architectural Management, 29(7), pp. 2854-2877. ISSN 0969-9988

Belniak, S; Leśniak, A; Plebankiewicz, E and Zima, K (2013) The influence of the building shape on the costs of its construction. Journal of Financial Management of Property and Construction, 18(1), pp. 90-102. ISSN 1366-4387

Benn, M and Stoy, C (2024) Challenges impairing the data quality of information deliverables in BIM during the planning phase of office buildings in Germany. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Bojic, M; Yik, F and Lee, M (2003) Influence of air-conditioning exhaust on exterior recessed space. Building Research & Information, 31(1), pp. 24-33. ISSN 0961-3218

Bordass, B; Cohen, R; Standeven, M and Leaman, A (2001) Assessing building performance in use 2: Technical performance of the Probe buildings. Building Research & Information, 29(2), pp. 103-113. ISSN 0961-3218

Bordass, B; Leaman, A and Ruyssevelt, P (2001) Assessing building performance in use 5: Conclusions and implications. Building Research & Information, 29(2), pp. 144-157. ISSN 0961-3218

Bordass, W and Leaman, A (1997) Design for manageability. Building Research & Information, 25(3), pp. 148-157. ISSN 0961-3218

Bordass, W and Leaman, A (1997) Future buildings and their services: Strategic considerations for designers and clients. Building Research & Information, 25(4), pp. 190-195. ISSN 0961-3218

Bowden, S L (2005) Application of mobile IT in construction. EngD thesis, Loughborough University, UK.

Braimah, N; Ndekugri, I and Gameson, R (2007) A systematic methodology for analysing disruption claims. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Bressan, Nicolò Maria (2024) VR as design management tool. PhD thesis, Università Iuav di Venezia, Italy.

Brown, C and Gorgolewski, M (2015) Understanding the role of inhabitants in innovative mechanical ventilation strategies. Building Research & Information, 43(2), pp. 210-221. ISSN 0961-3218

Byrd, R H (1981) The mathematical modelling of the environmental performance of buildings as an aid in the design process. PhD thesis, Aston University, UK.

Cao, Z; Huang, L; Mao, Y; Mustafa, M and Mohd Isa, M H (2025) Bridging conservation and modernity: Evaluation of functional priorities for architectural heritage adaptation in China. Building Research & Information, 53(7), pp. 833-845. ISSN 0961-3218

Carreira, P; Castelo, T; Gomes, C C; Ferreira, A; Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users perception. Engineering, Construction and Architectural Management, 25(1), pp. 90-112. ISSN 0969-9988

Carreira, P; Castelo, T; Gomes, C C; Ferreira, A; Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users' perceptions. Engineering, Construction and Architectural Management, 25(1), pp. 90-112. ISSN 0969-9988

Cemesova, A (2013) Enhancing BIM-based data transfer to support the design of low energy buildings. PhD thesis, Cardiff University, UK.

Chalhoub, J (2019) Benefits of using augmented reality in planning, construction and post-construction phases in specialty contracting. PhD thesis, Arizona State University, USA.

Chang, S; Castro-Lacouture, D and Yamagata, Y (2020) Estimating building electricity performance gaps with internet of things data using Bayesian multilevel additive modeling. Journal of Construction Engineering and Management, 146(12): 05020017, ISSN 0733-9364

Chaudhari, R; Goodrum, P; Brady, N; Jones, M; Hallowell, M; Yeh, T and Bhandari, S (2025) Exploring the impact of augmented reality on work performance in a full-scale MEP assembly task: Study of industry and novice populations. Journal of Construction Engineering and Management, 151(12): 04025189, ISSN 0733-9364

Chen, H and Chan, I Y S (2024) Effects of automation and transparency on human psychophysiological states and perceived system performance in construction safety automation: An electroencephalography experiment. Journal of Construction Engineering and Management, 150(7): 04024055, ISSN 0733-9364

Chen, H; Dong, Z and Chan, I Y S (2025) Biometric evaluation and immersive construction environments: A research overview of the current landscape, challenges, and future prospects. Journal of Construction Engineering and Management, 151(7): 03125005, ISSN 0733-9364

Chen, L; Zhang, J and Peng, W (2022) Research on the hierarchical discrete time-cost trade-off problem for program. Journal of Construction Engineering and Management, 148(7): 04022039, ISSN 0733-9364

Chun, M I; Harty, C and Schweber, L (2015) Comparative study of user-centred design approaches. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Danel, T; Lafhaj, Z; Puppala, A; BuHamdan, S; Lienard, S and Richard, P (2024) Identifying tower crane activities with data: The case of the concrete pouring. Engineering, Construction and Architectural Management, 31(2), pp. 939-956. ISSN 0969-9988

Dinis, F A M (2023) Development and validation of BIM-based natural user interfaces for non-geometrical information management. PhD thesis, Universidade do Porto, Portugal.

Distefano, M J and O'Brien, W J (2009) Comparative analysis of infrastructure assessment methodologies at the small unit level. Journal of Construction Engineering and Management, 135(2), pp. 96-107. ISSN 0733-9364

Du, J; Shi, Y; Zou, Z and Zhao, D (2018) COVR: Cloud-based multiuser virtual reality headset system for project communication of remote users. Journal of Construction Engineering and Management, 144(2): 04017109, ISSN 0733-9364

Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.

Ecem Yildiz, A; Dikmen, I and Talat Birgonul, M (2020) Using system dynamics for strategic performance management in construction. Journal of Construction Engineering and Management, 146(2), ISSN 0733-9364

Eiris, R; Albeaino, G; Gheisari, M; Benda, W and Faris, R (2021) Indrone: A 2D-based drone flight behavior visualization platform for indoor building inspection. Smart and Sustainable Built Environment, 10(3), pp. 438-456. ISSN 2046-6099

El Tayeh, A (2008) Social web-based systems for supporting geographically dispersed project teams in the architecture-engineering-construction industry. PhD thesis, University of Manchester, UK.

El-Diraby, T E (2012) Epistemology of construction informatics. Journal of Construction Engineering and Management, 138(1), pp. 53-65. ISSN 0733-9364

El-Tayeh, A and Gil, N (2007) Using digital socialization to support geographically dispersed AEC project teams. Journal of Construction Engineering and Management, 133(6), pp. 462-473. ISSN 0733-9364

Elazhary, M and El-adaway, I H (2025) Enhancing management of transportation projects: Integration factors for using smart contracts. Journal of Construction Engineering and Management, 151(12): 04025201, ISSN 0733-9364

Elgendi, E M O (2016) An automated dynamic site layout planning system: a case study of Egypt. PhD thesis, University of Salford, UK.

Esa, M (2015) The influence of project manager’s cognitive styles on project success in the Malaysian construction industry. PhD thesis, University of Malaya, Malaysia.

Fahri, J; Pollack, J and Kolar, D (2020) Identifying success criteria at the post-handover stage for international development projects. Construction Economics and Building, 20(4), pp. 103-119. ISSN 2204-9029

Fenais, A (2020) Developing an augmented reality solution for mapping underground infrastructure. PhD thesis, Arizona State University, USA.

Feriadi, H; Wong, N H; Chandra, S and Cheong, K W (2003) Adaptive behaviour and thermal comfort in Singapore's naturally ventilated housing. Building Research & Information, 31(1), pp. 13-23. ISSN 0961-3218

Foth, M (2018) Participatory urban informatics: Towards citizen-ability. Smart and Sustainable Built Environment, 7(1), pp. 4-19. ISSN 2046-6099

Franzè, A P; Belek Fialho Teixeira, M; Caldwell, G; Rafizadeh, H R; Schork, T; Gainey, L and Zahra, T (2025) Bricklayers' perspectives on human-robot collaboration (HRC) in on-site masonry construction: Opportunities, challenges, and considerations. Construction Innovation, 25(7), pp. 384-408. ISSN 1471-4175

França, Ana Judite Galbiatti Limongi (2016) Continuous improvement applied to standardized typology of buildings: Knowledge management in the context of the asset portfolio. PhD thesis, Universidade de São Paulo, Brazil.

Garriss, S (2008) Efficient, usable proof-construction strategies for distributed access-control systems. PhD thesis, Carnegie Mellon University, USA.

Gilani, S and O’Brien, W (2021) Natural ventilation usability under climate change in Canada and the United States. Building Research & Information, 49(4), pp. 367-386. ISSN 0961-3218

Giupponi, N and Thomson, C (2020) The implication of advances in community mapping through spatial information technologies for urban regeneration projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Glagola, C R (1993) A model of current quality performance measurements for industrial construction. PhD thesis, Clemson University, USA.

Gonsalves, N; Akanmu, A; Gao, X; Agee, P and Shojaei, A (2023) Industry perception of the suitability of wearable robot for construction work. Journal of Construction Engineering and Management, 149(5): 04023017, ISSN 0733-9364

Gonsalves, N J; Yusuf, A; Ogunseiju, O and Akanmu, A (2024) Evaluation of concrete workers' interaction with a passive back-support exoskeleton. Engineering, Construction and Architectural Management, 31(11), pp. 4585-4601. ISSN 0969-9988

Gram-Hanssen, K; Georg, S; Christiansen, E and Heiselberg, P (2018) What next for energy-related building regulations? The occupancy phase. Building Research & Information, 46(7), pp. 790-803. ISSN 0961-3218

Gupta, P and Elhag, T (2025) Applicability of lean techniques and processes on improving sustainability in construction projects. Built Environment Project and Asset Management, 15(2), pp. 247-270. ISSN 2044-124X

Gwak, H S; Son, S H; Park, Y J and Lee, D E (2016) Exact time-cost tradeoff analysis in concurrency-based scheduling. Journal of Construction Engineering and Management, 142(10): 04016054, ISSN 0733-9364

Hamida, M B (2025) Circular and adaptable building transformation: Reconceptualization, practice exploration, framework co‑development and implementation. PhD thesis, Delft University of Technology, Netherlands.

Hamida, M B; Jylhä, T; Remøy, H and Gruis, V (2022) Circular building adaptability and its determinants: a literature review. International Journal of Building Pathology and Adaptation, 41(6), pp. 47-69. ISSN 23984708

Hamida, M B; Remøy, H; Gruis, V and Jylhä, T (2025) Circular building adaptability in adaptive reuse: Multiple case studies in the Netherlands. Journal of Engineering, Design and Technology, 23(1), pp. 161-183. ISSN 1726-0531

Hellwig, R T (2015) Perceived control in indoor environments: A conceptual approach. Building Research & Information, 43(3), pp. 302-315. ISSN 0961-3218

Hendrickse, C and Thurner, T W (2019) Design intervention at major technological installations: Investigating the ergonomics of the South African Large Telescope (SALT). Journal of Engineering, Design and Technology, 17(2), pp. 402-413. ISSN 1726-0531

Hermans, M; van Zoest, S and Volker, L (2016) Assessing the maturity of public construction client organisations. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Hesselink, L; Vahdatikhaki, F; Harmsen, Y and Voordijk, H (2024) Usability analysis of virtual-reality-enabled digital twin for the inspection of sewage pumping stations. International Journal of Construction Management, 24(13), pp. 1419-1430. ISSN 1562-3599

Hill, Natoya (2025) A systematic literature review: Exploring the integration of artificial intelligence in construction management. DSc thesis, Middle Georgia State University, USA.

Hopfe, C J (2009) Uncertainty and sensitivity analysis in building performance simulation for decision support and design optimization. PhD thesis, Eindhoven University of Technology, Netherlands.

Hung, Yu-Hsiu (2010) How technology diffuses through construction user culture: An innovation design to improve safety technology adoption. PhD thesis, Virginia Tech, USA.

Ibbs, W and Nguyen, L D (2007) Schedule analysis under the effect of resource allocation. Journal of Construction Engineering and Management, 133(2), pp. 131-138. ISSN 0733-9364

Isaacs, J; Falconer, R; Gilmour, D and Blackwood, D (2010) Modelling and visualizing sustainability assessment in urbanenvironments. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Jang, W; Yu, G; Jung, W; Kim, D and Han, S H (2018) Financial conflict resolution for public-private partnership projects using a three-phase game framework. Journal of Construction Engineering and Management, 144(3): 05017022, ISSN 0733-9364

Jones, M M (2024) Exploring accessibility, usability, and relevance: A case study of Wyoming's construction workforce training program. PhD thesis, University of Wyoming, USA.

Kantola, M and Saari, A (2014) Commissioning for nearly zero-energy building projects. Construction Innovation, 14(3), pp. 370-382. ISSN 1471-4175

Khalid, Mohammad (2025) Enhancing computational thinking skills of the future construction workforce to perform sensor data analytics with end-user programming environment. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Kim, S; Mainardi, P; Jeong, H D; Rybkowski, Z K and Seo, J H (2025) Technology-driven serious games and simulations for construction management education. Journal of Construction Engineering and Management, 151(1): 04024185, ISSN 0733-9364

Kobayashi, Y (2001) Three-dimensional city modeler with fuzzy multiple layers perceptron: Application of soft computing in computer-aided architectural design systems. PhD thesis, University of California, Los Angeles, USA.

Kodikara Edirisinghe, R. and Gunathilake, L. (2026) An IoT-based heat stress management system for the construction industry. Engineering, Construction and Architectural Management, 33(3), pp. 2200-2219. ISSN 0969-9988

Kumar, V (2019) Developing COBie dataset management system (CDMS) to enhance usability of building information model-facilities management information exchange standard. PhD thesis, National University of Singapore, Singapore.

Kumar, V and Lin, E T A (2020) Conceptualizing "COBieEvaluator": A rule based system for tracking asset changes using COBie datasheets. Engineering, Construction and Architectural Management, 27(5), pp. 1093-1118. ISSN 0969-9988

Languell, J L (2001) Development of a prototype assessment tool to evaluate the potential to successfully implement deconstruction as a regional waste reduction strategy. PhD thesis, University of Florida, USA.

Leaman, A and Bordass, B (1999) Productivity in buildings: The 'killer' variables. Building Research & Information, 27(1), pp. 4-19. ISSN 0961-3218

Leaman, A and Bordass, B (2001) Assessing building performance in use 4: The probe occupant surveys and their implications. Building Research & Information, 29(2), pp. 129-143. ISSN 0961-3218

Lee, D E; Lim, T K and Arditi, D (2012) Stochastic project financing analysis system for construction. Journal of Construction Engineering and Management, 138(3), pp. 376-389. ISSN 0733-9364

Lee, N and Rojas, E M (2013) Visual representations for monitoring project performance: Developing novel prototypes for improved communication. Journal of Construction Engineering and Management, 139(8), pp. 994-1005. ISSN 0733-9364

Lee, Z P; Rahman, R A and Doh, S I (2022) Application of decision support tool in design-build projects: A quasi-experiment with novice decision makers. Built Environment Project and Asset Management, 12(4), pp. 537-555. ISSN 2044-124X

Leite, Regina Maria Cunha (2022) Gamification strategies and visual management: A model for disseminating production information and feedback to civil construction workers. PhD thesis, Universidade Senai Cimatec, Brazil.

Li, D; Zhou, H; Zhou, S; Huang, G; Ma, X; Zhao, Y; Wang, W and Ng, S T (2025) An eye-tracking-based approach to evaluate the usability of government portal websites in pilot smart cities. Engineering, Construction and Architectural Management, 32(4), pp. 2369-2396. ISSN 0969-9988

Li, L; Cheng, M; Tu, K; Ding, R; Zhang, J and Xu, B (2025) Human-machine interface based on constraint velocity polytope for safe and efficient operation of large-size hydraulic manipulator. Journal of Construction Engineering and Management, 151(7): 04025082, ISSN 0733-9364

Li, S; Wang, J and Xu, Z (2025) Automated compliance checking for BIM models based on Chinese-NLP and knowledge graph: An integrative conceptual framework. Engineering, Construction and Architectural Management, 32(6), pp. 3832-3856. ISSN 0969-9988

Liao, X; Lee, C Y and Chong, H Y (2020) Contractual practices between the consultant and employer in Chinese BIM-enabled construction projects. Engineering, Construction and Architectural Management, 27(1), pp. 227-244. ISSN 0969-9988

Lim, T K; Park, S M; Lee, H C and Lee, D E (2016) Artificial neural network-based slip-trip classifier using smart sensor for construction workplace. Journal of Construction Engineering and Management, 142(2): 04015065, ISSN 0733-9364

Lin, Y; Wu, D; Wang, X; Wang, X and Gao, S (2012) Statics-based simulation approach for two-crane lift. Journal of Construction Engineering and Management, 138(10), pp. 1139-1149. ISSN 0733-9364

Lindhard, S M; Lassen, A H; Cheng, Y; Musso, M; Wang, G and Bai, S (2025) The potential of exoskeletons in construction: barriers and challenges. Construction Innovation, 25(4), pp. 1231-1249. ISSN 1471-4175

Liu, C; González, V A; Lee, G; Cabrera-Guerrero, G; Zou, Y and Davies, R (2024) Integrating the last planner system and immersive virtual reality: Exploring the social mechanisms produced by using LPS in projects. Journal of Construction Engineering and Management, 150(7): 04024070, ISSN 0733-9364

Liu, C; González, V A; Lee, G; Davies, R; Cabrera-Guerrero, G and Zou, Y (2025) Assessing an immersive virtual reality-based simulation game capability to study the social mechanisms enabled by the Last Planner system in projects. Journal of Construction Engineering and Management, 151(9): 04025111, ISSN 0733-9364

Liu, Y; Messner, J I and Leicht, R M (2018) A process model for usability and maintainability design reviews. Architectural Engineering and Design Management, 14(6), pp. 457-469. ISSN 1745-2007

Lopez, R; Chong, H Y; Wang, X and Graham, J (2016) Technical review: Analysis and appraisal of four-dimensional building information modeling usability in construction and engineering projects. Journal of Construction Engineering and Management, 142(5): 06015005, ISSN 0733-9364

Maftei, L (2015) The use of immersive virtual reality technology in the design process: a reflective practice approach. PhD thesis, University of Reading, UK.

Majzoub, Omar (2025) A precursor to computation in architecture – an alternative to the current concept design process. PhD thesis, University of New South Wales, Australia.

Manewa, R M A S (2012) Economic considerations for adaptability in buildings. PhD thesis, Loughborough University, UK.

Mantle, E J (2007) An evaluation of 3d building modelling and visualisation packages for enhancing public participation within the planning process. PhD thesis, University of Glamorgan, UK.

Mastrolembo Ventura, Silvia (2019) The role of virtual reality in digitally-enabled design review: Procedural guidelines for the effective implementation of immersive virtual environments for usability-focused analysis. PhD thesis, Politecnico di Milano, Italy.

Matarneh, S T (2019) BIM-based information exchange framework to support facilities management systems. PhD thesis, University of Portsmouth, UK.

Matoseiro Dinis, F; Rodrigues, R and Pedro da Silva Poças Martins, J (2024) Development and validation of natural user interfaces for semantic enrichment of BIM models using open formats. Construction Innovation, 24(1), pp. 196-220. ISSN 1471-4175

Mazzola, C; Zanelli, A; Stimpfle, B and Canobbio, R (2021) Temporactive pavilion: Second design-to-construction loop of an ultra-lightweight temporary architecture. Architectural Engineering and Design Management, 17(3-4), pp. 216-228. ISSN 1745-2007

Md Ali, Z; Zawawi, R; Myeda, N E and Mohamad, N (2019) Adaptive reuse of historical buildings: Service quality measurement of Kuala Lumpur museums. International Journal of Building Pathology and Adaptation, 37(1), pp. 54-68. ISSN 23984708

Mechlenborg, M and Gram-Hanssen, K (2022) Masculine roles and practices in homes with photovoltaic systems. Buildings & Cities, 3(1), pp. 638-652. ISSN 2632-6655

Meistad, T (2014) How energy efficient office buildings challenge and contribute to usability. Smart and Sustainable Built Environment, 3(2), pp. 110-131. ISSN 2046-6099

Meistad, Torill Randi (2015) Sustainable building: From role model projects to industrial transformation. PhD thesis, Norges Teknisk-Naturvitenskapelige Universitet, Norway.

Meriläinen, S and Tervo, A (2025) The changing typology of urban apartment buildings in Aurinkolahti. Buildings & Cities, 6(1), pp. 50-69. ISSN 2632-6655

Miller, A; Radcliffe, D and Isokangas, E (2009) A perception-influence model for the management of technology implementation in construction. Construction Innovation, 9(2), pp. 168-183. ISSN 1471-4175

Moezzi, M and Goins, J (2011) Text mining for occupant perspectives on the physical workplace. Building Research & Information, 39(2), pp. 169-182. ISSN 0961-3218

Moghaddam, S.; Dashti, M. S.; Alvanchi, A. and Khanzadi, M. (2026) An integrated BIM-based augmented reality framework for improving facility maintenance management. Engineering, Construction and Architectural Management, 33(3), pp. 2007-2047. ISSN 0969-9988

Mohammadi, A; Yang, J; Borgianni, Y and Zeng, Y (2024) Barriers and enablers of TRIZ: A literature analysis using the tasks framework. Journal of Engineering, Design and Technology, 22(4), pp. 1206-1230. ISSN 1726-0531

Moura, Paula Kvitko de (2022) Guidelines for the development of innovative solutions in the construction industry. PhD thesis, Universidade Federal do Rio Grande do Sul, Brazil.

Mughrabi, A O (2019) Change management capability maturity model for contractors in the Kuwaiti construction industry. PhD thesis, Heriot-Watt University, UK.

Muramatsu, M and Kato, T (2019) Selection guide of multi-objective optimization for ergonomic design. Journal of Engineering, Design and Technology, 17(1), pp. 2-24. ISSN 1726-0531

Nahmens, I and Reichel, C (2013) Adoption of high performance building systems in hot-humid climates: lessons learned. Construction Innovation, 13(2), pp. 186-201. ISSN 1471-4175

Nam, T-J (2001) Investigations of collaborative design environments: a framework for real-time collaborative 3D CAD. PhD thesis, Brunel University, UK.

Nepal, M P (2011) Automated extraction and querying of construction-specific design features from a building information model. PhD thesis, University of British Columbia, Canada.

Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public–private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X

Nguyen, T; Hallo, L and Gunawan, I (2024) Investigating risk of public-private partnerships (PPPs) for smart transportation infrastructure project development. Built Environment Project and Asset Management, 14(1), pp. 74-91. ISSN 2044-124X

North, Steve (2003) Clients' 3D visualisation of construction performance: from s-curves to data surfaces. PhD thesis, University College London, UK.

Nourbakhsh, M; Mohamad Zin, R; Irizarry, J; Zolfagharian, S and Gheisari, M (2012) Mobile application prototype for onsite information management in construction industry. Engineering, Construction and Architectural Management, 19(5), pp. 474-494. ISSN 0969-9988

Ock, J-H (1998) Integrated decision process model (idepm) for the development of the build-operate-transfer (bot) highway project proposals. PhD thesis, University of Colorado at Boulder, USA.

Ogunseiju, O R; Gonsalves, N; Akanmu, A A; Abraham, Y and Nnaji, C (2024) Automated detection of learning stages and interaction difficulty from eye-tracking data within a mixed reality learning environment. Smart and Sustainable Built Environment, 13(6), pp. 1473-1489. ISSN 2046-6099

Ogunseiju, Omobolanle Ruth (2022) Impact of interactive holographic learning environment for bridging technical skill gaps of future smart construction engineering and management students. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Oh, Heung Jin (2024) Exploratory analysis of construction job opening advertisements for investigating actual labor needs using web scraping and text analytics. PhD thesis, Georgia Institute of Technology, USA.

Okunola, A; Akanmu, A A and Yusuf, A O (2025) Comparison of active and passive back-support exoskeletons for construction work: Range of motion, discomfort, usability, exertion and cognitive load assessments. Smart and Sustainable Built Environment, 14(3), pp. 582-598. ISSN 2046-6099

Organ, S (2020) The opportunities and challenges of improving the condition and sustainability of a historic building at an international tourist attraction in the UK. International Journal of Building Pathology and Adaptation, 38(2), pp. 329-355. ISSN 23984708

Oshidero, D. F. O. and Coley, D. A. (2026) Talking carbon: A lexical approach to predictive embodied carbon analysis via machine learning. Architectural Engineering and Design Management, 22(1), pp. 235-268. ISSN 1745-2007

Owolabi, A A; Anumba, C J and El-Hamalawi, A (2003) Towards implementing integrated building product libraries. Construction Innovation, 3(3), pp. 175-194. ISSN 1471-4175

Oyegoke, A S; Ajayi, S; Abbas, M A and Ogunlana, S (2025) Development of a smart home suitability indicator and indicative self-assessment platform for the disabled facilities grants (dfgs). International Journal of Building Pathology and Adaptation, 43(2), pp. 139-158. ISSN 2398-4708

Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Park, M-W (2012) Automated 3D vision-based tracking of construction entities. PhD thesis, Georgia Institute of Technology, USA.

Park, Y J; Gwak, H S and Lee, D E (2017) Dozer workability estimation method for economic dozing. Journal of Construction Engineering and Management, 143(2): 04016096, ISSN 0733-9364

Parvar, J (2003) Neural networks decision support system (decision to bid). PhD thesis, University of Manchester, UK.

Pepper, C; Dainty, A R J; Bagilhole, B M and Gibb, A G F (2002) Diversity: A driver of business improvement within the UK construction sector? In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Pereira, E.; Penner, J. and Ghorab, K. (2026) Integrating energy-based safety with gamified experiential learning for hazard-recognition training. Journal of Construction Engineering and Management, 152(8): 04026129, ISSN 0733-9364

Pereira, Ana Paula Carvalho (2017) Building information modeling in the project phase: A proposal for a BIM execution plan for SUMAI / UFBA. PhD thesis, Universidade Federal da Bahia, Brazil.

Plantinga, H E C; Voordijk, J T and Dorée, A G (2014) Assessing qualification systems: The relevance of explicating implicit reasoning. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Potseluyko Amobi, L (2021) Improving business and technical operations within timber frame self-build housing sector by applying integrated VR/AR and BIM technologies. PhD thesis, Teesside University, UK.

Prabhakaran, A (2023) Development of interactive and distributed virtual environments for immersive communication in the furniture, fixture and equipment sector. PhD thesis, University of the West of England, Bristol, UK.

Qin, Y and Bulbul, T (2023) An EEG-based mental workload evaluation for ar head-mounted display use in construction assembly tasks. Journal of Construction Engineering and Management, 149(9): 04023088, ISSN 0733-9364

Qu, T (2006) The usability of graphical user interfaces of mobile computing devices designed for construction foremen: Icons and pre-defined text lists compared. PhD thesis, University of Florida, USA.

Rahman, Muzibur (2022) Constructors' decision-support framework for nzeb projects. PhD thesis, Oklahoma State University, USA.

Rashidi, A; Yong, W Y; Maxwell, D and Fang, Y (2023) Construction planning through 4D BIM-based virtual reality for light steel framing building projects. Smart and Sustainable Built Environment, 12(5), pp. 1153-1173. ISSN 2046-6099

Rodrigues, Patrick Borges (2025) A user-centered framework for designing sensory-enhanced teleoperation interfaces for construction robots. PhD thesis, University of Southern California, USA.

Roupé, M (2013) Development and implementations of virtual reality for decision-making in urban planning and building design. PhD thesis, Chalmers University of Technology, Sweden.

Sakpere, W E; Mlitwa, N B W and Oshin, M A (2017) Towards an efficient indoor navigation system: A near field communication approach. Journal of Engineering, Design and Technology, 15(4), pp. 505-527.

Sanders, S R (1989) An analysis of factors affecting labor productivity in masonry construction. PhD thesis, Pennsylvania State University, USA.

Savikko, H; Hokkanen, J; Metsäranta, H; Honkatukia, J; Haapanen, M; Tohmo, T and Pongrácz, E (2025) A methodological framework to assess the employment impacts of transport infrastructure construction. Construction Economics and Building, 25(2), pp. 143-167. ISSN 2204-9029

Schuler, M. L.; Albertson, L.; Katz, L. E.; Armanios, D. E. and Faust, K. M. (2026) Drawn from experience: Coproducing a graphic guide with arctic water sector workers. Journal of Construction Engineering and Management, 152(9): 04026146, ISSN 0733-9364

Sengupta Dasgupta, P (2013) Interventions to reduce ergonomic exposures during drywall installation. ScD thesis, University of Massachusetts Lowell, USA.

Shaw, N (2010) Improving innovation management in construction. EngD thesis, Loughborough University, UK.

Shen, K; Zhu, Y; Pan, J and Li, X (2023) An intelligent decision-making model for the design of precast slab joints based on case-based reasoning. Journal of Construction Engineering and Management, 149(5): 04023025, ISSN 0733-9364

Shen, Xiaohan (2025) Vision-based information management using digital construction knowledge graphs to integrate data in digital twins for prefabricated construction. PhD thesis, University of New South Wales, Australia.

Shi-Dong, L and Zhao-Dong, X (2024) Research on IFC instance data based on topology induction network. Architectural Engineering and Design Management, 20(3), pp. 526-558. ISSN 1745-2007

Silverio Fernández, M A (2019) Implementation of smart devices in the construction industry. PhD thesis, University of Wolverhampton, UK.

Silverio-Fernandez, M A; Renukappa, S and Suresh, S (2019) Evaluating critical success factors for implementing smart devices in the construction industry: An empirical study in the Dominican Republic. Engineering, Construction and Architectural Management, 26(8), pp. 1625-1640. ISSN 0969-9988

Song, M H (2019) Formalization of smallest workface boundary (SWFB): Toward generating and operating level of development (LOD) 400-based daily bill of materials (BOM). PhD thesis, Stanford University, USA.

Stansfield, F R (1995) Work in the IT industry on usability provides an agenda for improvement of construction procurement methods. Journal of Construction Procurement, 1(2), pp. 124-149. ISSN 1358-9180

Steemers, K (2003) Towards a research agenda for adapting to climate change. Building Research & Information, 31(3-4), pp. 291-301. ISSN 0961-3218

Stevenson, F and Rijal, H B (2010) Developing occupancy feedback from a prototype to improve housing production. Building Research & Information, 38(5), pp. 549-563. ISSN 0961-3218

Stewart, J H (2024) The plastics crisis: Responsible recycling in civil engineering and infrastructure. PhD thesis, Mississippi State University, USA.

Struck, C (2012) Uncertainty propagation and sensitivity analysis techniques in building performance simulation to support conceptual building and system design. PhD thesis, Eindhoven University of Technology, Netherlands.

Sweetnam, T; Fell, M; Oikonomou, E and Oreszczyn, T (2019) Domestic demand-side response with heat pumps: Controls and tariffs. Building Research & Information, 47(4), pp. 344-361. ISSN 0961-3218

Tampio, K P and Haapasalo, H (2022) Organising methods enabling integration for value creation in complex projects. Construction Innovation, 24(7), pp. 21-43. ISSN 1471-4175

Tanyer, A M (2004) Implementation barriers of computer integrated construction: A usability perspective. PhD thesis, University of Salford, UK.

Tharachai, T (2004) Multiple project resource scheduling for construction. PhD thesis, University of Michigan, USA.

Vale, B and Vale, R (2010) Domestic energy use, lifestyles and poe: Past lessons for current problems. Building Research & Information, 38(5), pp. 578-588. ISSN 0961-3218

Van Dam, S S; Bakker, C A and Van Hal, J D M (2010) Home energy monitors: Impact over the medium-term. Building Research & Information, 38(5), pp. 458-469. ISSN 0961-3218

Venter, I M; Blignaut, R J and Renaud, K (2014) Uniformity in the midst of diversity. Journal of Engineering, Design and Technology, 12(4), pp. 550-562.

Vieira, P M d S (2007) Environmental assessment of office buildings. PhD thesis, University of California, Berkeley, USA.

Viteri, V R (2003) Experiential learning environments for structural behavior. PhD thesis, Massachusetts Institute of Technology, USA.

Wan, R H J; Jia, A Y and Goh, Y M (2021) Managing climatic heat stress in Singapore: State of the practice and wearables on site. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.

Wu, M; Wang, L; Li, M and Long, H (2015) Alleviating feature fatigue in product development based on the bass model. Journal of Engineering, Design and Technology, 13(3), pp. 350-368.

Wu, Shaoze (2024) Enhancing construction workforce safety through formulating an augmented reality digital twin system. PhD thesis, RMIT University, Australia.

Xie, H (2005) User model-driven architecture for information retrieval in construction project management. PhD thesis, University of Florida, USA.

Yalcinkaya, M and Singh, V (2019) Exploring the use of gestalt's principles in improving the visualization, user experience and comprehension of cobie data extension. Engineering, Construction and Architectural Management, 26(6), pp. 1024-1046. ISSN 0969-9988

Yang, W and Lam, P T I (2026) A framework for foundational and transitional value assessment of non-market benefits of a smart government system. Building Research & Information, 54(2), pp. 237-256. ISSN 0961-3218

Yevu, S K; Yu, A T W; Nani, G; Darko, A and Tetteh, M O (2022) Electronic procurement systems adoption in construction procurement: A global survey on the barriers and strategies from the developed and developing economies. Journal of Construction Engineering and Management, 148(1): 04021186, ISSN 0733-9364

Yu, H (2009) A knowledge based system for construction health and safety competence assessment. PhD thesis, University of Wolverhampton, UK.

Yusuf, A; Akanmu, A; Afolabi, A; Murzi, H; Ball, S and Ofori-Boadu, A N (2025) Design and evaluation of a web platform for connecting instructors and practitioners–instructors' perspective. International Journal of Construction Education and Research, 21(2), pp. 256-288. ISSN 1557-8771

Zabihi Kolaei, A; Khanzadi, M and Ghodrati Amiri, G (2026) Integration of augmented reality and blockchain technologies for visualizing and documenting change orders in a building project: Case study. Journal of Construction Engineering and Management, 152(2): 04025251, ISSN 0733-9364

Zeb, J and Froese, T (2014) Infrastructure management transaction formalism protocol specification: A process development model. Construction Innovation, 14(1), pp. 69-87. ISSN 1471-4175

Zhang, Yibo (2017) A tool to evaluate sustainability of pavement maintenance projects. PhD thesis, University of Louisville, USA.

Zhao, J (2020) Towards a proactive real-time data-driven musculoskeletal disorders prevention approach in construction. PhD thesis, Pennsylvania State University, USA.

Zhao, Y; Mantha, B R K; Knijnenburg, B P and Li, D (2025) Exploring the feasibility of mobile robots for post-occupancy evaluations. Building Research & Information, 53(1-2), pp. 165-182. ISSN 0961-3218

Zhou, W (2009) An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulation. PhD thesis, University of Wolverhampton, UK.

Zhou, W; Heesom, D; Georgakis, P and Tah, J H M (2014) User-centred design for collaborative 4D modelling. Construction Innovation, 14(4), pp. 493-517. ISSN 1471-4175

Zolfagharian, S; Irizarry, J; Ressang, A; Nourbakhsh, M and Gheisari, M (2014) Automated safety planning approach for residential construction sites in Malaysia. International Journal of Construction Management, 14(3), pp. 134-147. ISSN 1562-3599

Zu, F. and Zhang, X. (2026) Streamline the information phase of the value engineering workshop through a web-based platform integrating BIM and GIS. Engineering, Construction and Architectural Management, 33(5), pp. 4149-4180. ISSN 0969-9988

Zuluaga Santa, C M (2018) Protecting bridge maintenance workers: Evaluating fall protection supplementary devices using virtual prototyping and wearable technology. PhD thesis, North Carolina State University, USA.

Özer, S and Jacoby, S (2022) Dwelling size and usability in London: A study of floor plan data using machine learning. Building Research & Information, 50(6), pp. 694-708. ISSN 0961-3218

This list was generated on Sat Aug 22 01:37:50 2026 UTC.