Items with Index Term: upper bound

Number of items: 18.

Arora, R (1997) Role and influence of emerging social dynamics in decisions on investment opportunities in construction industry. PhD thesis, Indian Institute of Technology Delhi, India.

Bon, R (1988) Replacement simulation model: A framework for building portfolio decisions. Construction Management and Economics, 6(2), pp. 149-159. ISSN 01446193

Buckman, A H; Mayfield, M and Beck, S B M (2014) What is a smart building? Smart and Sustainable Built Environment, 3(2), pp. 92-109. ISSN 2046-6099

Choi, K (2008) A new decision-support model for innovative contracting strategies through a quantitative analysis on aspects of project performance. PhD thesis, University of California, Berkeley, USA.

Das, P P; Khatri, V N; Doley, R; Dutta, R K and Yadav, J S (2024) Estimation of bearing capacity of shallow footings on layered sand using finite elements analysis. Journal of Engineering, Design and Technology, 22(2), pp. 385-403. ISSN 1726-0531

Dong, F (2010) Essays in advanced risk management and quantitative strategies in infrastructure finance. PhD thesis, Columbia University, USA.

French, T R (2012) Evolutionary optimisation of network flow plans for emergency movement in the built environment. PhD thesis, University of Edinburgh, UK.

Guo, X (2008) Pricing and financing roads in transportation networks. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.

Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364

Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.

Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364

Kamanda-Kabague, B M (1981) Application of mathematical model techniques to the planning and control of overhead costs in the construction industry. PhD thesis, City, University of London, UK.

Karsten Winther, J; Nielsen, R; Schultz, C and Teizer, J (2021) Automated activity and progress analysis based on non-monotonic reasoning of construction operations. Smart and Sustainable Built Environment, 10(3), pp. 457-486. ISSN 2046-6099

Lin, G (2011) Decision model for determination of adaptation potential and renewal action for public housing in Singapore. PhD thesis, National University of Singapore, Singapore.

Nasirzadeh, F; Kabir, H M D; Akbari, M; Khosravi, A; Nahavandi, S and Carmichael, D G (2020) ANN-based prediction intervals to forecast labour productivity. Engineering, Construction and Architectural Management, 27(9), pp. 2335-2351. ISSN 0969-9988

Russell, A D and Ranasinghe, M (1991) Decision framework for fast-track construction: A deterministic analysis. Construction Management and Economics, 9(5), pp. 467-479. ISSN 01446193

Seydel, J (2003) Evaluating and comparing bidding optimization effectiveness. Journal of Construction Engineering and Management, 129(3), pp. 285-292. ISSN 0733-9364

Siu, M F F; Lu, M and Abourizk, S (2016) Resource supply-demand matching scheduling approach for construction workface planning. Journal of Construction Engineering and Management, 142(1): 04015048, ISSN 0733-9364

This list was generated on Sat Aug 22 01:53:38 2026 UTC.