Items with Index Term: turnover

Number of items: 191.

Abdolmaleki, G; Naismith, N; Ghodrati, N; Poshdar, M and Babaeian Jelodar, M (2024) An analysis of the literature on construction employee turnover: drivers, consequences, and future direction. Construction Management and Economics, 42(9), pp. 822-846. ISSN 01446193

Adham, A (2018) The political economy of work in Saudi Arabia: a comparative labour process analysis in two firms. PhD thesis, De Montfort University, UK.

Agunbiade, O (2019) Transcendental phenomenological study of what the pipeline engineering personnel perceive as intention-to-leave. DM thesis, University of Phoenix, USA.

Aibinu, A A and Pasco, T (2008) The accuracy of pre-tender building cost estimates in Australia. Construction Management and Economics, 26(12), pp. 1257-1269. ISSN 1466433X

Akintoye, A and Fitzgerald, E (2000) A survey of current cost estimating practices in the UK. Construction Management and Economics, 18(2), pp. 161-172. ISSN 01446193

Akintoye, A and Skitmore, M (1991) Profitability of UK construction contractors. Construction Management and Economics, 9(4), pp. 311-325. ISSN 01446193

Al kailani, H.; Bhattacharjee, K.; Bonilla, M. and Nnaji, C. (2026) Tailoring perceived workforce sustainability strategies in the US construction industry. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Al kailani, H.; Bhattacharjee, K.; Bonilla, M. and Nnaji, C. (2026) Tailoring perceived workforce sustainability strategies in the US construction industry. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Alharbi, S (2020) The influence of human resources management on job embeddedness and voluntary turnover intention: a case study of the constructions industry in Saudi Arabia. PhD thesis, University of Plymouth, UK.

Alsamadani, R; Hallowell, M R; Javernick-Will, A and Cabello, J (2013) Relationships among language proficiency, communication patterns, and safety performance in small work crews in the United States. Journal of Construction Engineering and Management, 139(9), pp. 1125-1134. ISSN 0733-9364

Altamimi, M (2024) BIM adoption in local-based architecture and engineering SMEs : Developing an application-based method to pinpoint objective BIM uses and align them with business standards to facilitate the execution of BIM projects in prospective architecture and engineering SMEs. PhD thesis, University of Pécs, Hungary.

Ameh, O J and Daniel, E I (2017) Human resource management in the Nigerian construction firms: Practices and challenges. Journal of Construction Business and Management, 1(2), pp. 47-54. ISSN 2521-0165

Amuda-Yusuf, G (2018) Critical success factors for building information modelling implementation. Construction Economics and Building, 18(3), pp. 55-73. ISSN 2204-9029

Asnaashari, E; Knight, A; Hurst, A and Farahani, S S (2009) Causes of construction delays in Iran: Project management, logistics, technology and environment. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Atukpa, D J (2021) Managerial support strategies to minimize job insecurity among Nigerian private firms. PhD thesis, Walden University, USA.

Avila, J; Rapp, R; Dunbar, S and Jackson, A T (2021) Burnout and worklife in disaster restoration: Maslach burnout inventory and areas of worklife survey. Journal of Construction Engineering and Management, 147(2): 04020171, ISSN 0733-9364

Aye, S. Y.; Santoso, D. S. and Dodanwala, T. C. (2026) Bridging the gap: How generational work values influence job satisfaction and turnover intention in the construction industry. Journal of Engineering, Design and Technology, 24(4), pp. 920-942. ISSN 1726-0531

Ayodele, O A; Chang-Richards, A and González, V (2020) Factors affecting workforce turnover in the construction sector: A systematic review. Journal of Construction Engineering and Management, 146(2), ISSN 0733-9364

Ayodele, O A; Chang-Richards, Y and González, V A (2022) A framework for addressing construction labour turnover in New Zealand. Engineering, Construction and Architectural Management, 29(2), pp. 601-618. ISSN 0969-9988

Baker, M; Ali, M; Hassett, E and Jahan Tumpa, R (2025) Tapping the untapped resource to address construction skills shortages: Perceptions of Australian women career changers and construction women. Journal of Construction Engineering and Management, 151(4): 04025006, ISSN 0733-9364

Banerjee, S (2022) Developing an organization-wide knowledge repository with intelligent knowledge transference to enhance construction project outcomes. PhD thesis, North Carolina State University, USA.

Bani Ismail, L (2012) An evaluation of the implementation of total quality management within the construction sector in the United Kingdom and Jordan. PhD thesis, University of Huddersfield, UK.

Bani Ismail, Loiy (2012) An evaluation of the implementation of total quality management (TQM) within the construction sector in the United Kingdom and Jordan. PhD thesis, University of Huddersfield, UK.

Berrill, P and Hertwich, E G (2021) Material flows and GHG emissions from housing stock evolution in US counties, 2020–60. Buildings & Cities, 2(1), pp. 599-617. ISSN 2632-6655

Borg, J and Scott-Young, C M (2022) Contributing factors to turnover intentions of early career project management professionals in construction. Construction Management and Economics, 40(10), pp. 835-853. ISSN 01446193

Bosfield, R (2014) Feasibility of an open source repository for increasing the usage of best practices in the architecture-engineering-construction industry. PhD thesis, Arizona State University, USA.

Brandenburg, S G (2004) The Tier I workforce management strategy: Concept and application. PhD thesis, University of Texas at Austin, USA.

Briscoe, G H; Dainty, A R J and Millett, S J (1999) The likely impact of the tax system on self-employment in the british construction industry. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Butcher, D C A (2011) Learning organization principles and processes: UK construction organization experiences. PhD thesis, University of South Wales, UK.

Buzzelli, M D (2001) The Canadian urban housebuilding industry: Firm size structure and production methods in Ontario, 1945–2000. PhD thesis, McMaster University, Canada.

Caldas, C H; Gibson Jr, G E; Weerasooriya, R and Yohe, A M (2009) Identification of effective management practices and technologies for lessons learned programs in the construction industry. Journal of Construction Engineering and Management, 135(6), pp. 531-539. ISSN 0733-9364

Carmody, S; Spillane, J P and Clarke, N (2022) Barriers to the implementation of modular construction in Ireland: A case study from an Irish small and medium-sized enterprise perspective. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Carrillo, P and Heavey, I A N (2000) UK contractors' acquisitions strategy for central and eastern Europe. Engineering, Construction and Architectural Management, 7(3), pp. 322-328. ISSN 0969-9988

Charlson, J (2021) Emerging trends in construction law at the confluence of academia and industry. PhD thesis, University of Wolverhampton, UK.

Chathurangi, B. N. M.; Kamardeen, I. and Firose, M. M. (2026) Mitigating gendered career challenges in construction through psychological capital. Journal of Construction Engineering and Management, 152(10): 04026172, ISSN 0733-9364

Cheetham, D W (1982) Labour management practices on construction sites and some of their consequences. Construction Papers, 1(3), pp. 37-53. ISSN 0144-8587

Cheetham, D W; Kaka, A P and Humphreys, G (1997) Development and implementation of a system of financial planning and control for a medium sized building contractor. Journal of Financial Management of Property and Construction, 2(1), pp. 5-34. ISSN 1366-4387

Cheng, M Y; Vu, Q T and Wu, T C (2026) Highway bridge crack inspection verification and training using an automated augmented reality system. Journal of Construction Engineering and Management, 152(3): 04025279, ISSN 0733-9364

Chih, Y Y; Kiazad, K; Zhou, L; Capezio, A; Li, M and Restubog, S L D (2016) Investigating employee turnover in the construction industry: A psychological contract perspective. Journal of Construction Engineering and Management, 142(6): 04016006, ISSN 0733-9364

Childs, B R; Weidman, J E; Farnsworth, C B and Christofferson, J P (2017) Use of personality profile assessments in the us commercial construction industry. International Journal of Construction Education and Research, 13(4), pp. 267-83. ISSN 1557-8771

Chua, D K H; Kog, Y C; Loh, P K and Jaselskis, E J (1997) Model for construction budget performance: neural network approach. Journal of Construction Engineering and Management, 123(3), pp. 214-222. ISSN 0733-9364

Cummins, A; Graham, B; Thomas, K and Lucey, T (2016) The effectiveness of managing through trust the middle management layer of a construction company: Proposed ethnographic research. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Dainty, A R J; Bagilhole, B M and Neale, R H (1998) Improving the retention of construction professionals: A soft HRM approach. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Davies, R J (2003) Formulating competitive strategy in the UK housebuilding industry: Executive summary. EngD thesis, University of Warwick, UK.

Davis, R and Watson, P (1999) The utilization of formulae in overhead and profit claims. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Denny, J (2025) Organizing change: A single case study exploring the perceptions of self-determination in high school employees during a building renovation. EdD thesis, Baylor University, USA.

Dhaenens, A; Zheng, W; Sanders, K and Sumelius, J (2026) Mind the gap: Employee work arrangements, work-family balance satisfaction, and turnover in international property development. Journal of Construction Engineering and Management, 152(1): 04025231, ISSN 0733-9364

Dodanwala, T C and Santoso, D S (2022) The mediating role of job stress on the relationship between job satisfaction facets and turnover intention of the construction professionals. Engineering, Construction and Architectural Management, 29(4), pp. 1777-1796. ISSN 0969-9988

Dodanwala, T C; Santoso, D S and Yukongdi, V (2023) Examining work role stressors, job satisfaction, job stress, and turnover intention of sri lanka's construction industry. International Journal of Construction Management, 23(15), pp. 2583-2592. ISSN 1562-3599

Du, J J; Zhou, J; Liu, C and Picken, D (2006) Exploring turnover intention of construction managers in China. Journal of Construction Research, 7(1), pp. 191-205. ISSN 1609-9451

Duong, L N K; Wang, J X; Wood, L C; Reiners, T and Koushan, M (2021) The value of incremental environmental sustainability innovation in the construction industry: An event study. Construction Management and Economics, 39(5), pp. 398-418. ISSN 01446193

Dupin, P (2021) Using pull and flow systems to improve production stability in real estate development projects. PhD thesis, Nottingham Trent University, UK.

Feiruzi, A (2024) The turnover dynamics of residential buildings. PhD thesis, Lancaster University, UK.

Fieldson, R (2017) The afterlife clause; towards a strategy for improved adaptation in retail property. International Journal of Building Pathology and Adaptation, 35(4), pp. 364-379.

Francis, V (2002) Supportive organizations: Assessing their effect on civil engineers. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Franz, B; Leicht, R; Molenaar, K and Messner, J (2017) Impact of team integration and group cohesion on project delivery performance. Journal of Construction Engineering and Management, 143(1): 04016088, ISSN 0733-9364

Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance. PhD thesis, Pennsylvania State University, USA.

Frödell, M (2014) Organisation of purchasing and buyer-supplier relationships in large construction companies. PhD thesis, Chalmers University of Technology, Sweden.

Gaber Abubaker, A (2016) Factors affecting maintenance labour productivity in the building industry. PhD thesis, University of Dundee, UK.

Gbiengu, P.; Khan, M.; Nnaji, C. and Karakhan, A. A. (2026) Enhancing employee retention in construction: Role of workforce sustainability attributes. International Journal of Construction Management, 26(9), pp. 1815-1835. ISSN 1562-3599

Gochoco, J J (1968) The capital structure and financing of the construction industry. PhD thesis, University of Manchester, UK.

Goldman, C M (2025) The built environment and employee well-being: An investigation into the attributes and impacts of supportive physical work environments in long-term care facilities. PhD thesis, University of Colorado at Denver, USA.

Gomar, J E; Haas, C T and Morton, D P (2002) Assignment and allocation optimization of partially multiskilled workforce. Journal of Construction Engineering and Management, 128(2), pp. 103-109. ISSN 0733-9364

Graham, B and Thomas, K (2005) An investigation into the development of knowledge management systems within the leading Irish construction companies. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Griner Jr., C H (2019) Small construction business owners' strategies for employee retention. DBA thesis, Walden University, USA.

Grosskopf, K R (2010) Post-disaster recovery and reconstruction safety training. International Journal of Disaster Resilience in the Built Environment, 1(3), pp. 322-333. ISSN 1759-5916

Gruneberg, S (2005) The performance of major firms in the heating and ventilating industry. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Hajikazemi, S.; Duryan, M.; Smyth, H.; Yuan, F. and Liu, C. (2026) Exploring mindfulness as a tool for recognition and prevention of burnout in construction and engineering. Engineering, Construction and Architectural Management, 33(7), pp. 5675-5694. ISSN 0969-9988

Hanna, A S and Iskandar, K A (2017) Quantifying and modeling the cumulative impact of change orders. Journal of Construction Engineering and Management, 143(10): 04017076, ISSN 0733-9364

Hanus, V P (2025) Predicting critical management-controlled factors to increase productivity within the construction industry. DEngr thesis, George Washington University, USA.

Hare, B and Cameron, I (2011) Site manager safety training. Engineering, Construction and Architectural Management, 18(6), pp. 568-578. ISSN 0969-9988

Hee, C H S and Ling, F Y Y (2011) Strategies for reducing employee turnover and increasing retention rates of quantity surveyors. Construction Management and Economics, 29(10), pp. 1059-1072. ISSN 01446193

Hijazi, S A (2016) Developing a framework to enhance building handover practices in public sector construction projects in the Kingdom of Saudi Arabia. PhD thesis, University of Salford, UK.

Hinze, J and Gambatese, J (2003) Factors that influence safety performance of specialty contractors. Journal of Construction Engineering and Management, 129(2), pp. 159-164. ISSN 0733-9364

Hua, G B (2007) Applying the strategic alignment model to business and ICT strategies of Singapore's small and medium-sized architecture, engineering and construction enterprises. Construction Management and Economics, 25(2), pp. 157-169. ISSN 1466433X

Hui, E C M; Lo, T K K; Chen, J and Wang, Z (2012) Housing and consumer markets in urban China. Construction Management and Economics, 30(2), pp. 117-131. ISSN 1466433X

Husam, S; Laishram, B and Johari, S (2024) Determining the extent of attributes contributing to gender inclusion of workers in the construction industry. Journal of Construction Engineering and Management, 150(10): 04024145, ISSN 0733-9364

Ikpe, E; Hammon, F and Oloke, D (2012) Cost-benefit analysis for accident prevention in construction projects. Journal of Construction Engineering and Management, 138(8), pp. 991-998. ISSN 0733-9364

Ikpe, E O (2009) Development of cost benefit analysis model of accident prevention on construction projects. PhD thesis, University of Wolverhampton, UK.

Jaselskis, E J and Ashley, D B (1991) Optimal allocation of project management resources for achieving success. Journal of Construction Engineering and Management, 117(2), pp. 321-340. ISSN 0733-9364

Jiang, S and Li, J (2025) Impact of person-environment fit on construction project managers' turnover intention: A moderated mediation model. Engineering, Construction and Architectural Management, 32(4), pp. 2487-2506. ISSN 0969-9988

Johnson, G L (2020) An examination of the effect of capital structure on financial performance among construction firms in Romania 2010-2016. PhD thesis, Capella University, USA.

Jones, S M; Ross, A and Sertyesilisik, B (2010) Testing the unfolding model of voluntary turnover on construction professionals. Construction Management and Economics, 28(3), pp. 271-285. ISSN 1466433X

Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.

Kaewsri, N and Tongthong, T (2011) An investigation of women engineers in non-traditional occupations in the Thai construction industry. Construction Economics and Building, 11(2), pp. 1-21. ISSN 2204-9029

Kaka, A and Lewis, J (2003) Development of a company-level dynamic cash flow forecasting model. Construction Management and Economics, 21(7), pp. 693-705. ISSN 01446193

Kaka, A P (2001) Turnover forecasting for contracting companies based on published information. Journal of Financial Management of Property and Construction, 6(3), pp. 217-229. ISSN 1366-4387

Kaka, A P and Khosrowshahi, F (2009) A mathematical-based model for company-level budgeting incorporating future unknown contracts. Engineering, Construction and Architectural Management, 16(1), pp. 48-60. ISSN 0969-9988

Kassa, R; Ogundare, T I; Lines, B; Smithwick, J and Sullivan, K (2024) Comparative analysis of human traits and tendencies: General vs. specialty contractor project managers. International Journal of Construction Education and Research, 20(3), pp. 284-300. ISSN 15578771

Kenley, R (1999) Cash farming in building and construction: A stochastic analysis. Construction Management and Economics, 17(3), pp. 393-401. ISSN 01446193

Kim, J and Philips, P (2014) Remuneration and absenteeism on a large construction site. Construction Management and Economics, 32(10), pp. 983-999. ISSN 01446193

King Lewis, A and Shan, Y (2024) Persistence of women in the construction industry. Journal of Construction Engineering and Management, 150(7): 04024061, ISSN 0733-9364

Koch C, B H (2013) Strategic management competencies in Scandinavian contractors. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Kulchartchai, O and Hadikusumo, B H (2010) Exploratory study of obstacles in safety culture development in the construction industry: A grounded theory approach. Journal of Construction in Developing Countries, 15(1), pp. 45-66. ISSN 1823-6499

Kululanga, G K (1999) A framework to facilitate construction contractors' learning. PhD thesis, Loughborough University, UK.

Kumar Sharma, R and Bhalla, N (2025) Enlightening the critical factors affecting the solvency of Indian construction industry: An empirical analysis using multivariate discriminant analysis and logistic regression. Construction Economics and Building, 25(2), pp. 276-302. ISSN 2204-9029

Laptali, E (1996) Application of optimisation techniques to planning and estimating decisions in the building process. PhD thesis, University of Glamorgan, UK.

Lau, C H (2019) The global trading activities of consulting engineering firms: managing risk and geographical choice. PhD thesis, University of Oxford, UK.

Laufer, A (1985) On site performance improvement programs. Journal of Construction Engineering and Management, 111(1), pp. 82-97. ISSN 0733-9364

LeBlond, D; Owen, F; Gibson Jr, G E; Haas, C T and Traver, A E (1998) Control improvement for advanced construction equipment. Journal of Construction Engineering and Management, 124(4), pp. 289-296. ISSN 0733-9364

Leaman, A and Bordass, B (1999) Productivity in buildings: The 'killer' variables. Building Research & Information, 27(1), pp. 4-19. ISSN 0961-3218

Lee, F-P B (2009) Factors affecting the profitability of construction companies in Hong Kong. PhD thesis, University of Hong Kong, Hong Kong.

Leung, M Y; Chong, A; Ng, S T and Cheung, M C K (2004) Demystifying stakeholders' commitment and its impacts on construction projects. Construction Management and Economics, 22(7), pp. 701-715. ISSN 01446193

Li, Y; Soomro, M A; Khan, A N; Han, Y and Xue, R (2022) Impact of ethical leadership on employee turnover intentions in the construction industry. Journal of Construction Engineering and Management, 148(7): 04022054, ISSN 0733-9364

Ling, F Y Y; Chan, S L; Chong, E and Ee, L P (2004) Predicting performance of design-build and design-bid-build projects. Journal of Construction Engineering and Management, 130(1), pp. 75-83. ISSN 0733-9364

Lingard, H; Brown, K; Bradley, L; Bailey, C and Townsend, K (2007) Improving employees' work-life balance in the construction industry: Project alliance case study. Journal of Construction Engineering and Management, 133(10), pp. 807-815. ISSN 0733-9364

Liu, B; Wang, Q; Wu, G; Zheng, J and Li, L (2020) How family-supportive supervisor affect Chinese construction workers' work-family conflict and turnover intention: Investigating the moderating role of work and family identity salience. Construction Management and Economics, 38(9), pp. 807-823. ISSN 01446193

Liu, Q (2025) The impact of funnel sales management on sales performance in engineering construction companies: An empirical study based on CE company data. DBA thesis, Arizona State University, USA.

Love, P E D; Irani, Z; li, H; Cheng, E W L and Tse, R Y C (2001) An empirical analysis of the barriers to implementing e-commerce in small-medium sized construction contractors in the state of Victoria, Australia. Construction Innovation, 1(1), pp. 31-41. ISSN 1471-4175

Mohammed, Miswan Abdul Hakim (1994) An investigation into firms' strategies and their financial performance in the UK construction industry. PhD thesis, University College London, UK.

Motil, M M (2015) Project duration, budget, individual role, and burnout among construction managers. PhD thesis, Walden University, USA.

Mousavi, S Y and Kariminia, S (2022) Analysis of human behavior in case of fire inside a high-rise building: Effect of risk perception and individual's location. International Journal of Building Pathology and Adaptation, 40(4), pp. 441-461. ISSN 23984708

Murphy, B (2020) Job embeddedness in the construction industry. DBA thesis, Trident University International, USA.

Nadim, W (2009) Industrialising the construction industry: a collaborative training and education model. PhD thesis, University of Salford, UK.

Nahmens, I and Bindroo, V (2011) Is customization fruitful in industrialized homebuilding industry? Journal of Construction Engineering and Management, 137(12), pp. 1027-1035. ISSN 0733-9364

Nauman, S; Zheng, C and Ahmad, R (2021) Employee career outlook and turnover: Unleashing the roles of career adaptability and career satisfaction in international construction projects. Journal of Construction Engineering and Management, 147(11): 04021150, ISSN 0733-9364

Nawaz Khan, A; Khan, N A and Soomro, M A (2020) Influence of ethical leadership in managing human resources in construction companies. Journal of Construction Engineering and Management, 146(11): 04020125, ISSN 0733-9364

Nicholas, J; Holt, G D and Harris, P T (2000) An investigation into predicting materials suppliers' profits. Journal of Construction Procurement, 6(2), ISSN 1358-9180

Nicholas, J; Holt, G D and Mihsein, M (2000) Forecasting construction materials suppliers' financial turnover. Engineering, Construction and Architectural Management, 7(3), pp. 221-231. ISSN 0969-9988

Nowbati, B (2011) Visual information and knowledge representation in organisations. EngD thesis, Loughborough University, UK.

Odeyinka, H A; Lowe, J and Kaka, A (2008) An evaluation of risk factors impacting construction cash flow forecast. Journal of Financial Management of Property and Construction, 13(1), pp. 5-17. ISSN 1366-4387

Oladimeji, O and Aina, O O (2018) Financial performance of locally owned construction firms in Southwestern Nigeria. Journal of Financial Management of Property and Construction, 23(1), pp. 112-128. ISSN 1366-4387

Organ, S (2020) The opportunities and challenges of improving the condition and sustainability of a historic building at an international tourist attraction in the UK. International Journal of Building Pathology and Adaptation, 38(2), pp. 329-355. ISSN 23984708

Oswald, D; Smith, S and Sherratt, F (2015) Doing the 'funky chicken' to communicate on multinational projects. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Patton, J R (2013) Task diminishment: Construction value loss due to sub-optimal task execution. PhD thesis, Indiana State University, USA.

Pellicer, T M; Pellicer, E and Eaton, D (2009) A macroeconomic regression analysis of the European construction industry. Engineering, Construction and Architectural Management, 16(6), pp. 573-597. ISSN 0969-9988

Perera, Colombapatabendige Savindi Ranthika (2023) A technology acceptance framework for the adoption of construction 4.0. PhD thesis, University of Melbourne, Australia.

Perrenoud, A J (2020) Delphi approach to identifying best practices for succession planning within construction firms. International Journal of Construction Education and Research, 16(3), pp. 197-210. ISSN 1557-8771

Pesterfield, C (2022) Reconceptualising responses to the UK's 2015 Modern Slavery Act: a construction industry case study. PhD thesis, University of Bristol, UK.

Potseluyko Amobi, L (2021) Improving business and technical operations within timber frame self-build housing sector by applying integrated VR/AR and BIM technologies. PhD thesis, Teesside University, UK.

Punwani, A (1997) A study of the growth-investment-financing nexus of the major UK construction groups. Construction Management and Economics, 15(4), pp. 349-361. ISSN 01446193

Raidén, A B (2004) The development of a strategic employee resourcing framework (SERF) for construction organisations. PhD thesis, Loughborough University, UK.

Raidén, A B; Dainty, A R J and Neale, R H (2006) Balancing employee needs, project requirements and organisational priorities in team deployment. Construction Management and Economics, 24(8), pp. 883-895. ISSN 1466433X

Rastogi, A and Kumar Singla, H K (2025) Exhausted employees do not leave, disengaged employees do: A case of the Indian construction industry. Construction Economics and Building, 25(3-4), pp. 143-162. ISSN 2204-9029

Reisi, R. and Ghoddousi, P. (2025) The influence of emotional intelligence on job satisfaction and organizational commitment in tehran's construction industry: A structural equation modeling approach. Engineering, Construction and Architectural Management, 33(5), pp. 3718-3736. ISSN 0969-9988

Rezvani, A; Ashkanasy, N and Khosravi, P (2020) Key attitudes: Unlocking the relationships between emotional intelligence and performance in construction projects. Journal of Construction Engineering and Management, 146(4): 04020025, ISSN 0733-9364

Rivas, R A; Borcherding, J D; Gonzlez, V and Alarcn, L F (2011) Analysis of factors influencing productivity using craftsmen questionnaires: Case study in a Chilean construction company. Journal of Construction Engineering and Management, 137(4), pp. 312-320. ISSN 0733-9364

Rosso, S (2007) Environmental life-cycle of domestic kitchen refurbishment. PhD thesis, University of Brighton, UK.

Rumawas, W (2022) Employees’ turnover intention in the construction industry in Indonesia. Journal of Construction in Developing Countries, 27(2), pp. 127-146. ISSN 1823-6499

Safapour, E; Kermanshachi, S and Kamalirad, S (2021) Analysis of effective project-based communication components within primary stakeholders in construction industry. Built Environment Project and Asset Management, 11(2), pp. 157-173. ISSN 2044-124X

Sagoo, G S (2016) Attitudes and perceptions of construction business owners on the effect of immigration within the West London construction business community. PhD thesis, Swiss Management Center, Switzerland.

Saket, M M (1986) Cost-significance applied to estimating and control of construction projects. PhD thesis, University of Dundee, UK.

Salih, A (2020) Project management information system introduction: Challenges and remedies in a construction context. PhD thesis, University of Liverpool, UK.

Sang, K J C (2007) Health and well-being in the architectural profession and the influence of gender. PhD thesis, Loughborough University, UK.

Sang, K J C; Dainty, A R J and Ison, S G (2007) Gender: A risk factor for occupational stress in the architectural profession? Construction Management and Economics, 25(12), pp. 1305-1317. ISSN 1466433X

Sang, K J C; Dainty, A R J and Ison, S G (2008) The impact of self-employment on architects' job satisfaction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Sang, K J C; Ison, S G and Dainty, A R J (2009) The job satisfaction of UK architects and relationships with work-life balance and turnover intentions. Engineering, Construction and Architectural Management, 16(3), pp. 288-300. ISSN 0969-9988

Schuler, M. L.; Albertson, L.; Katz, L. E.; Armanios, D. E. and Faust, K. M. (2026) Drawn from experience: Coproducing a graphic guide with arctic water sector workers. Journal of Construction Engineering and Management, 152(9): 04026146, ISSN 0733-9364

Seek, Ngee Huat (1981) Modification of the existing housing stock: A study of housing adjustments through home improvement. PhD thesis, Australian National University, Australia.

Smith, Philip Ray (2026) Integrated communication and organizational guidance in construction: A phenomenological study of employee experiences during change. PhD thesis, National University, USA.

Soetanto, R; Proverbs, D G and Cooper, P (1999) A conceptual model of performance and satisfaction for main participants of construction project coalitions. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.

Sommerville, J (1993) Recruitment sources and employee turnover in sectors of the construction industry. PhD thesis, Heriot-Watt University, UK.

Sommerville, J (1996) An analysis of recruitment sources and employee turnover in Scottish construction organizations. Construction Management and Economics, 14(2), pp. 147-154. ISSN 01446193

Steel, A C (1985) The diffusion of working time innovations in manufacturing and construction industry. PhD thesis, Brunel University, UK.

Subramaniyan, A S (2020) Engineering procurement and construction companies in India: Which factors drive their willingness to pay. PhD thesis, Chitkara University, Punjab, India.

Sutrisna, M; Tjia, D and Wu, P (2021) Developing a predictive model of construction industry-university research collaboration. Construction Innovation, 21(4), pp. 761-781. ISSN 1471-4175

Szydlik, C C (2014) Identifying and overcoming the barriers to sustainable construction. PhD thesis, Missouri University of Science and Technology, USA.

Talabi, B O (2016) Achieving safer behaviours of frontline construction workers: The role of supervisors. PhD thesis, Loughborough University, UK.

Taylor, M D (2010) A definition and valuation of the UK offsite construction sector. Construction Management and Economics, 28(8), pp. 885-896. ISSN 1466433X

Taylor-Lewis, D (2012) Entrepreneurial support for black (afro-caribbean) and Asian construction businesses: Can it enhance their growth? PhD thesis, Oxford Brookes University, UK.

Teo, P and Love, P E D (2017) Re-examining the association between quality and safety performance in construction: From heterogeneous to homogeneous datasets. Journal of Construction Engineering and Management, 143(6): 04017011, ISSN 0733-9364

Thiengburanathum, P (2003) Design of construction production systems: Representation, taxonomy, and design framework. PhD thesis, University of Colorado at Boulder, USA.

Tijani, B; Osei-Kyei, R and Feng, Y (2022) A review of work-life balance in the construction industry. International Journal of Construction Management, 22(14), pp. 2671-2686. ISSN 1562-3599

Tilley, M (2016) What elements are required to achieve sustainable business change using health and safety as a lens? DProf thesis, Middlesex University, UK.

Tripathi, K K; Hasan, A and Neeraj Jha, K (2021) Evaluating performance of construction organizations using fuzzy preference relation technique. International Journal of Construction Management, 21(12), pp. 1287-1300. ISSN 1562-3599

Tucker, G C; Windapo, A and Cattell, K S (2015) Exploring the use of financial capacity as a predictor of construction company corporate performance: Evidence from South Africa. Journal of Engineering, Design and Technology, 13(4), pp. 596-611.

Turner, T (2024) Strategies to engage multigenerational workforces, with a focus on millennials. PhD thesis, Walden University, USA.

Tutesigensi, A and Oak, D P (2007) Feasibility of collaborative working at the second tier subcontractor level in a prime contract. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Tutesigensi, A and Parcell, K (2007) Benefits of mobile telephones for construction contractors in the United Kingdom. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Ugural, M and Giritli, H (2021) Three-way interaction model for turnover intention of construction professionals: Some evidence from Turkey. Journal of Construction Engineering and Management, 147(4): 04021008, ISSN 0733-9364

Uher, T E (1996) Cost estimating practices in Australian construction. Engineering, Construction and Architectural Management, 3(1-2), pp. 83-95. ISSN 0969-9988

Volpe, E (2024) Exploring inclusive spaces for early career women in civil engineering. PhD thesis, University of Florida, USA.

Walker, D H T and Wilson, A J (2004) The knowledge advantage (K-Adv) concept. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Wang, Y; Deng, X and Mao, H (2023) The optimization of personnel localization management on international construction projects: Cases study from China enterprises. Engineering, Construction and Architectural Management, 30(8), pp. 3259-3291. ISSN 0969-9988

Wang, Y; Goodrum, P M; Haas, C T and Glover, R W (2008) Craft training issues in American industrial and commercial construction. Journal of Construction Engineering and Management, 134(10), pp. 795-803. ISSN 0733-9364

Wentz, B (2015) Life stressors of mechanical contracting supervisory personnel. International Journal of Construction Education and Research, 11(4), pp. 268-279. ISSN 1557-8771

Wentz, B E (2013) Life stressors of mechanical contracting supervisory personnel. PhD thesis, Indiana State University, USA.

White, J A (2024) Examining the relationship between belonging, career growth, and intention to quit in the construction industry: A quantitative study. DBA thesis, Trevecca Nazarene University, USA.

Willenbrock, J H; Thomas, H R and Francis, P J (1987) Factors affecting outage construction efficiency. Journal of Construction Engineering and Management, 113(1), pp. 99-116. ISSN 0733-9364

Wu, Z; Wang, Y and Liu, M (2024) Job stress and burnout among construction professionals: The moderating role of online emotions. Engineering, Construction and Architectural Management, 31(12), pp. 4831-4851. ISSN 0969-9988

Xing, M; Cao, J and Cao, D (2023) Impacts of policy mix comprehensiveness on BIM implementation: Moderating effects of environmental state and response uncertainty. Journal of Construction Engineering and Management, 149(2): 04022171, ISSN 0733-9364

Xue, H; Li Teh, K K and Ling, F Y Y (2025) Effects of crisis management leadership, perceived self-efficacy, and job performance on facility management professionals' job satisfaction in a crisis. Journal of Construction Engineering and Management, 151(7): 04025084, ISSN 0733-9364

Yakubu, O A and Sun, M (2009) A survey of construction project cost and time control practices in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Yang, Z R (1997) UK construction company failure prediction: Robust heteroscedastic parzen window classifier. PhD thesis, University of Portsmouth, UK.

Yip, B L P (2007) Job burnout among construction professionals in Hong Kong: A moderator model with coping strategies. PhD thesis, University of Hong Kong, Hong Kong.

Zaky, N; Ahmed, M Z; Alarjani, A and Attia, E A (2025) Lean manufacturing implementation in iron and steel industries: Effect of wastes management on the production costs. Journal of Engineering, Design and Technology, 23(2), pp. 525-545. ISSN 1726-0531

Zhang, S; Wang, J; Ke, Y; Li, N and Su, Z (2025) Exploring the impact of job satisfaction on turnover intention among professionals in the construction industry. Engineering, Construction and Architectural Management, 32(11), pp. 7426-7448. ISSN 0969-9988

Zhang, X. (2026) Simulation study on schedule control for engineering design based on system dynamics. Journal of Construction Engineering and Management, 152(10): 04026166, ISSN 0733-9364

Ziouziou, S and Murdoch, I J (2002) Internationalization: The repositioning of the Japanese construction industry. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.

Zou, P X W and Roslan, B A (2005) Different perspectives towards using web-based project management systems in construction: Large enterprises versus small- and medium-sized enterprises. Architectural Engineering and Design Management, 1(2), pp. 127-143. ISSN 1745-2007

Çivici, T and Ayalp, G G (2025) Modelling the critical determinants of architects' work-related stress. International Journal of Construction Management, 25(2), pp. 224-237. ISSN 1562-3599

This list was generated on Sat Aug 22 01:41:35 2026 UTC.