Items with Index Term: traditional procurement
Abdel Meguid, T A (1998) Managed claims procurement strategy (MCPS): A comparative study of the performance of alternate building procurement strategies. PhD thesis, Universite de Montreal, Canada.
Abiodun, I (2012) The role of public private partnership in highway infrastructure development and sustainability in Nigeria. PhD thesis, University of Salford, UK.
Aftab, U; Hassan, M U; Ullah, F; Nasir, A R and Thaheem, M J (2026) BIM-based search and selection of construction material suppliers: A dedicated framework and prototype. Construction Innovation, 26(3), pp. 892-915. ISSN 1471-4175
Al-Ajam, M (2008) Integrating collaborative extranets with project integrated databases to improve the construction tender stage. PhD thesis, University of Salford, UK.
Al-Hazmi, T A (1999) Project procurement system selection model (with particular reference to Saudi Arabia). PhD thesis, Loughborough University, UK.
Alhazmi, T and McCaffer, R (2000) Project procurement system selection model. Journal of Construction Engineering and Management, 126(3), pp. 176-184. ISSN 0733-9364
Alhusban, M (2018) Conceptual procurement framework for building information modelling uptake to enhance buildings' sustainability performance in the Jordanian public sector. PhD thesis, University of Portsmouth, UK.
Alofi, A (2017) Improving the Saudi Arabia procurement system: Perception and development of the construction industry. PhD thesis, Arizona State University, USA.
Ayegba, C (2018) Duties and required competencies of a management contractor. Journal of Construction Business and Management, 2(1), pp. 1-9. ISSN 2521-0165
Bibby, L (2003) Improving design management techniques in construction. EngD thesis, Loughborough University, UK.
Bibby, L; Austin, S and Bouchlaghem, D (2006) The impact of a design management training initiative on project performance. Engineering, Construction and Architectural Management, 13(1), pp. 7-26. ISSN 0969-9988
Boes, H and Dorée, A (2008) Public procurement of local authorities in the Netherlands: A case of breaking tradition for a more strategic approach? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Boes, H and Dorée, A (2011) The development of public procurement at local level in the Netherlands: A longitudinal study. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Callaghan, Stephen (2023) Model and strategies for early contractor involvement in large linear engineering construction projects. PhD thesis, Queensland University of Technology, Australia.
Challender, J; Farrell, P and Sherratt, F (2014) Partnering practices: An investigation of influences on project success. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Chan, A P C; Lai, M K; Tam, C M and Akintoye, A (2001) Analysis of construction cost variation factors. Journal of Financial Management of Property and Construction, 6(1), pp. 51-60. ISSN 1366-4387
Cheung, Yan Ki Fiona (2011) Relationship management as a strategy for supply chain engagement in the civil engineering construction industry. PhD thesis, Queensland University of Technology, Australia.
Dharmapuri Tirumala, R; Dangol, N; Tiwari, P and Vaz-Serra, P (2021) Comparative analysis of outcomes under PPP and traditional modes of delivery: A study of schools in Melbourne. Construction Management and Economics, 39(11), pp. 894-911. ISSN 01446193
Dorée, A G (2004) Collusion in the Dutch construction industry: An industrial organization perspective. Building Research & Information, 32(2), pp. 146-156. ISSN 0961-3218
Ekanayake, B J; Ysandanayake, Y and Ramachandra, T (2018) Application of value management to refurbishment projects: A Sri Lankan case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Ekung, S; Okonkwo, C and Nwosu, E (2021) Claims culture and client-contractors' willingness to engage in future projects: A multivariate analysis. African Journal of Built Environment Research, 5(1), pp. 19-40. ISSN 2414-0236
El Sawalhi, N I and El Agha, O (2017) Multi-attribute utility theory for selecting an appropriate procurement method in the construction projects. Journal of Construction in Developing Countries, 22(1), pp. 75-96. ISSN 1823-6499
Elhag, T; Eapen, S and Ballal, T (2020) Moderating claims and disputes through collaborative procurement. Construction Innovation, 20(1), pp. 79-95. ISSN 1471-4175
Eriksson, P E and Pesämaa, O (2007) Modelling procurement effects on cooperation. Construction Management and Economics, 25(8), pp. 893-901. ISSN 1466433X
Evans, M (2022) Strategic frameworks for managing lean construction on megaprojects: towards global integrated delivery and corporate governance. PhD thesis, University of Bolton, UK.
Evans, M and Farrell, P (2023) A strategic framework managing challenges of integrating lean construction and integrated project delivery on construction megaprojects, towards global integrated delivery transformative initiatives in multinational organisations. Journal of Engineering, Design and Technology, 21(2), pp. 376-416. ISSN 1726-0531
Farrell, A and Sunindijo, R Y (2022) Overcoming challenges of early contractor involvement in local government projects. International Journal of Construction Management, 22(10), pp. 1902-1909. ISSN 1562-3599
Fatokun, A O (2018) Value for money integration in the renegotiation of public private partnership road projects. PhD thesis, University of Central Lancashire, UK.
Franz, B; Leicht, R; Molenaar, K and Messner, J (2017) Impact of team integration and group cohesion on project delivery performance. Journal of Construction Engineering and Management, 143(1): 04016088, ISSN 0733-9364
Franz, B W (2014) Modeling the role of team integration and group cohesion in construction project performance. PhD thesis, Pennsylvania State University, USA.
Greenwood, D; Walker, P and Walker, A (2008) The world turned upside-down: Architects as subcontractors in design-and-build contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Grifa, M A (2006) The construction industry in Libya , with particular reference to operations in Tripoli. PhD thesis, University of Newcastle upon Tyne, UK.
Gruneberg, S and Hughes, W P (2004) Analysing the types of procurement used in the UK: A comparison of two data sets. Journal of Financial Management of Property and Construction, 9(2), pp. 63-74. ISSN 1366-4387
Habib, M and Spang, K (2014) Alternative project delivery systems for transport infrastructure in Germany. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Hampton, G; Baldwin, A N and Holt, G D (2012) Project delays and cost: Stakeholder perceptions of traditional v. PPP procurement. Journal of Financial Management of Property and Construction, 17(1), pp. 73-91. ISSN 1366-4387
Huang, Y-L (1995) Project and policy analysis of build-operate-transfer infrastructure development. PhD thesis, University of California, Berkeley, USA.
Khalfan, M M A and McDermott, P (2006) Once unthought, now the best practice within the construction sector. Journal of Construction Procurement, 12(1),
Khalifa, M; Farrell, P and Emam, H (2015) The concept of partnering in public–private partnership projects in the United Arab Emirates. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 277-284. ISSN 17514304
Kong, A T and Gray, J (2006) Traditional procurement is too slow. Construction Economics and Building, 6(1), pp. 51-62. ISSN 2204-9029
Kurniawan, F (2013) An integrated project evaluation tool for public-private partnership projects. PhD thesis, Heriot-Watt University, UK.
Kurniawan, F; Ogunlana, S and Motawa, I (2010) An integrated project evaluation tool for PFI seaport projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Kwawu, W and Laryea, S (2014) Governance structures in collaborative working practices. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.
Kwofie, T E; Aigbavboa, C O and Machethe, S O (2019) Nature of communication performance in non-traditional procurements in South Africa. Engineering, Construction and Architectural Management, 26(10), pp. 2264-2288. ISSN 0969-9988
Lam, E W; Chan, A P C and Chan, D W (2003) Why is design-build commonly used in the public sector? An illustration from Hong Kong. Construction Economics and Building, 3(1), pp. 53-62. ISSN 2204-9029
Lam, K-C (2003) Co-ordination of building services and procurement methods for highly serviced buildings. PhD thesis, Loughborough University, UK.
Laryea, S and Watermeyer, R (2014) Innovative construction procurement at Wits University. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 220-231. ISSN 17514304
Leviäkangas, P; Wigan, M and Haapasalo, H (2013) Financial anatomy of E4 Helsinki-Lahti shadow toll PPP project. Built Environment Project and Asset Management, 3(2), pp. 165-180. ISSN 2044-124X
Liu, J; Love, P E D; Smith, J; Regan, M and Palaneeswaran, E (2015) Review of performance measurement: Implications for public-private partnerships. Built Environment Project and Asset Management, 5(1), pp. 35-51. ISSN 2044-124X
Mahamadu, A M; Mahdjoubi, L; Booth, C and Fewings, P (2015) Integrated delivery of quality, safety and environment through road sector procurement: The case of public sector agencies in Ghana. Journal of Construction in Developing Countries, 20(1), pp. 1-24. ISSN 1823-6499
Mallawaarachchi, V T; Senanayake, S M A H; Disaratna, V and Perera, B A K S (2024) Application of subcontracting as a quality improvement tool for building constructions in Sri Lanka. International Journal of Construction Management, 24(1), pp. 44-56. ISSN 1562-3599
Milner, A J (2019) Subcontracts in the UK construction industry: an investigation into the root causes of disputes. PhD thesis, University of Salford, UK.
Musa, M M (2019) A framework for implementing target value delivery to enhance value creation in the construction industry. PhD thesis, Nottingham Trent University, UK.
Mwanaumo, E M (2013) An integrated approach to multi-stakeholder interventions in construction health and safety. DPhil thesis, University of Johannesburg, South Africa.
Ngowi, A B (1997) Impact of culture on construction procurement. Journal of Construction Procurement, 3(1), pp. 3-15. ISSN 1358-9180
Nimesha Sahani, J; Chan, D W M and Kumaraswamy, M (2021) A systematic literature review and analysis towards developing PPP models for delivering smart infrastructure. Built Environment Project and Asset Management, 11(1), pp. 121-137. ISSN 2044-124X
Odeyinka, H A (2007) Modelling risk impacts on the budgeted cost of traditionally procured building projects. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Odeyinka, H A and Kaka, A (2005) An evaluation of contractors' satisfaction with payment terms influencing construction cash flow. Journal of Financial Management of Property and Construction, 10(3), pp. 171-180. ISSN 1366-4387
Ogbeifun, E; Mbohwa, C and Pretorius, J H C (2018) Fragmentation of capital development projects: A tool for job creation and skill development. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Ogwueleka, A C (2025) Supply chain integration in public sector construction projects: Adoption and barriers. Construction Economics and Building, 25(3-4), pp. 272-288. ISSN 2204-9029
Ojo, S O; Adeyemi, O Y and Ikpo, I J (2000) Effects of procurement methods on clients objectives of time and cost in the Nigerian construction industry. Journal of Financial Management of Property and Construction, 5(1-2), pp. 105-108. ISSN 1366-4387
Opoku, A and Ibrahim-Adam, R (2018) Early contractor involvement in government construction projects in Ghana. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Osipova, E (2013) On enhancing joint risk management throughout a project's lifecycle: Empirical studies of Swedish construction projects. PhD thesis, Luleå University of Technology, Sweden.
Othman, A A E and Youssef, L Y W (2021) A framework for implementing integrated project delivery in architecture design firms in Egypt. Journal of Engineering, Design and Technology, 19(3), pp. 721-757. ISSN 1726-0531
Poon, J (2004) Development of an expert system modelling the construction process. Journal of Construction Research, 5(1), pp. 125-138. ISSN 1609-9451
Poon, J; Potts, K and Cooper, P (1999) Development of a new best practice model for building projects. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Poon, J L K (2001) Development of a process model for the design stage of building projects. PhD thesis, University of Wolverhampton, UK.
Potts, K and Wall, M (2002) Managing the commissioning of building services. Engineering, Construction and Architectural Management, 9(4), pp. 336-344. ISSN 0969-9988
Pryke, Stephen David (2002) UK construction in transition: developing a social network approach to the evaluation of new procurement and management strategies. PhD thesis, University College London, UK.
Rahmani, Farshid (2016) Conceptual models for selecting and managing early contractor involvement (ECI) delivery system by clients. PhD thesis, RMIT University, Australia.
Raisbeck, P (2009) Considering design and PPP innovation: A review of design factors in PPP research. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Raisbeck, P; Duffield, C and Xu, M (2010) Comparative performance of PPPs and traditional procurement in Australia. Construction Management and Economics, 28(4), pp. 345-359. ISSN 1466433X
Rajan, T; Siddharth, R and Mukund, S P (2010) PPPs in road renovation and maintenance: A case study of the East Coast Road project. Journal of Financial Management of Property and Construction, 15(1), pp. 21-40. ISSN 1366-4387
Ren, Z; Kwaw, P and Yang, F (2012) Ghana's public procurement reform and the continuous use of the traditional procurement system: The way forward. Built Environment Project and Asset Management, 2(1), pp. 56-69. ISSN 2044-124X
Rowlinson, S M (1988) An analysis of factors affecting project performance in industrial buildings with particular reference to design build contracts. PhD thesis, Brunel University, UK.
Samarasinghe, D A S (2014) Building materials supply chains: An evaluative study of the New Zealand residential construction. PhD thesis, Auckland University of Technology, New Zealand.
Senaratne, S and Malewana, C (2011) Linking individual, team and organizational learning in construction project team settings. Architectural Engineering and Design Management, 7(1), pp. 50-63. ISSN 1745-2007
Senaratne, S and Samaraweera, A (2015) Construction project leadership across the team development process. Built Environment Project and Asset Management, 5(1), pp. 69-88. ISSN 2044-124X
Senaratne, S and Udawatta, N (2013) Managing intragroup conflicts in construction project teams: Case studies in Sri Lanka. Architectural Engineering and Design Management, 9(3), pp. 158-175. ISSN 1745-2007
Shahrin, F; Mahmood, K and Hassan, F (2021) Project cost overruns and risk allocation in public funded projects in Malaysia. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Shehu, Z; Holt, G D; Endut, I R and Akintoye, A (2015) Analysis of characteristics affecting completion time for Malaysian construction projects. Built Environment Project and Asset Management, 5(1), pp. 52-68. ISSN 2044-124X
Sidwell, T and Kennedy, R (2004) Re-valuing construction through project delivery. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Silva, P M; Domingo, N and Ali, N A N A (2025) Pre-contract measures to avoid potential disputes in the New Zealand construction industry. Construction Economics and Building, 25(2), pp. 235-252. ISSN 2204-9029
Sospeter, N G (2025) A categorization of factors affecting quality of design documentation in Tanzanian construction projects. Journal of Engineering, Design and Technology, 23(1), pp. 228-248. ISSN 1726-0531
Strahorn, S; Gajendran, T and Brewer, G (2015) The influence of trust in traditional contracting: Investigating the "lived experience" of stakeholders. Construction Economics and Building, 15(2), pp. 81-101. ISSN 2204-9029
Sulaiman, K (2008) A study of building procurement process as a potential tool to enhance safety practice in the construction industry. PhD thesis, University of Salford, UK.
Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.
Symons, Anne Wood (2021) Integrated design, design management and the delivery of major hospitals. PhD thesis, University College London, UK.
Tennant, S and Fernie, S (2010) A contemporary examination of framework agreements. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Thakhtravachi, M (2017) Tacit knowledge integration within the traditional construction procurement system. PhD thesis, University of Salford, UK.
Umeokafor, N; Windapo, A O; Manu, P; Diugwu, I and Haroglu, H (2023) Critical barriers to prevention through design in construction in developing countries: A qualitative inquiry. Engineering, Construction and Architectural Management, 30(7), pp. 3014-3042. ISSN 0969-9988
Vennström, A and Erik Eriksson, P (2010) Client perceived barriers to change of the construction process. Construction Innovation, 10(2), pp. 126-137. ISSN 1471-4175
Walker, D H T (1997) Construction time performance and traditional versus non-traditional procurement methods. Journal of Construction Procurement, 3(1), pp. 42-55. ISSN 1358-9180
Windapo, A O; Olugboyega, O and Odediran, S (2020) Impacts of procurement strategies on construction SMEs' growth. Journal of Financial Management of Property and Construction, 25(3), pp. 423-446. ISSN 1366-4387
Xiong, W (2015) A study of renegotiation and early termination in public private partnerships projects. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Yu, W D and Wang, K W (2012) Best value or lowest bid? A quantitative perspective. Journal of Construction Engineering and Management, 138(1), pp. 128-134. ISSN 0733-9364
Yuan, Z and Khosrowshahi, F (2005) Information system for project managers in chinese construction small and medium sized enterprises. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Zawawi, M I b Z (2017) Improving competition within public private partnership (PPP) procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.
Zin Zawawi, M I (2017) Improving competition within public private partnership procurement process for infrastructure delivery in Malaysia. PhD thesis, University of Salford, UK.