Items with Index Term: tower crane
Al Hattab, M; Zankoul, E; Barakat, M and Hamzeh, F (2018) Crane overlap and operational flexibility: Balancing utilization, duration, and safety. Construction Innovation, 18(1), pp. 43-63. ISSN 1471-4175
Ali, A H; Zayed, T; Abdulai, S F and Wang, R D (2025) A comprehensive framework for examining the influence of tower crane safe operations on sustainable practices in modular integrated construction. Engineering, Construction and Architectural Management, 32(11), pp. 7776-7803. ISSN 0969-9988
Amiri, R; Majrouhi Sardroud, J and Momenaei Kermani, V (2023) Decision support system for tower crane location and material supply point in construction sites using an integer linear programming model. Engineering, Construction and Architectural Management, 30(4), pp. 1444-1462. ISSN 0969-9988
Appleton, B J A; Niaz, M A; Abourizk, S M; Al-Hussein, M and Mohamed, Y (2006) Priority rating logic simulation model for tower crane operations management. Journal of Construction Research, 7(1), pp. 133-147. ISSN 1609-9451
Beliveau, Y; Dixit, S and Dal, T (1993) Dynamic damping of payload motion for cranes. Journal of Construction Engineering and Management, 119(3), pp. 631-644. ISSN 0733-9364
Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Danel, T; Lafhaj, Z; Puppala, A; BuHamdan, S; Lienard, S and Richard, P (2024) Identifying tower crane activities with data: The case of the concrete pouring. Engineering, Construction and Architectural Management, 31(2), pp. 939-956. ISSN 0969-9988
Emsley, M W (2001) A model to optimize single tower crane location within a construction site. PhD thesis, Loughborough University, UK.
Furusaka, S (1984) A model for the selection of the optimum crane for construction sites. Construction Management and Economics, 2(2), pp. 157-176. ISSN 01446193
Hebiba, A M; Bouferguene, A; Moon, S and Han, S (2022) Wind-wise automated stability analysis for selection of tower crane and location. Journal of Construction Engineering and Management, 148(11): 04022127, ISSN 0733-9364
Herrera-Pérez, V.; Rubio-Romero, J. C.; Fuertes, A.; Salguero-Caparrós, F. and del Carmen Pardo-Ferreira, M. (2026) Investigating the impact of medication consumption on crane-related occupational health and safety risks in construction projects. Journal of Construction Engineering and Management, 152(8): 04026116, ISSN 0733-9364
Huang, C; Wang, Z K; Li, B; Wang, C; Xu, L S; Jiang, K; Liu, M; Guo, C X; Zhao, X F and Yang, H (2023) Discretized cell modeling for optimal layout of multiple tower cranes. Journal of Construction Engineering and Management, 149(8): 04023068, ISSN 0733-9364
Imam, R and Ayadi, O (2022) Powering electric tower cranes by solar energy for sustainable construction. International Journal of Construction Management, 22(13), pp. 2614-2624. ISSN 1562-3599
Ji, Y and Leite, F (2020) Optimized planning approach for multiple tower cranes and material supply points using mixed-integer programming. Journal of Construction Engineering and Management, 146(3): 04020007, ISSN 0733-9364
Jiang, L; Zhao, T; Feng, C and Zhang, W (2023) Improvement of random forest by multiple imputation applied to tower crane accident prediction with missing data. Engineering, Construction and Architectural Management, 30(3), pp. 1222-1242. ISSN 0969-9988
Kim, T; Lim, H; Cho, H and Kang, K I (2014) Automated lifting system integrated with construction hoists for table formwork in tall buildings. Journal of Construction Engineering and Management, 140(10): 04014049, ISSN 0733-9364
Leung, A W T and Tam, C M (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(3), pp. 305-314. ISSN 01446193
Leung, A W T and Tam, C M (1999) Models for assessing hoisting times of tower cranes. Journal of Construction Engineering and Management, 125(6), pp. 385-391. ISSN 0733-9364
Li, F.; Chi, H. L.; Li, R.; Zou, Z. and Wang, R. D. (2026) Two-stage optimization design framework for tower crane layout planning in modular integrated construction considering transportation efficiency, operator visibility, and lifting safety. Journal of Construction Engineering and Management, 152(6): 04026080, ISSN 0733-9364
Li, H; Chan, G and Skitmore, M (2013) Integrating real time positioning systems to improve blind lifting and loading crane operations. Construction Management and Economics, 31(6), pp. 596-605. ISSN 1466433X
Lin, Z; Petzold, F and Ma, Z (2026) Uncovering the timeline hidden in tower crane operation navigation for better lifting activities in construction site. Journal of Construction Engineering and Management, 152(4): 04026011, ISSN 0733-9364
Lu, Y and Zhu, Y (2021) Integrating hoisting efficiency into construction site layout plan model for prefabricated construction. Journal of Construction Engineering and Management, 147(10): 04021130, ISSN 0733-9364
Mohandes, S R (2020) Towards improvements to the occupational health and safety in construction industry. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Moussavi Nadoushani, Z S; Hammad, A W A and Akbarnezhad, A (2017) Location optimization of tower crane and allocation of material supply points in a construction site considering operating and rental costs. Journal of Construction Engineering and Management, 143(1): 04016089, ISSN 0733-9364
Parisi, F; Sangiorgio, V; Parisi, N; Mangini, A M; Fanti, M P and Adam, J M (2024) A new concept for large additive manufacturing in construction: Tower crane-based 3D printing controlled by deep reinforcement learning. Construction Innovation, 24(1), pp. 8-32. ISSN 1471-4175
Parisi, Fabio (2023) Automation and information approaches to support maintenance and production management in the construction industry. PhD thesis, Politecnico di Bari, Italy.
Pham, V H S and Pham, D H (2025) A cutting-edge approach to prefabricated construction site layouts using multi-objective artificial hummingbird algorithm solution. International Journal of Construction Management, 25(16), pp. 2063-2081. ISSN 1562-3599
Pham, V. H. S. and Pham, D. H. (2026) Advanced construction site layout planning for prefabricated projects: An application of the new algorithm. Engineering, Construction and Architectural Management, 33(3), pp. 2471-2511. ISSN 0969-9988
Pham, V H S and Pham, D H (2025) Dynamic multiobjective optimization model for construction site layout in prefabricated projects. Journal of Construction Engineering and Management, 151(10): 04025150, ISSN 0733-9364
Raviv, G and Shapira, A (2018) Systematic approach to crane-related near-miss analysis in the construction industry. International Journal of Construction Management, 18(4), pp. 310-320. ISSN 1562-3599
Rawlinson, F and Farrell, P (2009) The vision of zero risk tolerance in craft workers and operatives: An unattainable goal? In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Selinger, S (1983) Economic service life of building construction equipment. Journal of Construction Engineering and Management, 109(4), pp. 398-405. ISSN 0733-9364
Shapira, A and Elbaz, A (2014) Tower crane cycle times: Case study of remote-control versus cab-control operation. Journal of Construction Engineering and Management, 140(12): 05014010, ISSN 0733-9364
Shapira, A; Filin, S and Wicnudel, A (2014) Quantitative analysis of blind tower-crane lifts using laser-scanning information. Construction Innovation, 14(3), pp. 383-403. ISSN 1471-4175
Shapira, A and Glascock, J D (1996) Culture of using mobile cranes for building construction. Journal of Construction Engineering and Management, 122(4), pp. 298-307. ISSN 0733-9364
Shapira, A; Lucko, G and Schexnayder, C J (2007) Cranes for building construction projects. Journal of Construction Engineering and Management, 133(9), pp. 690-700. ISSN 0733-9364
Shapira, A and Lyachin, B (2009) Identification and analysis of factors affecting safety on construction sites with tower cranes. Journal of Construction Engineering and Management, 135(1), pp. 24-33. ISSN 0733-9364
Shapira, A; Rosenfeld, Y and Mizrahi, I (2008) Vision system for tower cranes. Journal of Construction Engineering and Management, 134(5), pp. 320-332. ISSN 0733-9364
Shapira, A and Simcha, M (2009) Measurement and risk scales of crane-related safety factors on construction sites. Journal of Construction Engineering and Management, 135(10), pp. 979-989. ISSN 0733-9364
Shapira, A and Simcha, M (2009) AHP-based weighting of factors affecting safety on construction sites with tower cranes. Journal of Construction Engineering and Management, 135(4), pp. 307-318. ISSN 0733-9364
Shapira, A; Simcha, M and Goldenberg, M (2012) Integrative model for quantitative evaluation of safety on construction sites with tower cranes. Journal of Construction Engineering and Management, 138(11), pp. 1281-1293. ISSN 0733-9364
Shi, X; Fu, K; Qiao, Y; Santos, J and Yuan, Z (2026) Accident cause analysis for lifting prefabricated components of assembled buildings based on hybrid simulation technology from human factor perspective. Engineering, Construction and Architectural Management, 33(1), pp. 578-601. ISSN 0969-9988
Tam, C M and Tong, T K L (2003) GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction. Construction Management and Economics, 21(3), pp. 257-266. ISSN 01446193
Tam, C M; Tong, T K L and Chan, W K W (2001) Genetic algorithm for optimizing supply locations around tower crane. Journal of Construction Engineering and Management, 127(4), pp. 315-320. ISSN 0733-9364
Tork, A (2013) A real-time crane service scheduling decision support system (CSS-DSS) for construction tower cranes. PhD thesis, University of Central Florida, USA.
Wang, Y.; Zhao, W.; Cui, W. and Zhou, G. (2026) Comparison of five meta-heuristic algorithms in layout optimization of multiple tower cranes. Engineering, Construction and Architectural Management, 33(7), pp. 5849-5873. ISSN 0969-9988
Wang, R D; Zayed, T; Eltoukhy, A E E and Wu, H (2024) Integrated planning approach for optimizing tower crane and truck locations in modular integrated construction. Journal of Construction Engineering and Management, 150(9): 04024121, ISSN 0733-9364
Wijesundera, D A and Harris, F C (1989) The selection of materials handling methods in construction by simulation. Construction Management and Economics, 7(2), pp. 95-102. ISSN 01446193
Wu, K and García De Soto, B (2021) Lifting sequence optimization of luffing tower cranes considering motion paths with dynamic programming. Journal of Construction Engineering and Management, 147(10): 04021126, ISSN 0733-9364
Yin, J; Li, J; Yang, A and Cai, S (2024) Optimization of service scheduling problem for overlapping tower cranes with cooperative coevolutionary genetic algorithm. Engineering, Construction and Architectural Management, 31(3), pp. 1348-1369. ISSN 0969-9988
Zhang, J.; Wang, Y.; Wang, R. D.; Li, X.; Zhang, Z. and Yang, Z. (2026) A multitower crane layout planning framework for modular integrated construction considering material relay handling. Journal of Construction Engineering and Management, 152(8): 04026109, ISSN 0733-9364
Zhang, C; Zhang, W; Shi, Y; Zhao, T and Zhang, Y (2025) Digital safety navigation for tower crane climbing process from a systematic perspective: Risk identification, safety information requirements, and related intelligent platform. Journal of Construction Engineering and Management, 151(8): 04025096, ISSN 0733-9364
Zhang, F; Liu, H; Wang, L; Chen, Z; Zhang, Q and Guo, L (2025) State awareness and collision risk assessment algorithm for tower crane based on bidirectional inverse perspective mapping and skeleton key points. Journal of Construction Engineering and Management, 151(2): 04024205, ISSN 0733-9364
Zhang, M and Ge, S (2022) Vision and trajectory-based dynamic collision prewarning mechanism for tower cranes. Journal of Construction Engineering and Management, 148(7): 04022057, ISSN 0733-9364
Zhang, P; Harris, F C and Olomolaiye, P O (1996) A computer-based model for optimizing the location of a single tower crane. Building Research & Information, 24(2), pp. 113-123. ISSN 0961-3218
Zhang, P; Harris, F C; Olomolaiye, P O and Holt, G D (1999) Location optimization for a group of tower cranes. Journal of Construction Engineering and Management, 125(2), pp. 115-122. ISSN 0733-9364
Zhang, W; Xue, N; Zhang, J and Zhang, X (2021) Identification of critical causal factors and paths of tower-crane accidents in China through system thinking and complex networks. Journal of Construction Engineering and Management, 147(12): 04021174, ISSN 0733-9364
Zhang, W; Zhang, H and Yu, L (2023) Collaborative planning for stacking and installation of prefabricated building components regarding crane-collision avoidance. Journal of Construction Engineering and Management, 149(6): 04023029, ISSN 0733-9364
Zhang, X; Zhang, W; Jiang, L and Zhao, T (2020) Identification of critical causes of tower-crane accidents through system thinking and case analysis. Journal of Construction Engineering and Management, 146(7): 04020071, ISSN 0733-9364
Zhang, Z; Pan, W and Pan, M (2022) Critical considerations on tower crane layout planning for high-rise modular integrated construction. Engineering, Construction and Architectural Management, 29(7), pp. 2615-2634. ISSN 0969-9988
Zhou, H.; Xu, M. and Yang, Q. (2026) Quantitative safety risk coupling assessment method based on complex network theory: A case study in super-high-rise building construction. Journal of Construction Engineering and Management, 152(7): 04026095, ISSN 0733-9364
Up a level