Items with Index Term: topology
Adebisi, J and McArthur, J J (2025) HVAC characterisation of existing Canadian buildings for decarbonisation retrofit identification. Buildings & Cities, 6(1), pp. 729-746. ISSN 2632-6655
Al-Harasis, D H; Jabi, W and Sharmin, T (2025) Developing a taxonomy for sensory-informed architectural design qualities in autism. Building Research & Information, 53(4), pp. 532-551. ISSN 0961-3218
Almadhoob, Huda Mohamed Ali Hasan Husain (2020) Self-organising networks in complex infrastructure projects: the case of London Bank Station Capacity Upgrade Project. PhD thesis, University College London, UK.
Almatroushi, H; Hariga, M; As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: An integrated approach. Engineering, Construction and Architectural Management, 27(9), pp. 2135-2161. ISSN 0969-9988
Ariyachandra, M F (2021) Automating the generation of geometric information models to support digital twinning of existing rail infrastructure. PhD thesis, University of Cambridge, UK.
Ballesteros-Pérez, P; Sanz-Ablanedo, E; Soetanto, R; González-Cruz, M C; Larsen, G D and Cerezo-Narváez, A (2020) Duration and cost variability of construction activities: An empirical study. Journal of Construction Engineering and Management, 146(1): 04019093, ISSN 0733-9364
Barrientos-Orellana, A; Ballesteros-Pérez, P; Mora-Melia, D; González-Cruz, M C and Vanhoucke, M (2022) Stability and accuracy of deterministic project duration forecasting methods in earned value management. Engineering, Construction and Architectural Management, 29(3), pp. 1449-1469. ISSN 0969-9988
Chen, D; Zhou, J; Duan, P and Zhang, J (2023) Integrating knowledge management and BIM for safety risk identification of deep foundation pit construction. Engineering, Construction and Architectural Management, 30(8), pp. 3242-3258. ISSN 0969-9988
Donato, V (2017) Towards design process validation integrating graph theory into BIM. Architectural Engineering and Design Management, 13(1), pp. 22-38. ISSN 1745-2007
Du, J; Zhao, D and Zhang, O (2019) Impacts of human communication network topology on group optimism bias in capital project planning: A human-subject experiment. Construction Management and Economics, 37(1), pp. 44-60. ISSN 01446193
Duva, M (2022) A multi-level and in-depth analysis of AEC project networks: Topology, social influence, and intervention. PhD thesis, Michigan State University, USA.
Edwards, D J; Yang, J; Wright, B C and Love, P E D (2007) Establishing the link between plant operator performance and personal motivation. Journal of Engineering, Design and Technology, 5(2), pp. 173-187. ISSN 1726-0531
El Sawalhi, N I H (2007) Developing a model for construction contractors pre-qualification in the Gaza Strip and West Bank. PhD thesis, University of Salford, UK.
El-Sawalhi, N; Eaton, D and Rustom, R (2008) Forecasting contractor performance using a neural network and genetic algorithm in a pre-qualification model. Construction Innovation, 8(4), pp. 280-298. ISSN 1471-4175
Evans, S; Liddiard, R and Steadman, P (2019) Modelling a whole building stock: Domestic, non-domestic and mixed use. Building Research & Information, 47(2), pp. 156-172. ISSN 0961-3218
Faraj, I (2001) Verification and spatial clearance of features in a product modelling environment. Construction Innovation, 1(1), pp. 55-74. ISSN 1471-4175
Faraj, I (2003) Geometric verification of design. Engineering, Construction and Architectural Management, 10(1), pp. 56-70. ISSN 0969-9988
Fattahi Tabasi, S; Rafizadeh, H R; Andaji Garmaroudi, A and Banihashemi, S (2024) Optimizing urban layouts through computational generative design: density distribution and shape optimization. Architectural Engineering and Design Management, 20(5), pp. 1164-1184. ISSN 1745-2007
Franco-Duran, D M and De La Garza, J M (2020) Performance of resource-constrained scheduling heuristics. Journal of Construction Engineering and Management, 146(4): 04020026, ISSN 0733-9364
Hamidavi, T (2020) Automatic integrated structural design and optimisation in BIM. PhD thesis, University of Portsmouth, UK.
Han, Y; Li, Y; Rao, P and Taylor, J E (2021) Global collaborative network of skyscraper projects from 1990 to 2010: Temporal evolution and spatial characteristics. Journal of Construction Engineering and Management, 147(8): 0002096, ISSN 0733-9364
Hemalattha, S and Vidjeapriya, R (2021) Developing an integrated framework for optimization of spatial requirements of construction equipment. Built Environment Project and Asset Management, 11(5), pp. 903-917. ISSN 2044-124X
Hu, D and Mohamed, Y (2014) Simulation-model-structuring methodology for industrial construction fabrication shops. Journal of Construction Engineering and Management, 140(5): 04014002, ISSN 0733-9364
Jalloul, Hiba (2024) Leveraging emergence for enhanced planning and decision-making in the built environment: Applications in resilience and sustainability planning. PhD thesis, Florida State University, USA.
Jeong, W S (2014) Integrating building information modeling with object-oriented physical modeling for building thermal simulation. PhD thesis, Texas A&M University, USA.
Johansen, K W; Hong, K; Schultz, C and Teizer, J (2024) Automated quantification of construction workers’ exposure to falling object hazards. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 177(4), pp. 207-222. ISSN 17514304
Lambers, R; Cheung, F and Skitmore, M (2024) Risk management strategies for common residential construction defects: The case of Queensland, Australia. International Journal of Construction Management, 24(10), pp. 1126-1135. ISSN 1562-3599
Lee, S-H (2012) Management of building energy consumption and energy supply network on campus scale. PhD thesis, Georgia Institute of Technology, USA.
Lee, Y S; Kim, J J and Lee, T S (2016) Topological competiveness based on social relationships in the Korean construction-management industry. Journal of Construction Engineering and Management, 142(11): 05016014, ISSN 0733-9364
Lin, S C (2015) An analysis for construction engineering networks. Journal of Construction Engineering and Management, 141(5): 04014096, ISSN 0733-9364
Lu, W; Wu, L; Zhao, R; Li, X and Xue, F (2021) Blockchain technology for governmental supervision of construction work: Learning from digital currency electronic payment systems. Journal of Construction Engineering and Management, 147(10): 02148, ISSN 0733-9364
Manrique Delgado, B; Cao, S; Hasan, A and Sirén, K (2018) Energy and exergy analysis of prosumers in hybrid energy grids. Building Research & Information, 46(6), pp. 668-685. ISSN 0961-3218
Mora, R (2005) Representation and reasoning for integrated conceptual design of building structures. PhD thesis, Concordia University, Canada.
Newton, S (1991) An agenda for cost modelling research. Construction Management and Economics, 9(2), pp. 97-112. ISSN 01446193
Oxman, R (2007) A performance-based model in digital design: Per-formative: design beyond aesthetic. Architectural Engineering and Design Management, 3(3), pp. 169-180. ISSN 1745-2007
Rausch, C; Sanchez, B and Haas, C (2021) Topology optimization of architectural panels to minimize waste during fabrication: Algorithms for panel unfolding and nesting. Journal of Construction Engineering and Management, 147(7): 2089, ISSN 0733-9364
Rouhana, F and Jawad, D (2020) Transportation network resilience against failures: GIS-based assessment of network topology role. International Journal of Disaster Resilience in the Built Environment, 12(4), pp. 357-370. ISSN 1759-5916
Said, H; Rajagopalan, A and Hall, D M (2025) Longitudinal analysis of interorganizational collaborative networks of cross-laminated timber (CLT) construction. Construction Innovation, 25(6), pp. 1840-1864. ISSN 1471-4175
Sedaghati, R (2000) Investigations in structural optimization of nonlinear problems using the finite element method. PhD thesis, University of Victoria, Canada.
Shi-Dong, L and Zhao-Dong, X (2024) Research on IFC instance data based on topology induction network. Architectural Engineering and Design Management, 20(3), pp. 526-558. ISSN 1745-2007
Stefańska, A; Cygan, M; Batte, K and Pietrzak, J (2021) Application of timber and wood-based materials in architectural design using multi-objective optimisation tools. Construction Economics and Building, 21(3), pp. 105-121. ISSN 2204-9029
Su, P; Lu, W; Chen, J and Hong, S (2024) Floor plan graph learning for generative design of residential buildings: A discrete denoising diffusion model. Building Research & Information, 52(6), pp. 627-653. ISSN 0961-3218
Su, X (2013) A spatial temporal information model for construction planning. PhD thesis, Purdue University, USA.
Taylor, D D J (2018) Tools for managing intermittent water supplies. PhD thesis, Massachusetts Institute of Technology, USA.
Vander Schaaf, R E (2008) A system-of-system (sos) approach for improved decision-making in infrastructure project selection problems. PhD thesis, Purdue University, USA.
Wang, J; Xiahou, X; Lin, Y; Liu, Y; Han, Z and Song, Y (2025) A novel approach for pipeline generation using a mixed GA and tree strategy. Journal of Construction Engineering and Management, 151(9): 04025122, ISSN 0733-9364
Wang, Zhichen (2025) Framework for automated change propagation from building information models to building energy models. PhD thesis, Carnegie Mellon University, USA.
Wei, Yuchen (2021) Reliability analysis method and network optimization of 5g backhaul network for operators. MPhil thesis, University of Sydney, Australia.
Winn, K R (2014) Inter-scalar multivariable decision making framework for the architectural envelope. PhD thesis, Rensselaer Polytechnic Institute, USA.
Yang, J; Wu, Y and Li, D (2024) Block planning based on grid's topology for the dismantling of long-span spatial lattice structures. Journal of Construction Engineering and Management, 150(9): 04024118, ISSN 0733-9364
Yin, D; Deng, X and Lu, K (2025) Automatic generation of pipelines from 2D CAD drawings to 3D IFC models using a parametric method. International Journal of Construction Management, 25(6), pp. 699-717. ISSN 1562-3599
Zarghami, S A and Gunawan, I (2020) A domain-specific measure of centrality for water distribution networks. Engineering, Construction and Architectural Management, 27(2), pp. 341-355. ISSN 0969-9988
Zarghami, S A; Gunawan, I and Schultmann, F (2019) Entropy of centrality values for topological vulnerability analysis of water distribution networks. Built Environment Project and Asset Management, 9(3), pp. 412-425. ISSN 2044-124X
Zhang, X.; Huang, J. and Wang, D. (2026) A quantitative method for indoor trajectory analysis of older adults for spatial evaluation and optimization. Building Research & Information, 54(6), pp. 753-774. ISSN 0961-3218
Zhang, Y (2009) Research on hydraulic engineering construction management decision support system based on network analysis method (in Chinese). PhD thesis, Beijing University of Aeronautics and Astronautics, China.
Zheng, W.; Huang, Y. and Huang, W. (2026) Data-driven analysis of key factors in building fire risk. Engineering, Construction and Architectural Management, pp. 1-29. ISSN 0969-9988
Up a level