Items with Index Term: time prediction

Number of items: 15.

Alemu, S K (2022) Construction time prediction model for public building projects. Engineering, Construction and Architectural Management, 29(5), pp. 2183-2206. ISSN 0969-9988

Chan, D W M and Kumaraswamy, M M (1999) Modelling and predicting construction durations in Hong Kong public housing. Construction Management and Economics, 17(3), pp. 351-362. ISSN 01446193

Chanda, E K and Gardiner, S (2010) A comparative study of truck cycle time prediction methods in open-pit mining. Engineering, Construction and Architectural Management, 17(5), pp. 446-460. ISSN 0969-9988

Chen, H; Feng, Z; Liu, Y; Chen, B; Deng, T; Qin, Y and Xu, W (2023) Multiobjective optimization of a 3D laser scanning scheme for engineering structures based on rf-NSGA-II. Journal of Construction Engineering and Management, 149(2): 4022169, ISSN 0733-9364

Flanagan, R (1980) Tender price and time prediction for construction work. PhD thesis, Aston University, UK.

Gray, C (1986) Intelligent' construction time and cost analysis. Construction Management and Economics, 4(2), pp. 135-150. ISSN 01446193

Malekaee Ashtiyani, F.; Karimi Gavareshki, M. h and Gheidar-Kheljani, J. (2026) Real-time prediction of project duration deviation using CNN-LSTM-FIS. Built Environment Project and Asset Management, 16(2), pp. 304-320. ISSN 2044-124X

Mohsen, O; Petre, C and Mohamed, Y (2023) Machine-learning approach to predict total fabrication duration of industrial pipe spools. Journal of Construction Engineering and Management, 149(2): 04022172, ISSN 0733-9364

Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.

Nadafi, S; Moosavirad, S H and Ariafar, S (2019) Predicting the project time and costs using EVM based on gray numbers. Engineering, Construction and Architectural Management, 26(9), pp. 2107-2119. ISSN 0969-9988

Nkado, R N (1992) Construction time information system for the building industry. Construction Management and Economics, 10(6), pp. 489-509. ISSN 01446193

Sun, C and Xu, J (2011) Estimation of time for wenchuan earthquake reconstruction in China. Journal of Construction Engineering and Management, 137(3), pp. 179-187. ISSN 0733-9364

Wong, T; Wei, Y; Zeng, Y; Jie, Y and Zhao, X (2025) A novel real-time torque prediction of epb shield in mixed ground using machine learning method based on geological knowledge fusion. Journal of Construction Engineering and Management, 151(3): 04025005, ISSN 0733-9364

Yan, H.; Liu, C.; Yang, X.; Li, X. and Li, J. (2026) Digital twin-enabled 3D near-misses prediction method based on trajectories and postures for proactive construction safety management. Engineering, Construction and Architectural Management, pp. 1-27. ISSN 0969-9988

Zhou, T; Zhu, Q; Shi, Y and Du, J (2022) Construction robot teleoperation safeguard based on real-time human hand motion prediction. Journal of Construction Engineering and Management, 148(7): 04022040, ISSN 0733-9364

This list was generated on Sat Aug 22 02:05:29 2026 UTC.