Items with Index Term: time efficiency

Number of items: 23.

Ajayi, S; Brinklow-Harris, J; Alaka, H A and Dauda, J A (2019) Managing the benefits and impediments to offsite construction in the UK construction industry. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.

Almatroushi, H; Hariga, M; As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: An integrated approach. Engineering, Construction and Architectural Management, 27(9), pp. 2135-2161. ISSN 0969-9988

Atherinis, D; Bakowski, B; Velcek, M and Moon, S (2018) Developing and laboratory testing a smart system for automated falsework inspection in construction. Journal of Construction Engineering and Management, 144(3): 04017119, ISSN 0733-9364

Babalola, H I and Aliu, J O (2026) Lean construction practices for enhancing project delivery in the construction industry: Examining the beneficial outcomes. International Journal of Construction Management, 26(6), pp. 1097-1111. ISSN 1562-3599

Banihashemi, S; Assadimoghadam, A; Hajirasouli, A; LeNguyen, K and Mohandes, S R (2025) Parametric design in construction: A new paradigm for quality management and defect reduction. International Journal of Construction Management, 25(13), pp. 1534-1551. ISSN 1562-3599

Dai, F; Rashidi, A; Brilakis, I and Vela, P (2013) Comparison of image-based and time-of-flight-based technologies for three-dimensional reconstruction of infrastructure. Journal of Construction Engineering and Management, 139(1), pp. 69-79. ISSN 0733-9364

Darwish, M; Elsayed, A Y and Nassar, K (2018) Design and constructability of a novel funicular arched steel truss falsework. Journal of Construction Engineering and Management, 144(3): 04018002, ISSN 0733-9364

Gugssa, M; Li, L; Pu, L; Gurbuz, A; Luo, Y and Wang, J (2025) Enabling near-real-time safety glove detection through edge computing and transfer learning: comparative analysis of edge and cloud computing-based methods. Engineering, Construction and Architectural Management, 32(7), pp. 4700-4717. ISSN 0969-9988

Hajirasouli, A; Banihashemi, S; Drogemuller, R; Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: Thematic analysis and conceptual frameworks. Construction Innovation, 22(3), pp. 412-443. ISSN 1471-4175

Haller, M and Stehn, L (2010) Standardizing the pre-design-phase for improved efficiency in off-site housing projects. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Hosseini, A.; Niknam, M.; Shafaat, A. and Fathi, A. (2026) A unified ontology framework for cross-domain integration of BIM, IoT, and maintenance services in smart facility management. Engineering, Construction and Architectural Management, 33(3), pp. 1784-1812. ISSN 0969-9988

Manley, K and Chen, L (2016) The impact of client characteristics on the time and cost performance of collaborative infrastructure projects. Engineering, Construction and Architectural Management, 23(4), pp. 511-532. ISSN 0969-9988

Martins, S S; Evangelista, A C J; Hammad, A W A; Tam, V W Y and Haddad, A (2022) Evaluation of 4D BIM tools applicability in construction planning efficiency. International Journal of Construction Management, 22(15), pp. 2987-3000. ISSN 1562-3599

Nassereddine, H M (2019) Design, development and validation of an augmented reality-enabled production strategy process for the construction industry. PhD thesis, University of Wisconsin - Madison, USA.

Ottou, J A; Baiden, B K; Nani, G and Martin Morgan, T (2021) Benefits of implementing six sigma in competitive tendering process. Built Environment Project and Asset Management, 11(2), pp. 214-230. ISSN 2044-124X

Pouraghajan, M; Omrani, S and Drogemuller, R (2025) Enhancing decision-making in Australian concrete construction: A decision support model using an entropy-TOPSIS approach. Engineering, Construction and Architectural Management, 32(9), pp. 5913-5942. ISSN 0969-9988

Rasoulimanesh, M.; Rahai, A. and Shahhosseini, V. (2025) An integrated decision support system for strategic budget/resource allocation in bridge infrastructure management based on digital technologies. Smart and Sustainable Built Environment, 15(5), pp. 1939-1966. ISSN 2046-6099

Trinh, Hoang T (2021) Optimisation framework for sustainable design of concrete buildings. PhD thesis, Griffith University, Australia.

Uthai, T; Zhou, T; Ye, Y; You, H and Du, J (2025) Haptics-based robot teleoperation for soft object manipulation. Journal of Construction Engineering and Management, 151(5): 04025028, ISSN 0733-9364

Wang, C; Liu, H; Sing, M C P and Wu, J (2024) Pre-construction duration of public-private partnership projects: Evidence from China. Engineering, Construction and Architectural Management, 31(4), pp. 1715-1729. ISSN 0969-9988

Wang, Y; Thangasamy, V K; Tiong, R L K and Zhang, L (2022) Improved workflow for precast element design based on BIM and lean construction. Journal of Construction Engineering and Management, 148(8): 04022065, ISSN 0733-9364

Zhou, R.; Li, H.; Hu, W.; Meng, T.; Lu, H.; Wu, Y.; Chen, Y.; Cao, D. and Wang, F. Y. (2026) Integrated dual-crane positioning and lifting planning in extreme conditions: A critical states and spatial constraint optimization approach. Journal of Construction Engineering and Management, 152(6): 04026072, ISSN 0733-9364

Zhou, S and Gheisari, M (2018) Unmanned aerial system applications in construction: a systematic review. Construction Innovation, 18(4), pp. 453-468. ISSN 1471-4175

This list was generated on Sat Aug 22 01:44:13 2026 UTC.