Items with Index Term: time control
Al-Gathafi, M M (2005) Riskness of time and cost overruns and the effectiveness of risk response measure strategies in the Libyan construction industry. PhD thesis, University of Liverpool, UK.
Azimi, R (2011) An integrated real-time control system for structural steel fabrication projects. PhD thesis, University of Alberta, Canada.
El-Sayegh, S M and Al-Haj, R (2017) A new framework for time-cost trade-off considering float loss impact. Journal of Financial Management of Property and Construction, 22(1), pp. 20-36. ISSN 1366-4387
Igwe, U S; Mohamed, S F; Dzahir, M A M; Yusof, Z M and Khiyon, N A (2022) Towards a framework of automated resource model for post contract cost control of construction projects. International Journal of Construction Management, 22(16), pp. 3088-3097. ISSN 1562-3599
Jeong, J G (2006) A framework for supply chain modeling and optimization for the manufactured housing industry. PhD thesis, Purdue University, USA.
Kan, C; Fang, Y; Anumba, C J and Messner, J I (2018) A cyber-physical system (CPS) for planning and monitoring mobile cranes on construction sites. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(6), pp. 240-250. ISSN 17514304
Lingard, H; Francis, V and Turner, M (2012) Work time demands, work time control and supervisor support in the Australian construction industry: An analysis of work-family interaction. Engineering, Construction and Architectural Management, 19(6), pp. 647-665. ISSN 0969-9988
Louis, J (2016) Simulation analysis, monitoring, and control of operations. PhD thesis, Purdue University, USA.
Lu, M; Poon, C S and Wong, L C (2006) Application framework for mapping and simulation of waste handling processes in construction. Journal of Construction Engineering and Management, 132(11), pp. 1212-1221. ISSN 0733-9364
Mason, B (2023) Advancing autonomous green stormwater infrastructure. PhD thesis, University of Michigan, USA.
Navon, R and Berkovich, O (2005) Development and on-site evaluation of an automated materials management and control model. Journal of Construction Engineering and Management, 131(12), pp. 1328-1336. ISSN 0733-9364
Navon, R and Goldschmidt, E (2003) Can labor inputs be measured and controlled automatically? Journal of Construction Engineering and Management, 129(4), pp. 437-445. ISSN 0733-9364
Navon, R and Shpatnitsky, Y (2005) A model for automated monitoring of road construction. Construction Management and Economics, 23(9), pp. 941-951. ISSN 01446193
Olawale, Y A and Sun, M (2010) Cost and time control of construction projects: Inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(5), pp. 509-526. ISSN 1466433X
Rylander, D (2021) Productivity improvements in construction transport operation through lean thinking and systems of systems. PhD thesis, Malardalen University, Sweden.
Saket, M M (1986) Cost-significance applied to estimating and control of construction projects. PhD thesis, University of Dundee, UK.
Smith, N J (1986) The study of criticality: An investigation based on network theory into the relationship between time and cost in civil engineering bridgeworks contracts and the measurement of the effects of change. PhD thesis, University of Manchester Institute of Science and Technology, UK.
Tahir, H A (2015) A project control framework for the Libyan construction industry. PhD thesis, Sheffield Hallam University, UK.
Walker, D H T (1997) Construction time performance and traditional versus non-traditional procurement methods. Journal of Construction Procurement, 3(1), pp. 42-55. ISSN 1358-9180
Yakubu, O A (2010) Cost and time control practice of construction projects in the UK: The pursuit of effective management control. PhD thesis, University of the West of England, Bristol, UK.
Yakubu, O A and Sun, M (2009) A survey of construction project cost and time control practices in the UK. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Yap, J B H and Lim, S Y (2023) Collaborative project procurement in the construction industry: Investigating the drivers and barriers in Malaysia. Journal of Construction in Developing Countries, 28(1), pp. 171-192. ISSN 1823-6499
Up a level