Items with Index Term: time-cost trade-off

Number of items: 62.

Aiyin, J and Yimin, Z (2010) A multi-stage approach to time-cost trade-off analysis using mathematical programming. International Journal of Construction Management, 10(3), pp. 13-27. ISSN 1562-3599

Akin, F D; Polat, G; Turkoglu, H and Damci, A (2021) A crashing-based time-cost trade-off model considering quality cost and contract clauses. International Journal of Construction Management, 23(6), pp. 954-963. ISSN 1562-3599

Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.

Aminbakhsh, A and Sonmez, R (2015) Pareto oriented optimization of discrete time-cost trade-off problem using particle swarm optimization. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Aminbakhsh, S (2018) Heuristic and exact methods for the large-scale discrete time-cost trade-off problems. PhD thesis, Middle East Technical University, Turkey.

Ammar, M A (2011) Optimization of project time-cost trade-off problem with discounted cash flows. Journal of Construction Engineering and Management, 137(1), pp. 65-71. ISSN 0733-9364

Ammar, M A (2020) Efficient modeling of time-cost trade-off problem by eliminating redundant paths. International Journal of Construction Management, 20(7), pp. 812-821. ISSN 1562-3599

An, J; Li, S and Wu, X P (2025) Multi-objective planning for time-cost trade-offs in multi-project parallel environment. Engineering, Construction and Architectural Management, 32(6), pp. 4051-4073. ISSN 0969-9988

Burns, S A; Liu, L and Feng, C W (1996) The LP/IP hybrid method for construction time-cost trade-off analysis. Construction Management and Economics, 14(3), pp. 265-276. ISSN 01446193

Chen, L; Zhang, J and Peng, W (2022) Research on the hierarchical discrete time-cost trade-off problem for program. Journal of Construction Engineering and Management, 148(7): 04022039, ISSN 0733-9364

Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.

Dehghan, R and Ruwnapura, J Y (2014) Model of trade-off between overlapping and rework of design activities. Journal of Construction Engineering and Management, 140(2): 04013043, ISSN 0733-9364

El-Sayegh, S M and Al-Haj, R (2017) A new framework for time-cost trade-off considering float loss impact. Journal of Financial Management of Property and Construction, 22(1), pp. 20-36. ISSN 1366-4387

Elazouni, A and Abido, M A (2014) Enhanced trade-off of construction projects: Finance-resource-profit. Journal of Construction Engineering and Management, 140(9): 04014043, ISSN 0733-9364

Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364

Elazouni, A M and Metwally, F G (2007) Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management, 133(1), pp. 86-90. ISSN 0733-9364

Eshtehardian, E; Afshar, A and Abbasnia, R (2008) Time-cost optimization: Using GA and fuzzy sets theory for uncertainties in cost. Construction Management and Economics, 26(7), pp. 679-691. ISSN 1466433X

Ezeldin, A S and Soliman, A (2009) Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42-55. ISSN 0733-9364

Fang, Y and Ng, S T (2019) Genetic algorithm for determining the construction logistics of precast components. Engineering, Construction and Architectural Management, 26(10), pp. 2289-2306. ISSN 0969-9988

Geem, Z W (2010) Multiobjective optimization of time-cost trade-off using harmony search. Journal of Construction Engineering and Management, 136(6), pp. 711-716. ISSN 0733-9364

Gelisen, G (2010) Automated productivity based schedule animation (APBSA). PhD thesis, Polytechnic Institute of New York University, USA.

Gelisen, G and Griffis, F H (2014) Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis. Journal of Construction Engineering and Management, 140(4): B4013007, ISSN 0733-9364

Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: Reflections on a case study from Iran. Construction Management and Economics, 30(8), pp. 687-695. ISSN 1466433X

Han, T; Zhou, G; Xie, Y; Qiao, F; Feng, J; Liu, P and Wang, S (2026) Time-cost trade-off optimization in ultralong tunnel construction based on working face planning. Journal of Construction Engineering and Management, 152(3): 04026007, ISSN 0733-9364

Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(4), pp. 377-385. ISSN 01446193

Hegazy, T and Ersahin, T (2001) Simplified spreadsheet solutions. II: Overall schedule optimization. Journal of Construction Engineering and Management, 127(6), pp. 469-475. ISSN 0733-9364

Hegazy, T and Menesi, W (2012) Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138(6), pp. 688-696. ISSN 0733-9364

Hegazy, T and Wassef, N (2001) Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127(3), pp. 183-191. ISSN 0733-9364

Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X

Jain, R and Prakash, O (2024) Optimizing contractor's accruals under conditions of penalty imposition due to unforeseen delays. International Journal of Construction Management, 24(8), pp. 854-866. ISSN 1562-3599

Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(2), pp. 135-146. ISSN 01446193

Khataei, S (2024) A BIM-integrated agent-based simulation method for time-space conflict detection among mobile resources in construction projects. PhD thesis, Middle East Technical University, Turkey.

Li, H; Cao, J N and Love, P E D (1999) Using machine learning and GA to solve time-cost trade-off problems. Journal of Construction Engineering and Management, 125(5), pp. 347-353. ISSN 0733-9364

Li, J; Huang, W; Song, D; Zhou, L and Yang, B (2025) A constrained planning method: Considering storage space limitations and soft logic for cruise cabin assembly scheduling. Journal of Construction Engineering and Management, 151(8): 04025102, ISSN 0733-9364

Liu, J and Rahbar, F (2004) Project time-cost trade-off optimization by maximal flow theory. Journal of Construction Engineering and Management, 130(4), pp. 607-609. ISSN 0733-9364

Marzouk, M; Said, H and El-Said, M (2009) Framework for multiobjective optimization of launching girder bridges. Journal of Construction Engineering and Management, 135(8), pp. 791-800. ISSN 0733-9364

Moselhi, O and Ei-Rayes, K (1993) Scheduling of repetitive projects with cost optimization. Journal of Construction Engineering and Management, 119(4), pp. 681-697. ISSN 0733-9364

Moselhi, O and Roofigari-Esfahan, N (2013) Project schedule compression: A multi-objective methodology. Construction Innovation, 13(4), pp. 374-393. ISSN 1471-4175

Moussourakis, J and Haksever, C (2010) Project compression with nonlinear cost functions. Journal of Construction Engineering and Management, 136(2), pp. 251-259. ISSN 0733-9364

O'Brien, W J and Fischer, M A (2000) Importance of capacity constraints to construction cost and schedule. Journal of Construction Engineering and Management, 126(5), pp. 366-373. ISSN 0733-9364

Pakgohar, A (2014) Hierarchical multi-project planning and supply chain management: an integrated framework. PhD thesis, University of Exeter, UK.

Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.

Panwar, A and Jha, K N (2021) Integrating quality and safety in construction scheduling time-cost trade-off model. Journal of Construction Engineering and Management, 147(2): 04020160, ISSN 0733-9364

Pham, V H S; Nguyen Dang, N T and Nam, N V (2025) Optimizing time and cost in construction projects with a hybridized multi-verse optimizer and opposition-based learning. Engineering, Construction and Architectural Management, 32(7), pp. 4852-4886. ISSN 0969-9988

Reda, R and Carr, R I (1989) Time-cost trade-off among related activities. Journal of Construction Engineering and Management, 115(3), pp. 475-486. ISSN 0733-9364

Rohani, M; Shafabakhsh, G; Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(8), pp. 1053-1074. ISSN 0969-9988

Senouci, A B and Eldin, N N (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), pp. 869-877. ISSN 0733-9364

Sheykhi, R (2016) Risk-based decision making support for construction corporate resource management. PhD thesis, Florida International University, USA.

Sonmez, R; Aminbakhsh, S and Atan, T (2020) Activity uncrashing heuristic with noncritical activity rescheduling method for the discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 146(8): 1870, ISSN 0733-9364

Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364

Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599

Toǧan, V; Sulub, A S; Eirgash, M A and Mostofi, F (2026) Project scheduling to minimize the time and cost in large-scale construction projects with repulsion-based improved arithmetic optimization. Journal of Construction Engineering and Management, 152(3): 04025277, ISSN 0733-9364

Turkoglu, H; Arditi, D and Polat, G (2023) Mathematical multiobjective optimization model for trade-offs in small-scale construction projects. Journal of Construction Engineering and Management, 149(7): 04023056, ISSN 0733-9364

Turkoglu, H; Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(5): 04024031, ISSN 0733-9364

Turkoglu, H; Polat, G and Akin, F D (2023) Crashing construction projects considering schedule flexibility: An illustrative example. International Journal of Construction Management, 23(4), pp. 619-628. ISSN 1562-3599

Wang, J; Huang, W and Chen, Y (2025) Solving stochastic time-cost trade-off problems via modified double-loop procedure with adaptive domain decomposition method. Journal of Construction Engineering and Management, 151(2): 04024199, ISSN 0733-9364

Wang, P; Wang, K; Huang, Y and Fenn, P (2024) A contingency approach for time-cost trade-off in construction projects based on machine learning techniques. Engineering, Construction and Architectural Management, 31(11), pp. 4677-4695. ISSN 0969-9988

Xiong, Y and Kuang, Y (2008) Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off. Journal of Construction Engineering and Management, 134(2), pp. 153-156. ISSN 0733-9364

Yang, I T (2007) Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis. Journal of Construction Engineering and Management, 133(7), pp. 498-505. ISSN 0733-9364

Yang, I T; Lin, Y C and Lee, H Y (2014) Use of support vector regression to improve computational efficiency of stochastic time-cost trade-off. Journal of Construction Engineering and Management, 140(1): 04013036, ISSN 0733-9364

Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364

Zheng, D X M; Ng, S T and Kumaraswamy, M M (2002) Applying genetic algorithm techniques for time-cost optimization. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.