Items with Index Term: test case
Akinade, O O (2017) BIM-based software for construction waste analytics using artificial intelligence hybrid models. PhD thesis, University of the West of England, Bristol, UK.
Altun, M (2024) Data-driven and knowledge-assisted model-based frameworks for supporting facility maintenance. PhD thesis, Middle East Technical University, Turkey.
Arnold, J A (2000) Information interoperation for internet-based component engineering analysis. PhD thesis, Stanford University, USA.
Charoenngam, C; Coquinco, S T and Hadikusumo, B H W (2003) Web-based application for managing change orders in construction projects. Construction Innovation, 3(4), pp. 197-215. ISSN 1471-4175
Cheng, M Y; Wang, H T; Wu, Y W; Khitam, A F K and Li, Y M (2026) Multi-objective strategic travel network planning for post-earthquake bridge inspections. International Journal of Construction Management, 26(4), pp. 561-582. ISSN 1562-3599
Cui, Q; Johnson, P; Quick, A and Hastak, M (2008) Valuing the warranty ceiling clause on New Mexico Highway 44 using a binomial lattice model. Journal of Construction Engineering and Management, 134(1), pp. 10-17. ISSN 0733-9364
Fahmy, A; Hassan, T; Bassioni, H and McCaffer, R (2020) Dynamic scheduling model for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 313-330. ISSN 2044-124X
Fiorineschi, L; Bacci, T; Frillici, F S S; Cubeda, S; Volpe, Y; Rotini, F; Carfagni, M and Facchini, B (2023) Non-reactive test rig for combustor-turbine interaction studies in industrial gas turbines. Journal of Engineering, Design and Technology, 21(3), pp. 758-777. ISSN 1726-0531
Gwak, H S; Son, S H; Park, Y J and Lee, D E (2016) Exact time-cost tradeoff analysis in concurrency-based scheduling. Journal of Construction Engineering and Management, 142(10): 04016054, ISSN 0733-9364
Hartmann, T; Gao, J and Fischer, M (2008) Areas of application for 3D and 4D models on construction projects. Journal of Construction Engineering and Management, 134(10), pp. 776-785. ISSN 0733-9364
Haymaker, J (2004) The perspective approach: Enabling engineers to construct and integrate views and generate an evolving project model. PhD thesis, Stanford University, USA.
Howard, Robert W (2021) Of incentive, bias, and behaviour: an empirical economic investigation into project delivery constructs influencing the adoption of building information modelling. PhD thesis, University College London, UK.
Jeon, J; Zhang, Y; Yang, L; Xu, X; Cai, H and Tran, D (2023) Risk breakdown matrix for risk-based inspection of transportation infrastructure projects. Journal of Construction Engineering and Management, 149(4): 04023007, ISSN 0733-9364
Jeong, W S (2014) Integrating building information modeling with object-oriented physical modeling for building thermal simulation. PhD thesis, Texas A&M University, USA.
Ji, S H; Park, M and Lee, H S (2012) Case adaptation method of case-based reasoning for construction cost estimation in Korea. Journal of Construction Engineering and Management, 138(1), pp. 43-52. ISSN 0733-9364
Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.
Kashiwagi, D T (1991) Development of a performance based design/procurement system for nonstructural facility systems. PhD thesis, Arizona State University, USA.
Kishore, V; Abraham, D M and Sinfield, J V (2011) Portfolio cash assessment using fuzzy systems theory. Journal of Construction Engineering and Management, 137(5), pp. 333-343. ISSN 0733-9364
Koo, B (2004) Formalizing construction sequence constraints for the rapid generation of scheduling alternatives. PhD thesis, Stanford University, USA.
Kwon, N; Cho, J; Lee, H S; Yoon, I and Park, M (2019) Compensation cost estimation model for construction noise claims using case-based reasoning. Journal of Construction Engineering and Management, 145(8): 04019047, ISSN 0733-9364
Kwon, N; Park, M; Lee, H S; Ahn, J and Kim, S (2017) Construction noise prediction model based on case-based reasoning in the preconstruction phase. Journal of Construction Engineering and Management, 143(6): 04017008, ISSN 0733-9364
Laura Pisello, A; Xu, X; Taylor, J E and Cotana, F (2012) Network of buildings' impact on indoor thermal performance. Smart and Sustainable Built Environment, 1(1), pp. 73-86. ISSN 2046-6099
Lee, D E; Lim, T K and Arditi, D (2012) Stochastic project financing analysis system for construction. Journal of Construction Engineering and Management, 138(3), pp. 376-389. ISSN 0733-9364
Leontaris, G (2021) Decision making under uncertainty for construction management of offshore wind assets. PhD thesis, Delft University of Technology, Netherlands.
Lim, T K; Park, S M; Lee, H C and Lee, D E (2016) Artificial neural network-based slip-trip classifier using smart sensor for construction workplace. Journal of Construction Engineering and Management, 142(2): 04015065, ISSN 0733-9364
Marzouk, M and Moselhi, O (2004) Fuzzy clustering model for estimating haulers' travel time. Journal of Construction Engineering and Management, 130(6), pp. 878-886. ISSN 0733-9364
Mohieldin, Y A (1989) Analysis of construction processes with nonstationary work task durations. PhD thesis, University of Maryland, College Park, USA.
Moon, Sungkon (2014) Dynamic control of supply chain quality to improve process performance in construction. PhD thesis, University of New South Wales, Australia.
Mora, R (2005) Representation and reasoning for integrated conceptual design of building structures. PhD thesis, Concordia University, Canada.
Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.
Nikkhoo, P (2022) A systematic method to reduce the duration impact of change events on construction projects. PhD thesis, Stanford University, USA.
O'Grady, W (2013) A knowledge management system to optimise comfort throughout the building life-cycle. PhD thesis, University College Cork, Ireland.
Oti, A H; Tah, J H M and Abanda, F H (2018) Integration of lessons learned knowledge in building information modeling. Journal of Construction Engineering and Management, 144(9): 04018081, ISSN 0733-9364
Pakgohar, A (2014) Hierarchical multi-project planning and supply chain management: an integrated framework. PhD thesis, University of Exeter, UK.
Park, Y J; Gwak, H S and Lee, D E (2017) Dozer workability estimation method for economic dozing. Journal of Construction Engineering and Management, 143(2): 04016096, ISSN 0733-9364
Patil, S K (2016) Determining influencing factors and predicting dispute outcome of variation claims in Indian construction contracts/ by Smita Krishnarao Patil. PhD thesis, Indian Institute of Technology Delhi, India.
Pregenzer, L J; Seppanen, P J; Kunz, J C and Paulson, B C (1999) Value-added assessment of construction plans. Journal of Construction Engineering and Management, 125(4), pp. 242-248. ISSN 0733-9364
Reinhardt, J (2003) Navigational models for effective and efficient interaction with integrated product and process models on construction sites. PhD thesis, Carnegie Mellon University, USA.
Ribeiro, F J L T (1995) Assessment of applications for the house renovations grants system: An IT support framework. PhD thesis, University of Salford, UK.
Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.
Schroeder, H P (1991) Dycam 1.0: Dynamic construction activity model, a decision support tool for construction planning. PhD thesis, University of Colorado at Boulder, USA.
Scott, D (1997) An intelligent approach to the engineering management of housing subsidence cases. PhD thesis, Teesside University, UK.
Shafiq, M T and Lockley, S R (2022) Application of signature-based matching for IFC model comparison. International Journal of Construction Management, 22(9), pp. 1765-1774. ISSN 1562-3599
Shen, K; Zhu, Y; Pan, J and Li, X (2023) An intelligent decision-making model for the design of precast slab joints based on case-based reasoning. Journal of Construction Engineering and Management, 149(5): 04023025, ISSN 0733-9364
Türkakın, O H; Manisalı, E and Arditi, D (2020) Delay analysis in construction projects with no updated work schedules. Engineering, Construction and Architectural Management, 27(10), pp. 2893-2909. ISSN 0969-9988
Wang, H-H (2010) A context-based representation and reasoning formalism to support construction safety planning. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Weldu, Y W (2016) Automated generation and visualization of initial construction schedules from building information models. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Wirahadikusumah, R; Abraham, D M and Castello, J (1999) Markov decision process for sewer rehabilitation. Engineering, Construction and Architectural Management, 6(4), pp. 358-370. ISSN 0969-9988
Wong Chong, Oscar (2022) IFC-based system and methods to support analysis of robot-assisted offsite construction. PhD thesis, Purdue University, USA.
Yasamis-Speroni, F; Lee, D E and Arditi, D (2012) Evaluating the quality performance of pavement contractors. Journal of Construction Engineering and Management, 138(10), pp. 1114-1124. ISSN 0733-9364
Zhang, J (2015) Automated code compliance checking in the construction domain using semantic natural language processing and logic-based reasoning. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Zhang, J; Eastham, D L and Bernold, L E (2005) Waste-based management in residential construction. Journal of Construction Engineering and Management, 131(4), pp. 423-430. ISSN 0733-9364
Zhang, M; Cao, T and Zhao, X (2019) Using smartphones to detect and identify construction workers' near-miss falls based on ann. Journal of Construction Engineering and Management, 145(1): 04018120, ISSN 0733-9364
Up a level