Al-Ajam, M (2008) Integrating collaborative extranets with project integrated databases to improve the construction tender stage. PhD thesis, University of Salford, UK.

Alghamdi, A M (2022) A systemic approach for construction contract claims settlement in the Kingdom of Saudi Arabia. PhD thesis, University of Reading, UK.

Blay-Armah A, R A (2013) The impact of varying asset specificities of subcontractors on relationships development in construction. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.

Blyth, K A (2002) A computer model that forecasts the cash flow of building projects at the tender stage using stage payments. PhD thesis, University of Liverpool, UK.

Cepeda, D M; Sohail, M and Ogunlowo, O O (2018) Understanding the critical success factors for delivery of megaprojects in Colombia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 45-57. ISSN 17514304

Chen, C (2007) Institutional barriers to private participation in infrastructure: The case of electronic toll collection in Taiwan. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Ekanayake, B J; Ysandanayake, Y and Ramachandra, T (2018) Application of value management to refurbishment projects: A Sri Lankan case study. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.

Elghaish, F; Abrishami, S; Abu Samra, S; Gaterell, M; Hosseini, M R and Wise, R (2021) Cash flow system development framework within integrated project delivery (IPD) using BIM tools. International Journal of Construction Management, 21(6), pp. 555-570. ISSN 1562-3599

Elghaish, F A K (2020) An automated IPD cost management system: BIM and blockchain based solution. PhD thesis, University of Portsmouth, UK.

Ellis, R C T; Wood, G D and Keel, D A (2005) Value management practices of leading UK cost consultants. Construction Management and Economics, 23(5), pp. 483-493. ISSN 01446193

Fogarty, H (2009) Contractor perspective of the new Irish public works contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(1), pp. 29-34. ISSN 17514312

Gruneberg, S and Hughes, W P (2004) Construction consortia: Do they serve any real purpose? In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Hassim, S; Muniandy, R; Alias, A H and Abdullah, P (2018) Construction tender price estimation standardization (TPES) in Malaysia: Modeling using fuzzy neural network. Engineering, Construction and Architectural Management, 25(3), pp. 443-457. ISSN 0969-9988

Hastie, J; Sutrisna, M and Egbu, C (2017) Modelling knowledge integration process in early contractor involvement procurement at tender stage: A Western Australian case study. Construction Innovation, 17(4), pp. 429-456. ISSN 1471-4175

Hogg, K (2003) The role of the quantity surveying profession in accommodating client risk. Journal of Financial Management of Property and Construction, 8(1), pp. 49-56. ISSN 1366-4387

Jamieson, I A (1998) The development of a concurrently engineered procurement process. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988

Kamanda-Kabague, B M (1981) Application of mathematical model techniques to the planning and control of overhead costs in the construction industry. PhD thesis, City, University of London, UK.

Laryea, S and Hughes, W (2008) How contractors price risk in bids: Theory and practice. Construction Management and Economics, 26(9), pp. 911-924. ISSN 1466433X

Meléndez, W; Saavedra, R; Garcés, G and Herrera, R (2026) Comparative analysis of quantity take-off in reinforcing steel bars in apartment buildings based on CAD and BIM method: A case study. International Journal of Construction Management, 26(5), pp. 751-771. ISSN 1562-3599

Obiozo, R N (2018) The role of psychosocial recuperative therapy in enhancing construction performance on projects. PhD thesis, Nelson Mandela University, South Africa.

Odeyinka, H A; Lowe, J and Kaka, A P (2013) Artificial neural network cost flow risk assessment model. Construction Management and Economics, 31(5), pp. 423-439. ISSN 01446193

Oladiran, O J (2009) Innovative waste management through the use of waste management plans on construction projects in Nigeria. Architectural Engineering and Design Management, 5(3), pp. 165-176. ISSN 1745-2007

Oswald, D (2016) Investigating unsafe acts on a large multinational construction project. PhD thesis, University of Edinburgh, UK.

Pasquire, C L (1991) Builders quantities for contractors' management. PhD thesis, Loughborough University, UK.

Rooke, J; Seymour, D and Fellows, R (2004) Planning for claims: An ethnography of industry culture. Construction Management and Economics, 22(6), pp. 655-662. ISSN 01446193

Rose, T M and Manley, K (2014) Revisiting the adoption of innovative products on Australian road infrastructure projects. Construction Management and Economics, 32(9), pp. 904-917. ISSN 01446193

Sumner, S and Farrell, P (2003) The influence of clients on health and safety standards in construction. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Sundaram, T K (1989) Contract management: a rational approach to construction contract pricing. PhD thesis, Indian Institute of Technology Delhi, India.