Items with Index Term: temporary work
Aboagye-Nimo, E; Painting, N and Piroozfar, P (2024) Picking up where we left off: A 'temporary' safety culture. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.
AlAbbadi, G (2020) Development of a framework towards enhancing workers productivity in the Jordanian construction industry. PhD thesis, Coventry University, UK.
Baldwin, A; Li, H; Huang, T; Kong, C W; Guo, H L; Chan, N and Wong, J (2009) Supporting pre-tender construction planning with virtual prototyping. Engineering, Construction and Architectural Management, 16(2), pp. 150-161. ISSN 0969-9988
Bower, D A (1995) The creation of a proactive link between time and money. PhD thesis, University of Manchester, UK.
Burbridge, A and Troutbeck, R (2017) Zero roadworker harm: Ethical and legal challenges. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 170(2), pp. 77-84. ISSN 17514304
Dempsey, H; Curran, M and Spillane, J P (2020) Scaffolding safety in the UK and Ireland: A framework to improve health and safety neglect on small and medium-sized construction projects. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Hatmoko, J U D (2008) The impact of supply chain management practice on construction project performance. PhD thesis, University of Newcastle upon Tyne, UK.
Hatmoko, J U D and Scott, S (2010) Simulating the impact of supply chain management practice on the performance of medium-sized building projects. Construction Management and Economics, 28(1), pp. 35-49. ISSN 1466433X
Kadir, M R b A (1996) Conceptual phase best practices. PhD thesis, Loughborough University, UK.
Malekzadeh, H; Edwards, D J and Harris, F C (2005) Simulating the ground freezing process: a decision support model. Journal of Construction Research, 6(1), pp. 107-121. ISSN 1609-9451
Ng, A K W and Price, A D F (2005) Assessing the impact of main contractor's site co-ordination on sub-contractors' performance in Hong Kong. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Ng, A K W and Price, A D F (2010) Optimizing the time performance of subcontractors in building projects. Construction Economics and Building, 10(1-2), pp. 90-102. ISSN 2204-9029
Rotimi, F E; Rotimi, J O B; Silva, C W C; Olatunji, O A and Ramanayaka, C E D (2023) The determinants of job satisfaction amongst specific migrant construction workers. Built Environment Project and Asset Management, 13(5), pp. 738-755. ISSN 2044-124X
Rubio-Romero, J C; Rubio, M C and García-Hernández, C (2013) Analysis of construction equipment safety in temporary work at height. Journal of Construction Engineering and Management, 139(1), pp. 9-14. ISSN 0733-9364
Rwamamara, R; Norberg, H; Olofsson, T and Lagerqvist, O (2010) Using visualization technologies for design and planning of a healthy construction workplace. Construction Innovation, 10(3), pp. 248-266. ISSN 1471-4175
Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures. PhD thesis, Illinois Institute of Technology, USA.
Tah, J H M (1989) Integrated microcomputer applications in formwork design. PhD thesis, Loughborough University, UK.
Up a level