Items with Index Term: team building

Number of items: 46.

Adu, E T and Opawole, A (2020) Assessment of performance of teamwork in construction projects delivery in South-Southern Nigeria. Journal of Engineering, Design and Technology, 18(1), pp. 230-250. ISSN 1726-0531

Alarcon-Cardenas, L F (1992) Project performance modeling: A methodology for evaluating project execution strategies. PhD thesis, University of California, Berkeley, USA.

Asiedu, R O; Manu, P; Mahamadu, A M; Booth, C A; Olomolaiye, P; Agyekum, K and Abadi, M (2023) Critical skills for infrastructure procurement: Insights from developing country contexts. Journal of Engineering, Design and Technology, 21(6), pp. 1948-1974. ISSN 1726-0531

Ayodeji, F J (2014) Evaluation of site managers' hindrances towards optimal utilisation of construction resources. Journal of Engineering, Design and Technology, 12(3), pp. 348-363.

Bingham, E; Edward Gibson, G and El Asmar, M (2019) Identifying team selection and alignment factors by delivery method for transportation projects. Journal of Construction Engineering and Management, 145(10): 04019061, ISSN 0733-9364

Boyd, D and Foss, P (1997) Developing intimacy in construction industry groups. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Brooks, T; Bruen, J and Curran, M (2020) The value of 'non-value adding' activity. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Childs, B R; Weidman, J E; Farnsworth, C B and Christofferson, J P (2017) Use of personality profile assessments in the us commercial construction industry. International Journal of Construction Education and Research, 13(4), pp. 267-83. ISSN 1557-8771

Chow, L J; Then, D and Skitmore, R M (2005) Characteristics of teamwork in Singapore construction projects. Journal of Construction Research, 6(1), pp. 15-46. ISSN 1609-9451

Deshpande, A S (2009) Best practices for the management of design in fast track industrial projects. PhD thesis, University of Cincinnati, USA.

Egbu, C O (1999) Skills, knowledge and competencies for managing construction refurbishment works. Construction Management and Economics, 17(1), pp. 29-43. ISSN 01446193

Elvin, G A (1998) A process model for integrated design and construction. PhD thesis, University of California, Berkeley, USA.

Gardner, Stephen T (2024) Technical and interpersonal skills and characteristics of successful construction project managers. PhD thesis, Griffith University, Australia.

Goh, C S; Abdul-Rahman, H and Abdul Samad, Z (2013) Applying risk management workshop for a public construction project: Case study. Journal of Construction Engineering and Management, 139(5), pp. 572-580. ISSN 0733-9364

Hochstatter, Kirk (2025) Collaborative project delivery governance and shared leadership in AEC building virtual teams. PhD thesis, University of Washington, USA.

Iyer, K C and Jha, K N (2003) Analysis of critical coordination activities of Indian construction projects. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.

Jha, K N (2004) Factors for the success of a construction project: empirical study. PhD thesis, Indian Institute of Technology Delhi, India.

Jha, K N (2005) Attributes of a project coordinator. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Jha, K N and Iyer, C K (2006) What attributes should a project coordinator possess? Construction Management and Economics, 24(9), pp. 977-988. ISSN 1466433X

Jha, K N and Misra, S (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25(4), pp. 409-421. ISSN 1466433X

Kim, T-y (2001) Trends of selected construction industry practices. PhD thesis, University of Texas at Austin, USA.

Kumaraswamy, M M; Rahman, M M; Ling, F Y Y and Phng, S T (2005) Reconstructing cultures for relational contracting. Journal of Construction Engineering and Management, 131(10), pp. 1065-1075. ISSN 0733-9364

Kwofie, T E; Alhassan, A; Botchway, E and Afranie, I (2015) Factors contributing towards the effectiveness of construction project teams. International Journal of Construction Management, 15(2), pp. 170-178. ISSN 1562-3599

Lee, S H; Thomas, S R and Tucker, R L (2005) The relative impacts of selected practices on project cost and schedule. Construction Management and Economics, 23(5), pp. 545-553. ISSN 01446193

Luo, L; Zhang, L; Zheng, X and Wu, G (2022) A hybrid approach for investigating impacts of leadership dynamics on project performance. Engineering, Construction and Architectural Management, 29(5), pp. 1965-1990. ISSN 0969-9988

Mahamadu, A-M; Manu, P; Booth, C; Olomolaiye, P; Coker, A; Ibrahim, A and Lamond, J (2018) Infrastructure procurement skills gap amongst procurement personnel in Nigeria's public sector. Journal of Engineering, Design and Technology, 16(1), pp. 2-24.

Marinelli, M and Salopek, M (2020) Joint risk management and collaborative ethos: Exploratory research in the UK construction sector. Journal of Engineering, Design and Technology, 18(2), pp. 343-361. ISSN 1726-0531

Matthews, J and Rowlinson, S (1999) Partnering: Incorporating safety management. Engineering, Construction and Architectural Management, 6(4), pp. 347-357. ISSN 0969-9988

Maytorena Sanchez, Eunice S (2003) Building conversion process: a cognitive exploration. PhD thesis, University College London, UK.

Mohammed, A A and Abdul-Rahman, H (2014) Aspects of project learning in construction: A socio-technical model. Construction Innovation, 14(2), pp. 229-244. ISSN 1471-4175

Morrow, T K (1998) Effects of selected practices on project cost performance. PhD thesis, University of Texas at Austin, USA.

Noor, R N H R M; Ibrahim, C K I C and Belayutham, S (2021) Making sense of multi-actor social collaboration in building information modelling Level 2 projects: A case in Malaysia. Construction Economics and Building, 21(4), pp. 89-114. ISSN 2204-9029

Novak, V M (2012) Managing sustainability value in design: A systems approach. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Oey, M (2001) Effects of selected practices on the cost performance of building projects. PhD thesis, University of Texas at Austin, USA.

Onyia, U (2019) Improving the supervisory and managerial skills and competences required in construction management in Nigeria. PhD thesis, London South Bank University, UK.

Retamal, F; Salazar, L A and Alarcón, L F (2022) Online monitoring and implementation of commitment management performance and its impact on project planning in four construction projects. Journal of Construction Engineering and Management, 148(10): 05022011, ISSN 0733-9364

Ruff, C M; Dzombak, D A and Hendrickson, C T (1996) Owner-contractor relationships on contaminated site remediation projects. Journal of Construction Engineering and Management, 122(4), pp. 348-353. ISSN 0733-9364

Shan, Y; Goodrum, P M; Zhai, D; Haas, C and Caldas, C H (2011) The impact of management practices on mechanical construction productivity. Construction Management and Economics, 29(3), pp. 305-316. ISSN 1466433X

Smallwood, J and Allen, C (2020) The impact of a first-year orientation team building exercise. Construction Economics and Building, 20(3), pp. 142-159. ISSN 2204-9029

Smallwood, J and Allen, C J (2017) Making an impact: Team building as an alternative education to enable construction management honours students to deliver. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Smallwood, J J and Allen, C J (2020) The impact of a first-year orientation team building event: A longitudinal review. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Sunkanmi, A B (2023) An integrated conflict management model for the South African construction industry. PhD thesis, University of Johannesburg, South Africa.

Tennant, S (2007) Site management teams and project performance in the UK construction industry. PhD thesis, University of Strathclyde, UK.

Toolanen, B (2008) Lean contracting relational contracting influenced by lean thinking. PhD thesis, Luleå University of Technology, Sweden.

Walker, D H T (1996) The contribution of the construction management team to good construction time performance: An Australian experience. Journal of Construction Procurement, 2(2), pp. 4-18. ISSN 1358-9180

Zuppa, D; Olbina, S and Issa, R (2016) Perceptions of trust in the US construction industry. Engineering, Construction and Architectural Management, 23(2), pp. 211-236. ISSN 0969-9988

This list was generated on Sat Aug 22 01:35:07 2026 UTC.