Items with Index Term: target cost
Ahiaga-Dagbui, D and Smith, S D (2012) Neural networks for modelling the final target cost of water projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Alwisy, A; Bouferguene, A and Al-Hussein, M (2020) Framework for target cost modelling in construction projects. International Journal of Construction Management, 20(2), pp. 89-104. ISSN 1562-3599
Badenfelt, U (2007) Trust and control in the early phases of target cost contracts. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Badenfelt, U (2008) The selection of sharing ratios in target cost contracts. Engineering, Construction and Architectural Management, 15(1), pp. 54-65. ISSN 0969-9988
Badenfelt, U (2010) I trust you, I trust you not: A longitudinal study of control mechanisms in incentive contracts. Construction Management and Economics, 28(3), pp. 301-310. ISSN 1466433X
Bateman, G H (2009) The IChemE international forms of contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 162(4), pp. 169-174. ISSN 17514304
Bender, W J (2000) A risk-based cost control methodology for constructing complex structures with the mobile offshore base as a case study. PhD thesis, University of Maryland, College Park, USA.
Boukendour, S and Hughes, W P (2014) Collaborative incentive contracts: Stimulating competitive behaviour without competition. Construction Management and Economics, 32(3), pp. 279-289. ISSN 01446193
Chan, D M; Chan, A P C; Lam, P T I; Lam, E W M and Wong, J M W (2007) Evaluating guaranteed maximum price and target cost contracting strategies in Hong Kong construction industry. Journal of Financial Management of Property and Construction, 12(3), pp. 139-150. ISSN 1366-4387
Chan, D W M; Chan, A P C; Lam, P T I and Wong, J M W (2010) Empirical study of the risks and difficulties in implementing guaranteed maximum price and target cost contracts in construction. Journal of Construction Engineering and Management, 136(5), pp. 495-507. ISSN 0733-9364
Chan, H L J (2011) Developing a fuzzy risk assessment model for target cost and guaranteed maximum price contracts in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Doğan, S Z (2005) Using machine learning techniques for early cost prediction of structural systems of buildings. PhD thesis, Izmir Institute of Technology, Turkey.
Grau, D; Cruz Rios, F and Sherman, R (2021) Project validation: A set-based and concurrent design approach to inform owner's authorization decision on complex projects. Journal of Construction Engineering and Management, 147(10): 04021132, ISSN 0733-9364
Jacomit, A M and Granja, A D (2011) An investigation into the adoption of target costing on Brazilian public social housing projects. Architectural Engineering and Design Management, 7(2), pp. 113-127. ISSN 1745-2007
Laryea, S (2016) Risk apportionment in target cost contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(6), pp. 248-257. ISSN 17514304
Laryea, S and Watermeyer, R (2014) Innovative construction procurement at Wits University. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 167(5), pp. 220-231. ISSN 17514304
Li, Y C; Luk, W H and Cheng, E (2016) Hong Kong's first public sector NEC contract: Lessons learnt. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(6), pp. 231-237. ISSN 17514304
Lord, S-F; Noye, S; Ure, J; Tennant, M G and Fisk, D J (2016) Comparative review of building commissioning regulation: A quality perspective. Building Research & Information, 44(5-6), pp. 630-643. ISSN 0961-3218
Ma, Q and Cheung, S O (2025) Augmenting the incentivizing power of target cost contracting in integrated project delivery. Journal of Construction Engineering and Management, 151(7): 04025069, ISSN 0733-9364
Ma, Q; Li, S and Cheung, S O (2022) Unveiling embedded risks in integrated project delivery. Journal of Construction Engineering and Management, 148(1): 04021180, ISSN 0733-9364
Mahdi, H S and Carmichael, D G (2014) An optimal target cost contract with a risk neutral owner. Engineering, Construction and Architectural Management, 21(5), pp. 586-604. ISSN 0969-9988
Obi, L I (2017) Development of a system model for cost management in low-cost housing projects in Nigeria. PhD thesis, University of Salford, UK.
Pasquire, C; Pennanen, A; Ballard, G and Haahtela, Y (2011) Target costing and designing to targets in construction. Journal of Financial Management of Property and Construction, 16(1), pp. 52-63. ISSN 1366-4387
Perry, J G and Barnes, M (2000) Target cost contracts: An analysis of the interplay between fee, target, share and price. Engineering, Construction and Architectural Management, 7(2), pp. 202-208. ISSN 0969-9988
Potts, K (2009) Construction during World War II: Management and financial administration. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Ranasinghe, M (1998) Risk management in the insurance industry: Insights for the engineering construction industry. Construction Management and Economics, 16(1), pp. 31-39. ISSN 01446193
Rosander, L and Kadefors, A (2019) From project to policy: Implementing a collaborative procurement strategy in a public client organisation. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Saeidlou, S and Ghadiminia, N (2024) A construction cost estimation framework using DNN and validation unit. Building Research & Information, 52(1-2), pp. 38-48. ISSN 0961-3218
Shehadeh, A; Alshboul, O and Hamedat, O (2022) Risk assessment model for optimal gain-pain share ratio in target cost contract for construction projects. Journal of Construction Engineering and Management, 148(2): 04021197, ISSN 0733-9364
Volker, L; Eriksson, P E; Kadefors, A and Larsson, J (2018) A case-based comparison of the efficiency and innovation potential of integrative and collaborative procurement strategies. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Wamuziri, S and Seywright, A (2005) Risk sharing and effective incentives in collaborative procurement. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Williams T, W M R P (2013) Target cost contracts: Adopting innovative incentive mechanisms to improve the project delivery process. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Zimina, D; Ballard, G and Pasquire, C (2012) Target value design: Using collaboration and a lean approach to reduce construction cost. Construction Management and Economics, 30(5), pp. 383-398. ISSN 1466433X
de Melo, R S S; Do, D; Tillmann, P; Ballard, G and Granja, A D (2016) Target value design in the public sector: Evidence from a hospital project in San Francisco, CA. Architectural Engineering and Design Management, 12(2), pp. 125-137. ISSN 1745-2007
Up a level