Items with Index Term: successor
AbdElMottaleb, Mohamed (2025) AI in project management: Machine learning application for construction scheduling. PhD thesis, University of Salford, UK.
Alikhani, H; Le, C; Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(9): 04023082, ISSN 0733-9364
Arabpour Roghabadi, M and Moselhi, O (2021) Optimized crew selection for scheduling of repetitive projects. Engineering, Construction and Architectural Management, 28(6), pp. 1517-1540. ISSN 0969-9988
Bashford, H H; Sawhney, A; Walsh, K D and Kot, K (2003) Implications of even flow production methodology for U.S. Housing industry. Journal of Construction Engineering and Management, 129(3), pp. 330-332. ISSN 0733-9364
Craig, R (2000) Re-engineering the tender code for construction works. Construction Management and Economics, 18(1), pp. 91-100. ISSN 01446193
Driessen, M (2014) Asphalt encounters: Chinese road building in Ethiopia. PhD thesis, University of Oxford, UK.
Hassan, A and El-Rayes, K (2020) Quantifying the interruption impact of activity delays in non-serial repetitive construction projects. Construction Management and Economics, 38(6), pp. 515-533. ISSN 01446193
Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364
Maradza, E N (2015) Adaptation of industry BIM process standards in a large construction firm. PhD thesis, University of Reading, UK.
Moselhi, O and Hassanein, A (2003) Optimized scheduling of linear projects. Journal of Construction Engineering and Management, 129(6), pp. 664-673. ISSN 0733-9364
Nguyen, T H D; Chileshe, N; Rameezdeen, R and Wood, A (2019) Stakeholder influence pathways in construction projects: Multicase study. Journal of Construction Engineering and Management, 145(9): 05019011, ISSN 0733-9364
Perrenoud, A J and Sullivan, K T (2017) Analysis of executive succession planning in 12 construction companies. International Journal of Construction Education and Research, 13(1), pp. 64-80. ISSN 1557-8771
Russell, A D and Wong, W C M (1993) New generation of planning structures. Journal of Construction Engineering and Management, 119(2), pp. 196-214. ISSN 0733-9364
Sawhney, A; Walsh, K D; Bashford, H H and Palaniappan, S (2009) Impact of inspected buffers on production parameters of construction processes. Journal of Construction Engineering and Management, 135(4), pp. 319-329. ISSN 0733-9364
Tommelein, I D; Riley, D R and Howell, G A (1999) Parade game: Impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5), pp. 304-310. ISSN 0733-9364
Wamsler, C and Brink, E (2016) The urban domino effect: A conceptualization of cities' interconnectedness of risk. International Journal of Disaster Resilience in the Built Environment, 7(2), pp. 80-113. ISSN 1759-5916
Up a level