Items with Index Term: subjectivity
Abdelgawad, M A M and Fayek, A R (2012) Comprehensive hybrid framework for risk analysis in the construction industry using combined failure mode and effect analysis, fault trees, event trees, and fuzzy logic. Journal of Construction Engineering and Management, 138(5), pp. 642-651. ISSN 0733-9364
Adebimpe, O A; Proverbs, D G and Oladokun, V O (2021) A fuzzy-analytic hierarchy process approach for measuring flood resilience at the individual property level. International Journal of Building Pathology and Adaptation, 39(2), pp. 197-217. ISSN 23984708
Aflatooni, Mehran (2015) Synthetic rating system for railway bridge management. PhD thesis, Queensland University of Technology, Australia.
Al-Tubayyeb, S A (1989) Improving construction contract administration utilizing multiattribute statistical analysis on bid stage information. PhD thesis, University of California, Berkeley, USA.
Alam, A; Bhat, M S; Farooq, H; Ahmad, B; Ahmad, S and Sheikh, A H (2018) Flood risk assessment of srinagar city in Jammu and Kashmir, India. International Journal of Disaster Resilience in the Built Environment, 9(2), pp. 114-129. ISSN 1759-5916
Allahi, Fahimeh (2020) Development of simulation based approaches for cost estimation and effect analysis in industrial and humanitarian projects, including system dynamic model and Monte Carlo simulation. PhD thesis, Università degli Studi di Genova, Italy.
Almeida, Rafael Goffinet de (2023) Spatialities of participation: Agencies between culture, politics and neoliberal subjectvation. PhD thesis, Universidade de São Paulo, Brazil.
Ammar, M; Zayed, T and Moselhi, O (2013) Fuzzy-based life-cycle cost model for decision making under subjectivity. Journal of Construction Engineering and Management, 139(5), pp. 556-563. ISSN 0733-9364
Asadabadi, M R (2024) Project investment decisions: Comparison of nonmonetary benefits. Journal of Construction Engineering and Management, 150(8): 05024008, ISSN 0733-9364
Ayinla, K; Saka, A; Seidu, R and Madanayake, U (2023) The impact of artificial intelligence on construction costing practice. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 39th Annual ARCOM Conference, 4-6 September 2023, University of Leeds, Leeds, UK.
Bajpai, A and Misra, S C (2023) A framework for continuation of digitalization in construction: A PLS-SEM approach. Engineering, Construction and Architectural Management, 30(10), pp. 4715-4734. ISSN 0969-9988
Bakheet, M T (1995) Contractors' risk assessment system. PhD thesis, Georgia Institute of Technology, USA.
Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.
Birgonul, M T; Dikmen, I and Demirel, T (2005) Decision support tool for the quantification of fault rates in construction fall accidents. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Carvajal-Figueroa, A (2006) The identification and measurement of the benefits of visualization technologies during the briefing process. PhD thesis, University of Reading, UK.
Chai, Y T and Wang, T K (2023) Evaluation and decision-making framework for concrete surface quality based on computer vision and ontology. Engineering, Construction and Architectural Management, 30(10), pp. 4881-4913. ISSN 0969-9988
Che Ibrahim, C K I; Costello, S B and Wilkinson, S (2015) A fuzzy approach to developing scales for performance levels of alliance team integration assessment. Journal of Construction Engineering and Management, 141(5): 04014094, ISSN 0733-9364
Cheng, M Y; Vu, Q T; Dessalegn, M and Chen, J H (2025) Time-dependent rebar price prediction for procurement decision-making using bio-optimized deep machine learning. Engineering, Construction and Architectural Management, 32(12), pp. 7938-7971. ISSN 0969-9988
Cheng, M Y; Vu, Q T and Wu, T C (2026) Highway bridge crack inspection verification and training using an automated augmented reality system. Journal of Construction Engineering and Management, 152(3): 04025279, ISSN 0733-9364
Dawson, S; Goulding, J and Gledson, B (2024) Use of focus groups and reflexive thematic analysis to uncover the essential conditions for UK built environment degree apprenticeships. International Journal of Construction Education and Research, 20(4), pp. 562-580. ISSN 1557-8771
Dikmen, I; Birgonul, M T and Arikan, A E (2004) A critical review of risk management support tools. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Dozzi, S P; Abourizk, S M and Schroeder, S L (1996) Utility-theory model for bid markup decisions. Journal of Construction Engineering and Management, 122(2), pp. 119-124. ISSN 0733-9364
Elyamany, A H M (2010) Developing a rational approach for contractor selection based on history of construction quality and long-term performance. PhD thesis, North Dakota State University, USA.
Fadoul, A (2020) A BIM-based model for constructability assessment of buildings design. PhD thesis, University of Nottingham, UK.
Flynn, C (2020) Risk transfer in operational public private partnerships in the education sector. PhD thesis, Queen's University Belfast, UK.
Foudah, A; Tarek, M; Essam, S; El Hawary, M; Adel, K and Marzouk, M (2026) Digital twin publications in construction (2017–2023): A bibliometrics-based visualization analysis. Construction Innovation, 26(1), pp. 147-172. ISSN 1471-4175
Gilani, G; Pons, O and De La Fuente, A (2022) Sustainability-oriented approach to assist decision makers in building facade management. Journal of Construction Engineering and Management, 148(1): 04021182, ISSN 0733-9364
Gorse, C A; Ellis, R and Hudson-Tyreman, A (2005) Prospective delay analysis and adjudication. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Gottlieb, S C and Jensen, J S (2016) Governmentalities of construction: From mortar to modular systems and markets. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Gunning, J G (1999) A review of the application of risk assessment procedures in construction management and research. Journal of Financial Management of Property and Construction, 4(1), pp. 59-74. ISSN 1366-4387
Guo, H and Lu, W (2023) Measuring competitiveness with data-driven principal component analysis: A case study of chinese international construction companies. Engineering, Construction and Architectural Management, 30(4), pp. 1558-1577. ISSN 0969-9988
Hanna, A S; Ibrahim, M W; Lotfallah, W; Iskandar, K A and Russell, J S (2016) Modeling project manager competency: An integrated mathematical approach. Journal of Construction Engineering and Management, 142(8): 4016029, ISSN 0733-9364
Hanna, A S; Iskandar, K A and Lotfallah, W (2019) Benchmarking project performance: A guideline for assessing vulnerability of mechanical and electrical projects to productivity loss. Construction Management and Economics, 37(2), pp. 101-111. ISSN 01446193
Hassan, A; Purnomo, M R A and Anugerah, A R (2020) Fuzzy-analytical-hierarchy process in failure mode and effect analysis (FMEA) to identify process failure in the warehouse of a cement industry. Journal of Engineering, Design and Technology, 18(2), pp. 378-388. ISSN 1726-0531
Holt, G D (1995) A methodology for predicting the performance of construction contractors. PhD thesis, University of Wolverhampton, UK.
Huang, R Y (2006) A performance-based bridge LCCA model using visual inspection inventory data. Construction Management and Economics, 24(10), pp. 1069-1081. ISSN 1466433X
Hyari, K H and Thneibat, M (2025) Detecting skewed pricing in tenders for public-sector projects. Construction Innovation, 25(4), pp. 1153-1170. ISSN 1471-4175
Ibrahim, Y M (2008) Developing a model for vision-based progress measurement and visualisation of as-built construction operations. PhD thesis, Heriot-Watt University, UK.
Iskandar, K A; Hanna, A S and Lotfallah, W (2019) Modeling the performance of healthcare construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 2023-2039. ISSN 0969-9988
Islam, M S; Nepal, M P and Skitmore, M (2019) Modified fuzzy group decision-making approach to cost overrun risk assessment of power plant projects. Journal of Construction Engineering and Management, 145(2): 04018126, ISSN 0733-9364
Jafary, P.; Shojaei, D.; Rajabifard, A. and Ngo, T. (2026) AI-augmented construction cost estimation: An ensemble natural language processing (NLP) model to align quantity take-offs with cost indexes. International Journal of Construction Management, 26(8), pp. 1508-1526. ISSN 1562-3599
Jiang, X; Wang, S; Liu, Y; Xia, B; Skitmore, M; Nepal, M and Ghanbaripour, A N (2023) A method for the ontology-based risk management of PPP construction projects. Construction Innovation, 23(5), pp. 1095-1129. ISSN 1471-4175
Jiang, Z; Han, Y; Cheng, Y; Wang, Z and Meng, H (2025) An improved yolov8-dyhead-wiseiou model for positioning and counting detection of grouting sleeves in a prefabricated wall. Journal of Construction Engineering and Management, 151(4): 04025016, ISSN 0733-9364
Kamm, J D (2017) A study of technological change in the construction industry through understanding the importance of innovation, risk and stakeholder alignment in construction lending. PhD thesis, Indiana State University, USA.
Kangari, R and Bakheet, M (2001) Construction surety bonding. Journal of Construction Engineering and Management, 127(3), pp. 232-238. ISSN 0733-9364
Kashiwagi, D T and Byfield, R (2002) Minimizing political influence in performance contracting case studies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
Kashiwagi, D T and Byfield, R (2002) Testing of minimization of subjectivity in best value procurement by using artificial intelligence systems in state of Utah procurement. Journal of Construction Engineering and Management, 128(6), pp. 496-502. ISSN 0733-9364
Kashiwagi, D T and Byfield, R (2002) Project MA Case study of potential impact of subjective decision making on construction performance. Journal of Construction Procurement, 8(2), pp. 101-116. ISSN 1358-9180
Kim, J (2004) Delay forecasting using a vulnerability index. PhD thesis, Purdue University, USA.
Kim, S and Hammad, A (2024) Decision support system (DSS) for selecting sustainable insulation material using Pareto search and novel fuzzy-modified technique for order of preference by similarity to ideal solution (TOPSIS) approach. International Journal of Construction Management, 24(7), pp. 734-747. ISSN 1562-3599
Kishk, M and Al-Hajj, A (2000) A fuzzy model and algorithm to handle subjectivity in life cycle costing based decision-making. Journal of Financial Management of Property and Construction, 5(1-2), pp. 93-104. ISSN 1366-4387
Kulshrestha, M (1997) Total Value Control in Construction through Multiple Criteria Decision Making (MCDM). PhD thesis, Indian Institute of Technology Delhi, India.
Lam, K C; Hu, T; Ng, S T; Skitmore, M and Cheoung, S O (2001) A fuzzy neural network approach for contractor prequalification. Construction Management and Economics, 19(2), pp. 175-188. ISSN 01446193
Lam, K C; Hu, T S and Ng, S T (2005) Using the principal component analysis method as a tool in contractor pre-qualification. Construction Management and Economics, 23(7), pp. 673-684. ISSN 01446193
Lan, Roy Uzoma (2025) Advancing workplace safety through intelligent monitoring: Applications of artificial intelligence and computer vision in high-risk industrial environments. PhD thesis, The University of Texas at San Antonio, USA.
Lee, G (2004) A new formal and analytical process to product modeling (PPM) method and its application to the precast concrete industry. PhD thesis, Georgia Institute of Technology, USA.
Li, X K; Wang, X M and Lei, L (2020) The application of an ANP-fuzzy comprehensive evaluation model to assess lean construction management performance. Engineering, Construction and Architectural Management, 27(2), pp. 356-384. ISSN 0969-9988
Loewenson, T N (2020) A weird-tender: unearthing an inclusive practice for public procurement in Lusaka through design, fiction and performance. PhD thesis, University College London, UK.
Lowe, R (2006) Defining absolute environmental limits for the built environment. Building Research & Information, 34(4), pp. 405-415. ISSN 0961-3218
Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599
Martinez, L H (2001) A neuro-fuzzy decision support system for risk analysis of revenue-dependent infrastructure projects. PhD thesis, Purdue University, USA.
Marzouk, M and Mohamed, E (2018) Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(1), pp. 90-108. ISSN 1471-4175
Migliaccio, G C; Bogus, S M and Cordova-Alvidrez, A A (2014) Continuous quality improvement techniques for data collection in asset management systems. Journal of Construction Engineering and Management, 140(4): B4013008, ISSN 0733-9364
Mohammadi, Masoud (2023) Development of bridge information model (brim) for digital twinning and management using tls technology. PhD thesis, Western Sydney University, Australia.
Mohammed, A; Zayed, T; Nasiri, F and Bagchi, A (2024) Asset management-based resilience index formulation for pavements via principal components analysis. Construction Innovation, 24(3), pp. 830-845. ISSN 1471-4175
Mohandes, S. R.; Singh, A. K.; Ibrahim, A.; Ma, N.; Kineber, A. F. and Shakor, P. (2026) Pioneering digital transformation: Unveiling the blockchain and digital twin technologies' synergy. Journal of Engineering, Design and Technology, 24(4), pp. 1076-1100. ISSN 1726-0531
Molina, G; Donn, M; Johnstone, M L and Macgregor, C (2023) The feeling of comfort in residential settings I: A qualitative model. Buildings & Cities, 4(1), pp. 422-440. ISSN 2632-6655
Mostofi, F and Toǧan, V (2023) A data-driven recommendation system for construction safety risk assessment. Journal of Construction Engineering and Management, 149(12): 04023139, ISSN 0733-9364
Newton, A J (1995) The planning and management of detailed building design. PhD thesis, Loughborough University, UK.
Ng, T; Luu, D and Chen, S (2002) Decision criteria and their subjectivity in construction procurement selection. Construction Economics and Building, 2(1), pp. 70-80. ISSN 2204-9029
Nwodo, M N (2020) Investigation of exergy-based life cycle assessment of buildings. PhD thesis, University of Florida, USA.
Omar, H (2020) Towards an automated photogrammetry-based approach for monitoring and controlling construction site activities. PhD thesis, University of the West of England, Bristol, UK.
Osuolale, M. D.; Ajisomo, T. and Felkner, J. (2026) Quantifying barriers to sustainable material adoption in emerging markets using fuzzy synthetic evaluation. Smart and Sustainable Built Environment, pp. 1-32. ISSN 2046-6099
Panella, Fabio (2023) Automating inspection of tunnels with photogrammetry and deep learning. PhD thesis, University College London, UK.
Park, J; Park, J; Kim, J and Kim, J (2012) Building information modelling based energy performance assessment system: An assessment of the energy performance index in Korea. Construction Innovation, 12(3), pp. 335-354. ISSN 1471-4175
Perera, T G U P (2019) Achieving sustainable housing affordability through an institutionalist approach to communicative planning: a case study of a new settlements and sustainable urban extensions in England. PhD thesis, University of Birmingham, UK.
Perez-Bezos, S; Grijalba, O and Hernandez-Minguillon, R J (2023) Multifactorial approach to indoor environmental quality perception of social housing residents in Northern Spain. Building Research & Information, 51(4), pp. 392-410. ISSN 0961-3218
Plebankiewicz, E and Kubek, D (2016) Multicriteria selection of the building material supplier using AHP and fuzzy AHP. Journal of Construction Engineering and Management, 142(1): 04015057, ISSN 0733-9364
Premakumara, A and Siriwardana, C (2025) A comprehensive approach for assessing the causes of low productivity in the construction sector: A systematic categorization and ranking using Pareto and fuzzy analysis. Construction Management and Economics, 43(1), pp. 40-58. ISSN 0144-6193
Rad, H N and Khosrowshahi, F (1998) Quality measurement in construction projects. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Rankin, K; Suji, M; Pandey, B; Baniya, J; Hirslund, D V; Limbu, B; Rawal, N and Shneiderman, S (2026) Negotiating expertise in nepal's post-earthquake disaster reconstruction. Buildings & Cities, 7(1), pp. 1-19. ISSN 2632-6655
Reddy, A S; Kumar, P R and Raj, P A (2022) Entropy-based fuzzy TOPSIS framework for selection of a sustainable building material. International Journal of Construction Management, 22(7), pp. 1194-1205. ISSN 1562-3599
Sangiorgio, Valentino (2019) Development of a decision support system for the structural degradation analysis of RC buildings supported by user-reported data and modern information technologies. PhD thesis, Politecnico di Bari, Italy.
Santos, P A S; Cortez, B and Carvalho, M T M (2025) Integrating GIS and BIM with MCDM for infrastructure planning: A comprehensive framework. Engineering, Construction and Architectural Management, 32(6), pp. 4197-4226. ISSN 0969-9988
Sergeeva, N (2014) Narratives of innovation in the UK construction sector: a sensemaking perspective. PhD thesis, University of Reading, UK.
Singer, H and Özşahin, Ş (2022) Prioritization of laminate flooring selection criteria from experts' perspectives: A spherical fuzzy AHP-based model. Architectural Engineering and Design Management, 18(6), pp. 911-926. ISSN 1745-2007
Singla, H K and Sridharan, S (2022) Factors influencing the level of accuracy and compromise in overhead estimation for construction projects in India: An exploratory investigation. Engineering, Construction and Architectural Management, 29(10), pp. 4040-4060. ISSN 0969-9988
Smith, S D; Beausang, P; Moriarty, D and Campbell, J M (2008) Subjectivity in data extraction: A study based on construction hazard identification. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Soetanto, R and Proverbs, D G (2002) Modelling client satisfaction levels: The impact of contractor performance. Construction Economics and Building, 2(1), pp. 13-27. ISSN 2204-9029
Soetanto, R and Proverbs, D G (2004) Intelligent models for predicting levels of client satisfaction. Journal of Construction Research, 5(2), pp. 233-253. ISSN 1609-9451
Soliman-Junior, J; Tzortzopoulos, P and Kagioglou, M (2022) Designers' perspective on the use of automation to support regulatory compliance in healthcare building projects. Construction Management and Economics, 40(2), pp. 123-141. ISSN 01446193
Stoyell, J L (2004) Eco-design decision-making: towards sustainable engineering design of large made-to-order products. PhD thesis, University of Newcastle upon Tyne, UK.
Tah, J H M; Aouad, G; Lee, A and Wu, S (2004) Conceptual information modelling for risk analysis and management in an nD-modelling environment. Journal of Construction Procurement, 10(1),
Tan, Y (2006) A case-based reasoning approach to improve risk identification in construction projects. PhD thesis, University of Leeds, UK.
Tan, Y; Smith, N J and Bower, D A (2003) Improving risk identification by utilizing hybrid intelligent reasoning. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Tariq, S; Hussein, M; Wang, R D and Zayed, T (2022) Trends and developments of on-site crane layout planning 1983–2020: Bibliometric, scientometric and qualitative analyses. Construction Innovation, 22(4), pp. 1011-1035. ISSN 1471-4175
Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364
Tesfamariam, S (2008) Seismic risk assessment of reinforced concrete buildings using fuzzy based techniques. PhD thesis, University of Ottawa, Canada.
Thallapureddy, S (2024) Optimizing incident investigation information collection in the construction industry. PhD thesis, University of Colorado at Boulder, USA.
Vesali Mahmoud, N (2016) A comprehensive decision support framework in the front-end phase of major transportation projects. PhD thesis, Florida International University, USA.
Watts, G (2019) Measuring and managing the social value created by a diverse construction business. PhD thesis, Loughborough University, UK.
Wijnia, Y C (2016) Processing risk in asset management: Exploring the boundaries of risk based optimization under uncertainty for an energy infrastructure asset manager. PhD thesis, Delft University of Technology, Netherlands.
Wu, H; Zhong, W; Zhong, B; Li, H; Guo, J and Mehmood, I (2025) Barrier identification, analysis and solutions of blockchain adoption in construction: A fuzzy DEMATEL and TOE integrated method. Engineering, Construction and Architectural Management, 32(1), pp. 409-426. ISSN 0969-9988
Xia, B (2010) The selection of design-build operational variations in the people's republic of China using Delphi method and fuzzy set theory. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Xia, B; Chan, A P C and Yeung, J F Y (2011) Developing a fuzzy multicriteria decision-making model for selecting design-build operational variations. Journal of Construction Engineering and Management, 137(12), pp. 1176-1184. ISSN 0733-9364
Xiao, C (2015) Comparative analysis of entropy algorithms to determine the most effective technique for measuring complexity in building construction. PhD thesis, Texas A&M University, USA.
Yeung, F Y (2007) Developing a partnering performance index (PPI) for construction projects: A fuzzy set theory approach. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Yue, H; Ye, G; Liu, Q; Yang, X; Xiang, Q and Luo, Y (2024) Impact of cognitive fatigue on attention and the implications for construction safety: A neuroscientific perspective. Journal of Construction Engineering and Management, 150(8): 04024102, ISSN 0733-9364
Zeng, J; An, M and Chan, A H C (2005) A fuzzy reasoning decision making approach based multi-expert judgement for construction project risk analysis. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Zeng, J; An, M; Chan, A H C and Lin, Y (2004) A methodology for assessing risks in the construction process. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Zhang, H; Li, H and Tam, C M (2004) Fuzzy discrete-event simulation for modeling uncertain activity duration. Engineering, Construction and Architectural Management, 11(6), pp. 426-437. ISSN 0969-9988
Zhang, H and Tam, C M (2003) Fuzzy decision-making for dynamic resource allocation. Construction Management and Economics, 21(1), pp. 31-41. ISSN 01446193
Zhang, H; Xing, F and Liu, J (2011) Rehabilitation decision-making for buildings in the Wenchuan area. Construction Management and Economics, 29(6), pp. 569-578. ISSN 1466433X
Çidik, M S (2023) Politics of social value in the built environment. Buildings & Cities, 4(1), pp. 475-487. ISSN 2632-6655