Items with Index Term: streamlining
Abdel-Hamid, M.; Abdelhaleem, H. M. and Abd El-Razek Fathy, A. E. (2025) Assessing the implementation of BIM for enhancing green building certification evaluations. Architectural Engineering and Design Management, 21(5), pp. 1040-1056. ISSN 1745-2007
Aboagye-Nimo, E and Raidén, A B (2019) Challenging standardisation by embracing ambiguities of site safety: The case of micro construction firms. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Abu Hammad, A A (2003) A decision support system for manufactured housing production process planning and facility layout. PhD thesis, University of Cincinnati, USA.
Afzal, Muneeb (2024) Improving request for information (RFI) processing in construction projects using natural language processing (NLP) techniques. PhD thesis, University of Technology Sydney, Australia.
Akande, I.; Opoko, A. P. and Adewolu, A. O. (2026) Exploring the relationships between emerging technologies and design process in Nigerian architectural firms. Engineering, Construction and Architectural Management, pp. 1-21. ISSN 0969-9988
Akinci, B; Kiziltas, S; Ergen, E; Karaesmen, I Z and Keceli, F (2006) Modeling and analyzing the impact of technology on data capture and transfer processes at construction sites: A case study. Journal of Construction Engineering and Management, 132(11), pp. 1148-1157. ISSN 0733-9364
Albar, A M (2022) The design and development of an intelligent adaptive extrusion system for additive manufacturing robotics in construction using advanced cementitious materials. PhD thesis, Brunel University, UK.
Aljagoub, D (2025) Enhancing delamination detection and monitoring of concrete bridges through infrared thermography, deep learning, field data, and numerical simulations. PhD thesis, University of Delaware, USA.
Bahram, D. (2025) Briefing: Importance of trust when adopting an intelligent environment. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 3-6. ISSN 1751-4304
Barbosa, Adriano Aurelio Ribeiro (2014) Implementing a sound power method for testing noise on masonry saw. PhD thesis, Universidade Estadual de Campinas, Brazil.
Bashirzadeh Tabrizi, Toktam (2019) Towards a simplified LCA tool: Minimising the life cycle environmental impact at the early stages of building design. PhD thesis, University of Sydney, Australia.
Boroujeni, K A (2023) Visual data analytic and robotics for automated construction performance monitoring. PhD thesis, North Carolina State University, USA.
Campion, N A (2015) Advancing life cycle assessment: Perspectives from the building and healthcare industries. PhD thesis, University of Pittsburgh, USA.
Dreschler, M (2009) Fair competition: How to apply the 'economically most advantageous tender' award mechanism in the Dutch construction industry. PhD thesis, Delft University of Technology, Netherlands.
Ekanayake, E M A C; Shen, G and Kumaraswamy, M M (2021) Critical capabilities of improving supply chain resilience in industrialized construction in Hong Kong. Engineering, Construction and Architectural Management, 28(10), pp. 3236-3260. ISSN 0969-9988
Ghansah, F A and Lu, W (2024) Major opportunities of digital twins for smart buildings: A scientometric and content analysis. Smart and Sustainable Built Environment, 13(1), pp. 63-84. ISSN 2046-6099
Ghosh, B. and Karmakar, S. (2026) Development and application of a digitalised construction safety document management system for advanced constructions using building information modeling. International Journal of Construction Management, 26(8), pp. 1490-1507. ISSN 1562-3599
Guerra, Beatriz Chinelato (2021) BIM-based construction waste management and circular economy for resource recovery. PhD thesis, University of Texas at Austin, USA.
Gunatilake, S (2013) The uptake and implementation of sustainable construction: transforming policy into practice. PhD thesis, University of Central Lancashire, UK.
Guo, Y; Liu, J; Chen, C; Luo, X and Martek, I (2024) PPP project price mode typologies: A China-based comparative case study. Engineering, Construction and Architectural Management, 31(5), pp. 2034-2052. ISSN 0969-9988
Hlatshwayo, T; Emuze, F and Smallwood, J J (2025) Efficacy of the construction industry legislative framework in developing countries: An Eswatini case. Built Environment Project and Asset Management, 15(1), pp. 1-17. ISSN 2044-124X
Hu, Xiaoqiang (2023) New approaches to improving highway design, safety, and visual presentation. PhD thesis, Purdue University, USA.
Hussain, R S; Ruikar, K; Enoch, M P; Brien, N and Gartside, D (2017) Process mapping for road works planning and coordination. Built Environment Project and Asset Management, 7(2), pp. 157-172. ISSN 2044-124X
Igwe, U S; Mohamed, S F; Azwarie, M B M D; Nwofia, C M and Ihekweme, N M (2025) Assessment of post contract cost control issues in Nigeria: Quantity surveyors' perspective. International Journal of Construction Management, 25(14), pp. 1725-1735. ISSN 1562-3599
Jansson, G; Söderholm, E and Johnsson, H (2008) Design process organisation at industrial house builders: A case study of two timber housing companies in Sweden. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Jayarathna, H S N M; Perera, B A K S; Atapattu, D and Rodrigo, N (2025) Circular economy and blockchain-integrated road map to improve construction waste management. Construction Innovation, 25(7), pp. 23-49. ISSN 1471-4175
Jeong, J G (2006) A framework for supply chain modeling and optimization for the manufactured housing industry. PhD thesis, Purdue University, USA.
Kasprzak, C and Dubler, C (2012) Aligning BIM with FM: Streamlining the process for future projects. Construction Economics and Building, 12(4), pp. 68-77. ISSN 2204-9029
Kelvin Ibrahim, M and Aliu, J O (2026) Bridging the digital divide: Strategies for successful technology implementation in the UK construction sector. International Journal of Construction Management, 26(6), pp. 1017-1032. ISSN 1562-3599
Keskin, B; Salman, B and Ozorhon, B (2021) Airport project delivery within BIM-centric construction technology ecosystems. Engineering, Construction and Architectural Management, 28(2), pp. 530-548. ISSN 0969-9988
Kifokeris, D and Tezel, A (2025) Blockchain and lean construction: An exploration of bidirectional synergies and interactions. Architectural Engineering and Design Management, 21(1), pp. 171-189. ISSN 1745-2007
Koo, H. J.; Guerra, B. C.; Saka, S. and Leite, F. (2026) Streamlining BIM coordination and clash resolution through risk and relevance analysis. Journal of Construction Engineering and Management, 152(7): 04026092, ISSN 0733-9364
Lee, S; Peña-Mora, F and Park, M (2005) Quality and change management model for large scale concurrent design and construction projects. Journal of Construction Engineering and Management, 131(8), pp. 890-902. ISSN 0733-9364
Li, Y.; Tai, S. and Tai, Z. (2024) Development of ANP-based greenness evaluation model of construction technologies in China. Journal of Engineering, Design and Technology, 24(2), pp. 602-630. ISSN 1726-0531
Lindholm, J; Johansson, P and Yitmen, I (2025) Toward a BIM information delivery framework based on common data environment. Construction Innovation, 25(7), pp. 139-157. ISSN 1471-4175
Makore, S (2015) The role of knowledge management in organisational performance. PhD thesis, University of Pretoria, South Africa.
Marinelli, M (2019) Evaluation of PPP road projects in Greece. Built Environment Project and Asset Management, 9(2), pp. 186-198. ISSN 2044-124X
Matarneh, S; Danso-Amoako, M; Al-Bizri, S; Gaterell, M and Matarneh, R (2019) BIM-based facilities information: Streamlining the information exchange process. Journal of Engineering, Design and Technology, 17(6), pp. 1304-1322. ISSN 1726-0531
Matarneh, S T (2019) BIM-based information exchange framework to support facilities management systems. PhD thesis, University of Portsmouth, UK.
Meiling, J and Johnsson, H (2008) Feedback in industrialised housing: Why does it not happen? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Messaoudi, M (2020) BIM-based virtual permitting review process for residential building in the state of Florida. PhD thesis, University of Florida, USA.
Moghaddam, S.; Dashti, M. S.; Alvanchi, A. and Khanzadi, M. (2026) An integrated BIM-based augmented reality framework for improving facility maintenance management. Engineering, Construction and Architectural Management, 33(3), pp. 2007-2047. ISSN 0969-9988
Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.
Munir, M; Kiviniemi, A and Jones, S W (2019) Business value of integrated BIM-based asset management. Engineering, Construction and Architectural Management, 26(6), pp. 1171-1191. ISSN 0969-9988
Nyalungu, Jey; Mbona, Sizwe; Ogunsola, Sijuwade and Sibuyi, Venus (2026) The effectiveness of supply chain management in enhancing project management outcomes. Journal of Construction Business and Management, 8(2), pp. 54-64. ISSN 2521-0165
Olajide, J F; Ajayi, O O; Kudirat Ibilola, Z and Adenuga, O A (2021) Climatic conditions and the resilience of buildings along Lagos coastline. Built Environment Project and Asset Management, 11(4), pp. 738-749. ISSN 2044-124X
Oyegoke, A S; Ajayi, S; Abbas, M A and Ogunlana, S (2024) Development of Adapt-ABLE smart system: An end-to-end system for speeding up disabled housing adaptation process. International Journal of Building Pathology and Adaptation, 42(4), pp. 531-552. ISSN 23984708
Pal, A.; Lin, J. J.; Amer, F.; Hsieh, S. H. and Golparvar Fard, M. (2026) Automatic mapping of schedule activities and reality models for tracking construction progress. Engineering, Construction and Architectural Management, 33(3), pp. 1932-1958. ISSN 0969-9988
Paterson, Ian (1981) Contractors' risk and insurance in the Australian building industry. PhD thesis, University of New South Wales, Australia.
Perera, B A K S and Dewagoda, K G (2020) Streamlining the management of payment delays: The case of Sri Lankan government building construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 236-256. ISSN 1366-4387
Ranasinghe, U; Ruwanpura, J and Liu, X (2012) Streamlining the construction productivity improvement process with the proposed role of a construction productivity improvement officer. Journal of Construction Engineering and Management, 138(6), pp. 697-706. ISSN 0733-9364
Rathnayake, B; Gunathilake, L; Edirisinghe, R and Perera, S (2025) Ecoconstruct: A blockchain-based system for carbon trading in construction projects. Construction Innovation, 25(7), pp. 213-234. ISSN 1471-4175
Salim, M (1993) Process-oriented planning for the placement of reinforcing bars. PhD thesis, North Carolina State University, USA.
Schönbeck, P (2022) Data based configuration decisions in hospital construction projects. PhD thesis, KTH Royal Institute of Technology, Sweden.
Senghore, O; Hastak, M; Abdelhamid, T S; AbuHammad, A and Syal, M G (2004) Production process for manufactured housing. Journal of Construction Engineering and Management, 130(5), pp. 708-718. ISSN 0733-9364
Seyis, S and Ozkan, S (2024) Benefits and challenges of implementing the common data environments in the construction phase of BIM-based projects. Journal of Construction Engineering and Management, 150(8): 04024091, ISSN 0733-9364
Singh, M M; Sawhney, A and Sharma, V (2017) Utilising building component data from BIM for formwork planning. Construction Economics and Building, 17(4), pp. 20-36. ISSN 2204-9029
Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.
Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364
Songer, A D; Hays, B and North, C (2004) Multidimensional visualization of project control data. Construction Innovation, 4(3), pp. 173-190. ISSN 1471-4175
Ssimbwa, Edward (2023) Streamlining the management of building construction regulatory framework in Sub-Sahara africa's public service - a case for Uganda. DM thesis, Colorado Technical University, USA.
Tumpa, R J and Naeni, L (2025) Improving decision-making and stakeholder engagement at project governance using digital technology for sustainable infrastructure projects. Smart and Sustainable Built Environment, 14(4), pp. 1292-1329. ISSN 2046-6099
Usman, W. I.; Mazher, K. M.; Umer, W.; Wuni, I. Y.; Alshibani, A.; Ghaithan, A.; Nasir, A. R. and Mohammed, A. (2026) BIM-based construction accidents knowledge database management system: Centralized accessible information repository for enhanced learning from the past. Journal of Construction Engineering and Management, 152(9): 04026149, ISSN 0733-9364
Whaley, A (2016) Why claims fail: An autoethnographic investigation of claims management under gcc construction contracts. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.
Yang, W and Lam, P T I (2026) A framework for foundational and transitional value assessment of non-market benefits of a smart government system. Building Research & Information, 54(2), pp. 237-256. ISSN 0961-3218
Yang, Y (2020) An integrated infrastructure asset management model to improve the resilience of high-density cities. PhD thesis, University of Hong Kong, Hong Kong.
Yau, Y (2009) On the proposed private certification of building works in Hong Kong. International Journal of Law in the Built Environment, 1(3), pp. 221-233. ISSN 1756-1450
Zuo, W; Li, Q; Wang, Q; Qiao, S; Mei, T and Guo, Z (2026) Lego voxelization method for arbitrary building information models to support path planning. Journal of Construction Engineering and Management, 152(2): 04025239, ISSN 0733-9364
Up a level