Items with Index Term: steel structure

Number of items: 43.

Aderinlewo, O and Alade, G A (2014) Reliability-based analysis and design of steel frames with different supports. Journal of Engineering, Design and Technology, 12(1), pp. 39-52. ISSN 1726-0531

Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364

Anastasiades, K; Michels, S; Van Wuytswinkel, H; Blom, J and Audenaert, A (2022) Barriers for the circular reuse of steel in the Belgian construction sector: an industry-wide perspective. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(4), pp. 142-155. ISSN 17514304

Aouad, G F and Barrett, P S (1998) The feasibility of using hybrid concrete structures within the context of cost and time. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.

Badra, N; Hegazy, H; Mousa, M; Zhang, J; Syed Zakaria, S A; Aboul Haggag, S and Abdul-Rashied, I (2025) Preliminary cost forecasting and optimization for the construction of steel pedestrian bridges in Egypt. Engineering, Construction and Architectural Management, 32(4), pp. 2210-2241. ISSN 0969-9988

Badra, N; Hegazy, H; Zhang, J; Yahia, M; Fathy, M and AboulHaggag, S (2025) Application of fuzzy multi-objective model for crashing the construction of steel structure projects post-pandemic (Covid-19). International Journal of Construction Management, 25(3), pp. 363-374. ISSN 1562-3599

Bai, L (2013) RFID sensor-driven structural condition monitoring in integrated building information modeling environment. PhD thesis, University of Maryland, College Park, USA.

Caetano, L F; de Souza, H A and Gomes, A P (2022) Effect of the exposed steel structure on the thermal performance of buildings. Architectural Engineering and Design Management, 18(1), pp. 38-55. ISSN 1745-2007

Chen, J (2021) Study on the joint mechanical properties of steel structure buildings. International Journal of Building Pathology and Adaptation, 39(4), pp. 655-665. ISSN 23984708

Ech Charqy, Y; Radouani, R and Essahli, M (2023) Fe modeling of the effect of conductivity in galvanic corrosion between different types of stainless steel and carbon steel in a structure bolted joint. International Journal of Building Pathology and Adaptation, 41(3), pp. 574-587. ISSN 23984708

Faircloth, Adam D (2022) Development of a non-destructive evaluation system for mass timber panels. MPhil thesis, Griffith University, Australia.

Fazlipour, M and Samadzad, M (2026) Engineering and economic feasibility of a new prefabrication ecosystem for steel construction in diverse low-rise residential buildings. Journal of Construction Engineering and Management, 152(2): 04025238, ISSN 0733-9364

Forde, B and Stiemer, S F (1985) Steel construction evaluation by MLR-strategies. Journal of Construction Engineering and Management, 111(2), pp. 149-156. ISSN 0733-9364

Gomes, Helton Cristiano (2013) Multi-objective optimization algorithms for the activity sequencing problem in steel construction projects. PhD thesis, Universidade Federal de Ouro Preto, Brazil.

Hajikarimi, M H; Hajikarimi, A A and Ghalambor, M A (2009) Utilisation of knowledge management in decreasing waste of steel structure construction via increasing effectiveness of welding process. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Hofmann, Giane Alfenas Antunes (2019) Parameters for the prevention of pathologies in steel-structured buildings. PhD thesis, Universidade Federal de Ouro Preto, Brazil.

Hopkin, D J (2011) The fire performance of engineered timber products and systems. EngD thesis, Loughborough University, UK.

Hsie, M (1994) Computer-aided acceptance planning: Generating quality acceptance parameters and stratified sampling plans through neural network learning ability and CAD modeling. PhD thesis, Purdue University, USA.

Jagtap, P R and Pore, S M (2019) Effectiveness of CFRP composites on compression flange of structural I-beam. Journal of Engineering, Design and Technology, 17(4), pp. 782-792. ISSN 1726-0531

Kanai, Júlia (2025) Systematic management model based on lean construction through a mobile app for industrialized buildings in the frame system. PhD thesis, Universidade Estadual de Campinas, Brazil.

Khoury, H M (2009) Context-aware information access and retrieval for rapid on-site decision making in construction, inspection and maintenance of constructed facilities. PhD thesis, University of Michigan, USA.

Lee, M; Jeong, J and Lee, J (2025) Development of a quantitative assessment method for occupational accident risk of construction workers using resource and cost information in the preconstruction stage. Journal of Construction Engineering and Management, 151(12): 04025208, ISSN 0733-9364

Leu, S S; Huang, K J; Hung, C C W and Wu, P L (2024) Revolutionizing steel building project cost overrun risk assessment by Bayesian network. Engineering, Construction and Architectural Management, 31(12), pp. 4975-4987. ISSN 0969-9988

Mahjoubpour, B; Nasirzadeh, F; Mohammad Hosein Zadeh Golabchi, M; Ramezani Khajehghiasi, M and Mir, M (2018) Modeling of workers' learning behavior in construction projects using agent-based approach: The case study of a steel structure project. Engineering, Construction and Architectural Management, 25(4), pp. 559-573. ISSN 0969-9988

Mirshekarlou, B R (2018) An investigation of material waste management in prefabricated construction industry and developing an integrated waste management tool. PhD thesis, Middle East Technical University, Turkey.

Mohsen, O; Petre, C and Mohamed, Y (2023) Machine-learning approach to predict total fabrication duration of industrial pipe spools. Journal of Construction Engineering and Management, 149(2): 04022172, ISSN 0733-9364

Mohsenijam, Arash (2019) Advancing regression based analytics for steel fabrication productivity modeling. PhD thesis, University of Alberta, Canada.

Pham, V. H. S. and Pham, D. H. (2026) Advanced construction site layout planning for prefabricated projects: An application of the new algorithm. Engineering, Construction and Architectural Management, 33(3), pp. 2471-2511. ISSN 0969-9988

Pham, V H S and Pham, D H (2025) Dynamic multiobjective optimization model for construction site layout in prefabricated projects. Journal of Construction Engineering and Management, 151(10): 04025150, ISSN 0733-9364

Pongiglione, M; Calderini, C and Guy, G B (2017) A new demountable seismic-resistant joint to improve industrial building reparability. International Journal of Disaster Resilience in the Built Environment, 8(3), pp. 251-262. ISSN 1759-5916

Saade, M R M; da Silva, M G; Gomes, V; Franco, H G; Schwamback, D and Lavor, B (2014) Material eco-efficiency indicators for Brazilian buildings. Smart and Sustainable Built Environment, 3(1), pp. 54-71. ISSN 2046-6099

Sarma, K C (2001) Fuzzy discrete multicriteria cost optimization of steel structures using genetic algorithm. PhD thesis, Ohio State University, USA.

Shoar, S; Nasirzadeh, F and Zarandi, H R (2019) Quantitative assessment of risks on construction projects using fault tree analysis with hybrid uncertainties. Construction Innovation, 19(1), pp. 48-70. ISSN 1471-4175

Singh, T; Kalra, M and Misra, A K (2020) Simplified probabilistic seismic assessment of dampers in tall and braced structures in buildings. Journal of Engineering, Design and Technology, 18(5), pp. 1037-1052. ISSN 1726-0531

Tighnavard Balasbaneh, A and Ramadan, B S (2026) Integrating three pillars of sustainability for evaluating the modular construction building. Construction Innovation, 26(2), pp. 328-352. ISSN 1471-4175

Turkan, Y; Bosché, F; Haas, C T and Haas, R (2013) Toward automated earned value tracking using 3D imaging tools. Journal of Construction Engineering and Management, 139(4), pp. 423-433. ISSN 0733-9364

Wang, Z (2020) Building internal heat dissipation of special shaped columns composed of concrete-filled square steel tubes based on thermal bridge models. International Journal of Building Pathology and Adaptation, 38(3), pp. 441-449. ISSN 23984708

Xia, Y (2020) Research on dynamic data monitoring of steel structure building information using BIM. Journal of Engineering, Design and Technology, 18(5), pp. 1165-1173. ISSN 1726-0531

Yousefzadeh, S; Spillane, J P; Lamont, L; McFadden, J and Lim, J P B (2015) Building information modelling (BIM) software interoperability: A review of the construction sector. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Yu, H; Peng, Z; He, Z and Huang, C (2024) Application maturity evaluation of building steel structure welding robotic technology based on multi-level gray theory. Engineering, Construction and Architectural Management, 31(11), pp. 4372-4397. ISSN 0969-9988

Yu, J; Chan, A; Wang, B; Liu, Y and Wang, J (2023) A mixed-methods study of the critical success factors in the development of assembled buildings in steel structure projects in China. International Journal of Construction Management, 23(13), pp. 2288-2297. ISSN 1562-3599

Zhao, Z; Wang, X; Ji, Y; Liu, H; Liu, X and Yao, F (2025) Analysis of quality-influencing factors of adopting prefabricated steel structure housings: Based on the ISM-MICMAC model. Journal of Construction Engineering and Management, 151(8): 04025098, ISSN 0733-9364

Zhou, H and Rezazadeh Azar, E (2019) BIM-based energy consumption assessment of the on-site construction of building structural systems. Built Environment Project and Asset Management, 9(1), pp. 2-14. ISSN 2044-124X

This list was generated on Sat Aug 22 01:39:02 2026 UTC.