Items with Index Term: statistical test
Abdul-Aziz, A R; Shiew yi, H and Jaafar, M (2007) Impact of firm characteristics on the value of resources for Malaysian private housing developers. Journal of Financial Management of Property and Construction, 12(2), pp. 95-106. ISSN 1366-4387
Abdulhadi, M A M E (2012) IT adoption in the construction sector in Libya. PhD thesis, University of Glamorgan, UK.
Abu-Khader, W (2023) Barriers to the adoption of digitalization in the construction industry: Perspectives of owners, contractors, and contractors. Construction Economics and Building, 23(3-4), pp. 878-106. ISSN 2204-9029
Acheng, P O; Kibwami, N; Mukasa, T J; Odongkara, B B; Birungi, R; Semanda, J and Manga, M (2023) Building information modelling adoption in uganda's construction industry. International Journal of Construction Management, 23(13), pp. 2185-2208. ISSN 1562-3599
Akinrinade, M B (2018) Managing risk in construction projects: A quantitative study. PhD thesis, Northcentral University, USA.
Alwashah, Z.; Sweis, G. J.; Abu Hajar, H.; Abu-Khader, W. and Sweis, R. (2026) Awareness and willingness to adopt Construction 4.0 technologies: Evidence from Jordan. Engineering, Construction and Architectural Management, 33(7), pp. 5364-5383. ISSN 0969-9988
Amadi, A (2023) The statistical sensitivity of highway project cost to geo-heterogeneity in the tropics. International Journal of Building Pathology and Adaptation, 41(4), pp. 875-902. ISSN 23984708
Arambula, E and Gharaibeh, N (2014) Methods for accumulating construction and material quality test results and their effect on acceptance decisions. Journal of Construction Engineering and Management, 140(8): 06014006, ISSN 0733-9364
Arslan, V; Ulubeyli, S and Doǧan, E (2025) Reasons of diversification strategy in construction: A view of senior managers. Journal of Financial Management of Property and Construction, 30(3), pp. 455-476. ISSN 1366-4387
Atapattu, C N; Domingo, N and Sutrisna, M (2024) A conceptual cost estimation model for the pre-design stage of road projects using multiple regression analysis. Journal of Financial Management of Property and Construction, 29(3), pp. 388-404. ISSN 1366-4387
Ayoade, O A (2013) Measuring the impact of institutional and sustainability influences on renewed housing development strategies: implications for the shared equity housing model. PhD thesis, University of Salford, UK.
Azmy, N (2012) The role of team effectiveness in construction project teams and project performance. PhD thesis, Iowa State University, USA.
Bahmani, H; Ao, Y; Yang, D; Wang, D; Li, M; Long, Y and Peng, P (2025) Implications for improving evacuation safety in primary school corridors: A video-based analysis on evacuees' speed and density. Engineering, Construction and Architectural Management, 32(12), pp. 8472-8493. ISSN 0969-9988
Bashir, A M (2013) A framework for utilising lean construction strategies to promote safety on construction sites. PhD thesis, University of Wolverhampton, UK.
Bayhan, H G (2025) Transaction costs in construction project team communications: Language model and network science applications. PhD thesis, Michigan State University, USA.
Belay, A M and Torp, O (2023) Construction cost performance under quality-gated framework: The cases of Norwegian road constructions. International Journal of Construction Management, 23(6), pp. 1030-1043. ISSN 1562-3599
Calle Muller, C and ElZomor, M (2025) The role of disruptive technologies in enhancing disaster response and resilience in low-income communities. International Journal of Disaster Resilience in the Built Environment, 16(5), pp. 604-619. ISSN 1759-5908
Chen, X; Chang-Richards, A; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2025) Digital technologies in the AEC sector: A comparative study of digital competence among industry practitioners. International Journal of Construction Management, 25(1), pp. 63-76. ISSN 1562-3599
Christermaller, F; Ibrahim, C K I C; Manu, P; Belayutham, S; Mahamadu, A-M and Yunusa-Kaltungo, A (2022) Implementation of design for safety (dfs) in construction in developing countries: A study of designers in Malaysia. Construction Economics and Building, 22(2), pp. 1-26. ISSN 2204-9029
Dartevelle, O; van Moeseke, G; Masy, G; Mlecnik, E and Altomonte, S (2024) On the effectiveness of passive controls for summer thermal comfort in highly insulated dwellings. Building Research & Information, 52(3), pp. 311-331. ISSN 0961-3218
Doan, D T; GhaffarianHoseini, A; Naismith, N; Ghaffarianhoseini, A; Zhang, T and Tookey, J (2023) An empirical examination of green star certification uptake and its relationship with BIM adoption in New Zealand. Smart and Sustainable Built Environment, 12(1), pp. 84-104. ISSN 2046-6099
Dobrovnik, M.; Herold, D. M. and Kummer, S. (2026) Perception differences in dynamic capabilities for digital supply chain transformation across managerial hierarchies: A DEMATEL-based analysis in the construction industry. Construction Innovation, 26(9), pp. 204-232. ISSN 1471-4175
Edwards, D J; Holt, G D and Harris, F C (2000) A model for predicting plant maintenance costs. Construction Management and Economics, 18(1), pp. 65-75. ISSN 01446193
Evans, M (2022) Strategic frameworks for managing lean construction on megaprojects: towards global integrated delivery and corporate governance. PhD thesis, University of Bolton, UK.
Evans, M and Farrell, P (2023) A strategic framework managing challenges of integrating lean construction and integrated project delivery on construction megaprojects, towards global integrated delivery transformative initiatives in multinational organisations. Journal of Engineering, Design and Technology, 21(2), pp. 376-416. ISSN 1726-0531
Evans, M; Farrell, P; Elbeltagi, E and Dion, H (2023) Barriers to integrating lean construction and integrated project delivery (IPD) on construction megaprojects towards the global integrated delivery (gid) in multinational organisations: Lean IPD&gid transformative initiatives. Journal of Engineering, Design and Technology, 21(3), pp. 778-818. ISSN 1726-0531
Evans, M; Farrell, P; Zewein, W and Mashali, A (2021) Analysis framework for the interactions between building information modelling (BIM) and lean construction on construction mega-projects. Journal of Engineering, Design and Technology, 19(6), pp. 1451-1471. ISSN 1726-0531
Fenn, F P (1999) An aetiology of construction disputes. PhD thesis, University of Manchester, UK.
Gale, A W (1994) Women in construction: An investigation into some of the aspects of image and knowledge as determinants of the under representation of women in construction management in the British construction industry. PhD thesis, University of Bath, UK.
García de Soto, B (2014) A methodology to make accurate preliminary estimates of construction material quantities for construction projects. DSc thesis, ETH Zürich, Switzerland.
Gholizadeh, P (2022) Analyzing accidents among specialty contractors: A data mining approach. PhD thesis, George Mason University, USA.
Higgins, D M (2013) The black swan effect and the impact on Australian property forecasting. Journal of Financial Management of Property and Construction, 18(1), pp. 76-89. ISSN 1366-4387
Ho, M F C and Ng, C W V (2003) Quantity surveyors' background and training, and their ethical concepts, conceptions and interests considerations. Construction Management and Economics, 21(1), pp. 43-67. ISSN 01446193
Ibrahim, K; Okanlawon, T T; Oyewobi, L O; Badamasi, A; Dodo, M and Jimoh, R A (2026) Construction 4.0: Enhancing sustainable construction practices by evaluating digital twin barriers in the Nigerian AEC industry. Engineering, Construction and Architectural Management, 33(1), pp. 258-283. ISSN 0969-9988
Ismail, S (2013) Factors attracting the use of public private partnership in Malaysia. Journal of Construction in Developing Countries, 18(1), pp. 95-108. ISSN 1823-6499
Ismail, S and Haris, F A (2014) Constraints in implementing public private partnership (PPP) in Malaysia. Built Environment Project and Asset Management, 4(3), pp. 238-250. ISSN 2044-124X
Ismail, S; Mohamad, R and Mohd Said, J (2022) Performance indicators for lifecycle process of public private partnership (PPP) projects in Malaysia. Built Environment Project and Asset Management, 12(5), pp. 704-718. ISSN 2044-124X
Izzudin Mohd Ali, M Y (1994) Critical investigation of joint ventures by UK contractors with other European partners. PhD thesis, Loughborough University, UK.
Jin, X H; Zhang, G and Yang, R J (2012) Factor analysis of partners' commitment to risk management in public-private partnership projects. Construction Innovation, 12(3), pp. 297-316. ISSN 1471-4175
Kabundu, E K (2020) A housing affordability and tenure of choice quantum deliverable model in South Africa. PhD thesis, Nelson Mandela Metropolitan University, South Africa.
Kermanshachi, S (2016) Decision making and uncertainty analysis in success of construction projects. PhD thesis, Texas A&M University, USA.
Khatib, J M; Chileshe, N and Sloan, S (2007) Antecedents and benefits of 3D and 4D modelling for construction planners. Journal of Engineering, Design and Technology, 5(2), pp. 159-172. ISSN 1726-0531
Kiral, I A and Demirkesen, S (2023) Assessing the impact of peripheral vision on construction site safety. Engineering, Construction and Architectural Management, 30(9), pp. 4435-4463. ISSN 0969-9988
Kurwi, S (2019) Integrating BIM and GIS for design collaboration in railway projects. PhD thesis, Loughborough University, UK.
Lai, X; Huang, J; Lin, S; Hu, C; Mao, N; Liu, J and Chen, Q (2023) Efficiency scoring for subway tunnel construction based on shield-focused big data and Gaussian broad learning system. Journal of Construction Engineering and Management, 149(12): 04023132, ISSN 0733-9364
Lee, T S (1990) Detection of collusion in highway construction contract bidding. PhD thesis, University of Wisconsin - Madison, USA.
Lindfors, C (2003) Process oriented information management in construction. PhD thesis, KTH Royal Institute of Technology, Sweden.
Lindhard, S and Wandahl, S (2014) Exploration of the reasons for delays in construction. International Journal of Construction Management, 14(1), pp. 36-44. ISSN 1562-3599
Ling, F Y Y; Zhang, Z and Wong, W T (2020) How personality traits influence management styles of construction project managers. Built Environment Project and Asset Management, 10(3), pp. 453-468. ISSN 2044-124X
Ling, Y Y (2002) Model for predicting performance of architects and engineers. Journal of Construction Engineering and Management, 128(5), pp. 446-455. ISSN 0733-9364
Lucko, G; Vorster, M C and Anderson-Cook, C M (2007) Unknown element of owning costs-impact of residual value. Journal of Construction Engineering and Management, 133(1), pp. 3-9. ISSN 0733-9364
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, D and Silva, R (2024) A systematic evaluation on the competencies of construction supervisors in productivity and performance improvement practices: Sri Lankan perspective. Smart and Sustainable Built Environment, 13(4), pp. 960-988. ISSN 2046-6099
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, M M D R and Silva, R (2024) Assessing the competencies of construction supervisors in providing work-based training components for construction labour – Sri Lankan perspective. Journal of Engineering, Design and Technology, 22(5), pp. 1655-1681. ISSN 1726-0531
Manoharan, K; Dissanayake, P; Pathirana, C; Deegahawature, M M D R and Silva, R (2024) Assessing the competencies of construction supervisors in providing work-based training components for construction labour: Sri Lankan perspective. Journal of Engineering, Design and Technology, 22(5), pp. 1655-1681. ISSN 1726-0531
Marzouk, M and Mohamed, E (2018) Modeling bid/no bid decisions using fuzzy fault tree. Construction Innovation, 18(1), pp. 90-108. ISSN 1471-4175
Mohammed, A; Zayed, T; Nasiri, F and Bagchi, A (2024) Asset management-based resilience index formulation for pavements via principal components analysis. Construction Innovation, 24(3), pp. 830-845. ISSN 1471-4175
Mwelu, N; Watundu, S and Moya, M (2024) Demand side perception on success factors for implementing public road construction projects. Journal of Construction in Developing Countries, 29(1), pp. 1-22. ISSN 1823-6499
Nguyen, L D; Phan, D H and Tang, L C M (2013) Simulating construction duration for multistory buildings with controlling activities. Journal of Construction Engineering and Management, 139(8), pp. 951-959. ISSN 0733-9364
Nguyen, T; Do, Q; Le, T and Le, C (2024) Discovering workers' actions leading to severe construction accidents using accident report data and sequence mining techniques. Journal of Construction Engineering and Management, 150(12): 04024172, ISSN 0733-9364
Oh, J; Touran, A; D'Angelo, D; Clark, T; Fisher, C; Gaskins, C and Ashuri, B (2025) Empirical assessment of variability in project effectiveness and change orders across project delivery methods. Journal of Construction Engineering and Management, 151(11): 04025170, ISSN 0733-9364
Omotayo, T; Olanipekun, A; Obi, L and Boateng, P (2020) A systems thinking approach for incremental reduction of non-physical waste. Built Environment Project and Asset Management, 10(4), pp. 509-528. ISSN 2044-124X
Osei-Kyei, R. and Chan, A. P. C. (2019) Model for predicting the success of public–private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007
Osei-Kyei, R and Chan, A P C (2019) Model for predicting the success of public-private partnership infrastructure projects in developing countries: A case of Ghana. Architectural Engineering and Design Management, 15(3), pp. 213-232. ISSN 1745-2007
Osunsanmi, T O; Aigbavboa, C O; Emmanuel Oke, A and Liphadzi, M (2020) Appraisal of stakeholders' willingness to adopt construction 4.0 technologies for construction projects. Built Environment Project and Asset Management, 10(4), pp. 547-565. ISSN 2044-124X
Owolabi, H (2018) Public accountability: The case of government guarantee scheme in PFI/PPP projects. PhD thesis, University of the West of England, Bristol, UK.
Pereira, E; Hermann, U; Han, S and Abourizk, S (2018) Case-based reasoning approach for assessing safety performance using safety-related measures. Journal of Construction Engineering and Management, 144(9): 04018088, ISSN 0733-9364
Pereira, E S S (2017) A framework for assessing the safety performance of industrial projects using safety-related measures. PhD thesis, University of Alberta, Canada.
Pittri, H; Agyekum, K; Ayebeng Botchway, E; Opoku, A and Bimpli, I (2024) Design for deconstruction (dfd) implementation among design professionals: Empirical evidence from Ghana. International Journal of Construction Management, 24(13), pp. 1387-1397. ISSN 1562-3599
Rasheed, N; Shahzad, W M and Rotimi, J O B (2024) Factor analysis of risk allocation criteria (rac) in public-private partnership (PPP) projects: A case of New Zealand. Construction Economics and Building, 24(4-5), pp. 142-159. ISSN 2204-9029
Sands, K S and Suh, M J (2026) Roofers' perceptions on topics of heat safety. International Journal of Construction Education and Research, 22(1), pp. 53-71. ISSN 1557-8771
Seo, W; Kim, B; Bang, S and Kang, Y (2024) Identifying key financial variables predicting the financial performance of construction companies. Journal of Construction Engineering and Management, 150(3): 04024007, ISSN 0733-9364
Shang, G; Low, S P and Lim, X Y V (2023) Prospects, drivers of and barriers to artificial intelligence adoption in project management. Built Environment Project and Asset Management, 13(5), pp. 629-645. ISSN 2044-124X
Shebob, A (2012) Development of a methodology for analysing and quantifying delay factors affecting construction projects in Libya. PhD thesis, Teesside University, UK.
Shebob, A; Dawood, N and Xu, Q (2011) Analysing construction delay factors: A case study of building construction project in Libya. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Shrestha, K; Shrestha, P P and Lidder, M (2019) Life-cycle cost comparison of chip seal and striping: In-house workers versus private contractors. Engineering, Construction and Architectural Management, 26(6), pp. 927-944. ISSN 0969-9988
Shrestha, P P and Fernane, J D (2017) Performance of design-build and design-bid-build projects for public universities. Journal of Construction Engineering and Management, 143(3): 04016101, ISSN 0733-9364
Shrestha, P P; Shrestha, K K and Zeleke, H B (2019) Probability of change orders and the effect on cost and schedule for new public school buildings. Engineering, Construction and Architectural Management, 26(6), pp. 1087-1104. ISSN 0969-9988
Sierra, L A; Pellicer, E and Yepes, V (2016) Social sustainability in the lifecycle of Chilean public infrastructure. Journal of Construction Engineering and Management, 142(5): 05015020, ISSN 0733-9364
Stephens, P (1974) Builders' and plumbers' merchanting: an attribute study of organization, functions and performance. PhD thesis, University of Manchester, UK.
Stout, Timothy J (2023) Schedule forecast optimization for the construction and commissioning of nuclear power plants. DEngr thesis, George Washington University, USA.
Swaffield, L M and Pasquire, C L (1996) A critique of mechanical and electrical services cost planning: Existing methods and published information. Journal of Financial Management of Property and Construction, 1(3), pp. 23-42. ISSN 1366-4387
Talabi, B; Edum-Fotwe, F and Gibb, A (2019) Personal attributes of supervisors: Are these the key to transforming construction safety in the UK? Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(3), pp. 101-111. ISSN 17514304
Tangwe, S L and Simon, M (2018) Impact of standby losses and isotherm blanket contributions on the hot water cylinders of various heating technologies. Journal of Engineering, Design and Technology, 16(5), pp. 798-810. ISSN 1726-0531
Tatari, O; Castro-Lacouture, D and Skibniewski, M J (2007) Current state of construction enterprise information systems: Survey research. Construction Innovation, 7(4), pp. 310-319. ISSN 1471-4175
Tran, D Q; Diraviam, G and Minchin, R E (2018) Performance of highway design-bid-build and design-build projects by work types. Journal of Construction Engineering and Management, 144(2): 04017112, ISSN 0733-9364
Uddin, M M (2011) Robust statistical methods for non-normal quality assurance data analysis in transportation projects. PhD thesis, University of Kentucky, USA.
Wang, P; Fenn, P and Wang, K (2024) A novel approach for construction disputes causal inferences based on empirical data: A case-controlled method combined with Bradford Hill criteria. Engineering, Construction and Architectural Management, 31(11), pp. 4625-4644. ISSN 0969-9988
Wang, Rui (2015) The virtual learning experience: Learning styles, task complexity and presence in the context of emerging VR technologies. PhD thesis, University of New South Wales, Australia.
Watfa, M K and Akili, A (2023) Factors influencing elders' intention to use a housing community: A virtual reality approach extending the theory of planned behaviour. International Journal of Construction Management, 23(5), pp. 799-813. ISSN 1562-3599
Weddikkara, C (2003) The impact of professional culture on dispute resolution in the building industries of Australia and Sri-Lanka. PhD thesis, Murdoch University, Australia.
Weirs, J (2021) From student to young professional: Exploring the impact of work-based placements on the transformation of undergraduate construction students. DProf thesis, University of Northumbria at Newcastle, UK.
Yaghi, M A F (1980) Organizational decision making in a public organization: A case study of the new york state facilities design and construction group. DPA thesis, State University of New York at Albany, USA.
Zapata Quimbayo, C A; Mejía Vega, C A and Marques, N L (2019) Minimum revenue guarantees valuation in PPP projects under a mean reverting process. Construction Management and Economics, 37(3), pp. 121-138. ISSN 01446193
Zeitoun, A A (1992) Evaluation of cost and schedule growth trends during construction. PhD thesis, Oklahoma State University, USA.
Zhang, X (2006) Factor analysis of public clients' best-value objective in public-privately partnered infrastructure projects. Journal of Construction Engineering and Management, 132(9), pp. 956-965. ISSN 0733-9364
Up a level