Items with Index Term: statistical model

Number of items: 77.

Al Qady, M and Kandil, A (2013) Document management in construction: Practices and opinions. Journal of Construction Engineering and Management, 139(10): 06013002, ISSN 0733-9364

Al-Dughaither, K A (1996) International construction financing strategies: Influential factors and decision-making. PhD thesis, Carnegie Mellon University, USA.

Alpmen, A S (2013) Development and implementation of a proactive safety performance evaluation system for general contractors. PhD thesis, Wayne State University, USA.

Alzraiee, H (2024) Quantifying labour impact cost due to change orders. International Journal of Construction Management, 24(4), pp. 467-475. ISSN 1562-3599

Ammar, A; Hanna, A S; Nordheim, E V and Russell, J S (2003) Indicator variables model of firm's size-profitability relationship of electrical contractors using financial and economic data. Journal of Construction Engineering and Management, 129(2), pp. 192-197. ISSN 0733-9364

Ammar, A I (2001) Profitability of electrical contractors using financial and economical data: The effect of company's size. PhD thesis, University of Wisconsin - Madison, USA.

Anastasopoulos, P C; Labi, S; Bhargava, A; Bordat, C and Mannering, F L (2010) Frequency of change orders in highway construction using alternate count-data modeling methods. Journal of Construction Engineering and Management, 136(8), pp. 886-893. ISSN 0733-9364

Anastasopoulos, P C; Labi, S; Bhargava, A and Mannering, F L (2012) Empirical assessment of the likelihood and duration of highway project time delays. Journal of Construction Engineering and Management, 138(3), pp. 390-398. ISSN 0733-9364

Ashtab, M and Ryoo, B Y (2022) Predicting construction workforce demand using a combination of feature selection and multivariate deep-learning seq2seq models. Journal of Construction Engineering and Management, 148(12): 04022136, ISSN 0733-9364

Atapattu, C N; Domingo, N and Sutrisna, M (2023) Significant factors affecting the New Zealand transportation infrastructure project cost: quantity surveyors' perception. Built Environment Project and Asset Management, 13(5), pp. 756-777. ISSN 2044-124X

Bhargava, A; Anastasopoulos, P C; Labi, S; Sinha, K C and Mannering, F L (2010) Three-stage least-squares analysis of time and cost overruns in construction contracts. Journal of Construction Engineering and Management, 136(11), pp. 1207-1218. ISSN 0733-9364

Bishop, E A (1997) Talking shop: Egyptian engineers and Soviet specialists at the Aswan High Dam. PhD thesis, University of Chicago, USA.

Biswas, P K; Khan, S M; Piratla, K and Chowdhury, M (2023) Development and evaluation of statistical and machine-learning models for queue-length estimation for lane closures in freeway work zones. Journal of Construction Engineering and Management, 149(5): 04023023, ISSN 0733-9364

Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.

Bray Jr., H G (1994) Domestic construction contractors and ISO 9000 registration. DE thesis, Louisiana Tech University, USA.

Cakan, H; Kazan, E and Usmen, M (2014) Investigation of factors contributing to fatal and non-fatal roofer fall accidents. International Journal of Construction Education and Research, 10(4), pp. 300-317. ISSN 1557-8771

Carvajal-Figueroa, A (2006) The identification and measurement of the benefits of visualization technologies during the briefing process. PhD thesis, University of Reading, UK.

Chao, L C and Chien, C F (2009) Estimating project S-curves using polynomial function and neural networks. Journal of Construction Engineering and Management, 135(3), pp. 169-177. ISSN 0733-9364

Chen, C (2005) Entry strategies for international construction markets. PhD thesis, Pennsylvania State University, USA.

Chen, C (2008) Entry mode selection for international construction markets: The influence of host country related factors. Construction Management and Economics, 26(3), pp. 303-314. ISSN 1466433X

Chua, D K H and Goh, Y M (2005) Poisson model of construction incident occurrence. Journal of Construction Engineering and Management, 131(6), pp. 715-722. ISSN 0733-9364

Cuciniello, G; Inzerillo, G; Corazziari, L; Ciampini, A; Degni, R; Torresi, M and Leandri, P (2023) Modeling the tire-pavement noise as a regression function of speed, mixture properties, and age of the layer. Journal of Construction Engineering and Management, 149(9): 04023080, ISSN 0733-9364

Delaney, F T (2003) Effectiveness of mergers and acquisitions and corporate financial performance in construction. PhD thesis, Edinburgh Napier University, UK.

Delaney, J W (2018) The effect of competition on bid quality and final results on state dot projects. PhD thesis, State University of New York at Buffalo, USA.

Dunston, P S and Bernold, L E (2000) Adaptive control for safe and quality rebar fabrication. Journal of Construction Engineering and Management, 126(2), pp. 122-129. ISSN 0733-9364

Elazouni, A and Salem, O A (2011) Progress monitoring of construction projects using pattern recognition techniques. Construction Management and Economics, 29(4), pp. 355-370. ISSN 1466433X

Ewart, K and Silcock, G (1987) An analysis of the cost of compliance with the fire services order, Northern Ireland, 1985. Construction Management and Economics, 5(1), pp. 3-12. ISSN 01446193

Ghulman, B A (2000) Predicting construction cost growth in ODOT's paving projects using information available at the bidding time. PhD thesis, Oklahoma State University, USA.

Gonzlez, V; Alarcn, L F; Maturana, S and Bustamante, J A (2011) Site management of work-in-process buffers to enhance project performance using the reliable commitment model: Case study. Journal of Construction Engineering and Management, 137(9), pp. 707-715. ISSN 0733-9364

González, V; Alarcón, L F; Maturana, S; Mundaca, F and Bustamante, J (2010) Improving planning reliability and project performance using the reliable commitment model. Journal of Construction Engineering and Management, 136(10), pp. 1129-1139. ISSN 0733-9364

Govan, P B (2014) Causal network methods for integrated project portfolio risk analysis. PhD thesis, Texas A&M University, USA.

Gunner, J C (1997) A model of building price forecasting accuracy. PhD thesis, University of Salford, UK.

Hanna, A S and Gunduz, M (2004) Impact of change orders on small labor-intensive projects. Journal of Construction Engineering and Management, 130(5), pp. 726-733. ISSN 0733-9364

Hanna, A S; Russell, J S; Gotzion, T W and Nordheim, E V (1999) Impact of change orders on labor efficiency for mechanical construction. Journal of Construction Engineering and Management, 125(3), pp. 176-184. ISSN 0733-9364

He, R (2023) Modeling of sustainable materials management systems: Hybrid science-based, data-driven approaches. PhD thesis, Carnegie Mellon University, USA.

Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(1), pp. 49-61. ISSN 01446193

Hollar, D A; Rasdorf, W; Liu, M; Hummer, J E; Arocho, I and Hsiang, S M (2013) Preliminary engineering cost estimation model for bridge projects. Journal of Construction Engineering and Management, 139(9), pp. 1259-1267. ISSN 0733-9364

Hosseinian, A H and Baradaran, V (2023) A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: A case study in construction industry. Engineering, Construction and Architectural Management, 30(1), pp. 321-363. ISSN 0969-9988

Ilbeigi, M; Ashuri, B and Shayegh, S (2016) Price adjustment clauses and submitted bid prices for major asphalt line items in highway projects. Journal of Construction Engineering and Management, 142(5): 04015103, ISSN 0733-9364

Irfan, M; Khalid, R A; Kaka Khel, S S U H; Maqsoom, A and Sherani, I K (2023) Impact of work–life balance with the role of organizational support and job burnout on project performance. Engineering, Construction and Architectural Management, 30(1), pp. 154-171. ISSN 0969-9988

Jafarzadeh, R; Ingham, J M; Walsh, K Q; Hassani, N and Ghodrati Amiri, G R (2015) Using statistical regression analysis to establish construction cost models for seismic retrofit of confined masonry buildings. Journal of Construction Engineering and Management, 141(5): 04014098, ISSN 0733-9364

Jalloul, Hiba (2024) Leveraging emergence for enhanced planning and decision-making in the built environment: Applications in resilience and sustainability planning. PhD thesis, Florida State University, USA.

Karimi, H; Taylor, T R B; Goodrum, P M and Srinivasan, C (2016) Quantitative analysis of the impact of craft worker availability on construction project safety performance. Construction Innovation, 16(3), pp. 307-322. ISSN 1471-4175

Kim, B C and Reinschmidt, K F (2011) Combination of project cost forecasts in earned value management. Journal of Construction Engineering and Management, 137(11), pp. 958-966. ISSN 0733-9364

Koksal, A and Arditi, D (2004) Predicting construction company decline. Journal of Construction Engineering and Management, 130(6), pp. 799-807. ISSN 0733-9364

Lasshof, B and Stoy, C (2016) Estimation models for heating energy and electricity costs. Construction Management and Economics, 34(9), pp. 622-640. ISSN 01446193

Lee, S-H (2012) Management of building energy consumption and energy supply network on campus scale. PhD thesis, Georgia Institute of Technology, USA.

Lucko, G (2011) Modeling the residual market value of construction equipment under changed economic conditions. Journal of Construction Engineering and Management, 137, pp. 806-816. ISSN 0733-9364

Lucko, G and Mitchell, Z W (2010) Quantitative research: Preparation of incongruous economic data sets for archival data analysis. Journal of Construction Engineering and Management, 136(1), pp. 49-57. ISSN 0733-9364

Nakano, V M (2008) A design assessment system to protect buildings from internal chemical and biological threats. PhD thesis, Purdue University, USA.

Odeyinka, H A and Lowe, J G (2000) An assessment of risk factors involved in modelling cash flow forecasting. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Olubodun, F and Mole, T (1997) The impact of tenants on public housing stock maintenance expenditure in the UK. In: Stephenson, P (ed.) Proceedings of 13th Annual ARCOM Conference, 15-17 September 1997, Cambridge, UK.

Peng, M (2006) Item-level quantity-based preliminary cost estimating system for highway structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.

Peng, Min (2006) Item-level quantity-based preliminary cost estimating system for highways structures and miscellaneous construction. PhD thesis, University of Texas at Austin, USA.

Pin, T H and Scott, W F (1994) Bidding model for refurbishment work. Journal of Construction Engineering and Management, 120(2), pp. 257-273. ISSN 0733-9364

Portas, J and AbouRizk, S (1997) Neural network model for estimating construction productivity. Journal of Construction Engineering and Management, 123(4), pp. 399-410. ISSN 0733-9364

Poshdar, M; González, V A; Raftery, G M and Orozco, F (2014) Characterization of process variability in construction. Journal of Construction Engineering and Management, 140(11): 5014009, ISSN 0733-9364

Qiao, Y; Fricker, J D and Labi, S (2019) Influence of project bundling on maintenance of traffic costs across highway project types. Journal of Construction Engineering and Management, 145(8): 05019010, ISSN 0733-9364

Rampini, Luca (2023) Artificial intelligence enhances digital asset management. PhD thesis, Politecnico di Milano, Italy.

Rudeli, N; Santilli, A; Puente, I and Viles, E (2017) Statistical model for schedule prediction: Validation in a housing-cooperative construction database. Journal of Construction Engineering and Management, 143(11): 04017083, ISSN 0733-9364

Salem, O M (1999) Infrastructure construction and rehabilitation: Risk-based life cycle cost analysis. PhD thesis, University of Alberta, Canada.

Samarghandi, H; Tabatabaei, S M M; Taabayan, P; Hashemi, A M and Willoughby, K (2016) Studying the reasons for delay and cost overrun in construction projects: The case of Iran. Journal of Construction in Developing Countries, 21(1), pp. 51-84. ISSN 1823-6499

Sanders, S R and Thomas, H R (1993) Masonry productivity forecasting model. Journal of Construction Engineering and Management, 119(1), pp. 163-179. ISSN 0733-9364

Serag, E (2006) Change orders and productivity loss quantification using verifiable site data. PhD thesis, University of Central Florida, USA.

Serag, E; Oloufa, A; Malone, L and Radwan, E (2010) Model for quantifying the impact of change orders on project cost for U.S. roadwork construction. Journal of Construction Engineering and Management, 136(9), pp. 1015-1027. ISSN 0733-9364

Shourkabi, A (2016) A study of designer time utilisation in Iranian construction consultancies. PhD thesis, Loughborough University, UK.

Skitmore, M (1991) The construction contract bidder homogeneity assumption: An empirical test. Construction Management and Economics, 9(5), pp. 403-429. ISSN 01446193

Skitmore, R M; Pettitt, A N and McVinish, R (2007) Gates' bidding model. Journal of Construction Engineering and Management, 133(11), pp. 855-863. ISSN 0733-9364

Soleimani, N (2022) Earthquake risk to civil infrastructure systems. PhD thesis, University of Delaware, USA.

Sun, J; Murphy, M R; Hazlett, D G; Shuai, C and Gao, L (2025) Simulation-based framework for predicting construction workforce demand: A comparative analysis with multivariate LSTM-based seq2seq model. Journal of Construction Engineering and Management, 151(6): 04025049, ISSN 0733-9364

Teller, J (2021) Urban density and covid-19: Towards an adaptive approach. Buildings & Cities, 2(1), pp. 150-165. ISSN 2632-6655

Wang, W (2010) Multivariate stochastic copula-based deterioration models in infrastructure economic risk management. DES thesis, Columbia University, USA.

Wimalasena, B A D S (2011) A planning tool for construction waste management. PhD thesis, University of Calgary, Canada.

Wong, M W J (2006) Forecasting manpower demand in the construction industry of Hong Kong. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Zhao, Y (2023) Sustainability, acceptance risk analysis and machine learning in assessing mechanical properties and the impact of highway materials in transportation infrastructure. PhD thesis, University of Maryland, College Park, USA.

li, H; yu, L and Cheng, E W L (2005) A GIS-based site selection system for real estate projects. Construction Innovation, 5(4), pp. 231-241. ISSN 1471-4175

van Gelder, P H A J M (2000) Statistical methods for the risk -based design of civil structures. PhD thesis, Delft University of Technology, Netherlands.

This list was generated on Sat Aug 22 02:13:37 2026 UTC.