Items with Index Term: stakeholder satisfaction
Abaza, M and Kisi, K (2024) Improper risk management outcomes and lessons learned from an EPC water transmission project. Journal of Construction Engineering and Management, 150(11): 05024012, ISSN 0733-9364
Abolghasemi, M.; Al-Mhdawi, M. K. S.; Rahimian, F. and Qazi, A. (2026) Exploring the nexus of stakeholder management, project performance and stakeholder satisfaction in Malaysian residential building projects: A PLS-SEM approach. Engineering, Construction and Architectural Management, 33(3), pp. 2089-2117. ISSN 0969-9988
Akinladenu, Kafilat (2025) Exploring the relationship between project managers' technical competence and project success. DBA thesis, Wilmington University (Delaware), USA.
Alkamali, A (2025) Investing in biophilic design integration for stakeholders. PhD thesis, Arizona State University, USA.
Alshboul, O. and Shehadeh, A. (2026) Conflict resolution and negotiation in construction projects using game theory: Achieving win-win outcomes. International Journal of Construction Management, 26(7), pp. 1341-1364. ISSN 1562-3599
Amarah, Burhan (2016) Development of a triple bottom line stakeholder satisfaction model. PhD thesis, Bond University, Australia.
Asiedu, R and Iddris, F (2022) Value co-creation approach to management of construction project stakeholders. Journal of Construction in Developing Countries, 27(1), pp. 1-23. ISSN 1823-6499
Babar, S; Thaheem, M J and Ayub, B (2017) Estimated cost at completion: Integrating risk into earned value management. Journal of Construction Engineering and Management, 143(3): 04016104, ISSN 0733-9364
Bakhtawar, B; Thaheem, M J; Arshad, H and Qadeer, A (2018) How to embrace the stakeholder in public private partnership decision-making? A theoretical discourse. In: Gorse, C and Neilson, C J (eds.) Proceedings of 34th Annual ARCOM Conference, 3-5 September 2018, Queen’s University, Belfast, UK.
Boudlal, Youssef Ait (2014) Project management and its relation to long-term project success: An empirically based theoretical framework. PhD thesis, University of Louisville, USA.
Carey, G (2017) An evaluation of how VfM can be achieved from a government's perspective in relation to school building projects in Ireland. PhD thesis, University of Salford, UK.
Dharmapuri Tirumala, R; Dangol, N; Tiwari, P and Vaz-Serra, P (2021) Comparative analysis of outcomes under PPP and traditional modes of delivery: A study of schools in Melbourne. Construction Management and Economics, 39(11), pp. 894-911. ISSN 01446193
Eyiah-Botwe, E (2017) Development of a sustainable stakeholder management framework for construction projects in Ghana. PhD thesis, University of Johannesburg, South Africa.
Eyiah-Botwe, E; Aigbavboa, C O and Thwala, W D (2020) Curbing PPP construction projects' failure using enhanced stakeholder management success in developing countries. Built Environment Project and Asset Management, 10(1), pp. 50-63. ISSN 2044-124X
Fapohunda, J A (2009) Operational framework for optimal utilisation of construction resources during the production process. PhD thesis, Sheffield Hallam University, UK.
Gilani, G; Pons, O and De La Fuente, A (2022) Sustainability-oriented approach to assist decision makers in building facade management. Journal of Construction Engineering and Management, 148(1): 04021182, ISSN 0733-9364
Gupta, Naresh (2024) Impact of COVID-19 pandemic on the sustained development of infrastructure projects: Putting economies on the brink. PhD thesis, University of Adelaide, Australia.
Halder, A. (2026) Modeling critical driving factors of stakeholder integration and their influences on construction megaproject performance: A regression-based analysis. Journal of Engineering, Design and Technology, 24(1), pp. 213-241. ISSN 1726-0531
Ingle, P V and Mahesh, G (2022) Construction project performance areas for Indian construction projects. International Journal of Construction Management, 22(8), pp. 1443-1454. ISSN 1562-3599
Kulatunga, U; Amaratunga, D and Haigh, R (2009) Critical success factors of construction research and development. Construction Management and Economics, 27(9), pp. 891-900. ISSN 1466433X
Mani, S; Ahmadi Eftekhari, N; Hosseini, M R and Bakhshi, J (2024) Sociotechnical dimensions of BIM-induced changes in stakeholder management of public and private building projects. Construction Innovation, 24(2), pp. 425-445. ISSN 1471-4175
Mbugua, L M (2000) A methodology for evaluating the business performance of UK construction companies. PhD thesis, University of Wolverhampton, UK.
Nguyen Van, D; Le Dinh, T and Tran, H-B (2022) Assessing stakeholder satisfaction in PPP transport projects in developing countries: Evidence from Vietnam. Built Environment Project and Asset Management, 12(2), pp. 309-324. ISSN 2044-124X
Nyalungu, Jey; Mbona, Sizwe; Ogunsola, Sijuwade and Sibuyi, Venus (2026) The effectiveness of supply chain management in enhancing project management outcomes. Journal of Construction Business and Management, 8(2), pp. 54-64. ISSN 2521-0165
Nzekwe-Excel, C (2010) Development of an integrated framework for satisfaction assessment of construction project teams. PhD thesis, University of Wolverhampton, UK.
Nzekwe-Excel, C; Nwagboso, C; Proverbs, D and Georgakis, P (2008) An approach for evaluating the satisfaction of a construction project team. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Olatunji, O A; Orundami, A O and Ogundare, O (2018) Causal relationship between material price fluctuation and project's outturn costs. Built Environment Project and Asset Management, 8(4), pp. 358-371. ISSN 2044-124X
Pearce, A R (1999) Sustainability and the built environment: A metric and process for prioritizing improvement opportunities. PhD thesis, Georgia Institute of Technology, USA.
Phung, Q; Erdogan, B and Nielsen, Y (2026) Influence of sustainability adoption on the success of construction projects. Building Research & Information, 54(3), pp. 345-358. ISSN 0961-3218
Prachi Vinod, I; Gangadhar, M and Deepak, M D (2021) Identifying the performance areas affecting the project performance for Indian construction projects. Journal of Engineering, Design and Technology, 19(1), pp. 1-20. ISSN 1726-0531
Wuni, I Y; Shen, G Q and Osei-Kyei, R (2020) Evaluating the critical success criteria for prefabricated prefinished volumetric construction projects. Journal of Financial Management of Property and Construction, 26(2), pp. 279-297. ISSN 1366-4387
Xu, Xiaohang (2022) A study on the role of opportunism forms in increasing stakeholder satisfaction in PPP projects using transaction cost economics theory. PhD thesis, University of Technology Sydney, Australia.
Yu, J and Leung, M Y (2018) Structural stakeholder model in public engagement for construction development projects. Journal of Construction Engineering and Management, 144(6): 04018046, ISSN 0733-9364
Up a level