Items with Index Term: stacking

Number of items: 25.

Biswas, P K; Khan, S M; Piratla, K and Chowdhury, M (2023) Development and evaluation of statistical and machine-learning models for queue-length estimation for lane closures in freeway work zones. Journal of Construction Engineering and Management, 149(5): 04023023, ISSN 0733-9364

Chen, Z; Li, T; Qin, L and Jiang, Y (2025) Vision-guided autonomous block loading in a dual-robot collaborative handling framework. Journal of Construction Engineering and Management, 151(5): 04025035, ISSN 0733-9364

Egwim, C N; Alaka, H; Egunjobi, O O; Gomes, A and Mporas, I (2024) Comparison of machine learning algorithms for evaluating building energy efficiency using big data analytics. Journal of Engineering, Design and Technology, 22(4), pp. 1325-1350. ISSN 1726-0531

Egwim, C N; Alaka, H; Pan, Y; Balogun, H; Ajayi, S; Hye, A and Egunjobi, O O (2025) Ensemble of ensembles for fine particulate matter pollution prediction using big data analytics and IoT emission sensors. Journal of Engineering, Design and Technology, 23(2), pp. 640-665. ISSN 1726-0531

Gbadegesin, A O; Sun, Y and Nwulu, N I (2021) Stacked value streams of hybrid energy storage systems in prosumer microgrids. Journal of Engineering, Design and Technology, 19(5), pp. 1063-1079. ISSN 1726-0531

Grant, E (2013) "Pack 'em, rack 'em and stack 'em": The appropriateness of the use and reuse of shipping containers for prison accommodation. Construction Economics and Building, 13(2), pp. 35-44. ISSN 2204-9029

Hazrati, A (2016) Predicting construction labor productivity with Bayesian belief networks. PhD thesis, University of Nebraska - Lincoln, USA.

Horman, M J; Orosz, M P and Riley, D R (2006) Sequence planning for electrical construction. Journal of Construction Engineering and Management, 132(4), pp. 363-372. ISSN 0733-9364

Ibrahim, M W; Hanna, A S; Russell, J S; Abotaleb, I S and El-Adaway, I H (2020) Quantitative analysis of the impacts of out-of-sequence work on project performance. Journal of Construction Engineering and Management, 146(8): 04020090, ISSN 0733-9364

Karatas, I and Budak, A (2024) Development and comparative of a new meta-ensemble machine learning model in predicting construction labor productivity. Engineering, Construction and Architectural Management, 31(3), pp. 1123-1144. ISSN 0969-9988

Kilpeläinen, S; Pelsmakers, S; Castaño-Rosa, R and Miettinen, M S (2025) Exploring diverse drivers behind hybrid heating solutions. Buildings & Cities, 6(1), pp. 580-596. ISSN 2632-6655

Lee, G H; Kim, J I; Koo, C and Kim, T W (2022) Automated generation of precast concrete slab stacks for transportation in offsite construction projects. Journal of Construction Engineering and Management, 148(8): 04022072, ISSN 0733-9364

Lee, Y (2020) A methodology to align the logistical requirements of prefabricated wall panels. PhD thesis, Stanford University, USA.

Li, J; Zhu, J and Guan, C (2024) Mitigating fatigue in tunnel construction through illumination: Evidence from virtual reality. Journal of Construction Engineering and Management, 150(11): 04024165, ISSN 0733-9364

Lucko, G (2008) Productivity scheduling method compared to linear and repetitive project scheduling methods. Journal of Construction Engineering and Management, 134(9), pp. 711-720. ISSN 0733-9364

Magoda, C M; Gryzagoridis, J and Kanyarusoke, K (2021) Effective heat conductivity of Honeycomb (porous) composite panel. Journal of Engineering, Design and Technology, 19(4), pp. 876-887. ISSN 1726-0531

Marasini, R (2002) An integrated simulation approach for realising efficient stockyard layouts: An application in the precast concrete products industry. PhD thesis, University of Teesside, UK.

Marasini, R and Dawood, N (2000) A simulation model to manage and optimise stockyard layout: A case study in precast concrete products industry. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.

Meharie, M G; Mengesha, W J; Gariy, Z A and Mutuku, R N N (2022) Application of stacking ensemble machine learning algorithm in predicting the cost of highway construction projects. Engineering, Construction and Architectural Management, 29(7), pp. 2836-2853. ISSN 0969-9988

Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss. PhD thesis, University of Washington, USA.

Shang, M; Zhang, Y; He, Z; Qiao, H; Liu, X; Feng, Q; Xue, C; Zhang, Y; Su, F; Wang, J; Han, Y and Meng, X (2023) Workability properties of specified density concrete with municipal solid waste incinerator tailings added as a lightweight aggregate. Journal of Construction Engineering and Management, 149(8): 04023058, ISSN 0733-9364

Shewchuk, J P and Guo, C (2012) Panel stacking, panel sequencing, and stack locating in residential construction: Lean approach. Journal of Construction Engineering and Management, 138(9), pp. 1006-1016. ISSN 0733-9364

Wang, C; Qiao, H; Li, Q; Su, R and An, B (2024) Advances in recycled concrete research: Improving shrinkage for sustainable building applications. Architectural Engineering and Design Management, 20(6), pp. 1589-1611. ISSN 1745-2007

Yi, W; Wang, H; Zhen, L and Liu, Y (2023) Automated generation of horizontal precast slab stacking plans. Journal of Construction Engineering and Management, 149(12): 04023121, ISSN 0733-9364

Zhang, W; Zhang, H and Yu, L (2023) Collaborative planning for stacking and installation of prefabricated building components regarding crane-collision avoidance. Journal of Construction Engineering and Management, 149(6): 04023029, ISSN 0733-9364

This list was generated on Sat Aug 22 01:34:35 2026 UTC.