Items with Index Term: software development

Number of items: 47.

Akin, S; Ergun, O; Surer, E and Gursel Dino, I (2021) An immersive performative architectural design tool with daylighting simulations: A building information modeling-based approach. Engineering, Construction and Architectural Management, 28(4), pp. 1319-1344. ISSN 0969-9988

Al-Lahham, Yazan (2019) Risk management approaches in SMEs: A study of owner-managers in Jordan. PhD thesis, University of Liverpool, UK.

Asad, M M; Hassan, R B; Sherwani, F; Aamir, M; Soomro, Q M and Sohu, S (2019) Design and development of a novel knowledge-based decision support system for industrial safety management at drilling process: HAZFO Expert 1.0. Journal of Engineering, Design and Technology, 17(4), pp. 705-718. ISSN 1726-0531

Baba, A (2013) Developing a decision support framework for low carbon housing design and delivery in the UK. PhD thesis, University of the West of England, Bristol, UK.

Boudlal, Youssef Ait (2014) Project management and its relation to long-term project success: An empirically based theoretical framework. PhD thesis, University of Louisville, USA.

Bukhari, Fakhri A (2011) A hierarchical evolutionary algorithmic design (head) system for generating and evolving building design models. PhD thesis, Queensland University of Technology, Australia.

Cheng, J (2005) A simulation access language and framework with applications to project management. PhD thesis, Stanford University, USA.

Cui, X (2002) Delay time modelling and software development. PhD thesis, University of Salford, UK.

Delgado-Arvelo, Y (2012) An investigation into the data collection process for the development of cost models. PhD thesis, De Montfort University, UK.

Domdouzis, K (2007) Applications of wireless sensor technologies in construction. PhD thesis, Loughborough University, UK.

Dowsett, R; Harty, C and Davies, R (2017) Epistemological differences and new technology in construction. In: Chan, P W and Neilson, C J (eds.) Proceedings of 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK.

Ewin, N A; Oxley, R and Poole, F (1990) Advanced applications software for speculative housing companies. Construction Management and Economics, 8(2), pp. 109-133. ISSN 01446193

Farghaly, K; Abanda, F H; Vidalakis, C and Wood, G (2019) BIM-linked data integration for asset management. Built Environment Project and Asset Management, 9(4), pp. 489-502. ISSN 2044-124X

Gameson, R; Suresh, S and Chinyio, E (2008) Project debriefing: A multi-domain review of practices and procedures. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.

Hartmann, T (2008) A grassroots model of decision support system implementations by construction project teams. PhD thesis, Stanford University, USA.

Hawkey, Barry (2024) Qualitative comparative analysis of software development practices translated from scene to screen using the real-to-real method for inter-industry learning. PhD thesis, Colorado State University, USA.

Heesom, D (2004) An analytical system for space planning on construction sites. PhD thesis, University of Wolverhampton, UK.

Hernandez Mendez, A (2018) Improving project performance through implementation of agile methodologies in the renewable energy construction industry. DEngr thesis, George Washington University, USA.

Howes, R (1983) Project management control utilising innovative forecasting and computerised data bases. PhD thesis, Brunel University, UK.

Kanoglu, A and Arditi, D (2001) A computer-based information system for architectural design offices. Construction Innovation, 1(1), pp. 15-29. ISSN 1471-4175

Khosrowshahi, F (2015) Enhanced project brief: Structured approach to client-designer interface. Engineering, Construction and Architectural Management, 22(5), pp. 474-492. ISSN 0969-9988

Krönert, N (2010) Requiements engineering in construction (Anforderungs-engineering im bauwesen). DSc thesis, ETH Zürich, Switzerland.

Kumar, V and Lin, E T A (2020) Conceptualizing "COBieEvaluator": A rule based system for tracking asset changes using COBie datasheets. Engineering, Construction and Architectural Management, 27(5), pp. 1093-1118. ISSN 0969-9988

Lal, Anshu Singh (2024) Best practices of information technology project managers leading agile projects. EdD thesis, Pepperdine University, USA.

Meadati, P K (2007) Integration of construction process documents into building information modeling. PhD thesis, University of Nebraska - Lincoln, USA.

Mlitwa, N W B and Wanyonyi, D W (2015) Towards interactive open source based m-Learning solution: The m-Chisimba framework. Journal of Engineering, Design and Technology, 13(3), pp. 463-485.

Moore, N (2013) A model based system for contextual on-site construction planning in augmented reality. PhD thesis, University of Wolverhampton, UK.

Moore, N J (2013) A contextual AR model based system on-site construction planning. PhD thesis, University of Wolverhampton, UK.

Nam, T-J (2001) Investigations of collaborative design environments: a framework for real-time collaborative 3D CAD. PhD thesis, Brunel University, UK.

Nordin, A (2013) Constructing component-based systems directly from requirements using incremental composition. PhD thesis, University of Manchester, UK.

O'Brien, M J and Pantouvakis, J P (1993) A new approach to the development of computer- aided estimating systems for the construction industry. Construction Management and Economics, 11(1), pp. 30-44. ISSN 01446193

Olatunji, O A and Sher, W (2015) Estimating in geometric 3D CAD. Journal of Financial Management of Property and Construction, 20(1), pp. 24-49. ISSN 1366-4387

Pala, M; Edum-Fotwe, F; Ruikar, K; Peters, C and Doughty, N (2016) Implementing commercial information exchange: A construction supply chain case study. Construction Management and Economics, 34(12), pp. 898-918. ISSN 01446193

Potseluyko Amobi, L (2021) Improving business and technical operations within timber frame self-build housing sector by applying integrated VR/AR and BIM technologies. PhD thesis, Teesside University, UK.

Salazar-Kish, J M (2001) Modeling concurrency tradeoffs and their effects on project duration and rework. PhD thesis, Stanford University, USA.

Simpson, E; Gilmour, D; Blackwood, D; Falconer, R and Isaacs, J (2015) Major project team learning: Examining building information modelling. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Soliman-Junior, J; Tzortzopoulos, P and Kagioglou, M (2022) Designers' perspective on the use of automation to support regulatory compliance in healthcare building projects. Construction Management and Economics, 40(2), pp. 123-141. ISSN 01446193

Taha, M A-E (1994) Applying distributed artificial intelligence to the prequalification of construction contractors. PhD thesis, University of Wisconsin - Madison, USA.

Thawanapong, C and Tachakitkachorn, T (2026) The sequence of activities for digital twin implementation for building operations by industrial practitioners: A multiple case study analysis in Thailand. International Journal of Construction Management, 26(5), pp. 825-839. ISSN 1562-3599

Thomson, Esmeralda (2017) Adoptive governance in distributed agile development projects. PhD thesis, University of New South Wales, Australia.

Wang, H (2021) BIM-based knowledge management for the use of construction and facilities management knowledge in construction projects. PhD thesis, Queen's University Belfast, UK.

Xie, H (2005) User model-driven architecture for information retrieval in construction project management. PhD thesis, University of Florida, USA.

Xie, H; Hong, Y and Brilakis, I (2022) Analysis of user needs in time-related risk management for holistic project understanding. Journal of Construction Engineering and Management, 148(4): 05022002, ISSN 0733-9364

Xu, S; Liu, K and Tang, L C M (2015) Incorporation of expert reasoning into the BIM-based cost estimating process. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.

Yalcinkaya, M and Singh, V (2019) Exploring the use of gestalt's principles in improving the visualization, user experience and comprehension of cobie data extension. Engineering, Construction and Architectural Management, 26(6), pp. 1024-1046. ISSN 0969-9988

Zhang, J (2015) Automated code compliance checking in the construction domain using semantic natural language processing and logic-based reasoning. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Zhang, X (2019) Integrating lean construction, BIM and quality: a new paradigm for the improvement of Chinese construction quality. PhD thesis, University of Bath, UK.

This list was generated on Sat Aug 22 02:12:47 2026 UTC.