Items with Index Term: slack

Number of items: 26.

Abdulhadi, M A M E (2012) IT adoption in the construction sector in Libya. PhD thesis, University of Glamorgan, UK.

Dilger, W H; Tadros, G S and Giannelia, P (1992) Method proposed for construction of multispan cable-stayed bridges. Journal of Construction Engineering and Management, 118(2), pp. 273-282. ISSN 0733-9364

Fireman, M C T; Saurin, T A; Formoso, C T; Koskela, L and Tommelein, I D (2023) Slack in production planning and control: A study in the construction industry. Construction Management and Economics, 41(3), pp. 256-276. ISSN 01446193

Fu, Y (2019) Organizational governance and value creation: An empirical study in megaproject contexts. PhD thesis, University of Manchester, UK.

Gao, H; Zhang, L and Gu, S (2026) Carbon emission efficiency measurement of construction enterprises based on the three-stage DEA-sbm model. Journal of Construction Engineering and Management, 152(4): 04026028, ISSN 0733-9364

Gil, N; Beckman, S and Tommelein, I (2008) Problem-solving base building under uncertainty and ambiguity: Multiple-case study on an airport expansion program. Journal of Construction Engineering and Management, 134(12), pp. 991-1001. ISSN 0733-9364

Horsthuis, C (2016) The importance of organisational slack as an unexplored determinant of firm level innovation and performance in the construction context. PhD thesis, Loughborough University, UK.

Horsthuis, C; Thomson, D S and Fernie, S (2012) The case for slack to promote innovative behaviour in construction firms. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Hu, X and Liu, C (2017) Slacks-based data envelopment analysis for eco-efficiency assessment in the Australian construction industry. Construction Management and Economics, 35(11-12), pp. 693-706. ISSN 01446193

Hu, Xiancun (2015) Construction industry performance measurement with carbon reduction. PhD thesis, Deakin University, Australia.

Ingirige, B and Sexton, M (2006) Alliances in construction: Investigating initiatives and barriers for long-term collaboration. Engineering, Construction and Architectural Management, 13(5), pp. 521-535. ISSN 0969-9988

Jeong, K S; Lu, S L and Sexton, M G (2010) Good practice transfer within small construction specialist trade contractors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.

Kanit, R; Gunduz, M and Ozkan, O (2009) Investigating the effectiveness of certain priority rules on resource scheduling of housing estate projects. Journal of Construction Engineering and Management, 135(7), pp. 609-613. ISSN 0733-9364

Marion, G L C; Saurin, T A and Viana, D D (2025) The cost-benefit of slack in production planning and control in construction projects. Construction Management and Economics, 43(11), pp. 883-900. ISSN 0144-6193

Meese, N (2012) Knowledge sharing for sustainable development: a mixed-method study of an international civil engineering consultancy. EngD thesis, University of Bath, UK.

Nam, C H and Tatum, C B (1997) Leaders and champions for construction innovation. Construction Management and Economics, 15(3), pp. 259-270. ISSN 01446193

Pratas, J D G (2000) Comparison of the use and success of budgetary and schedule-based management information systems (MIS) in construction. PhD thesis, University of Manchester, UK.

Pultar, M (1990) Progress-based construction scheduling. Journal of Construction Engineering and Management, 116(4), pp. 670-688. ISSN 0733-9364

Qi, Liang (2022) Towards understanding the diffusion and adoption of innovation in the Australian construction industry. PhD thesis, RMIT University, Australia.

Rusydiana, A. S.; Uula, M. M. and Riani, R. (2026) Measuring the performance of climate action of OIC countries. International Journal of Disaster Resilience in the Built Environment, 17(2), pp. 277-296. ISSN 1759-5908

Sandberg, R; Löwstedt, M and Räisänen, C (2021) Working in a loosely coupled system: Exploring practices and implications of coupling work on construction sites. Construction Management and Economics, 39(3), pp. 212-226. ISSN 01446193

Schneider, R H (1981) Local construction regulatory process innovation: A comparative analysis of Florida building inspection departments. PhD thesis, University of Florida, USA.

Tonetto, M S; Formoso, C T; Saurin, T A; Bonesi De Luca, F; Lora, F P and Lantelme, E (2024) Resilient performance on construction projects in the post-pandemic era: An organizational perspective. Engineering, Construction and Architectural Management, 31(12), pp. 5007-5028. ISSN 0969-9988

Ugwuoke, A A (2018) Innovation persistence during economic crisis by Nigeria's construction contracting firms: an investigation of the critical success factors. PhD thesis, University of Salford, UK.

Wang, S.; Hu, X.; Wei, A.; Yang, W. and Cui, Q. (2026) The non-linear impact of industrial agglomeration on green total factor productivity in construction: Moderating role of construction consulting services. Engineering, Construction and Architectural Management, 33(15), pp. 458-480. ISSN 0969-9988

Zarghami, S A (2024) No scheduling problem but rather a rescheduling problem: Measuring robustness of schedule network in construction projects. Journal of Construction Engineering and Management, 150(2): 04023157, ISSN 0733-9364

This list was generated on Sat Aug 22 02:06:13 2026 UTC.