Items with Index Term: site operation
Abubakar, A (1992) A quantitative approach to cost monitoring and control of construction projects. PhD thesis, Loughborough University, UK.
Alkoc, E and Erbatur, F (1998) Site expert: A prototype knowledge-based expert system. Engineering, Construction and Architectural Management, 5(3), pp. 238-251. ISSN 0969-9988
Alsamadani, R; Hallowell, M and Javernick-Will, A N (2013) Measuring and modelling safety communication in small work crews in the US using social network analysis. Construction Management and Economics, 31(6), pp. 568-579. ISSN 1466433X
Alshibani, A (2008) Optimizing and controlling earthmoving operations using spatial technologies. PhD thesis, Concordia University, Canada.
Bernold, L E (2002) Spatial integration in construction. Journal of Construction Engineering and Management, 128(5), pp. 400-408. ISSN 0733-9364
Beyh, S (2004) Computer and communication engineering: internet protocol telephony in construction. PhD thesis, University of Salford, UK.
Brooks, T; Gunning, J G; Spillane, J P and Cole, J (2021) Regulatory decoupling and the effectiveness of the ISO 9001 quality management system in the construction sector in the UK–a case study analysis. Construction Management and Economics, 39(12), pp. 988-1005. ISSN 01446193
Cameron, I; Gillan, G and Duff, A R (2007) Issues in the selection of fall prevention and arrest equipment. Engineering, Construction and Architectural Management, 14(4), pp. 363-374. ISSN 0969-9988
Chahrour, R; Hafeez, M A; Ahmad, A M; Sulieman, H I; Dawood, H; Rodriguez-Trejo, S; Kassem, M; Naji, K K and Dawood, N (2021) Cost-benefit analysis of BIM-enabled design clash detection and resolution. Construction Management and Economics, 39(1), pp. 55-72. ISSN 01446193
Chan, C F P (2001) The development of construction law in singapore. PhD thesis, University of London, UK.
Cheetham, D W (1982) Labour management practices on construction sites and some of their consequences. Construction Papers, 1(3), pp. 37-53. ISSN 0144-8587
Choi, J O; Chen, X B and Kim, T W (2019) Opportunities and challenges of modular methods in dense urban environment. International Journal of Construction Management, 19(2), pp. 93-105. ISSN 1562-3599
Codarin, Sara (2020) Innovative construction systems within building processes: An approach to large-scale robotic additive layer manufacturing for the conservation of cultural heritage. PhD thesis, University of Ferrara, Italy.
Eksteen, B and Rosenberg, D (2002) The management of overhead costs in construction companies. In: Greenwood, D (ed.) Proceedings of 18th Annual ARCOM Conference, 2-4 September 2002, Northumbria, UK.
El-Batal, R S (1995) Reasoning by abstraction for public works contracts using a blackboard architecture. PhD thesis, Polytechnic University, USA.
Gibb, A G F and Isack, F (2003) Re-engineering through pre-assembly: Client expectations and drivers. Building Research & Information, 31(2), pp. 146-160. ISSN 0961-3218
Hewage, K N (2007) Construction productivity improvement by worker motivation and it based communication. PhD thesis, University of Calgary, Canada.
Hewavitharana, S; Perera, A; Perera, S; Perera, P and Nanayakkara, S (2025) Framework for systematic adoption of ERP systems in the Sri Lankan construction industry. Built Environment Project and Asset Management, 15(3), pp. 629-646. ISSN 2044-124X
Hildreth, J C and Vorster, M C (2010) Learning construction performance improvement through planning. International Journal of Construction Education and Research, 6(2), pp. 139-151. ISSN 1557-8771
Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364
Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364
Hua, G B (2008) The state of applications of quantitative analysis techniques to construction economics and management (1983 to 2006). Construction Management and Economics, 26(5), pp. 485-497. ISSN 1466433X
Hwang, S (2011) Time series models for forecasting construction costs using time series indexes. Journal of Construction Engineering and Management, 137(9), pp. 656-662. ISSN 0733-9364
Ingemansson Havenvid, M; Hulthen, K; Linne, A and Sundquist, V (2015) New ways of organising construction due to user demands. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Jonsson, J (1996) Construction site productivity measurements selection, application and evaluation of methods and measures. PhD thesis, Luleå University of Technology, Sweden.
Koekemoer, V and Smallwood, J (2007) Information technology (it) in the construction process. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.
Kuittinen, M and Häkkinen, T (2020) Reduced carbon footprints of buildings: New Finnish standards and assessments. Buildings & Cities, 1(1), pp. 182-197. ISSN 2632-6655
Li, H; Chan, N K Y and Skitmore, M (2012) The use of virtual prototyping to rehearse the sequence of construction work involving mobile cranes. Construction Innovation, 12(4), pp. 429-446. ISSN 1471-4175
Li, H; Guo, H; Skibniewski, M J and Skitmore, M (2008) Using the IKEA model and virtual prototyping technology to improve construction process management. Construction Management and Economics, 26(9), pp. 991-1000. ISSN 1466433X
Lu, M; Lau, S C and Poon, C S (2009) Simulation approach to evaluating cost efficiency of selective demolition practices: Case of Hong Kong's Kai Tak Airport demolition. Journal of Construction Engineering and Management, 135(6), pp. 448-457. ISSN 0733-9364
Löfgren, A (2008) Making mobile meaning: Expectations and experiences of mobile computing usefulness in construction site management practice. PhD thesis, KTH Royal Institute of Technology, Sweden.
Maqsoom, A; Choudhry, R M; Umer, M and Mehmood, T (2021) Influencing factors indicating time delay in construction projects: Impact of firm size and experience. International Journal of Construction Management, 21(12), pp. 1251-1262. ISSN 1562-3599
Marton, J (2004) In search of organisational legitimacy construction sites. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Moselhi, O and Khan, Z (2012) Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(3), pp. 272-296. ISSN 1471-4175
Nam, C H and Tatum, C B (1988) Major characteristics of constructed products and resulting limitations of construction technology. Construction Management and Economics, 6(2), pp. 133-147. ISSN 01446193
Nayfeh, M (1989) A combination of cyclone and vert techniques for the management of construction projects. PhD thesis, Aston University, UK.
Ofori, G; Zhang, Z and Ling, F Y Y (2021) Initiatives that enable Singapore contractors to improve construction productivity. Built Environment Project and Asset Management, 11(5), pp. 785-803. ISSN 2044-124X
Proverbs, D G; Holt, G D and Olomolaiye, P O (1998) A comparative evaluation of concrete placing productivity rates amongst French, German and UK construction contractors. Engineering, Construction and Architectural Management, 5(2), pp. 174-181. ISSN 0969-9988
Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.
Robson, A; Boyd, D and Thurairajah, N (2015) Are contractors' cost accounting practices up to the job of establishing improvement in site operations? In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK.
Robson, A; Boyd, D and Thurairajah, N (2016) Studying 'cost as information' to account for construction improvements. Construction Management and Economics, 34(6), pp. 418-431. ISSN 01446193
Sadeghpour, F (2004) A CAD-based model for site layout. PhD thesis, Concordia University, Canada.
Shen, X; Marks, E; Pradhananga, N and Cheng, T (2016) Hazardous proximity zone design for heavy construction excavation equipment. Journal of Construction Engineering and Management, 142(6): 05016001, ISSN 0733-9364
Shi, J J (1999) A neural network based system for predicting earthmoving production. Construction Management and Economics, 17(4), pp. 463-471. ISSN 01446193
Soltanmohammadlou, Nazi (2025) A sociotechnical system for earthmoving equipment safety in Australian construction sites. PhD thesis, Queensland University of Technology, Australia.
Song, J; Haas, C T and Caldas, C H (2006) Tracking the location of materials on construction job sites. Journal of Construction Engineering and Management, 132(9), pp. 911-918. ISSN 0733-9364
Sundquist, V; Gadde, L-E and Hulthén, K (2018) Reorganizing construction logistics for improved performance. Construction Management and Economics, 36(1), pp. 49-65. ISSN 0144-6193
Tam, C M; Tong, T K L and Chan, K K (2006) Rough set theory for distilling construction safety measures. Construction Management and Economics, 24(11), pp. 1199-1206. ISSN 1466433X
Tang, S L; Lee, H K and Wong, K (1997) Safety cost optimization of building projects in Hong Kong. Construction Management and Economics, 15(2), pp. 177-186. ISSN 01446193
Torres Calderon, W (2022) Video representation learning for vision-driven activity analysis in construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Woodhead, W D and Salomonsson, G D (1983) A computer based system for recording and analysing building site labour input. Construction Papers, 2(2), pp. 47-52. ISSN 0144-8587
Zakieh, R (1991) Quantity-significance and its application to construction project modelling. PhD thesis, University of Dundee, UK.
Zhang, J; Eastham, D L and Bernold, L E (2005) Waste-based management in residential construction. Journal of Construction Engineering and Management, 131(4), pp. 423-430. ISSN 0733-9364
li, H; Chen, Z; Wong, C T C and Love, P E D (2002) A quantitative approach to construction pollution control based on resource levelling. Construction Innovation, 2(2), pp. 71-81. ISSN 1471-4175
Up a level