Items with Index Term: simplification
Abdulmajid, S A D (1967) Resource forecasting models for private housing projects. PhD thesis, University of Manchester, UK.
Agbulos, A; Mohamed, Y; Al-Hussein, M; Abourizk, S and Roesch, J (2006) Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews. Journal of Construction Engineering and Management, 132(3), pp. 291-299. ISSN 0733-9364
Ahmed, M; Shakaib, M and Siddiqui, M A (2024) Analysis and comparison of flow velocities and in-cylinder temperature distributions to quantify oxides of nitrogen in a compression ignition engine using diesel and biodiesel fuels. Journal of Engineering, Design and Technology, 22(2), pp. 422-437. ISSN 1726-0531
Al-Hajj, A N (1991) Simple cost-significant models for total life-cycle costing in buildings. PhD thesis, University of Dundee, UK.
Aljohani, A (2019) Cost overrun causality model in Saudi Arabian public sector construction projects. PhD thesis, Robert Gordon University, UK.
Badu, E; Edwards, D J and Owusu-Manu, D (2012) Trade credit and supply chain delivery in the Ghanaian construction industry: Analysis of vendor interactions with small to medium enterprises. Journal of Engineering, Design and Technology, 10(3), pp. 360-379. ISSN 1726-0531
Ballesteros-Pérez, P; Skitmore, M; Cerezo-Narváez, A; González-Cruz, M C; Pastor-Fernández, A and Otero-Mateo, M (2021) Standard deviation of bids for construction contract auctions. Journal of Construction Engineering and Management, 147(8): 04021096, ISSN 0733-9364
Bao, Z; Laovisutthichai, V; Tan, T; Wang, Q and Lu, W (2022) Design for manufacture and assembly (dfma) enablers for offsite interior design and construction. Building Research & Information, 50(3), pp. 325-338. ISSN 0961-3218
Bonham, D R; Goodrum, P M; Littlejohn, R and Albattah, M A (2017) Application of data mining techniques to quantify the relative influence of design and installation characteristics on labor productivity. Journal of Construction Engineering and Management, 143(8): 04017052, ISSN 0733-9364
Boyd, D (2021) A critical inquiry into the hyperreality of digitalization in construction. Construction Management and Economics, 39(7), pp. 549-564. ISSN 01446193
Bueno, C; Pereira, L M and Fabricio, M M (2018) Life cycle assessment and environmental-based choices at the early design stages: An application using building information modelling. Architectural Engineering and Design Management, 14(5), pp. 332-346. ISSN 1745-2007
Carvalho, J P A (2023) Integration of BIM in building sustainability assessment methods. PhD thesis, Universidade do Minho, Portugal.
Chmielewski, H T (2023) Overcoming modeling barriers in long-term interdependent infrastructure systems planning. PhD thesis, North Carolina State University, USA.
Cottrell, W D (1999) Simplified program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 125(1), pp. 16-22. ISSN 0733-9364
Da Rocha, C G; Wijayaratna, K; Jong, K and Haller, D (2023) Examining off-site construction from a flow viewpoint. Journal of Construction Engineering and Management, 149(3): 05023001, ISSN 0733-9364
Dalla Valle, Anna (2019) Environment-driven change management in AEC firms: Life cycle perspective in practice. PhD thesis, Politecnico di Milano, Italy.
Dauber, V F (2003) Measuring and minimising waste in construction by applying lean thinking. PhD thesis, University of Dundee, UK.
Del Caño, A and De La Cruz, M P (2002) Integrated methodology for project risk management. Journal of Construction Engineering and Management, 128(6), pp. 473-485. ISSN 0733-9364
Din, A (2020) Accounting for carbon impacts in buildings: a rating procedure. PhD thesis, London Metropolitan University, UK.
Emsoff, J E (1994) An object-oriented environment for the visual integration of project scheduling data. PhD thesis, Texas A&M University, USA.
Feldbauer, R R (2019) Mindful project management: a framework to enhance underperformance managing large hospital builds by incorporating principles adapted from High Reliability Organizations. PhD thesis, University of Liverpool, UK.
Fereshtehnejad, S (2018) Multi-hazard lifecycle methods for aging structures and infrastructure systems. PhD thesis, Ohio State University, USA.
Florencio, Lutemberg de Araújo (2018) Structuring of a rating system for the classification of risk of linking commercial real estate properties as guarantee for long-term credit operations. PhD thesis, Universidade de São Paulo, Brazil.
Fujimoto, A; Matsui, K; Ozawa, K and Muratsubaki, Y (2000) New design standard for civil engineering structures based on the minimum labour concept. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Galiano-Garrigós, A; García-Figueroa, A; Rizo-Maestre, C and González-Avilés, Á (2019) Evaluation of BIM energy performance and CO2 emissions assessment tools: A case study in warm weather. Building Research & Information, 47(7), pp. 787-812. ISSN 0961-3218
Goncalves, V L; Costanzo, V; Fabbri, K and Rakha, T (2022) Overheating assessment in Passivhaus dwellings: The influence of prediction tools. Buildings & Cities, 3(1), pp. 153-167. ISSN 2632-6655
Graca, Moacyr Eduardo Alves da (1985) Formulation of a model for evaluation of the determinant conditions for secondary vent need in buildings' drainage systems. PhD thesis, Universidade de São Paulo, Brazil.
Guo, H (2009) Rethinking construction project management using the VP-based manufacturing management model. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Hajjar, D (1999) A unified modeling methodology for simulation-based planning of construction projects. PhD thesis, University of Alberta, Canada.
Handa, V K and Abdalla, O (1989) Forecasting productivity by work sampling. Construction Management and Economics, 7(1), pp. 19-28. ISSN 01446193
Huang, P-D (1988) Impact of CADD technology on the architectural community. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Ittmann, J T (2020) Liability of the structural engineer: Establishing, quantifying, and managing risks. PhD thesis, Louisiana State University and Agricultural & Mechanical College, USA.
Jalloul, Hiba (2024) Leveraging emergence for enhanced planning and decision-making in the built environment: Applications in resilience and sustainability planning. PhD thesis, Florida State University, USA.
John, V (2012) Derivation of reliable simplification strategies for the comparative LCA of individual and "typical" newly built Swiss apartment buildings. DSc thesis, ETH Zürich, Switzerland.
Kassem, M; Dawood, N and Mitchell, D (2012) A decision support system for the selection of curtain wall systems at the design development stage. Construction Management and Economics, 30(12), pp. 1039-1053. ISSN 1466433X
Kishk, M (2005) On the mathematical modelling of whole-life costs. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Li, W; Zhang, Y; Lu, D and Augenbroe, G (2020) Quantification methods of natural ventilated building performance in preliminary design. Building Research & Information, 48(4), pp. 401-414. ISSN 0961-3218
Lichtenberg, J (2005) Slimbouwen®: A strategy for innovation. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Lindgren, J (2018) Diffusion of systemic innovations in the construction sector. PhD thesis, Halmstad University, Sweden.
Lu, H; Wang, H; Yu, D and Ye, J (2023) Sharp schedule compression in urgent emergency construction projects via activity crashing, substitution and overlapping: A case study of huoshengshan and leishenshan hospital projects in wuhan. Engineering, Construction and Architectural Management, 30(8), pp. 3696-3712. ISSN 0969-9988
Lucko, G (2011) Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing. Journal of Construction Engineering and Management, 137(7), pp. 523-535. ISSN 0733-9364
Mak, S W (1995) Risk analysis in construction: A paradigm shift from a hard to soft approach. Construction Management and Economics, 13(5), pp. 385-392. ISSN 01446193
Mathews, J D (2000) Optimisation and decision support during the conceptual stage of building design: New techniques based on the genetic algorithm. PhD thesis, University of Plymouth, UK.
McLean, J S (2017) Navigational complexity within building codes. PhD thesis, University of Vermont and State Agricultural College, USA.
Meng, K (2021) Performance measurement for UK construction projects. PhD thesis, University of Manchester, UK.
Moore, D (1996) Buildability assessment and the development of an automated design aid for managing the transfer of construction process knowledge. Engineering, Construction and Architectural Management, 3(1-2), pp. 29-46. ISSN 0969-9988
Moore, D R (1996) Task difficulty assessment: a contribution towards improved buildability through simplification. PhD thesis, De Montfort University, UK.
Peacock, W S (1990) Site investigation procedures and risk analysis. PhD thesis, University of Manchester, UK.
Peiman, F; Khalilzadeh, M; Shahsavari-Pour, N and Ravanshadnia, M (2025) Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables. Engineering, Construction and Architectural Management, 32(4), pp. 2069-2104. ISSN 0969-9988
Perry, J G and Barnes, M (2000) Target cost contracts: An analysis of the interplay between fee, target, share and price. Engineering, Construction and Architectural Management, 7(2), pp. 202-208. ISSN 0969-9988
Plotnick, F L (2008) Rdm: Relationship diagramming method. PhD thesis, Drexel University, USA.
Rogers, M D (2014) Power and narrative in project management: lessons learned in recognising the importance of phronesis. DMan thesis, University of Hertfordshire, UK.
Root, D and Blismas, N G (2003) Increasing questionnaire responses from industry: Practices surrounding the use of postal questionnaires. In: Greenwood, D J (ed.) Proceedings of 19th Annual ARCOM Conference, 3-5 September 2003, Brighton, UK.
Shayboun, M; Koch, C and Kifokeris, D (2021) A comparison of accident causation models (ACMS) and machine learning (ML) for applied analysis within accident reports. In: Scott, L and Neilson, C J (eds.) Proceedings of 37th Annual ARCOM Conference, 6-7 September 2021, Online Event, UK.
Silva, Fernanda Belizario (2022) Proposal of life cycle-based environmental performance indicators for decision-making in construction. PhD thesis, Universidade de São Paulo, Brazil.
Subramanyan, H; Sawant, P H and Bhatt, V (2012) Construction project risk assessment: Development of model based on investigation of opinion of construction project experts from India. Journal of Construction Engineering and Management, 138(3), pp. 409-421. ISSN 0733-9364
Walker, D H T; Bourne, L M and Shelley, A (2008) Influence, stakeholder mapping and visualization. Construction Management and Economics, 26(6), pp. 645-658. ISSN 1466433X
Walsh, K D; Sawhney, A and Bashford, H H (2007) Production equations for unsteady-state construction processes. Journal of Construction Engineering and Management, 133(3), pp. 254-261. ISSN 0733-9364
Yuan, Z; Chang, Y; Chen, Y; Wang, Y; Huang, W and Chen, C (2024) Simulating and optimizing precast wall lifting in prefabricated building construction. Engineering, Construction and Architectural Management, 31(6), pp. 2437-2456. ISSN 0969-9988
Yunus, Riduan (2012) Decision making guidelines for sustainable construction of industrialised building systems. PhD thesis, Queensland University of Technology, Australia.
Zhai, Y; Sun, Y; Li, Y and Tang, S (2025) Design for assembly in construction system: Three iterative upgrades of a panelized system. Architectural Engineering and Design Management, 21(3), pp. 410-429. ISSN 1745-2007
van den Brom, P; Meijer, A and Visscher, H (2018) Performance gaps in energy consumption: Household groups and building characteristics. Building Research & Information, 46(1), pp. 54-70. ISSN 0961-3218
Çıdık, M S; Boyd, D and Thurairajah, N (2017) Ordering in disguise: Digital integration in built-environment practices. Building Research & Information, 45(6), pp. 665-680. ISSN 0961-3218
Up a level