Items with Index Term: shortages

Number of items: 181.

Abdalla, A (2007) Meeting housing needs in Libya: towards a responsive owner-built housing with particular reference to Benghazi City. PhD thesis, University of Newcastle upon Tyne, UK.

Abdul Nabi, M and El-Adaway, I H (2022) Understanding disputes in modular construction projects: Key common causes and their associations. Journal of Construction Engineering and Management, 148(1): 04021184, ISSN 0733-9364

Abdullah, A-N M (2019) Assessing economic, social, political and environmental issues related to mega-projects : A case study of Merowe Dam in Sudan. PhD thesis, University of Plymouth, UK.

Abdullah, F (1999) The Malaysian construction industry: an analysis on the impact of Vision 2020. PhD thesis, University of Reading, UK.

Abubakar, M E; Hasan, A and Jha, K N (2022) Delays and financial implications of COVID-19 for contractors in irrigation projects. Journal of Construction Engineering and Management, 148(9): 05022006, ISSN 0733-9364

Acheampong, P (2013) Employers' perception of graduates with entry-level technical skills from construction industry programs in Ghana and Nigeria. PhD thesis, Pennsylvania State University, USA.

Adah, C A; Daniel, E I and Tunji-Olayeni, P (2025) The experience of women in construction craftspeople apprenticeship programmes in Nigeria. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 83-93. ISSN 17514304

Adebayo, A K; Price, A D F and Gibb, A G F (2006) Impact of modern methods of construction on healthcare infrastructure. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Adekunle, O O (2019) A linear programming-based optimization model to address skilled labor shortages through strategic investments in the construction industry. DEng thesis, Morgan State University, USA.

Adu, E. T.; Olowookere, L. B. and Olorunlogbon, O. O. (2026) Gender inclusiveness in addressing manpower shortages in the Nigerian construction industry: Barriers and benefits. International Journal of Construction Education and Research, 22(2), pp. 191-210. ISSN 1557-8771

Agapiou, A and Dainty, A R J (2003) Client-led approaches to increasing participation of women, ethnic minorities and disabled people in the construction workforce: A framework for change. Journal of Construction Procurement, 9(2), pp. 4-16. ISSN 1358-9180

Ahmed, V; Pathmeswaran, R; Baldry, D; Worrall, L and Abouen, S (2008) An investigation into the barriers facing black and minority ethnics within the UK construction industry. Journal of Construction in Developing Countries, 13(2), pp. 83-99. ISSN 1823-6499

Ahmed, V; Worrall, L; Abouen, S; Baldry, D and Pathmeswaran, R (2007) Socio-economics and black and minority ethnics in the UK construction industry. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Aiyetan, O A and Dillip, D (2018) System dynamics approach to mitigating skilled labour shortages in the construction industry: A South Africa context. Construction Economics and Building, 18(4), pp. 45-63. ISSN 2204-9029

Al kailani, H.; Bhattacharjee, K.; Bonilla, M. and Nnaji, C. (2026) Tailoring perceived workforce sustainability strategies in the US construction industry. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Al kailani, H.; Bhattacharjee, K.; Bonilla, M. and Nnaji, C. (2026) Tailoring perceived workforce sustainability strategies in the US construction industry. Built Environment Project and Asset Management, pp. 1-18. ISSN 2044-124X

Al-Haddad, S (2020) State transportation agencies: A quantitative study on the use of construction engineering and inspection consultants and their impact on project performance. PhD thesis, University of Colorado at Boulder, USA.

Albattah, M A (2016) A critical analysis of the structural changes related to craft demographics influencing craft supply and demand in the United States across multiple dimensions. PhD thesis, University of Colorado at Boulder, USA.

Alkasisbeh, M R (2018) An integrated decision support framework for life-cycle building asset management. PhD thesis, Western Michigan University, USA.

Alkilani, S; Loosemore, M; Hammad, A W A and Kerr, S M (2025) Refugees', asylum seekers' and migrants' experiences of finding meaningful work in the Australian construction industry: a Bourdieusean analysis. Engineering, Construction and Architectural Management, 32(7), pp. 4651-4672. ISSN 0969-9988

Alshammari, S A R (2019) Developing a comprehensive construction delay analysis technique. PhD thesis, Brunel University, UK.

Alsubaey, M H (2017) A hybrid machine learning and text-mining approach for the automated generation of early warnings in construction project management. PhD thesis, Cranfield University, UK.

Amiri, O; Ayazi, A; Rahimi, M and Khazaeni, G (2022) Risks of water and wastewater PPP projects: An investors' perspective. Construction Innovation, 22(4), pp. 1104-1121. ISSN 1471-4175

Anumba, C (2006) Application of GIS to labour market planning in construction. EngD thesis, Loughborough University, UK.

Anumba, C; Dainty, A R J; Ison, S G and Sergeant, A (2005) The application of GIS to construction labour market planning. Construction Innovation, 5(4), pp. 219-230. ISSN 1471-4175

Arditi, D; Akan, G T and Gurdamar, S (1985) Reasons for delays in public projects in Turkey. Construction Management and Economics, 3(2), pp. 171-181. ISSN 01446193

Baker, M; Ali, M; Hassett, E and Jahan Tumpa, R (2025) Tapping the untapped resource to address construction skills shortages: Perceptions of Australian women career changers and construction women. Journal of Construction Engineering and Management, 151(4): 04025006, ISSN 0733-9364

Bamana, F; Lehoux, N and Cloutier, C (2019) Simulation of a construction project: Assessing impact of just-in-time and lean principles. Journal of Construction Engineering and Management, 145(5): 05019005, ISSN 0733-9364

Banks, E R (2021) Women in construction: Exploring gender-diverse recruitment for engaging a full workforce. PhD thesis, Northcentral University, USA.

Bekele, A A; Mahesh, G and Ingle, P V (2025) Enhancing SMCs' competitiveness through improving material supply chain management practice. International Journal of Construction Management, 25(1), pp. 77-88. ISSN 1562-3599

Bell, L C and Stukhart, G (1986) Attributes of materials management systems. Journal of Construction Engineering and Management, 112(1), pp. 14-21. ISSN 0733-9364

Ben Mahmoud, B; Lehoux, N; Blanchet, P and Jobidon, G (2026) Towards a resilient project delivery system selection: Evaluating the impact of external environment criteria for public infrastructure in quebec. Construction Management and Economics, 44(3), pp. 159-182. ISSN 0144-6193

Bessy, K J (2019) Identifying best practices for attracting and retaining skilled labor in the construction industry: A Delphi study. PhD thesis, Ashford University, USA.

Bevan, W (2016) An investigation of the required skills for the delivery of low and zero carbon buildings within a region. PhD thesis, University of Reading, UK.

Blismas, N and Wakefield, R (2009) Drivers, constraints and the future of offsite manufacture in Australia. Construction Innovation, 9(1), pp. 72-83. ISSN 1471-4175

Borg, J and Scott-Young, C M (2022) Contributing factors to turnover intentions of early career project management professionals in construction. Construction Management and Economics, 40(10), pp. 835-853. ISSN 01446193

Borg, J; Scott-Young, C M and Maqsood, T (2025) Preparing project management professionals for construction careers: Australian stakeholders' perceptions of educators' role. International Journal of Construction Education and Research, 21(3), pp. 346-370. ISSN 1557-8771

Borg Axisa, G and Borg, R P (2024) Climate change adaptation in Malta: Assessment of skills in the built environment. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 668-679. ISSN 1759-5916

Bradford, C W (2017) The impact of the systematic incorporation of tolerances on gypsum board installation. PhD thesis, Indiana State University, USA.

Brandenburg, S G (2004) The Tier I workforce management strategy: Concept and application. PhD thesis, University of Texas at Austin, USA.

Bruen, J; Spillane, J P and Brooks, T (2020) Post-disaster affordable and sustainable house design and delivery: An international non-governmental organisation (INGO) perspective. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.

Burleson, R C; Haas, C T; Tucker, R L and Stanley, A (1998) Multiskilled labor utilization strategies in construction. Journal of Construction Engineering and Management, 124(6), pp. 480-489. ISSN 0733-9364

Buxton, A (2010) A future in the past: Unlocking a career in Britain's built heritage. PhD thesis, Sheffield Hallam University, UK.

Castaneda-Maza, J A (2002) Workers' skills and receptiveness to operate under the Tier II construction management strategy. PhD thesis, University of Texas at Austin, USA.

Castañeda, J A; Tucker, R L and Haas, C T (2005) Workers' skills and receptiveness to operate under the Tier II construction management strategy. Journal of Construction Engineering and Management, 131(7), pp. 799-807. ISSN 0733-9364

Castro-Lacouture, D; Süer, G A; Gonzalez-Joaqui, J and Yates, J K (2009) Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method. Journal of Construction Engineering and Management, 135(10), pp. 1096-1104. ISSN 0733-9364

Chan, P W and Connolly, M (2006) The role of schools careers advisers in encouraging new entrants into construction. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Chan, P W and Dainty, A R J (2007) Resolving the UK construction skills crisis: A critical perspective on the research and policy agenda. Construction Management and Economics, 25(4), pp. 375-386. ISSN 1466433X

Chang, Y; Wilkinson, S; Potangaroa, R and Seville, E (2010) Resourcing challenges for post-disaster housing reconstruction: A comparative analysis. Building Research & Information, 38(3), pp. 247-264. ISSN 0961-3218

Chang, Y; Wilkinson, S; Seville, E and Potangaroa, R (2012) Changes in resource need for post-disaster reconstruction: A longitudinal study in China. Building Research & Information, 40(3), pp. 327-336. ISSN 0961-3218

Chang-Richards, Y; Wilkinson, S; Seville, E and Brunsdon, D (2017) Effects of a major disaster on skills shortages in the construction industry: Lessons learned from New Zealand. Engineering, Construction and Architectural Management, 24(1), pp. 2-20. ISSN 0969-9988

Chao, Q; Rotimi, F E and Rotimi, J O B (2021) International construction joint ventures as a resourcing model. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(1), pp. 28-37. ISSN 17514304

Chen, Jamie (2025) Improving construction supply chain material management resilience through mathematical optimisation. PhD thesis, University of New South Wales, Australia.

Chiang, Y H; Wong, F K W and Liang, S (2018) Fatal construction accidents in Hong Kong. Journal of Construction Engineering and Management, 144(3): 04017121, ISSN 0733-9364

Dainty, A R J (1998) A grounded theory of the determinants of women's under-achievement in large construction companies. PhD thesis, Loughborough University, UK.

Dainty, A R J; Bagilhole, B M and Neale, R H (2000) A grounded theory of women's career underachievement in large UK construction companies. Construction Management and Economics, 18(2), pp. 239-250. ISSN 01446193

Dainty, A R J and Edwards, D J (2003) The UK building education recruitment crisis: A call for action. Construction Management and Economics, 21(7), pp. 767-775. ISSN 01446193

Dainty, A R J; Ison, S G and Briscoe, G H (2005) The construction labour market skills crisis: The perspective of small-medium-sized firms. Construction Management and Economics, 23(4), pp. 387-398. ISSN 01446193

Denny, J (2025) Organizing change: A single case study exploring the perceptions of self-determination in high school employees during a building renovation. EdD thesis, Baylor University, USA.

Deshapriya, L A M; Perera, B A K S; Ilangakoon, I W M A D and Weerasooriya, D (2025) Management of adverse effects of construction digitalization on the quantity surveying key roles: A qualitative Delphi study. Journal of Engineering, Design and Technology, 23(6), pp. 1815-1837. ISSN 1726-0531

Dhal, M (2020) Labor stand: Face of precarious migrant construction workers in India. Journal of Construction Engineering and Management, 146(6): 04020048, ISSN 0733-9364

Doan, D T and Chinda, T (2016) Modeling construction and demolition waste recycling program in Bangkok: Benefit and cost analysis. Journal of Construction Engineering and Management, 142(12): 05016015, ISSN 0733-9364

Dong, Y; Hu, Y; Cai, J; Xu, X and Li, S (2025) Improving construction workforce entry by examining construction equipment operators' employment practices. Journal of Construction Engineering and Management, 151(10): 04025138, ISSN 0733-9364

Ebekozien, A; Abdul-Aziz, A R and Jaafar, M (2021) Low-cost housing policies and squatters struggles in Nigeria: The Nigerian perspective on possible solutions. International Journal of Construction Management, 21(11), pp. 1088-1098. ISSN 1562-3599

Elbashbishy, T and El-Adaway, I H (2026) Assessing the criticality of construction trades: Skilled labor shortages and their cost and schedule impacts. Journal of Construction Engineering and Management, 152(1): 04025230, ISSN 0733-9364

Elbashbishy, T and El-Adaway, I H (2023) System dynamic modeling to study the impact of construction industry characteristics and associated macroeconomic indicators on workforce size and labor retention rate. Journal of Construction Engineering and Management, 149(10): 04023100, ISSN 0733-9364

Ene, G U; Goulding, J S and John, G A (2016) Sustainable human capacity development in the African built environment: How far is the journey to a knowledge society? Smart and Sustainable Built Environment, 5(3), pp. 212-231. ISSN 2046-6099

Everett, J G (1991) Construction automation: Basic task selection and development of the cranium. PhD thesis, Massachusetts Institute of Technology, USA.

Fang, F and Aboushhiwa, R A (2012) Strategies to address skills shortages in South African civil engineering. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 165(2), pp. 103-109. ISSN 17514312

Fash, M F (2024) Development of a femalized kinesthetic learning model to increase architecture, engineering, and construction (AEC) career interests in African American middle school girls. PhD thesis, North Carolina Agricultural and Technical State University, USA.

Forbes, C (2018) Rebuilding Nepal: Traditional and modern approaches, building or diminishing resilience? International Journal of Disaster Resilience in the Built Environment, 9(3), pp. 218-229. ISSN 1759-5916

Francis, V and Prosser, A (2014) Exploring vocational guidance and gender in construction. International Journal of Construction Education and Research, 10(1), pp. 39-57. ISSN 1557-8771

Francis, Valerie Elizabeth (2013) Women and their career progression in the Australian construction industry. PhD thesis, University of Melbourne, Australia.

Gajjar, D; Lucas, J and Davis, D (2023) Understanding employee perception to promote management level workforce development for roofing contractors. International Journal of Construction Education and Research, 19(2), pp. 221-238. ISSN 1557-8771

Gann, D M and Barlow, J (1996) Flexibility in building use: The technical feasibility of converting redundant offices into flats. Construction Management and Economics, 14(1), pp. 55-66. ISSN 01446193

Garba, A and Kishk, M (2014) Renewable energy technology means of providing sustainable electricity in Nigerian rural areas: A review. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

George, A; Aboagye-Nimo, E and Mamphey, S (2021) The effects of skills shortages on construction costs in the UK. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 175(2), pp. 78-86. ISSN 17514304

Gerber, A and Crafford, G (2025) Shocking shortage: the electrical trade crisis in the Eastern Cape, South Africa. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 178(2), pp. 94-102. ISSN 17514304

Grifa, M A (2006) The construction industry in Libya , with particular reference to operations in Tripoli. PhD thesis, University of Newcastle upon Tyne, UK.

Gupta, Naresh (2024) Impact of COVID-19 pandemic on the sustained development of infrastructure projects: Putting economies on the brink. PhD thesis, University of Adelaide, Australia.

Halligan, D W; Demsetz, L A; Brown, J D and Pace, C B (1994) Action-response model and loss of productivity in construction. Journal of Construction Engineering and Management, 120(1), pp. 47-64. ISSN 0733-9364

Hashemi, A (2009) Construction technology transfer: an assessment of the relevance of modern methods of construction to housing shortages in Iran. PhD thesis, Cardiff University, UK.

Hauptfleisch, A C and Verster, J J P (2007) Mentoring: A key intervention in small construction contractor capacity building in South Africa. In: Boyd, D (ed.) Proceedings of 23rd Annual ARCOM Conference, 3-5 September 2007, Belfast, UK.

Heffernan, E; Pan, W and Liang, X (2012) Delivering zero carbon homes in the UK. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Hegazy, T; Shabeeb, A K; Elbeltagi, E and Cheema, T (2000) Algorithm for scheduling with multiskilled constrained resources. Journal of Construction Engineering and Management, 126(6), pp. 414-421. ISSN 0733-9364

Hintson, J (2025) State expansion and hollowness in contemporary Africa. PhD thesis, Stanford University, California, USA.

Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364

Hsu, P. Y. (2026) Reinforcement learning framework for just-in-time material ordering in urban construction: Development, evaluation, and real-time deployment. Journal of Construction Engineering and Management, 152(9): 04026157, ISSN 0733-9364

Husam, S; Laishram, B and Johari, S (2024) Framework to enhance gender inclusion of workers in construction sites. Journal of Construction Engineering and Management, 150(4): 04024018, ISSN 0733-9364

Ihuah, P W (2015) Conceptual framework for the sustainable management of social (public) housing estates in the Niger Delta region of Nigeria. PhD thesis, University of Salford, UK.

Islam, M S (2024) Identification of seasonal drought and its impacts on cropping season in Bangladesh. International Journal of Disaster Resilience in the Built Environment, 15(4), pp. 516-529. ISSN 1759-5916

Islam, M S; Salem, M; Tantawy, M and Salah, M (2024) Cost overrun risk assessment for healthcare projects: A modified fuzzy group decision-making approach. Journal of Construction Engineering and Management, 150(12): 04024168, ISSN 0733-9364

Jagger, N S B (2017) Skill requirements of the low carbon transition. PhD thesis, University of Sussex, UK.

Jaselskis, E J and Talukhaba, A (1998) Bidding considerations in developing countries. Journal of Construction Engineering and Management, 124(3), pp. 185-193. ISSN 0733-9364

Kabundu, E K (2020) A housing affordability and tenure of choice quantum deliverable model in South Africa. PhD thesis, Nelson Mandela Metropolitan University, South Africa.

Kakar, A S; Hasan, A; Jha, K N and Singh, A (2024) Project cost performance factors in the war-affected and conflict-sensitive Afghan construction industry. Journal of Engineering, Design and Technology, 22(5), pp. 1570-1590. ISSN 1726-0531

Kapambwe, F C (2003) An evaluation of the implications of equity foreign direct investment risks in BOT infrastructure projects for overseas contractors in sub-Saharan Africa. PhD thesis, University of Reading, UK.

Karimi, H (2017) Quantitative analysis of the impact of craft labor availability on construction project performance. PhD thesis, University of Kentucky, USA.

Karimi, H; Taylor, T R B; Dadi, G B; Goodrum, P M and Srinivasan, C (2018) Impact of skilled labor availability on construction project cost performance. Journal of Construction Engineering and Management, 144(7): 04018057, ISSN 0733-9364

Karimi, H; Taylor, T R B and Goodrum, P M (2017) Analysis of the impact of craft labour availability on North American construction project productivity and schedule performance. Construction Management and Economics, 35(6), pp. 368-380. ISSN 01446193

Karimi, H; Taylor, T R B; Goodrum, P M and Srinivasan, C (2016) Quantitative analysis of the impact of craft worker availability on construction project safety performance. Construction Innovation, 16(3), pp. 307-322. ISSN 1471-4175

Kasim, N B (2008) Improving materials management on construction projects. PhD thesis, Loughborough University, UK.

Kearns, A. (2022) Housing space and occupancy standards: Developing evidence for policy from a health and wellbeing perspective in the UK context. Building Research & Information, 50(7), pp. 722-737. ISSN 0961-3218

Keath, M (1983) The development of school construction systems in Hertfordshire 1946-64. PhD thesis, University of Greenwich, UK.

Khatleli, N (2016) The impediments to efficient megaproject implementation in South Africa. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Killingsworth, J; Mehany, M H and Ladhari, H (2021) General contractors’ experience using off-site structural framing systems. Construction Innovation, 21(1), pp. 40-63. ISSN 1471-4175

Kuo, Y. C. (2026) Interactive relationships among factors influencing skilled labor shortages in the construction industry. Engineering, Construction and Architectural Management, 33(3), pp. 2625-2648. ISSN 0969-9988

Laing, Xiaoyun (2025) Communicate, understand, and collaborate: An AI-integrated human-robot collaboration approach to improve safety and productivity in construction. PhD thesis, The University of Texas at San Antonio, USA.

Liu, W; Zhang, J and Liu, W (2021) Heuristic methods for finance-based and resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 147(11): 04021141, ISSN 0733-9364

Lobo, Y B and Wilkinson, S (2008) New approaches to solving the skills shortages in the New Zealand construction industry. Engineering, Construction and Architectural Management, 15(1), pp. 42-53. ISSN 0969-9988

Lounsbury, C R (1983) From craft to industry: The building process in North Carolina in the nineteenth century. PhD thesis, George Washington University, USA.

Low, S P; Gao, S and Wong, G Q E (2017) Resilience of hospital facilities in Singapore's healthcare industry: A pilot study. International Journal of Disaster Resilience in the Built Environment, 8(5), pp. 537-554. ISSN 1759-5916

Lundrigan, C (2016) Megaprojects: A design and strategy perspective. PhD thesis, University of Manchester, UK.

Madanayake, U H; Ayinla, K O and Saka, A B (2026) An investigation of learner types and their unique preferences on the work-based learning (wbl) model: A case of quantity surveying apprenticeship. Construction Management and Economics, 44(1), pp. 1-22. ISSN 0144-6193

Maharjan, R (2017) Effects of contract procurement factors on performance of transportation projects. PhD thesis, University of Nevada, Las Vegas, USA.

Mahdi, I and Soliman, E (2021) Significant and top ranked delay factors in Arabic Gulf Countries. International Journal of Construction Management, 21(2), pp. 167-180. ISSN 1562-3599

Marchant, T (2013) Keep going: Career perspectives on ageing and masculinity of self-employed tradesmen in Australia. Construction Management and Economics, 31(8), pp. 845-860. ISSN 1466433X

Maslova, S and Burgess, G (2023) Delivering human-centred housing: Understanding the role of post-occupancy evaluation and customer feedback in traditional and innovative social housebuilding in England. Construction Management and Economics, 41(4), pp. 277-292. ISSN 01446193

Mbae, A M and Nwulu, N I (2020) Day-ahead load forecasting using improved grey Verhulst model. Journal of Engineering, Design and Technology, 18(5), pp. 1335-1348. ISSN 1726-0531

Memon, F A (2023) Stakeholder engagement in managing scope change during the execution phase of UK construction projects. PhD thesis, University of Bedfordshire, UK.

Merryweather Powell, J. and Shibeika, A. (2025) Brexit and beyond: Addressing skills shortage in the UK construction industry. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(1), pp. 50-57. ISSN 1751-4304

Minooei, F (2018) Towards a deeper understanding of the U.S. workforce development system in the construction industry. PhD thesis, University of Colorado at Boulder, USA.

Mohamad, M and Tran, D Q (2021) Risk-based prioritization approach to construction inspections for transportation projects. Journal of Construction Engineering and Management, 147(1): 04020150, ISSN 0733-9364

Mohamed, M; Pärn, E A and Edwards, D J (2017) Brexit: Measuring the impact upon skilled labour in the UK construction industry. International Journal of Building Pathology and Adaptation, 35(3), pp. 264-279.

Morgan, M and Cruickshank, H (2014) Quantifying the extent of space shortages: English dwellings. Building Research & Information, 42(6), pp. 710-724. ISSN 0961-3218

Morrissey, D; Goodier, C and Demian, P (2024) Offsite construction in ireland’s hospitals: Unveiling the complexities of OSC adoption. In: Thomson, C (ed.) Proceedings of 40th Annual ARCOM Conference, 2-4 September 2024, London South Bank University, UK.

Nadim, W and Goulding, J S (2009) Offsite production in the UK: The construction industry and academia. Architectural Engineering and Design Management, 5(3), pp. 136-152. ISSN 1745-2007

Naing, M and Nitivattananon, V (2020) Analysis of the housing market with the roles of private house-builders on the middle-income group segment in Yangon, Myanmar. Journal of Construction in Developing Countries, 25(1), pp. 83-108. ISSN 1823-6499

Ndukwe, C. V.; Chan, T. K. and Gao, S. (2026) Challenges and improvements of an SME-oriented procurement policy in the construction sector: A case of victoria's local jobs first policy. Construction Management and Economics, 44(8), pp. 565-592. ISSN 0144-6193

Norazman, N; Salleh, N M; Mohd Nashruddin, S N A and Wan Ismail, W N (2025) Strategic planning of sustainable maintenance in heritage school buildings: Malaysia perspectives. International Journal of Building Pathology and Adaptation, 43(3), pp. 440-462. ISSN 2398-4708

Nwankwo, D C (2023) Improving approaches to material inventory management in construction industry in the UK. DBA thesis, University of Wales Trinity Saint David, UK.

Olotuah, A O and Aiyetan, A O (2006) Sustainable low-cost housing provision in Nigeria: A bottom-up participatory approach. In: Boyd, D (ed.) Proceedings of 22nd Annual ARCOM Conference, 4-6 September 2006, Birmingham, UK.

Omoregbe, A O (2020) Immigration policy and the U.S. shortage of construction workers in the skilled trades. PhD thesis, Northcentral University, USA.

Onyia, U (2019) Improving the supervisory and managerial skills and competences required in construction management in Nigeria. PhD thesis, London South Bank University, UK.

Oo, B L; Liu, X and Lim, B T H (2022) The experiences of tradeswomen in the Australian construction industry. International Journal of Construction Management, 22(8), pp. 1408-1419. ISSN 1562-3599

Ovrawah, Victor (2025) Automated prefabrication in the Australian residential building sector: Current state of development and adoption barriers. PhD thesis, Bond University, Australia.

Oyegoke, A S; Fisher, B W; Ajayi, S; Omotayo, T S and Ewuga, D (2024) The disruptive factors and longevity effects of covid-19 and brexit on the SMEs construction supply chain in the UK. Journal of Financial Management of Property and Construction, 29(1), pp. 115-134. ISSN 1366-4387

Pardalis, G. and Sula, M. (2026) One-stop shops as leverage points for renovation sufficiency. Buildings & Cities, 7(1), pp. 614-632. ISSN 2632-6655

Park, T; Kim, B and Kim, H (2013) Real option approach to sharing privatization risk in underground infrastructures. Journal of Construction Engineering and Management, 139(6), pp. 685-693. ISSN 0733-9364

Perdomo-Rivera, J L (2004) A framework for a decision support model for supply chain management in the construction industry. PhD thesis, Virginia Tech, USA.

Potts, K (2009) Construction during World War II: Management and financial administration. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.

Powell, A; Bagilhole, B M; Dainty, A R J and Neale, R H (2004) An investigation of women's career choice in construction. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Pugh, T E (1994) Design-construction interface performance on traditional capital improvement projects. PhD thesis, University of Texas at Austin, USA.

Reeve, A C; Desha, C; Hargreaves, D and Hargroves, K (2015) Biophilic urbanism: Contributions to holistic urban greening for urban renewal. Smart and Sustainable Built Environment, 4(2), pp. 215-233. ISSN 2046-6099

Rehan, A; Thorpe, D and Heravi, A (2025) An empirical study on project managers' leadership behavioral practices impacting project success–the Australian construction sector. International Journal of Construction Education and Research, 21(2), pp. 164-188. ISSN 1557-8771

Rose, T; Manley, K and Widen, K (2019) Do firm-level barriers to construction product innovation adoption vary according to position in the supply chain? Construction Innovation, 19(2), pp. 212-235. ISSN 1471-4175

Rowings, J E; Federle, M O and Birkland, S A (1996) Characteristics of the craft workforce. Journal of Construction Engineering and Management, 122(1), pp. 83-90. ISSN 0733-9364

Said, H and El-Rayes, K (2011) Optimizing material procurement and storage on construction sites. Journal of Construction Engineering and Management, 137(6), pp. 421-431. ISSN 0733-9364

Sami Ur Rehman, M; Shafiq, M T and Afzal, M (2022) Impact of COVID-19 on project performance in the UAE construction industry. Journal of Engineering, Design and Technology, 20(1), pp. 245-266. ISSN 1726-0531

Sampath, D; De Silva, N and Withanage, K T (2020) Entrepreneurial potentials in Sri Lankan quantity surveyors. International Journal of Construction Management, 23(1), pp. 48-57. ISSN 1562-3599

Sandbhor, S and Botre, R (2014) Applying total interpretive structural modeling to study factors affecting construction labour productivity. Construction Economics and Building, 14(1), pp. 20-31. ISSN 2204-9029

Savoie, É; Sapinski, J P and Laroche, A M (2025) Key factors for revitalising heritage buildings through adaptive reuse. Buildings & Cities, 6(1), pp. 103-120. ISSN 2632-6655

Scott-Young, C M; Turner, M and Holdsworth, S (2020) Male and female mental health differences in built environment undergraduates. Construction Management and Economics, 38(9), pp. 789-806. ISSN 01446193

Sedighi, F and Loosemore, M (2012) Employer-of-choice characteristics in the construction industry. Construction Management and Economics, 30(11), pp. 941-950. ISSN 1466433X

Sheibani, G and Havard, T (2005) The government role in housing in libya during the period 1970: 2000. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.

Shiha, A and El-Adaway, I H (2025) Localized multivariate statistical assessment of United States construction labor shortages. Journal of Construction Engineering and Management, 151(8): 04025097, ISSN 0733-9364

Shiha, A and El-adaway, I H (2025) Identifying early warning signs of construction labor shortages. Construction Management and Economics, 43(10), pp. 765-793. ISSN 0144-6193

Siriwardhana, S and Moehler, R (2024) Mastering the skills of construction 4.0: A review of the literature using science mapping. Smart and Sustainable Built Environment, 13(4), pp. 989-1014. ISSN 2046-6099

Skibniewski, M and Molinski, J (1989) Modelling of building production activities for multifacility projects. Construction Management and Economics, 7(4), pp. 357-365. ISSN 01446193

Soto Ortiz, S.; Kang, K.; Hubbard, B. and Besiktepe, D. (2026) Supply chain disruption risks in U.S. Construction industry: Post-pandemic perspectives. Construction Management and Economics, 44(9), pp. 703-720. ISSN 0144-6193

Srour, I M (2005) A linear programming approach to optimize strategic investment in the construction workforce. PhD thesis, University of Texas at Austin, USA.

Steele, A and Todd, S (2005) The future of the black and minority ethnic (BME) construction sector in England. Construction Management and Economics, 23(10), pp. 1017-1023. ISSN 01446193

Stevens, J D and Murray, A L (1994) Modified roof erection system. Journal of Construction Engineering and Management, 120(4), pp. 828-837. ISSN 0733-9364

Stewart, L (2022) Business strategies for reducing professional labor shortages within the u.S. Construction industry. DBA thesis, Walden University, USA.

Sun, G; Sun, J and Li, F (2022) Influencing factors of early termination for PPP projects based on multicase grounded theory. Journal of Construction Engineering and Management, 148(11): 04022120, ISSN 0733-9364

Sundqvist, J; Larsson, B and Lindahl, G (2007) Cooperation in the building sector between building material manufacturers and contractors to develop products. Construction Economics and Building, 7(2), pp. 45-53. ISSN 2204-9029

Sweis, G J (2000) Impact of conversion technology on productivity in masonry construction. PhD thesis, Northwestern University, USA.

Thurairajah, N; Rathnasinghe, A; Brough, J and Jayathilaka, G (2022) The toxic triangle of small and medium-sized enterprise housebuilding: A review of the UK housing industry's dilemma. In: Tutesigensi, A and Neilson, C J (eds.) Proceedings of 38th Annual ARCOM Conference, 5-7 September 2022, Glasgow Caledonian University, Glasgow, UK.

Tserng, H P; Yin, S Y L and Li, S (2006) Developing a resource supply chain planning system for construction projects. Journal of Construction Engineering and Management, 132(4), pp. 393-407. ISSN 0733-9364

Valdes-Vasquez, R (2011) Social sustainability considerations during planning and design: A framework of processes for construction projects. PhD thesis, Clemson University, USA.

Vereen, S C (2013) Forecasting skilled labor demand in the US construction industry. PhD thesis, North Carolina State University, USA.

Wall, C M (2004) New ways of building: Architects, operatives and industrialised production in britain 1940-70. PhD thesis, University of Cambridge, UK.

Wan, M.; Li, L.; Yuan, M. and Yin, X. (2026) Modeling stakeholder-associated risk networks in the life cycle of building-integrated photovoltaic projects. Engineering, Construction and Architectural Management, 33(7), pp. 5469-5494. ISSN 0969-9988

Wang, Y; Goodrum, P M; Haas, C T and Glover, R W (2009) Analysis of observed skill affinity patterns and motivation for multiskilling among craft workers in the U.S. Industrial construction sector. Journal of Construction Engineering and Management, 135(10), pp. 999-1008. ISSN 0733-9364

Watson, M (2007) Concerns for skills shortages in the 21st century: A review into the construction industry, Australia. Construction Economics and Building, 7(1), pp. 45-54. ISSN 2204-9029

Whittock, M (2002) Women's experiences of non-traditional employment: Is gender equality in this area a possibility? Construction Management and Economics, 20(5), pp. 449-456. ISSN 01446193

Yang, H; Li, H; Wang, G and Cao, D (2025) Interregional migration of construction workers in China: Roles of employment opportunities and environment amenities. Engineering, Construction and Architectural Management, 32(1), pp. 87-108. ISSN 0969-9988

Yap, J B H; Lim, B L; Skitmore, M and Gray, J (2022) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 800-822. ISSN 1726-0531

Zafar, I; Wuni, I Y; Shen, G Q P; Ahmed, S and Yousaf, T (2022) A fuzzy synthetic evaluation analysis of time overrun risk factors in highway projects of terrorism-affected countries: The case of Pakistan. International Journal of Construction Management, 22(4), pp. 732-750. ISSN 1562-3599

Zakeri, M (1996) An evaluation of productivity and management practice in the Iranian construction industry. PhD thesis, University of Wolverhampton, UK.

Zarghami, S A (2022) Forecasting project duration in the face of disruptive events: A resource-based approach. Journal of Construction Engineering and Management, 148(5): 04022016, ISSN 0733-9364

This list was generated on Sat Aug 22 02:09:45 2026 UTC.