Items with Index Term: severity index
Abas, M; Khattak, S B; Habib, T and Nadir, U (2022) Assessment of critical risk and success factors in construction supply chain: A case of Pakistan. International Journal of Construction Management, 22(12), pp. 2258-2266. ISSN 1562-3599
Ailabouni, N; Painting, N and Ashton, P (2009) Factors affecting employee productivity in the UAE construction industry. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Al-Khalil, M I and Al-Ghafly, M A (1999) Important causes of delay in public utility projects in Saudi Arabia. Construction Management and Economics, 17(5), pp. 647-655. ISSN 01446193
AlAbbadi, G (2020) Development of a framework towards enhancing workers productivity in the Jordanian construction industry. PhD thesis, Coventry University, UK.
Alinaitwe, H; Apolot, R and Tindiwensi, D (2013) Investigation into the causes of delays and cost overruns in Uganda's public sector construction projects. Journal of Construction in Developing Countries, 18(2), pp. 33-47. ISSN 1823-6499
Alshdiefat, A S (2018) Developing an assessment model for the adoption of building information modelling to reduce the cost of change orders in the Jordanian construction industry. PhD thesis, University of Salford, UK.
Aniekwu, A (1995) The business environment of the construction industry in Nigeria. Construction Management and Economics, 13(6), pp. 445-455. ISSN 01446193
Ayodele, E O (2017) Development of a framework in minimising errors in construction documents in Nigeria. PhD thesis, University of Salford, UK.
Datta, S D; Akter, J; Rhyme, A N; Mamun, M A; Rana, M J and Abdullah, M S (2025) Assessing and mitigating building fire risk based on the scenario clusters in Bangladesh. International Journal of Construction Management, 25(12), pp. 1381-1394. ISSN 1562-3599
Edet, C B and Gidado, K (2008) PFI hospitals in the UK: Measuring the medical practitioners level of satisfaction. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Edike, U E (2023) Material management practices and factors influencing material conservation on construction sites in Nigeria. Journal of Engineering, Design and Technology, 21(4), pp. 1197-1211. ISSN 1726-0531
Elhag, T M S and Boussabaine, A H (1999) Evaluation of construction cost and time attributes. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Idrus A.B, N J B (2002) Construction related factors influencing the choice of concrete floor systems. Construction Management and Economics, 20(1), pp. 13-19. ISSN 01446193
Igwe, C; Nasiri, F and Hammad, A (2022) An empirical study on non-physical waste factors in the construction industry. Engineering, Construction and Architectural Management, 29(10), pp. 4088-4106. ISSN 0969-9988
Kwawu, W; Elhag, T and Ballal, T (2010) Knowledge transfer processes in PFI/PPP: Critical success factors. In: Egbu, C (ed.) Proceedings of 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK.
Lan, R; Adenuga, O and Awolusi, I (2025) Impact of construction project failure on key project stakeholders: Assessing the perspectives of professionals in Lagos metropolis. Construction Economics and Building, 25(3-4), pp. 90-120. ISSN 2204-9029
Marzuki, P; Oktavianus, A; Regina, A and Hasiholan, B (2019) Interface problems in change order-challenged projects. Journal of Construction in Developing Countries, 24(2), pp. 1-22. ISSN 1823-6499
Ogunbiyi, O E (2014) Implementation of the lean approach in sustainable construction: a conceptual framework. PhD thesis, University of Central Lancashire, UK.
Ogunsina, O; Ekwus Obiegbu, M and Adeniyi, O (2018) Factors confronting quantity surveying practice: The case of Nigeria. Journal of Engineering, Design and Technology, 16(5), pp. 767-782. ISSN 1726-0531
Okafor, C C; Ani, U S and Ugwu, O (2022) Evaluation of supply chain management lapses in nigeria’s construction industry. International Journal of Construction Education and Research, 18(2), pp. 103-122. ISSN 1557-8771
Okafor, C C; Sydney Ani, U and Ugwu, O (2024) Critical solutions to the lapses of supply chain management in Nigeria's construction industry. International Journal of Building Pathology and Adaptation, 42(4), pp. 768-787. ISSN 23984708
Omoregie, A (2006) Blueprints for infrastructure and service delivery in Sub-Saharan Africa. PhD thesis, De Montfort University, UK.
Owusu-Manu, D G; Mankata, L M; Debrah, C; Edwards, D J and Martek, I (2021) Mechanisms and challenges in financing renewable energy projects in Sub-Saharan Africa: A Ghanaian perspective. Journal of Financial Management of Property and Construction, 26(3), pp. 319-336. ISSN 1366-4387
Ramanathan, C; Narayanan, S P and Idrus, A B (2012) Construction delays causing risks on time and cost: a critical review. Construction Economics and Building, 12(1), pp. 37-57. ISSN 2204-9029
Shebob, A; Dawood, N; Shah, R K and Xu, Q (2012) Comparative study of delay factors in Libyan and the UK construction industry. Engineering, Construction and Architectural Management, 19(6), pp. 688-712. ISSN 0969-9988
Wuni, I Y; Shen, G Q and Saka, A B (2023) Computing the severities of critical onsite assembly risk factors for modular integrated construction projects. Engineering, Construction and Architectural Management, 30(5), pp. 1864-1882. ISSN 0969-9988
Up a level