Items with Index Term: sensitivity analysis

Number of items: 368.

Abbasi, M H (2024) Phasing out fossil fuel heating in UK homes: A multi-dimensional framework for sustainability assessment of alternatives and their lifecycle implications. PhD thesis, Liverpool John Moores University, UK.

Abdelgawad, M A M (2011) Hybrid decision support system for risk criticality assessment and risk analysis. PhD thesis, University of Alberta, Canada.

Abdelmageed, S; Abdelkhalek, S I F M; Hussien, M and Zayed, T (2024) A hybrid simulation model for modules installation in modular integrated construction projects. International Journal of Construction Management, 24(13), pp. 1407-1418. ISSN 1562-3599

Abdessalem, J; Fakhreddine, D; Said, A and Mohamed, H (2014) Shape optimization for a hyperelastic axisymmetric structure. Journal of Engineering, Design and Technology, 12(2), pp. 177-194. ISSN 1726-0531

Abdul Nabi, M and El-Adaway, I H (2021) Risk-based approach to predict the cost performance of modularization in construction projects. Journal of Construction Engineering and Management, 147(10): 04021133, ISSN 0733-9364

Abdul Nabi, M and El-Adaway, I H (2022) A proactive risk assessment framework to maximize schedule benefits of modularization in construction projects. Journal of Construction Engineering and Management, 148(7): 002311, ISSN 0733-9364

Abdullah, A (2003) Intelligent selection of demolition techniques. PhD thesis, Loughborough University, UK.

Adekunle, O O (2019) A linear programming-based optimization model to address skilled labor shortages through strategic investments in the construction industry. DEng thesis, Morgan State University, USA.

Adey, B T; Lethanh, N; Hartmann, A and Viti, F (2014) Evaluation of intervention strategies for a road link in the Netherlands. Built Environment Project and Asset Management, 4(2), pp. 180-198. ISSN 2044-124X

Aghimien, D; Aghimien, E I; Aigbavboa, C O; Aliu, J O; Oke, A E and Chan, D W M (2026) Strategies for enhancing construction digitalisation: A machine learning-based sensitivity analysis. Engineering, Construction and Architectural Management, 33(15), pp. 115-136. ISSN 0969-9988

Aghimien, D; Aigbavboa, C O; Chan, D W M and Aghimien, E I (2024) Determinants of cloud computing deployment in South African construction organisations using structural equation modelling and machine learning technique. Engineering, Construction and Architectural Management, 31(3), pp. 1037-1060. ISSN 0969-9988

Al Yami, H M A (2017) Decision making analysis for an integrated risk management framework of maritime container port infrastructure and transportation systems. PhD thesis, Liverpool John Moores University, UK.

Al-Humaidi, H M (2007) A fuzzy logic approach to model delays in construction projects. PhD thesis, Ohio State University, USA.

Al-Sakkaf, A; Bagchi, A; Zayed, T and Mahmoud, S (2023) Sustainability assessment model for heritage buildings. Smart and Sustainable Built Environment, 12(1), pp. 105-127. ISSN 2046-6099

Al-Smadi, H; Al-Sakkaf, A; Zayed, T and Nasiri, F (2023) An integrated space-based building maintenance management model using multi-objective optimization. Smart and Sustainable Built Environment, 12(2), pp. 277-297. ISSN 2046-6099

Alarc N, L F and Bastias, A (2000) A computer environment to support the strategic decision-making process in construction firms. Engineering, Construction and Architectural Management, 7(1), pp. 63-75. ISSN 0969-9988

Alarcón, L F; Ashley, D B; De Hanily, A S; Molenaar, K R and Ungo, R (2011) Risk planning and management for the Panama Canal expansion program. Journal of Construction Engineering and Management, 137(10), pp. 762-771. ISSN 0733-9364

Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads. PhD thesis, Heriot-Watt University, UK.

Alavipour, S M R and Arditi, D (2018) Optimizing financing cost in construction projects with fixed project duration. Journal of Construction Engineering and Management, 144(4): 04018012, ISSN 0733-9364

Ali, M M and Elazouni, A (2009) Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities. Construction Management and Economics, 27(9), pp. 839-856. ISSN 1466433X

Almalki, M; Salman, B; Salem, O and Ammoury, M (2026) A decision-support framework for accelerated wastewater pipeline construction: Integrating economic, social, environmental, and technical criteria. Journal of Construction Engineering and Management, 152(3): 04025263, ISSN 0733-9364

Almalki, M (2024) Accelerated wastewater pipeline construction. PhD thesis, Syracuse University, USA.

Alnaqbi, A; Al-Khateeb, G G and Zeiada, W (2025) Machine learning applications for predicting longitudinal cracking in continuously reinforced concrete pavement. Construction Economics and Building, 25(1), pp. 143-170. ISSN 2204-9029

Alsharqawi, M; Abu Dabous, S; Zayed, T and Hamdan, S (2021) Budget optimization of concrete bridge decks under performance-based contract settings. Journal of Construction Engineering and Management, 147(6): 04021040, ISSN 0733-9364

Alsharqawi, M; Zayed, T and Shami, A (2020) Ground penetrating radar-based deterioration assessment of RC bridge decks. Construction Innovation, 20(1), pp. 1-17. ISSN 1471-4175

Alshibani, A; El Ghazzawi, Y A; Mohammed, A; Ghaithan, A M and Hassanain, M A (2024) A multi-criteria decision-making model for heavy construction equipment replacement in Saudi Arabia. Journal of Financial Management of Property and Construction, 29(3), pp. 485-511. ISSN 1366-4387

Andrić, J M; Wang, J; Zou, P X W; Zhang, J and Zhong, R (2019) Fuzzy logic-based method for risk assessment of belt and road infrastructure projects. Journal of Construction Engineering and Management, 145(12): 4019082, ISSN 0733-9364

André, J P C G (2014) Determination of the main parameters affecting the performance of bridge falsework systems. PhD thesis, Oxford Brookes University, UK.

Anglade, Y J (1998) Development of methodology for highway agencies to follow in establishing optimum acceptance plans for pavements. PhD thesis, University of Florida, USA.

Arashpour, M; Wakefield, R; Blismas, N and Abbasi, B (2016) Quantitative analysis of rate-driven and due date-driven construction: Production efficiency, supervision, and controllability in residential projects. Journal of Construction Engineering and Management, 142(1): 05015012, ISSN 0733-9364

Arida, M A (2024) Enhancing thermal comfort in commercial buildings: Contributions of machine learning algorithms for optimizing predictive thermal comfort indices. PhD thesis, North Carolina Agricultural and Technical State University, USA.

Arocho Rosa, I d M (2015) The impact of transportation construction projects and activities on emissions. PhD thesis, North Carolina State University, USA.

Arowosafe, O I (2018) Contractors’ selection criteria for sustainable infrastructure delivery in Nigeria. PhD thesis, University of Derby, UK.

Assad, M; Hosny, O; Elhakeem, A and El Haggar, S (2015) Green building design in Egypt from cost and energy perspectives. Architectural Engineering and Design Management, 11(1), pp. 21-40. ISSN 1745-2007

Atiq Ur Rehman, M; Chaabane, A and Khan, S A (2026) A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: A case study in building renovation. International Journal of Construction Management, 26(1), pp. 29-53. ISSN 1562-3599

Atiq Ur Rehman, M.; Khan, S. A. and Chaabane, A. (2026) An integrated decision support model for early planning in off-site construction projects. Journal of Construction Engineering and Management, 152(9): 04026142, ISSN 0733-9364

Attalla, M M A M (2000) Reconstruction of operating facilities: A model for project management. PhD thesis, University of Waterloo, Canada.

Badawy, M; El-Sheikh, R and Hamdy, K (2025) Sensitivity analysis of key factors influencing concession period estimation in PPP wastewater treatment projects: A system dynamics approach. Construction Economics and Building, 25(3-4), pp. 65-89. ISSN 2204-9029

Badran, Y (2020) Analysis of construction and stakeholder risks for Public Private Partnership projects in developing countries: a comparative analysis using Artificial Neural Networks to determine the effect of poor stakeholder management and construction risks on the project's schedule (PPP vs. traditional projects). PhD thesis, University of Salford, UK.

Bastos, J; Batterman, S A and Freire, F (2016) Significance of mobility in the life-cycle assessment of buildings. Building Research & Information, 44(4), pp. 376-393. ISSN 0961-3218

Benjaoran, V; Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(1), pp. 93-105. ISSN 01446193

Bon, R (1988) Replacement simulation model: A framework for building portfolio decisions. Construction Management and Economics, 6(2), pp. 149-159. ISSN 01446193

Bortolini, R and Forcada, N (2020) A probabilistic performance evaluation for buildings and constructed assets. Building Research & Information, 48(8), pp. 838-855. ISSN 0961-3218

Cadenazzi, T; Keles, B; Rahman, M K and Nanni, A (2022) Life-cycle cost and life-cycle assessment of a monumental fiber-reinforced polymer reinforced concrete structure. Journal of Construction Engineering and Management, 148(9): 05022007, ISSN 0733-9364

Castro-Lacouture, D; Süer, G A; Gonzalez-Joaqui, J and Yates, J K (2009) Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method. Journal of Construction Engineering and Management, 135(10), pp. 1096-1104. ISSN 0733-9364

Celik, T (1989) Improving concrete quality by using an expert system. PhD thesis, Loughborough University, UK.

Chanyotha, S (1991) Generic cost estimates, site screening, and site design of low- and intermediate-level waste system. PhD thesis, University of Arizona, USA.

Chau, A D; Hoang, H T and Nguyen, L D (2025) Web-based decision support system for automated pavement design and life-cycle cost analysis. Journal of Construction Engineering and Management, 151(8): 05025004, ISSN 0733-9364

Chauhan, S S (1999) Dam safety risk assessment modeling with uncertainty analysis. PhD thesis, Utah State University, USA.

Cheung, S-O (1998) Project dispute resolution satisfaction of construction clients in Hong Kong. PhD thesis, University of Wolverhampton, UK.

Chew, M Y L; De Silva, N and Tan, S S (2004) A neural network approach to assessing building façade maintability in the tropics. Construction Management and Economics, 22(6), pp. 581-594. ISSN 0144-6193

Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.

Choudhary, K; Gill, G; Sangwa, N R and Sarna, B (2025) Utilising copper tailings as a sustainable alternative to conventional structural filling materials: LCA analysis. Built Environment Project and Asset Management, 15(3), pp. 415-431. ISSN 2044-124X

Chowdhury, R (2009) Life cycle based analysis of various materials used in road construction. PhD thesis, University of Toledo, USA.

Chung, J H (2015) Optimizing financial structure of transportation public-private partnership infrastructure projects based on traffic revenue risks: Case study of US DBFOM project. PhD thesis, University of Florida, USA.

Conejos, S; Ubando, A and Lin Chew, M Y (2022) Design for maintainability tool for nano-façade coating applications on high-rise façades in the tropics. Built Environment Project and Asset Management, 12(1), pp. 70-95. ISSN 2044-124X

Cottrell, D S (1995) Enhancing construction productivity through continuous process improvements. PhD thesis, Texas A&M University, USA.

Craighill, A L (2002) Lifecycle assessment and evaluation of construction and demolition waste management. PhD thesis, University of East Anglia, UK.

Davis II, D C E (2023) Algorithmic design in recommender systems: Expanding DBE participation in the U.S. construction industry. DBA thesis, University of South Florida, USA.

Delgado, J M P Q; Ramos, N M M; Barreira, E and Simões, M L (2014) Probabilistic risk assessment methodology of exterior surfaces defacement caused by algae growth. Journal of Construction Engineering and Management, 140(12): 05014012, ISSN 0733-9364

Deshpande, S D (1988) Some facility planning techniques for construction site layouts. PhD thesis, Indian Institute of Technology Delhi, India.

Dhanasekar, M (2000) Identification of optimal size resources for a repetitive housing construction. Engineering, Construction and Architectural Management, 7(4), pp. 347-361. ISSN 0969-9988

Dias Jr, A and Ioannou, P G (1996) Company and project evaluation model for privately promoted infrastructure projects. Journal of Construction Engineering and Management, 122(1), pp. 71-82. ISSN 0733-9364

Dobossy, M E (2006) Simulation-based seismic reliability assessment of complex structural systems. PhD thesis, Princeton University, USA.

Dong, Z; Qin, R; Zou, P; Yao, X; Cui, P; Zhang, F and Yang, Y (2025) Occupational health risk assessment of PC production-caused pollution based on damage assessment and cyclic mitigation model. Engineering, Construction and Architectural Management, 32(6), pp. 3679-3699. ISSN 0969-9988

Doukari, O; Kassem, M; Scoditti, E; Aguejdad, R and Greenwood, D (2024) A BIM based tool for evaluating building renovation strategies: The case of three demonstration sites in different European countries. Construction Innovation, 24(1), pp. 365-383. ISSN 1471-4175

Du, J; El-Gafy, M and Zhao, D (2016) Optimization of change order management process with object-oriented discrete event simulation: Case study. Journal of Construction Engineering and Management, 142(4): 05015018, ISSN 0733-9364

Easa, S M and Can, E K (1985) Optimization model for aggregate blending. Journal of Construction Engineering and Management, 111(3), pp. 216-230. ISSN 0733-9364

Ebrahimy, Y; AbouRizk, S M; Fernando, S and Mohamed, Y (2011) Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. Engineering, Construction and Architectural Management, 18(5), pp. 462-480. ISSN 0969-9988

Edwards, D J; Yang, J; Wright, B C and Love, P E D (2007) Establishing the link between plant operator performance and personal motivation. Journal of Engineering, Design and Technology, 5(2), pp. 173-187. ISSN 1726-0531

El-Mashaleh, M S; Hyari, K H; Bdour, A N and Rababeh, S M (2016) A multi-attribute decision-making model for construction enterprise resource planning system selection. International Journal of Construction Education and Research, 12(1), pp. 66-79. ISSN 1557-8771

El-Sayegh, S (2018) Resource levelling optimization model considering float loss impact. Engineering, Construction and Architectural Management, 25(5), pp. 639-653. ISSN 0969-9988

El-Sayegh, S M (2009) Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27(4), pp. 385-398. ISSN 1466433X

Elazouni, A M and Metwally, F G (2000) D-sub: Decision support system for subcontracting construction works. Journal of Construction Engineering and Management, 126(3), pp. 191-199. ISSN 0733-9364

Elbashbishy, T and El-Adaway, I H (2023) System dynamic modeling to study the impact of construction industry characteristics and associated macroeconomic indicators on workforce size and labor retention rate. Journal of Construction Engineering and Management, 149(10): 04023100, ISSN 0733-9364

Elhag, T M S (2004) Tender price modelling: artificial neural networks and regression techniques. PhD thesis, University of Liverpool, UK.

Elhakeem, A and Hegazy, T (2005) Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131(2), pp. 168-175. ISSN 0733-9364

Elkadi, Karim (2024) BIM-enabled facility management framework and simulation. PhD thesis, George Mason University, USA.

Elmisalami, T E (2001) Developing a multi-attribute utility model (MAUM) for selecting information technologies in the construction industry. PhD thesis, Iowa State University, USA.

Elmousalami, H H; Elyamany, A H and Ibrahim, A H (2018) Predicting conceptual cost for field canal improvement projects. Journal of Construction Engineering and Management, 144(11): 04018102, ISSN 0733-9364

Elnady, Ahmed Abdelrady Okasha Mohamed (2023) An integrated framework for balancing contractor's workload versus capacity using system dynamics. PhD thesis, University of Alberta, Canada.

Elshaboury, N and Marzouk, M (2021) Optimizing construction and demolition waste transportation for sustainable construction projects. Engineering, Construction and Architectural Management, 28(9), pp. 2411-2425. ISSN 0969-9988

Essah, E A; Sanders, C H; Baker, P and Kalagasidis, A S (2009) Condensation and moisture transport in cold roofs: Effects of roof underlay. Building Research & Information, 37(2), pp. 117-128. ISSN 0961-3218

Etemadinia, H and Tavakolan, M (2021) Using a hybrid system dynamics and interpretive structural modeling for risk analysis of design phase of the construction projects. International Journal of Construction Management, 21(1), pp. 93-112. ISSN 1562-3599

Ezeldin, A S and Sharara, L M (2006) Neural networks for estimating the productivity of voncreting activities. Journal of Construction Engineering and Management, 132(6), pp. 650-656. ISSN 0733-9364

Fan, S L; Yeh, I C and Chi, W S (2021) Improvement in estimating durations for building projects using artificial neural network and sensitivity analysis. Journal of Construction Engineering and Management, 147(7): 04021050, ISSN 0733-9364

Fathy, A E A E R; Abdel-Hamid, M and Abdelhaleem, H M (2025) Developing a predictive maintenance model for the rehabilitation of roads' assets. International Journal of Construction Management, 25(4), pp. 398-408. ISSN 1562-3599

Felllows, R F (1988) Escalation management. PhD thesis, University of Reading, UK.

Fellows, R F (1991) Escalation management: Forecasting the effects of inflation on building projects. Construction Management and Economics, 9(2), pp. 187-204. ISSN 01446193

Firth, S K; Lomas, K J and Wright, A J (2010) Targeting household energy-efficiency measures using sensitivity analysis. Building Research & Information, 38(1), pp. 25-41. ISSN 0961-3218

Fuller, R J and Luther, M B (2003) Simulation of condensation problems in a roller-skating centre. Building Research & Information, 31(1), pp. 48-59. ISSN 0961-3218

Gallego, E; Fuentes, J M; Ramírez, A and Ayuga, F (2010) Design of tall formworks by a finite-element model. Journal of Construction Engineering and Management, 136(7), pp. 803-810. ISSN 0733-9364

Gbadamosi, S L and Nwulu, N I (2020) Optimal planning of renewable energy systems for power loss reduction in transmission expansion planning. Journal of Engineering, Design and Technology, 18(5), pp. 1209-1222. ISSN 1726-0531

Ghasemi, M; Chakrabortty, R K; Shahabi-Shahmiri, R and Mirnezami, S A (2024) A chance-constrained programming method with credibility measure for solving the multi-skill multi-mode resource-constrained project scheduling problem. International Journal of Construction Management, 24(10), pp. 1090-1106. ISSN 1562-3599

Ghorbani Naeini, H; Norouziasas, A; Piraei, F; Kazemi, M; Kazemi, M and Hamdy, M (2024) Impact of building envelope parameters on occupants’ thermal comfort and energy use in courtyard houses. Architectural Engineering and Design Management, 20(6), pp. 1725-1751. ISSN 1745-2007

Ghorbany, S; Yousefi, S and Noorzai, E (2024) Evaluating and optimizing performance of public-private partnership projects using copula Bayesian network. Engineering, Construction and Architectural Management, 31(1), pp. 290-323. ISSN 0969-9988

Giustozzi, F (2012) Life cycle assessment of sustainable road pavements: Carbon footprinting and multi-attribute analysis. PhD thesis, Virginia Polytechnic Institute and State University, USA.

Gonzalez-Quevedo, A A (1991) Sensitivity analysis of construction simulation. PhD thesis, Purdue University, USA.

Gransberg, D D (2004) Life cycle evaluation criteria for design-build highway pavement projects. PhD thesis, University of Colorado at Boulder, USA.

Guan, Li (2022) An integrated decision support system for project risk assessment and treatment decision making considering risk interdependencies. PhD thesis, University of New South Wales, Australia.

Gunaydin, H M (1999) Impact of information technologies on project management functions. PhD thesis, Illinois Institute of Technology, USA.

Guo, J; Chen, J and Xie, Y (2022) Determining a reasonable concession period for risky transportation BOT projects with government subsidies based on cumulative prospect theory. Engineering, Construction and Architectural Management, 29(3), pp. 1396-1426. ISSN 0969-9988

Guo, K; Zhang, L and Wang, T (2021) Concession period optimisation in complex projects under uncertainty: A public-private partnership perspective. Construction Management and Economics, 39(2), pp. 156-172. ISSN 01446193

Guo, Q L (2001) Development of risk analysis models for decision-making in project management. PhD thesis, Edinburgh Napier University, UK.

Guo, Y; Su, Y; Chen, C and Martek, I (2024) Inclusion of "managing flexibility" valuations in the pricing of PPP projects: A multi-objective decision-making method. Engineering, Construction and Architectural Management, 31(11), pp. 4562-4584. ISSN 0969-9988

Gurgun, A P and Koc, K (2022) Administrative risks challenging the adoption of smart contracts in construction projects. Engineering, Construction and Architectural Management, 29(2), pp. 989-1015. ISSN 0969-9988

Haddad, S; Osmond, P and King, S (2019) Application of adaptive thermal comfort methods for Iranian schoolchildren. Building Research & Information, 47(2), pp. 173-189. ISSN 0961-3218

Hadizadeh-Bazaz, M.; Navarro, I. J. and Yepes, V. (2026) Smart integration of non-destructive damage detection and life-cycle assessment for sustainable maintenance of coastal bridges. Smart and Sustainable Built Environment, pp. 1-27. ISSN 2046-6099

Haidar, A; Naoum, S; Howes, R and Tah, J (1999) Genetic algorithms application and testing for equipment selection. Journal of Construction Engineering and Management, 125(1), pp. 32-38. ISSN 0733-9364

Hajji, A M and Lewis, P (2013) Development of productivity-based estimating tool for energy and air emissions from earthwork construction activities. Smart and Sustainable Built Environment, 2(1), pp. 84-100. ISSN 2046-6099

Hamida, A; Alsudairi, A; Alshaibani, K and Alshamrani, O (2022) Parametric study of the impact of building envelope systems on embodied and operational carbon of residential buildings. International Journal of Building Pathology and Adaptation, 40(5), pp. 753-774. ISSN 23984708

Han, J; Chen, C; Tiong, R L K; Wu, K and Chew, D K H (2024) Strategic workforce planning for production of prefabricated bathroom units: An advanced markovian approach. Journal of Construction Engineering and Management, 150(8): 04024097, ISSN 0733-9364

Han, J; Gu, F and Wu, G (2023) Managing cooperation in multipartner project teams with heterogeneous team members. Journal of Construction Engineering and Management, 149(10): 04023101, ISSN 0733-9364

Hanna, A S; Camlic, R; Peterson, P A and Lee, M J (2004) Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), pp. 762-771. ISSN 0733-9364

Hao, J L J (2002) Better use of information: A simulation model for international construction joint ventures in China. PhD thesis, Hong Kong Polytechnic University, Hong Kong.

Harputlugil, G U; Harputlugil, T and De Wilde, P (2009) Thermal design of Turkish schools: Prospects for an improved pre-design process. Architectural Engineering and Design Management, 5(3), pp. 153-164. ISSN 1745-2007

Hartwig, J and Kockat, J (2016) Macroeconomic effects of energetic building retrofit: Input-output sensitivity analyses. Construction Management and Economics, 34(2), pp. 79-97. ISSN 01446193

Hashemi, R and Shahbandarzadeh, H (2024) A fuzzy goal programming model for time, cost, and quality trade-off problem in metro construction projects considering sustainable development. International Journal of Construction Management, 24(3), pp. 323-330. ISSN 1562-3599

Hassan, M M and Gruber, S (2008) Application of discrete-event simulation to study the paving operation of asphalt concrete. Construction Innovation, 8(1), pp. 7-22. ISSN 1471-4175

Hassan, M M and Gruber, S (2008) Simulation of concrete paving operations on Interstate-74. Journal of Construction Engineering and Management, 134(1), pp. 2-9. ISSN 0733-9364

Hazrati, A (2016) Predicting construction labor productivity with Bayesian belief networks. PhD thesis, University of Nebraska - Lincoln, USA.

Hegazy, T and Ayed, A (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, 124(3), pp. 210-218. ISSN 0733-9364

Heravi, G and Eslamdoost, E (2015) Applying artificial neural networks for measuring and predicting construction-labor productivity. Journal of Construction Engineering and Management, 141(10): 04015032, ISSN 0733-9364

Heravi, G; Taherkhani, A H; Sobhkhiz, S; Mashhadi, A H and Zahiri-Hashemi, R (2022) Integrating risk management's best practices to estimate deep excavation projects' time and cost. Built Environment Project and Asset Management, 12(2), pp. 180-204. ISSN 2044-124X

Heydari, M; Heravi, G; Raeisinafchi, R and Karimi, H (2024) A dynamic model to assess the role of site supervision systems in the safety performance of construction projects. Journal of Construction Engineering and Management, 150(3): 04024001, ISSN 0733-9364

Ho, C T T (2019) Application of optimization to the production planning of construction prefabrication supply chains. PhD thesis, University of Washington, USA.

Hopfe, C J (2009) Uncertainty and sensitivity analysis in building performance simulation for decision support and design optimization. PhD thesis, Eindhoven University of Technology, Netherlands.

Huang, Y; Chen, R; Guo, P and Duan, Z (2025) Research on contractor claim strategy based on the principle of maximizing profits by using evolutionary game model. Engineering, Construction and Architectural Management, 32(12), pp. 8423-8444. ISSN 0969-9988

Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation. PhD thesis, University of Wisconsin - Madison, USA.

Hughes, M; Palmer, J; Cheng, V and Shipworth, D (2013) Sensitivity and uncertainty analysis of england's housing energy model. Building Research & Information, 41(2), pp. 156-167. ISSN 0961-3218

Hulio, Z H and Jiang, W (2020) An assessment of effects of non-stationary operational conditions on wind turbine under different wind scenario. Journal of Engineering, Design and Technology, 18(1), pp. 102-121. ISSN 1726-0531

Ibbs, C W J (1980) Risk, complex decision-making and the application of multiattribute utility analysis in the construction industry. PhD thesis, University of California, Berkeley, USA.

Ibraheem, Y; Piroozfar, P A E; Farr, E R P and Ravenscroft, N (2020) Methodological evaluation of integrated façade systems: Sensitivity analysis of net energy in a base-case model. International Journal of Building Pathology and Adaptation, 38(1), pp. 107-126. ISSN 23984708

Illankoon, Illankoon Mudiyanselage Chethana Sanathani (2018) A life-cycle cost model for green commercial office buildings with optimal green star credits. PhD thesis, Western Sydney University, Australia.

Ioannou, P G (2022) Risk-sensitive competitive bidding model and impact of risk aversion and cost uncertainty on optimum bid. Journal of Construction Engineering and Management, 148(3): 04021205, ISSN 0733-9364

Iqbal, M.; Fan, Y.; Ahmad, N. and Altaf, M. (2026) DEMATEL-ML-ISM decision framework for prioritizing smart contract security risks in blockchain-enabled construction projects. Journal of Construction Engineering and Management, 152(8): 04026108, ISSN 0733-9364

Iqbal, M.; Fan, Y.; Ahmad, N. and Altaf, M. (2026) DEMATEL–ML–ISM decision framework for prioritizing smart contract security risks in blockchain-enabled construction projects. Journal of Construction Engineering and Management, 152(8): 04026108, ISSN 0733-9364

Jahangiri, M; Haghani, A; Heidarian, S; Mostafaeipour, A; Raiesi, H A and Alidadi Shamsabadi, A (2020) Sensitivity analysis of using solar cells in regional electricity power supply of off-grid power systems in Iran. Journal of Engineering, Design and Technology, 18(6), pp. 1849-1866. ISSN 1726-0531

Jalilzadehazhari, E; Johansson, P; Johansson, J and Mahapatra, K (2017) Application of analytical hierarchy process for selecting an interior window blind. Architectural Engineering and Design Management, 13(4), pp. 308-324. ISSN 1745-2007

Jang, S G (2011) A concessionaire selection decision model: development and application for the PPP project procurement. PhD thesis, University of Southampton, UK.

Jaselskis, E J (1988) Achieving construction project success through predictive discrete choice models. PhD thesis, University of Texas at Austin, USA.

Jiang, A (2012) Negotiating construction contracts through practical cash flow planning and analysis model. International Journal of Construction Management, 12(2), pp. 23-33. ISSN 1562-3599

Jin, Y (2013) Evaluating infrastructure performance to assist facility management toward sustainable systems. PhD thesis, Michigan Technological University, USA.

Jorge, J (1990) Model of uniform cost policies and procedures for the establishment of construction equipment rates. PhD thesis, University of Florida, USA.

Jrade, A (2004) Integrated conceptual cost estimating and life cycle costing system for building projects. PhD thesis, Concordia University, Canada.

Junnila, S (2004) The environmental impact of an office building throughout its life cycle. PhD thesis, Helsinki University of Technology, Finland.

Kaboli, A S and Carmichael, D G (2014) Truck dispatching and minimum emissions earthmoving. Smart and Sustainable Built Environment, 3(2), pp. 170-186. ISSN 2046-6099

Kaboli, Alireza (2014) Cost and emissions analysis of earthmoving operations. PhD thesis, University of New South Wales, Australia.

Kang, Y-J (2000) Minimum life-cycle cost structural design against natural hazards. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Kangari, R (1982) Construction project selection under risk: Market model approach. PhD thesis, University of Illinois at Urbana-Champaign, USA.

Karunyasopon, P; Park, D Y; Le, D M and Chang, S (2024) Performance analysis of transparent BIPV/T double skin façades integrated with the decision-making algorithm for mixed-mode building ventilation. Architectural Engineering and Design Management, 20(5), pp. 1141-1163. ISSN 1745-2007

Kassab, M; Hipel, K and Hegazy, T (2006) Conflict resolution in construction disputes using the graph model. Journal of Construction Engineering and Management, 132(10), pp. 1043-1052. ISSN 0733-9364

Kebriyaii, O; Heidari, A; Khalilzadeh, M and Pamucar, D (2025) A green project scheduling with material ordering problem considering cost constraints and quality of materials. Engineering, Construction and Architectural Management, 32(8), pp. 4991-5018. ISSN 0969-9988

Khanh, K D; Minh, N V and Dinh Thuc, L (2025) Enhancing the accuracy of construction project completion estimates by incorporating updated timing-based error margins (utems). International Journal of Construction Management, 25(15), pp. 1859-1868. ISSN 1562-3599

Kim, B C and Kim, H J (2014) Sensitivity of earned value schedule forecasting to S-curve patterns. Journal of Construction Engineering and Management, 140(7): 04014023, ISSN 0733-9364

Kishk, M; Pollock, R and Okhuahesogie, E (2004) Sensitivity of simulated whole-life costs to input probability distributions. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.

Koc, K and Pelin Gurgun, A (2021) Assessment of readability risks in contracts causing conflicts in construction projects. Journal of Construction Engineering and Management, 147(6): 20202277, ISSN 0733-9364

Kostuk, K J (2003) Quantifying the uncertainty associated with long-term maintenance contracts. PhD thesis, University of Saskatchewan, Canada.

Krych, K; Heeren, N and Hertwich, E G (2021) Factors influencing the life-cycle GHG emissions of Brazilian office buildings. Buildings & Cities, 2(1), pp. 856-873. ISSN 2632-6655

Kurniawan, F; Ogunlana, S and Motawa, I (2014) Stakeholders' expectations in utilising financial models for public-private partnership projects. Built Environment Project and Asset Management, 4(1), pp. 4-21. ISSN 2044-124X

Lachance, E; Lehoux, N and Blanchet, P (2023) A simulation model to analyze different automation scenarios in a mixed-assembly manufacturing line: Timber-frame prefabrication industry. Journal of Construction Engineering and Management, 149(10): 04023091, ISSN 0733-9364

Lam, E W M; Chan, A P C; Olawumi, T O; Wong, I and Kazeem, K O (2024) Sustainability concepts in global high-rise residential buildings: A scientometric and systematic review. Smart and Sustainable Built Environment, 13(2), pp. 425-443. ISSN 2046-6099

Lambropoulos, S; Manolopoulos, N and Pantouvakis, J P (1996) Semantic: Smart earthmoving analysis and estimation of cost. Construction Management and Economics, 14(2), pp. 79-92. ISSN 01446193

Laura-Portugal, C. and Hammad, A. (2026) Deep learning-based forecasting for construction project duration at completion. International Journal of Construction Management, 26(8), pp. 1543-1561. ISSN 1562-3599

Lawal, Y S; Ibrahim, A M; Abubakar, M; Ishaq, Z H and Sa'ad, M M (2023) A simulation-based binomial model for building development appraisal. Journal of Engineering, Design and Technology, 21(1), pp. 75-107. ISSN 1726-0531

Lee, C (2023) Evaluating construction delays using productivity-based resource reallocation for economic feasibility. Engineering, Construction and Architectural Management, 30(4), pp. 1679-1696. ISSN 0969-9988

Lee, E B (2000) Constructability and productivity analysis for long life pavement rehabilitation strategies (LLPRS). PhD thesis, University of California, Berkeley, USA.

Leu, S S; Huang, K J; Hung, C C W and Wu, P L (2024) Revolutionizing steel building project cost overrun risk assessment by Bayesian network. Engineering, Construction and Architectural Management, 31(12), pp. 4975-4987. ISSN 0969-9988

Ley, J D (2004) An environmental and material flow analysis of the UK steel construction sector. EngD thesis, Cardiff University, UK.

Li, X.; Lin, M.; Chen, J. and Jim, C. Y. (2026) A lifecycle-based risk assessment framework for prefabricated building supply chains using G1-entropy weight and cloud matter-element models. Engineering, Construction and Architectural Management, 33(7), pp. 5645-5674. ISSN 0969-9988

Li, C Q (2000) A method for reliability-based economic design of building structures. Building Research & Information, 28(4), pp. 260-267. ISSN 0961-3218

Li, H; Jin, Z; Li, V; Liu, G and Skitmore, R M (2013) An entry mode decision-making model for the international expansion of construction enterprises. Engineering, Construction and Architectural Management, 20(2), pp. 160-180. ISSN 0969-9988

Li, H X; Ma, Z; Liu, H; Wang, J; Al-Hussein, M and Mills, A (2020) Exploring and verifying BIM-based energy simulation for building operations. Engineering, Construction and Architectural Management, 27(8), pp. 1679-1702. ISSN 0969-9988

Li, Y; Zhang, L; Liu, X and Li, X (2025) A project scheduling optimization model for reducing construction dust emissions based on variability in meteorological conditions. Journal of Construction Engineering and Management, 151(11): 04025171, ISSN 0733-9364

Liang, D (2001) Improved reliability and economic modeling for new and retrofitted low-rise structures subjected to extreme wind hazards. PhD thesis, State University of New York at Buffalo, USA.

Liang, R; Li, R and Chong, H Y (2023) Decision-making model for evaluating joint venture contractors in construction of complex infrastructure megaprojects. Journal of Construction Engineering and Management, 149(9): 04023071, ISSN 0733-9364

Liu, W; Chan, A P C; Debrah, C and Darko, A (2026) Evaluating project success for emergency healthcare infrastructure based on the cloud matter-element model. Journal of Construction Engineering and Management, 152(5): 04026038, ISSN 0733-9364

Liu, W; Feng, Z and Luo, X (2026) Study of a risk-sharing mechanism in a prefabricated building project supply chain. Journal of Construction Engineering and Management, 152(6): 04026063, ISSN 0733-9364

Liu, S; Jin, H; Liu, C; Xie, B and Mills, A (2022) Development and testing of a rent determination framework for PPP rental villages. International Journal of Construction Management, 22(2), pp. 192-204. ISSN 1562-3599

Lowe, R (2007) Technical options and strategies for decarbonizing UK housing. Building Research & Information, 35(4), pp. 412-425. ISSN 0961-3218

Lu, H (2002) Extended production integration for construction (epic): An integration system for building construction. PhD thesis, University of Florida, USA.

Lu, M (2000) Productivity studies using advanced ANN models. PhD thesis, University of Alberta, Canada.

Lu, Y; Liu, J and Yu, W (2024) Social risk analysis for mega construction projects based on structural equation model and bayesian network: A risk evolution perspective. Engineering, Construction and Architectural Management, 31(7), pp. 2604-2629. ISSN 0969-9988

Lucko, G; Vorster, M C and Anderson-Cook, C M (2007) Unknown element of owning costs-impact of residual value. Journal of Construction Engineering and Management, 133(1), pp. 3-9. ISSN 0733-9364

Luo, L; Niu, X; Jiang, K; Bo, Q and Zhou, D (2026) Fuzzy cognitive map-based approach for measuring megaproject complexity considering dynamic interactions. Journal of Construction Engineering and Management, 152(2): 04025255, ISSN 0733-9364

Luo, L; Wu, X; Hong, J and Wu, G (2022) Fuzzy cognitive map-enabled approach for investigating the relationship between influencing factors and prefabricated building cost considering dynamic interactions. Journal of Construction Engineering and Management, 148(9): 04022081, ISSN 0733-9364

Ma, Z; Chong, H Y and Liao, P C (2021) Development of a time-variant causal model of human error in construction with dynamic Bayesian network. Engineering, Construction and Architectural Management, 28(1), pp. 291-307. ISSN 0969-9988

Macieira, M; Mendonça, P; Miranda Guedes, J and Tereso, A (2022) Evaluating the efficiency of membrane's refurbishment solutions to perform vertical extensions in old buildings using a multicriteria decision-support model. Architectural Engineering and Design Management, 18(1), pp. 1-25. ISSN 1745-2007

Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.

Mahmoodi, A. and Easa, S. M. (2026) A multi-objective matheuristic framework for sustainable truck-UAV last-mile delivery in smart urban built environments. Smart and Sustainable Built Environment, pp. 1-48. ISSN 2046-6099

Mani, S.; Karunasena, G.; Hosseini, M. R. and Hasan, A. (2026) Building circularity performance model: A weighted multi-level assessment framework aligned with ISO standards. Smart and Sustainable Built Environment, ISSN 2046-6099

Marzouk, M and Hamdala, D (2025) Phasing real estate projects considering profitability and customer satisfaction. Engineering, Construction and Architectural Management, 32(5), pp. 2942-2970. ISSN 0969-9988

Mashhadi, A H; Azad, A R G and Tavakolan, M (2023) Life cycle cost comparison of strengthening a steel bridge using post-installed shear connectors with bridge reconstruction. International Journal of Construction Management, 23(8), pp. 1311-1322. ISSN 1562-3599

Masoumi, R (2015) A framework for project portfolio formation using a hybrid of multicriteria decision-making methods. PhD thesis, Northeastern University, USA.

Mavahebi Tabatabai, G.; Tahsildoost, M.; Ardekani, A. and Zomorodian, Z. S. (2026) Optimizing urban block layouts and density distribution: A generative design framework for neighborhood performance. Smart and Sustainable Built Environment, 15(5), pp. 1722-1750. ISSN 2046-6099

Mehrvarz, Nassim (2025) Optimising sustainability in building design from a life cycle perspective. PhD thesis, University of New South Wales, Australia.

Melgarejo, J A (1987) A decision model for human error in the design and construction process. PhD thesis, University of Michigan, USA.

Melhem, N N; Maher, R A and Sundermeier, M (2021) Waste-based management of steel reinforcement cutting in construction projects. Journal of Construction Engineering and Management, 147(7): 04021056, ISSN 0733-9364

Meng, S (2023) Development of a regional wind risk assessment framework for wood-frame single-family residential building stock. PhD thesis, University of California, Los Angeles, USA.

Mirzadeh, I (2014) More roads for the money. PhD thesis, KTH Royal Institute of Technology, Sweden.

Mishra, S P; Parbat, D K and Modak, J P (2014) Field data-based mathematical simulation of manual rebar cutting. Journal of Construction in Developing Countries, 19(1), pp. 111-126. ISSN 1823-6499

Mohamadi, Y; Celik, T and Celik, T (2024) Optimising building envelope and insulation materials for energy efficiency and life-cycle cost in Cypriot residences. Architectural Engineering and Design Management, 20(5), pp. 1060-1078. ISSN 1745-2007

Mohammadinia, M R (1997) Development of rational and defensible pay schedules for a performance specification using performance prediction and user and agency costs. PhD thesis, Polytechnic University, USA.

Mohammadrezaytayebi, S; Sebt, M H and Afshar, M R (2023) Introducing a system dynamic–based model of quality estimation for construction industry subcontractors' works. International Journal of Construction Management, 23(4), pp. 586-595. ISSN 1562-3599

Moret, Y and Einstein, H H (2012) Modeling correlations in rail line construction. Journal of Construction Engineering and Management, 138(9), pp. 1075-1084. ISSN 0733-9364

Moselhi, O; Hegazy, T and Fazio, P (1993) DBID: Analogy-based dss for bidding in construction. Journal of Construction Engineering and Management, 119(3), pp. 466-479. ISSN 0733-9364

Mostafavi, A (2013) Ex-ante assessment of financial innovation policies in infrastructure system-of-systems. PhD thesis, Purdue University, USA.

Mostafavi, A and Karamouz, M (2010) Selecting appropriate project delivery system: Fuzzy approach with risk analysis. Journal of Construction Engineering and Management, 136(8), pp. 923-930. ISSN 0733-9364

Moussavi Nadoushani, Z S; Akbarnezhad, A and Rey, D (2018) Optimization of concrete placing operation based on competing carbon footprint, cost and production rate objectives. Engineering, Construction and Architectural Management, 25(7), pp. 938-957. ISSN 0969-9988

Moustafa, I M M (2001) A decision support system for the selection of the optimum contractor. PhD thesis, University of Southampton, UK.

Mulholland, B and Christian, J (1999) Risk assessment in construction schedules. Journal of Construction Engineering and Management, 125(1), pp. 8-15. ISSN 0733-9364

Nasir, D; McCabe, B and Hartono, L (2003) Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model. Journal of Construction Engineering and Management, 129(5), pp. 518-527. ISSN 0733-9364

Navon, R; Arkin, H and Burg, I (1997) Economic evaluation of HVAC systems with ice storage designed using an optimization technique. Construction Management and Economics, 15(5), pp. 429-439. ISSN 01446193

Ng, S T and Wong, Y M W (2007) Payment and audit mechanisms for non private-funded PPP-based infrastructure maintenance projects. Construction Management and Economics, 25(9), pp. 915-923. ISSN 1466433X

Ng, S T and Xie, J (2008) A simulation model for evaluating the tariff stability of concession-based PPP proposals. Construction Innovation, 8(2), pp. 106-119. ISSN 1471-4175

Nguyen, L D and Ibbs, W (2010) Case law and variations in cumulative impact productivity claims. Journal of Construction Engineering and Management, 136(8), pp. 826-833. ISSN 0733-9364

Nguyen, L D; Tran, D Q and Chandrawinata, M P (2016) Predicting safety risk of working at heights using Bayesian networks. Journal of Construction Engineering and Management, 142(9): 04016041, ISSN 0733-9364

Nguyen Ngoc, H; Mohammed Abdelkader, E; Al-Sakkaf, A; Alfalah, G and Zayed, T (2024) A hybrid AHP-MAUT model for assessing competitiveness of construction companies: A case study of construction companies in Vietnam and Canada. Construction Innovation, 24(5), pp. 1320-1353. ISSN 1471-4175

Nizam Shaikh, R (2019) BIM-based investigation of total energy consumption in delivering buildings as a product. PhD thesis, University of Liverpool, UK.

Noorzai, E (2023) Evaluating lean techniques to improve success factors in the construction phase. Construction Innovation, 23(3), pp. 622-639. ISSN 1471-4175

Ochoa Franco, L A (2004) Life cycle assessment of residential buildings. PhD thesis, Carnegie Mellon University, USA.

Ofosu, K (2010) An integrated approach to transportation infrastructure management. PhD thesis, Florida State University, USA.

Okakpu, A I (2019) Investigating the effectiveness of adopting building information modelling for refurbishment of complex buildings: Case study of auckland. PhD thesis, Auckland University of Technology, New Zealand.

Olomolaiye, P O (1988) An evaluation of bricklayers' motivation and productivity. PhD thesis, Loughborough University, UK.

Oshodi, O S; Thwala, W D; Odubiyi, T B; Abidoye, R B and Aigbavboa, C O (2019) Using neural network model to estimate the rental price of residential properties. Journal of Financial Management of Property and Construction, 24(2), pp. 217-230. ISSN 1366-4387

Pacheco-Torres, R; Etxebarria-Berrizbeitia, S and Gago, E J (2024) Influence of urban density on energy retrofit of building stock: Case study of Spain. Architectural Engineering and Design Management, 20(6), pp. 1832-1855. ISSN 1745-2007

Palsodkar, M; Yadav, G and Nagare, M R (2024) Integrating industry 4.0 and agile new product development practices to evaluate the penetration of sustainable development goals in manufacturing industries. Journal of Engineering, Design and Technology, 22(4), pp. 1351-1392. ISSN 1726-0531

Pan, L-J (1996) A study of risk management in dealing with contracts in the construction industry. PhD thesis, University of Glasgow, UK.

Panas, A and Pantouvakis, J P (2018) On the use of learning curves for the estimation of construction productivity. International Journal of Construction Management, 18(4), pp. 301-309. ISSN 1562-3599

Pandey, S; Paudel, S; Devkota, K; Kshetri, K and Asteris, P G (2025) Machine learning unveils the complex nonlinearity of concrete materials' uniaxial compressive strength. International Journal of Construction Management, 25(6), pp. 635-649. ISSN 1562-3599

Panthi, K (2009) A methodological framework for modeling pavement maintenance costs for projects with performance-based contracts. PhD thesis, Florida International University, USA.

Panwar, A and Jha, K N (2021) Integrating quality and safety in construction scheduling time-cost trade-off model. Journal of Construction Engineering and Management, 147(2): 04020160, ISSN 0733-9364

Papageorgiou, G and Demetriou, G (2020) Investigating learning and diffusion strategies for sustainable mobility. Smart and Sustainable Built Environment, 9(1), pp. 1-16. ISSN 2046-6099

Park, S-B (2003) Study of multicriteria decision-making: Development of a decision model to determine when to conduct nighttime construction road work. PhD thesis, Oregon State University, USA.

Patel, D A and Jha, K N (2015) Neural network model for the prediction of safe work behavior in construction projects. Journal of Construction Engineering and Management, 141(1): 04014066, ISSN 0733-9364

Patel, D J and Patel, D A (2025) Development of demolition project hazard index using the possibility approach. International Journal of Construction Management, 25(3), pp. 301-311. ISSN 1562-3599

Pathak, C (2021) Electric vehicle infrastructure decision support system. PhD thesis, University of Washington, USA.

Pearce, A R (1999) Sustainability and the built environment: A metric and process for prioritizing improvement opportunities. PhD thesis, Georgia Institute of Technology, USA.

Peiman, F; Khalilzadeh, M; Shahsavari-Pour, N and Ravanshadnia, M (2025) Estimation of building project completion duration using a natural gradient boosting ensemble model and legal and institutional variables. Engineering, Construction and Architectural Management, 32(4), pp. 2069-2104. ISSN 0969-9988

Pellegrino, R (2021) Effects of public supports for mitigating revenue risk in public-private partnership projects: Model to choose among support alternatives. Journal of Construction Engineering and Management, 147(12), ISSN 0733-9364

Plumblee II, J M (2013) Incorporating natural hazard resistance into the life cycle assessment framework. PhD thesis, Clemson University, USA.

Polat, G and Bayhan, H G (2022) Selection of HVAC-ahu system supplier with environmental considerations using fuzzy edas method. International Journal of Construction Management, 22(10), pp. 1863-1871. ISSN 1562-3599

Pongpeng, J (2002) Multicriteria and multidecision-makers in tender evaluation. PhD thesis, Queensland University of Technology, Australia.

Pongpeng, J and Liston, J (2003) Tensem: A multicriteria and multidecision-makers' model in tender evaluation. Construction Management and Economics, 21(1), pp. 21-30. ISSN 01446193

Rachmawati, F; Mudjahidin, M and Dewi Widowati, E (2024) Work rate modeling of building construction projects using system dynamic to optimize project cost and time performance. International Journal of Construction Management, 24(2), pp. 213-225. ISSN 1562-3599

Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364

Raji, B (2018) Sustainable high-rises: Design strategies for energy-efficient and comfortable tall office buildings in various climates. PhD thesis, Delft University of Technology, Netherlands.

Ramalingam Rethnam, O and Thomas, A (2024) Urban building energy modelling-based framework to analyze the effectiveness of the community-wide implementation of national energy conservation codes. Smart and Sustainable Built Environment, 13(5), pp. 1213-1239. ISSN 2046-6099

Rastegar, H; Arbab Shirani, B; Mirmohammadi, S H and Akhondi Bajegani, E (2021) Stochastic programming model for bidding price decision in construction projects. Journal of Construction Engineering and Management, 147(4): 02008, ISSN 0733-9364

Recsei, Richard Anthony (1998) A generalised decision support system for contaminated site management. PhD thesis, University of New South Wales, Australia.

Reger, Darren Peter (2015) Economically and environmentally informed policies for road resurfacing: Tradeoffs between costs and greenhouse gas emissions. PhD thesis, University of California, USA.

Reigle, J A (2000) Development of an integrated project-level pavement management model using risk analysis. PhD thesis, West Virginia University, USA.

Rezaee Arjroody, A; Hosseini, S A; Akhbari, M; Safa, E and Asadpour, J (2024) Accurate estimation of cost and time utilizing risk analysis and simulation (case study: Road construction projects in Iran). International Journal of Construction Management, 24(1), pp. 19-30. ISSN 1562-3599

Rodionova, A (2022) Robust and reliable building renovation strategies for environmental and economic performance. DSc thesis, ETH Zürich, Switzerland.

Rodrigues, C A (2017) Life-cycle environmental and cost assessment of building retrofits: Evaluating conventional and streamlined approaches. PhD thesis, Universidade de Coimbra, Portugal.

Rosado, Lais Peixoto (2019) Life cycle assessment of construction and demolition waste management in a Brazilian watershed. PhD thesis, Universidade Estadual de Campinas, Brazil.

Russell, A D and Caselton, W F (1988) Extensions to linear scheduling optimization. Journal of Construction Engineering and Management, 114(1), pp. 36-52. ISSN 0733-9364

Said, H (2016) Modeling and likelihood prediction of prefabrication feasibility for electrical construction firms. Journal of Construction Engineering and Management, 142(2): 04015071, ISSN 0733-9364

Saleem, M (2024) Internal damage detection in reinforced concrete member using ultrasonic pulse velocity nondestructive testing. Journal of Construction Engineering and Management, 150(8): 04024084, ISSN 0733-9364

Salih, F and El-Adaway, I H (2024) Quantifying the impact of technology utilization on schedule and cost performance in construction projects. Journal of Construction Engineering and Management, 150(8): 04024078, ISSN 0733-9364

Sandagomika, H; Shringi, A; Mohandes, S R; Kineber, A F; Bazli, M and Arashpour, M (2024) Mixed reality-based approach for minimizing time uncertainty in prefabrication. Journal of Construction Engineering and Management, 150(11): 04024147, ISSN 0733-9364

Sandhyavitri, A (2022) Stochastic analyses for managing risk of delay in duri oil construction projects, Indonesia. International Journal of Construction Management, 22(4), pp. 711-731. ISSN 1562-3599

Schöttle, A and Arroyo, P (2017) Comparison of weighting-rating-calculating, best value, and choosing by advantages for bidder selection. Journal of Construction Engineering and Management, 143(8): 05017015, ISSN 0733-9364

Seng, Hansen (2020) A front end planning decision-making framework for infrastructure project selection and prioritisation in Indonesia. PhD thesis, RMIT University, Australia.

Shah, R K (2011) Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects. PhD thesis, Teesside University, UK.

Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), pp. 435-448. ISSN 1466433X

Shahi, S; Beesley, P and Haas, C T (2023) Creating space and time for innovation: a methodology for building adaptation design appraisal using physics-based simulation tools and interactive multi-objective optimization. Engineering, Construction and Architectural Management, 30(3), pp. 1098-1121. ISSN 0969-9988

Shahin, A; Fahimian, M; Mahboubi Niazmandi, M; Soltaninejad, M and Wood, L C (2026) The green building policy puzzle: A stakeholder-informed multistage fuzzy framework for incentive evaluation. Journal of Construction Engineering and Management, 152(2): 04025246, ISSN 0733-9364

Shalaby, A M H (2021) Model for the automated generation of optimized work packages in results-based-finance mega sanitation projects. PhD thesis, The American University in Cairo, Egypt.

Shehab, T; Blampied, N; Nasr, E and Sindhu, L (2024) Ann-based estimation model for the preconstruction cost of pavement rehabilitation projects. International Journal of Construction Management, 24(8), pp. 894-901. ISSN 1562-3599

Shen, J; Liu, S and Zhang, J (2024) Using text mining and Bayesian network to identify key risk factors for safety accidents in metro construction. Journal of Construction Engineering and Management, 150(6): 04024052, ISSN 0733-9364

Shi, J J (1999) Mathematical models for maximizing aggregate plant production. Journal of Construction Engineering and Management, 125(1), pp. 53-60. ISSN 0733-9364

Shoghli, O (2014) A decision support system for multi-objective multi-asset roadway asset management (DSRAM). PhD thesis, Virginia Polytechnic Institute and State University, USA.

Shohet, I M and Perelstein, E (2004) Decision support model for the allocation of resources in rehabilitation projects. Journal of Construction Engineering and Management, 130(2), pp. 249-257. ISSN 0733-9364

Shokoohi, F. and Vosoughifar, H. (2026) Multi-dimensional sensitivity analysis of lean and sustainable construction: A novel modified trapezoidal DEMATEL–ANP (mtda) approach for integrated project management. International Journal of Construction Management, 26(10), pp. 1999-2017. ISSN 1562-3599

Si, J (2017) Green retrofit of existing non-domestic buildings as a multi criteria decision making process. PhD thesis, University College London, UK.

Silva-Jauregui, D (1982) The economics of capacity expansion in the mexican cement industry. PhD thesis, Northwestern University, USA.

Sing, T F (2002) Time to build options in construction processes. Construction Management and Economics, 20(2), pp. 119-130. ISSN 01446193

Singer, H. and İlçe, A. C. (2026) An integrated multicriteria decision-making approach for raised floor panel selection. Architectural Engineering and Design Management, 22(1), pp. 122-148. ISSN 1745-2007

Skibniewski, M J and Chao, L C (1992) Evaluation of advanced construction technology with AHP method. Journal of Construction Engineering and Management, 118(3), pp. 577-593. ISSN 0733-9364

Soares, R (1999) User cost customization for a Florida bridge management system. PhD thesis, University of Florida, USA.

Soltanmohammadlou, N.; Hon, C. K. H.; Drogemuller, R.; Motamedisedeh, O. and Rahimian, F. (2026) Modelling risk factors in earthmoving equipment operations on Australian construction sites: A fuzzy DEMATEL approach. Engineering, Construction and Architectural Management, 33(3), pp. 2118-2153. ISSN 0969-9988

Sospeter, N G and Awuzie, B O (2024) Capital budgeting implementation by public sector construction firms in tanzania's housebuilding industry: An exploratory study. Journal of Construction in Developing Countries, 29(1), pp. 87-109. ISSN 1823-6499

Sprau Coulter, T L (2014) Improving energy audit process and report outcomes through planning initiatives. PhD thesis, Pennsylvania State University, USA.

Sruthilaya, D; Vilventhan, A and Gopal, P R C (2025) Development of a project complexity measurement model for metro rail projects. Engineering, Construction and Architectural Management, 32(4), pp. 2728-2744. ISSN 0969-9988

Stone, A; Shipworth, D; Biddulph, P and Oreszczyn, T (2014) Key factors determining the energy rating of existing English houses. Building Research & Information, 42(6), pp. 725-738. ISSN 0961-3218

Struck, C (2012) Uncertainty propagation and sensitivity analysis techniques in building performance simulation to support conceptual building and system design. PhD thesis, Eindhoven University of Technology, Netherlands.

Sun, Y.; Lin, K.; Wang, J.; Zhu, F.; Wang, L. and Lu, L. (2026) Risk assessment of mountain tunnel entrance collapse based on pso-LSTM surface settlement prediction. Engineering, Construction and Architectural Management, 33(3), pp. 2586-2605. ISSN 0969-9988

Sun, Y and Zhang, L (2015) Balancing public and private stakeholder interests in BOT concessions: Minimum revenue guarantee and royalty scheme applied to a water treatment project in China. Journal of Construction Engineering and Management, 141(2): 04014070, ISSN 0733-9364

Sundling, R; Olander, S; Wallentén, P; Burke, S; Bernardo, R and Blomsterberg, Å (2019) Lifecycle profit analysis of prefabricated multi-active façades. International Journal of Building Pathology and Adaptation, 37(5), pp. 565-578. ISSN 23984708

Sällström Eriksson, L and Lidelöw, S (2025) Maintaining or replacing a building's windows: A comparative life cycle study. International Journal of Building Pathology and Adaptation, 43(4), pp. 766-786. ISSN 2398-4708

Tajaddini, A; Pirooznezhad, L; Ravanshadnia, M and Coley, D (2024) Fuzzy inference decision model to quantify the effectiveness of incentives on delivering green buildings. International Journal of Construction Management, 24(15), pp. 1599-1616. ISSN 1562-3599

Taku, A M (2021) Predicting modular efficiency in oil and gas capital projects using multi-criteria decision analysis. DEng thesis, George Washington University, USA.

Tamimi, M F (2022) Reliability and sensitivity analysis of civil and marine structures using machine-learning-assisted simulation. PhD thesis, Oklahoma State University, USA.

Tan, L; Zhang, Y; Chen, Y and Zhu, T (2023) A multiple-objective decision-support model for lighting maintenance routing considering carbon dioxide emissions and balanced workload. Journal of Construction Engineering and Management, 149(8): 04023063, ISSN 0733-9364

Tang, W; Cui, Q; Zhang, F and Chen, Y (2019) Urban rail-transit project investment benefits based on compound real options and trapezoid fuzzy numbers. Journal of Construction Engineering and Management, 145(1): 05018016, ISSN 0733-9364

Tang, Y H and Ogunlana, S O (2003) Modelling the dynamic perfomance of a construction organization. Construction Management and Economics, 21(2), pp. 127-136. ISSN 01446193

Tao, S; Yu, J; Zhu, J; Chen, S and Li, X (2026) Precast component production scheduling considering outsourcing and multiskilled resources. Journal of Construction Engineering and Management, 152(5): 04026040, ISSN 0733-9364

Tao, Y; Hu, H; Xu, F and Zhang, Z (2023) Ergonomic risk assessment of construction workers and projects based on fuzzy Bayesian network and D-S evidence theory. Journal of Construction Engineering and Management, 149(6): 04023034, ISSN 0733-9364

Tarekegn Gurmu, A and Mahmood, M N (2024) Critical factors affecting quality in building construction projects: Systematic review and meta-analysis. Journal of Construction Engineering and Management, 150(3): 04024004, ISSN 0733-9364

Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599

Taylor, T R B and Ford, D N (2008) Managing tipping point dynamics in complex construction projects. Journal of Construction Engineering and Management, 134(6), pp. 421-431. ISSN 0733-9364

Tehrani, B M; BuHamdan, S and Alwisy, A (2024) Robotics in industrialized construction: An activity-based ranking system for assembly manufacturing tasks. Engineering, Construction and Architectural Management, 31(6), pp. 2264-2285. ISSN 0969-9988

Thomas, A V and Sudhakumar, J (2014) Modelling masonry labour productivity using multiple regression. In: Raiden, A and Aboagye-Nimo, E (eds.) Proceedings of 30th Annual ARCOM Conference, 1-3 September 2014, Portsmouth, UK.

Tokede, O and Ahiaga-Dagbui, D (2016) Evaluating the whole-life cost implication of revocability and disruption in office retrofit building projects. In: Chan, P W and Neilson, C J (eds.) Proceedings of 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester, UK.

Tokede, O and Wamuziri, S (2012) Perceptions of fuzzy set theory in construction risk analysis. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.

Tokede, O O (2016) Developing whole-life cost models for retrofit options in office buildings. PhD thesis, Edinburgh Napier University, UK.

Tomlinson, J (1998) A premises occupancy cost forecasting model. PhD thesis, University of Liverpool, UK.

Tonini de Araújo, M; de Souza, H A and Gomes, A P (2022) Computer simulation of moisture transfer in walls: Impacts on the thermal performance of buildings. Architectural Engineering and Design Management, 18(4), pp. 453-472. ISSN 1745-2007

Touran, A and Asai, T (1987) Simulation of tunneling operations. Journal of Construction Engineering and Management, 113(4), pp. 554-568. ISSN 0733-9364

Touran, A and Taher, K A H (1988) Optimum fleet size determination by queuing and simulation. Construction Management and Economics, 6(4), pp. 295-306. ISSN 01446193

Tran, D Q and Molenaar, K R (2015) Risk-based project delivery selection model for highway design and construction. Journal of Construction Engineering and Management, 141(12): 04015041, ISSN 0733-9364

Uhlik III, F T (1984) Optimizing earthwork estimating for highway construction. PhD thesis, Pennsylvania State University, USA.

Vahdatmanesh, M and Firouzi, A (2018) Price risk management in BOT railroad construction projects using financial derivatives. Journal of Financial Management of Property and Construction, 23(3), pp. 349-362. ISSN 1366-4387

Vahdatmanesh, M and Firouzi, A (2020) Construction material supply risk management using Asian option contracts: The case of a pipeline project. Engineering, Construction and Architectural Management, 27(10), pp. 3395-3414. ISSN 0969-9988

Viljoen, P S (1981) Incentive management techniques for pavement rehabilitation construction. PhD thesis, University of California, Berkeley, USA.

Vithanage, S C; Sing, M C P; Davis, P and Newaz, M T (2022) Assessing the off-site manufacturing workers' influence on safety performance: A Bayesian network approach. Journal of Construction Engineering and Management, 148(1): 04021185, ISSN 0733-9364

Wagle, S; Gopalakrishnan, B; Li, H; Liu, Z; Chaudhari, S and Sundaramoorthy, S (2024) Simulating energy performance of buildings: a study using eQUEST and Energy Star® portfolio manager. Architectural Engineering and Design Management, 20(5), pp. 997-1018. ISSN 1745-2007

Wang, H; Yi, W; Zhen, L; Song, Y and Wu, P (2025) Designing optimal government-contractor subsidy policy for promoting modular construction: Bilevel stochastic program. Journal of Construction Engineering and Management, 151(10): 04025136, ISSN 0733-9364

Wang, M (2014) Sensitivity analysis and evolutionary optimization for building design. PhD thesis, Loughborough University, UK.

Wang, P (2019) The aetiology and progression of construction disputes between client and contractor in the UK. PhD thesis, University of Manchester, UK.

Wang, S; Hasan, M and Lu, M (2024) Global sensitivity analysis methodology for construction simulation models: Multiple linear regressions versus multilayer perceptions. Journal of Construction Engineering and Management, 150(5): 04024035, ISSN 0733-9364

Wang, Z; Jia, L; Lv, J and Huang, J (2024) Minimization of rebar cutting waste using BIM and cutting pattern-oriented multiobjective optimization. Journal of Construction Engineering and Management, 150(11): 04024166, ISSN 0733-9364

Warszawski, A and Sacks, R (2004) Practical multifactor approach to evaluating risk of investment in engineering projects. Journal of Construction Engineering and Management, 130(3), pp. 357-367. ISSN 0733-9364

Wenzelberger, J P (1987) The economic analysis of tall buildings (Milwaukee, Wisconsin; Boston, Massachusetts; Kansas City, Missouri). DSc thesis, George Washington University, USA.

Wibowo, A (2005) Estimating general threshold traffic levels of typical build, operate, and transfer toll road projects in Indonesia. Construction Management and Economics, 23(6), pp. 621-630. ISSN 01446193

Wibowo, A and Kochendörfer, B (2005) Financial risk analysis of project finance in Indonesian toll roads. Journal of Construction Engineering and Management, 131(9), pp. 963-972. ISSN 0733-9364

Wijewickrama, M. K. C. S.; Chileshe, N.; Rameezdeen, R. and Ochoa, J. J. (2026) Application of a Bayesian belief network-based information processing model for quality assurance in demolition waste reverse logistics: Insights from two case studies. Engineering, Construction and Architectural Management, 33(15), ISSN 0969-9988

Won, S J (2011) A general performance model for design-build highway pavement warranty decisions. PhD thesis, University of Colorado at Boulder, USA.

Wong, I L; Perera, S and Eames, P C (2010) Goal directed life cycle costing as a method to evaluate the economic feasibility of office buildings with conventional and TI-façades. Construction Management and Economics, 28(7), pp. 715-735. ISSN 1466433X

Xie, L L; Luo, Y; Hou, L and Yu, J (2025) Determinants for megaproject knowledge innovation management: A Bayesian network analysis. Engineering, Construction and Architectural Management, 32(9), pp. 5885-5912. ISSN 0969-9988

Xu, T.; Song, Z.; Fan, S. and Guo, D. (2026) Improved risk assessment model using the cloud theory of the existing tunnel in foundation pit construction environment. Engineering, Construction and Architectural Management, 33(5), pp. 3737-3760. ISSN 0969-9988

Yamusa, M. A.; Lawal, H. S.; Abdulrahman, R. S.; Salisu, A. S.; Saka, A.; Abubakar, M. and Abdullahi, M. (2026) A machine-learning model for estimating construction renovation costs. International Journal of Building Pathology and Adaptation, 44(3), pp. 757-772. ISSN 2398-4708

Yan, P; Liu, J; Zhao, X and Skitmore, M (2022) Risk response incorporating risk preferences in international construction projects. Engineering, Construction and Architectural Management, 29(9), pp. 3499-3519. ISSN 0969-9988

Yanardag Erdener, H M and Edis, E (2024) The effect of living wall systems' variables on the energy consumption of buildings. Built Environment Project and Asset Management, 14(3), pp. 333-348. ISSN 2044-124X

Yang, L-R (2003) Influence of technology on project success measures. PhD thesis, University of Texas at Austin, USA.

Yang, S; Zhang, J; Xu, S; Deng, T; He, Q and Wang, P (2025) Work section planning for accompanying construction of extra-long tunnel and ballastless track of mountainous high-speed railways. Journal of Construction Engineering and Management, 151(9): 04025126, ISSN 0733-9364

Yang, W; Firouzi, A and Li, C Q (2023) Risk transfer in project finance loans for toll road using credit default swaps. Journal of Financial Management of Property and Construction, 28(1), pp. 1-21. ISSN 1366-4387

Yang, Y; Wei, Z; Zhang, Z and Xie, H (2025) Modeling the enablers for blockchain technology adoption in the construction supply chain. Journal of Construction Engineering and Management, 151(9): 04025113, ISSN 0733-9364

Yao, Z; Chen, Z and Lee, Y (2025) A construction site layout planning study for dust reduction. Journal of Construction Engineering and Management, 151(6): 04025066, ISSN 0733-9364

Yeo, K T (1982) A systems approach to cost management of large scale offshore oil projects. PhD thesis, University of Manchester, UK.

Yevu, S K; Yu, A T W; Darko, A; Nani, G and Edwards, D J (2023) Modeling the influence patterns of barriers to electronic procurement technology usage in construction projects. Engineering, Construction and Architectural Management, 30(10), pp. 5133-5159. ISSN 0969-9988

Yisa, S B (1995) A methodology for evaluating the marketing function in the UK construction industry. PhD thesis, University of Wolverhampton, UK.

Yoo, W; Ozer, H and Ham, Y (2019) System-level approach for identifying main uncertainty sources in pavement construction life-cycle assessment for quantifying environmental impacts. Journal of Construction Engineering and Management, 145(2): 04018137, ISSN 0733-9364

Yoon, Y and Gangarao, H (2021) Prioritization framework for rockfall countermeasures for rock-cut slopes for rural roads. Journal of Construction Engineering and Management, 147(10), ISSN 0733-9364

Younes, B; Bouferguène, A; Al-Hussein, M and Yu, H (2015) Overdue invoice management: Markov chain approach. Journal of Construction Engineering and Management, 141(1): 04014062, ISSN 0733-9364

Yousefi, S; Hegazy, T; Capuru̧o, R A C and Attalla, M (2008) System of multiple anns for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134(5), pp. 342-351. ISSN 0733-9364

Yuan, Z; Wang, H; Yang, Y; Chao, Y; Huang, D and Yu, D (2024) Improving the construction accuracy of precast components in prefabricated buildings by analyzing relevant factors from the perspective of supply chain: A system dynamics model. Architectural Engineering and Design Management, 20(2), pp. 230-248. ISSN 1745-2007

Zafaranchi, M and Sözer, H (2024) Comparing energy profiles of different building types by determining their sensitivities. Architectural Engineering and Design Management, 20(6), pp. 1489-1510. ISSN 1745-2007

Zaferanchi, M and Sozer, H (2024) Effectiveness of interventions to convert the energy consumption of an educational building to zero energy. International Journal of Building Pathology and Adaptation, 42(4), pp. 485-509. ISSN 23984708

Zahed, S E; Shahooei, S; Farooghi, F; Shahandashti, M and Ardekani, S (2019) Life-cycle cost analysis of a short-haul underground freight transportation system for the DFW airport. Built Environment Project and Asset Management, 9(3), pp. 440-456. ISSN 2044-124X

Zayed, T M and Halpin, D (2001) Simulation of concrete batch plant production. Journal of Construction Engineering and Management, 127(2), pp. 132-141. ISSN 0733-9364

Zayed, T M and Minkarah, I (2004) Resource allocation for concrete batch plant operation: Case study. Journal of Construction Engineering and Management, 130(4), pp. 560-569. ISSN 0733-9364

Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X

Zhang, X. (2026) Simulation study on schedule control for engineering design based on system dynamics. Journal of Construction Engineering and Management, 152(10): 04026166, ISSN 0733-9364

Zhang, Y; Xu, L; Xue, X; Wang, Z and Skibniewski, M (2026) Formation and dynamics of prefabricated building innovation network. Engineering, Construction and Architectural Management, 33(1), pp. 98-124. ISSN 0969-9988

Zhang, Z.; Wang, Y.; Liu, J.; Wang, Y.; Liu, C. and Geng, X. (2026) Transport risk assessment for China's prefabricated construction supply chain: Integrating game theory and fuzzy Bayesian network. Engineering, Construction and Architectural Management, pp. 1-24. ISSN 0969-9988

Zhang, C; Zayed, T and Hammad, A (2008) Resource management of bridge deck rehabilitation: Jacques cartier bridge case study. Journal of Construction Engineering and Management, 134(5), pp. 311-319. ISSN 0733-9364

Zhang, X (2006) Markov-based optimization model for building facilities management. Journal of Construction Engineering and Management, 132(11), pp. 1203-1211. ISSN 0733-9364

Zhang, X (2019) Application of queuing theory: A decision support model for construction companies in the implementation of 3D printing. PhD thesis, University of Florida, USA.

Zhao, N.; Gao, K.; Li, H.; Talebian, N. and Skitmore, M. (2026) System dynamics simulation of factors influencing organizational resilience for subway construction in emergency situations. International Journal of Construction Management, 26(7), pp. 1149-1169. ISSN 1562-3599

Zhou, H W; Zhou, Y H and Zhao, C J (2016) Fault-response mechanism of production system in concrete-dam-construction simulation. Journal of Construction Engineering and Management, 142(11): 04016065, ISSN 0733-9364

Zhou, Xiaoyan (2023) A reinforcement learning neural network approach to online optimization of construction manufacturing processes. PhD thesis, University of Florida, USA.

Ziadat, W (2018) A meta-analysis study of project and programme management complexity in the oil and gas sector of the Middle East and North Africa region. PhD thesis, University of Manchester, UK.

Zohrehvandi, S. (2026) A sustainable project scheduling algorithm in construction; an approach to using project buffer management techniques. International Journal of Construction Education and Research, 22(2), pp. 331-359. ISSN 1557-8771

Zohrehvandi, S; Khalilzadeh, M; Amiri, M and Shadrokh, S (2022) Project buffer sizing and dynamic buffer consumption algorithm in power generation construction. Engineering, Construction and Architectural Management, 29(2), pp. 716-738. ISSN 0969-9988

Öberg, V; Jockwer, R; Goto, Y and Al-Emrani, M (2025) Design for structural adaptation: Economic feasibility of an implementation for Swedish timber buildings. Building Research & Information, 53(6), pp. 759-776. ISSN 0961-3218

Ökmen, Ö and Öztaş, A (2015) Scenario based evaluation of a cost risk model through sensitivity analysis. Engineering, Construction and Architectural Management, 22(4), pp. 403-423. ISSN 0969-9988

This list was generated on Sat Aug 22 01:41:19 2026 UTC.