Items with Index Term: scheduling
AbdElMottaleb, Mohamed (2025) AI in project management: Machine learning application for construction scheduling. PhD thesis, University of Salford, UK.
Abdallah, A M (2021) A study on bridge inspections: Identifying barriers to new practices and providing strategies for change. PhD thesis, Colorado State University, USA.
Abdel-Monem, M and Hegazy, T (2013) Enhancing construction as-built documentation using interactive voice response. Journal of Construction Engineering and Management, 139(7), pp. 895-898. ISSN 0733-9364
Abdelmohsen, S M A (2011) An ethnographically informed analysis of design intent communication in BIM-enabled architectural practice. PhD thesis, Georgia Institute of Technology, USA.
Abdul-Rahman, H and Alidrisyi, M N (1994) A perspective of material management practices in fast developing economy: The case of Malaysia. Construction Management and Economics, 12(5), pp. 413-422. ISSN 01446193
Abdulghafour, A B (1998) Modeling highway construction tasks to determine project duration. PhD thesis, University of Tennessee, USA.
Abeid, J and Arditi, D (2003) Photo-net: An integrated system for controlling construction progress. Engineering, Construction and Architectural Management, 10(3), pp. 162-171. ISSN 0969-9988
Abeid, J N (2000) Photo-net: An integrated system for controlling the progress of construction activities. PhD thesis, Illinois Institute of Technology, USA.
Abu Hammad, A A (2003) A decision support system for manufactured housing production process planning and facility layout. PhD thesis, University of Cincinnati, USA.
Abu-Hijleh, S F (1991) A model for variance-based exception reporting with user-defined criteria. PhD thesis, University of California, Berkeley, USA.
Abubaker, A E (2010) Improvement of project planning in Libya. PhD thesis, University of Newcastle upon Tyne, UK.
Abubaker, A E; Greenwood, D and Osborne, A (2008) A study of project planning on Libyan construction projects. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Abudayyeh, O; Dibert-DeYoung, A and Jaselskis, E (2004) Analysis of trends in construction research: 1985-2002. Journal of Construction Engineering and Management, 130(3), pp. 433-439. ISSN 0733-9364
Adebisi, E O; Ojo, S O and Alao, O O (2018) Assessment of factors influencing the failure and abandonment of multi-storey building projects in Nigeria. International Journal of Building Pathology and Adaptation, 36(2), pp. 210-231. ISSN 23984708
Adeli, H and Karim, A (1997) Scheduling/cost optimization and neural dynamics model for construction. Journal of Construction Engineering and Management, 123(4), pp. 450-458. ISSN 0733-9364
Adjei-Kumi, T (1997) The development of an intelligent system for visual simulation of construction projects. PhD thesis, University of Strathclyde, UK.
Afshar, M R; Shahhosseini, V and Sebt, M H (2022) A genetic algorithm with a new local search method for solving the multimode resource-constrained project scheduling problem. International Journal of Construction Management, 22(3), pp. 357-365. ISSN 1562-3599
Agapiou, A; Clausen, L E; Flanagan, R; Norman, G and Notman, D (1998) The role of logistics in the materials flow control process. Construction Management and Economics, 16(2), pp. 131-137. ISSN 01446193
Aghajamali, K; Rahimi, A; Metvaei, S; Lei, Z; Chen, Q; Suliman, A and Pirzad, A (2026) Production planning with an enriched BIM-based heuristic construction order model to improve the efficiency of complex prefabricated projects. Journal of Construction Engineering and Management, 152(6): 04026057, ISSN 0733-9364
Agyekum-Mensah, G (2013) The development of an innovative sustainable total planning and control system for construction projects. PhD thesis, Nottingham Trent University, UK.
Ahluwalia, S S (2009) A framework for efficient condition assessment of the building infrastructure. PhD thesis, University of Waterloo, Canada.
Ahmed, S S (2018) Innovation of building processes in Syria by using BIM. PhD thesis, Czech Technical University, Czech Republic.
Ahmed, T; Hossain, S M and Hossain, M A (2021) Reducing completion time and optimizing resource use of resource-constrained construction operation by means of simulation modeling. International Journal of Construction Management, 21(4), pp. 404-415. ISSN 1562-3599
Ahn, C R and Lee, S (2013) Importance of operational efficiency to achieve energy efficiency and exhaust emission reduction of construction operations. Journal of Construction Engineering and Management, 139(4), pp. 404-413. ISSN 0733-9364
Ahrari, A (2012) A decision support system for dynamic integrated project scheduling and equipment operation planning. PhD thesis, University of Maryland, College Park, USA.
Ahuja, V and Thiruvengadam, V (2004) Project scheduling and monitoring: Current research status. Construction Innovation, 4(1), pp. 19-31. ISSN 1471-4175
Aiyetan, O A and Dillip, D (2018) System dynamics approach to mitigating skilled labour shortages in the construction industry: A South Africa context. Construction Economics and Building, 18(4), pp. 45-63. ISSN 2204-9029
Akar, G (2009) Analysis of activity choice: The role of activity attributes and individual schedules. PhD thesis, University of Maryland, College Park, USA.
Akin, F D; Damci, A and Arditi, D (2024) Optimum finance-based scheduling. Journal of Construction Engineering and Management, 150(9): 04024104, ISSN 0733-9364
Akin, F D; Polat, G; Turkoglu, H and Damci, A (2021) A crashing-based time-cost trade-off model considering quality cost and contract clauses. International Journal of Construction Management, 23(6), pp. 954-963. ISSN 1562-3599
Akinci, B; Fischer, M and Kunz, J (2002) Automated generation of work spaces required by construction activities. Journal of Construction Engineering and Management, 128(4), pp. 306-315. ISSN 0733-9364
Akinci, B; Fischer, M; Kunz, J and Levitt, R (2002) Representing work spaces generically in construction method models. Journal of Construction Engineering and Management, 128(4), pp. 296-305. ISSN 0733-9364
Akinci, B H (2000) Automatic generation of work spaces and analysis of time-space conflicts at construction sites. PhD thesis, Stanford University, USA.
Al Nasseri, H and Aulin, R (2016) Enablers and barriers to project planning and scheduling based on construction projects in Oman. Journal of Construction in Developing Countries, 21(2), pp. 1-20. ISSN 1823-6499
Al Nasseri, H and Aulin, R (2016) Understanding management roles and organisational behaviours in planning and scheduling based on construction projects in Oman. Journal of Construction in Developing Countries, 21(1), pp. 1-18. ISSN 1823-6499
Al Nasseri, H A; Widen, K and Aulin, R (2016) A taxonomy of planning and scheduling methods to support their more efficient use in construction project management. Journal of Engineering, Design and Technology, 14(3), pp. 580-601.
Al-Amin, Md (2023) Pavement maintenance and rehabilitation programming and budget allocation from strategic perspectives: Multiobjective optimization models. PhD thesis, University of Texas at Austin, USA.
Al-Gahtani, K S (2009) Float allocation using the total risk approach. Journal of Construction Engineering and Management, 135(2), pp. 88-95. ISSN 0733-9364
Al-Ghzawi, M and El-Rayes, K (2023) Optimizing the planning of airport airside expansion projects to minimize air traffic disruptions and construction cost. Journal of Construction Engineering and Management, 149(4): 04023013, ISSN 0733-9364
Al-Joma, M and Mangin, J C (2004) A scheduling model for repetitive activities. In: Khosrowshahi, F (ed.) Proceedings of 20th Annual ARCOM Conference, 1-3 September 2004, Edinburgh, UK.
Al-Kaisy, A and Nassar, K (2009) Developing a decision support tool for nighttime construction in highway projects. Journal of Construction Engineering and Management, 135(2), pp. 119-125. ISSN 0733-9364
Al-Sasi, B O (2007) A lean approach to capacity management in construction. PhD thesis, University of Southampton, UK.
Al-Sedairy, S (1984) Large scale projects: management, design and execution. PhD thesis, University of Sheffield, UK.
Al-Zahrani, J I (2013) The impact of contractors' attributes on construction project success. PhD thesis, University of Manchester, UK.
Al-Zarrad, M A (2018) Multi-criteria decision-making model to improve linear repetitive projects time-cost trade-off in uncertain environment. PhD thesis, University of Alabama, USA.
AlNasseri, H A (2015) Understanding applications of project planning and scheduling in construction projects. PhD thesis, Lund University, Sweden.
Alajmani, H; Ahmed, S and El-Sayegh, S M (2024) Factors causing delays in the UAE construction industry amid the covid-19 pandemic. Journal of Financial Management of Property and Construction, 29(1), pp. 135-151. ISSN 1366-4387
Alarcón, L F; Ashley, D B; De Hanily, A S; Molenaar, K R and Ungo, R (2011) Risk planning and management for the Panama Canal expansion program. Journal of Construction Engineering and Management, 137(10), pp. 762-771. ISSN 0733-9364
Alashari, M; El-Rayes, K and Alotaibi, M (2023) Optimizing the planning of maintenance activities in education buildings. Journal of Construction Engineering and Management, 149(10): 04023094, ISSN 0733-9364
Alavipour, S M (2017) Project scheduling using optimized financing. PhD thesis, Illinois Institute of Technology, USA.
Alavipour, S M R and Arditi, D (2019) Maximizing expected contractor profit using an integrated model. Engineering, Construction and Architectural Management, 26(1), pp. 118-138. ISSN 0969-9988
Ali, A H; Kineber, A F; Elyamany, A; Ibrahim, A H and Daoud, A O (2025) Application of Ginni's mean analysis for identifying the stationary driver enhancing modular construction adoption in the building industry. International Journal of Construction Management, 25(3), pp. 322-333. ISSN 1562-3599
Ali, M M and Elazouni, A (2009) Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities. Construction Management and Economics, 27(9), pp. 839-856. ISSN 1466433X
Alikhani, H; Le, C; Jeong, H D and Damnjanovic, I (2023) Sequential machine learning for activity sequence prediction from daily work report data. Journal of Construction Engineering and Management, 149(9): 04023082, ISSN 0733-9364
Alinaitwe, H; Nyamutale, W and Tindiwensi, D (2014) Design phase constructability improvement strategies for highway projects in Uganda. Journal of Construction in Developing Countries, 19(1), pp. 127-140. ISSN 1823-6499
Alkass, S; Mazerolle, M and Harris, F (1996) Construction delay analysis techniques. Construction Management and Economics, 14(5), pp. 375-394. ISSN 01446193
Alkayyali, O J (1993) A computerized multi-dimensional support system (CM-DSS) for planning, scheduling and controlling construction projects. PhD thesis, University of Cincinnati, USA.
Allam, S I G (1986) Planning and scheduling: A new model for planning and scheduling construction projects. PhD thesis, Brunel University, UK.
Allam, S I G (1988) Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems. Construction Management and Economics, 6(2), pp. 93-115. ISSN 01446193
Alleman, D and Lee, E B (2020) Mitigating the legal challenges of imposing disincentives on nonperforming transportation projects. Engineering, Construction and Architectural Management, 27(10), pp. 2859-2891. ISSN 0969-9988
Almasoud, A S (1996) A simulation model for repetitive project scheduling. PhD thesis, University of Colorado at Boulder, USA.
Almatroushi, H; Hariga, M; As'ad, R and Al-Bar, A (2020) The multi resource leveling and materials procurement problem: An integrated approach. Engineering, Construction and Architectural Management, 27(9), pp. 2135-2161. ISSN 0969-9988
Alnajjar, A (1995) Hyper automated estimating support system. PhD thesis, Illinois Institute of Technology, USA.
Alotaibi, M; El-Rayes, K and Altuwaim, A (2021) Optimizing the renovation scheduling of leased residential buildings to minimize total project cost. Journal of Construction Engineering and Management, 147(7): 2063, ISSN 0733-9364
Altuwaim, A and El-Rayes, K (2018) Optimizing the scheduling of repetitive construction to minimize interruption cost. Journal of Construction Engineering and Management, 144(7): 4018051, ISSN 0733-9364
Altuwaim, A and El-Rayes, K (2021) Multiobjective optimization model for planning repetitive construction projects. Journal of Construction Engineering and Management, 147(7): 04021072, ISSN 0733-9364
Altuwaim, A A (2018) Optimal scheduling and resource utilization for repetitive construction projects. PhD thesis, University of Illinois, USA.
Alzayd, Rana (2016) A constructability methodology to integrate planning and design for workers' safety in construction management. DrIng thesis, University of Braunschweig & University of Florence, Germany.
Alzraiee, H (2024) Quantifying labour impact cost due to change orders. International Journal of Construction Management, 24(4), pp. 467-475. ISSN 1562-3599
Amarkhil, Q.; Alroomi, A. S. and Narimani, M. R. (2026) Leveraging BIM, EPS and constraint programming for automated scheduling: A methodology for structured scheduling data and combinatorial optimization. Engineering, Construction and Architectural Management, 33(3), pp. 1980-2006. ISSN 0969-9988
Amer, F; Koh, H Y and Golparvar-Fard, M (2021) Automated methods and systems for construction planning and scheduling: Critical review of three decades of research. Journal of Construction Engineering and Management, 147(7): 0002093, ISSN 0733-9364
Ammar, M. A. and Alattyih, W. (2026) Lingo optimization modelling of construction scheduling. International Journal of Construction Management, 26(9), pp. 1746-1760. ISSN 1562-3599
Ammar, M A (2003) Float analysis of non-serial repetitive activities. Construction Management and Economics, 21(5), pp. 535-542. ISSN 01446193
Ammar, M A (2013) LOB and CPM integrated method for scheduling repetitive projects. Journal of Construction Engineering and Management, 139(1), pp. 44-50. ISSN 0733-9364
Ammar, M A (2020) Resource optimisation in line of balance scheduling. Construction Management and Economics, 38(8), pp. 715-725. ISSN 01446193
Ammar, M A (2020) Efficient modeling of time-cost trade-off problem by eliminating redundant paths. International Journal of Construction Management, 20(7), pp. 812-821. ISSN 1562-3599
Ammar, M A (2022) Optimization of line of balance scheduling considering work interruption. International Journal of Construction Management, 22(2), pp. 305-316. ISSN 1562-3599
Ammar, M A and Abd-ElKhalek, S I (2022) Criticality measurement in fuzzy project scheduling. International Journal of Construction Management, 22(2), pp. 252-261. ISSN 1562-3599
Ammar, M A and Abdel-Maged, A F (2018) Modeling of LOB scheduling with learning development effect. International Journal of Construction Management, 18(6), pp. 517-526. ISSN 1562-3599
Ammar, M A and Mohieldin, Y A (2002) Resource constrained project scheduling using simulation. Construction Management and Economics, 20(4), pp. 323-330. ISSN 01446193
Anagnostopoulos, K P and Koulinas, G K (2010) A simulated annealing hyperheuristic for construction resource levelling. Construction Management and Economics, 28(2), pp. 163-175. ISSN 1466433X
Andersen, M T and Findsen, A L (2019) Exploring the benefits of structured information with the use of virtual design and construction principles in a BIM life-cycle approach. Architectural Engineering and Design Management, 15(2), pp. 83-100. ISSN 1745-2007
Anson, M; Tang, S L and Ying, K C (2002) Measurement of the performance of ready mixed concreting resources as data for system simulation. Construction Management and Economics, 20(3), pp. 237-250. ISSN 01446193
Anson, M; Ying, K C T and Siu, M F F (2019) Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. Engineering, Construction and Architectural Management, 26(8), pp. 1672-1695. ISSN 0969-9988
Aouad, G F (1991) Integrated planning systems for the construction industry. PhD thesis, Loughborough University, UK.
Aouad, G F; Kawooya, A A O and Price, A D F (1996) Construction planning models: A review of history, capabilities and limitations. Journal of Construction Procurement, 2(2), pp. 19-37. ISSN 1358-9180
Apipattanavis, S; Sabol, K; Molenaar, K R; Rajagopalan, B; Xi, Y; Blackard, B and Patil, S (2010) Integrated framework for quantifying and predicting weather-related highway construction delays. Journal of Construction Engineering and Management, 136(11), pp. 1160-1168. ISSN 0733-9364
Appau, K A (1994) An integrated model of computer-aided cost estimating/scheduling in construction management. PhD thesis, Georgia Institute of Technology, USA.
Arabpour Roghabadi, M and Moselhi, O (2021) Optimized crew selection for scheduling of repetitive projects. Engineering, Construction and Architectural Management, 28(6), pp. 1517-1540. ISSN 0969-9988
Arditi, D (1984) Graduate education in construction management. Construction Management and Economics, 2(3), pp. 193-199. ISSN 01446193
Arditi, D (1985) Construction productivity improvement. Journal of Construction Engineering and Management, 111(1), pp. 1-14. ISSN 0733-9364
Arditi, D and Albulak, M Z (1986) Line-of-balance scheduling in pavement construction. Journal of Construction Engineering and Management, 112(3), pp. 411-424. ISSN 0733-9364
Arditi, D; Elhassan, A and Toklu, Y C (2002) Constructability analysis in the design firm. Journal of Construction Engineering and Management, 128(2), pp. 117-126. ISSN 0733-9364
Arditi, D and Koseoglu, H (1983) Factors affecting success in network applications in a developing country. Construction Management and Economics, 1(1), pp. 3-16. ISSN 01446193
Arditi, D and Mochtar, K (1996) Productivity improvement in the Indonesian construction industry. Construction Management and Economics, 14(1), pp. 13-24. ISSN 01446193
Arditi, D and Mochtar, K (2000) Trends in productivity improvement in the US construction industry. Construction Management and Economics, 18(1), pp. 15-27. ISSN 01446193
Arditi, D and Pattanakitchamroon, T (2008) Analysis methods in time-based claims. Journal of Construction Engineering and Management, 134(4), pp. 242-252. ISSN 0733-9364
Arditi, D; Sikangwan, P and Tokdemir, O B (2002) Scheduling system for high rise building construction. Construction Management and Economics, 20(4), pp. 353-364. ISSN 01446193
Arditi, D; Tokdemir, O B and Suh, K (2001) Scheduling system for repetitive unit construction using line-of-balance technology. Engineering, Construction and Architectural Management, 8(2), pp. 90-103. ISSN 0969-9988
Arditi, D; Tokdemir, O B and Suh, K (2002) Challenges in line-of-balance scheduling. Journal of Construction Engineering and Management, 128(6), pp. 545-556. ISSN 0733-9364
Arun, C (2004) Development of a decision support tool for scheduling highway construction projects based on simulation studies. PhD thesis, Anna University, Chennai, India.
Asadujjaman, Md (2023) Planning and scheduling supply chain integrated projects. PhD thesis, University of New South Wales, Australia.
Ashuri, B and Tavakolan, M (2012) Fuzzy enabled hybrid genetic algorithm-particle swarm optimization approach to solve tcro problems in construction project planning. Journal of Construction Engineering and Management, 138(9), pp. 1065-1074. ISSN 0733-9364
Aslani, P (2007) Dynamic resource -constrained scheduling. PhD thesis, Polytechnic University, USA.
Asnaashari, E (2011) A holistic conceptual model for managing construction logistics in building projects: the case of Iran. PhD thesis, Nottingham Trent University, UK.
Asnaashari, E; Knight, A; Hurst, A and Farahani, S S (2009) Causes of construction delays in Iran: Project management, logistics, technology and environment. In: Dainty, A R J (ed.) Proceedings of 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK.
Atapattu, C N; Domingo, N and Sutrisna, M (2023) Significant factors affecting the New Zealand transportation infrastructure project cost: quantity surveyors' perception. Built Environment Project and Asset Management, 13(5), pp. 756-777. ISSN 2044-124X
Atiq Ur Rehman, M; Chaabane, A and Khan, S A (2026) A novel decision support system for integrating supply chain and project management decisions to optimize multiple project performance: A case study in building renovation. International Journal of Construction Management, 26(1), pp. 29-53. ISSN 1562-3599
Austin, S; Baldwin, A and Newton, A (1994) Manipulating the flow of design information to improve the programming of building design. Construction Management and Economics, 12(5), pp. 445-455. ISSN 01446193
Ayeni, Reuben Ebenmosi (2025) Intelligent project duration estimating system: An AI-based predictive approach for construction time estimation. PhD thesis, London South Bank University, UK.
Ayyub, B M (1983) Structural safety analysis of reinforced concrete buildings during construction (fuzzy set). PhD thesis, Georgia Institute of Technology, USA.
Babazadeh, N; Teizer, J; Bargstädt, H J and Melzner, J (2025) Predictive simulation of construction site noise emissions from heavy equipment. Smart and Sustainable Built Environment, 14(3), pp. 715-739. ISSN 2046-6099
Badra, N; Hegazy, H; Zhang, J; Yahia, M; Fathy, M and AboulHaggag, S (2025) Application of fuzzy multi-objective model for crashing the construction of steel structure projects post-pandemic (Covid-19). International Journal of Construction Management, 25(3), pp. 363-374. ISSN 1562-3599
Bajjou, M S and Chafi, A (2026) Enhancing environmental sustainability through lean construction principles: An industry-based SEM analysis. Engineering, Construction and Architectural Management, 33(1), pp. 171-206. ISSN 0969-9988
Bajjou, M S and Chafi, A (2020) Empirical study of schedule delay in Moroccan construction projects. International Journal of Construction Management, 20(7), pp. 783-800. ISSN 1562-3599
Bajjou, M S and Chafi, A (2025) Developing and validating a new conceptual model for successful implementation of lean construction: SEM analysis. Engineering, Construction and Architectural Management, 32(3), pp. 1581-1620. ISSN 0969-9988
Bakry, I; Moselhi, O and Zayed, T (2016) Optimized scheduling and buffering of repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 23(6), pp. 782-800. ISSN 0969-9988
Ballesteros-Pérez, P (2017) M-PERT: Manual project-duration estimation technique for teaching scheduling basics. Journal of Construction Engineering and Management, 143(9): 04017063, ISSN 0733-9364
Ballesteros-Pérez, P; Sanz-Ablanedo, E; Cerezo-Narváez, A; Lucko, G; Pastor-Fernández, A; Otero-Mateo, M and Contreras-Samper, J P (2020) Forecasting accuracy of in-progress activity duration and cost estimates. Journal of Construction Engineering and Management, 146(9), ISSN 0733-9364
Ballesteros-Pérez, P; Sanz-Ablanedo, E; Soetanto, R; González-Cruz, M C; Larsen, G D and Cerezo-Narváez, A (2020) Duration and cost variability of construction activities: An empirical study. Journal of Construction Engineering and Management, 146(1): 04019093, ISSN 0733-9364
Banik, G C (2001) Construction productivity improvement: Current US perspective. Journal of Construction Procurement, 7(2), pp. 60-71. ISSN 1358-9180
Bansal, V K and Pal, M (2011) Construction projects scheduling using GIS tools. International Journal of Construction Management, 11(1), pp. 1-18. ISSN 1562-3599
Barraza, G A (2011) Probabilistic estimation and allocation of project time contingency. Journal of Construction Engineering and Management, 137(4), pp. 259-265. ISSN 0733-9364
Barraza, G A; Back, W E and Mata, F (2004) Probabilistic forecasting of project performance using stochastic S curves. Journal of Construction Engineering and Management, 130(1), pp. 25-32. ISSN 0733-9364
Barraza, G A and Bueno, R A (2007) Probabilistic control of project performance using control limit curves. Journal of Construction Engineering and Management, 133(12), pp. 957-965. ISSN 0733-9364
Bashford, H H; Walsh, K D and Sawhney, A (2005) Production system loading-cycle time relationship in residential construction. Journal of Construction Engineering and Management, 131(1), pp. 15-22. ISSN 0733-9364
Bates, M; Sturges, J; McGowan, K and Sommerville, J (1999) Material supply in house construction: The potential to enhance performance by improving communication. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Bayesteh, Ali (2024) Agile-based optimized planning and scheduling methodology for multiple scattered projects. PhD thesis, University of Alberta, Canada.
Bayraktar, M E and Hastak, M (2009) Bayesian belief network model for decision making in highway maintenance: Case studies. Journal of Construction Engineering and Management, 135(12), pp. 1357-1369. ISSN 0733-9364
Beheiry, S M A; Chong, W K and Haas, C T (2006) Examining the business impact of owner commitment to sustainability. Journal of Construction Engineering and Management, 132(4), pp. 384-392. ISSN 0733-9364
Bekdik, B; Pörzgen, J; Bull, S S and Thuesen, C (2018) Modularising design processes of façades in Denmark: Re-exploring the use of design structure matrix. Architectural Engineering and Design Management, 14(1-2), pp. 95-108. ISSN 1745-2007
Bell, L C and Stukhart, G (1987) Costs and benefits of materials management systems. Journal of Construction Engineering and Management, 113(2), pp. 222-234. ISSN 0733-9364
Benjaoran, V; Dawood, N and Hobbs, B (2005) Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics, 23(1), pp. 93-105. ISSN 01446193
Benjaoran, V; Tabyang, W and Sooksil, N (2015) Precedence relationship options for the resource levelling problem using a genetic algorithm. Construction Management and Economics, 33(9), pp. 711-723. ISSN 01446193
Bennett, Brian Kevin (2023) Increasing knowledge of scheduling activity sequencing in construction management education using interactive 3D gaming models. PhD thesis, University of Florida, USA.
Bennett, F L (1966) Some approaches to the critical path scheduling resource allocation problem. PhD thesis, Cornell University, USA.
Bentley, D and Stacey, R (1998) The potential for applying complex adaptive systems theory to the process of estimating in the construction industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Beran, V; Dlask, P; Eaton, D; Hromada, E and Zindulka, O (2011) Mapping of synchronous activities through virtual management momentum simulation. Construction Innovation, 11(2), pp. 190-211. ISSN 1471-4175
Besiktepe, D; Sparkling, A; Debs, L and Manuel, R (2024) Digital technology applications in construction education: A systematic review of methodological pluralism. International Journal of Construction Education and Research, 20(4), pp. 421-443. ISSN 1557-8771
Bhatia, A; Moselhi, O and Han, S (2025) Hybrid optimization approach for scheduling in panelized construction manufacturing. Journal of Construction Engineering and Management, 151(8): 04025107, ISSN 0733-9364
Bhaumik, P K (2016) Developing and using a new family of project S-curves using early and late shape parameters. Journal of Construction Engineering and Management, 142(12): 04016076, ISSN 0733-9364
Bi, L; Ren, B; Zhong, D and Hu, L (2015) Real-time construction schedule analysis of long-distance diversion tunnels based on lithological predictions using a markov process. Journal of Construction Engineering and Management, 141(2): 04014076, ISSN 0733-9364
Bilge, E Ç and Yaman, H (2022) Research trends analysis using text mining in construction management: 2000–2020. Engineering, Construction and Architectural Management, 29(8), pp. 3210-3233. ISSN 0969-9988
Biotto, C (2019) Integration of overlapped design and construction stages through location-based planning tools. PhD thesis, University of Huddersfield, UK.
Björnfot, A and Jongeling, R (2007) Application of line-of-balance and 4D CAD for lean planning. Construction Innovation, 7(2), pp. 200-211. ISSN 1471-4175
Blakey, L H (1990) Bar codes: Prescription for precision, performance, and productivity. Journal of Construction Engineering and Management, 116(3), pp. 468-479. ISSN 0733-9364
Bogus, S M; Diekmann, J E; Molenaar, K R; Harper, C; Patil, S and Lee, J S (2011) Simulation of overlapping design activities in concurrent engineering. Journal of Construction Engineering and Management, 137(11), pp. 950-957. ISSN 0733-9364
Bonnal, P; Gourc, D; Hameri, A P and Lacoste, G (2005) A linear-discrete scheduling model for the resource-constrained project scheduling problem. Construction Management and Economics, 23(8), pp. 797-814. ISSN 01446193
Bonnal, P; Gourc, D and Lacoste, G (2004) Where do we stand with fuzzy project scheduling? Journal of Construction Engineering and Management, 130(1), pp. 114-123. ISSN 0733-9364
Borges, W F and Mário, P D C (2017) Five project-duration control methods in time units: Case study of a linearly distributed planned value. Journal of Construction Engineering and Management, 143(6): 05017002, ISSN 0733-9364
Boussabaine, A (1991) An expert system prototype for construction planning and productivity analysis. PhD thesis, University of Manchester, UK.
Bowen, P; Govender, R and Edwards, P (2014) Structural equation modeling of occupational stress in the construction industry. Journal of Construction Engineering and Management, 140(9): 04014042, ISSN 0733-9364
Boysen, J (1982) Aggregate project model for resource allocation within multiproject construction systems. PhD thesis, University of California, Berkeley, USA.
Bragadin, M A and Kähkönen, K (2016) Schedule health assessment of construction projects. Construction Management and Economics, 34(12), pp. 875-897. ISSN 01446193
Brilakis, I and Soibelman, L (2006) Multimodal image retrieval from construction databases and model-based systems. Journal of Construction Engineering and Management, 132(7), pp. 777-785. ISSN 0733-9364
Browning, F R (1994) Planning system for hazardous waste site characterization. PhD thesis, University of Missouri - Rolla, USA.
Bryde, D J and Schulmeister, R (2012) Applying lean principles to a building refurbishment project: Experiences of key stakeholders. Construction Management and Economics, 30(9), pp. 777-794. ISSN 1466433X
Bubshait, A A and Cunningham, M J (1998) Comparison of delay analysis methodologies. Journal of Construction Engineering and Management, 124(4), pp. 315-322. ISSN 0733-9364
Bubshait, A A and Tahir, B M (1996) Planning and scheduling concrete repair work: a case study. Building Research & Information, 24(6), pp. 363-368. ISSN 0961-3218
Bugg, R A and Redden, L W (2020) Assessment and improvement of a required construction management service-learning course. In: Scott, L and Neilson, C J (eds.) Proceedings of 36th Annual ARCOM Conference, 7-8 September 2020, Online Event, UK.
Bynum, P; Issa, R R A and Olbina, S (2013) Building information modeling in support of sustainable design and construction. Journal of Construction Engineering and Management, 139(1), pp. 24-34. ISSN 0733-9364
Cajzek, R and Klanšek, U (2019) Cost optimization of project schedules under constrained resources and alternative production processes by mixed-integer nonlinear programming. Engineering, Construction and Architectural Management, 26(10), pp. 2474-2508. ISSN 0969-9988
Cancian, Glen A (2016) Heuristic based optimisation of pavement management scheduling. PhD thesis, Griffith University, Australia.
Cao, Q; Zou, X and Zhang, L (2022) Multiobjective robust optimization model for generating stable and makespan-protective repetitive schedules. Journal of Construction Engineering and Management, 148(9): 04022099, ISSN 0733-9364
Cao, Q; Zou, X and Zhang, L (2025) A flexible scheduling framework for repetitive construction projects based on constraint programming. Journal of Construction Engineering and Management, 151(7): 04025073, ISSN 0733-9364
Caprario, Rick (2025) Interpersonal communication, relationships, and collaboration among construction specialty contractor project management professionals: A single case study. EdD thesis, Baylor University, USA.
Carpenter, N (2014) Comparison of the design-bid-build and construction manager at risk project delivery methods utilized for the construction of public schools. PhD thesis, Clemson University, USA.
Castro-Lacouture, D; Süer, G A; Gonzalez-Joaqui, J and Yates, J K (2009) Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method. Journal of Construction Engineering and Management, 135(10), pp. 1096-1104. ISSN 0733-9364
Celoza, A; De Oliveira, D P and Leite, F (2023) Qualitative analysis of the impact of contracts on information management in AEC projects. Journal of Construction Engineering and Management, 149(3): 04022185, ISSN 0733-9364
Cepeda, D M; Sohail, M and Ogunlowo, O O (2018) Understanding the critical success factors for delivery of megaprojects in Colombia. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 171(2), pp. 45-57. ISSN 17514304
Chan, K Y (2012) Optimizing construction planning and scheduling by virtual prototyping enabled resource analysis. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Chan, P W (2005) An interpretivistic approach to understand the factors that affect construction labour productivity. PhD thesis, Heriot-Watt University, UK.
Chan, W H and Lu, M (2008) Materials handling system simulation in precast viaduct construction: Modeling, analysis, and implementation. Journal of Construction Engineering and Management, 134(4), pp. 300-310. ISSN 0733-9364
Chan, W T and Hu, H (2002) Constraint programming approach to precast production scheduling. Journal of Construction Engineering and Management, 128(6), pp. 513-521. ISSN 0733-9364
Chand, Shelvin (2018) Automated design of heuristics for the resource constrained project scheduling problem. PhD thesis, University of New South Wales, Australia.
Chang, T-C (1987) Network resource allocation using an expert system with fuzzy logic reasoning. PhD thesis, University of California, Berkeley, USA.
Chantawit, D; Hadikusumo, B H W; Charoenngam, C and Rowlinson, S (2005) 4DCAD-Safety: Visualizing project scheduling and safety planning. Construction Innovation, 5(2), pp. 99-114. ISSN 1471-4175
Chassiakos, A P and Sakellaropoulos, S P (2005) Time-cost optimization of construction projects with generalized activity constraints. Journal of Construction Engineering and Management, 131(10), pp. 1115-1124. ISSN 0733-9364
Chau, K W; Anson, M and Zhang, J P (2004) Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), pp. 598-606. ISSN 0733-9364
Chehayeb, N N (1996) Simulation-based project control. PhD thesis, University of Alberta, Canada.
Chehayeb, N N and AbouRizk, S M (1998) Simulation-based scheduling with continuous activity relationships. Journal of Construction Engineering and Management, 124(2), pp. 107-115. ISSN 0733-9364
Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988
Chen, J. H.; Shen, L. and Yu, T. (2026) Predicting manpower allocation for landscape construction projects using xgboost and shap. Engineering, Construction and Architectural Management, pp. 1-19. ISSN 0969-9988
Chen, C (2016) Crane planning optimization for construction. PhD thesis, National University of Singapore, Singapore.
Chen, H L; O'Brien, W J and Herbsman, Z J (2005) Assessing the accuracy of cash flow models: The significance of payment conditions. Journal of Construction Engineering and Management, 131(6), pp. 669-676. ISSN 0733-9364
Chen, Jamie (2025) Improving construction supply chain material management resilience through mathematical optimisation. PhD thesis, University of New South Wales, Australia.
Chen, L; Zhang, J and Peng, W (2022) Research on the hierarchical discrete time-cost trade-off problem for program. Journal of Construction Engineering and Management, 148(7): 04022039, ISSN 0733-9364
Chen, Q; Adey, B T; Haas, C T and Hall, D M (2022) Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management. Construction Innovation, 22(1), pp. 76-100. ISSN 1471-4175
Chen, S (2013) Scheduling, contracting, and capacity planning in project-based supply chains. PhD thesis, Stanford University, USA.
Chen, S-M (2002) Intelligent scheduling model and multi-dimensional CM information system. PhD thesis, Columbia University, USA.
Chen, W (2019) Integration of building information modeling and internet of things for facility maintenance management. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Chen, W-T (1994) Developing a knowledge-based expert system to determine contract duration for highway construction. PhD thesis, University of Florida, USA.
Chen, X; Chang-Richards, A; Ling, F Y Y; Yiu, T W; Pelosi, A and Yang, N (2025) Digital technologies in the AEC sector: A comparative study of digital competence among industry practitioners. International Journal of Construction Management, 25(1), pp. 63-76. ISSN 1562-3599
Chen, Z; Boateng, P and Ogunlana, S O (2019) A dynamic system approach to risk analysis for megaproject delivery. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 172(6), pp. 232-252. ISSN 17514304
Cheng, J (2005) A simulation access language and framework with applications to project management. PhD thesis, Stanford University, USA.
Cheng, M Y; Chang, Y H and Korir, D (2019) Novel approach to estimating schedule to completion in construction projects using sequence and nonsequence learning. Journal of Construction Engineering and Management, 145(11): 04019072, ISSN 0733-9364
Cheng, M Y; Huang, K Y and Hutomo, M (2018) Multiobjective dynamic-guiding PSO for optimizing work shift schedules. Journal of Construction Engineering and Management, 144(9): 04018089, ISSN 0733-9364
Cheraghi, E; Zohrehvandi, S; Vanhoucke, M and Mohamadpour Tosarkani, B (2023) A multiproject scheduling and resource management model in projects construction. Engineering, Construction and Architectural Management, 30(4), pp. 1578-1600. ISSN 0969-9988
Chester, M and Hendrickson, C (2005) Cost impacts, scheduling impacts, and the claims process during construction. Journal of Construction Engineering and Management, 131(1), pp. 102-107. ISSN 0733-9364
Chileshe, N; Reza Hosseini, M and Jepson, J (2016) Critical barriers to implementing risk assessment and management practices in the Iranian construction sector. Journal of Construction in Developing Countries, 21(2), pp. 81-112. ISSN 1823-6499
Chinanuwatwong, S (1998) Scheduling overtime in construction using time-cost trade-off. PhD thesis, University of Texas at Austin, USA.
Chiu H.N, T D M (2002) An efficient search procedure for the resource-constrained multi-project scheduling problem with discounted cash flows. Construction Management and Economics, 20(1), pp. 55-66. ISSN 01446193
Cho, S (2000) Sequential estimation and decision-making in project management: A Bayesian way and heuristic approaches. PhD thesis, George Washington University, USA.
Cho, S K (2011) The relation between lean construction and performance in the Korean construction industry. PhD thesis, University of California, Berkeley, USA.
Choi, B; Lee, H S; Park, M; Cho, Y K and Kim, H (2014) Framework for work-space planning using four-dimensional BIM in construction projects. Journal of Construction Engineering and Management, 140(9): 04014041, ISSN 0733-9364
Choi, K; Kwak, Y H; Pyeon, J H and Son, K (2012) Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects. Journal of Construction Engineering and Management, 138(3), pp. 323-330. ISSN 0733-9364
Choo, H J; Tommelein, I D; Ballard, G and Zabelle, T R (1999) Workplan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125(3), pp. 151-160. ISSN 0733-9364
Christodoulou, S E; Ellinas, G and Michaelidou-Kamenou, A (2010) Minimum moment method for resource leveling using entropy maximization. Journal of Construction Engineering and Management, 136(5), pp. 518-527. ISSN 0733-9364
Christodoulou, S E; Ellinas, G N and Aslani, P (2009) Disorder considerations in resource-constrained scheduling. Construction Management and Economics, 27(3), pp. 229-240. ISSN 1466433X
Chrzanowski, E N and Johnston, D W (1986) Application of linear scheduling. Journal of Construction Engineering and Management, 112(4), pp. 476-491. ISSN 0733-9364
Chua, D K H and Shen, L J (2005) Key constraints analysis with integrated production scheduler. Journal of Construction Engineering and Management, 131(7), pp. 753-764. ISSN 0733-9364
Chua, D K H; Shen, L J and Bok, S H (2003) Constralnt-based planning with integrated production scheduler over internet. Journal of Construction Engineering and Management, 129(3), pp. 293-301. ISSN 0733-9364
Chua, D K H; Tyagi, A; Ling, S and Bok, S H (2003) Process-parameter-interface model for design management. Journal of Construction Engineering and Management, 129(6), pp. 653-663. ISSN 0733-9364
Chua, D K H and Yeoh, K W (2011) PDM++: Planning framework from a construction requirements perspective. Journal of Construction Engineering and Management, 137(4), pp. 266-274. ISSN 0733-9364
Cleveland Jr, A B (2011) Emerging tools to enable construction engineering. Journal of Construction Engineering and Management, 137(10), pp. 836-842. ISSN 0733-9364
Cosma, C (2003) Development of a systematic approach for uncertainty assessment in scheduling multiple repetitive construction processes by using fuzzy set theory. PhD thesis, University of Florida, USA.
D'Onofrio, R M (2017) CPM scheduling: A 60-year history. Journal of Construction Engineering and Management, 143(10): 02517010, ISSN 0733-9364
D'Orazio, M; Bernardini, G and Di Giuseppe, E (2024) Improving sustainable management of university buildings based on occupancy data. Journal of Construction Engineering and Management, 150(1): 04023154, ISSN 0733-9364
Dabbas, M A A (1981) Computerized decision making in construction. PhD thesis, Georgia Institute of Technology, USA.
Dainty, A R J; Harty, T E and Neale, R H (2000) Improving employee resourcing within large construction organizations. In: Akintoye, A (ed.) Proceedings of 16th Annual ARCOM Conference, 6-8 September 2000, Glasgow, UK.
Damci, A (2022) Revisiting the concept of natural rhythm of production in line of balance scheduling. International Journal of Construction Management, 22(12), pp. 2335-2344. ISSN 1562-3599
Damci, A; Arditi, D and Polat, G (2013) Multiresource leveling in line-of-balance scheduling. Journal of Construction Engineering and Management, 139(9), pp. 1108-1116. ISSN 0733-9364
Dan, Y and Liu, G (2024) Integrated scheduling optimization of production and transportation for precast component with delivery time window. Engineering, Construction and Architectural Management, 31(8), pp. 3335-3355. ISSN 0969-9988
Dang, T and Bargstädt, H J (2016) 4D relationships: The missing link in 4D scheduling. Journal of Construction Engineering and Management, 142(2): 04015072, ISSN 0733-9364
Darlow, M J (1968) Investigations into line of balance scheduling house building. PhD thesis, Loughborough University, UK.
Das, D K and Emuze, F (2017) A dynamic model of contractor-induced delays in India. Journal of Construction in Developing Countries, 22(1), pp. 21-39. ISSN 1823-6499
Dawood, N (2010) Development of 4D-based performance indicators in construction industry. Engineering, Construction and Architectural Management, 17(2), pp. 210-230. ISSN 0969-9988
Dawood, N and Sikka, S (2009) Development of 4D based performance indicators in construction industry. Engineering, Construction and Architectural Management, 16(5), pp. 438-458. ISSN 0969-9988
Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(1), pp. 19-30. ISSN 01446193
Dawood, N N (1994) Developing a production management modelling approach for precast concrete building products. Construction Management and Economics, 12(5), pp. 393-412. ISSN 01446193
Dawood, N N (1995) An integrated knowledge-based/simulation approach to production planning: An application to the pre-cast industry. Construction Management and Economics, 13(1), pp. 53-64. ISSN 01446193
Dawood, N N (1996) A strategy for a computer-based materials management system for the building industry. Journal of Financial Management of Property and Construction, 1(2), pp. 17-28. ISSN 1366-4387
Dawood, N N (1998) A framework of integrating design and production system for the off-site building product industry. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Dayanand, N (1996) Scheduling payments in projects: An optimization framework. PhD thesis, Carnegie Mellon University, USA.
De La Garza, J M; Prateapusanond, A and Ambani, N (2007) Preallocation of total float in the application of a critical path method based construction contract. Journal of Construction Engineering and Management, 133(11), pp. 836-845. ISSN 0733-9364
De La Garza-Rodriguez, J M (1988) A knowledge engineering approach to the analysis and evaluation of schedules for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
De Marco, A; Briccarello, D and Rafele, C (2009) Cost and schedule monitoring of industrial building projects: Case study. Journal of Construction Engineering and Management, 135(9), pp. 853-862. ISSN 0733-9364
Dehghan, R (2012) A new model, algorithm and computer tool to optimize overlapping of design activities in construction projects. PhD thesis, University of Calgary, Canada.
Desgagné-Lebeuf, A; Lehoux, N and Beauregard, R (2022) Scheduling tools for the construction industry: Overview and decision support system for tool selection. International Journal of Construction Management, 22(14), pp. 2687-2698. ISSN 1562-3599
Dharwadkar, P V (1994) A prototype object-oriented system for three-dimensional CAD and schedule integration. PhD thesis, University of Texas at Austin, USA.
Dixit, V; Chaudhuri, A and Srivastava, R K (2018) Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18(3), pp. 189-206. ISSN 1562-3599
Doloi, H (2013) Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. Journal of Construction Engineering and Management, 139(3), pp. 267-279. ISSN 0733-9364
Dorward, D R (2006) The effect of selected output modifications on facilitating the assessment of PDM schedules. PhD thesis, Indiana State University, USA.
Dou, Y; Zhong, L and Luo, L (2025) Supply chain resilience of prefabricated construction: Perspectives of stakeholder capabilities and vulnerabilities. Journal of Construction Engineering and Management, 151(4): 04025013, ISSN 0733-9364
Doulabi, S H H; Seifi, A and Shariat, S Y (2011) Efficient hybrid genetic algorithm for resource leveling via activity splitting. Journal of Construction Engineering and Management, 137(2), pp. 137-146. ISSN 0733-9364
Du, J; Xue, Y; Sugumaran, V; Hu, M and Dong, P (2023) Improved biogeography-based optimization algorithm for lean production scheduling of prefabricated components. Engineering, Construction and Architectural Management, 30(4), pp. 1601-1635. ISSN 0969-9988
Duffy, G A (2009) Linear scheduling of pipeline construction projects with varying production rates. PhD thesis, Oklahoma State University, USA.
Duffy, G A; Oberlender, G D and Seok Jeong, D H (2011) Linear scheduling model with varying production rates. Journal of Construction Engineering and Management, 137(8), pp. 574-582. ISSN 0733-9364
Dupin, P (2021) Using pull and flow systems to improve production stability in real estate development projects. PhD thesis, Nottingham Trent University, UK.
Dzeng, R J and Tommelein, I D (1997) Boiler erection scheduling using product models and case-based reasoning. Journal of Construction Engineering and Management, 123(3), pp. 338-347. ISSN 0733-9364
Dzeng, R J; Tserng, H P and Wang, W C (2005) Automating schedule review for expressway construction. Journal of Construction Engineering and Management, 131(1), pp. 127-136. ISSN 0733-9364
Dzeng, R J; Wang, W C and Tserng, H P (2004) Module-based construction schedule administration for public infrastructure agencies. Journal of Construction Engineering and Management, 130(1), pp. 5-14. ISSN 0733-9364
Dzeng, R-J (1995) Caseplan: A case-based planner and scheduler for construction using product modeling. PhD thesis, University of Michigan, USA.
Easa, S M (1989) Resource leveling in construction by optimization. Journal of Construction Engineering and Management, 115(2), pp. 302-316. ISSN 0733-9364
East, E W and Kim, S (1993) Standardizing scheduling data exchange. Journal of Construction Engineering and Management, 119(2), pp. 215-225. ISSN 0733-9364
East, E W and Liu, L Y (2006) Multiproject planning and resource controls for facility management. Journal of Construction Engineering and Management, 132(12), pp. 1294-1305. ISSN 0733-9364
Echeverry, D (1991) Factors for generating initial construction schedules. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Edwards, D J and Holt, G D (2001) Predicting construction plant maintenance expenditure. Building Research & Information, 29(6), pp. 417-427. ISSN 0961-3218
Edwards, D J and Yisa, S (2001) Modelling the magnitude of plant downtime: A tool for improving plant operations management. Engineering, Construction and Architectural Management, 8(3), pp. 225-232. ISSN 0969-9988
Egebjerg, C (2013) Learning from movie-sets coordination. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Egger, H S (1986) Business techniques and skills utilized by small residential contractors with one to four employees in six high growth areas of Texas. EdD thesis, Texas A&M University, USA.
Eid, M S; Elbeltagi, E E and El-Adaway, I H (2021) Simultaneous multi-criteria optimization for scheduling linear infrastructure projects. International Journal of Construction Management, 21(1), pp. 41-55. ISSN 1562-3599
Eizak Shiri, F (2015) Planning intentionality and its implications for project planned time. PhD thesis, University of Manchester, UK.
El-Bibany, H (1997) Parametric constraint management in planning and scheduling: Computational basis. Journal of Construction Engineering and Management, 123(3), pp. 348-353. ISSN 0733-9364
El-Gohary, K M; Aziz, R F and Abdel-Khalek, H A (2017) Engineering approach using ANN to improve and predict construction labor productivity under different influences. Journal of Construction Engineering and Management, 143(8): 04017045, ISSN 0733-9364
El-Omari, S (2008) Automated data acquisition for tracking and control of construction projects. PhD thesis, Concordia University, Canada.
El-Rayes, K (2001) Object-oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, 127(3), pp. 199-205. ISSN 0733-9364
El-Rayes, K and Jun, D H (2009) Optimizing resource leveling in construction projects. Journal of Construction Engineering and Management, 135(11), pp. 1172-1180. ISSN 0733-9364
El-Rayes, K and Moselhi, O (1998) Resource-driven scheduling of repetitive activities. Construction Management and Economics, 16(4), pp. 433-446. ISSN 01446193
El-Rayes, K and Moselhi, O (2001) Optimizing resource utilization for repetitive construction projects. Journal of Construction Engineering and Management, 127(1), pp. 18-26. ISSN 0733-9364
El-Rayes, K; Ramanathan, R and Moselhi, O (2002) An object-oriented model for planning and control of housing construction. Construction Management and Economics, 20(3), pp. 201-210. ISSN 01446193
El-Rayes, K A (1998) Optimized scheduling for repetitive construction projects. PhD thesis, Concordia University, Canada.
El-Sayegh, S (2018) Resource levelling optimization model considering float loss impact. Engineering, Construction and Architectural Management, 25(5), pp. 639-653. ISSN 0969-9988
El-Sayegh, S M (1998) Linear construction planning model (LCPM): A new model for planning, and scheduling linear construction projects. PhD thesis, Texas A&M University, USA.
ElMenshawy, M and Marzouk, M (2021) Automated BIM schedule generation approach for solving time–cost trade-off problems. Engineering, Construction and Architectural Management, 28(10), pp. 3346-3367. ISSN 0969-9988
Elazouni, A (2009) Heuristic method for multi-project finance-based scheduling. Construction Management and Economics, 27(2), pp. 199-211. ISSN 1466433X
Elazouni, A and Abido, M A (2014) Enhanced trade-off of construction projects: Finance-resource-profit. Journal of Construction Engineering and Management, 140(9): 04014043, ISSN 0733-9364
Elazouni, A; Alghazi, A and Selim, S Z (2015) Finance-based scheduling using meta-heuristics: Discrete versus continuous optimization problems. Journal of Financial Management of Property and Construction, 20(1), pp. 85-104. ISSN 1366-4387
Elazouni, A M and Gab-Allah, A A (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), pp. 15-24. ISSN 0733-9364
Elazouni, A M and Metwally, F G (2005) Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), pp. 400-412. ISSN 0733-9364
Elazouni, A M and Metwally, F G (2007) Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management, 133(1), pp. 86-90. ISSN 0733-9364
Elbeltagi, E; Ammar, M; Sanad, H and Kassab, M (2016) Overall multiobjective optimization of construction projects scheduling using particle swarm. Engineering, Construction and Architectural Management, 23(3), pp. 265-282. ISSN 0969-9988
Elbeltagi, E; Hegazy, T and Eldosouky, A (2004) Dynamic layout of construction temporary facilities considering safety. Journal of Construction Engineering and Management, 130(4), pp. 534-541. ISSN 0733-9364
Elbeltagi, E; Hegazy, T; Hosny, A H and Eldosouky, A (2001) Schedule-dependent evolution of site layout planning. Construction Management and Economics, 19(7), pp. 689-697. ISSN 01446193
Eldin, N N (1991) Management of engineering/design phase. Journal of Construction Engineering and Management, 117(1), pp. 163-175. ISSN 0733-9364
Elghaish, F and Abrishami, S (2020) Developing a framework to revolutionise the 4D BIM process: IPD-based solution. Construction Innovation, 20(3), pp. 401-420. ISSN 1471-4175
Elhakeem, A and Hegazy, T (2005) Graphical approach for manpower planning in infrastructure networks. Journal of Construction Engineering and Management, 131(2), pp. 168-175. ISSN 0733-9364
Elkabalawy, M and Moselhi, O (2022) Optimized resource-constrained method for project schedule compression. Engineering, Construction and Architectural Management, 29(5), pp. 2106-2129. ISSN 0969-9988
Elkadi, Karim (2024) BIM-enabled facility management framework and simulation. PhD thesis, George Mason University, USA.
Elliott, B R (2000) Investigation of the construction scheduling communication process: Problems, foreman's role, means of improvement and use of information technology. PhD thesis, University of Florida, USA.
Ellis Jr., R D (1989) Model for prediction of highway construction production rates. PhD thesis, University of Florida, USA.
Elmasry, M; Zayed, T and Hawari, A (2019) Multi-objective optimization model for inspection scheduling of sewer pipelines. Journal of Construction Engineering and Management, 145(2): 04018129, ISSN 0733-9364
Elzarka, H M and Bell, L C (1995) Object-oriented methodology for materials-management systems. Journal of Construction Engineering and Management, 121(4), pp. 438-445. ISSN 0733-9364
Emam, H (2021) Optimising project controls for construction using BIM and Big Data Analytics. PhD thesis, University of Bolton, UK.
Emam, H; Farrell, P and Ahmed, S (2016) Formulating a linear scheduling development index. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(5), pp. 188-198. ISSN 17514304
Emsoff, J E (1994) An object-oriented environment for the visual integration of project scheduling data. PhD thesis, Texas A&M University, USA.
Ensafi, Mahnaz (2022) Work order prioritization using neural networks to improve building operation. PhD thesis, Virginia Tech, USA.
Enshassi, A (1996) Materials control and waste on building sites. Building Research & Information, 24(1), pp. 31-34. ISSN 0961-3218
Eskander, A K (1998) Total project management delay analysis method (TPM-DAM) with emphasis on project preplanning. PhD thesis, Polytechnic University, USA.
Esmaeili, B and Hallowell, M (2013) Integration of safety risk data with highway construction schedules. Construction Management and Economics, 31(6), pp. 528-541. ISSN 1466433X
Esmaeili, B; Hallowell, M R and Rajagopalan, B (2015) Attribute-based safety risk assessment. II: Predicting safety outcomes using generalized linear models. Journal of Construction Engineering and Management, 141(8): 04015022, ISSN 0733-9364
Ezeldin, A S and Soliman, A (2009) Hybrid time-cost optimization of nonserial repetitive construction projects. Journal of Construction Engineering and Management, 135(1), pp. 42-55. ISSN 0733-9364
Ezzeddine, A; Shehab, L; Lucko, G and Hamzeh, F (2022) Forecasting construction project performance with momentum using singularity functions in LPS. Journal of Construction Engineering and Management, 148(8): 04022063, ISSN 0733-9364
Fahmie, M M (1994) A knowledge-based expert system approach to analyze and evaluate highway construction schedules. PhD thesis, Florida University, USA.
Fahmy, A (2014) A dynamic scheduling model for construction enterprises. PhD thesis, Loughborough University, UK.
Fahmy, A; Hassan, T; Bassioni, H and McCaffer, R (2020) Dynamic scheduling model for the construction industry. Built Environment Project and Asset Management, 10(3), pp. 313-330. ISSN 2044-124X
Fan, C; Binchao, D and Yin, Y (2023) Hierarchical structure and transfer mechanism to assess the scheduling-related risk in construction of prefabricated buildings: An integrated ISM–MICMAC approach. Engineering, Construction and Architectural Management, 30(7), pp. 2991-3013. ISSN 0969-9988
Fan, S L (2012) Modified time impact analysis method. Journal of Construction Engineering and Management, 138(2), pp. 227-233. ISSN 0733-9364
Fan, S L and Tserng, H P (2006) Object-oriented scheduling for repetitive projects with soft logics. Journal of Construction Engineering and Management, 132(1), pp. 35-48. ISSN 0733-9364
Farahani, A; Wallbaum, H and Dalenbäck, J O (2019) Optimized maintenance and renovation scheduling in multifamily buildings: a systematic approach based on condition state and life cycle cost of building components. Construction Management and Economics, 37(3), pp. 139-155. ISSN 01446193
Farahani, A; Wallbaum, H and Dalenbäck, J O (2020) Cost-optimal maintenance and renovation planning in multifamily buildings with annual budget constraints. Journal of Construction Engineering and Management, 146(3): 04020009, ISSN 0733-9364
Farnsworth, C B; Beveridge, S; Miller, K R and Christofferson, J P (2015) Application, advantages, and methods associated with using BIM in commercial construction. International Journal of Construction Education and Research, 11(3), pp. 218-236. ISSN 1557-8771
Fazlipour, M and Samadzad, M (2026) Engineering and economic feasibility of a new prefabrication ecosystem for steel construction in diverse low-rise residential buildings. Journal of Construction Engineering and Management, 152(2): 04025238, ISSN 0733-9364
Federico, D A; Berta, M; Bottero, M; Mallia, G and Morgese, V (2024) Multicriteria-decision support for master plan scheduling: Urban regeneration of an industrial area in Northern Italy. Construction Management and Economics, 42(5), pp. 476-501. ISSN 01446193
Fischer, M A and Aalami, F B (1996) Scheduling with computer-interpretable construction method models. Journal of Construction Engineering and Management, 122(4), pp. 337-347. ISSN 0733-9364
Fisher, D J and Rajan, N (1996) Automated constructibility analysis of work-zone traffic-control planning. Journal of Construction Engineering and Management, 122(1), pp. 36-43. ISSN 0733-9364
Florez, L; Irizarry, J; Castro-Lacouture, D; Abdollahipour, S and Jeong, H (2012) Feasibility of implementing a computer-assisted pavement rehabilitation decision support system. International Journal of Construction Education and Research, 8(4), pp. 281-300. ISSN 1557-8771
Ford, D N; Anderson, S D; Damron, A J; De Las Casas, R; Gokmen, N and Kuennen, S T (2004) Managing constructibility reviews to reduce highway project durations. Journal of Construction Engineering and Management, 130(1), pp. 33-42. ISSN 0733-9364
Francis, A (2013) The chronographical approach for construction project modelling. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(4), pp. 188-204. ISSN 17514312
Francis, A (2016) A chronographic protocol for modelling construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(4), pp. 168-177. ISSN 17514304
Francis, A (2017) Simulating uncertainties in construction projects with chronographical scheduling logic. Journal of Construction Engineering and Management, 143(1): 04016085, ISSN 0733-9364
Francis, A; Bibai, J and Miresco, E (2013) Simulation of scheduling logic using dynamic functions. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 166(3), pp. 145-158. ISSN 17514312
Franco-Duran, D M and De La Garza, J M (2020) Performance of resource-constrained scheduling heuristics. Journal of Construction Engineering and Management, 146(4): 04020026, ISSN 0733-9364
Franco-Duran, D M and Garza, J M D L (2019) Review of resource-constrained scheduling algorithms. Journal of Construction Engineering and Management, 145(11): 03119006, ISSN 0733-9364
Frandson, A (2019) Takt time planning as a work structuring method to improve construction work flow. PhD thesis, University of California, Berkeley, USA.
Froese, T M (1992) Integrated computer-aided project management through standard object-oriented models. PhD thesis, Stanford University, USA.
Fugar, F D K and Agyakwah-Baah, A B (2010) Delays in building construction projects in Ghana. Construction Economics and Building, 10(1-2), pp. 103-116. ISSN 2204-9029
Gajpal, Y and Elazouni, A (2015) Enhanced heuristic for finance-based scheduling of construction projects. Construction Management and Economics, 33(7), pp. 531-553. ISSN 01446193
Galloway, P D (2006) Comparative study of university courses on critical-path method scheduling. Journal of Construction Engineering and Management, 132(7), pp. 712-722. ISSN 0733-9364
Galloway, P D (2006) Survey of the construction industry relative to the use of CPM scheduling for construction projects. Journal of Construction Engineering and Management, 132(7), pp. 697-711. ISSN 0733-9364
Gao, M Y; Han, J; Yang, Y; Tiong, R L K; Zhao, C and Han, C (2024) BIM-based and IoT-driven smart tracking for precast construction dynamic scheduling. Journal of Construction Engineering and Management, 150(9): 04024117, ISSN 0733-9364
Geem, Z W (2010) Multiobjective optimization of time-cost trade-off using harmony search. Journal of Construction Engineering and Management, 136(6), pp. 711-716. ISSN 0733-9364
Gelisen, G (2010) Automated productivity based schedule animation (APBSA). PhD thesis, Polytechnic Institute of New York University, USA.
Gelisen, G and Griffis, F H (2014) Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis. Journal of Construction Engineering and Management, 140(4): B4013007, ISSN 0733-9364
Georgy, M and Basily, S Y (2008) Using genetic algorithms in optimizing construction material delivery schedules. Construction Innovation, 8(1), pp. 23-45. ISSN 1471-4175
Ghadar, K O (2017) An examination of PERT implementation in the Libyan construction industry. PhD thesis, Cardiff Metropolitan University, UK.
Ghaffari, M (2017) The impact of multitasking on critical chain portfolios. PhD thesis, University of Manchester, UK.
Ghimire, Prashna (2025) Framework for integrating industry knowledge into a large language model to assist construction cost estimation. PhD thesis, University of Nebraska - Lincoln, USA.
Goedert, J D and Sekpe, V D (2013) Decision support system-enhanced scheduling in matrix organizations using the analytic hierarchy process. Journal of Construction Engineering and Management, 139(11): 5013003, ISSN 0733-9364
Gomes, Helton Cristiano (2013) Multi-objective optimization algorithms for the activity sequencing problem in steel construction projects. PhD thesis, Universidade Federal de Ouro Preto, Brazil.
González, P; González, V; Molenaar, K and Orozco, F (2014) Analysis of causes of delay and time performance in construction projects. Journal of Construction Engineering and Management, 140(1): 04013027, ISSN 0733-9364
González-Cruz, M C; Ballesteros-Pérez, P; Lucko, G and Zhang, J X (2022) Critical duration index: Anticipating project delays from deterministic schedule information. Journal of Construction Engineering and Management, 148(11): 04022121, ISSN 0733-9364
Gould, C H (1988) Rolling fours: Novel work schedule. Journal of Construction Engineering and Management, 114(4), pp. 577-593. ISSN 0733-9364
Grau, D and Back, W E (2015) Predictability index: Novel metric to assess cost and schedule performance. Journal of Construction Engineering and Management, 141(12): 04015043, ISSN 0733-9364
Greenwood, D and Gledson, B J (2012) The efficient scheduling of resources in engineering construction projects: Reflections on a case study from Iran. Construction Management and Economics, 30(8), pp. 687-695. ISSN 1466433X
Greenwood, D; Walker, P and Walker, A (2008) The world turned upside-down: Architects as subcontractors in design-and-build contracts. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Grzeszczyk, G; Unterhitzenberger, C; Abdelmegid, M and Sainati, T (2025) Beyond guesswork: Predicting project delays and timelines with a forward-looking risk-adjusted approach. Construction Management and Economics, 43(12), pp. 1045-1059. ISSN 0144-6193
Gunduz, M (2002) Change orders impact assessment for labor intensive construction. PhD thesis, University of Wisconsin - Madison, USA.
Guo, S J (2002) Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering and Management, 128(4), pp. 287-295. ISSN 0733-9364
Gurgun, A P; Koc, K and Kunkcu, H (2024) Exploring the adoption of technology against delays in construction projects. Engineering, Construction and Architectural Management, 31(3), pp. 1222-1253. ISSN 0969-9988
Gwak, H S; Son, S H; Park, Y J and Lee, D E (2016) Exact time-cost tradeoff analysis in concurrency-based scheduling. Journal of Construction Engineering and Management, 142(10): 04016054, ISSN 0733-9364
Haas, C and Einstein, H H (2002) Updating the decision aids for tunneling. Journal of Construction Engineering and Management, 128(1), pp. 40-48. ISSN 0733-9364
Haas, T C; Rodriguez, A M; Glover, R and Goodrum, P M (2001) Implementing a multiskilled workforce. Construction Management and Economics, 19(6), pp. 633-641. ISSN 01446193
Hajiashrafi, R (2025) Streamlined shapley value models for contribution-based compensation allocation in scheduling networks in construction project management. PhD thesis, Catholic University of America, USA.
Hajibabai, L (2014) Scheduling and routing of service trucks and planning of resource replenishment locations for winter roadway maintenance. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hajibabai, L; Aziz, Z and Peña-Mora, F (2011) Visualizing greenhouse gas emissions from construction activities. Construction Innovation, 11(3), pp. 356-370. ISSN 1471-4175
Hajirasouli, A; Banihashemi, S; Drogemuller, R; Fazeli, A and Mohandes, S R (2022) Augmented reality in design and construction: Thematic analysis and conceptual frameworks. Construction Innovation, 22(3), pp. 412-443. ISSN 1471-4175
Halabya, A and El-Rayes, K (2020) Optimizing the planning of pedestrian facilities upgrade projects to maximize accessibility for people with disabilities. Journal of Construction Engineering and Management, 146(1): 04019088, ISSN 0733-9364
Haller, M; Lu, W; Stehn, L and Jansson, G (2015) An indicator for superfluous iteration in offsite building design processes. Architectural Engineering and Design Management, 11(5), pp. 360-375. ISSN 1745-2007
Hammad, A W; Grzybowska, H; Sutrisna, M; Akbarnezhad, A and Haddad, A (2020) A novel mathematical optimisation model for the scheduling of activities in modular construction factories. Construction Management and Economics, 38(6), pp. 534-551. ISSN 01446193
Hamzeh, F R (2009) Improving construction workflow: The role of production planning and control. PhD thesis, University of California, Berkeley, USA.
Han, Bing (2022) Implementing virtual reality-based design review in the construction industry. PhD thesis, University of Texas at Austin, USA.
Handa, V K and Barcia, R M (1986) Linear scheduling using optimal control theory. Journal of Construction Engineering and Management, 112(3), pp. 387-393. ISSN 0733-9364
Handa, V K and Rivers, D (1983) Downgrading construction incidents. Journal of Construction Engineering and Management, 109(2), pp. 190-205. ISSN 0733-9364
Hanna, A S (2012) Using the earned value management system to improve electrical project control. Journal of Construction Engineering and Management, 138(3), pp. 449-457. ISSN 0733-9364
Hanna, A S; Chang, C K; Lackney, J A and Sullivan, K T (2007) Impact of overmanning on mechanical and sheet metal labor productivity. Journal of Construction Engineering and Management, 133(1), pp. 22-28. ISSN 0733-9364
Hanna, A S; Chang, C K; Sullivan, K T and Lackney, J A (2008) Impact of shift work on labor productivity for labor intensive contractor. Journal of Construction Engineering and Management, 134(3), pp. 197-204. ISSN 0733-9364
Hanna, A S; Taylor, C S and Sullivan, K T (2005) Impact of extended overtime on construction labor productivity. Journal of Construction Engineering and Management, 131(6), pp. 734-739. ISSN 0733-9364
Harding, A M (1999) A global approach to project optimisation. PhD thesis, University of Edinburgh, UK.
Harmelink, D J (1995) Linear scheduling model: The development of a linear scheduling model with microcomputer applications for highway construction project control. PhD thesis, Iowa State University, USA.
Harmelink, D J (2001) Linear scheduling model: Float characteristics. Journal of Construction Engineering and Management, 127(4), pp. 255-260. ISSN 0733-9364
Harmelink, D J and Rowings, J E (1998) Linear scheduling model: Development of controlling activity path. Journal of Construction Engineering and Management, 124(4), pp. 263-268. ISSN 0733-9364
Harris, R B and Ioannou, P G (1998) Scheduling projects with repeating activities. Journal of Construction Engineering and Management, 124(4), pp. 269-278. ISSN 0733-9364
Hartmann, T and Fischer, M (2007) Supporting the constructability review with 3D/4D models. Building Research & Information, 35(1), pp. 70-80. ISSN 0961-3218
Hasan, A and Jha, K N (2019) Client and contractor roles in schedule incentive/disincentive projects: An empirical study from India. Engineering, Construction and Architectural Management, 26(3), pp. 386-407. ISSN 0969-9988
Hasan, M and Lu, M (2021) Error propagation model for analyzing project labor cost budget risks in industrial construction. Journal of Construction Engineering and Management, 147(4): 2010, ISSN 0733-9364
Hassan, A and El-Rayes, K (2020) Quantifying the interruption impact of activity delays in non-serial repetitive construction projects. Construction Management and Economics, 38(6), pp. 515-533. ISSN 01446193
Hassan, A; El-Rayes, K and Attalla, M (2021) Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty. Engineering, Construction and Architectural Management, 28(6), pp. 1615-1634. ISSN 0969-9988
Hassan, A; El-Rayes, K and Attalla, M (2023) Stochastic scheduling optimization of repetitive construction projects to minimize project duration and cost. International Journal of Construction Management, 23(9), pp. 1447-1456. ISSN 1562-3599
Hassan, A A A (2019) Risk management of repetitive construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Hassanein, A (2003) Planning and scheduling highway construction using GIS and dynamic programming. PhD thesis, Concordia University, Canada.
Hassanein, A and Moselhi, O (2004) Planning and scheduling highway construction. Journal of Construction Engineering and Management, 130(5), pp. 638-646. ISSN 0733-9364
Hassanein, A and Moselhi, O (2005) Accelerating linear projects. Construction Management and Economics, 23(4), pp. 377-385. ISSN 01446193
Hassanein, A A G and Melin, J W (1996) Time constraints set by prime contractors for their sub-contractors. Building Research & Information, 24(5), pp. 293-301. ISSN 0961-3218
Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2007) Project manager's decision aid for a radical project cycle reduction. Journal of Construction Engineering and Management, 133(6), pp. 437-446. ISSN 0733-9364
Hastak, M; Gokhale, S; Goyani, K; Hong, T and Safi, B (2008) Analysis of techniques leading to radical reduction in project cycle time. Journal of Construction Engineering and Management, 134(12), pp. 915-927. ISSN 0733-9364
He, C (2022) Integrate human and engineering aspects to facilitate construction scheduling under uncertainty. PhD thesis, North Carolina State University, USA.
He, C; Liu, M; Alves, T D C L; Scala, N M and Hsiang, S M (2022) Prioritizing collaborative scheduling practices based on their impact on project performance. Construction Management and Economics, 40(7-8), pp. 618-637. ISSN 01446193
Heaton, R; Martin, H; Chadee, A; Milling, A; Dunne, S and Borthwick, F (2022) The construction materials conundrum: Practical solutions to address integrated supply chain complexities. Journal of Construction Engineering and Management, 148(8): 04022071, ISSN 0733-9364
Heesom, D (2004) An analytical system for space planning on construction sites. PhD thesis, University of Wolverhampton, UK.
Hegab, M and Smith, G R (2009) Labor performance analysis for microtunneling projects. Journal of Construction Engineering and Management, 135(5), pp. 432-435. ISSN 0733-9364
Hegazy, T (2006) Computerized system for efficient delivery of infrastructure maintenance/repair programs. Journal of Construction Engineering and Management, 132(1), pp. 26-34. ISSN 0733-9364
Hegazy, T; Abdel-Monem, M and Saad, D A (2014) Framework for enhanced progress tracking and control of linear projects. Engineering, Construction and Architectural Management, 21(1), pp. 94-110. ISSN 0969-9988
Hegazy, T; Abdel-Monem, M; Saad, D A and Rashedi, R (2013) Hands-on exercise for enhancing students' construction management skills. Journal of Construction Engineering and Management, 139(9), pp. 1135-1143. ISSN 0733-9364
Hegazy, T; Elbeltagi, E and Zhang, K (2005) Keeping better site records using intelligent bar charts. Journal of Construction Engineering and Management, 131(5), pp. 513-521. ISSN 0733-9364
Hegazy, T; Elhakeem, A and Elbeltagi, E (2004) Distributed scheduling model for infrastructure networks. Journal of Construction Engineering and Management, 130(2), pp. 160-167. ISSN 0733-9364
Hegazy, T and Kamarah, E (2008) Efficient repetitive scheduling for high-rise construction. Journal of Construction Engineering and Management, 134(4), pp. 253-264. ISSN 0733-9364
Hegazy, T and Kassab, M (2003) Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management, 129(6), pp. 698-705. ISSN 0733-9364
Hegazy, T and Menesi, W (2008) Delay analysis under multiple baseline updates. Journal of Construction Engineering and Management, 134(8), pp. 575-582. ISSN 0733-9364
Hegazy, T and Menesi, W (2010) Critical path segments scheduling technique. Journal of Construction Engineering and Management, 136(10), pp. 1078-1085. ISSN 0733-9364
Hegazy, T and Menesi, W (2012) Heuristic method for satisfying both deadlines and resource constraints. Journal of Construction Engineering and Management, 138(6), pp. 688-696. ISSN 0733-9364
Hegazy, T and Petzold, K (2003) Genetic optimization for dynamic project control. Journal of Construction Engineering and Management, 129(4), pp. 396-404. ISSN 0733-9364
Hegazy, T; Saad, D A and Mostafa, K (2020) Enhanced repetitive-scheduling computation and visualization. Journal of Construction Engineering and Management, 146(10): 04020118, ISSN 0733-9364
Hegazy, T; Shabeeb, A K; Elbeltagi, E and Cheema, T (2000) Algorithm for scheduling with multiskilled constrained resources. Journal of Construction Engineering and Management, 126(6), pp. 414-421. ISSN 0733-9364
Hegazy, T and Wassef, N (2001) Cost optimization in projects with repetitive nonserial activities. Journal of Construction Engineering and Management, 127(3), pp. 183-191. ISSN 0733-9364
Hegazy, T M (1994) Integrated bid preparation with emphases on risk assessment using neural networks. PhD thesis, Concordia University, Canada.
Heineck, L F (1983) On the analyses of activity durations on three house building sites. PhD thesis, University of Leeds, UK.
Hejducki, Z and Mrozowicz, J (2001) Stream methods of construction work organization: An introduction to the problem. Engineering, Construction and Architectural Management, 8(2), pp. 80-89. ISSN 0969-9988
Helaly, H.; El-Rayes, K. and Ignacio, E. J. (2026) Multiobjective optimization for the planning of prefabricated bridge construction projects. Journal of Construction Engineering and Management, 152(8): 04026103, ISSN 0733-9364
Hendrickson, Thomas Peter (2013) Carbon and water resource management for water distribution systems. PhD thesis, University of California, USA.
Heravi, G; Kebria, M F and Rostami, M (2021) Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Engineering, Construction and Architectural Management, 28(1), pp. 174-195. ISSN 0969-9988
Herbsman, Z (1986) SERC: A model for estimating construction inputs. Journal of Construction Engineering and Management, 112(3), pp. 425-439. ISSN 0733-9364
Herbsman, Z and Ellis, R (1990) Research of factors influencing construction productivity. Construction Management and Economics, 8(1), pp. 49-61. ISSN 01446193
Hide, G (2010) Managing a programme under the NEC3 ECC contract. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 163(3), pp. 111-119. ISSN 17514312
Hindmarch, H (2012) Design change management: Developing a software application to support the evaluation of construction design changes. DEng thesis, University of Manchester, UK.
Hinze, J and Raboud, P (1988) Safety on large building construction projects. Journal of Construction Engineering and Management, 114(2), pp. 286-293. ISSN 0733-9364
Hollister, K C (1992) An extended structured query language incorporating object data types for the construction industry. PhD thesis, University of Florida, USA.
Hong, T; Cho, K; Hyun, C and Han, S (2011) Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building. Journal of Construction Engineering and Management, 137(6), pp. 393-402. ISSN 0733-9364
Hong, Y; Xie, H; Agapaki, E and Brilakis, I (2023) Graph-based automated construction scheduling without the use of BIM. Journal of Construction Engineering and Management, 149(2): 05022020, ISSN 0733-9364
Hooper, M (2015) BIM anatomy II: Standardisation needs & support systems. PhD thesis, Lund University, Sweden.
Hooper, M (2015) Automated model progression scheduling using level of development. Construction Innovation, 15(4), pp. 428-448. ISSN 1471-4175
Hosny, O A (1991) An intelligent decision support system for construction planning and scheduling. PhD thesis, University of Missouri - Rolla, USA.
Hosseini, A (2019) Data-driven modeling of in-service performance of flexible pavements, using life-cycle information. PhD thesis, Temple University, USA.
Hou, X; Zeng, Y and Xue, J (2020) Detecting structural components of building engineering based on deep-learning method. Journal of Construction Engineering and Management, 146(2): 04019097, ISSN 0733-9364
Householder, J L and Rutland, H E (1990) Who owns float? Journal of Construction Engineering and Management, 116(1), pp. 130-133. ISSN 0733-9364
Hsu, P Y; Aurisicchio, M; Angeloudis, P and Whyte, J (2020) Understanding and visualizing schedule deviations in construction projects using fault tree analysis. Engineering, Construction and Architectural Management, 27(9), pp. 2501-2522. ISSN 0969-9988
Hu, C and Liu, D (2018) Improved critical path method with trapezoidal fuzzy activity durations. Journal of Construction Engineering and Management, 144(9): 04018090, ISSN 0733-9364
Hu, D and Mohamed, Y (2014) Simulation-model-structuring methodology for industrial construction fabrication shops. Journal of Construction Engineering and Management, 140(5): 04014002, ISSN 0733-9364
Hu, D; Mohamed, Y; Taghaddos, H and Hermann, U (2018) A simulation-based method for effective workface planning of industrial construction projects. Construction Management and Economics, 36(6), pp. 328-347. ISSN 01446193
Huang, C-N (2003) Time study on two-echelon supply chain for steel framing construction: Field investigation and networking model simulation. PhD thesis, University of Wisconsin - Madison, USA.
Huang, R Y and Halpin, D W (2000) Graphically based lp modelling for linear scheduling analysis: The polo system. Engineering, Construction and Architectural Management, 7(1), pp. 41-51. ISSN 0969-9988
Huang, R Y and Sun, K S (2006) Non-unit-based planning and scheduling of repetitive construction projects. Journal of Construction Engineering and Management, 132(6), pp. 585-597. ISSN 0733-9364
Huang, T (2009) Virtual prototyping technologies enhanced construction planning. PhD thesis, Hong Kong Polytechnic University, Hong Kong.
Huang, T; li, H; Guo, H; Chan, N; Kong, S; Chan, G and Skitmore, M (2009) Construction virtual prototyping: A survey of use. Construction Innovation, 9(4), pp. 420-433. ISSN 1471-4175
Huang, Y C (2006) Graphical-based multistage scheduling method for RC buildings. Construction Management and Economics, 24(1), pp. 5-18. ISSN 01446193
Hummer, J E; Arocho, I and Rasdorf, W (2017) Approach to assessing tradeoffs between construction equipment fleet emissions and cost. Journal of Construction Engineering and Management, 143(5): 04016122, ISSN 0733-9364
Hurtado, K (2018) An andragogically-centered schema for a heuristic approach to post-collegiate development in the built environment. PhD thesis, Arizona State University, USA.
Hussain, M B (1993) Constraint-based construction project scheduling. PhD thesis, Carnegie Mellon University, USA.
Hutchings, D M and Christofferson, J P (2004) Management practices of residential construction companies producing 25 or fewer units annually. International Journal of Construction Education and Research, 1(1), pp. 34-44. ISSN 1557-8771
Hyari, K H; El-Rayes, K and El-Mashaleh, M (2009) Automated trade-off between time and cost in planning repetitive construction projects. Construction Management and Economics, 27(8), pp. 749-761. ISSN 1466433X
Hymes, S J (2010) Front end specifications and the propagation of construction claims. DSc thesis, Washington University in St. Louis, USA.
Hymes, S J (2011) Front-end specifications and construction claims. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 164(3), pp. 139-146. ISSN 17514312
Ibbs, W (2005) Impact of change's timing on labor productivity. Journal of Construction Engineering and Management, 131(11), pp. 1219-1223. ISSN 0733-9364
Ibbs, W and Nguyen, L D (2007) Alternative for quantifying field-overhead damages. Journal of Construction Engineering and Management, 133(10), pp. 736-742. ISSN 0733-9364
Ibbs, W and Nguyen, L D (2007) Schedule analysis under the effect of resource allocation. Journal of Construction Engineering and Management, 133(2), pp. 131-138. ISSN 0733-9364
Ibn Majdoub Hassani, Z; El Barkany, A; Jabri, A; El Abbassi, I and Darcherif, A M (2020) Hybrid approach for solving the integrated planning and scheduling production problem. Journal of Engineering, Design and Technology, 18(1), pp. 172-189. ISSN 1726-0531
Igwe, C; Nasiri, F and Hammad, A (2022) An empirical study on non-physical waste factors in the construction industry. Engineering, Construction and Architectural Management, 29(10), pp. 4088-4106. ISSN 0969-9988
Igwe, C; Nasiri, F and Hammad, A (2022) Construction workspace management: Critical review and roadmap. International Journal of Construction Management, 22(10), pp. 1960-1973. ISSN 1562-3599
Ioannou, P G and Yang, I T (2016) Repetitive scheduling method: Requirements, modeling, and implementation. Journal of Construction Engineering and Management, 142(5): 04016002, ISSN 0733-9364
Ipsilandis, P G (2007) Multiobjective linear programming model for scheduling linear repetitive projects. Journal of Construction Engineering and Management, 133(6), pp. 417-424. ISSN 0733-9364
Iranagh, M A and Sonmez, R (2012) A genetic algorithm for resource levelling of construction projects. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Isidore, L J (1999) Integrated range estimating and probabilistic scheduling of construction projects. PhD thesis, Texas A&M University, USA.
Isidore, L J and Back, W E (2001) Probabilistic optimal-cost scheduling. Journal of Construction Engineering and Management, 127(6), pp. 431-437. ISSN 0733-9364
Isidore, L J and Back, W E (2002) Multiple simulation analysis for probabilistic cost and schedule integration. Journal of Construction Engineering and Management, 128(3), pp. 211-219. ISSN 0733-9364
Isidore, L J; Back, W E and Fry, G T (2001) Integrated probabilistic schedules and estimates from project simulated data. Construction Management and Economics, 19(4), pp. 417-426. ISSN 01446193
Iyer, K C and Jha, K N (2006) Critical factors affecting schedule performance: Evidence from Indian construction projects. Journal of Construction Engineering and Management, 132(8), pp. 871-881. ISSN 0733-9364
Jaafari, A (1984) Criticism of CPM for project planning analysis. Journal of Construction Engineering and Management, 110(2), pp. 222-233. ISSN 0733-9364
Jaafari, A; Manivong, K K and Chaaya, M (2001) Vircon: Interactive system for teaching construction management. Journal of Construction Engineering and Management, 127(1), pp. 66-75. ISSN 0733-9364
Jabbari, A (2020) Project planning algorithms: Lowering cost and improving delivery time in capital projects. PhD thesis, University of California, Berkeley, USA.
Jain, R and Prakash, O (2024) Optimizing contractor's accruals under conditions of penalty imposition due to unforeseen delays. International Journal of Construction Management, 24(8), pp. 854-866. ISSN 1562-3599
Jaśkowski, P and Sobotka, A (2006) Scheduling construction projects using evolutionary algorithm. Journal of Construction Engineering and Management, 132(8), pp. 861-870. ISSN 0733-9364
Jiang, G and Shi, J (2005) Exact algorithm for solving project scheduling problems under multiple resource constraints. Journal of Construction Engineering and Management, 131(9), pp. 986-992. ISSN 0733-9364
Jin, R; Yang, T; Piroozfar, P; Kang, B G; Wanatowski, D; Hancock, C M and Tang, L (2018) Project-based pedagogy in interdisciplinary building design adopting BIM. Engineering, Construction and Architectural Management, 25(10), pp. 1376-1397. ISSN 0969-9988
Jin, R; Zuo, J and Hong, J (2019) Scientometric review of articles published in ASCE's journal of construction engineering and management from 2000 to 2018. Journal of Construction Engineering and Management, 145(8): 06019001, ISSN 0733-9364
Joannides, M M; Olbina, S and Issa, R R A (2012) Implementation of building information modeling into accredited programs in architecture and construction education. International Journal of Construction Education and Research, 8(2), pp. 83-100. ISSN 1557-8771
Jongeling, R (2006) A process model for work-flow management in construction. PhD thesis, Luleå University of Technology, Sweden.
Jordan Srour, F; Kiomjian, D and Srour, I M (2018) Automating the use of learning curve models in construction task duration estimates. Journal of Construction Engineering and Management, 144(7): 04018055, ISSN 0733-9364
Jun, D H (2010) Multi-objective optimization for resource driven scheduling in construction projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Jun, D H and El-Rayes, K (2011) Multiobjective optimization of resource leveling and allocation during construction scheduling. Journal of Construction Engineering and Management, 137(12), pp. 1080-1088. ISSN 0733-9364
Jung, M; Park, M; Lee, H S and Kim, H (2016) Weather-delay simulation model based on vertical weather profile for high-rise building construction. Journal of Construction Engineering and Management, 142(6): 04016007, ISSN 0733-9364
Jung, Y and Kang, S (2007) Knowledge-based standard progress measurement for integrated cost and schedule performance control. Journal of Construction Engineering and Management, 133(1), pp. 10-21. ISSN 0733-9364
Jung, Y and Woo, S (2004) Flexible work breakdown structure for integrated cost and schedule control. Journal of Construction Engineering and Management, 130(5), pp. 616-625. ISSN 0733-9364
Kadry, M; Osman, H and Georgy, M (2017) Causes of construction delays in countries with high geopolitical risks. Journal of Construction Engineering and Management, 143(2): 04016095, ISSN 0733-9364
Kaewmoracharoen, M (2009) Feasibility of visualization and simulation applications to improve work zone safety and mobility. PhD thesis, Iowa State University, USA.
Kaka, A P; Lewis, J and Petros, H (2003) The effects of the variability of project planning on cost commitment curves: A case study. Engineering, Construction and Architectural Management, 10(1), pp. 15-26. ISSN 0969-9988
Kalian, A A A (1998) Computer aided manufacturing for prefabricated concrete buildings. PhD thesis, Teesside University, UK.
Kallantzis, A and Lambropoulos, S (2004) Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling. Engineering, Construction and Architectural Management, 11(3), pp. 211-222. ISSN 0969-9988
Kallantzis, A; Soldatos, J and Lambropoulos, S (2007) Linear versus network scheduling: A critical path comparison. Journal of Construction Engineering and Management, 133(7), pp. 483-491. ISSN 0733-9364
Kamat, V R; Martinez, J C; Fischer, M; Golparvar-Fard, M; Pea-Mora, F and Savarese, S (2011) Research in visualization techniques for field construction. Journal of Construction Engineering and Management, 137, pp. 853-862. ISSN 0733-9364
Kanagasabapathi, B and Ananthanarayanan, K (2005) A simulation model for resource constrained scheduling of multiple projects. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Kandil, A and El-Rayes, K (2006) Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects. Journal of Construction Engineering and Management, 132(5), pp. 491-498. ISSN 0733-9364
Kang, H-Y (2001) Web-based four-dimensional visualization for constuction scheduling. PhD thesis, Texas A&M University, USA.
Kang, J H; Anderson, S D and Clayton, M J (2007) Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling. Journal of Construction Engineering and Management, 133(6), pp. 447-461. ISSN 0733-9364
Kanit, R; Gunduz, M and Ozkan, O (2009) Investigating the effectiveness of certain priority rules on resource scheduling of housing estate projects. Journal of Construction Engineering and Management, 135(7), pp. 609-613. ISSN 0733-9364
Kannimuthu, M; Raphael, B; Ekambaram, P and Kuppuswamy, A (2020) Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem. Engineering, Construction and Architectural Management, 27(4), pp. 893-916. ISSN 0969-9988
Kanoglu, A and Arditi, D (2001) A computer-based information system for architectural design offices. Construction Innovation, 1(1), pp. 15-29. ISSN 1471-4175
Karami, H and Olatunji, O A (2019) Key value engineering protocols in marine projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 173(1), pp. 21-31. ISSN 17514304
Karami, H and Olatunji, O A (2020) Critical overrun causations in marine projects. Engineering, Construction and Architectural Management, 27(7), pp. 1579-1594. ISSN 0969-9988
Karhu, V (2001) A generic construction process modelling method. PhD thesis, KTH Royal Institute of Technology, Sweden.
Karim, A and Adeli, H (1999) OO information model for construction project management. Journal of Construction Engineering and Management, 125(5), pp. 361-367. ISSN 0733-9364
Karni, R (1987) A systematic approach to stochastic scheduling. Construction Management and Economics, 5(3), pp. 187-198. ISSN 01446193
Karpen, S (2013) The role of task openness in forming completion time estimates. PhD thesis, Indiana University, USA.
Karshenas, S (1981) Probabilistic evaluation of safety of buildings during construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Karshenas, S and Haber, D (1990) Economic optimization of construction project scheduling. Construction Management and Economics, 8(2), pp. 135-146. ISSN 01446193
Kartam, N A (1997) Integrating safety and health performance into construction CPM. Journal of Construction Engineering and Management, 123(2), pp. 121-126. ISSN 0733-9364
Kartam, N A-F (1989) Investigating the utility of artificial intelligence techniques for automatic generation of construction project plans. PhD thesis, Stanford University, USA.
Karumanasseri, G and Abourizk, S (2002) Decision support system for scheduling steel fabrication projects. Journal of Construction Engineering and Management, 128(5), pp. 392-399. ISSN 0733-9364
Kataoka, M (2008) Automated generation of construction plans from primitive geometries. Journal of Construction Engineering and Management, 134(8), pp. 592-600. ISSN 0733-9364
Katsimpalis, E; Adey, B T and Haas, C T (2026) Automatically transforming virtual realitysimulations into project schedules. Journal of Construction Engineering and Management, 152(6): 04026059, ISSN 0733-9364
Katsuragawa, C M; Lucko, G; Isaac, S and Su, Y (2021) Fuzzy linear and repetitive scheduling for construction projects. Journal of Construction Engineering and Management, 147(3): 04021002, ISSN 0733-9364
Kauffold, P V (1977) Critical resource allocation in stochastic project networks. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Kawal, D E (1970) A systems model of a construction firm. PhD thesis, Iowa State University, USA.
Kedarisetty, S (2025) Pavement management systems in local governments. PhD thesis, University of California, Davis, USA.
Keeter, E H (1985) The development of a task inventory for baccalaureate programs in construction management (education, curriculum). PhD thesis, Texas A&M University, USA.
Khalili, A (2013) An IFC-based framework for optimizing level of prefabrication in industrialized building systems. PhD thesis, National University of Singapore, Singapore.
Khallaf, Z; Alshibani, A; Alsawafy, O; Mohammed, A and Bubshait, A (2024) Dynamic fleet configuration model for optimizing earthmoving operations using mixed integer linear programming. Journal of Construction Engineering and Management, 150(11): 04024152, ISSN 0733-9364
Khamooshi, H and Cioffi, D F (2013) Uncertainty in task duration and cost estimates: Fusion of probabilistic forecasts and deterministic scheduling. Journal of Construction Engineering and Management, 139(5), pp. 488-497. ISSN 0733-9364
Khodakarami, V (2009) Applying Bayesian networks to model uncertainty in project scheduling. PhD thesis, Queen Mary University of London, UK.
Kidd, A; Appelbe, S and Morgan, A (2015) The use and abuse of programmes in construction contracts. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 168(6), pp. 294-301. ISSN 17514304
Kim, B C and Reinschmidt, K F (2009) Probabilistic forecasting of project duration using bayesian inference and the beta distribution. Journal of Construction Engineering and Management, 135(3), pp. 178-186. ISSN 0733-9364
Kim, B C and Reinschmidt, K F (2010) Probabilistic forecasting of project duration using Kalman filter and the earned value method. Journal of Construction Engineering and Management, 136(8), pp. 834-843. ISSN 0733-9364
Kim, H; Orr, K; Shen, Z; Moon, H; Ju, K and Choi, W (2014) Highway alignment construction comparison using object-oriented 3D visualization modeling. Journal of Construction Engineering and Management, 140(10): 05014008, ISSN 0733-9364
Kim, J (2004) Delay forecasting using a vulnerability index. PhD thesis, Purdue University, USA.
Kim, J (2007) An investigation of activity duration input modeling by duration variance ratio for simulation-based construction scheduling. PhD thesis, Rutgers The State University of New Jersey - New Brunswick, USA.
Kim, J L and Ellis, R D (2010) Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm. Journal of Construction Engineering and Management, 136(2), pp. 160-169. ISSN 0733-9364
Kim, J L and Ellis Jr, R D (2008) Permutation-based elitist genetic algorithm for optimization of large-sized resource-constrained project scheduling. Journal of Construction Engineering and Management, 134(11), pp. 904-913. ISSN 0733-9364
Kim, J-L (2006) A multiheuristic approach to resource constrained project scheduling: An adaptive hybrid genetic algorithm. PhD thesis, University of Florida, USA.
Kim, K (2002) Distributed coordination of project schedule changes: An agent-based compensatory negotiation approach. PhD thesis, Stanford University, USA.
Kim, K (2003) A resource-constrained CPM (RCPM) scheduling and control technique with multiple calendars. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Kim, K and De La Garza, J M (2003) Phantom float. Journal of Construction Engineering and Management, 129(5), pp. 507-517. ISSN 0733-9364
Kim, K and De La Garza, J M (2005) Critical path method with multiple calendars. Journal of Construction Engineering and Management, 131(3), pp. 330-342. ISSN 0733-9364
Kim, K and De La Garza, J M (2005) Evaluation of the resource-constrained critical path method algorithms. Journal of Construction Engineering and Management, 131(5), pp. 522-532. ISSN 0733-9364
Kim, T; Lim, H; Cho, H and Kang, K I (2014) Automated lifting system integrated with construction hoists for table formwork in tall buildings. Journal of Construction Engineering and Management, 140(10): 04014049, ISSN 0733-9364
Kiwan, M S A A (1994) Integration of building design and construction information: A neutral object-oriented model. PhD thesis, University of Dundee, UK.
Klanšek, U (2016) Mixed-integer nonlinear programming model for nonlinear discrete optimization of project schedules under restricted costs. Journal of Construction Engineering and Management, 142(3): 04015088, ISSN 0733-9364
Koch, C and Bendixen, M (2005) Multiple perspectives on organizing: Projects between tyranny and perforation. Building Research & Information, 33(6), pp. 536-546. ISSN 0961-3218
Kodikara, G W; Thorpe, A and McCaffer, R (1993) The use of bills of quantities in building contractor organizations. Construction Management and Economics, 11(4), pp. 261-269. ISSN 01446193
Koehn, E (1975) Probabilistic system for project management. PhD thesis, Wayne State University, USA.
Koehn, E and Caplan, S B (1987) Work improvement data for small and medium size contractors. Journal of Construction Engineering and Management, 113(2), pp. 327-339. ISSN 0733-9364
Kong, F and Dou, D (2020) RCPSP with combined precedence relations and resource calendars. Journal of Construction Engineering and Management, 146(12): 04020133, ISSN 0733-9364
Kong, F and Dou, D (2021) Resource-constrained project scheduling problem under multiple time constraints. Journal of Construction Engineering and Management, 147(2): 04020170, ISSN 0733-9364
Kong, F; Guo, J and Lv, X (2021) Project resource input optimization problem with combined time constraints based on node network diagram and constraint programming. Journal of Construction Engineering and Management, 147(12): 2192, ISSN 0733-9364
Koo, B (2004) Formalizing construction sequence constraints for the rapid generation of scheduling alternatives. PhD thesis, Stanford University, USA.
Koo, K-J (2000) Organizational program management for multiple maintenance projects under multi-trade capacity constraints. PhD thesis, University of Wisconsin - Madison, USA.
Koseoglu, O; Sakin, M and Arayici, Y (2018) Exploring the BIM and lean synergies in the Istanbul Grand Airport construction project. Engineering, Construction and Architectural Management, 25(10), pp. 1339-1354. ISSN 0969-9988
Koulinas, G K and Anagnostopoulos, K P (2012) Construction resource allocation and leveling using a threshold accepting-based hyperheuristic algorithm. Journal of Construction Engineering and Management, 138(7), pp. 854-863. ISSN 0733-9364
Koushki, P A and Kartam, N (2004) Impact of construction materials on project time and cost in Kuwait. Engineering, Construction and Architectural Management, 11(2), pp. 126-132. ISSN 0969-9988
Kuo, S-F (1995) Decision support for irrigated project planning using a genetic algorithm. PhD thesis, Utah State University, USA.
Kuttantharappel Soman, R (2020) Automated look-ahead schedule generation using linked-data based constraint checking for construction projects. PhD thesis, Imperial College London, UK.
Kähkönen, K E E (1993) Modelling activity dependencies for building construction project scheduling. PhD thesis, University of Reading, UK.
Laishram, B and Sood, R (2024) Challenges in implementation of 7D-BIM for infrastructure asset management: A systematic review. Construction Economics and Building, 24(3), pp. 95-117. ISSN 2204-9029
Lam, K A and Runeson, G (1999) Modelling financial decisions in construction firms. Construction Management and Economics, 17(5), pp. 589-602. ISSN 01446193
Lam, Y T (1995) A knowledge-based system for planning and scheduling ready-mixed concrete. PhD thesis, Loughborough University, UK.
Le, C; Jeong, H D and Damnjanovic, I (2021) Network theory-driven construction logic knowledge network: Process modeling and application in highway projects. Journal of Construction Engineering and Management, 147(10): 04021261, ISSN 0733-9364
Lee, J. S. (2026) Visualising the impact of change orders on productivity in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 179(2), pp. 134-142. ISSN 1751-4304
Lee, D E (2005) Probability of project completion using stochastic project scheduling simulation. Journal of Construction Engineering and Management, 131(3), pp. 310-318. ISSN 0733-9364
Lee, D E and Arditi, D (2006) Automated statistical analysis in stochastic project scheduling simulation. Journal of Construction Engineering and Management, 132(3), pp. 268-277. ISSN 0733-9364
Lee, D E; Lim, T K and Arditi, D (2012) Stochastic project financing analysis system for construction. Journal of Construction Engineering and Management, 138(3), pp. 376-389. ISSN 0733-9364
Lee, E B (2000) Constructability and productivity analysis for long life pavement rehabilitation strategies (LLPRS). PhD thesis, University of California, Berkeley, USA.
Lee, E B and Ibbs, C W (2005) Computer simulation model: Construction analysis for pavement rehabilitation strategies. Journal of Construction Engineering and Management, 131(4), pp. 449-458. ISSN 0733-9364
Lee, H S; Shin, J W; Park, M and Ryu, H G (2009) Probabilistic duration estimation model for high-rise structural work. Journal of Construction Engineering and Management, 135(12), pp. 1289-1298. ISSN 0733-9364
Lee, J (2008) Dynamic project management methodology: Managing schedule compression. PhD thesis, University of Florida, USA.
Lee, J and Hyun, H (2019) Multiple modular building construction project scheduling using genetic algorithms. Journal of Construction Engineering and Management, 145(1): 04018116, ISSN 0733-9364
Lee, J; Park, M; Lee, H S and Hyun, H (2019) Classification of modular building construction projects based on schedule-driven approach. Journal of Construction Engineering and Management, 145(5): 04019031, ISSN 0733-9364
Lee, S; Peña-Mora, F and Park, M (2005) Quality and change management model for large scale concurrent design and construction projects. Journal of Construction Engineering and Management, 131(8), pp. 890-902. ISSN 0733-9364
Lee, S; Peña-Mora, F and Park, M (2006) Reliability and stability buffering approach: Focusing on the issues of errors and changes in concurrent design and construction projects. Journal of Construction Engineering and Management, 132(5), pp. 452-464. ISSN 0733-9364
Lee, Y-I (1994) Short-term resource-constrained scheduling for construction projects. PhD thesis, University of Texas at Austin, USA.
Leu, S S and Hung, T H (2002) A genetic algorithm-based optimal resource-constrained scheduling simulation model. Construction Management and Economics, 20(2), pp. 131-141. ISSN 01446193
Leu, S S and Hwang, S T (2001) Optimal repetitive scheduling model with shareable resource constraint. Journal of Construction Engineering and Management, 127(4), pp. 270-280. ISSN 0733-9364
Leu, S S and Yang, C H (1999) GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125(6), pp. 420-427. ISSN 0733-9364
Leu, S S and Yang, C H (1999) A genetic-algorithm-based resource-constrained construction scheduling system. Construction Management and Economics, 17(6), pp. 767-776. ISSN 01446193
Li, Y; Gao, R; Wu, H; Wen, J; Li, T and Dong, X (2026) Multiobjective construction schedule optimization with labor resource allocation: Coupling parameter-adaptive genetic algorithm and network flow. Journal of Construction Engineering and Management, 152(5): 04026053, ISSN 0733-9364
Li, H; Wang, M and Dong, X (2019) Resource leveling in projects with stochastic minimum time lags. Journal of Construction Engineering and Management, 145(4): 04019015, ISSN 0733-9364
Li, H; Xu, Z and Demeulemeester, E (2015) Scheduling policies for the stochastic resource leveling problem. Journal of Construction Engineering and Management, 141(2): 04014072, ISSN 0733-9364
Li, J; Huang, W; Song, D; Zhou, L and Yang, B (2025) A constrained planning method: Considering storage space limitations and soft logic for cruise cabin assembly scheduling. Journal of Construction Engineering and Management, 151(8): 04025102, ISSN 0733-9364
Li, Q; Jiang, M; Tao, S; Hao, J and Chong, H Y (2023) The integrated problem of construction project scheduling and multiskilled staff assignment with learning effect. Journal of Construction Engineering and Management, 149(8): 04023064, ISSN 0733-9364
Li, Q; Sun, Q; Tao, S and Gao, X (2020) Multi-skill project scheduling with skill evolution and cooperation effectiveness. Engineering, Construction and Architectural Management, 27(8), pp. 2023-2045. ISSN 0969-9988
Li, R and Roberti, R (2017) Optimal scheduling of railway track possessions in large-scale projects with multiple construction works. Journal of Construction Engineering and Management, 143(6): 04017007, ISSN 0733-9364
Li, W (2008) An agent-based negotiation model for the sourcing of construction suppliers. PhD thesis, University of Hong Kong, Hong Kong.
Li, Y (2023) Integrated multi-stage decision-support for enhanced infrastructure restoration under uncertainty. PhD thesis, George Mason University, USA.
Li, Y; Zhang, L; Liu, X and Li, X (2025) A project scheduling optimization model for reducing construction dust emissions based on variability in meteorological conditions. Journal of Construction Engineering and Management, 151(11): 04025171, ISSN 0733-9364
Lin, K L and Haas, C T (1996) Multiple heavy lifts optimization. Journal of Construction Engineering and Management, 122(4), pp. 354-362. ISSN 0733-9364
Lindhard, S and Wandahl, S (2014) Exploration of the reasons for delays in construction. International Journal of Construction Management, 14(1), pp. 36-44. ISSN 1562-3599
Lindhard, S M; Neve, H; Terje Kalsaas, B; Møller, D E and Wandahl, S (2022) Ranking and comparing key factors causing time-overruns in on-site construction. International Journal of Construction Management, 22(14), pp. 2724-2730. ISSN 1562-3599
Lindén, S and Josephson, P E (2013) In-housing or out-sourcing on-site materials handling in housing? Journal of Engineering, Design and Technology, 11(1), pp. 90-106. ISSN 1726-0531
Lingard, H; Brown, K; Bradley, L; Bailey, C and Townsend, K (2007) Improving employees' work-life balance in the construction industry: Project alliance case study. Journal of Construction Engineering and Management, 133(10), pp. 807-815. ISSN 0733-9364
Liu, J.; Chen, J.; Li, Y. and Zhao, K. (2026) Optimizing constrained construction crew-task assignment with grey wolf optimizer. Journal of Construction Engineering and Management, 152(8): 04026118, ISSN 0733-9364
Liu, J and Lu, M (2018) Constraint programming approach to optimizing project schedules under material logistics and crew availability constraints. Journal of Construction Engineering and Management, 144(7): 04018049, ISSN 0733-9364
Liu, J and Lu, M (2020) Synchronized optimization of various management-function schedules in a multiproject environment: Case study of planning steel girder fabrication projects in bridge construction. Journal of Construction Engineering and Management, 146(5): 05020002, ISSN 0733-9364
Liu, J and Rahbar, F (2004) Project time-cost trade-off optimization by maximal flow theory. Journal of Construction Engineering and Management, 130(4), pp. 607-609. ISSN 0733-9364
Liu, J; Chen, J; Tian, J and Li, Y (2025) An efficient random key-based genetic algorithm for solving multimode resource-constrained project scheduling problem. Journal of Construction Engineering and Management, 151(12): 04025193, ISSN 0733-9364
Liu, Jing (2018) Dual-level resource-constrained multi-project scheduling framework for prefabrication in construction. PhD thesis, University of Alberta, Canada.
Liu, S S and Wang, C J (2010) Profit optimization for multiproject scheduling problems considering cash flow. Journal of Construction Engineering and Management, 136(12), pp. 1268-1278. ISSN 0733-9364
Liu, W (2008) Systems theory based method for construction project planning. PhD thesis, University of Florida, USA.
Liu, W; Zhang, J; Qu, C and Zhang, H (2024) Performance of priority rules for finance-based and resource-constrained project scheduling heuristics. Journal of Construction Engineering and Management, 150(6): 04024047, ISSN 0733-9364
Liu, Y and Mohamed, Y (2012) Modelling industrial construction operations using a multi-agent resource allocation framework. Engineering, Construction and Architectural Management, 19(4), pp. 406-427. ISSN 0969-9988
Lopez, R; Chong, H Y; Wang, X and Graham, J (2016) Technical review: Analysis and appraisal of four-dimensional building information modeling usability in construction and engineering projects. Journal of Construction Engineering and Management, 142(5): 06015005, ISSN 0733-9364
Lorterapong, P and Moselhi, O (1996) Project-network analysis using fuzzy sets theory. Journal of Construction Engineering and Management, 122(4), pp. 308-317. ISSN 0733-9364
Lorterapong, P and Ussavadilokrit, M (2013) Construction scheduling using the constraint satisfaction problem method. Journal of Construction Engineering and Management, 139(4), pp. 414-422. ISSN 0733-9364
Love, P E D (2002) Influence of project type and procurement method on rework costs in building construction projects. Journal of Construction Engineering and Management, 128(1), pp. 18-29. ISSN 0733-9364
Lu, M and Lam, H C (2008) Critical path scheduling under resource calendar constraints. Journal of Construction Engineering and Management, 134(1), pp. 25-31. ISSN 0733-9364
Lu, M and Lam, H C (2009) Transform schemes applied on non-finish-to-start logical relationships in project network diagrams. Journal of Construction Engineering and Management, 135(9), pp. 863-873. ISSN 0733-9364
Lu, M and Li, H (2003) Resource-activity critical-path method for construction planning. Journal of Construction Engineering and Management, 129(4), pp. 412-420. ISSN 0733-9364
Lu, Z (2018) Feasibility assessment framework for financing public-private partnership infrastructure projects through asset-backed security. PhD thesis, Columbia University, USA.
Lucko, G (2008) Productivity scheduling method compared to linear and repetitive project scheduling methods. Journal of Construction Engineering and Management, 134(9), pp. 711-720. ISSN 0733-9364
Lucko, G (2009) Productivity scheduling method: Linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(4), pp. 246-253. ISSN 0733-9364
Lucko, G (2011) Integrating efficient resource optimization and linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 137(1), pp. 45-55. ISSN 0733-9364
Lucko, G (2011) Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing. Journal of Construction Engineering and Management, 137(7), pp. 523-535. ISSN 0733-9364
Lucko, G; Alves, T D C L and Angelim, V L (2014) Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling. Construction Management and Economics, 32(6), pp. 575-594. ISSN 01446193
Lucko, G and Gattei, G (2016) Line-of-balance against linear scheduling: Critical comparison. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 169(1), pp. 26-44. ISSN 17514304
Lucko, G and Pea Orozco, A A (2009) Float types in linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(5), pp. 368-377. ISSN 0733-9364
Lutz, J D and Hijazi, A (1993) Planning repetitive construction: Current practice. Construction Management and Economics, 11(2), pp. 99-110. ISSN 01446193
Ma, G; Gu, L and Li, N (2015) Scenario-based proactive robust optimization for critical-chain project scheduling. Journal of Construction Engineering and Management, 141(10): 04015030, ISSN 0733-9364
Ma, G; Wang, A; Li, N; Gu, L and Ai, Q (2014) Improved critical chain project management framework for scheduling construction projects. Journal of Construction Engineering and Management, 140(12): 04014055, ISSN 0733-9364
Maghiar, M (2011) Crew coordination modeling in wood-framing construction. PhD thesis, Arizona State University, USA.
Mahamid, I (2017) Analysis of schedule deviations in road construction projects and the effects of project physical characteristics. Journal of Financial Management of Property and Construction, 22(2), pp. 192-210. ISSN 1366-4387
Mahdi Hosseinian, S; Arjomand, A; Li, C Q and Zhang, G (2022) Developing a model for assessing project completion time reliability during construction using time-dependent reliability theory. Journal of Construction Engineering and Management, 148(4): 04022006, ISSN 0733-9364
Maheswari, J U; Mujumdar, P; Padala, S P S and Gwaskoti, A (2022) BDM–MDM integrated solution concept for scheduling information-driven projects. Engineering, Construction and Architectural Management, 29(2), pp. 1016-1037. ISSN 0969-9988
Mahfouz, T S (2009) Construction legal support for differing site conditions (DSC) through statistical modeling and machine learning (ML). PhD thesis, Iowa State University, USA.
Mahmood, A and Abrishami, S (2020) BIM for lean building surveying services. Construction Innovation, 20(3), pp. 447-470. ISSN 1471-4175
Mahmoodi, A. and Easa, S. M. (2026) A multi-objective matheuristic framework for sustainable truck-UAV last-mile delivery in smart urban built environments. Smart and Sustainable Built Environment, pp. 1-48. ISSN 2046-6099
Malcomb, A P (2022) New universal law: Application of Tracy-Widom theory for construction network schedule resilience. PhD thesis, Catholic University of America, USA.
Maravas, A and Pantouvakis, J P (2011) Fuzzy repetitive scheduling method for projects with repeating activities. Journal of Construction Engineering and Management, 137(7), pp. 561-564. ISSN 0733-9364
Marchant, T (2013) Keep going: Career perspectives on ageing and masculinity of self-employed tradesmen in Australia. Construction Management and Economics, 31(8), pp. 845-860. ISSN 1466433X
Mariaca Clavel, Israel Simon (2025) Dynamic construction scheduling: Utilizing AI data automation in a BIM-integrated serious game framework. PhD thesis, University College London, UK.
Markiz, N and Jrade, A (2022) Integrating an expert system with brims, cost estimation, and linear scheduling at conceptual design stage of bridge projects. International Journal of Construction Management, 22(5), pp. 913-928. ISSN 1562-3599
Marshall, J J (2008) City Inn v. Shepherd: A matter of judgement. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 161(2), pp. 71-75. ISSN 17514312
Martins, S S; Evangelista, A C J; Hammad, A W A; Tam, V W Y and Haddad, A (2022) Evaluation of 4D BIM tools applicability in construction planning efficiency. International Journal of Construction Management, 22(15), pp. 2987-3000. ISSN 1562-3599
Marzouk, M; Abdallah, M and El-Said, M (2010) Modeling microtunneling projects using computer simulation. Journal of Construction Engineering and Management, 136(6), pp. 670-682. ISSN 0733-9364
Masera, M (1999) An innovative planning technique in quality management. In: Hughes, W (ed.) Proceedings of 15th Annual ARCOM Conference, 15-17 September 1999, Liverpool, UK.
Mat Zin, R (2006) A case study of management control. A construction project: Issues of transaction costs and trust. PhD thesis, University of Manchester, UK.
Mattila, K G (1997) Resources leveling of linear schedules: A mathematical approach using integer linear programming. PhD thesis, Purdue University, USA.
Mattila, K G and Bowman, M R (2004) Accuracy of highway contractor's schedules. Journal of Construction Engineering and Management, 130(5), pp. 647-655. ISSN 0733-9364
Mattila, K G and Park, A (2003) Comparison of linear scheduling model and repetitive scheduling method. Journal of Construction Engineering and Management, 129(1), pp. 56-64. ISSN 0733-9364
Mawad, S and Bakry, I (2023) Enhanced method to plan the operations of vertical supply systems of high-rise projects. International Journal of Construction Management, 23(4), pp. 629-638. ISSN 1562-3599
McCahill, D F (1990) A practical model for simulation of earthwork construction, with applications for scheduling. PhD thesis, University of Maryland, College Park, USA.
McCann, M (1986) An application of convex programming to construction scheduling. PhD thesis, Iowa State University, USA.
McGartland, M R and Hendrickson, C T (1985) Expert systems for construction project monitoring. Journal of Construction Engineering and Management, 111(3), pp. 293-307. ISSN 0733-9364
McLeod, J S (2000) Planning for startup: An evaluation of factors affecting the startup of process industry facilities. PhD thesis, University of Texas at Austin, USA.
Mehany, M S H M (2014) Delay-caused claims in infrastructure projects under design-bid-build delivery systems. PhD thesis, Colorado State University, USA.
Mehmood, U.; Ujang, U. and Azri, S. (2026) Spatiotemporal 3D GIS-integrated rule-based scheduling for high-rise maintenance optimisation: A Malaysian case study. Built Environment Project and Asset Management, 16(2), pp. 321-337. ISSN 2044-124X
Mejlænder-Larsen, Ø (2019) A three-step process for reporting progress in detail engineering using BIM, based on experiences from oil and gas projects. Engineering, Construction and Architectural Management, 26(4), pp. 648-667. ISSN 0969-9988
Memon, F A (2023) Stakeholder engagement in managing scope change during the execution phase of UK construction projects. PhD thesis, University of Bedfordshire, UK.
Mendes, J R; Fernando, L; Heineck, M and Vaca, O L (1998) New applications of line of balance on scheduling of multi-storey buildings. In: Hughes, W (ed.) Proceedings of 14th Annual ARCOM Conference, 9-11 September 1998, Reading, UK.
Menesi, W; Golzarpoor, B and Hegazy, T (2013) Fast and near-optimum schedule optimization for large-scale projects. Journal of Construction Engineering and Management, 139(9), pp. 1117-1124. ISSN 0733-9364
Messi, Leonardo (2022) Development of a BIM-based simulator for workspace management in construction. PhD thesis, Università Politecnica delle Marche, Italy.
Miers, R J (2001) Critical needs in current construction management education practices: The problem solving process as related to the curriculum. PhD thesis, State University of New York College of Environmental Science and Forestry, USA.
Miles, R S and Ballard, G (2002) Problems in the interface between mechanical design and construction: A research proposal. Journal of Construction Research, 3(1), pp. 83-95. ISSN 1609-9451
Miller, S and Dorée, A (2008) Improving logistics in the asphalt paving process: What can we learn from the planner's logic? In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Minchin Jr, R E; Henriquez, N R; King, A M and Lewis, D W (2010) Owners respond: Preferences for task performance, delivery systems, and quality management. Journal of Construction Engineering and Management, 136(3), pp. 283-293. ISSN 0733-9364
Miskawi, Z (1993) A numerical analysis method for computing schedule and resource forecasting for industrial projects. Construction Management and Economics, 11(6), pp. 411-420. ISSN 01446193
Mogge Jr., J W (2004) Breaking through the first cost barriers of sustainable planning, design, and construction. PhD thesis, Georgia Institute of Technology, USA.
Moghani, E (2013) A simulation-based framework for as-built documentation of construction process and product information. PhD thesis, University of Alberta, Canada.
Mohamed, Emad (2021) Decision-support system for construction risk management in onshore wind projects. PhD thesis, University of Alberta, Canada.
Mohamed, S Y (2020) Stochastic performance and maintenance optimization models for pavement infrastructure management. PhD thesis, Purdue University, USA.
Mohamed, Y; Borrego, D; Francisco, L; Al-Hussein, M; Abourizk, S and Hermann, U (2007) Simulation-based scheduling of module assembly yards: Case study. Engineering, Construction and Architectural Management, 14(3), pp. 293-311. ISSN 0969-9988
Mohammadi, A; Amador-Jimenez, L and Nasiri, F (2020) Reliable, effective, and sustainable urban railways: A model for optimal planning and asset management. Journal of Construction Engineering and Management, 146(6): 04020057, ISSN 0733-9364
Mohammadi, A; Igwe, C; Amador-Jimenez, L and Nasiri, F (2020) Applying lean construction principles in road maintenance planning and scheduling. International Journal of Construction Management, 22(12), pp. 2364-2374. ISSN 1562-3599
Mohsen, Osama (2021) A machine learning approach to predict production time in industrialized building construction. PhD thesis, University of Alberta, Canada.
Mokhtar, A H M (1998) An information model for managing design changes in a collaborative multidisciplinary design environment. PhD thesis, Concordia University, Canada.
Molenaar, K R (2005) Programmatic cost risk analysis for highway megaprojects. Journal of Construction Engineering and Management, 131(3), pp. 343-353. ISSN 0733-9364
Momtazi, S (2021) Reducing cost overruns in construction projects using lean methodology. DEng thesis, George Washington University, USA.
Monteiro do Nascimento, F A; Neto, G D M P; Hazin Alencar, L and Valdes-Vasquez, R (2026) Multicriteria subcontractor selection model for construction activities in wind farm projects. International Journal of Construction Management, 26(5), pp. 772-788. ISSN 1562-3599
Moore, N (2013) A model based system for contextual on-site construction planning in augmented reality. PhD thesis, University of Wolverhampton, UK.
Moore, N J (2013) A contextual AR model based system on-site construction planning. PhD thesis, University of Wolverhampton, UK.
Morad, A A (1990) Geometric-based reasoning system for project planning utilizing AI and CAD technologies. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Morgado, J and Neves, J (2014) Work zone planning in pavement rehabilitation: Integrating cost, duration, and user effects. Journal of Construction Engineering and Management, 140(11): 4014050, ISSN 0733-9364
Morkos, R (2014) Operational efficiency frontier: Visualizing, manipulating, and navigating the construction scheduling state space with precedence, discrete, and disjunctive constraints. PhD thesis, Stanford University, USA.
Moselhi, O and Ei-Rayes, K (1993) Scheduling of repetitive projects with cost optimization. Journal of Construction Engineering and Management, 119(4), pp. 681-697. ISSN 0733-9364
Moselhi, O and Hassanein, A (2003) Optimized scheduling of linear projects. Journal of Construction Engineering and Management, 129(6), pp. 664-673. ISSN 0733-9364
Moselhi, O and Lorterapong, P (1993) Near optimal solution for resource-constrained scheduling problems. Construction Management and Economics, 11(4), pp. 293-303. ISSN 01446193
Moselhi, O and Nicholas, M J (1990) Hybrid expert system for construction planning and scheduling. Journal of Construction Engineering and Management, 116(2), pp. 221-238. ISSN 0733-9364
Mostafa, K and Hegazy, T (2025) Smart rehabilitation-planning framework for sustainable infrastructure: Roofing application. Journal of Construction Engineering and Management, 151(2): 04024203, ISSN 0733-9364
Motawa, I A (2001) Simulating the implementation of technological innovations in construction. PhD thesis, Loughborough University, UK.
Mwanaki Alinaitwe, H (2008) Improvement of labour performance and productivity in Uganda's building industry. PhD thesis, Lund University, Sweden.
Naas, J D (1990) Identifying and predicting present and future occupational competencies for commercial construction superintendents in Illinois. PhD thesis, Southern Illinois University at Carbondale, USA.
Nageeb, M (2012) The effectiveness of the hybrid graphical representation method in visually combining and communicating logical and spatial relationships between scheduled activities. PhD thesis, Texas A&M University, USA.
Nasir, D; McCabe, B and Hartono, L (2003) Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model. Journal of Construction Engineering and Management, 129(5), pp. 518-527. ISSN 0733-9364
Nasirian, A; Abbasi, B; Cheng, T C E and Arashpour, M (2022) Multiskilled workforce planning: A case from the construction industry. Journal of Construction Engineering and Management, 148(5): 04022021, ISSN 0733-9364
Nasr, E B (2005) An integrated project planning and control system approach for measuring project performance. PhD thesis, University of Colorado at Boulder, USA.
Nassar, K M; Gunnarsson, H G and Hegab, M Y (2005) Using weibull analysis for evaluation of cost and schedule performance. Journal of Construction Engineering and Management, 131(12), pp. 1257-1262. ISSN 0733-9364
Nassar, K M and Hegab, M Y (2006) Developing a complexity measure for project schedules. Journal of Construction Engineering and Management, 132(6), pp. 554-561. ISSN 0733-9364
Naumets, S; Lu, M and Ali, M (2022) Project schedule development under environment-induced time-window constraints: Case of constructing river-crossing bridge in remote Northern region. Journal of Construction Engineering and Management, 148(12): 04022129, ISSN 0733-9364
Navon, R and Haskaya, I (2006) Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics, 24(12), pp. 1225-1229. ISSN 1466433X
Nawaz Khan, A; Khan, N A and Soomro, M A (2020) Influence of ethical leadership in managing human resources in construction companies. Journal of Construction Engineering and Management, 146(11): 04020125, ISSN 0733-9364
Ndekugri, I; Braimah, N and Gameson, R (2008) Delay analysis within construction contracting organizations. Journal of Construction Engineering and Management, 134(9), pp. 692-700. ISSN 0733-9364
Nee, T S; Xing, A C and Yong, L Y (2024) Assessing the post-disaster effects of COVID-19 pandemic towards Malaysian construction industry. Journal of Construction in Developing Countries, 29(2), pp. 59-75. ISSN 1823-6499
Neely, L E (2017) Project scheduling disputes: Expert characterization and estimate aggregation. PhD thesis, University of Maryland, College Park, USA.
Neil, J M (1978) Construction cost estimating concepts and their application. PhD thesis, Texas A&M University, USA.
Nepal, M P; Park, M and Son, B (2006) Effects of schedule pressure on construction performance. Journal of Construction Engineering and Management, 132(2), pp. 182-188. ISSN 0733-9364
Ng, Y. Y.; Ma, Q. and Yam, M. C. H. (2026) Optimizing subcontractor selection: A dual-model AHP framework for aligning client and contractor priorities in construction. Journal of Engineering, Design and Technology, 24(4), pp. 869-893. ISSN 1726-0531
Nguyen, M. V. and Do, X. S. (2026) Investigating key sources of work stress at Vietnamese architectural design firms. Journal of Engineering, Design and Technology, 24(6), pp. 1412-1434. ISSN 1726-0531
Nguyen, D T; Doan, D T V; Tran, N N C and Tran, D H (2023) A novel multiple objective whale optimization for time-cost-quality tradeoff in non-unit repetitive projects. International Journal of Construction Management, 23(5), pp. 843-854. ISSN 1562-3599
Nguyen, Dinh Manh (2017) Maintenance practices: Improving sustainability performance of existing office buildings: An Australian case study. PhD thesis, University of Technology Sydney, Australia.
Nguyen, L D; Phan, D H and Tang, L C M (2013) Simulating construction duration for multistory buildings with controlling activities. Journal of Construction Engineering and Management, 139(8), pp. 951-959. ISSN 0733-9364
Nguyen, L d (2007) The dynamics of float, logic, resource allocation, and delay timing in forensic schedule analysis and construction delay claims. PhD thesis, University of California, Berkeley, USA.
Nikolić, D (2011) Evaluating a simulation game in construction engineering education: The virtual construction simulator 3. PhD thesis, Pennsylvania State University, USA.
Niskanen, T and Lauttalammi, J (1989) Accident prevention in materials handling at building construction sites. Construction Management and Economics, 7(3), pp. 263-279. ISSN 01446193
Noganta, A (2019) Key challenges faced by main contractors in coordinating the works of their subcontractors: A case study of kusile power station project. PhD thesis, University of the Witwatersrand, Johannesburg, South Africa.
Noorian Talouki, R; Hosseini Shirvani, M and Motameni, H (2022) A hybrid meta-heuristic scheduler algorithm for optimization of workflow scheduling in cloud heterogeneous computing environment. Journal of Engineering, Design and Technology, 20(6), pp. 1581-1605. ISSN 1726-0531
Nwadigo, O (2019) Real-time and dynamic planning and scheduling under disruption using multi-hybrid simulation and optimisation. PhD thesis, Auckland University of Technology, New Zealand.
Nwadigo, O B K; Naismith, N; GhaffarianHoseini, A; GhaffarianHoseini, A and Tookey, J (2022) Construction project planning and scheduling as a dynamic system: A content analysis of the current status, technologies and forward action. Smart and Sustainable Built Environment, 11(4), pp. 972-995. ISSN 2046-6099
O'Brien, P J (2007) Timely completion of school construction projects in Ohio as a function of compliance with contractual schedule development timelines. PhD thesis, Walden University, USA.
Olbina, S (2008) Improving the delivery system for teaching the project planning and feasibility/site development course to building construction undergraduate students and real estate graduate students. International Journal of Construction Education and Research, 4(1), pp. 46-64. ISSN 1557-8771
Oliveros, A V O and Fayek, A R (2005) Fuzzy logic approach for activity delay analysis and schedule updating. Journal of Construction Engineering and Management, 131(1), pp. 42-51. ISSN 0733-9364
Olivieri, H; Seppänen, O; Alves, T D C L; Scala, N M; Schiavone, V; Liu, M and Granja, A D (2019) Survey comparing critical path method, last planner system, and location-based techniques. Journal of Construction Engineering and Management, 145(12): 04019077, ISSN 0733-9364
Olivieri, H; Seppänen, O and Denis Granja, A (2018) Improving workflow and resource usage in construction schedules through location-based management system (LBMS). Construction Management and Economics, 36(2), pp. 109-124. ISSN 01446193
Oloke, D; Manase, D and Olomolaiye, P (2005) Construction health and safety (H&S) performance: A conceptual framework for enhancing information and communication technology (ICT) impacts. In: Khosrowshahi, F (ed.) Proceedings of 21st Annual ARCOM Conference, 7-9 September 2005, London, UK.
Oloufa, A A; Eltahan, A A and Papacostas, C S (1994) Integrated GIS for construction site investigation. Journal of Construction Engineering and Management, 120(1), pp. 211-222. ISSN 0733-9364
Omar, N (2022) Enhancing agile application in construction projects using BIM. PhD thesis, Heriot-Watt University, UK.
Oo, B L; Lim, T H B and Zhang, Y (2021) Women workforce in construction during the COVID-19 pandemic: Challenges and strategies. Construction Economics and Building, 21(4), pp. 38-59. ISSN 2204-9029
Orabi, W (2010) Optimizing highway reconstruction and rehabilitation projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Orczyk, J J (1989) Parametric construction scheduling. PhD thesis, Purdue University, USA.
Osman, H M and El-Diraby, T E (2011) Knowledge-enabled decision support system for routing urban utilities. Journal of Construction Engineering and Management, 137(3), pp. 198-213. ISSN 0733-9364
Oswald, D; Sherratt, F and Smith, S (2019) Managing production pressures through dangerous informality: A case study. Engineering, Construction and Architectural Management, 26(11), pp. 2581-2596. ISSN 0969-9988
Ottesen, J (2019) CPM schedule density: A new predictor for productivity loss. PhD thesis, University of Washington, USA.
Ouga, A D; Alinaitwe, H M and Mwesige, G (2020) Modelling block laying productivity on building sites in Kampala. Journal of Construction in Developing Countries, 25(1), pp. 109-128. ISSN 1823-6499
Ovararin, N (2001) Quantifying productivity loss due to field disruptions in masonry construction. PhD thesis, University of Texas at Austin, USA.
Oyewobi, L; Okanlawon, T T; Ibrahim, K and Jimoh, R A (2025) Influence of blockchain adoption barriers and drivers on potential application areas in the construction lifecycle: Partial least squares structural equation modelling (PLS-SEM) approach. Engineering, Construction and Architectural Management, 32(3), pp. 1798-1815. ISSN 0969-9988
O’Brien, J J; Kreitzberg, F C and Mikes, W F (1985) Network scheduling variations for repetitive work. Journal of Construction Engineering and Management, 111(2), pp. 105-116. ISSN 0733-9364
Padala, S P S and Goyal, A (2025) Early stage cost prediction model for Indian building construction projects using artificial neural networks. Journal of Financial Management of Property and Construction, 30(3), pp. 377-397. ISSN 1366-4387
Paek, J H and Ock, J H (1996) Innovative building construction technique: Modified up/down method. Journal of Construction Engineering and Management, 122(2), pp. 141-146. ISSN 0733-9364
Pahwa, J S (2009) MDSSF: a federated architecture for product procurement. PhD thesis, Cardiff University, UK.
Pan, N-F S (2001) Fuzzy reasoning expert scheduling system (FRESS) for highway construction subject to rain impact: A case study in Taiwan. PhD thesis, Ohio State University, USA.
Pandey, P (2019) Lean scheduling in construction projects: realistic milestone planning. PhD thesis, Indian Institute of Technology Delhi, India.
Panwar, A (2019) Development of a many-objective model based on NSGA-III for construction projects. PhD thesis, Indian Institute of Technology Delhi, India.
Panwar, A and Jha, K N (2019) A many-objective optimization model for construction scheduling. Construction Management and Economics, 37(12), pp. 727-739. ISSN 01446193
Panwar, A and Jha, K N (2021) Integrating quality and safety in construction scheduling time-cost trade-off model. Journal of Construction Engineering and Management, 147(2): 04020160, ISSN 0733-9364
Panwar, A; Tripathi, K K and Jha, K N (2019) A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects. Engineering, Construction and Architectural Management, 26(9), pp. 1924-1945. ISSN 0969-9988
Pareek, P; Han, S and Misra, S (2016) Application of Bayesian updating for real-time schedule estimation in a concreting operation. International Journal of Construction Management, 16(1), pp. 54-66. ISSN 1562-3599
Park, M (2001) Dynamic planning and control methodology for large-scale concurrent construction projects. PhD thesis, Massachusetts Institute of Technology, USA.
Parsi, M; Baradaran, V and Hosseinian, A H (2025) Integrating the stochastic multiproject scheduling and material ordering problems for offshore projects: Multiagent optimization methodology. Engineering, Construction and Architectural Management, 32(4), pp. 2614-2645. ISSN 0969-9988
Pasiphol, S (1994) New concepts for total float distribution in CPM project scheduling. PhD thesis, University of Texas at Austin, USA.
Patsiatzis, Dimitrios I (2003) Optimal process plant layout using mathematical programming. PhD thesis, University College London, UK.
Paulson, B C; Beisman, G H; Bell, L C; Bjornsson, H C; Bowerman, M D; Carr, R I; Coppi, D F; Crandall, K C; DeLong, C E; Halpin, D W; Hogg, P; Levin, P; Lluch, J F; Logcher, R D; Melin, J W; Moore, W C; Mueller, F W; Nowak, J A; O'Connor, M J; Pinnell, S S; Sears, G A; Stark, R M; Stevens, J D; Tarkoy, P J and Youngs, J R (1985) Application of small computers in construction. Journal of Construction Engineering and Management, 111(3), pp. 173-189. ISSN 0733-9364
Pawan, P and Lorterapong, P (2016) A fuzzy-based integrated framework for assessing time contingency in construction projects. Journal of Construction Engineering and Management, 142(3): 04015083, ISSN 0733-9364
Paz, J C; Rozenboim, D; Cuadros, Á; Cano, S and Escobar, J W (2018) A simulation-based scheduling methodology for construction projects considering the potential impacts of delay risks. Construction Economics and Building, 18(2), pp. 41-69. ISSN 2204-9029
Perera, A A D A J and Imriyas, K (2004) An integrated construction project cost information system using MS accesstm and MS projecttm. Construction Management and Economics, 22(2), pp. 203-211. ISSN 01446193
Perez, A M and Ghosh, S (2018) Barriers faced by new-adopter of last planner system®: A case study. Engineering, Construction and Architectural Management, 25(9), pp. 1110-1126. ISSN 0969-9988
Perry, M J (1997) Distributed cognition and computer supported collaborative design: The organisation of work in construction engineering. PhD thesis, Brunel University, UK.
Petroutsatou, K (2022) A proposal of project management practices in public institutions through a comparative analyses of critical path method and critical chain. International Journal of Construction Management, 22(2), pp. 242-251. ISSN 1562-3599
Pheng, L S and Tan, S K L (1997) The measurement of just in time wastage for a public housing project in Singapore. Building Research & Information, 25(2), pp. 67-81. ISSN 0961-3218
Phillips, H C (2009) A proposed method to determine confidence in a construction schedule. PhD thesis, University of New Mexico, USA.
Pieterse, B; Agyekum, K; Manu, P; Mohandes, S R; Cheung, C and Yunusa-Kaltungo, A (2024) Examining critical project management skills for successful delivery of major maintenance projects: Insights from the United Kingdom energy sector. Engineering, Construction and Architectural Management, 31(4), pp. 1556-1584. ISSN 0969-9988
Pinto Langoni, C R (1987) A decomposition approach for the project scheduling problem (network analysis). PhD thesis, Texas A&M University, USA.
Plotnick, F L (2008) Rdm: Relationship diagramming method. PhD thesis, Drexel University, USA.
Polat, G; Arditi, D and Mungen, U (2007) Simulation-based decision support system for economical supply chain management of rebar. Journal of Construction Engineering and Management, 133(1), pp. 29-39. ISSN 0733-9364
Popescu-Kohler, A I (1998) Improvements to construction delay analysis techniques. PhD thesis, University of Texas at Austin, USA.
Poshdar, M; González, V A; Raftery, G M; Orozco, F; Romeo, J S and Forcael, E (2016) A probabilistic-based method to determine optimum size of project buffer in construction schedules. Journal of Construction Engineering and Management, 142(10): 04016046, ISSN 0733-9364
Pour Aghajan, Marjan (2025) Supporting early decision-making between precast and in-situ concrete in construction industry. PhD thesis, Queensland University of Technology, Australia.
Pouyandeh, F; Golabchi, M and Taghizadeh, K (2022) Providing a model to choose the most appropriate agile method in construction projects. Proceedings of Institution of Civil Engineers: Management, Procurement and Law, 176(1), pp. 14-27. ISSN 17514304
Prateapusanond, Apirath (2003) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract. PhD thesis, Virginia Tech, USA.
Pultar, M (1990) Progress-based construction scheduling. Journal of Construction Engineering and Management, 116(4), pp. 670-688. ISSN 0733-9364
Purushothaman, M B and Kumar, S (2022) Environment, resources, and surroundings based dynamic project schedule model for the road construction industry in New Zealand. Smart and Sustainable Built Environment, 11(2), pp. 294-312. ISSN 2046-6099
Que, B C (2002) Incorporating practicability into genetic algorithm-based time-cost optimization. Journal of Construction Engineering and Management, 128(2), pp. 139-143. ISSN 0733-9364
Qui, N T (2013) Automated schedule generation and analysis from a construction requirement perspective. PhD thesis, National University of Singapore, Singapore.
Rachid, Z; Toufik, B and Mohammed, B (2019) Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), pp. 371-381. ISSN 1562-3599
Rafiei, M H and Adeli, H (2018) Novel machine-learning model for estimating construction costs considering economic variables and indexes. Journal of Construction Engineering and Management, 144(12): 04018106, ISSN 0733-9364
Rahbar, F (1997) Computer-aided parametric planning (CAPP). PhD thesis, Iowa State University, USA.
Raisbeck, P (2013) Time keeps on slippin', slippin', slippin' into the future: BIM, imaging and time on construction sights. In: Smith, S D and Ahiaga-Dagbui, D D (eds.) Proceedings of 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK.
Rajput, B; Kore, S and Agarwal, A (2024) Competencies of civil engineering graduates: Indian construction professionals' perspective. International Journal of Construction Management, 24(11), pp. 1240-1248. ISSN 1562-3599
Ramani, P V; Selvaraj, P; T., S and Gupta, A (2022) Application of linear scheduling in water canal construction with a comparison of critical path method. Journal of Construction in Developing Countries, 27(1), pp. 189-212. ISSN 1823-6499
Rasdorf, W J and Herbert, M J (1990) Bar coding in construction engineering. Journal of Construction Engineering and Management, 116(2), pp. 261-280. ISSN 0733-9364
Rayburn, L M (1989) Productivity database and job cost control using microcomputers. Journal of Construction Engineering and Management, 115(4), pp. 585-601. ISSN 0733-9364
Reda, R M (1990) RPM: Repetitive project modeling. Journal of Construction Engineering and Management, 116(2), pp. 316-330. ISSN 0733-9364
Redden, L and Bugg, R A (2022) Efficacy and benefits of a required service-learning course in construction management education. International Journal of Construction Education and Research, 18(4), pp. 315-332. ISSN 1557-8771
Reis, J S and Lucko, G (2016) Productivity scheduling method with maximum constraints. International Journal of Construction Management, 16(1), pp. 77-93. ISSN 1562-3599
Ren, Z (2002) A multi-agent systems approach to construction claims negotiation. PhD thesis, Loughborough University, UK.
Ren, Z; Chrysostomou, V and Price, T (2012) The measurement of carbon performance of construction activities: A case study of a hotel construction project in South Wales. Smart and Sustainable Built Environment, 1(2), pp. 153-171. ISSN 2046-6099
Reynolds, M F (1990) Facilities planning and construction internship. DEng thesis, Texas A&M University, USA.
Rezakhani, P (2017) Hybrid fuzzy-bayesian dynamic decision support tool for resource-based scheduling of construction projects. PhD thesis, University of Missouri - Kansas City, USA.
Rezakhani, P (2022) Hybrid fuzzy-Bayesian decision support tool for dynamic project scheduling and control under uncertainty. International Journal of Construction Management, 22(15), pp. 2864-2876. ISSN 1562-3599
Richards, J L (1973) An integrated approach to construction management. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Rizaee, S and Lei, Z (2024) Duration estimation of a heavy industrial scaffolding project: A case study. Journal of Construction Engineering and Management, 150(4): 05024002, ISSN 0733-9364
Robles, J (2023) Fast-track projects with cost and schedule overruns: A supply chain management perspective. DBA thesis, Capella University, USA.
Robson, A (2017) 'Cost as information' for construction supply chain improvements. PhD thesis, Birmingham City University, UK.
Rohani, M; Shafabakhsh, G; Haddad, A and Asnaashari, E (2018) Strategy management of construction workspaces by conflict resolution algorithm and visualization model. Engineering, Construction and Architectural Management, 25(8), pp. 1053-1074. ISSN 0969-9988
Roofigari-Esfahan, N; Paez, A and N.razavi, S (2015) Location-aware scheduling and control of linear projects: Introducing space-time float prisms. Journal of Construction Engineering and Management, 141(1): 06014008, ISSN 0733-9364
Rotimi, J O B and Ramanayaka, C D D (2015) Analysis of the influence of a strategy-led planning approach on successful construction project implementation. Construction Economics and Building, 15(2), pp. 13-30. ISSN 2204-9029
Rueda-Benavides, J; Gransberg, D; Khalafalla, M and Mayorga, C (2024) Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting. Construction Management and Economics, 42(1), pp. 1-15. ISSN 01446193
Russell, A D and Wong, W C M (1993) New generation of planning structures. Journal of Construction Engineering and Management, 119(2), pp. 196-214. ISSN 0733-9364
Rustom, R N and Yahia, A (2007) Estimating productivity using simulation: A case study of Gaza beach embankment protection project. Construction Innovation, 7(2), pp. 167-186. ISSN 1471-4175
Sacks, R; Esquenazi, A and Goldin, M (2007) LEAPCON: Simulation of lean construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(7), pp. 529-539. ISSN 0733-9364
Sacks, R and Goldin, M (2007) Lean management model for construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(5), pp. 374-384. ISSN 0733-9364
Sadeghi, S.; Niu, C.; Marjani, T. and Lotfi, R. (2026) Machine learning-enabled construction project management: Systematic review, comparative performance synthesis and implementation framework. Built Environment Project and Asset Management, 16(3), pp. 461-483. ISSN 2044-124X
Sadeghi, N; Fayek, A R and Seresht, N G (2016) A fuzzy discrete event simulation framework for construction applications: Improving the simulation time advancement. Journal of Construction Engineering and Management, 142(12): 04016071, ISSN 0733-9364
Sadeghi, Neda (2024) Quantifying the impact of time-space conflict on construction project schedules: A task-centric approach. PhD thesis, Texas A&M University, USA.
Said, H M M (2010) Optimizing site layout and material logistics planning during the construction of critical infrastructure projects. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Said, H M M and Lucko, G (2016) Float types in construction spatial scheduling. Journal of Construction Engineering and Management, 142(12): 04016077, ISSN 0733-9364
Sakka, Z I and El-Sayegh, S M (2007) Float consumption impact on cost and schedule in the construction industry. Journal of Construction Engineering and Management, 133(2), pp. 124-130. ISSN 0733-9364
Salam, Md Abdus (2007) Time and cost overruns on high-rise building construction in Bangladesh. PhD thesis, Abertay University, UK.
Salama, T and Moselhi, O (2019) Multi-objective optimization for repetitive scheduling under uncertainty. Engineering, Construction and Architectural Management, 26(7), pp. 1294-1320. ISSN 0969-9988
Salem, O and Mohanty, S (2008) Project management practices and information technology research. Journal of Construction Engineering and Management, 134(7), pp. 501-508. ISSN 0733-9364
Salhab, D; Lindhard, S M and Hamzeh, F (2024) Simulation-based approximation of the gain from applying overlapping activities. Journal of Construction Engineering and Management, 150(4): 04024019, ISSN 0733-9364
Salhab, D; Lindhard, S M and Hamzeh, F (2024) Schedule compression and emerging waste in construction: An assessment of overlapping activities. Engineering, Construction and Architectural Management, 31(12), pp. 4920-4941. ISSN 0969-9988
Salhab, D; Møller, D E; Lindhard, S M; Hamzeh, F; Randrup, M and Pilgaard, A (2022) Accounting for variability: Identifying critical activities as a supplement to the critical path. Journal of Construction Engineering and Management, 148(5): 04022019, ISSN 0733-9364
Salman, A; Moselhi, O and Zayed, T (2013) Scheduling model for rehabilitation of distribution networks using MINLP. Journal of Construction Engineering and Management, 139(5), pp. 498-509. ISSN 0733-9364
Salter, M (1989) Planning systems for small firms. PhD thesis, Sheffield Hallam University, UK.
Sam, M; Franz, B W and Alwisy, A (2026) Comparing vulnerability to adverse events in construction processes performed by human-robot collaboration and traditional crews: A case study in drywall finishing. Journal of Construction Engineering and Management, 152(6): 05026005, ISSN 0733-9364
Samuels, A F and Bruder, M J (1996) Construction representative: Scheduling and cost management. Journal of Construction Engineering and Management, 122(3), pp. 281-290. ISSN 0733-9364
Sandagomika, H; Shringi, A; Mohandes, S R; Kineber, A F; Bazli, M and Arashpour, M (2024) Mixed reality-based approach for minimizing time uncertainty in prefabrication. Journal of Construction Engineering and Management, 150(11): 04024147, ISSN 0733-9364
Sanni-Anibire, M O; Mohamad Zin, R and Olatunji, S O (2022) Causes of delay in the global construction industry: A meta analytical review. International Journal of Construction Management, 22(8), pp. 1395-1407. ISSN 1562-3599
Sarihi, M; Shahhosseini, V and Banki, M T (2020) Multiskilled project management workforce assignment across multiple projects regarding competency. Journal of Construction Engineering and Management, 146(12): 04020134, ISSN 0733-9364
Sarkar, D; Gohel, J and Dabasia, K (2021) Optimization of ready mixed concrete delivery for commercial batching plants of Ahmedabad, India. International Journal of Construction Management, 21(10), pp. 1024-1043. ISSN 1562-3599
Sarkar, D; Jha, K N and Patel, S (2021) Critical chain project management for a highway construction project with a focus on theory of constraints. International Journal of Construction Management, 21(2), pp. 194-207. ISSN 1562-3599
Sarraj, Z M A (1990) Formal development of line-of-balance technique. Journal of Construction Engineering and Management, 116(4), pp. 689-704. ISSN 0733-9364
Scala, N M; Alves, T d C L; Hawkins, D; Schiavone, V and Liu, M (2025) Application of the maturity model for collaborative scheduling for construction projects. Engineering, Construction and Architectural Management, 32(11), pp. 7399-7425. ISSN 0969-9988
Scala, N M; Liu, M; Alves, T C L; Schiavone, V and Hawkins, D (2023) The gold standard: Developing a maturity model to assess collaborative scheduling. Engineering, Construction and Architectural Management, 30(4), pp. 1636-1656. ISSN 0969-9988
Scales, Jeffrey G (2021) Including generative mechanisms in project scheduling using hybrid simulation. PhD thesis, University of Technology Sydney, Australia.
Schatteman, D; Herroelen, W; Van De Vonder, S and Boone, A (2008) Methodology for integrated risk management and proactive scheduling of construction projects. Journal of Construction Engineering and Management, 134(11), pp. 885-893. ISSN 0733-9364
Schied Jr., E P (2012) Geometric information scheduling to identify and resolve spatial conflicts and increase efficiency of space use on construction projects. PhD thesis, Catholic University of America, USA.
Scholtenhuis, L L O; Hartmann, T and Dorée, A G (2016) Testing the value of 4D visualizations for enhancing mindfulness in utility reconstruction works. Journal of Construction Engineering and Management, 142(7): 4016015, ISSN 0733-9364
Schroeder, H P (1991) Dycam 1.0: Dynamic construction activity model, a decision support tool for construction planning. PhD thesis, University of Colorado at Boulder, USA.
Schultmann, F and Rentz, O (2002) Scheduling of deconstruction projects under resource constraints. Construction Management and Economics, 20(5), pp. 391-401. ISSN 01446193
Schultmann, F and Sunke, N (2007) Energy-oriented deconstruction and recovery planning. Building Research & Information, 35(6), pp. 602-615. ISSN 0961-3218
Selvam, G and Tadepalli, T C M (2022) Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling. International Journal of Construction Management, 22(4), pp. 659-668. ISSN 1562-3599
Senior, B A (1995) Late-time computation for task chains using discrete-event simulation. Journal of Construction Engineering and Management, 121(4), pp. 397-403. ISSN 0733-9364
Senior, B A (1996) Electrical construction foreman task scheduling. Journal of Construction Engineering and Management, 122(4), pp. 363-369. ISSN 0733-9364
Senior, B A and Halpin, D W (1998) Simplified simulation system for construction projects. Journal of Construction Engineering and Management, 124(1), pp. 72-81. ISSN 0733-9364
Senior-Brown, B A (1993) A study of the planning and integrated cyclic analysis of serial system operations. PhD thesis, Purdue University, USA.
Senouci, A and El-Rayes, K (2009) Time-profit trade-off analysis for construction projects. Journal of Construction Engineering and Management, 135(8), pp. 718-725. ISSN 0733-9364
Senouci, A B and Adeli, H (2001) Resource scheduling using neural dynamics model of adeli and park. Journal of Construction Engineering and Management, 127(1), pp. 28-34. ISSN 0733-9364
Senouci, A B and Eldin, N N (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130(6), pp. 869-877. ISSN 0733-9364
Seppänen, O (2025) Integrated forecasting approach for takt and location-based scheduling. Journal of Construction Engineering and Management, 151(12): 04025199, ISSN 0733-9364
Shafaat, A (2016) Designing project systems in presence of variations. PhD thesis, Purdue University, USA.
Shafahi, A (2016) Mathematical model and framework for multi-phase project optimization. PhD thesis, University of Maryland, College Park, USA.
Shah, R K (2011) Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects. PhD thesis, Teesside University, UK.
Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(5), pp. 435-448. ISSN 1466433X
Shahbodaghlou, F (1987) A feasibility model for use of weather protection in cold region construction. PhD thesis, Purdue University, USA.
Shahedi, F. and Abrishami, S. (2026) Adaptive construction scheduling with AI in 4D/5D BIM: Integrating weather data and activity-based costing. Smart and Sustainable Built Environment, pp. 1-15. ISSN 2046-6099
Shahsavand, P; Marefat, A and Parchamijalal, M (2018) Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. Engineering, Construction and Architectural Management, 25(4), pp. 497-533. ISSN 0969-9988
Shaked, O and Warszawski, A (1992) Consched: Expert system for scheduling of modular construction projects. Journal of Construction Engineering and Management, 118(3), pp. 488-506. ISSN 0733-9364
Shamp, P (2017) Scheduling strategies for construction project managers toward on time delivery. PhD thesis, Walden University, USA.
Shan, Y (2014) Integrated information modeling of construction project productivity. PhD thesis, University of Colorado at Boulder, USA.
Shanmuganayagam, V (1989) Current float techniques for resources scheduling. Journal of Construction Engineering and Management, 115(3), pp. 401-411. ISSN 0733-9364
Sharma, H; McIntyre, C; Gao, Z and Nguyen, T H (2009) Developing a traffic closure integrated linear schedule for highway rehabilitation projects. Journal of Construction Engineering and Management, 135(3), pp. 146-155. ISSN 0733-9364
Sharma, S; Bansal, V K and Parti, R (2016) Location-based highway construction planning using geographic information systems. International Journal of Construction Management, 16(4), pp. 299-314. ISSN 1562-3599
Sharma, V; Zaki, M; Jha, K N and Krishnan, N M A (2022) Machine learning-aided cost prediction and optimization in construction operations. Engineering, Construction and Architectural Management, 29(3), pp. 1241-1257. ISSN 0969-9988
Shash, A A and Ahcom, J (2006) Organizational aspects of planning and scheduling subsystem. Journal of Construction Research, 7(1), pp. 247-265. ISSN 1609-9451
Sheikhkhoshkar, M; Bril El-Haouzi, H; Aubry, A and Hamzeh, F (2023) Functionality as a key concept for integrated project planning and scheduling methods. Journal of Construction Engineering and Management, 149(7): 04023053, ISSN 0733-9364
Shelake, A G and Gogate, N G (2026) An integrated risk prioritization and determination of activity-wise delay (irpad) framework for enhancing schedule management in tunnel projects. Engineering, Construction and Architectural Management, 33(1), pp. 763-784. ISSN 0969-9988
Shen, Z and Wu, J (2025) Multiobjective ant colony system algorithm for component-level construction schedule optimization. Journal of Construction Engineering and Management, 151(3): 04025002, ISSN 0733-9364
Shepherd, S and Woskie, S R (2010) Case study to identify barriers and incentives to implementing an engineering control for concrete grinding dust. Journal of Construction Engineering and Management, 136(11), pp. 1238-1248. ISSN 0733-9364
Shi, Q; Yu, J; Zhang, L; Su, Y; Wang, J and Kong, Q (2025) An optimization model for the duration of workshop production processes for precast concrete components for highway projects. International Journal of Construction Management, 25(7), pp. 813-825. ISSN 1562-3599
Shih, N J and Huang, S T (2006) 3D scan information management system for construction management. Journal of Construction Engineering and Management, 132(2), pp. 134-142. ISSN 0733-9364
Shikhrobat, M B; Kabiri, S and Flanagan, R (2019) Project planning and scheduling using system dynamics for dealing with complexity on construction projects. In: Gorse, C and Neilson, C J (eds.) Proceedings of 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK.
Shim, E and Kim, B C (2014) Batch-size based repetitive scheduling method (BRSM). International Journal of Construction Education and Research, 10(2), pp. 140-156. ISSN 1557-8771
Shirong, L (1996) New approach for optimization of overall construction schedule. Journal of Construction Engineering and Management, 122(1), pp. 7-13. ISSN 0733-9364
Shohet, I M and Frydman, S (2003) Communication patterns in construction at construction manager level. Journal of Construction Engineering and Management, 129(5), pp. 570-577. ISSN 0733-9364
Shokri, S; Haas, C T; Haas, R C G and Lee, S H (2016) Interface-management process for managing risks in complex capital projects. Journal of Construction Engineering and Management, 142(2): 04015069, ISSN 0733-9364
Shtub, A (1988) The integration of CPM and material management in project management. Construction Management and Economics, 6(4), pp. 261-272. ISSN 01446193
Shu-Shun, L and Shih, K C (2009) A framework of critical resource chain for project schedule analysis. Construction Management and Economics, 27(9), pp. 857-869. ISSN 1466433X
Siddika, A and Lu, M (2023) Project schedule acceleration optimization integrated with energy source-based assessment of occupational health and safety risks. Journal of Construction Engineering and Management, 149(12): 04023120, ISSN 0733-9364
Siddiqui, M K (2008) Coordination of distributed schedules in a heterogeneous environment: identification of conflicts using schedule mappings. PhD thesis, University of Texas at Austin, USA.
Singh, J (2021) BIM-based automatic piping layout design and schedule optimization. PhD thesis, Hong Kong University of Science and Technology, Hong Kong.
Singh, J; Cheng, J C P and Anumba, C J (2021) BIM-based approach for automatic pipe systems installation coordination and schedule optimization. Journal of Construction Engineering and Management, 147(11): 04021143, ISSN 0733-9364
Singh, M M; Sawhney, A and Sharma, V (2017) Utilising building component data from BIM for formwork planning. Construction Economics and Building, 17(4), pp. 20-36. ISSN 2204-9029
Singh, V V and Tommelein, I D (2023) Visual workload leveling and zoning using work density method for construction process planning. Journal of Construction Engineering and Management, 149(10): 04023102, ISSN 0733-9364
Sirajuddin, A M Y (1991) An automated project planner. PhD thesis, University of Nottingham, UK.
Siu, M F (2016) Development of quantitative methods for project scheduling and workface planning under time-dependent resource constraints. PhD thesis, University of Alberta, Canada.
Siu, M F F; Lu, M; AbouRizk, S and Tidder, V (2016) Quantitative assessment of budget sufficiency and resource utilization for resource-constrained project schedules. Journal of Construction Engineering and Management, 142(6): 04016003, ISSN 0733-9364
Siu, M F F; Lu, M and Abourizk, S (2016) Resource supply-demand matching scheduling approach for construction workface planning. Journal of Construction Engineering and Management, 142(1): 04015048, ISSN 0733-9364
Smailes, R L (2000) Building chan chan: The application of construction project management to the analysis of ancient architecture. PhD thesis, University of Florida, USA.
Smith, G R and Hancher, D E (1989) Estimating precipitation impacts for scheduling. Journal of Construction Engineering and Management, 115(4), pp. 552-566. ISSN 0733-9364
Soh, I (2003) The acquisition and analysis of time management perception in the architectural domain. PhD thesis, Texas A&M University, USA.
Soleimanifar, Meimanat (2016) Integrated project management framework for a pipe spool fabrication shop. PhD thesis, University of Alberta, Canada.
Son, J (1997) Multi-heuristic approach to resource leveling in construction: A hybrid model. PhD thesis, Purdue University, USA.
Son, J and Skibniewski, M J (1999) Multiheuristic approach for resource leveling problem in construction engineering: Hybrid approach. Journal of Construction Engineering and Management, 125(1), pp. 23-31. ISSN 0733-9364
Song, L and Abourizk, S M (2008) Measuring and modeling labor productivity using historical data. Journal of Construction Engineering and Management, 134(10), pp. 786-794. ISSN 0733-9364
Song, Y and Chua, D K H (2007) Temporal logic representation schema for intermediate function. Journal of Construction Engineering and Management, 133(4), pp. 277-286. ISSN 0733-9364
Song, Y and Chua, D K H (2011) Requirement and availability time-window analysis of intermediate function. Journal of Construction Engineering and Management, 137(11), pp. 967-975. ISSN 0733-9364
Songer, A D; Diekmann, J E and Karet, D (2001) Animation-based construction schedule review. Construction Innovation, 1(3), pp. 181-190. ISSN 1471-4175
Songer, A D; Diekmann, J E; Rasheed, K A and Hays, B (2001) Construction scheduling using 3-D CAD and walk-thru. Construction Innovation, 1(3), pp. 191-207. ISSN 1471-4175
Sonmez, R; Aminbakhsh, S and Atan, T (2020) Activity uncrashing heuristic with noncritical activity rescheduling method for the discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 146(8): 1870, ISSN 0733-9364
Sonmez, R; Iranagh, M A and Uysal, F (2016) Critical sequence crashing heuristic for resource-constrained discrete time-cost trade-off problem. Journal of Construction Engineering and Management, 142(3): 04015090, ISSN 0733-9364
Soo, Alexander (2015) The effect of construction demand on inexperienced bidders' bidding behaviour. PhD thesis, University of Sydney, Australia.
Sousa, V; Almeida, N M and Dias, L A (2014) Role of statistics and engineering judgment in developing optimized time-cost relationship models. Journal of Construction Engineering and Management, 140(8): 04014034, ISSN 0733-9364
Spencer, G R (1987) Integration of cost estimating with critical path scheduling. PhD thesis, Oklahoma State University, USA.
Srijaroen, C; Hoy, M; Horpibulsuk, S; Rachan, R and Arulrajah, A (2021) Soil-cement screw pile: Alternative pile for low- and medium-rise buildings in soft bangkok clay. Journal of Construction Engineering and Management, 147(2): 1988, ISSN 0733-9364
Srisethanil, C (1996) Pedagogical framework for an engineering intelligent tutoring system. PhD thesis, Georgia Institute of Technology, USA.
Srisuwanrat, C (2009) The sequence step algorithm: A simulation-based scheduling algorithm for repetitive projects with probabilistic activity durations. PhD thesis, University of Michigan, USA.
Sturts Dossick, C and Schunk, T K (2007) Subcontractor schedule control method. Journal of Construction Engineering and Management, 133(3), pp. 262-265. ISSN 0733-9364
Su, X (2013) A spatial temporal information model for construction planning. PhD thesis, Purdue University, USA.
Su, Y (2017) Unified quantitative modeling for integrated multi-objective project management with singularity functions. PhD thesis, Catholic University of America, USA.
Su, Y; Isaac, S and Lucko, G (2018) Integrated temporal-spatial model for construction plans with boolean logic operators. Journal of Construction Engineering and Management, 144(4): 04018009, ISSN 0733-9364
Su, Y and Lucko, G (2015) Optimum present value scheduling based on synthetic cash flow model with singularity functions. Journal of Construction Engineering and Management, 141(11): 04015036, ISSN 0733-9364
Su, Y; Lucko, G and Thompson, R C (2018) Application of voting theory to the float ownership problem. Journal of Construction Engineering and Management, 144(1): 04017094, ISSN 0733-9364
Suckarieh, G (1984) Construction management control with microcomputers. Journal of Construction Engineering and Management, 110(1), pp. 72-78. ISSN 0733-9364
Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology. PhD thesis, Illinois Institute of Technology, USA.
Suhail, S A and Neale, R H (1994) CPM/LOB: New methodology to integrate CPM and line of balance. Journal of Construction Engineering and Management, 120(3), pp. 667-684. ISSN 0733-9364
Sunindijo, R Y and Zou, P X W (2011) Influence of technical skill on safety task implementation and safety climate development in construction. In: Egbu, C and Lou, E C W (eds.) Proceedings of 27th Annual ARCOM Conference, 5-7 September 2011, Bristol, UK.
Sutrisna, M (2004) Developing a knowledge based system for the valuation of variations on civil engineering works. PhD thesis, University of Wolverhampton, UK.
Tafese, E. M. and Mengistu, D. G. (2026) Labor productivity management practice in construction companies. International Journal of Construction Management, 26(8), pp. 1527-1542. ISSN 1562-3599
Taghaddos, H (2010) Developing a generic resource allocation framework for construction simulation. PhD thesis, University of Alberta, Canada.
Tah, J H M (1989) Integrated microcomputer applications in formwork design. PhD thesis, Loughborough University, UK.
Talbot, B (2021) A novel data-driven tool to improve construction schedule accuracy. DProf thesis, Anglia Ruskin University, UK.
Talley, K G and Torres, A S (2018) Measuring the impact of using daily objectives to provide rapid feedback in construction courses. International Journal of Construction Education and Research, 14(2), pp. 95-117. ISSN 1557-8771
Tallgren, M V (2018) Developing a collaborative planning tool for construction-a building information model-enhanced planning and scheduling tool for production. PhD thesis, Chalmers Tekniska Hogskola, Sweden.
Tan, L; Zhang, Y; Chen, Y and Zhu, T (2023) A multiple-objective decision-support model for lighting maintenance routing considering carbon dioxide emissions and balanced workload. Journal of Construction Engineering and Management, 149(8): 04023063, ISSN 0733-9364
Tang, G; Zhao, Z; Cao, L; Qi, Y; Yu, X and Liu, W (2023) A simulation optimization approach to optimize dredger fleet schedule plan for dredging works in existing ports. Journal of Construction Engineering and Management, 149(2): 4022165, ISSN 0733-9364
Tang, S L; Ying, K C; Anson, M and Lu, M (2005) Rmcsim: A simulation model of a ready-mixed concrete plant serving multiple sites using multiple truckmixers. Construction Management and Economics, 23(1), pp. 15-31. ISSN 01446193
Tang, Y; Liu, R and Sun, Q (2014) Two-stage scheduling model for resource leveling of linear projects. Journal of Construction Engineering and Management, 140(7): 04014022, ISSN 0733-9364
Tao, S; Yu, J; Zhu, J; Chen, S and Li, X (2026) Precast component production scheduling considering outsourcing and multiskilled resources. Journal of Construction Engineering and Management, 152(5): 04026040, ISSN 0733-9364
Tao, Y; Hu, H; Xu, F and Zhang, Z (2024) Work-rest schedule optimization of precast production considering workers' overexertion. Journal of Construction Engineering and Management, 150(5): 04024033, ISSN 0733-9364
Tao, Y; Hu, H; Xu, F and Zhang, Z (2025) Ergonomic risk mitigation through workforce planning for construction projects. Journal of Construction Engineering and Management, 151(4): 04025012, ISSN 0733-9364
Tapia, Ricardo M (2017) Linear scheduling and procurement tools to manage geotechnical risk in design-build construction projects. PhD thesis, Iowa State University, USA.
Tarandi, V (1998) Neutral intelligent CAD communication: Information exchange in construction based upon a minimal schema. DTech thesis, KTH Royal Institute of Technology, Sweden.
Tatari, A (2023) Simulating cost risks for prefabricated construction in developing countries using Bayesian networks. Journal of Construction Engineering and Management, 149(6): 04023037, ISSN 0733-9364
Tatum, M C and Terrell, F (2012) Hurricane reconstruction in the United States Gulf Coast. International Journal of Disaster Resilience in the Built Environment, 3(3), pp. 199-219. ISSN 1759-5916
Tavakolan, M (2011) Development of construction projects scheduling with evolutionary algorithms. PhD thesis, Columbia University, USA.
Tavakolan, M; Chokan, F and Dadashi Haji, M (2024) Simultaneous project portfolio selection and scheduling from contractor perspective. International Journal of Construction Management, 24(3), pp. 298-313. ISSN 1562-3599
Tavakolan, M and Nikoukar, S (2022) Developing an optimization financing cost-scheduling trade-off model in construction project. International Journal of Construction Management, 22(2), pp. 262-277. ISSN 1562-3599
Taylor, J M (1981) Development and evaluation of a network scheduling procedure based on utility theory. PhD thesis, Texas A&M University, USA.
Tenah, K A (1979) Construction management information control systems (CMICS). PhD thesis, Texas A&M University, USA.
Tennant, S; McCarney, M and Tong, M K L (2012) Re-engineering the construction supply chain: Transferring on-site activity off-site. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Terzioglu, T and Polat, G (2026) Evaluating interactions between formwork system selection criteria for building construction projects: A rough DEMATEL approach. Journal of Construction Engineering and Management, 152(1): 04025225, ISSN 0733-9364
Thabet, W Y (1992) A space-constrained resource-constrained scheduling system for multi-story buildings. PhD thesis, Virginia Polytechnic Institute and State University, USA.
Thabet, W Y and Beliveau, Y J (1994) HVLS: Horizontal and vertical logic scheduling for multistory projects. Journal of Construction Engineering and Management, 120(4), pp. 875-892. ISSN 0733-9364
Thabet, W Y and Beliveau, Y J (1994) Modeling work space to schedule repetitive floors in multistory buildings. Journal of Construction Engineering and Management, 120(1), pp. 96-116. ISSN 0733-9364
Tharachai, T (2004) Multiple project resource scheduling for construction. PhD thesis, University of Michigan, USA.
Thiengburanathum, P (2003) Design of construction production systems: Representation, taxonomy, and design framework. PhD thesis, University of Colorado at Boulder, USA.
Thomas, H R and Ellis, R D (2007) Contractor prebid planning principles. Journal of Construction Engineering and Management, 133(8), pp. 542-552. ISSN 0733-9364
Thorpe, D and Karan, E (2008) Method for calculating schedule delay considering weather conditions. In: Dainty, A (ed.) Proceedings of 24th Annual ARCOM Conference, 1-3 September 2008, Cardiff, UK.
Tokdemir, O B (2003) ALISS: Advanced linear scheduling system. PhD thesis, Illinois Institute of Technology, USA.
Tokdemir, O B; Erol, H and Dikmen, I (2019) Delay risk assessment of repetitive construction projects using line-of-balance scheduling and Monte Carlo simulation. Journal of Construction Engineering and Management, 145(2): 04018132, ISSN 0733-9364
Tomar, A and Bansal, V K (2022) Generation, visualization, and evaluation schedule of repetitive construction projects using GIS. International Journal of Construction Management, 22(6), pp. 1104-1119. ISSN 1562-3599
Tomczak, M and Jaśkowski, P (2020) New approach to improve general contractor crew's work continuity in repetitive construction projects. Journal of Construction Engineering and Management, 146(5): 1824, ISSN 0733-9364
Tommelein, I D (1998) Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique. Journal of Construction Engineering and Management, 124(4), pp. 279-288. ISSN 0733-9364
Tommelein, I D (2022) Work density method for takt planning of construction processes with nonrepetitive work. Journal of Construction Engineering and Management, 148(12): 04022134, ISSN 0733-9364
Toor, S U R and Ogunlana, S (2008) Problems causing delays in major construction projects in Thailand. Construction Management and Economics, 26(4), pp. 395-408. ISSN 1466433X
Tork, A (2013) A real-time crane service scheduling decision support system (CSS-DSS) for construction tower cranes. PhD thesis, University of Central Florida, USA.
Torres, A (2023) Using large peer-teaching groups to learn construction management software packages. International Journal of Construction Education and Research, 19(4), pp. 426-442. ISSN 1557-8771
Touran, A and Lopez, R (2006) Modeling cost escalation in large infrastructure projects. Journal of Construction Engineering and Management, 132(8), pp. 853-860. ISSN 0733-9364
Toǧan, V; Sulub, A S; Eirgash, M A and Mostofi, F (2026) Project scheduling to minimize the time and cost in large-scale construction projects with repulsion-based improved arithmetic optimization. Journal of Construction Engineering and Management, 152(3): 04025277, ISSN 0733-9364
Tran, D H (2020) Optimizing time-cost in generalized construction projects using multiple-objective social group optimization and multi-criteria decision-making methods. Engineering, Construction and Architectural Management, 27(9), pp. 2287-2313. ISSN 0969-9988
Tran, D H and Long, L D (2018) Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution. Engineering, Construction and Architectural Management, 25(5), pp. 623-638. ISSN 0969-9988
Tsai, D M and Chiu, H N (1996) Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics, 14(4), pp. 325-340. ISSN 01446193
Turkoglu, H; Arditi, D and Polat, G (2023) Mathematical multiobjective optimization model for trade-offs in small-scale construction projects. Journal of Construction Engineering and Management, 149(7): 04023056, ISSN 0733-9364
Turkoglu, H; Arditi, D and Polat, G (2024) Augmented time-cost trade-off optimization using particle swarm optimization. Journal of Construction Engineering and Management, 150(5): 04024031, ISSN 0733-9364
Turkoglu, H; Polat, G and Akin, F D (2023) Crashing construction projects considering schedule flexibility: An illustrative example. International Journal of Construction Management, 23(4), pp. 619-628. ISSN 1562-3599
Turkoglu, H; Arditi, D and Polat, G (2025) Golden eagle optimizer-based multi-objective optimization model for scheduling construction projects. Construction Management and Economics, 43(9), pp. 704-722. ISSN 0144-6193
Türkakın, O H; Manisalı, E and Arditi, D (2020) Delay analysis in construction projects with no updated work schedules. Engineering, Construction and Architectural Management, 27(10), pp. 2893-2909. ISSN 0969-9988
Ungureanu, L C; Hartmann, T and Serbanoiu, I (2019) Quantitative lean assessment of line of balance schedules' quality. Engineering, Construction and Architectural Management, 26(2), pp. 224-244. ISSN 0969-9988
Uysal, F (2014) Hybrid meta-heuristic algorithms for the resource constrained multi-project scheduling problem. PhD thesis, Middle East Technical University, Turkey.
Valikoniene, L (2015) Resource buffers in critical chain project management. PhD thesis, University of Manchester, UK.
Vanegas Pabon, J A (1988) A model for design/construction integration during the initial phases of design for building construction projects. PhD thesis, Stanford University, USA.
Vanhoucke, M (2006) Work continuity constraints in project scheduling. Journal of Construction Engineering and Management, 132(1), pp. 14-25. ISSN 0733-9364
Vanichvatana, S (1993) Predicting consequential effects of construction project changes. PhD thesis, University of California, Berkeley, USA.
Vatterott, A G (2018) A multi-skilled approach to property maintenance considering temporal, spatial and resource constraints. PhD thesis, University of Missouri - Saint Louis, USA.
Vigneshwar, R V K and Shanmugapriya, S (2023) Investigating the factors affecting construction site productivity: a case of India. Engineering, Construction and Architectural Management, 30(2), pp. 963-985. ISSN 0969-9988
Viles, E; Rudeli, N C and Santilli, A (2020) Causes of delay in construction projects: A quantitative analysis. Engineering, Construction and Architectural Management, 27(4), pp. 917-935. ISSN 0969-9988
Villa, J and Ariaratnam, S T (2013) Project management functions for the light industrial sector in Mexico. International Journal of Construction Education and Research, 9(3), pp. 163-182. ISSN 1557-8771
Volker, L; Scharpff, J C D; de Weerdt, M M and Herder, P M (2012) Designing a dynamic network-based approach for asset management activities. In: Smith, S D (ed.) Proceedings of 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK.
Wang, C; Li, B; Li, B and Baldwin, A (2017) Case study of "project controlling" on a large HOPSCA project in China. Engineering, Construction and Architectural Management, 24(6), pp. 862-874. ISSN 0969-9988
Wang, C H and Huang, Y C (1998) Controlling activity interval times in LOB scheduling. Construction Management and Economics, 16(1), pp. 5-16. ISSN 01446193
Wang, H; Yang, Q; Liu, Q; Zhao, C and Zhou, W (2024) Automatic planning for cable crane operations in concrete dam construction. Journal of Construction Engineering and Management, 150(12): 04024177, ISSN 0733-9364
Wang, J (2022) BIM and construction dispute management. PhD thesis, University of Manchester, UK.
Wang, J; Han, C and Li, X (2023) Modified streamlined optimization algorithm for time-cost tradeoff problems of complex large-scale construction projects. Journal of Construction Engineering and Management, 149(5): 04023022, ISSN 0733-9364
Wang, T; Abdallah, M; Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(1), pp. 82-100. ISSN 0969-9988
Wang, T K; Ford, D N; Chong, H Y and Zhang, W (2018) Causes of delays in the construction phase of Chinese building projects. Engineering, Construction and Architectural Management, 25(11), pp. 1534-1551. ISSN 0969-9988
Wang, W C and Demsetz, L A (2000) Application example for evaluating networks considering correlation. Journal of Construction Engineering and Management, 126(6), pp. 467-474. ISSN 0733-9364
Wang, Z (2016) Coordinated supplier selection and project scheduling in resource-constrained construction supply chains. PhD thesis, Rutgers The State University of New Jersey, USA.
Wang, Z; Hu, H and Gong, J (2018) Modeling worker competence to advance precast production scheduling optimization. Journal of Construction Engineering and Management, 144(11): 04018098, ISSN 0733-9364
Wang, Z; Liu, Y; Hu, H and Dai, L (2021) Hybrid rescheduling optimization model under disruptions in precast production considering real-world environment. Journal of Construction Engineering and Management, 147(4): 04021012, ISSN 0733-9364
Wang, Z and Rezazadeh Azar, E (2019) BIM-based draft schedule generation in reinforced concrete-framed buildings. Construction Innovation, 19(2), pp. 280-294. ISSN 1471-4175
Waugh, L M (1990) A construction planner. PhD thesis, Stanford University, USA.
Wetherington, L E (1992) The effect of variations in management techniques on construction productivity. PhD thesis, University of Florida, USA.
White, A (1985) The critical path method and construction contracts: A polemic. Construction Management and Economics, 3(1), pp. 15-24. ISSN 01446193
Whiteman, W E and Irwig, H G (1988) Disturbance scheduling technique for managing renovation work. Journal of Construction Engineering and Management, 114(2), pp. 191-213. ISSN 0733-9364
Williams, L M (2000) Strategic decision support for project portfolio management in the public sector. PhD thesis, University of California, Los Angeles, USA.
Williams, T J (2020) Relationships between cost estimates, scheduling and project success in the construction sector. PhD thesis, Walden University, USA.
Winch, G M and North, S (2006) Critical space analysis. Journal of Construction Engineering and Management, 132(5), pp. 473-481. ISSN 0733-9364
Woldetsadik, E T (2025) A predictive model for estimating formwork and shoring removal time. DEngr thesis, George Washington University, USA.
Woo, S (1999) Monte Carlo simulation of labor performance during overtime and its impact on project duration. PhD thesis, University of Texas at Austin, USA.
Woolery, J C and Crandall, K C (1983) Stochastic network model for planning scheduling. Journal of Construction Engineering and Management, 109(3), pp. 342-354. ISSN 0733-9364
Wu, Z.; Park, A.; Awada, M. and Assaad, R. H. (2026) School building conditions and chronic absenteeism within socioeconomic contexts: A component-level statistical analysis in New York state. Engineering, Construction and Architectural Management, 33(15), pp. 432-457. ISSN 0969-9988
Wu, R W K and Hadipriono, F C (1994) Fuzzy modus ponens deduction technique for construction scheduling. Journal of Construction Engineering and Management, 120(1), pp. 162-179. ISSN 0733-9364
Wuni, I Y and Shen, G Q (2020) Critical success factors for management of the early stages of prefabricated prefinished volumetric construction project life cycle. Engineering, Construction and Architectural Management, 27(9), pp. 2315-2333. ISSN 0969-9988
Xie, H; Hong, Y and Brilakis, I (2022) Analysis of user needs in time-related risk management for holistic project understanding. Journal of Construction Engineering and Management, 148(4): 05022002, ISSN 0733-9364
Xie, L L; Chen, Y; Wu, S; Chang, R D and Han, Y (2024) Knowledge extraction for solving resource-constrained project scheduling problem through decision tree. Engineering, Construction and Architectural Management, 31(7), pp. 2852-2877. ISSN 0969-9988
Xu, X (2024) A multi-agent reinforcement learning task allocation framework for navigation sequences of construction robots. PhD thesis, New York University Tandon School of Engineering, USA.
Xue, J; Shen, G Q; Yang, R J; Zafar, I; Ekanayake, E M A C; Lin, X and Darko, A (2020) Influence of formal and informal stakeholder relationship on megaproject performance: A case of China. Engineering, Construction and Architectural Management, 27(7), pp. 1505-1531. ISSN 0969-9988
Yadav, H; Soni, U and Kumar, G (2023) Analysing challenges to smart waste management for a sustainable circular economy in developing countries: A fuzzy DEMATEL study. Smart and Sustainable Built Environment, 12(2), pp. 361-384. ISSN 2046-6099
Yamin, R A (2001) Cumulative effect of productivity rates in linear schedules. PhD thesis, Purdue University, USA.
Yamín, R A and Harmelink, D J (2001) Comparison of linear scheduling model (LSM) and critical path method (CPM). Journal of Construction Engineering and Management, 127(5), pp. 374-381. ISSN 0733-9364
Yang, I T (2005) Chance-constrained time-cost tradeoff analysis considering funding variability. Journal of Construction Engineering and Management, 131(9), pp. 1002-1012. ISSN 0733-9364
Yang, I T (2007) Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis. Journal of Construction Engineering and Management, 133(7), pp. 498-505. ISSN 0733-9364
Yang, I T and Ioannou, P G (2004) Scheduling system with focus on practical concerns in repetitive projects. Construction Management and Economics, 22(6), pp. 619-630. ISSN 01446193
Yang, J B and Chen, Y F (2025) S-curve adjustment approaches for a force majeure event: COVID-19 as an example. Engineering, Construction and Architectural Management, 32(3), pp. 1621-1642. ISSN 0969-9988
Yang, J B and Tsai, M K (2011) Computerizing ICBF method for schedule delay analysis. Journal of Construction Engineering and Management, 137(8), pp. 583-591. ISSN 0733-9364
Yang, J B and Yin, P C (2009) Isolated collapsed but-for delay analysis methodology. Journal of Construction Engineering and Management, 135(7), pp. 570-578. ISSN 0733-9364
Yang, L R (2007) Exploring the links between technology usage and project outcomes. Construction Management and Economics, 25(10), pp. 1041-1051. ISSN 1466433X
Yang, Y; Pan, M and Pan, W (2022) Integrated offsite logistics scheduling approach for high-rise modular building projects. Journal of Construction Engineering and Management, 148(6): 04022032, ISSN 0733-9364
Yang, Y C; Park, C J; Kim, J H and Kim, J J (2007) Management of daily progress in a construction project of multiple apartment buildings. Journal of Construction Engineering and Management, 133(3), pp. 242-253. ISSN 0733-9364
Yao, Z; Zhang, L; Hua, Z and Luo, C (2025) Low-carbon multiobjective optimization for repetitive projects based on crew-based scheduling strategy. Journal of Construction Engineering and Management, 151(1): 04024183, ISSN 0733-9364
Yap, J B H; Lim, B L; Skitmore, M and Gray, J (2022) Criticality of project knowledge and experience in the delivery of construction projects. Journal of Engineering, Design and Technology, 20(3), pp. 800-822. ISSN 1726-0531
Yates, J K (1993) Construction decision support system for delay analysis. Journal of Construction Engineering and Management, 119(2), pp. 226-244. ISSN 0733-9364
Yau, N-J (1992) An object-oriented project model for integrating building design, construction scheduling, and cost estimating for mid-rise construction. PhD thesis, University of Illinois at Urbana-Champaign, USA.
Yazdi, Alireza Jalali (2022) Developing an integrated design support framework to enable mass-customisation in multi-storey timber building projects. PhD thesis, University of Technology Sydney, Australia.
Yeganeh, A A; Azizi, M and Falsafi, R (2019) Root causes of design-construction interface problems in Iranian design-build projects. Journal of Construction Engineering and Management, 145(12): 05019014, ISSN 0733-9364
Yeoh, K-W (2012) Construction requirements driven planning and scheduling. PhD thesis, National University of Singapore, Singapore.
Yi, K J and Langford, D (2006) Scheduling-based risk estimation and safety planning for construction projects. Journal of Construction Engineering and Management, 132(6), pp. 626-635. ISSN 0733-9364
Yi, K J; Lee, H S and Choi, Y K (2002) Network creation and development for repetitive-unit projects. Journal of Construction Engineering and Management, 128(3), pp. 257-264. ISSN 0733-9364
Yilmaz, S; Kumar, D; Hada, S; Demirkesen, S; Zhang, C and Li, H (2025) A PMBOK-based construction cost management framework for BIM integration in construction projects. International Journal of Construction Management, 25(8), pp. 861-875. ISSN 1562-3599
Yin, J; Li, J; Yang, A and Cai, S (2024) Optimization of service scheduling problem for overlapping tower cranes with cooperative coevolutionary genetic algorithm. Engineering, Construction and Architectural Management, 31(3), pp. 1348-1369. ISSN 0969-9988
Yong-Woo, K and Rhee, B-D (2024) Incentive-based coordination for scheduled delivery in prefab construction. Construction Management and Economics, 42(7), pp. 624-639. ISSN 01446193
Yousefi, S; Hegazy, T; Capuru̧o, R A C and Attalla, M (2008) System of multiple anns for online planning of numerous building improvements. Journal of Construction Engineering and Management, 134(5), pp. 342-351. ISSN 0733-9364
Yu, M; Ruan, W; Zhou, Y and Zhao, Y (2025) Flow shop scheduling for prefabricated components production considering parallel machines and buffer constraints. Journal of Construction Engineering and Management, 151(4): 04025010, ISSN 0733-9364
Yu, M; Wang, L; Ruan, W and Zheng, W (2025) Robust optimization for precast component production scheduling considering component transfer. Journal of Construction Engineering and Management, 151(10): 04025156, ISSN 0733-9364
Yun Zhen, G W; Wai Wah, L; Sui Pheng, L and Shi Yee, W (2026) Application of building information modelling (BIM) technology in risk management of high-rise building (hrb) projects in Malaysia. International Journal of Construction Management, 26(2), pp. 332-348. ISSN 1562-3599
Yunus, N B (1988) Toward the development of a knowledge-based construction schedule planning system. PhD thesis, University of Missouri - Rolla, USA.
Zaalouk, A; Altaf, M S and Han, S (2025) Operations-oriented supply chain master planning in panelized construction using hybrid multiagent simulation. Journal of Construction Engineering and Management, 151(10): 04025206, ISSN 0733-9364
Zaeri, F (2017) Exploring the potential for the application of simulation methods in construction project delivery in New Zealand. PhD thesis, Auckland University of Technology, New Zealand.
Zahraie, B and Tavakolan, M (2009) Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. Journal of Construction Engineering and Management, 135(11), pp. 1162-1171. ISSN 0733-9364
Zarei, F; Arashpour, M; Mirnezami, S A; Shahabi-Shahamiri, R and Ghasemi, M (2024) Multi-skill resource-constrained project scheduling problem considering overlapping: Fuzzy multi-objective programming approach to a case study. International Journal of Construction Management, 24(8), pp. 820-833. ISSN 1562-3599
Zarghami, S A (2024) No scheduling problem but rather a rescheduling problem: Measuring robustness of schedule network in construction projects. Journal of Construction Engineering and Management, 150(2): 04023157, ISSN 0733-9364
Zayed, T and Mohamed, E (2014) A case productivity model for automatic climbing system. Engineering, Construction and Architectural Management, 21(1), pp. 33-50. ISSN 0969-9988
Zayed, T; Sharifi, M R; Baciu, S and Amer, M (2008) Slip-form application to concrete structures. Journal of Construction Engineering and Management, 134(3), pp. 157-168. ISSN 0733-9364
Zayed, T M (2001) Assessment of productivity for concrete bored pile construction. PhD thesis, Purdue University, USA.
Zayed, T M and Halpin, D W (2004) Simulation as a tool for pile productivity assessment. Journal of Construction Engineering and Management, 130(3), pp. 394-404. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Productivity and cost regression models for pile construction. Journal of Construction Engineering and Management, 131(7), pp. 779-789. ISSN 0733-9364
Zayed, T M and Halpin, D W (2005) Deterministic models for assessing productivity and cost of bored piles. Construction Management and Economics, 23(5), pp. 531-543. ISSN 01446193
Zech, W C (2004) Enhancing work zone safety. PhD thesis, State University of New York at Buffalo, USA.
Zeng, N; Liu, Y and König, M (2023) 4D BIM-enabled look-ahead scheduling for early warning of off-site supply chain disruptions. Journal of Construction Engineering and Management, 149(1): 04022154, ISSN 0733-9364
Zeng, S; Chung, F and Ashuri, B (2024) Forecasting right-of-way (ROW) acquisition timeline of transportation projects. Built Environment Project and Asset Management, 14(2), pp. 129-146. ISSN 2044-124X
Zeng, Z (2007) Coordinated rescheduling of precast production. PhD thesis, National University of Singapore, Singapore.
Zhang, H; Li, H and Tam, C M (2006) Heuristic scheduling of resource-constrained, multiple-mode and repetitive projects. Construction Management and Economics, 24(2), pp. 159-169. ISSN 01446193
Zhang, H; Li, H and Tam, C M (2006) Particle swarm optimization for preemptive scheduling under break and resource-constraints. Journal of Construction Engineering and Management, 132(3), pp. 259-267. ISSN 0733-9364
Zhang, H; Li, L; Demeulemeester, E; Bai, S and Zhang, J (2025) Heuristic methods for dynamic multiproject scheduling problems with stochastic transfer times. Journal of Construction Engineering and Management, 151(2): 04024207, ISSN 0733-9364
Zhang, L; Dai, G; Zou, X and Qi, J (2020) Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty. Engineering, Construction and Architectural Management, 27(10), pp. 3095-3113. ISSN 0969-9988
Zhang, L and Qi, J (2012) Controlling path and controlling segment analysis in repetitive scheduling method. Journal of Construction Engineering and Management, 138(11), pp. 1341-1345. ISSN 0733-9364
Zhang, L; Zou, X and Kan, Z (2014) Improved strategy for resource allocation in repetitive projects considering the learning effect. Journal of Construction Engineering and Management, 140(11): 4014053, ISSN 0733-9364
Zhang, N and Tiong, R (2003) Integrated electronic commerce model for the construction industry. Journal of Construction Engineering and Management, 129(5), pp. 578-585. ISSN 0733-9364
Zhao, J. and Xu, Z. (2026) A generalizable deep reinforcement learning-based algorithm for priority rule scheduling in stochastic resource-constrained project scheduling. Journal of Construction Engineering and Management, 152(9): 04026156, ISSN 0733-9364
Zhao, J (2014) Performance modeling and optimization solutions for networking systems. PhD thesis, University of Hong Kong, Hong Kong.
Zhao, Y; Chen, W; Arashpour, M; Yang, Z; Shao, C and Li, C (2022) Predicting delays in prefabricated projects: Sd-bp neural network to define effects of risk disruption. Engineering, Construction and Architectural Management, 29(4), pp. 1753-1776. ISSN 0969-9988
Zhao, Z Y; You, W Y and Zuo, J (2010) Application of innovative critical chain method for project planning and control under resource constraints and uncertainty. Journal of Construction Engineering and Management, 136(9), pp. 1056-1060. ISSN 0733-9364
Zheng, D X M; Ng, S T and Kumaraswamy, M M (2005) Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization. Journal of Construction Engineering and Management, 131(1), pp. 81-91. ISSN 0733-9364
Zheng, R; Li, Z; Li, L; Dou, Y; Yuan, M and Yin, X (2024) Proposing a lean-optimized scheduling model of mixed-flow prefabricated component production in off-site construction. Journal of Construction Engineering and Management, 150(8): 04024088, ISSN 0733-9364
Zhong, B; Shen, L; Pan, X; Zhong, X and He, W (2024) Dispute classification and analysis: Deep learning-based text mining for construction contract management. Journal of Construction Engineering and Management, 150(1): 04023151, ISSN 0733-9364
Zhong, D H and Zhang, J S (2003) New method for calculating path float in program evaluation and review technique (PERT). Journal of Construction Engineering and Management, 129(5), pp. 501-506. ISSN 0733-9364
Zhong, Q (1998) Building process modelling using product modelling methodology and its application to scheduling. PhD thesis, National University of Singapore, Singapore.
Zhou, C; Li, R; Xiong, X; Li, J and Gao, Y (2023) Optimization of triage time and sample delivery path in health infrastructure to combat COVID-19. Engineering, Construction and Architectural Management, 30(8), pp. 3620-3644. ISSN 0969-9988
Zhou, W (2023) Condition state-based decision making in evolving systems: Applications in asset management and delivery. PhD thesis, George Mason University, USA.
Zhou, Xiaoyan (2023) A reinforcement learning neural network approach to online optimization of construction manufacturing processes. PhD thesis, University of Florida, USA.
Zhu, J; Zhang, C; Yuan, J; Pan, W; Xue, J and Lou, F (2025) An improved model for precast component transportation scheduling under dynamic traffic and weather conditions. Journal of Construction Engineering and Management, 151(11): 04025181, ISSN 0733-9364
Zhu, L and Cheung, S O (2021) Toward an equity-based analysis of construction incentivization. Journal of Construction Engineering and Management, 147(11): 04021148, ISSN 0733-9364
Zhu, X (2023) Machine learning supported multiple criteria decision making for project delivery system selection. PhD thesis, Queen's University Belfast, UK.
Zohrehvandi, S. (2026) A sustainable project scheduling algorithm in construction; an approach to using project buffer management techniques. International Journal of Construction Education and Research, 22(2), pp. 331-359. ISSN 1557-8771
Zohrehvandi, S and Khalilzadeh, M (2019) APRT-FMEA buffer sizing method in scheduling of a wind farm construction project. Engineering, Construction and Architectural Management, 26(6), pp. 1129-1150. ISSN 0969-9988
Zohrehvandi, S; Vanhoucke, M; Soltani, R and Javadi, M (2020) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(2), pp. 502-524. ISSN 0969-9988
Zoleykani, M. J. and Abbasianjahromi, H. (2026) Integrating ar and 4D-BIM for dynamic hazard management in construction projects. International Journal of Construction Management, 26(7), pp. 1239-1263. ISSN 1562-3599
Zou, H and Zhou, G (2024) Multimode variable resource-constrained time/cost trade-off problem in repetitive projects with adjustment strategy. International Journal of Construction Management, 24(12), pp. 1271-1281. ISSN 1562-3599
Zou, X and Rong, Z (2025) Resource-constrained repetitive project scheduling with soft logic. Engineering, Construction and Architectural Management, 32(4), pp. 2397-2429. ISSN 0969-9988
Zou, X; Wu, G and Zhang, Q (2021) Work continuity constraints in repetitive project scheduling considering soft logic. Engineering, Construction and Architectural Management, 28(6), pp. 1713-1738. ISSN 0969-9988
Zou, X; Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(2), pp. 669-701. ISSN 0969-9988
Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites. PhD thesis, University of Michigan, USA.
Zouein, P P and Tommelein, I D (2001) Improvement algorithm for limited space scheduling. Journal of Construction Engineering and Management, 127(2), pp. 116-124. ISSN 0733-9364
Zu, L and Liao, W (2025) Reinforcement learning-based multiobjective and multiconstraint production scheduling for precast concrete. Journal of Construction Engineering and Management, 151(8): 04025089, ISSN 0733-9364
Zuo, F; Zio, E and Yuan, Y (2022) Risk-response strategy optimization considering limited risk-related resource allocation and scheduling. Journal of Construction Engineering and Management, 148(11): 04022123, ISSN 0733-9364
ng, S T; Skitmore, M; Deng, M Z M and Nadeem, A (2004) Improving existing delay analysis techniques for the establishment of delay liabilities. Construction Innovation, 4(1), pp. 3-17. ISSN 1471-4175
zhao, X. and lu, R. (2025) Dynamic scheduling optimization model and algorithm for linear projects considering local rescheduling. Engineering, Construction and Architectural Management, 33(5), pp. 4019-4045. ISSN 0969-9988
Ökmen, Ö and Öztaş, A (2008) Construction project network evaluation with correlated schedule risk analysis model. Journal of Construction Engineering and Management, 134(1), pp. 49-63. ISSN 0733-9364